Pages that link to "PNO-III-97-009, on 970221,contaminated Scrap Metal Occurred. Licensee Also Indicated Addl Scrap Metal Located at Il Railroad Supply Co in Cordova,Il.Nrc Inspectors Monitored Licensee Activities Surrounding Incident"
Jump to navigation
Jump to search
The following pages link to PNO-III-97-009, on 970221,contaminated Scrap Metal Occurred. Licensee Also Indicated Addl Scrap Metal Located at Il Railroad Supply Co in Cordova,Il.Nrc Inspectors Monitored Licensee Activities Surrounding Incident:
Displayed 41 items.
- PNO-III-97-031, on 970401,licensee Identified Fractures on Auxiliary Switch Contact Block Mounted on 4 Kv Breaker Prior to Installation in Unit 2 safety-related Bus.Licensee Presently Testing Similar Breakers (← links)
- PNO-III-80-164, on 800902,licensee Found Leakage from 10-inch Core Spray Piping Inside Drywell.Two Welds in a Loop Have Seepage & One Weld in B Loop Has Visible Crack.Unit Is in Refueling Outage (← links)
- ML20138L852 (redirect page) (← links)
- PNO-III-97-009 (redirect page) (← links)
- PNO-III-97-022, on 970311,Unit 1 Reactor Shut Down to Repair Reactor Protection Sys Scram Relay Malfunction.Conservative Decision Made to Repair Relay While Shutdown Rather than Troubleshoot During Power Operations (← links)
- ML20126C709 (← links)
- PNO-III-80-029, on 800208,industrial Accident Occurred in Area of Torus Involving Loss of Two Fingers by Contractor. No Gross Contamination Was Detected Due to Low Contamination Levels in Torus Area (← links)
- PNO-III-79-057, on 791209,draining Operation from Svc Water Header of Heat Exchanger Resulted in Unplanned Release of Radioactive Liquid from Primary Side When All Valves Feeding Instrument Header Were Opened (← links)
- ML20125C630 (← links)
- ML20151U429 (← links)
- PNO-III-88-066, on 880724,unit Shut Down to Investigate Ground (Short) in Main Generator.Plant Expected to Remain Shut Down for 2 to 6 Wks for Generator Repairs (← links)
- PNO-III-94-079, on 941002,shut Down of Units Occurred When Operators Discovered Temp Differential Between Loop a & Loop B Exceeded 50 Degrees F.Inspectors Monitored Licensees Activities During & After Shutdown (← links)
- PNO-III-83-100, on 831020,ultrasonic Testing Identified One Crack & Ten Crack Indications in Unit 2 Primary Sys Piping, Including Seven Indications in Reactor Water Recirculation Sys.Licensee Intends to Issue News Announcement (← links)
- PNO-III-89-017, on 890302,licensee Personnel Entered Unit 2 Drywell to Investigate Possible Leak.Steam Leak Observed from Vacuum Breaker on Discharge Piping from C Electromagnetic Rv,Which Was Indicative of Valve Leakage (← links)
- PNO-III-89-036, on 890516,unit 1 Was Shutdown to Repair Socket Weld Leak on Feedwater Regulating Valve Bypass Line. Licensee Plans to Repair Other Minor Leaks & Perform Maint Activities During Unplanned Outage.State of Il Notified (← links)
- PNO-III-90-028, on 900410,dye Penetrant Testing on Inside of Reactor Vessel Head Identified 23 Cracks of Various Dimensions.Licensee Begun Repairing Cracks by Grinding Cracked Areas (← links)
- PNO-III-93-051, on 930901,licensee Shut Unit 2 Down to Repair body-to-bonnet Leak in Feedwater Check Valve Which Makes Up Part of Containment Isolation Boundary.Leak Was Reduced to Weep by Tightening Bonnet Studs (← links)
- ML20207G253 (← links)
- PNO-III-97-099, on 971219,unit Shut Down Due to Incomplete App R Safe Shutdown Analysis for Various Fire Scenarios. Licensee Completed Procedure Revs & Exited Administrative Technical Requirement in Early Dec (← links)
- PNO-III-86-017, on 860303,HPCI Sys Declared Inoperable When Water Backed Up Into HPCI Turbine.Caused by HPCI Gland Exhaust Condenser Tube Leak Coupled W/Failure of Sump Pump Motor.Repairs to Condenser Expected to Take 4 Days (← links)
- PNO-III-86-132, on 861110,10 of 24 Reactor & Senior Reactor Operators Failed Written NRC Requalification Exam. Confirmatory Action Ltr Will Be Issued by Region Iii.Util Will Administer Accelerated Program (← links)
- PNO-III-85-030, on 850401,during Visual Exam Prior to Ultrasonic testing,through-the-wall crack-like Indication Noted in Area Between Main Recirculation Pump & Base of Jet Pump Riser (M).Corrective Action Will Be Monitored (← links)
- PNO-III-89-027, on 890417,one of Four Electromagnetic Relief Valves Stuck Open During Testing & Reactor Manually Scrammed.Probably Caused by Eroded Seat on Pilot Valve. Relief & Pilot Valves Replaced (← links)
- ML20244A976 (← links)
- ML20244A975 (← links)
- ML20249B559 (← links)
- ML20249A884 (← links)
- ML20249A866 (← links)
- ML20249A861 (← links)
- ML20236V348 (← links)
- ML20236V276 (← links)
- ML20236V139 (← links)
- ML20236V057 (← links)
- ML20236U707 (← links)
- ML20236M096 (← links)
- PNO-III-87-104, on 870801,reactor Scram Occurred as Result of Turbine & Generator Trips Due to Fault in Main Transformer. Licensee Investigating Cause of Problem.Unit Expected to Be Shut Down for Several Wks for Replacement of Transformer (← links)
- PNO-II-87-135, on 871019,equipment Operator Attempted to Open Electrical Breaker for Circulating Water Pump 2A & Inadvertently Opened Adjacent Breaker for CRD Hydraulic Pump.Operator Actions Created Fire Ball,Damaging Breaker (← links)
- PNO-III-97-071, on 970903,Comm Ed Announced Series of Mgt Changes & Restructuring of Nuclear Div Organization.New Site Vice Presidents at Braidwood & Quad Cities Former Plant Managers.State of Il Will Be Notified of Mgt Changes (← links)
- PNO-III-87-081, on 870610,earthquake Measuring 5.0 on Richter Scale Occurred Near Lawrenceville,Il.Unusual Events Declared by Six Power Stations But No Damage Observed.Ground Motion Felt at Five Other Plants (← links)
- PNO-III-86-142, on 861205,licensees Notified NRC That Electrical Splices Did Not Meet Environ Qualification Requirements & Plants Shut Down.Each Unit Has 150 Splices Which Must Be Repaired.Repairs Expected to Take 5 Days (← links)
- PNO-III-80-164A, on 800919,no Addl Cracking in Core Spray Piping Has Been Identified Other than Pipe Cracks Previously Identified.Licensee Intends to Replace Defective Piping Elbows W/Different Matl (← links)