- PNO-II-85-112, on 851123,Limitorque Valve Motors Inside & Outside Containment Bldg Inspected After Util Determined That Some Motors May Not Be Environmentally Qualified.Unit Will Be Restarted.Insp of Unit 3 Motors Planned (← links)
- PNO-II-86-003, on 860107,unscheduled Shutdown Lasted Longer than 48 H Due to Damaged Steam Supply Stop Check Valve in Each Auxiliary Feedwater Sys Train.Remaining Valves Being Inspected (← links)
- PNO-II-85-097, on 851021,notification Received That Reactor Will Be Shut Down for Approx 8-10 Days to Repair Boot Seal Between Condenser & Low Pressure Turbine.Region II Will Conduct Routine Followup (← links)
- ML20151X532 (← links)
- PNO-II-88-027, on 880415,ENERCON Svc,Inc Completed Independent Mgt Appraisal of Plant Nuclear Operations Per NRC Order EA 87-85.Licensee Issued News W/Appraisal on 880418 & Currently Reviewing Appraisal.State of Fl Informed (← links)
- ML20151U677 (← links)
- PNO-II-88-005, on 880113,manual Reactor Trip Initiated Per off-normal Procedure.Caused by Loss of Power to Movable Gripper Coils.Unit Will Remain Down for Approx 10 Days Due to Pinhole Leak in Canopy Seal for Rod D-8 (← links)
- PNO-II-83-081, on 831012,FPL Took Unit Out Svc Because of Failure of One of Two Rhrps.Determined Rhrp Failure on 831011 Was Due to Short Circuit Caused by Water in Terminal Box Which Houses Pump Motor Leads (← links)
- ML20198Q729 (redirect page) (← links)
- PNO-II-84-039 (redirect page) (← links)
- PNO-II-87-020, on 870319,facility Made Critical,For First Time Since 861209,feed Sys Pipe Rupture.Extensive Replacement of Feedwater Piping in Both Units Completed & Program for Periodic Insp of Sys Instituted (← links)
- PNO-II-93-025, on 930610,controlled Shutdown from 100% Power to Mode 5 to Repair Secondary Steam Leak Began.Licensee Planning to Complete Repairs & Return Unit on Line as Early as 930613 (← links)
- PNO-II-87-017, media Interest Developed Re Air Lock Problem Identified When Routine Surveillance Test Indicated Minor Pressure Leakage on Inside Door of Personnel Lock.Unit to Be Retested & Returned to Svc (← links)
- IR 05000250/1987016 (← links)
- ML20249B228 (← links)
- ML20249B080 (← links)
- ML20249A904 (← links)
- ML20249A862 (← links)
- ML20249A539 (← links)
- ML20248L013 (← links)
- ML20236U015 (← links)
- PNO-II-87-075, on 871021 & 25,voiding Noted in Vessel Head Regions.Caused by Mispositioned Manual Valve in Nitrogen Vent Line.Investigation Continuing (← links)
- ML20236F554 (← links)
- ML20236F440 (← links)
- ML20236F338 (← links)
- PNO-II-87-074, on 870929,24 H Control Room Coverage Initiated by NRC in Response to Determination That Licensee Violated 10CFR50.54 by Allowing Nonlicensed Person to Manipulate Reactor Dilution Controls (← links)
- PNO-II-87-062, on 870926,nonlicensed Person Not in Training Status Allowed to Manipulate Reactor Dilution Controls in Control Room.Cause Not Stated.Licensed Personnel Had Prepared Sys Properly for Manipulation of Controls (← links)
- ML20216J702 (← links)
- PNO-II-88-030A, on 880517,during Police Interview,Security Officer at Turkey Point Admitted That Story Told Last Week of Exchanging Shots W/Three Unidentified Persons During Early Morning Hours of 880506 Near Plant False (← links)
- PNO-II-87-024, on 870407,Region II Ofc Received Anonymous Telcon Alleging That 14 Members of Bechtel Corp Work Crew Involved in Onsite Drug Use.On 870408,region Received Addl Telcon Alleging Drug Use by 5 Other Bechtel Employees (← links)
- PNO-II-87-019A, on 870322,NRC Informed That Insp & NDT of Reactor Head Closure Studs Indicated Exterior Corrosion & Evidence of Internal Thread Wasting.Reactor Head Will Be Removed for Insp (← links)
- PNO-II-92-055B, on 920830,offsite Power Was Restored to Four Safety Buses Following Loss of Offsite Power to Both Units on 920824,due to Hurricane Andrew (← links)
- PNO-II-92-055A, on 920824,declaration Was Issued Declaring South Florida Disaster Area as Result of effe25X,per Governor L Chiles Request (← links)
- PNO-II-92-055, on 920824,Turkey Point,Unit 3 & 4 Were Shutdown & in Mode 4 W/Hurricane Procedures in Effect.Units 3 & 4 Diesel Generator Manned.State of Fl,Fema,Doe & EPA Notified (← links)
- PNO-II-92-055C, on 920824,Hurricane Andrew Passed Directly Over Turkey Point Nuclear Plant W/Wind Reported as High as 140 Mph & Gusts Up to 152 Mph as Measure Before Meterological Equipment Disabled (← links)
- PNO-II-93-052, on 930930,plant Commenced Unit Shutdown from 100% Power Due to RCS Leakage Through Pressurizer Manway Flange.Unit Currently in Mode 3 at Normal Operating Temp & Pressure (← links)