Category:INSPECTION REPORT
MONTHYEARIR 05000312/19990031999-08-31031 August 1999 Insp Rept 50-312/99-03 on 990802-06.No Violations Noted. Major Areas Inspected:Decommissioning & Dismantlement Activities,Including Organization,Mgt & Cost Controls IR 05000312/19990021999-03-19019 March 1999 Insp Rept 50-312/99-02 on 990309-11.No Violations Noted. Major Areas Inspected:Licensee Physical Security Program, Including Access Authorization,Alarm Station & Communication & Testing & Maint IR 05000312/19980031998-08-0707 August 1998 Insp Rept 50-312/98-03 on 980706-09.No Violations Noted. Major Areas Inspected:Review of Licensee Programs Related to SFP Safety,Status of Decommissioning,Safety Review & self-assessments & Radiological Safety Programs IR 05000312/19980021998-06-0303 June 1998 Insp Rept 50-312/98-02 on 980519-21.Violations Noted. Major Areas Inspected:Announced Insp of Licensee Physical Security Program ML20202C4981998-02-0505 February 1998 Insp Rept 50-312/98-01 on 980105-08.Violations Noted.Major Areas Inspected:Organization,Mgt & Cost Controls,Maint & Surveillance,Cold Weather Preparation,Decommissioning Performance & Status Review & Health Physics IR 05000312/19970041997-10-21021 October 1997 Insp Rept 50-312/97-04 on 970922-25.Violations Noted. Major Areas Inspected:Organization,Mgt,Cost Control,Safety Reviews,Design Changes,Mods,Decommissioning Performance & Status Review IR 05000312/19970031997-06-17017 June 1997 Insp Rept 50-312/97-03 on 970603-05.No Violations Noted. Major Areas Inspected:Records & Repts,Testing & Maint, Protected Area Barrier & Detection Aids,Assessment Aids, Alarm Station & Communication & Security System IR 05000312/19970021997-04-25025 April 1997 Insp Rept 50-312/97-02 on 970331-0403.No Violations Noted. Major Areas Inspected:Incremental Decommissioning Activities in Turbine Bldg,Radiation Protection,Sfp Activities & Quality Assurance IR 05000312/19970011997-03-21021 March 1997 Insp Repts 50-312/97-01 & 72-0011/97-01 on 970224-27.No Violations Noted.Major Areas Inspected:Licensee Planned Work Associated W/Dismantlement of Turbine Bldg & Radiological Controls Being Implemented During Work Activities IR 05000312/19960031996-09-27027 September 1996 Insp Repts 50-312/96-03 & 72-0011/96-01 on 960909-12.No Violations Noted.Major Areas Inspected:Sfp & Radiological Ts,Radiological Exposure Controls & Implementation of New 10CFR49 Shipping Regulations IR 05000312/19930061993-09-0202 September 1993 Insp Rept 50-312/93-06 on 930819.No Violations or Deviations Noted.Major Areas Inspected:Licensee Employee Concerns Program IR 05000312/19930041993-08-11011 August 1993 Mgt Meeting Rept 50-312/93-04 on 930727.Major Areas Discussed:Status of Activities,Including Maint of Plant Equipment,Fire Protection Equipment & Plant Personnel Morale IR 05000312/19920071992-12-10010 December 1992 Insp Rept 50-312/92-07 on 921110-11.No Deviations or Violations Noted.Major Areas inspected:1992 Annual Emergency Preparedness Exercise & Associated Critiques & Inspector Identified Items IR 05000312/19900141990-11-14014 November 1990 Insp Rept 50-312/90-14 on 901003-04,09-11 & 1102.Violations Noted.Areas inspected:follow-up of Licensee Event Repts, Liquid Effluent,Solid Waste & Allegations IR 05000312/19900111990-07-31031 July 1990 Insp Rept 50-312/90-11 on 900527-0706.No Violations or Deviations Noted.Major Areas Inspected:Operational Safety Verification,Health Physics & Security Observations,Esf Sys Walkdown,Maint,Surveillance & Testing & QA IR 05000312/19890121989-09-21021 September 1989 Insp Rept 50-312/89-12 on 890801-04,21-25 & 30.No Violations Noted.Major Areas Inspected:Occupational Exposure,Including Alara,Radwaste Sys,Liquid & Liquid Wastes & Radwaste Mgt & Transportation IR 05000312/19890161989-09-21021 September 1989 Enforcement Conference Rept 50-312/89-16 on 890915. Violations Noted.Major Areas Discussed:Violations Noted in Insp Rept 50-312/89-16 & Indications That Findings Represent Decrease in Mgt Commitment to Emergency Preparedness IR 05000312/19890141989-09-11011 September 1989 Insp Rept 50-312/89-14 on 890828-0901.Violations Noted Re Failure to Conduct Required Semiannual Health Physics Drill & Initial Training.Major Areas Inspected:Operational Status of Emergency Preparedness Program IR 05000312/19890101989-08-10010 August 1989 Insp Rept 50-312/89-10 on 890603-0721.No Violations Noted. Major Areas Inspected:Areas of Operational Safety Verification,Health Physics & Security Observations,Maint, Surveillance & Testing & QA & Followup Items IR 05000312/19890081989-07-11011 July 1989 Insp Rept 50-312/89-08 on 890422-0602.No Violations or Deviations Noted.Two non-cited Violations Discussed.Major Areas Inspected:Operational Safety Verification,Health Physics & Security Observations & ESF Sys Walkdown IR 05000312/19890111989-07-0606 July 1989 Insp Rept 50-312/89-11 on 890629-30.No Violations Noted. Major Areas Inspected:Licensee Radiochemical Analyses to Verify Accuracy of Measurements of Radionuclides in Release Tank Water & Sediment from Effluent Discharge Point IR 05000312/19890071989-04-28028 April 1989 Insp Rept 50-312/89-07 on 890417-21.No Violations Noted. Major Areas Inspected:Previously Identified Items & Status of Emergency Preparedness Program IR 05000312/19890041989-03-31031 March 1989 Insp Rept 50-312/89-04 on 890114-0303.Violations Noted.Major Areas Inspected:Operational Safety Verification,Health Physics & Security Observations,Esf Sys Walkdown,Maint,Qa Surveillance & Testing & Followup Items ML20244B1161989-03-24024 March 1989 Insp Rept 50-312/89-01 on 890123-0217.Violations Noted.Major Areas Inspected:Maint Program & Implementation of Related Activities IR 05000312/19880411989-02-13013 February 1989 Insp Rept 50-312/88-41 on 881214-890103.No Violations Noted. Major Areas Inspected:Onsite Followup of Event of 881212 & Associated Mgt Meetings on 881219 & 890103.Weaknesses Observed Re Decision to Operate Plant in Degraded State IR 05000312/19880421989-02-13013 February 1989 Insp Rept 50-312/88-42 on 881227-30 & 890125-27.No Violations Noted.Major Areas Inspected:Followup Items,Part 21 Repts,Lers & Licensee Program to Maintain Quality of Diesel Generator Fuel Oil IR 05000312/19880401989-02-0606 February 1989 Insp Rept 50-312/88-40 on 881208-890113.No Violations or Deviations Noted.Major Areas Inspected:Operational Safety Verification,Health Physics & Security Observations,Esf Sys Walkdown,Maint,Qa & Surveillance & Testing IR 05000312/19880351988-11-21021 November 1988 Mgt Meeting Rept 50-312/88-35 on 881114.Major Areas Discussed:Licensee Operational Performance Since Restart in Mar 1988 & Progress Re Restart Commitments in Areas of Engineering,Procurement,Maint & Effluent Sys Areas IR 05000312/19880321988-10-25025 October 1988 Insp Rept 50-312/88-32 on 880919-1007.Violations Noted. Major Areas Inspected:Design Changes & Mods,Qa Audits,Pwr Moderator Dilution Requirements & Followup Items IR 05000312/19880301988-10-13013 October 1988 Insp Rept 50-312/88-30 on 880912-16.No Violations or Deviations Noted.Major Areas Inspected:Licensee Actions on Previous Insp Findings,Radioactive Liquid & Gaseous Waste & Review of Licensee Repts IR 05000312/19880271988-09-30030 September 1988 Insp Rept 50-312/88-27 on 880912-16.No Violations Noted. Major Areas Inspected:Licensee Conformance W/Rev 3 to Reg Guide 1.97.Rept Addresses & Closes Sims Issue Number 67.3.3 IR 05000312/19880231988-09-27027 September 1988 Insp Rept 50-312/88-23 on 880709-0906.Violations Noted. Major Areas Inspected:Operational Safety Verification, Health Physics & Security Observations,Esfs Sys Walkdown, Maint,Surveillance & Testing & Followup Items IR 05000312/19880261988-09-0909 September 1988 Enhanced Operational Insp Rept 50-312/88-26 on 880801-09.No Violations Noted.Major Areas Inspected:Plant Operation & Operational Support Activities ML20154H8171988-09-0101 September 1988 Insp Rept 50-312/88-25 on 880719-21.No Violations Noted. Major Areas Inspected:Exam of Emergency Facilities, Equipment & Emergency Preparedness Training ML20153E5081988-08-16016 August 1988 Insp Rept 50-312/88-24 on 880719-22.Violation Noted. Major Areas Inspected:Licensee Actions on Previous Insp Findings & Lers,External Exposure Control & Internal Exposure Control IR 05000312/19880161988-07-27027 July 1988 Insp Rept 50-312/88-16 on 880601-0708.No Violations or Deviations Noted.Major Areas Inspected:Operational Safety Verification,Health Physics & Security Observations,Esf Sys Walkdown,Maint & Surveillance & Testing IR 05000312/19880211988-07-27027 July 1988 Insp Rept 50-312/88-21 on 880711-15.No Violations or Deviations Noted.Major Areas Inspected:Licensee Action on Fastener Testing,Primary Coolant Sys Pressure Isolation Valves & Natural Circulation Cooldown ML20151W0871988-07-25025 July 1988 Insp Rept 50-312/88-02 on 880104-0309.Weaknesses Noted. Major Areas Inspected:Past & Present Procurement,Matls Control & Warehouse Activities Before Restart IR 05000312/19880191988-07-13013 July 1988 Enhanced Operational Insp Rept 50-312/88-19 on 880613-17. No Violations Noted.Major Areas Inspected:Plant Operation & Operational Support Activities IR 05000312/19880221988-07-13013 July 1988 Enforcement Conference Rept 50-312/88-22 on 880707.Major Areas Discussed:Implementation of Licensee Corrective Action to Improve Radiation Protection Program Following 880204 Incident When Individual Received Excess Radiation Exposure ML20150D9231988-06-24024 June 1988 Insp Rept 50-312/88-17 on 880606-10.Violations Noted.Major Areas Inspected:Licensee Action on Previous Insp Findings, Control of Radioactive Matls & Contamination,Alara, Facilities & Equipment & Review of Licensee Repts IR 05000312/19880151988-06-23023 June 1988 Insp Rept 50-312/88-15 on 880503-31.No Violations or Deviations Noted.Major Areas Inspected:Operational Safety Verification,Esf Sys Walkdown,Maint,Surveillance & Testing, Review of Control Rod Worth & Followup Items IR 05000312/19880201988-06-23023 June 1988 Insp Rept 50-312/88-20 on 880617.Violations Noted.Major Areas Inspected:Status of Unresolved Item 50-312/88-07-01 Re Skin Exposure of Worker Reported by Licensee on 880204 IR 05000312/19880121988-05-23023 May 1988 Insp Rept 50-312/88-12 on 880330-0502.Violations Noted.Major Areas Inspected:Operational Safety Verification,Maint, Surveillance & Followup Items IR 05000312/19880141988-05-19019 May 1988 Insp Rept 50-312/88-14 on 880425-28.No Violations or Deviations Noted.Major Areas Inspected:Licensee Plans for Coping W/Strikes & Nonlicensed Staff Training.Specific Weaknesses in Licensee Program Observed IR 05000312/19880131988-05-10010 May 1988 Insp Rept 50-312/88-13 on 880404-08 & 19.Violations Noted. Major Areas Inspected:Action on Previous Insp Findings,Solid Wastes,Transportation & Facility Tours IR 05000312/19880051988-05-10010 May 1988 Insp Rept 50-312/88-05 on 880204-0329.Violations Noted.Major Areas Inspected:Operational Safety Verification,Maint, Surveillance,Security & Health Physics Routine Modules & Followup Items IR 05000312/19880081988-04-21021 April 1988 Insp Rept 50-312/88-08 on 880307-22.Violations Noted.Major Areas Inspected:Licensee Capabilities for Mgt & Implementation of Effective Liquid & Gaseous Effluents Program After Restart IR 05000312/19880111988-04-20020 April 1988 Insp Rept 50-312/88-11 on 880317.No Violations Noted.Major Areas Inspected:Unusual Event on 880315 IR 05000312/19870401988-04-19019 April 1988 Insp Rept 50-312/87-40 on 871207-18 & 880208-17.Deficiencies Noted.Major Areas Inspected:Review of Licensee Readiness to Operate Facility,Including Functional Areas of Operations, Maint,Surveillance Testing & Design Change Control 1999-08-31
[Table view] Category:NRC-GENERATED
MONTHYEARIR 05000312/19990031999-08-31031 August 1999 Insp Rept 50-312/99-03 on 990802-06.No Violations Noted. Major Areas Inspected:Decommissioning & Dismantlement Activities,Including Organization,Mgt & Cost Controls IR 05000312/19990021999-03-19019 March 1999 Insp Rept 50-312/99-02 on 990309-11.No Violations Noted. Major Areas Inspected:Licensee Physical Security Program, Including Access Authorization,Alarm Station & Communication & Testing & Maint IR 05000312/19980031998-08-0707 August 1998 Insp Rept 50-312/98-03 on 980706-09.No Violations Noted. Major Areas Inspected:Review of Licensee Programs Related to SFP Safety,Status of Decommissioning,Safety Review & self-assessments & Radiological Safety Programs IR 05000312/19980021998-06-0303 June 1998 Insp Rept 50-312/98-02 on 980519-21.Violations Noted. Major Areas Inspected:Announced Insp of Licensee Physical Security Program ML20202C4981998-02-0505 February 1998 Insp Rept 50-312/98-01 on 980105-08.Violations Noted.Major Areas Inspected:Organization,Mgt & Cost Controls,Maint & Surveillance,Cold Weather Preparation,Decommissioning Performance & Status Review & Health Physics IR 05000312/19970041997-10-21021 October 1997 Insp Rept 50-312/97-04 on 970922-25.Violations Noted. Major Areas Inspected:Organization,Mgt,Cost Control,Safety Reviews,Design Changes,Mods,Decommissioning Performance & Status Review IR 05000312/19970031997-06-17017 June 1997 Insp Rept 50-312/97-03 on 970603-05.No Violations Noted. Major Areas Inspected:Records & Repts,Testing & Maint, Protected Area Barrier & Detection Aids,Assessment Aids, Alarm Station & Communication & Security System IR 05000312/19970021997-04-25025 April 1997 Insp Rept 50-312/97-02 on 970331-0403.No Violations Noted. Major Areas Inspected:Incremental Decommissioning Activities in Turbine Bldg,Radiation Protection,Sfp Activities & Quality Assurance IR 05000312/19970011997-03-21021 March 1997 Insp Repts 50-312/97-01 & 72-0011/97-01 on 970224-27.No Violations Noted.Major Areas Inspected:Licensee Planned Work Associated W/Dismantlement of Turbine Bldg & Radiological Controls Being Implemented During Work Activities IR 05000312/19960031996-09-27027 September 1996 Insp Repts 50-312/96-03 & 72-0011/96-01 on 960909-12.No Violations Noted.Major Areas Inspected:Sfp & Radiological Ts,Radiological Exposure Controls & Implementation of New 10CFR49 Shipping Regulations IR 05000312/19930061993-09-0202 September 1993 Insp Rept 50-312/93-06 on 930819.No Violations or Deviations Noted.Major Areas Inspected:Licensee Employee Concerns Program IR 05000312/19930041993-08-11011 August 1993 Mgt Meeting Rept 50-312/93-04 on 930727.Major Areas Discussed:Status of Activities,Including Maint of Plant Equipment,Fire Protection Equipment & Plant Personnel Morale IR 05000312/19920071992-12-10010 December 1992 Insp Rept 50-312/92-07 on 921110-11.No Deviations or Violations Noted.Major Areas inspected:1992 Annual Emergency Preparedness Exercise & Associated Critiques & Inspector Identified Items IR 05000312/19900141990-11-14014 November 1990 Insp Rept 50-312/90-14 on 901003-04,09-11 & 1102.Violations Noted.Areas inspected:follow-up of Licensee Event Repts, Liquid Effluent,Solid Waste & Allegations IR 05000312/19900111990-07-31031 July 1990 Insp Rept 50-312/90-11 on 900527-0706.No Violations or Deviations Noted.Major Areas Inspected:Operational Safety Verification,Health Physics & Security Observations,Esf Sys Walkdown,Maint,Surveillance & Testing & QA IR 05000312/19890121989-09-21021 September 1989 Insp Rept 50-312/89-12 on 890801-04,21-25 & 30.No Violations Noted.Major Areas Inspected:Occupational Exposure,Including Alara,Radwaste Sys,Liquid & Liquid Wastes & Radwaste Mgt & Transportation IR 05000312/19890161989-09-21021 September 1989 Enforcement Conference Rept 50-312/89-16 on 890915. Violations Noted.Major Areas Discussed:Violations Noted in Insp Rept 50-312/89-16 & Indications That Findings Represent Decrease in Mgt Commitment to Emergency Preparedness IR 05000312/19890141989-09-11011 September 1989 Insp Rept 50-312/89-14 on 890828-0901.Violations Noted Re Failure to Conduct Required Semiannual Health Physics Drill & Initial Training.Major Areas Inspected:Operational Status of Emergency Preparedness Program IR 05000312/19890101989-08-10010 August 1989 Insp Rept 50-312/89-10 on 890603-0721.No Violations Noted. Major Areas Inspected:Areas of Operational Safety Verification,Health Physics & Security Observations,Maint, Surveillance & Testing & QA & Followup Items IR 05000312/19890081989-07-11011 July 1989 Insp Rept 50-312/89-08 on 890422-0602.No Violations or Deviations Noted.Two non-cited Violations Discussed.Major Areas Inspected:Operational Safety Verification,Health Physics & Security Observations & ESF Sys Walkdown IR 05000312/19890111989-07-0606 July 1989 Insp Rept 50-312/89-11 on 890629-30.No Violations Noted. Major Areas Inspected:Licensee Radiochemical Analyses to Verify Accuracy of Measurements of Radionuclides in Release Tank Water & Sediment from Effluent Discharge Point IR 05000312/19890071989-04-28028 April 1989 Insp Rept 50-312/89-07 on 890417-21.No Violations Noted. Major Areas Inspected:Previously Identified Items & Status of Emergency Preparedness Program IR 05000312/19890041989-03-31031 March 1989 Insp Rept 50-312/89-04 on 890114-0303.Violations Noted.Major Areas Inspected:Operational Safety Verification,Health Physics & Security Observations,Esf Sys Walkdown,Maint,Qa Surveillance & Testing & Followup Items ML20244B1161989-03-24024 March 1989 Insp Rept 50-312/89-01 on 890123-0217.Violations Noted.Major Areas Inspected:Maint Program & Implementation of Related Activities IR 05000312/19880411989-02-13013 February 1989 Insp Rept 50-312/88-41 on 881214-890103.No Violations Noted. Major Areas Inspected:Onsite Followup of Event of 881212 & Associated Mgt Meetings on 881219 & 890103.Weaknesses Observed Re Decision to Operate Plant in Degraded State IR 05000312/19880421989-02-13013 February 1989 Insp Rept 50-312/88-42 on 881227-30 & 890125-27.No Violations Noted.Major Areas Inspected:Followup Items,Part 21 Repts,Lers & Licensee Program to Maintain Quality of Diesel Generator Fuel Oil IR 05000312/19880401989-02-0606 February 1989 Insp Rept 50-312/88-40 on 881208-890113.No Violations or Deviations Noted.Major Areas Inspected:Operational Safety Verification,Health Physics & Security Observations,Esf Sys Walkdown,Maint,Qa & Surveillance & Testing IR 05000312/19880351988-11-21021 November 1988 Mgt Meeting Rept 50-312/88-35 on 881114.Major Areas Discussed:Licensee Operational Performance Since Restart in Mar 1988 & Progress Re Restart Commitments in Areas of Engineering,Procurement,Maint & Effluent Sys Areas IR 05000312/19880321988-10-25025 October 1988 Insp Rept 50-312/88-32 on 880919-1007.Violations Noted. Major Areas Inspected:Design Changes & Mods,Qa Audits,Pwr Moderator Dilution Requirements & Followup Items IR 05000312/19880301988-10-13013 October 1988 Insp Rept 50-312/88-30 on 880912-16.No Violations or Deviations Noted.Major Areas Inspected:Licensee Actions on Previous Insp Findings,Radioactive Liquid & Gaseous Waste & Review of Licensee Repts IR 05000312/19880271988-09-30030 September 1988 Insp Rept 50-312/88-27 on 880912-16.No Violations Noted. Major Areas Inspected:Licensee Conformance W/Rev 3 to Reg Guide 1.97.Rept Addresses & Closes Sims Issue Number 67.3.3 IR 05000312/19880231988-09-27027 September 1988 Insp Rept 50-312/88-23 on 880709-0906.Violations Noted. Major Areas Inspected:Operational Safety Verification, Health Physics & Security Observations,Esfs Sys Walkdown, Maint,Surveillance & Testing & Followup Items IR 05000312/19880261988-09-0909 September 1988 Enhanced Operational Insp Rept 50-312/88-26 on 880801-09.No Violations Noted.Major Areas Inspected:Plant Operation & Operational Support Activities ML20154H8171988-09-0101 September 1988 Insp Rept 50-312/88-25 on 880719-21.No Violations Noted. Major Areas Inspected:Exam of Emergency Facilities, Equipment & Emergency Preparedness Training ML20153E5081988-08-16016 August 1988 Insp Rept 50-312/88-24 on 880719-22.Violation Noted. Major Areas Inspected:Licensee Actions on Previous Insp Findings & Lers,External Exposure Control & Internal Exposure Control IR 05000312/19880161988-07-27027 July 1988 Insp Rept 50-312/88-16 on 880601-0708.No Violations or Deviations Noted.Major Areas Inspected:Operational Safety Verification,Health Physics & Security Observations,Esf Sys Walkdown,Maint & Surveillance & Testing IR 05000312/19880211988-07-27027 July 1988 Insp Rept 50-312/88-21 on 880711-15.No Violations or Deviations Noted.Major Areas Inspected:Licensee Action on Fastener Testing,Primary Coolant Sys Pressure Isolation Valves & Natural Circulation Cooldown ML20151W0871988-07-25025 July 1988 Insp Rept 50-312/88-02 on 880104-0309.Weaknesses Noted. Major Areas Inspected:Past & Present Procurement,Matls Control & Warehouse Activities Before Restart IR 05000312/19880191988-07-13013 July 1988 Enhanced Operational Insp Rept 50-312/88-19 on 880613-17. No Violations Noted.Major Areas Inspected:Plant Operation & Operational Support Activities IR 05000312/19880221988-07-13013 July 1988 Enforcement Conference Rept 50-312/88-22 on 880707.Major Areas Discussed:Implementation of Licensee Corrective Action to Improve Radiation Protection Program Following 880204 Incident When Individual Received Excess Radiation Exposure ML20150D9231988-06-24024 June 1988 Insp Rept 50-312/88-17 on 880606-10.Violations Noted.Major Areas Inspected:Licensee Action on Previous Insp Findings, Control of Radioactive Matls & Contamination,Alara, Facilities & Equipment & Review of Licensee Repts IR 05000312/19880151988-06-23023 June 1988 Insp Rept 50-312/88-15 on 880503-31.No Violations or Deviations Noted.Major Areas Inspected:Operational Safety Verification,Esf Sys Walkdown,Maint,Surveillance & Testing, Review of Control Rod Worth & Followup Items IR 05000312/19880201988-06-23023 June 1988 Insp Rept 50-312/88-20 on 880617.Violations Noted.Major Areas Inspected:Status of Unresolved Item 50-312/88-07-01 Re Skin Exposure of Worker Reported by Licensee on 880204 IR 05000312/19880121988-05-23023 May 1988 Insp Rept 50-312/88-12 on 880330-0502.Violations Noted.Major Areas Inspected:Operational Safety Verification,Maint, Surveillance & Followup Items IR 05000312/19880141988-05-19019 May 1988 Insp Rept 50-312/88-14 on 880425-28.No Violations or Deviations Noted.Major Areas Inspected:Licensee Plans for Coping W/Strikes & Nonlicensed Staff Training.Specific Weaknesses in Licensee Program Observed IR 05000312/19880131988-05-10010 May 1988 Insp Rept 50-312/88-13 on 880404-08 & 19.Violations Noted. Major Areas Inspected:Action on Previous Insp Findings,Solid Wastes,Transportation & Facility Tours IR 05000312/19880051988-05-10010 May 1988 Insp Rept 50-312/88-05 on 880204-0329.Violations Noted.Major Areas Inspected:Operational Safety Verification,Maint, Surveillance,Security & Health Physics Routine Modules & Followup Items IR 05000312/19880081988-04-21021 April 1988 Insp Rept 50-312/88-08 on 880307-22.Violations Noted.Major Areas Inspected:Licensee Capabilities for Mgt & Implementation of Effective Liquid & Gaseous Effluents Program After Restart IR 05000312/19880111988-04-20020 April 1988 Insp Rept 50-312/88-11 on 880317.No Violations Noted.Major Areas Inspected:Unusual Event on 880315 IR 05000312/19870401988-04-19019 April 1988 Insp Rept 50-312/87-40 on 871207-18 & 880208-17.Deficiencies Noted.Major Areas Inspected:Review of Licensee Readiness to Operate Facility,Including Functional Areas of Operations, Maint,Surveillance Testing & Design Change Control 1999-08-31
[Table view] Category:INSPECTION REPORT
MONTHYEARIR 05000312/19990031999-08-31031 August 1999 Insp Rept 50-312/99-03 on 990802-06.No Violations Noted. Major Areas Inspected:Decommissioning & Dismantlement Activities,Including Organization,Mgt & Cost Controls IR 05000312/19990021999-03-19019 March 1999 Insp Rept 50-312/99-02 on 990309-11.No Violations Noted. Major Areas Inspected:Licensee Physical Security Program, Including Access Authorization,Alarm Station & Communication & Testing & Maint IR 05000312/19980031998-08-0707 August 1998 Insp Rept 50-312/98-03 on 980706-09.No Violations Noted. Major Areas Inspected:Review of Licensee Programs Related to SFP Safety,Status of Decommissioning,Safety Review & self-assessments & Radiological Safety Programs IR 05000312/19980021998-06-0303 June 1998 Insp Rept 50-312/98-02 on 980519-21.Violations Noted. Major Areas Inspected:Announced Insp of Licensee Physical Security Program ML20202C4981998-02-0505 February 1998 Insp Rept 50-312/98-01 on 980105-08.Violations Noted.Major Areas Inspected:Organization,Mgt & Cost Controls,Maint & Surveillance,Cold Weather Preparation,Decommissioning Performance & Status Review & Health Physics IR 05000312/19970041997-10-21021 October 1997 Insp Rept 50-312/97-04 on 970922-25.Violations Noted. Major Areas Inspected:Organization,Mgt,Cost Control,Safety Reviews,Design Changes,Mods,Decommissioning Performance & Status Review IR 05000312/19970031997-06-17017 June 1997 Insp Rept 50-312/97-03 on 970603-05.No Violations Noted. Major Areas Inspected:Records & Repts,Testing & Maint, Protected Area Barrier & Detection Aids,Assessment Aids, Alarm Station & Communication & Security System IR 05000312/19970021997-04-25025 April 1997 Insp Rept 50-312/97-02 on 970331-0403.No Violations Noted. Major Areas Inspected:Incremental Decommissioning Activities in Turbine Bldg,Radiation Protection,Sfp Activities & Quality Assurance IR 05000312/19970011997-03-21021 March 1997 Insp Repts 50-312/97-01 & 72-0011/97-01 on 970224-27.No Violations Noted.Major Areas Inspected:Licensee Planned Work Associated W/Dismantlement of Turbine Bldg & Radiological Controls Being Implemented During Work Activities IR 05000312/19960031996-09-27027 September 1996 Insp Repts 50-312/96-03 & 72-0011/96-01 on 960909-12.No Violations Noted.Major Areas Inspected:Sfp & Radiological Ts,Radiological Exposure Controls & Implementation of New 10CFR49 Shipping Regulations IR 05000312/19930061993-09-0202 September 1993 Insp Rept 50-312/93-06 on 930819.No Violations or Deviations Noted.Major Areas Inspected:Licensee Employee Concerns Program IR 05000312/19930041993-08-11011 August 1993 Mgt Meeting Rept 50-312/93-04 on 930727.Major Areas Discussed:Status of Activities,Including Maint of Plant Equipment,Fire Protection Equipment & Plant Personnel Morale IR 05000312/19920071992-12-10010 December 1992 Insp Rept 50-312/92-07 on 921110-11.No Deviations or Violations Noted.Major Areas inspected:1992 Annual Emergency Preparedness Exercise & Associated Critiques & Inspector Identified Items IR 05000312/19900141990-11-14014 November 1990 Insp Rept 50-312/90-14 on 901003-04,09-11 & 1102.Violations Noted.Areas inspected:follow-up of Licensee Event Repts, Liquid Effluent,Solid Waste & Allegations IR 05000312/19900111990-07-31031 July 1990 Insp Rept 50-312/90-11 on 900527-0706.No Violations or Deviations Noted.Major Areas Inspected:Operational Safety Verification,Health Physics & Security Observations,Esf Sys Walkdown,Maint,Surveillance & Testing & QA IR 05000312/19890121989-09-21021 September 1989 Insp Rept 50-312/89-12 on 890801-04,21-25 & 30.No Violations Noted.Major Areas Inspected:Occupational Exposure,Including Alara,Radwaste Sys,Liquid & Liquid Wastes & Radwaste Mgt & Transportation IR 05000312/19890161989-09-21021 September 1989 Enforcement Conference Rept 50-312/89-16 on 890915. Violations Noted.Major Areas Discussed:Violations Noted in Insp Rept 50-312/89-16 & Indications That Findings Represent Decrease in Mgt Commitment to Emergency Preparedness IR 05000312/19890141989-09-11011 September 1989 Insp Rept 50-312/89-14 on 890828-0901.Violations Noted Re Failure to Conduct Required Semiannual Health Physics Drill & Initial Training.Major Areas Inspected:Operational Status of Emergency Preparedness Program IR 05000312/19890101989-08-10010 August 1989 Insp Rept 50-312/89-10 on 890603-0721.No Violations Noted. Major Areas Inspected:Areas of Operational Safety Verification,Health Physics & Security Observations,Maint, Surveillance & Testing & QA & Followup Items IR 05000312/19890081989-07-11011 July 1989 Insp Rept 50-312/89-08 on 890422-0602.No Violations or Deviations Noted.Two non-cited Violations Discussed.Major Areas Inspected:Operational Safety Verification,Health Physics & Security Observations & ESF Sys Walkdown IR 05000312/19890111989-07-0606 July 1989 Insp Rept 50-312/89-11 on 890629-30.No Violations Noted. Major Areas Inspected:Licensee Radiochemical Analyses to Verify Accuracy of Measurements of Radionuclides in Release Tank Water & Sediment from Effluent Discharge Point IR 05000312/19890071989-04-28028 April 1989 Insp Rept 50-312/89-07 on 890417-21.No Violations Noted. Major Areas Inspected:Previously Identified Items & Status of Emergency Preparedness Program IR 05000312/19890041989-03-31031 March 1989 Insp Rept 50-312/89-04 on 890114-0303.Violations Noted.Major Areas Inspected:Operational Safety Verification,Health Physics & Security Observations,Esf Sys Walkdown,Maint,Qa Surveillance & Testing & Followup Items ML20244B1161989-03-24024 March 1989 Insp Rept 50-312/89-01 on 890123-0217.Violations Noted.Major Areas Inspected:Maint Program & Implementation of Related Activities IR 05000312/19880411989-02-13013 February 1989 Insp Rept 50-312/88-41 on 881214-890103.No Violations Noted. Major Areas Inspected:Onsite Followup of Event of 881212 & Associated Mgt Meetings on 881219 & 890103.Weaknesses Observed Re Decision to Operate Plant in Degraded State IR 05000312/19880421989-02-13013 February 1989 Insp Rept 50-312/88-42 on 881227-30 & 890125-27.No Violations Noted.Major Areas Inspected:Followup Items,Part 21 Repts,Lers & Licensee Program to Maintain Quality of Diesel Generator Fuel Oil IR 05000312/19880401989-02-0606 February 1989 Insp Rept 50-312/88-40 on 881208-890113.No Violations or Deviations Noted.Major Areas Inspected:Operational Safety Verification,Health Physics & Security Observations,Esf Sys Walkdown,Maint,Qa & Surveillance & Testing IR 05000312/19880351988-11-21021 November 1988 Mgt Meeting Rept 50-312/88-35 on 881114.Major Areas Discussed:Licensee Operational Performance Since Restart in Mar 1988 & Progress Re Restart Commitments in Areas of Engineering,Procurement,Maint & Effluent Sys Areas IR 05000312/19880321988-10-25025 October 1988 Insp Rept 50-312/88-32 on 880919-1007.Violations Noted. Major Areas Inspected:Design Changes & Mods,Qa Audits,Pwr Moderator Dilution Requirements & Followup Items IR 05000312/19880301988-10-13013 October 1988 Insp Rept 50-312/88-30 on 880912-16.No Violations or Deviations Noted.Major Areas Inspected:Licensee Actions on Previous Insp Findings,Radioactive Liquid & Gaseous Waste & Review of Licensee Repts IR 05000312/19880271988-09-30030 September 1988 Insp Rept 50-312/88-27 on 880912-16.No Violations Noted. Major Areas Inspected:Licensee Conformance W/Rev 3 to Reg Guide 1.97.Rept Addresses & Closes Sims Issue Number 67.3.3 IR 05000312/19880231988-09-27027 September 1988 Insp Rept 50-312/88-23 on 880709-0906.Violations Noted. Major Areas Inspected:Operational Safety Verification, Health Physics & Security Observations,Esfs Sys Walkdown, Maint,Surveillance & Testing & Followup Items IR 05000312/19880261988-09-0909 September 1988 Enhanced Operational Insp Rept 50-312/88-26 on 880801-09.No Violations Noted.Major Areas Inspected:Plant Operation & Operational Support Activities ML20154H8171988-09-0101 September 1988 Insp Rept 50-312/88-25 on 880719-21.No Violations Noted. Major Areas Inspected:Exam of Emergency Facilities, Equipment & Emergency Preparedness Training ML20153E5081988-08-16016 August 1988 Insp Rept 50-312/88-24 on 880719-22.Violation Noted. Major Areas Inspected:Licensee Actions on Previous Insp Findings & Lers,External Exposure Control & Internal Exposure Control IR 05000312/19880161988-07-27027 July 1988 Insp Rept 50-312/88-16 on 880601-0708.No Violations or Deviations Noted.Major Areas Inspected:Operational Safety Verification,Health Physics & Security Observations,Esf Sys Walkdown,Maint & Surveillance & Testing IR 05000312/19880211988-07-27027 July 1988 Insp Rept 50-312/88-21 on 880711-15.No Violations or Deviations Noted.Major Areas Inspected:Licensee Action on Fastener Testing,Primary Coolant Sys Pressure Isolation Valves & Natural Circulation Cooldown ML20151W0871988-07-25025 July 1988 Insp Rept 50-312/88-02 on 880104-0309.Weaknesses Noted. Major Areas Inspected:Past & Present Procurement,Matls Control & Warehouse Activities Before Restart IR 05000312/19880191988-07-13013 July 1988 Enhanced Operational Insp Rept 50-312/88-19 on 880613-17. No Violations Noted.Major Areas Inspected:Plant Operation & Operational Support Activities IR 05000312/19880221988-07-13013 July 1988 Enforcement Conference Rept 50-312/88-22 on 880707.Major Areas Discussed:Implementation of Licensee Corrective Action to Improve Radiation Protection Program Following 880204 Incident When Individual Received Excess Radiation Exposure ML20150D9231988-06-24024 June 1988 Insp Rept 50-312/88-17 on 880606-10.Violations Noted.Major Areas Inspected:Licensee Action on Previous Insp Findings, Control of Radioactive Matls & Contamination,Alara, Facilities & Equipment & Review of Licensee Repts IR 05000312/19880151988-06-23023 June 1988 Insp Rept 50-312/88-15 on 880503-31.No Violations or Deviations Noted.Major Areas Inspected:Operational Safety Verification,Esf Sys Walkdown,Maint,Surveillance & Testing, Review of Control Rod Worth & Followup Items IR 05000312/19880201988-06-23023 June 1988 Insp Rept 50-312/88-20 on 880617.Violations Noted.Major Areas Inspected:Status of Unresolved Item 50-312/88-07-01 Re Skin Exposure of Worker Reported by Licensee on 880204 IR 05000312/19880121988-05-23023 May 1988 Insp Rept 50-312/88-12 on 880330-0502.Violations Noted.Major Areas Inspected:Operational Safety Verification,Maint, Surveillance & Followup Items IR 05000312/19880141988-05-19019 May 1988 Insp Rept 50-312/88-14 on 880425-28.No Violations or Deviations Noted.Major Areas Inspected:Licensee Plans for Coping W/Strikes & Nonlicensed Staff Training.Specific Weaknesses in Licensee Program Observed IR 05000312/19880131988-05-10010 May 1988 Insp Rept 50-312/88-13 on 880404-08 & 19.Violations Noted. Major Areas Inspected:Action on Previous Insp Findings,Solid Wastes,Transportation & Facility Tours IR 05000312/19880051988-05-10010 May 1988 Insp Rept 50-312/88-05 on 880204-0329.Violations Noted.Major Areas Inspected:Operational Safety Verification,Maint, Surveillance,Security & Health Physics Routine Modules & Followup Items IR 05000312/19880081988-04-21021 April 1988 Insp Rept 50-312/88-08 on 880307-22.Violations Noted.Major Areas Inspected:Licensee Capabilities for Mgt & Implementation of Effective Liquid & Gaseous Effluents Program After Restart IR 05000312/19880111988-04-20020 April 1988 Insp Rept 50-312/88-11 on 880317.No Violations Noted.Major Areas Inspected:Unusual Event on 880315 IR 05000312/19870401988-04-19019 April 1988 Insp Rept 50-312/87-40 on 871207-18 & 880208-17.Deficiencies Noted.Major Areas Inspected:Review of Licensee Readiness to Operate Facility,Including Functional Areas of Operations, Maint,Surveillance Testing & Design Change Control 1999-08-31
[Table view] Category:UTILITY
MONTHYEARIR 05000312/19900111990-07-31031 July 1990 Insp Rept 50-312/90-11 on 900527-0706.No Violations or Deviations Noted.Major Areas Inspected:Operational Safety Verification,Health Physics & Security Observations,Esf Sys Walkdown,Maint,Surveillance & Testing & QA IR 05000312/19890121989-09-21021 September 1989 Insp Rept 50-312/89-12 on 890801-04,21-25 & 30.No Violations Noted.Major Areas Inspected:Occupational Exposure,Including Alara,Radwaste Sys,Liquid & Liquid Wastes & Radwaste Mgt & Transportation IR 05000312/19890161989-09-21021 September 1989 Enforcement Conference Rept 50-312/89-16 on 890915. Violations Noted.Major Areas Discussed:Violations Noted in Insp Rept 50-312/89-16 & Indications That Findings Represent Decrease in Mgt Commitment to Emergency Preparedness IR 05000312/19890141989-09-11011 September 1989 Insp Rept 50-312/89-14 on 890828-0901.Violations Noted Re Failure to Conduct Required Semiannual Health Physics Drill & Initial Training.Major Areas Inspected:Operational Status of Emergency Preparedness Program IR 05000312/19890101989-08-10010 August 1989 Insp Rept 50-312/89-10 on 890603-0721.No Violations Noted. Major Areas Inspected:Areas of Operational Safety Verification,Health Physics & Security Observations,Maint, Surveillance & Testing & QA & Followup Items IR 05000312/19890081989-07-11011 July 1989 Insp Rept 50-312/89-08 on 890422-0602.No Violations or Deviations Noted.Two non-cited Violations Discussed.Major Areas Inspected:Operational Safety Verification,Health Physics & Security Observations & ESF Sys Walkdown IR 05000312/19890111989-07-0606 July 1989 Insp Rept 50-312/89-11 on 890629-30.No Violations Noted. Major Areas Inspected:Licensee Radiochemical Analyses to Verify Accuracy of Measurements of Radionuclides in Release Tank Water & Sediment from Effluent Discharge Point IR 05000312/19890071989-04-28028 April 1989 Insp Rept 50-312/89-07 on 890417-21.No Violations Noted. Major Areas Inspected:Previously Identified Items & Status of Emergency Preparedness Program IR 05000312/19890041989-03-31031 March 1989 Insp Rept 50-312/89-04 on 890114-0303.Violations Noted.Major Areas Inspected:Operational Safety Verification,Health Physics & Security Observations,Esf Sys Walkdown,Maint,Qa Surveillance & Testing & Followup Items ML20244B1161989-03-24024 March 1989 Insp Rept 50-312/89-01 on 890123-0217.Violations Noted.Major Areas Inspected:Maint Program & Implementation of Related Activities IR 05000312/19880421989-02-13013 February 1989 Insp Rept 50-312/88-42 on 881227-30 & 890125-27.No Violations Noted.Major Areas Inspected:Followup Items,Part 21 Repts,Lers & Licensee Program to Maintain Quality of Diesel Generator Fuel Oil IR 05000312/19880411989-02-13013 February 1989 Insp Rept 50-312/88-41 on 881214-890103.No Violations Noted. Major Areas Inspected:Onsite Followup of Event of 881212 & Associated Mgt Meetings on 881219 & 890103.Weaknesses Observed Re Decision to Operate Plant in Degraded State IR 05000312/19880401989-02-0606 February 1989 Insp Rept 50-312/88-40 on 881208-890113.No Violations or Deviations Noted.Major Areas Inspected:Operational Safety Verification,Health Physics & Security Observations,Esf Sys Walkdown,Maint,Qa & Surveillance & Testing IR 05000312/19880351988-11-21021 November 1988 Mgt Meeting Rept 50-312/88-35 on 881114.Major Areas Discussed:Licensee Operational Performance Since Restart in Mar 1988 & Progress Re Restart Commitments in Areas of Engineering,Procurement,Maint & Effluent Sys Areas IR 05000312/19880321988-10-25025 October 1988 Insp Rept 50-312/88-32 on 880919-1007.Violations Noted. Major Areas Inspected:Design Changes & Mods,Qa Audits,Pwr Moderator Dilution Requirements & Followup Items IR 05000312/19880301988-10-13013 October 1988 Insp Rept 50-312/88-30 on 880912-16.No Violations or Deviations Noted.Major Areas Inspected:Licensee Actions on Previous Insp Findings,Radioactive Liquid & Gaseous Waste & Review of Licensee Repts IR 05000312/19880271988-09-30030 September 1988 Insp Rept 50-312/88-27 on 880912-16.No Violations Noted. Major Areas Inspected:Licensee Conformance W/Rev 3 to Reg Guide 1.97.Rept Addresses & Closes Sims Issue Number 67.3.3 IR 05000312/19880231988-09-27027 September 1988 Insp Rept 50-312/88-23 on 880709-0906.Violations Noted. Major Areas Inspected:Operational Safety Verification, Health Physics & Security Observations,Esfs Sys Walkdown, Maint,Surveillance & Testing & Followup Items IR 05000312/19880261988-09-0909 September 1988 Enhanced Operational Insp Rept 50-312/88-26 on 880801-09.No Violations Noted.Major Areas Inspected:Plant Operation & Operational Support Activities ML20154H8171988-09-0101 September 1988 Insp Rept 50-312/88-25 on 880719-21.No Violations Noted. Major Areas Inspected:Exam of Emergency Facilities, Equipment & Emergency Preparedness Training ML20153E5081988-08-16016 August 1988 Insp Rept 50-312/88-24 on 880719-22.Violation Noted. Major Areas Inspected:Licensee Actions on Previous Insp Findings & Lers,External Exposure Control & Internal Exposure Control IR 05000312/19880161988-07-27027 July 1988 Insp Rept 50-312/88-16 on 880601-0708.No Violations or Deviations Noted.Major Areas Inspected:Operational Safety Verification,Health Physics & Security Observations,Esf Sys Walkdown,Maint & Surveillance & Testing IR 05000312/19880211988-07-27027 July 1988 Insp Rept 50-312/88-21 on 880711-15.No Violations or Deviations Noted.Major Areas Inspected:Licensee Action on Fastener Testing,Primary Coolant Sys Pressure Isolation Valves & Natural Circulation Cooldown ML20151W0871988-07-25025 July 1988 Insp Rept 50-312/88-02 on 880104-0309.Weaknesses Noted. Major Areas Inspected:Past & Present Procurement,Matls Control & Warehouse Activities Before Restart IR 05000312/19880191988-07-13013 July 1988 Enhanced Operational Insp Rept 50-312/88-19 on 880613-17. No Violations Noted.Major Areas Inspected:Plant Operation & Operational Support Activities IR 05000312/19880221988-07-13013 July 1988 Enforcement Conference Rept 50-312/88-22 on 880707.Major Areas Discussed:Implementation of Licensee Corrective Action to Improve Radiation Protection Program Following 880204 Incident When Individual Received Excess Radiation Exposure ML20150D9231988-06-24024 June 1988 Insp Rept 50-312/88-17 on 880606-10.Violations Noted.Major Areas Inspected:Licensee Action on Previous Insp Findings, Control of Radioactive Matls & Contamination,Alara, Facilities & Equipment & Review of Licensee Repts IR 05000312/19880201988-06-23023 June 1988 Insp Rept 50-312/88-20 on 880617.Violations Noted.Major Areas Inspected:Status of Unresolved Item 50-312/88-07-01 Re Skin Exposure of Worker Reported by Licensee on 880204 IR 05000312/19880151988-06-23023 June 1988 Insp Rept 50-312/88-15 on 880503-31.No Violations or Deviations Noted.Major Areas Inspected:Operational Safety Verification,Esf Sys Walkdown,Maint,Surveillance & Testing, Review of Control Rod Worth & Followup Items IR 05000312/19880121988-05-23023 May 1988 Insp Rept 50-312/88-12 on 880330-0502.Violations Noted.Major Areas Inspected:Operational Safety Verification,Maint, Surveillance & Followup Items IR 05000312/19880141988-05-19019 May 1988 Insp Rept 50-312/88-14 on 880425-28.No Violations or Deviations Noted.Major Areas Inspected:Licensee Plans for Coping W/Strikes & Nonlicensed Staff Training.Specific Weaknesses in Licensee Program Observed IR 05000312/19880131988-05-10010 May 1988 Insp Rept 50-312/88-13 on 880404-08 & 19.Violations Noted. Major Areas Inspected:Action on Previous Insp Findings,Solid Wastes,Transportation & Facility Tours IR 05000312/19880051988-05-10010 May 1988 Insp Rept 50-312/88-05 on 880204-0329.Violations Noted.Major Areas Inspected:Operational Safety Verification,Maint, Surveillance,Security & Health Physics Routine Modules & Followup Items IR 05000312/19880081988-04-21021 April 1988 Insp Rept 50-312/88-08 on 880307-22.Violations Noted.Major Areas Inspected:Licensee Capabilities for Mgt & Implementation of Effective Liquid & Gaseous Effluents Program After Restart IR 05000312/19880111988-04-20020 April 1988 Insp Rept 50-312/88-11 on 880317.No Violations Noted.Major Areas Inspected:Unusual Event on 880315 IR 05000312/19870401988-04-19019 April 1988 Insp Rept 50-312/87-40 on 871207-18 & 880208-17.Deficiencies Noted.Major Areas Inspected:Review of Licensee Readiness to Operate Facility,Including Functional Areas of Operations, Maint,Surveillance Testing & Design Change Control ML20151C3641988-03-24024 March 1988 Insp Rept 50-312/87-44 on 871205-880203.Violation Noted. Major Areas Inspected:Operational Safety Verification,Maint, Surveillance & Followup Items IR 05000312/19880091988-03-15015 March 1988 Insp Rept 50-312/88-09 on 880307-08.No Violations Noted. Major Areas Inspected:Emergency Preparedness Program & Followup on Open Items.Insp Procedure 92701 Covered IR 05000312/19870491988-03-0808 March 1988 Insp Rept 50-312/87-49 on 871228-30 & 880127-28.No Violations or Deviations Noted.Major Areas Inspected:Fire Protection Program Implementation & Identified Open Items ML20148B7061988-03-0303 March 1988 Insp Rept 50-312/88-07 on 880205 & 08.Findings of Rept Will Be Identified as Unresolved Pending Completion of Investigation.Major Areas Inspected:Response to Licensee 880204 Rept of Potential Exposure to Extremity of Worker ML20148B4321988-03-0202 March 1988 Insp Rept 50-312/88-06 on 880124-0219.Violation Noted.Major Areas Inspected:Licensee Action on Previously Identified Inspector Items,Lers,Followup on Items of Noncompliance & Followup on Eastrp Corrective Action IR 05000312/19880011988-02-0505 February 1988 Insp Rept 50-312/88-01 on 880104-08,20 & 0202.No Violations or Deviations Noted.Major Areas inspected:post-accident Sampling Sys & Tour of Facility.Insp Procedures 25565,30703, 92701 & 92702 Addressed IR 05000312/19870371988-02-0303 February 1988 Insp Rept 50-312/87-37 on 871024-1204.Violations Noted.Major Areas Inspected:Operational Safety Verification,Maint, Surveillance & Followup Items IR 05000312/19870461988-01-26026 January 1988 Insp Rept 50-312/87-46 on 871214-18.No Violations Noted. Major Areas Inspected:Emergency Preparedness Program, Followup on Open Items & Insp Procedures 82206 & 92701 IR 05000312/19870421988-01-0808 January 1988 Insp Rept 50-312/87-42 on 871130-1204.No Violations or Deviations Noted.Major Areas inspected:post-accident Sampling Sys & Independent Insp Effort.Insp Procedures 30730,92701 & 92702 Addressed IR 05000312/19870451988-01-0505 January 1988 Insp Rept 50-312/87-45 on 871207-11.No Violations or Deviations Noted.Major Areas Inspected:Action on Previously Identified Items,Lers & NRC Bulletin Followup ML20195J7241988-01-0404 January 1988 Augmented Sys Review & Test Program Insp Rept 50-312/87-29 on 870928-1009.Open & Unresolved Items Noted.Major Areas Inspected:Open & Unresolved Items from Augmented Sys Review & Test Program Insp Rept 50-312/86-41 IR 05000312/19870391987-12-24024 December 1987 Insp Rept 50-312/87-39 on 871116-19.No Violations or Deviations Noted.Major Areas Inspected:Followup on Previously Identified Open Items & Fire Protection Program IR 05000312/19870271987-12-21021 December 1987 Insp Rept 50-312/87-27 on 871102-06.No Violations Noted. Major Areas Inspected:Emergency Preparedness Exercise, Associated Critique & Followup Items IR 05000312/19870331987-12-16016 December 1987 Insp Rept 50-312/87-33 on 871019-23.No Deficiencies or Violations Noted.Major Areas Inspected:Emergency Preparedness Program Including Meteorology & Followup of Open Items 1990-07-31
[Table view] Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS
MONTHYEARIR 05000312/19990031999-08-31031 August 1999 Insp Rept 50-312/99-03 on 990802-06.No Violations Noted. Major Areas Inspected:Decommissioning & Dismantlement Activities,Including Organization,Mgt & Cost Controls IR 05000312/19990021999-03-19019 March 1999 Insp Rept 50-312/99-02 on 990309-11.No Violations Noted. Major Areas Inspected:Licensee Physical Security Program, Including Access Authorization,Alarm Station & Communication & Testing & Maint IR 05000312/19980031998-08-0707 August 1998 Insp Rept 50-312/98-03 on 980706-09.No Violations Noted. Major Areas Inspected:Review of Licensee Programs Related to SFP Safety,Status of Decommissioning,Safety Review & self-assessments & Radiological Safety Programs ML20248K6301998-06-0303 June 1998 Notice of Violation from Insp on 980519-21.Violation Noted:Inspector Determined That Licensee Failed to Review & Consider All Info Obtained During Background Investigation IR 05000312/19980021998-06-0303 June 1998 Insp Rept 50-312/98-02 on 980519-21.Violations Noted. Major Areas Inspected:Announced Insp of Licensee Physical Security Program ML20202C4771998-02-0505 February 1998 Notice of Violation from Insp on 980105-08.Violation Noted: on 971222,shipment of Scrap Metal,In Form of Auxiliary Boiler,Was Released from Rancho Seco Site W/O Having Been Surveyed ML20202C4981998-02-0505 February 1998 Insp Rept 50-312/98-01 on 980105-08.Violations Noted.Major Areas Inspected:Organization,Mgt & Cost Controls,Maint & Surveillance,Cold Weather Preparation,Decommissioning Performance & Status Review & Health Physics ML20198K5451997-10-21021 October 1997 Notice of Violation from Insp on 970922-25.Violation Noted:On 970806,thermocouple for Spent Fuel Pool Temp Indicator Was Found to Be out-of-tolerance During Annual Calibration IR 05000312/19970041997-10-21021 October 1997 Insp Rept 50-312/97-04 on 970922-25.Violations Noted. Major Areas Inspected:Organization,Mgt,Cost Control,Safety Reviews,Design Changes,Mods,Decommissioning Performance & Status Review IR 05000312/19970031997-06-17017 June 1997 Insp Rept 50-312/97-03 on 970603-05.No Violations Noted. Major Areas Inspected:Records & Repts,Testing & Maint, Protected Area Barrier & Detection Aids,Assessment Aids, Alarm Station & Communication & Security System IR 05000312/19970021997-04-25025 April 1997 Insp Rept 50-312/97-02 on 970331-0403.No Violations Noted. Major Areas Inspected:Incremental Decommissioning Activities in Turbine Bldg,Radiation Protection,Sfp Activities & Quality Assurance IR 05000312/19970011997-03-21021 March 1997 Insp Repts 50-312/97-01 & 72-0011/97-01 on 970224-27.No Violations Noted.Major Areas Inspected:Licensee Planned Work Associated W/Dismantlement of Turbine Bldg & Radiological Controls Being Implemented During Work Activities IR 05000312/19960031996-09-27027 September 1996 Insp Repts 50-312/96-03 & 72-0011/96-01 on 960909-12.No Violations Noted.Major Areas Inspected:Sfp & Radiological Ts,Radiological Exposure Controls & Implementation of New 10CFR49 Shipping Regulations IR 05000312/19930061993-09-0202 September 1993 Insp Rept 50-312/93-06 on 930819.No Violations or Deviations Noted.Major Areas Inspected:Licensee Employee Concerns Program IR 05000312/19930041993-08-11011 August 1993 Mgt Meeting Rept 50-312/93-04 on 930727.Major Areas Discussed:Status of Activities,Including Maint of Plant Equipment,Fire Protection Equipment & Plant Personnel Morale IR 05000312/19920071992-12-10010 December 1992 Insp Rept 50-312/92-07 on 921110-11.No Deviations or Violations Noted.Major Areas inspected:1992 Annual Emergency Preparedness Exercise & Associated Critiques & Inspector Identified Items IR 05000312/19900141990-11-14014 November 1990 Insp Rept 50-312/90-14 on 901003-04,09-11 & 1102.Violations Noted.Areas inspected:follow-up of Licensee Event Repts, Liquid Effluent,Solid Waste & Allegations IR 05000312/19900111990-07-31031 July 1990 Insp Rept 50-312/90-11 on 900527-0706.No Violations or Deviations Noted.Major Areas Inspected:Operational Safety Verification,Health Physics & Security Observations,Esf Sys Walkdown,Maint,Surveillance & Testing & QA IR 05000312/19890161989-09-21021 September 1989 Enforcement Conference Rept 50-312/89-16 on 890915. Violations Noted.Major Areas Discussed:Violations Noted in Insp Rept 50-312/89-16 & Indications That Findings Represent Decrease in Mgt Commitment to Emergency Preparedness IR 05000312/19890121989-09-21021 September 1989 Insp Rept 50-312/89-12 on 890801-04,21-25 & 30.No Violations Noted.Major Areas Inspected:Occupational Exposure,Including Alara,Radwaste Sys,Liquid & Liquid Wastes & Radwaste Mgt & Transportation PNO-V-89-056, on 890911,SMUD Board Rejected Golden State Energy Proposal to Purchase Plant1989-09-12012 September 1989 PNO-V-89-056:on 890911,SMUD Board Rejected Golden State Energy Proposal to Purchase Plant IR 05000312/19890141989-09-11011 September 1989 Insp Rept 50-312/89-14 on 890828-0901.Violations Noted Re Failure to Conduct Required Semiannual Health Physics Drill & Initial Training.Major Areas Inspected:Operational Status of Emergency Preparedness Program PNO-V-89-053, on 890901,Golden State Energy Proposal to Purchase Rancho Seco Submitted to Util,Including MOU for Purchase of Plant,Power Sale Agreement & Interim Operation & Maint of Facility & Rate Structure.Vote Expected on 8909071989-09-0505 September 1989 PNO-V-89-053:on 890901,Golden State Energy Proposal to Purchase Rancho Seco Submitted to Util,Including MOU for Purchase of Plant,Power Sale Agreement & Interim Operation & Maint of Facility & Rate Structure.Vote Expected on 890907 PNO-V-89-050, on 890823,util Announced That Board of Directors Would Meet on 890825 Re Proposed Golden State Energy Purchase of Plant.Key Issues Listed,Including MOU Addressing Power Sale Agreement1989-08-23023 August 1989 PNO-V-89-050:on 890823,util Announced That Board of Directors Would Meet on 890825 Re Proposed Golden State Energy Purchase of Plant.Key Issues Listed,Including MOU Addressing Power Sale Agreement IR 05000312/19890101989-08-10010 August 1989 Insp Rept 50-312/89-10 on 890603-0721.No Violations Noted. Major Areas Inspected:Areas of Operational Safety Verification,Health Physics & Security Observations,Maint, Surveillance & Testing & QA & Followup Items PNO-V-89-044, on 890720,util Board Voted by 4-1 Vote to Enter Exclusive Negotiations W/Quadrex Corp for Possible Sale of Plant.Key Milestone Dates Listed.Board Maintained That Several Key Issues Must Be Addressed Before Voting on Sale1989-07-21021 July 1989 PNO-V-89-044:on 890720,util Board Voted by 4-1 Vote to Enter Exclusive Negotiations W/Quadrex Corp for Possible Sale of Plant.Key Milestone Dates Listed.Board Maintained That Several Key Issues Must Be Addressed Before Voting on Sale IR 05000312/19890081989-07-11011 July 1989 Insp Rept 50-312/89-08 on 890422-0602.No Violations or Deviations Noted.Two non-cited Violations Discussed.Major Areas Inspected:Operational Safety Verification,Health Physics & Security Observations & ESF Sys Walkdown IR 05000312/19890111989-07-0606 July 1989 Insp Rept 50-312/89-11 on 890629-30.No Violations Noted. Major Areas Inspected:Licensee Radiochemical Analyses to Verify Accuracy of Measurements of Radionuclides in Release Tank Water & Sediment from Effluent Discharge Point PNO-V-89-039, on 890620,util Announced That Licensee Open to Offers to Purchase Facility Until 890630.Of All Bidders,Only Quadrex Corp Proposes to Operate Facility as Nuclear Plant. Evaluation of Bids Expected to Be Completed by End of Jul1989-07-0303 July 1989 PNO-V-89-039:on 890620,util Announced That Licensee Open to Offers to Purchase Facility Until 890630.Of All Bidders,Only Quadrex Corp Proposes to Operate Facility as Nuclear Plant. Evaluation of Bids Expected to Be Completed by End of Jul PNO-V-89-036, on 890620,SMUD Voted 3-2 to Allow 10 Days for Qualified Private Bidders to Submit Proposals to Take Over Facility.Conditions Imposed on Bidders Listed.Existing Quadrex Proposal Withdrawn1989-06-21021 June 1989 PNO-V-89-036:on 890620,SMUD Voted 3-2 to Allow 10 Days for Qualified Private Bidders to Submit Proposals to Take Over Facility.Conditions Imposed on Bidders Listed.Existing Quadrex Proposal Withdrawn PNO-V-89-035, on 890619,licensee Announced That D Keuter Had Been Appointed New Site Manager & Jr Shetler as Deputy Site Manager.Licensee Recognizes That Organizational Changes Subj to NRC Approval1989-06-20020 June 1989 PNO-V-89-035:on 890619,licensee Announced That D Keuter Had Been Appointed New Site Manager & Jr Shetler as Deputy Site Manager.Licensee Recognizes That Organizational Changes Subj to NRC Approval PNO-V-89-034, on 890615,offer to Assume Financial & Technical Responsibility for Plant Announced.Plant Presently in Cold Shutdown W/Activities Continuing Towards off-loading Reactor Core in Oct 19891989-06-16016 June 1989 PNO-V-89-034:on 890615,offer to Assume Financial & Technical Responsibility for Plant Announced.Plant Presently in Cold Shutdown W/Activities Continuing Towards off-loading Reactor Core in Oct 1989 PNO-V-89-033C, on 890609,plant Reached Cold Shutdown in Preparation for Reinstalling Refueling Bridge Into Reactor Bldg.Bridge Removed for Refurbishment/Mod.Reduction in Force of Nonessential Contractor Personnel in Progress1989-06-12012 June 1989 PNO-V-89-033C:on 890609,plant Reached Cold Shutdown in Preparation for Reinstalling Refueling Bridge Into Reactor Bldg.Bridge Removed for Refurbishment/Mod.Reduction in Force of Nonessential Contractor Personnel in Progress PNO-V-89-033B, on 890608,licensee Continuing Cooldown of Plant.Ceo Nuclear,J Firlit,Announced Resignation.Work Force Reductions Initiated Which Will Initially Involve Approx 420 Nonessential Contractor Clerical & Crafts Personnel1989-06-0808 June 1989 PNO-V-89-033B:on 890608,licensee Continuing Cooldown of Plant.Ceo Nuclear,J Firlit,Announced Resignation.Work Force Reductions Initiated Which Will Initially Involve Approx 420 Nonessential Contractor Clerical & Crafts Personnel PNO-V-89-033A, on 890607,util Shut Down Plant & Entered Hot Shutdown Due to Voter Defeat of Measure K.Util Continuing to Implement Contingency Plan to Remove Plant from Svc. Reductions in Site Work Force Under Consideration1989-06-0707 June 1989 PNO-V-89-033A:on 890607,util Shut Down Plant & Entered Hot Shutdown Due to Voter Defeat of Measure K.Util Continuing to Implement Contingency Plan to Remove Plant from Svc. Reductions in Site Work Force Under Consideration PNO-V-89-033, on 890606,voters Defeated Measure K,Encouraging Util to Cease Operating Facility.Util Board Previously Announced That Plant Would Be Shutdown If Measure K Defeated.Safe Shutdown Plan Implemented1989-06-0707 June 1989 PNO-V-89-033:on 890606,voters Defeated Measure K,Encouraging Util to Cease Operating Facility.Util Board Previously Announced That Plant Would Be Shutdown If Measure K Defeated.Safe Shutdown Plan Implemented PNO-V-89-030, on 890518,airborne Process Monitors for Reactor Bldg Stack,Auxiliary Bldg Stack & Auxiliary Bldg Grade Level Vent Inoperable.Caused by Computer Controlled Svc Air Purge Valves in Open Position.Possibly Caused by Software Errors1989-05-19019 May 1989 PNO-V-89-030:on 890518,airborne Process Monitors for Reactor Bldg Stack,Auxiliary Bldg Stack & Auxiliary Bldg Grade Level Vent Inoperable.Caused by Computer Controlled Svc Air Purge Valves in Open Position.Possibly Caused by Software Errors IR 05000312/19890071989-04-28028 April 1989 Insp Rept 50-312/89-07 on 890417-21.No Violations Noted. Major Areas Inspected:Previously Identified Items & Status of Emergency Preparedness Program IR 05000312/19890041989-03-31031 March 1989 Insp Rept 50-312/89-04 on 890114-0303.Violations Noted.Major Areas Inspected:Operational Safety Verification,Health Physics & Security Observations,Esf Sys Walkdown,Maint,Qa Surveillance & Testing & Followup Items ML20248J6521989-03-31031 March 1989 Notice of Violation from Insp on 890114-0303.Violations Noted:Engineering Change Notice Not Initiated for Rebuilt Governor for Auxiliary Feed Pump Installed on 890131 & Maint Work Request Not Reviewed Prior to Performance of Test IR 05000312/19880391989-03-28028 March 1989 SALP Rept 50-312/88-39 for July 1986 - Dec 1988 ML20244A8021989-03-28028 March 1989 SALP Rept 50-312/88-39 for July 1986 - Dec 1988 ML20244B1141989-03-27027 March 1989 Notice of Violation from Insp on 890123-0217.Violations Noted:Nonconformance Rept Not Written After Determination That Debris Caused Failure of Two Instrument Air Sys Check Valves During Performance of Test Procedure STP-774 ML20244B1161989-03-24024 March 1989 Insp Rept 50-312/89-01 on 890123-0217.Violations Noted.Major Areas Inspected:Maint Program & Implementation of Related Activities IR 05000312/19880421989-02-13013 February 1989 Insp Rept 50-312/88-42 on 881227-30 & 890125-27.No Violations Noted.Major Areas Inspected:Followup Items,Part 21 Repts,Lers & Licensee Program to Maintain Quality of Diesel Generator Fuel Oil IR 05000312/19880411989-02-13013 February 1989 Insp Rept 50-312/88-41 on 881214-890103.No Violations Noted. Major Areas Inspected:Onsite Followup of Event of 881212 & Associated Mgt Meetings on 881219 & 890103.Weaknesses Observed Re Decision to Operate Plant in Degraded State IR 05000312/19880401989-02-0606 February 1989 Insp Rept 50-312/88-40 on 881208-890113.No Violations or Deviations Noted.Major Areas Inspected:Operational Safety Verification,Health Physics & Security Observations,Esf Sys Walkdown,Maint,Qa & Surveillance & Testing ML20235T2211989-02-0606 February 1989 Exam Rept 50-312/OL-88-02 on 881206-13.Exam Results:All Seven Senior Reactor Operator Candidates Passed Written & Oral Exams ML20196B6881988-11-30030 November 1988 PNS-V-88-006:on 881126,licensee Received Telcon Alleging That Nonlicensed Equipment Operator Observed Using Illegal Drugs.Individual Submitted to Urinalysis Test & Showed Positive for Marijuana.Individual Terminated on 881130 IR 05000312/19880351988-11-21021 November 1988 Mgt Meeting Rept 50-312/88-35 on 881114.Major Areas Discussed:Licensee Operational Performance Since Restart in Mar 1988 & Progress Re Restart Commitments in Areas of Engineering,Procurement,Maint & Effluent Sys Areas 1999-08-31
[Table view] |
See also: IR 05000312/1986008
Text
- .
. .
U. S. NUCLEAR REGULATORY COMMISSION
REGION V
Report No. 50-312/86-08
, Docket No. 50-312
License No. DPR-54
Licensee:
'
Sacramento Municipal Utility District'
P. O. Box-15830
Sacramento,~ California 95813
-
'
Facility Name: Rancho Seco Unit 1s
Inspection at: Herald,' California (Rancho Seco Site)
Inspection conduct d: F r 3 March 7, 1986
Inspectors:
G. PyPeprez, Ap
'
C
~ Spi 6pResidentInspector Date Signed
hb
(0' 'Y
C. J. 'ers ' si Inspector Date Signed
N-3/ M
L. g! Miller, @ tion Chief Date Signed
, Summary:
Inspection between February 3 to March 7, 1986 (Report 50-312/86-08)
Areas Inspected: This routine inspection by the Resident Inspectors involved
the areas of operational ~ safety. verification, maintenance, safety system
verification, and surveillance. During this' inspection, Inspection Procedures
61726, 62703, 71707, 71710, 90712, 94703, 94703, 94702 and 30703 were used.
Results: Of the areas inspected, one apparent violation on tool control was
identified. Also three unresolved items dealing with station batteries, and
one open item in the security area were identified.
,
l
l
t
s
8604150510 860403
PDR ADOCK 05000312
G PDR
.
_-_-__--_-_-.-,-,ae-
. .
DETAILS
1. Persons Contacted
a. Licensee Personnel
G. Coward, Manager, Nuclear Plant
- J. McColligan, Assistant Manager, Nuclear Plant
S. Redeker, Nuclear Operations Manager
J. Shetler, Nuclear Scheduling Manager
B. Spencer, Nuclear Operations Superintendent
- M. Price, Nuclear Mechanical Maintenance Superintendent
N. Brock, Nuclear I&C Maintenance Superintendent -
- R. Colombo, Regulatory Compliance Superintendent
- J. Field, Nuclear Technical Support Superintendent
- S. Crunk, Incident Analysis Group Supervisor
J. Jurkovich, Site Resident Engineer
- F. Kellie, Acting Chemical and Radiation Supervisor
L. Schwieger, Quality Assurance Manager
M. Hieronimos, Assistant to the Operations Superintendent
D. Comstock, Assistant to the Operations Superintendent
- J. Jewett, Site QA Supervisor
- H. Canter, QA Operations Surveillance Supervisor
- C. Stephenson, Regulatory Compliance Engineer
- B. Daniels, Supervisor,_ Electrical Engineering
- R. Lawrence, Assistant to Department Manager
- J. Irwin, Supervisor, I&C' Maintenance
- T. Tucker, Nuclear- Operations Superintendent
- C. Linkhart, Electrical Maintenance Superintendent
Other licensee employees contacted included t'echnicians, operators,
mechancies, security and office personnel.
- Attended the Exit Meeting on March 11, 1986.
2. Operational Safety Verification
At the start of this report period the plant was in a cold shutdown
condition. The plant has been in this mode of operation since the
December 26, 1985 plant trip initiated by a loss of integrated control
system power.
l
During this period the inspectors observed control room operations, 4
verified proper control room staffing, reviewed applicable logs,
conducted discussions with the operations crews, reviewed selected
emergency systems, reviewed tag-out records, verified proper removal from j
service of affected components,'and verified the licensee's adherence to
. limiting conditions for operations.
Tours of the auxiliary, turbine,'and reactor buildings and the general
site area were conducted to observe plant equipment condition, and to
!
. . _. .- - . .
2
.. ,
J
- verify that maintenance requests had been initiated for equipment in need
of maintenance.
'
'
The inspectors reviewed portions of non-licensed operator logs, conducted
various discussions with the non-licensed operators and observed them
[
performing their assigned duties.
, During tours of the facility, the inspectors frequently entered
L
-
radiologically. controlled areas. The. inspectors verified _ compliance:with
the licensee's radiation protection program. .The inspectors discussed '
l
the radiation work permit- requirements and,the. radiological conditions of'
the work areas with workers in the radiologically controlled areas.
Also, the inspectors verified proper clothing requirements and observed "'
the method of personal frisking when exiting radiological controlled
areas. The inspectors randomly examined selected. radiation protection ,
instruments to verify operability and adherence to' calibration frequence.
In addition, the pig-pen areas of the A and B OTSG were observed for
proper radiological controls.
'
The physical security plan was evaluated on a daily basis during this
.
period by observing security. performance during theLinspector's daily
activities. This involved the entry process, wearing of photo . j
identification badges by personnel, escorting of. visitors, and security
compensatory measures. The inspector found a personnel security badge -
~
l
inside the restricted area.on March 6, 1986. Additionally,' the person
who lost his security badge was acting as a visitor escort. The
inspector observed the licensee's action which included, in order, the
~ ,
l
dispatchment of. officers to an area where the person:without the badge J
was thought to'be, use of the public address system to locate.the
-individual, and finally, the identification and' recovery of the. .
,
individual. Due to.the nature of this event, the inspector contacted the .!
L
'
Region V office and the event will be inspected during a future security
inspection. This item will 4e considered open (50-312/86-08-01).
.l
3. Monthly Maintenance Observation
Station maintenance activities of' safety-related and non-safety-related
systems and components listed below were observed and reviewed to
ascertain that they were conducted in accordance with approved. _
procedures, regulatory guidesi and industry codes or standards and in
conformance with technical specifications-
.j
'
The following items were considered duringethis review: The limiting,
conditions for operation were met while. components ~or systems were
removed from service'; approvals were obtained prior =to initiating the -
work; activities were< accomplished'using approved procedures and were u
- inspected as= applicable; functional testing and/or calibrations were. -
1
performed prior to returning ' components ' or: systems to service; activities " j
were accomplished by qualified 4 personnel;; radiological controls were ,
'
,
p
implemented; and, ,
fire prevention controls'were< implemented. .s
' '
r *
.
.
.
. _ .. '4
l
' Included in this' area ~was the review and ob'servation of' troubleshooting
activities'related to' valves *that had; failed.to. operate properly;during
-
the December ~26,'1985 event. -'
L s
l
i 3 ,
,~
r,. .,
-
n j
- -
s i /' . -
,
.
'
'_ ____i __ ..____i _ _ _ _ _ - - - - - - - - - - - - - - - - - - - - - - - - - - - - ' - - - - - - - - - " ^ - - - -
'
- ~ ' ' ' ~ - - - -
., , ,.
- ~ ^ ^ ^ ~ ~ ~ ~ ~ - - ~ ~ ~j
. . . . . _
,,
4
- s ,
o
-
, ,
'
.
-
-
3
, . .
The following items were observed and/or' reviewed:
' ~
The dissassembly and reas ably o'f the hand operator-device of
the auxiliary feedwater' controlivalves 'FV-20527 and.FV-20528. -
c This also included the troubleshooting investigation of the
.
o
valves' performance. t
,
- p , -
'
I
'The troubleshooting,' dissassembly and ' reassembly of auxiliary
-
feedwater manual isolation valves, FWS-063.
'
,
, The' stroking of auxiliary feedwater manual isolation valves,.
,
FWS-064, to, verify the operability of the1 valve.
L The' inspector verified that the written maintenance instructions were
followed during the work for all. of these items. - No violations or
-
1 deviations were identified. i
!
,
' 10CFR 50, Appendix B, Criterion _12 requires that measures shall be
^
established to assure that tools,tga'uges, instruments and other.
~
measuring and test' devices used in activities affecting_ quality are
, properly controlled. Additionally the licensee's Quality Assurance
4
i
Policy 12' requires the same measures for control ~of measuring and-
test devices as Criterion 12.L AP 18, Plant Heusekeeping and
Inspection,. requires that " Tools and test equipment shall be stored
in their proper location at the end of the workday 'and anytime when
~
} :
r not_in use." -
,
j
.
1
Contrary ,to these requirements, _ the inspector found, on two occasions,
a
calibrated tools uncontrolled at the work site, when no work:was being
, accomplished. On March 5, and again on March 7, as.the inspector ~was; j
i
~
making a tour of the computer roomL adjacent to the control room, between ,
L 6:30 a.m.' and 7:00 a.m. , the inspector observed the following unattended '
calibrated tools placed on'a tool. cart, in ca'rdboard boxes,.and'on the
'
'i
[i floor-
'
l
J
CTE - 30788 Crimper
,.
! CTE - 30720' Crimper
[
'
CTE - 30682 Crimper
'
CTE - 30030 Torquing screwdriver.
CTE - 00432 Voltmeter
!
'
This is-an apparent viol: tion *(50-312/86-08-02).
-
,
4. Safety Features System Walkdown
J
f The inspector walked down'the B Diese1~ Generator system'to verify'its: _
'
- status. This was -done after a' scheduled surveillance had been completed. ,.
The inspector confirmed.the' system's valves were lined up'as per~the .
_
'
[- ' licensee'sLprocedures. -The equipmenticondition was. satisfactory. Also,
' . instrumentation that had calibration requirements 'was reviewed ~and- found-
~
'
,to be in calibration'at that time. -
'
-
4
i
s
No violations or:dev'iations were. identified. -
1 !
.
' .
_;
-
J
-
-
2
I
.. .
~ d o
3 .]
c s:
'
. ,
, _ }
r
'
-
~
y ,
"
- ; -
.- ' ' .~ ___,L. .- - . _____2,___.______3____ _________________:_______ _____;____2___;____=_ _- ____
4
, .
5. Monthly Surveillance Observation
,
The major surveillence activity during- this report period was eddy
current testing on the B Once Through Steam Generator (OTSG). The
licensee, through their secondary chemistry sampling, recognized a slight
increase in the tritium concentration level of the B OTSG prior to the
reactor shutdown of December 26, 1985. There was no other indication of
a steam generator tube leak, i.e. condenser air ejector count rate and
secondary activity were normal, and the primary to secondary leak rate
did not identify a leak. Therefore, although no indications, as defined
by the Technical Specifications, existed for an OTSG tube leak, the
licensee decided to inspect the A and B OTSG's for possible tube leaks.
By the end of this report period the licensee had completed the eddy
current testing in the B OTSG and had developed a list of tubes to be
plugged. The list of sample size and size of tube degradation'is
presented below:
TUBE SAMPLE SIZE DEGRADATION >40% DEGRADATION >20%
4
3% (929 tubes). 6 4
6% (1855 tubes) 6 7
12% (4200 tubes): 18 29
LANE / WEDGE REGION (100% SAMPLE SIZE)
642 16 20
The tubes in the greater than 40% degradation category will all be
plugged. The licensee also will plug 12 tubes in the greater than 20%
degradation category, as a preventative measure. A total of 58 tubes are
planned to be plugged. The sample size for all tube samples was more
than the minimum size identified in the Technical Specification. The
licensee has taken a conservative approach to the testing of the B OTSG
in that they followed the technical specification inservice surveillance !
requirements even though they were not required to do so at this time.
No violations or deviations were identified.
6. Management Meetings
During this report period the inspector participated in the following l
meetings with the licensee:
February 10, 1986, Licensee's presentation of findings from the
December 26, 1986 event
February 18, 1986, Licensee's. presentation on the Post Accident
Sampling System (PASS) system
'
March 4, 1986, Enforcement Conference on Security Violations
March 6, 1986, SMUD Board of Directors Meeting
_
-___-_-- __
. ..
5
7. Reviews of Degradation of Station Batteries
The inspector was notified by the licensee that they had identified
serious degradation of the batteries for the safety-related 125 volt D.C.
system (batteries A, E, C and D). The degradation was the deterioration
or flaking of the cell plates and also the flaking of the plate's hook
area where the plates connect to the cell's posts. This flaking of the
hook area is exhibited in the A, B, C and D batteries. Three unresolved
items related to this degradation were developed by the inspector.
a. Seismic Qualification
l The inspector observed the batteries' deterioration during
inspections of the battery rooms. In addition the inspector
compared the as-built condition of the batteries to the licensees'
controlled drawings (6292-E9.02-1-S1 and 6292-E9.02-22-S1) and found
l discrepancies. The controlled drawings require a cell to cell
measurement of one-half of an inch, the inspector found a majority
of the cell to cell measurements to be greater than one-half of an
l
inch. Additionally, the drawings do not specify an end gap
l measurement for the distance from the end cell to the steel end
stringer of the battery rack, yet the drawing does show, in a
sectional view, the end cell butted up against the end stringer.
The inspector found the end space measurement to vary from
three-sixteenths of an inch to up to one inch, with no end blocking
l material between the cell and the end-stringer.
The inspector also located a letter from GNB Batteries Inc., the
vendor, dated March 27, 1985 addressed to the licensee, describing
l GNB's recommendation for the spacing between the end cell and the
l end stringer of the battery rack. The spacing was recommended to be
no greater than one-quarter of an inch. The letter also stated that
the measurements were due to the vendor's seismic testing of their
batteries. It was evident that the vendor's recommendation was not
applied to the A, B, C and D batteries.
The vendor's drawing for the lay out of the original seismic
,
qualification test, (drawing 057064C), shows three battery cells
l mounted on the rack with cell to cell measurements of one-half of an
l
l
inch and end gap measurement of six and five-eighths of an inch.
This large end gap was filled with cell blocking material, which was
to be urethane, styrofoam or an approved equivalent. Therefore, it
appeared the batteries had not been installed per the design and the
seismic qualification of the batteries may have been compromised to
some degree. 'This item is considered unresolved, pending further
review of the significance of these nonconformances
(50-312/86-08-03).
b. Battery Operability-
.
The deterioration of the battery cells at the plates' attachment to
( the posts was evident in most of the cells. This type of
i
degradation was not expected of these batteries.- The licensee's
6
. ..
Updated Final Safety Analysis Report states "...that no changes have
been observed which would indicate physical weakening of cells of
similiar construction which have been in service for over 40 years,
and cells of identical construction which have been inservice for
over 15 years. The manufacturer concludes that the A, B, C and D
system batteries will be capable of meeting the specified seismic
requirements for at least 20 years after installation."
^ '
The inspector questioned whether the batteries should have been
considered operable, given the advanced deterioration of the battery
plates. Licensee representatives stated that they believe that the
batteries are operable.
These items are considered unresolved (50-312/86-08-04), pending
further review of the licensee's basis for this assertion.
c. Surveillance Program
In a previous inspection report (50-312/85-08) the inspector
identified errors and weaknesses in the surveillance program for the
station batteries. In addition it was identified that the duty
cycle discharge test performed on a refueling outage basis may not
be in compliance with the test required by the Technical
Specification (TS). TS 4.6.4.D requires the 125 volt DC system to
be tested: "...during each. refueling interval, the battery shall be
subjected to a rated load or equivalent test. . ." This test is
explained in the TS Bases as a surveillance "...which has been
demonstrated over the years to provide an indication of a cell
becoming unserviceable long before it fails." Due to the recent
indication of the batterys' physical condition it appears that the
test did not provide sufficient information to determine whether the
rate of battery deterioration was increasing. The inspector noted
that the licensee's surveillance program may not be adequate in
providing sufficient information to determine the batterys'
operability. The determination of whether the licensee's program
complied with the Technical Specifications is considered an
unresolved item (50-312/86-08-05). (Since this item is similiar to
unresolved item 85-08-01, item 85-08-01 will be administratively
closed.)
8. Exit Meeting
'
-
The resident inspectors met with licensee representatives (denoted in
paragraph 1) at various times during the report period and formally on
March ll, 1986. The scope and findings of the inspection activities as
given in this report, were summarized at the meeting.
,