Category:Report
MONTHYEARNL-24-0238, RIPE License Amendment Request to Change Containment Air Temperature Actions, Supplemental Information2024-06-14014 June 2024 RIPE License Amendment Request to Change Containment Air Temperature Actions, Supplemental Information ML24047A2092024-02-22022 February 2024 Calendar Year 2023 Baseline Inspection Completion NL-22-0510, Plants Units 1 and 2, 10 CFR 50.46 ECCS Evaluation Model Annual Report for 20212022-07-14014 July 2022 Plants Units 1 and 2, 10 CFR 50.46 ECCS Evaluation Model Annual Report for 2021 ML21214A3182021-08-0202 August 2021 301 Comments NL-20-0713, Request for One-Time Exemption from 10 CFR 50, Appendix E, Biennial Emergency Preparedness Exercise Requirements Due to COVID-19 Pandemic2020-09-21021 September 2020 Request for One-Time Exemption from 10 CFR 50, Appendix E, Biennial Emergency Preparedness Exercise Requirements Due to COVID-19 Pandemic NL-20-0034, Inservice Inspection Program Owner'S Activity Report for Outage 1R292020-01-17017 January 2020 Inservice Inspection Program Owner'S Activity Report for Outage 1R29 NL-19-0674, Proposed Alternative to Use ASME Code Case N-831-1, Ultrasonic Examination in Lieu of Radiography for Welds in Ferritic or Austenitic Pipe Section XI, Division 12019-09-30030 September 2019 Proposed Alternative to Use ASME Code Case N-831-1, Ultrasonic Examination in Lieu of Radiography for Welds in Ferritic or Austenitic Pipe Section XI, Division 1 NL-19-0795, Cameron Non-Proprietary Engineering Reports; ER-1180NP, Rev. 1, ER-1181NP, Rev. 1; ER-1182NP, Rev. 1; and ER-1183NP, Rev. 1.2019-05-31031 May 2019 Cameron Non-Proprietary Engineering Reports; ER-1180NP, Rev. 1, ER-1181NP, Rev. 1; ER-1182NP, Rev. 1; and ER-1183NP, Rev. 1. NL-17-1713, Proposed Alternative GEN-ISI-ALT-2017-03, and HNP-ISI-ALT-05-07, Version 1.0 Service Water Evaluation for Code Case N-513-4 for Moderate Pressure, and for Higher Pressure2018-04-0606 April 2018 Proposed Alternative GEN-ISI-ALT-2017-03, and HNP-ISI-ALT-05-07, Version 1.0 Service Water Evaluation for Code Case N-513-4 for Moderate Pressure, and for Higher Pressure NL-17-2061, Special Report 2017-002-00, Nonfunctional Radiation Monitor R-60B2017-12-14014 December 2017 Special Report 2017-002-00, Nonfunctional Radiation Monitor R-60B NL-17-1401, Post Accident Monitoring Report for 8 Train RVLIS2017-08-10010 August 2017 Post Accident Monitoring Report for 8 Train RVLIS NL-16-2541, Notification of 10 CFR 26.719(c) 30-Day Report for False Positive Drug Test Results2016-11-29029 November 2016 Notification of 10 CFR 26.719(c) 30-Day Report for False Positive Drug Test Results NL-16-0810, Submittal of Post Accident Monitoring Report2016-06-0909 June 2016 Submittal of Post Accident Monitoring Report NL-16-0683, Special Report No. 2016-002-00, Alternate AC Source Out of Service2016-06-0202 June 2016 Special Report No. 2016-002-00, Alternate AC Source Out of Service NL-16-0751, Special Report 2016-001-00, Nonfunctional Radiation Monitor R-60B and R-60C2016-05-23023 May 2016 Special Report 2016-001-00, Nonfunctional Radiation Monitor R-60B and R-60C ML16103A5732016-04-21021 April 2016 Final ASP Analysis (LER 364-14-002) ML16103A5722016-04-21021 April 2016 Transmittal of Final Farley Nuclear Plant Unit 2, Accident Sequence Precursor Analysis ML15253A4102016-03-11011 March 2016 Enclosure 2 Screening Analysis Report NL-15-2276, Submittal of 10 CFR 50.46 ECCS Evaluation Model Annual Report for 20142015-12-23023 December 2015 Submittal of 10 CFR 50.46 ECCS Evaluation Model Annual Report for 2014 NL-15-1489, 10 CFR 71.95 Report on Potential Issues Involving Radwaste Cask 8-12082015-08-17017 August 2015 10 CFR 71.95 Report on Potential Issues Involving Radwaste Cask 8-1208 ML15226A2292015-07-31031 July 2015 PWR Vessel Internals Program Plan for Aging Management of Reactor Internals NL-15-1507, J.M. Farley Nuclear Plant, Unit 1, PWR Vessel Internals Program Plan for Aging Management of Reactor Internals2015-07-31031 July 2015 J.M. Farley Nuclear Plant, Unit 1, PWR Vessel Internals Program Plan for Aging Management of Reactor Internals ML15182A1752015-06-26026 June 2015 Completion of Required Action by NRC Order EA-12-051 Reliable Spent Fuel Pool Level Instrumentation ML15106A3102015-04-17017 April 2015 April 22, 2015, Meeting with Southern Nuclear Company, Draft Minimum Shift Staffing Analysis NL-15-0418, Revision 6, Pressure Temperature Limits Reports2015-03-0505 March 2015 Revision 6, Pressure Temperature Limits Reports NL-15-0080, Special Report 2015-001-002015-01-26026 January 2015 Special Report 2015-001-00 NL-14-1899, Vogle, Units 1 and 2 - 10 CFR 50.46 ECCS Evaluation Model Annual Report for 20132014-12-0808 December 2014 Vogle, Units 1 and 2 - 10 CFR 50.46 ECCS Evaluation Model Annual Report for 2013 NL-14-1109, Third Six-Month Status Report of the Implementation of the Requirements of the Commission Order with Regard to Reliable Spent Fuel Pool Instrumentation (EA-12-051)2014-08-26026 August 2014 Third Six-Month Status Report of the Implementation of the Requirements of the Commission Order with Regard to Reliable Spent Fuel Pool Instrumentation (EA-12-051) ML14128A0832014-06-0303 June 2014 Staff Assessment of the Flooding Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 ML14098A4752014-04-16016 April 2014 Unit 1 - Staff Assessment of the Seismic Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima Dai-Ichi Nuclear Power Plant Accident ML14101A1192014-04-16016 April 2014 Staff Assessment of the Seismic Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima Dai-Ichi Nuclear Power Plant Accident NL-14-0342, Units 1 and 2, Seismic Hazard and Screening Report for CEUS Sites2014-03-31031 March 2014 Units 1 and 2, Seismic Hazard and Screening Report for CEUS Sites NL-14-0249, Joseph M. Farley, Unit 1, Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 3 Page 392 of 562 Through 429 of 5622014-02-20020 February 2014 Joseph M. Farley, Unit 1, Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 3 Page 392 of 562 Through 429 of 562 NL-14-0249, Joseph M. Farley, Unit 1, Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 3 Page 501 of 562 Through 542 of 5622014-02-20020 February 2014 Joseph M. Farley, Unit 1, Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 3 Page 501 of 562 Through 542 of 562 NL-14-0249, Joseph M. Farley, Unit 1, Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 3 Page 543 of 562 Through Attachment 62014-02-20020 February 2014 Joseph M. Farley, Unit 1, Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 3 Page 543 of 562 Through Attachment 6 NL-14-0249, Joseph M. Farley, Unit 1, Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 3 Page 351 of 562 Through 391 of 5622014-02-20020 February 2014 Joseph M. Farley, Unit 1, Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 3 Page 351 of 562 Through 391 of 562 NL-14-0249, Joseph M. Farley, Unit 1, Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 3 Page 313 of 562 Through 350 of 5622014-02-20020 February 2014 Joseph M. Farley, Unit 1, Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 3 Page 313 of 562 Through 350 of 562 NL-14-0249, Joseph M. Farley, Unit 1, Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 3 Page 430 of 562 Through 462 of 5622014-02-20020 February 2014 Joseph M. Farley, Unit 1, Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 3 Page 430 of 562 Through 462 of 562 NL-14-0249, Joseph M. Farley, Unit 1, Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 7 Page 57 of 217 Through 107 of 2172014-02-20020 February 2014 Joseph M. Farley, Unit 1, Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 7 Page 57 of 217 Through 107 of 217 NL-14-0249, Joseph M. Farley, Unit 1, Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 3 Page 463 of 562 Through 500 of 5622014-02-20020 February 2014 Joseph M. Farley, Unit 1, Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 3 Page 463 of 562 Through 500 of 562 ML14051A7342014-02-20020 February 2014 Updated Seismic Recommendation 2.3 Walkdown Report NL-14-0249, Enclosure 1, Updated Seismic Recommendation 2.3 Walkdown Report, Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 22014-02-20020 February 2014 Enclosure 1, Updated Seismic Recommendation 2.3 Walkdown Report, Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 2 ML14071A0622014-02-20020 February 2014 Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 3 Page 1 of 562 Through 46 of 562 ML14071A0632014-02-20020 February 2014 Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 7 Page 107 of 217 Through Attachment 8 Through End ML14071A0642014-02-20020 February 2014 Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 3 Page 47 of 562 Through 90 of 562 ML14071A0652014-02-20020 February 2014 Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 3 Page 91 of 562 Through 125 of 562 ML14071A0662014-02-20020 February 2014 Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 3 Page 126 of 562 Through 160 of 562 ML14071A0692014-02-20020 February 2014 Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 3 Page 234 of 562 Through 272 of 562 ML14071A0702014-02-20020 February 2014 Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 3 Page 273 of 562 Through 312 of 562 ML14071A0762014-02-20020 February 2014 Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 3 Page 501 of 562 Through 542 of 562 2024-06-14
[Table view] Category:Technical
MONTHYEARNL-22-0510, Plants Units 1 and 2, 10 CFR 50.46 ECCS Evaluation Model Annual Report for 20212022-07-14014 July 2022 Plants Units 1 and 2, 10 CFR 50.46 ECCS Evaluation Model Annual Report for 2021 NL-20-0713, Request for One-Time Exemption from 10 CFR 50, Appendix E, Biennial Emergency Preparedness Exercise Requirements Due to COVID-19 Pandemic2020-09-21021 September 2020 Request for One-Time Exemption from 10 CFR 50, Appendix E, Biennial Emergency Preparedness Exercise Requirements Due to COVID-19 Pandemic NL-19-0674, Proposed Alternative to Use ASME Code Case N-831-1, Ultrasonic Examination in Lieu of Radiography for Welds in Ferritic or Austenitic Pipe Section XI, Division 12019-09-30030 September 2019 Proposed Alternative to Use ASME Code Case N-831-1, Ultrasonic Examination in Lieu of Radiography for Welds in Ferritic or Austenitic Pipe Section XI, Division 1 NL-19-0795, Cameron Non-Proprietary Engineering Reports; ER-1180NP, Rev. 1, ER-1181NP, Rev. 1; ER-1182NP, Rev. 1; and ER-1183NP, Rev. 1.2019-05-31031 May 2019 Cameron Non-Proprietary Engineering Reports; ER-1180NP, Rev. 1, ER-1181NP, Rev. 1; ER-1182NP, Rev. 1; and ER-1183NP, Rev. 1. NL-17-1401, Post Accident Monitoring Report for 8 Train RVLIS2017-08-10010 August 2017 Post Accident Monitoring Report for 8 Train RVLIS ML16103A5722016-04-21021 April 2016 Transmittal of Final Farley Nuclear Plant Unit 2, Accident Sequence Precursor Analysis ML16103A5732016-04-21021 April 2016 Final ASP Analysis (LER 364-14-002) ML15226A2292015-07-31031 July 2015 PWR Vessel Internals Program Plan for Aging Management of Reactor Internals NL-15-1507, J.M. Farley Nuclear Plant, Unit 1, PWR Vessel Internals Program Plan for Aging Management of Reactor Internals2015-07-31031 July 2015 J.M. Farley Nuclear Plant, Unit 1, PWR Vessel Internals Program Plan for Aging Management of Reactor Internals ML14098A4752014-04-16016 April 2014 Unit 1 - Staff Assessment of the Seismic Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima Dai-Ichi Nuclear Power Plant Accident NL-14-0342, Units 1 and 2, Seismic Hazard and Screening Report for CEUS Sites2014-03-31031 March 2014 Units 1 and 2, Seismic Hazard and Screening Report for CEUS Sites NL-14-0249, Joseph M. Farley, Unit 1, Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 3 Page 197 of 562 Through 233 of 5622014-02-20020 February 2014 Joseph M. Farley, Unit 1, Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 3 Page 197 of 562 Through 233 of 562 NL-14-0249, Joseph M. Farley, Unit 1, Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 3 Page 273 of 562 Through 312 of 5622014-02-20020 February 2014 Joseph M. Farley, Unit 1, Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 3 Page 273 of 562 Through 312 of 562 NL-14-0249, Joseph M. Farley, Unit 1, Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 7 Page 107 of 217 Through Attachment 8 Through End2014-02-20020 February 2014 Joseph M. Farley, Unit 1, Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 7 Page 107 of 217 Through Attachment 8 Through End NL-14-0249, Joseph M. Farley, Unit 1, Enclosure 1, Updated Seismic Recommendation 2.3 Walkdown Report, Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachme2014-02-20020 February 2014 Joseph M. Farley, Unit 1, Enclosure 1, Updated Seismic Recommendation 2.3 Walkdown Report, Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment NL-14-0249, Joseph M. Farley Nuclear Plant, Unit 1 - Updated Seismic Recommendation 2.3 Walkdown Report2014-02-20020 February 2014 Joseph M. Farley Nuclear Plant, Unit 1 - Updated Seismic Recommendation 2.3 Walkdown Report NL-14-0249, Joseph M. Farley, Unit 1, Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 3 Page 1 of 562 Through 46 of 5622014-02-20020 February 2014 Joseph M. Farley, Unit 1, Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 3 Page 1 of 562 Through 46 of 562 NL-14-0249, Joseph M. Farley, Unit 1, Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 3 Page 392 of 562 Through 429 of 5622014-02-20020 February 2014 Joseph M. Farley, Unit 1, Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 3 Page 392 of 562 Through 429 of 562 NL-14-0249, Joseph M. Farley, Unit 1, Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 3 Page 126 of 562 Through 160 of 5622014-02-20020 February 2014 Joseph M. Farley, Unit 1, Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 3 Page 126 of 562 Through 160 of 562 NL-14-0249, Joseph M. Farley, Unit 1, Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 3 Page 47 of 562 Through 90 of 5622014-02-20020 February 2014 Joseph M. Farley, Unit 1, Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 3 Page 47 of 562 Through 90 of 562 NL-14-0249, Joseph M. Farley, Unit 1, Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 3 Page 91 of 562 Through 125 of 5622014-02-20020 February 2014 Joseph M. Farley, Unit 1, Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 3 Page 91 of 562 Through 125 of 562 NL-14-0249, Joseph M. Farley, Unit 1, Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 3 Page 234 of 562 Through 272 of 5622014-02-20020 February 2014 Joseph M. Farley, Unit 1, Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 3 Page 234 of 562 Through 272 of 562 NL-14-0249, Joseph M. Farley, Unit 1, Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 3 Page 351 of 562 Through 391 of 5622014-02-20020 February 2014 Joseph M. Farley, Unit 1, Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 3 Page 351 of 562 Through 391 of 562 NL-14-0249, Joseph M. Farley, Unit 1, Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 7 Page 108 of 217 Through 161 of 2172014-02-20020 February 2014 Joseph M. Farley, Unit 1, Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 7 Page 108 of 217 Through 161 of 217 NL-14-0249, Joseph M. Farley, Unit 1, Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 7 Page 57 of 217 Through 107 of 2172014-02-20020 February 2014 Joseph M. Farley, Unit 1, Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 7 Page 57 of 217 Through 107 of 217 NL-14-0249, Joseph M. Farley, Unit 1, Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 3 Page 430 of 562 Through 462 of 5622014-02-20020 February 2014 Joseph M. Farley, Unit 1, Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 3 Page 430 of 562 Through 462 of 562 NL-14-0249, Joseph M. Farley, Unit 1, Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 3 Page 543 of 562 Through Attachment 62014-02-20020 February 2014 Joseph M. Farley, Unit 1, Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 3 Page 543 of 562 Through Attachment 6 NL-14-0249, Joseph M. Farley, Unit 1, Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 3 Page 501 of 562 Through 542 of 5622014-02-20020 February 2014 Joseph M. Farley, Unit 1, Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 3 Page 501 of 562 Through 542 of 562 NL-14-0249, Joseph M. Farley, Unit 1, Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 3 Page 463 of 562 Through 500 of 5622014-02-20020 February 2014 Joseph M. Farley, Unit 1, Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 3 Page 463 of 562 Through 500 of 562 ML14071A0692014-02-20020 February 2014 Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 3 Page 234 of 562 Through 272 of 562 ML14071A0812014-02-20020 February 2014 Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 7 Page 162 of 217 Through 193 of 217 ML14071A0802014-02-20020 February 2014 Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 7 Page 108 of 217 Through 161 of 217 ML14071A0792014-02-20020 February 2014 Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 7 Page 57 of 217 Through 107 of 217 ML14071A0742014-02-20020 February 2014 Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 3 Page 430 of 562 Through 462 of 562 ML14071A0772014-02-20020 February 2014 Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 3 Page 543 of 562 Through Attachment 6 ML14071A0762014-02-20020 February 2014 Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 3 Page 501 of 562 Through 542 of 562 ML14071A0752014-02-20020 February 2014 Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 3 Page 463 of 562 Through 500 of 562 ML14071A0732014-02-20020 February 2014 Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 3 Page 392 of 562 Through 429 of 562 ML14071A0722014-02-20020 February 2014 Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 3 Page 351 of 562 Through 391 of 562 ML14071A0712014-02-20020 February 2014 Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 3 Page 313 of 562 Through 350 of 562 ML14071A0702014-02-20020 February 2014 Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 3 Page 273 of 562 Through 312 of 562 ML14071A0682014-02-20020 February 2014 Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 3 Page 197 of 562 Through 233 of 562 NL-14-0249, Joseph M. Farley, Unit 1, Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 3 Page 161 of 562 Through 196 of 5622014-02-20020 February 2014 Joseph M. Farley, Unit 1, Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 3 Page 161 of 562 Through 196 of 562 ML14071A0672014-02-20020 February 2014 Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 3 Page 161 of 562 Through 196 of 562 ML14071A0662014-02-20020 February 2014 Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 3 Page 126 of 562 Through 160 of 562 ML14071A0652014-02-20020 February 2014 Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 3 Page 91 of 562 Through 125 of 562 ML14071A0642014-02-20020 February 2014 Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 3 Page 47 of 562 Through 90 of 562 ML14071A0632014-02-20020 February 2014 Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 7 Page 107 of 217 Through Attachment 8 Through End ML14071A0622014-02-20020 February 2014 Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 3 Page 1 of 562 Through 46 of 562 NL-14-0249, Joseph M. Farley, Unit 1, Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 3 Page 313 of 562 Through 350 of 5622014-02-20020 February 2014 Joseph M. Farley, Unit 1, Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 3 Page 313 of 562 Through 350 of 562 2022-07-14
[Table view] |
Text
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0 Sheet iofY4 S iF1" Status: Y[O NI] UfI Seismic Walkdown Checklist (SWC)
Equipment ID No. 0QH21E005-1 3 Equip. Class' 20 Equipment Description 4.16KV SWMTCHGEAR 1G LOCAL CONT PANEL Location: Bldg, AUXILIARY Floor El. 121 Room, Area _ --._--
Manufacturer, Model, Etc. (optional but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorace
- 1. Is the anchorage configuration verification required (i.e., is the item one Y& NE]
of the 50% of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? YE] NO' UE N/AO
- 3. Is the anchorage free of corrosion that is more than mild surface Y] No- UV N/Al]
oxidation?
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Y16 NEo Uri N/AF-1 CINC ;ý ý "'N C x Vx Qix V, ( -
(>)~ 'ý*
- 5. Is the anchorage configuration consistent with plant documentation? Y-] NO UE N/AI (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yr-] NEU potentially adverse seismic conditions?
Enter the equipment class name from Appendix B: Classes of Equipment.
Page 161 of 562
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0 Sheet 2of "q Status: Yi ND UD Seismic Walkdown Checklist (SWC)
Equipment ID No. 01H21EO05 Equip. ClassW 20 Equipment Description 4.1J6KV SWITCHGEAR 1G LOCALCONT PANEL Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? YQ NO UO N/AC
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Y16 NCI UI N/AC and masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yt NC UC N/AC
- 10. Based on the above seismic interaction evaluations, is equipment free Y1 NM UC of potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no other seismic conditions that could Yd NC UC adversely affect the safety functions of the equipment?
Comments (Additional pages may be added as necessary)
Evaluated by- D T_ I(--Q Date: QL ý_ IZý- _
/ ~ ~ JLj<C~l~)hrAT 6-JcýZ A Page 162 of 562
NO. SNCF164-RPT-01, VERSION 2.0 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS Page 163 of 562
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0
/
Page 164 of 562
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0 Sheet 1 ofZ fl-Ii-L Status: YE] NE- UJ01 Seismic Walkdown Checklist (SWC)
Equipment ID No. Q1H21E505 Equip. Class' 20 Equipment Description 4.16KV SWITCHGEAR IJ LOCAL CONTROL PANEL Location: Bldg. DIESEL Floor El. 155' Room, Area 0056C Manufacturer, Model, Etc. (optional but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Waikdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorae
- 1. Is the anchorage configuration verification required (i.e., is the item one Y'N of the 50% of SWEL items requiring such verification)?
P.~?rSC SF-VAS, Ack.,c S 124 (ck
- 2. Is the anchorage free of bent, broken, missing or loose hardware? YO NO UR(N/A0 CV,0, 6L ,-03 C. V 6C v c ,-;D%*,* 0 04*,, -- ' w u,,A -
-to c->r- cc,6,-.a*4- -a,, -ces" a-.cl-r*-oje.
- 3. Is the anchorage free of corrosion that is more than mild surface YO NO U/0 N/AO oxidation?
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? YQ NO U1 "N/AQ
- 5. Is the anchorage configuration consistent with plant documentation? YO NO Uyl'N/AO (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of YO NO UP, potentially adverse seismic conditions?
I Enter the equipment class name from Appendix B: Classes of Equipment.
Page 165 of 562
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0 (a
Status: Sheet 2 of 2-Y[E] Nr!] U0' Seismic Walkdown Checklist (SWC) S Equipment ID No. 01H21E505 Equip. Class, 20 Equipment Description 4.16KV SWITCHGEAR 1J LOCAL CONTROL PANEL Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yp3NO UO N/AQ 1 -K '/
4' 4 * . 7.-nv... - - e.
&C 44- ' X*1 pj 41L.. ~tI.- 4o~ Ac 4er~e nics 4'4- Cccf%&VI- reAAW.v*. 1 41ýe pm,,1 Asn "L' I6rak4 -js 'tAlc)4 rc~~v, 44-.~~ ~ ~o~ i- ý.t 4,o 41-t ~wa. P
- 8. Are overhead equipment, distribution systems, ceiling dies and lighting, Y4 NO U N/IAO and masonry block walls not likely to collapse onto the equipment?
4-.jrCtcc>A;,eiýe ,NA-. -sv 4cA-c~; l: ,, 4c '
- 9. Do attached lines have adequate flexibility to avoid damage? Y*'N[I UO N/AQ
- 10. Based on the above seismic interaction evaluations, is equipment free Yq'NO UQ of potentially adverse seismic interaction effects?
Other Adverse Conditions I1. Have you looked for and found no other seismic conditions that could Y,**No UO adversely affect the safety functions of the equipment?
Comments (Additional pages may be added as necessary)
Evaluated by: ,f*ya." 14.A, s Date: '45A.-zC
/0 /5 Page 166 of 562
CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0 ATTACHMENT 3: SEISMIC WALKDOWN I-% 1 c
'a.,1 t.14
(
(i" "2 /
1777 7 Page 167 of 562
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0 go Page 168 of 562
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0 lF.-44 - S"-.4 I rrow bebw is to show the cwentabon jwheh points from Floor to Ced Page 169 of 562
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0 Page 170 of 562
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0 F' 4s, Sheet I of 19 Status: YO NEI UI Seismic Walkdown Checklist (SWC)
Equipment ID No. Q1H21E506 Equip. Class' 20 Equipment Description 4.16KV SWITCHGEAR 1K LOCAL CONT PANEL Location: Bldg. SWIS Floor El. 188 Room, Area -72,*
Manufacturer, Model, Etc. (optional but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is the anchorage configuration verification required (i.e., is the item one Y51 NO of the 50% of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? YO NOI U/I* N/AO
- 3. Is the anchorage free of corrosion that is more than mild surface YO NO Uý' N/AO oxidation?
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? YO NO UX NiAO Y171I NMl Uý' N/AII
- 5. Is the anchorage configuration consistent with plant documentation?
(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of YO NO U potentially adverse seismic conditions?
Enter the equipment class name from Appendix B: Classes of Equipment.
Page 171 of 562
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0 Sheet 2 of %4 FO-'iS Status: YI NO UZ Seismic Walkdown Checklist (SWC)
Equipment ID No. Q1H21E506 Equip. Class, 20 Equipment Description 4.16KV SWITCHGEAR 1K LOCAL CONT PANEL Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures?
Y NE UO N/AQ
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Yý NO U- N/AQ and masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? ý NO UO N/AO
- 10. Based on the above seismic interaction evaluations, is equipment free Yk NO UD of potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no other seismic conditions that could A NO UO adversely affect the safety functions of the equipment?
Comments (Additional pages may be added as necessary) fp~sl oMarv'-'
Evaluated b-/ l,!tA, Date: 15lz0,/2-1 L
- lcI\I AMU~~ TnQOhlLeii C Page 172 of 562
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0
~11
~r.
C'
£ Page 173 of 562
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0
,f..q-,. (%siEe) ....... ..... ........
kr ti Page 174 of 562
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0 Sheet 1 of Xf Status: YD NE] U@
Seismic Walkdown Checklist (SWC)
Equipment ID No. Q1H21E527 Equip. Class, 20 Equipment Description DIESEL GENERATOR 1B LOCAL CONT PANEL Location: Bldg. DIESEL Floor El. 155 Room, Area C.Cf Manufacturer, Model, Etc. (optional but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchora2e
- 1. Is the anchorage configuration verification required (i.e., is the item one Y3Q NEI-of the 50% of SWEL items requiring such verification)?
loot- vis bt. cd.* -Hr"C o& wial43own.
- 2. Is the anchorage free of bent, broken, missing or loose hardware? YC77 NC U0 N/A"
- 3. Is the anchorage free of corrosion that is more than mild surface YO] NC UA N/AC oxidation?
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? YO NO U3 N/AC
- 5. Is the anchorage configuration consistent with plant documentation? YOI NC U[I5 N/AC (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of YO' NEI U2 potentially adverse seismic conditions?
IEnter the equipment class name from Appendix B: Classes of Equipment.
Page 175 of 562
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0 P1Iiqf Sheet 2 of "
Status: YLI NEI uO Seismic Walkdown Checklist (SWC)
Equipment ID No. QIH21E527 Equip. Class, 20 Equipment Description DIESEL GENERATOR 18 LOCAL CONT PANEL Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Y% NO ur-] N/A[
4p~e~i c AVI-L ~* A-4k Wb~e4WrM e.-j
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Y$ NEI U- N/A]
and masonry block walls not likely to collapse onto the equipment?
CIm t IV3
- 9. Do attached lines have adequate flexibility to avoid damage? YNO uo N/AO
- 10. Based on the above seismic interaction evaluations, is equipment free NO UO-]
of potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no other seismic conditions that could Y N i U]
adversely affect the safety functions of the equipment? /
Comments (Additional pages may be added as necessary)
. ."S0
- - - N=ý Evaluated' : 2 / ~ 4.IlJ.(LL~yeDate: B~
'I
ýýia L~Q&L~ r\Acte4a~f Q'-Z'+-jrz 6-Page 176 of 562
NO. SNCF164-RPT-01, VERSION 2.0 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS Page 177 of 562
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0 CA E:
Page 178 of 562
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0 fýt 7 Sheet 1of 'r-.
Status: Y[] N1 U[]
Seismic Walkdown Checklist (SWC)
Equipment ID No. QIH21NBAFP2605A Equip.
Equipment Description HOT SHUTDOWN PANEL A Location: Bldg. AUXILIARY Floor El. 121 Room, Area 7( Z*-54 Manufacturer, Model, Etc. (optional but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorane
- 1. Is the anchorage configuration verification required (i.e., is the item one Y0 NCI of the 50% of SWEL items requiring such verification)? I-
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Ya NC UC N/ACI
- 3. Is the anchorage free of corrosion that is more than mild surface Y- NCI UCI N/A[]
oxidation?
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? YU NCI UC N/AC Is the anchorage configuration consistent with plant documentation? YA NC UC] N/AC (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification isrequired.)
Ie-ves-vc.?ny-W8C, 6/q4.
- 6. Based on the above anchorage evaluations, is the anchorage free of YN NEI U0 potentially adverse seismic conditions?
I Enter the equipment class name from Appendix B: Classes of Equipment.
Page 179 of 562
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0 Sheet 2 Of/
FVP1 Status: Y[] NT3U[1]
Seismic Walkdown Checklist (SWC)
Equipment ID No. QIH21NBAFP2605A Equip.
Equipment Description HOT SHUTDOWN PANEL A Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Y14NDNOU N/AD
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Yo NO UD" N/AO and masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Y1 NE UO N/AD
- 10. Based on the above.seismic interaction evaluations, is equipment free Y;ND NOID of potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no other seismic conditions that could YE] N LD U
adversely affect the safety functions of the equipment?
A cabCrym- t4nor my or bPCO ThAa MAines *g is /dde CoMmenUts(Additional pages may be added as necessary)
Evaluated by: JUUA& "QY *o
- tc¶ 4GW.UW-C* Madcq*I Date: [,9/L/ILZ Page 180 of 562
NO. SNCF164-RPT-01, VERSION 2.0 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS 7N Page 181 of 562
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0
,1~ - i-I
/ i', .1-Page 182 of 562
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0 Page 183 of 562
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0 Sheet 1 of WO5 Status: YE] NO U[1 Seismic Walkdown Checklist (SWC)
Equipment ID No. QIH22LOOIE, PkA Equip. Class, 20 FI-48 Equipment Description MULTIPLYING RELAY CABINET 1E Location: Bldg. AUX Floor El. 139 Room, Area 318 Manufacturer, Model, Etc. (optional but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is the anchorage configuration verification required (i.e., is the item one YO NO of the 50% of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? YZ N] UD N/AD
- 3. Is the anchorage free of corrosion that is more than mild surface YZ NE] UQ N/AD oxidation?
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? YCD NEI U-I N/AD
- 5. Is the anchorage configuration consistent with plant documentation? Y] NO UD N/A0 (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
4 spring nuts used to mount panel to unistrutsupport.cannot find associateddrawing.
- 6. Based on the above anchorage evaluations, is the anchorage free of Y0 NEI UD potentially adverse seismic conditions?
Enter the equipment class name from Appendix B: Classes of Equipment.
Page 184 of 562
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0 Sheet 2 of0 "
Status: YE] NW IU[-
Seismic Walkdown Checklist (SWC)
Equipment ID No. Q¢H22LOOIE Equip. Class, 20 Equipment Description MULTIPLYING RELAY CABINET 1E Interaction Effects
,/
- 7. Are soft targets free from impact by nearby equipment or structures? YO N,[*JC U 0 N/AD
-- IU
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Y\*, ND U(] N/AD and masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yý NND UD N/AD
- 10. Based on the above seismic interaction evaluations, is equipment free YD Ný UD" of potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no other seismic conditions that could Yi4N'- UD1 adversely affect the safety functions of the equipment? /-'
Comments (Additional pages may be added as necessary)
.4 Date: 2P zell..
Evaluatedl'Y: Te fayA Ltki~r Page 185 of 562
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0
Page 186 of 562
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0 Page 187 of 562
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0 Flq.. 9Cs w,,-)
Page 188 of 562
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0 S heau of - 4 Status:-~NO U Seismic Walkdown Checklist (SWC)
Equipment ID No. QIH22LO02 Equip. Clasal 20 Equipment Description TRAN-MFER RELAY CABINET I Location: Bldg, AUXILIARY Floor El, SWW 01AW Root Manufactuer, Model. Etc. (optional but recommended)
Instructions for Completiag Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
- 1. Is the anchorage configuration verification required (i.e.. is the item one of the 50% of SWEL items requiring such verification)?
4 U-st- & 014IL G-Z&-?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Y/N6 U- N/AU
- 3. Is the anchorage free of conrosion that is more than mild surface "*KO3 UI N/AQ oxidation?
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? VU /N[3UN/AU
- 5. Is the anchorage configuration consistent with plant documentation? Y " NO Ur N/AO (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of YLY4NO UO potentially adverse seismic conditions?
'Enter the equipment clas name fIom Appendix 8: Classes of EquipmCnL Page 189 of 562
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0 p-I d)-
4 Sheet 2 ofX Status: YeNO UCO Seismic Walkdown Checklist (SWC)
Equipment ID No. 01H22L002 Equip. Class' 2a Equipment Descnption TRANSFER RELAY CABINET I
- 7. Are soft targets free from impact by nearby equipment or structures? YV UO N/AD3
- 8. Are overhead equipment, distribution sysmt , ceiling tile. and lighting, U13 N/AD and masonry block walls not likely to collapse onto the equipment?
"*I]u0 ,:
- 9. Do attached lines have adequate flexibility to avoid damage? UO N/A[]
- 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
Other Adverse Conditons
- 11. Have you looked for and found no other seismic conditions that could *1N U0 adversely affect the safety functions of the equipment?
Comments (Additional pages may be added as necessary)
A/
AA 10 Wý.4-a.. V *wea*,* vj
~4If~
o W1+
ý/d I~I j X F..;, ý
~~10 PA W .
Date: 9. 2 f(, 2tZ.1 I
TM Llý YAA*&Lo-D ,..-A &JA/ *=Q -
Page 190 of 562
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0 ij Page 191 of 562
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0 r-f' qoq
-/ y Page 192 of 562
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0 FvI t)
Sheet 1of 4-Status: YE[ NEI U-Seismic Walkdown Checklist (SWC)
Equipment ID No. QIH22L503 Equip. Class' 20 Equipment Descri
-DIESEL Location: Bldg. _________ Floor El. 155 Room, Area SP__ _
Manufacturer, Model, Etc. (optional but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorane
- 1. Is the anchorage configuration verification required (i.e., is the item one YFNO of the 50% of SWEL items requiring such verification)?
Afhc*ýCn G IS 11siAe Of- CAl`,d't CI d 'u
- 2. Is the anchorage free of bent, broken, missing or loose hardware? YO NO Ulg N/AO
- 3. Is the anchorage free of corrosion that is more than mild surface YO NO UEA N/AC oxidation?
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? YDI NO U[1 N/AD
- 5. Is the anchorage configuration consistent with plant documentation? YO NO U1 N/AD]
(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Rcf- . ¢-W-t#* pctCk.,:ij (jQ.4 J-2.4-9 .
- 6. Based on the above anchorage evaluations, is the anchorage free of YO Nn UX potentially adverse seismic conditions?
I Enter the equipment class name from Appendix B: Classes of Equipment.
Page 193 of 562
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0 Sheet 2 of$4 S1- so Seismic Watkdown Checklist (SWC)
Status: YE] N[] Uf4 Equipment ID No. QtH22L503 Equip. Class, 20 Equipment Description DIESEL LOCAL RELAY PANEL 1B Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? YCM NO UO N/AO "A"" 10C wte41ae(4 \2 eL V*1 A46 wkkiaj A-~ aA 4T
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Yo No UD N/AD and masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Y% ND UO N/AD
- 10. Based on the above seismic interaction evaluations, is equipment free Y[b NO U of potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no other seismic conditions that could YA ND UD adversely affect the safety functions of the equipment?
Comments (Additional pages may be added as necessary)
~a~Oh 16DY- Mohrv% 59 %5. V~v-fhc% 1 ~ C ~
Evaluated by: M ýý~k UL4ara M CIVWacV Date: S f 2-(I F" T1iwj4w4 F1L4A lwi.ntI\
6,-1V,4 -(Z-
/ (V- !
Page 194 of 562
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0 Page 195 of 562
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0 Page 196 of 562