NL-14-0249, Joseph M. Farley, Unit 1, Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 3 Page 273 of 562 Through 312 of 562

From kanterella
Jump to navigation Jump to search
Joseph M. Farley, Unit 1, Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 3 Page 273 of 562 Through 312 of 562
ML14071A070
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 02/20/2014
From:
Southern Nuclear Operating Co
To:
Office of Nuclear Reactor Regulation
References
NL-14-0249
Download: ML14071A070 (40)


Text

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0 FI-71 Seismic Walkdown Checklist (SWC)Sheet 1 of '4 Status: YrfNRIU Equipment ID No. Q1P16V579 Equip. Class, 7 Equipment Description B TRAIN SERVICE WATER MINIFLOW Location:

Bldg. SWIS Floor El. 188 Room, Area J2A Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchora2e 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

YI- NO 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?

4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

YFJ NO UD N/A$)Yr NO UFC] Yrll NO UI- YO NE UO N/A#ý NO UC I Enter the equipment class name from Appendix B: Classes of Equipment.

Page 273 of 562 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0 H-~ /Sheet 2 ofW Status: Yo N] U07 Seismic Walkdown Checklist (SWC)Equipment ID No. QIP26Y57L.

Equip. Class)Equipment Description 8 TRAIN SERVICE WA TERR MIA!FOW Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

Yý NO UO N/AD 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Y NO UD N/AO and masonry block walls not likely to collapse onto the equipment?

9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yý N171 UO N/AOl Yý NEI UD Other Adverse Conditions
11. Have you looked for and found no other seismic conditions that could Y[NE U adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary)

A Isc i f ewre Evaluatedby:

... .Date: q/iji2 Page 274 of 562 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0 a1plo-V579 Z Page 275 of 562 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0 Page 276 of 562 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0 Sheet I of 3 Status: Y2 NEI] UM Seismic Walkdown Checklist (SWC)Equipment lD No. QIP17HOOIC Equip. Class' 21 Equipment Description CCW HEA T EXCHANGER TRAIN A Location:

Bldg. AUXILIARY Floor El. 100 Room, Area IR 5 Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchora2e 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

  • D 2z oG 5' 7 OZ r. (o.o 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
4. Is the anchorage free of visible. cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

YNQýNO UO N/AO YeNO U- N/A'Y`NO UI- N/A" NYWO U- N/A0 I Enter the equipment class name from Appendix B: Classes of Equipment.

Page 277 of 562 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0 Sheet92 of 3 Status: Y1 Ni] U[M Seismic Walkdown Checklist (SWC)Equipment ID No. QIP17HOO1C Equip. Class, Equipment Description CCW HEAT EXCHANGER TRA)Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?ND U" N/AD YXNN- ULD N/AD]tND U" N/AD Y NDU[D Other Adverse Conditions
11. Have you looked for and found no other seismic conditions that could Y/ND UDI]adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary) do VZA S~Ir I~,W &2A -(.--Evaluated by: Date: 2 Z7 _.It1YL~(~4011-S-6 7 6.) 1 -Z/V. *-'r Page 278 of 562 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0 Page 279 of 562 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0 Sheet 1 f$A Status: NEI U0]F 1- 7. s Seismic Walkdown Checklist (SWC)Equipment]ID No. Q IP1 7HV3045 Equip. Class' 7 Equipment Description CCW RETURN FROM RCP THERMAL BARRIER ISOLATION Location:

Bldg. AUXILIARY Floor El. 121 Room, Area 0 , Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one Y] NO/of the 50% of SWEL items requiring such verification)?

2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?

YE] NE] UE N/A3/YE NE] UE] N/AO'4. Is the anchorage free of visible cracks in the concrete near the anchors? Y[E] NE] UE] N/AE<5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

YO] N1 UO] N/ANI YE] NE] UE]8n',Sq\ 3rh WIQ ob&O-. o cfEqim nt'Enter the equipment class name from Appendix B: Classes of Equipment.

Page 280 of 562 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0 Sheet 2 Status: NJN U-]Seismic Walkdown Checklist (SWC)Equipment ID No. QIP17HV3045 Equip. Class' 7 Equipment Description CCW RETURN FROM RCP THERMAL BARRIER ISOLATION Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

Yt ND UD N/A]8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Yt NEI U-] N/AD1 and masonry block walls not likely to collapse onto the equipment?

9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yd1 NEI UDI N/AD Y[ý NM U-Other Adverse Conditions
11. Have you looked for and found no other seismic conditions that could Y[?1 ND UD'adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary)

<-Evaluated by: Date:- z I It 9

  • a,- .37 1-.Page 281 of 562 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0 Page 282 of 562 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0ý,A F-U 3 j'I 11 Page 283 of 562 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0~.l.Sheet o S .tatus: Yd NO] U[Seismic Walkdown Checklist (SWC)Equipment ID No. QWP17HV3067 Equip. Class' 7 Equipment Description CCW RETURN FROM EXCESS LETDOWN Location:

Bldg. AUXILIARY Floor El. 121 Room, Area C a Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchornee 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

YO N 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?

4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

N/25 Yn NE UO N/A" YO0 NO UM NIAV" YO0 NO UQ /A YOE NO UQ N/A@t*YijNEI SA -eIp C nmfoAe 0B: o A'Enter the equipment class name from Appendix B: Classes of Equipment.

Page 284 of 562 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0 Sheet 2 Status: Seismic Walkdown Checklist (SWC)Equipment ID No. QIP17HV3067 Equip. Class .7 Equipment Description CCW RETURN FROM EXCESS LETDOWN Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Y['NO UC N/A[YRNCI UIC N/AC YV/NC UC N/AO Yj'NE U1:C Other Adverse Conditions
11. Have you looked for and found no other seismic conditions that could Yjý NC' UCI adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary)

Date: L&I I I.__521/1 L'-[. al ......Page 285 of 562 ATTACHMENT 3: SEISMIC WALKDOMWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0 Shee 3 of 3 Status: N[ U[]Seismic Walkdown Checklist (SWC)Equipment ID No. QIP17HV3067 Equip. Class, 7 Equipmtet Description CCW RETURN FROM EXCESS LETDOWN PhotovraDhs N" "J Note: Note: Note: Page 286 of 562 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0 Sheet 1 ofg 7TYr-Status: YE] NJý UE Seismic Walkdown Checklist Equipment ED No. Q1P17HV3096%.

I. Equip. Class' 7 Equipment Description CCW NON-SAFETY ISOLA TION Location:

Bldg. AUXILIARY Floor El. 100 Root Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchoraie 1. Is the anchorage configuration verification required (i.e., is the item one YE] Ni of the 50% of SWEL items requiring such verification)?

2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?

tYVknfQ yi-'.r YEI NEI UE] N/AEJ YE] NE] Un N/A0'4. Is the anchorage free of visible cracks in the concrete near the anchors? YE] NE] UE] N/A[0I1 5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

YE] NE] UE] N/A[r YE'NO UE I Enter the equipment class name from Appendix B: Classes of Equipment.

Page 287 of 562 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0 Sheet 2 ofl "7 Status: YEI N1 UE3 Seismic Walkdown Checklist (SWC)Equipment

]D No. QIPI7HV3096B Equip. Class' 7 Equipment Description CCW NON-SAFETY ISOLATION Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

YO- NZ'UC N/AQ Or)fq Vscl an kQAf~W o Q 4Y~cj%.LA

'S ý00-D -tc .Qm 'j\NQ. u-Sq t-0 0. ,ý,Q (ýzV6-Alw; Ak\i dmf Q~Y~r 1ý ck1Q&ca ti'o~ Oldc" 01Q0fal sl efl e~t 00,Q" Z>Ock Cqjj 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YUONE- ur N/A " and masonry block walls not likely to collapse onto the equipment?

9. Do attached lines have adequate flexibility to avoid damage? 1 rd ta YE] N[E'UO N/AO.Based on te a~iove seismic interaction evafaions, is equipment ree YIJ NO UI 5 of potentially adverse seismic interaction effects?Other Adverse Conditions
11. Have you looked for and found no other seismic conditions that could YQ/N- U[-]adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary)

Evaluated by: .' -, Date; _ -.-QaL... ~1~ Ill, ~ s'*Lg~ 'Page 288 of 562 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0 Page 289 of 562 NO. SNCF164-RPT-01, VERSION 2.0 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS I'I'Page 290 of 562 L ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0-+-I --I<Ii Page 291 of 562 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0 t Page 292 of 562 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0 Page 293 of 562 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0 Sheet 1 ofr 'ýStatus: Y&J NO UM Seismic Walkdown Checklist (SWC)Equipment ID No. QIP17MOV3052 Equip. Class' 8 Equipment Description CCW TO RCP THERMAL BARRIER ISOLATION Location:

Bldg. AUXILIARY Floor El. 121 Room, Area 0903 Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchora2e 1. Is the anchorage configuration verification required (i.e., is the item one YE N)of the 50% of SWEL items requiring such verification)?

2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Entr eui cas ne fm AI.Enter the equipment c[ass name from Appendix B: Classes of Equipment.

YE) NE) UE) N/A YE) NE UE) N/A[g/YE) NE) UE) N/AW/YE) NE UE N/A)Y4NE) UrE Page 294 of 562 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0 W-') (-, Sheet 2 ofXLA Status: YtZ NI" UE]Seismic Walkdown Checklist (SWC)Equipment ID No. QIP17MOV3052 Equip. Class, 8 Equipment Description CCW TO RCP THERMAL BARRIER ISOLATION Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?YIA ND UD N/AD Yfý- NDI U N/AD YEJ ND LiD N/AD YEZ N' UD Other Adverse Conditions
11. Have you looked for and found no other seismic conditions that could Y[j ND UD adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary)

Evaluated by: .- 'Date: .Page 295 of 562 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0 Page 296 of 562 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS 1: 1 -') c NO. SNCF164-RPT-01, VERSION 2.0 ,*t .Aw L-A-Page 297 of 562 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0 f tll1 Shee 0of3 Status: N U[]Seismic Walkdown Checklist (SWC)Equipment ID No. QIP17MOV31858 Equip, Class, 8 Equipment Description CCW INLET TO RHR HEA T EXCHANGER NO 2 Location:

Bldg. AUXILIARY Floor El. 83 Room, Area 1 2 Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorne 1. Is the anchorage configuration verification required (i.e., is the item one YOM1 ofthe 50% of SWEL items requiring such verification)?

YO] NO UO N/A/2. Is the anchorage free of bent, broken, missing or loose hardware?I ý') -L- I t" F-ý C"kA P L) I,) f- P4 T-3. Is the anchorage free of corrosion that is more than mild surface oxidation?

4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

YO] NO U- N/AE" 7 YO] NO UC N/Aml7 YO] NO U] NIA YUVNO UO/II b LIN ((0 ?ov j f- --NT I Enter the equipment class name from Appendix B: Classes of Equipment.

Page 298 of 562 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0 Sheet 2 of 3 Status: Y[TNE] UE Seismic Walkdown Checklist (SWC)Equipment ID No. QIP17MOV3.85B Equip. Class' 8 Equipment Description CCW INLET TO RHR HEAT EXCHANGER NO 2 I Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage?10, Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Y1NC U- N/AD YENI- U- N/AEI YEN[--O UEI N/AE Y/ UE]Other Adverse Conditions
11. Have you looked for and found no other seismic conditions that could 16N " U-adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary)

J'Jt4...,)Evaluated by: S *% A "(4, Date: z _ ._..__g/2 J2-ya Page 299 of 562 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0-I Page 300 of 562 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0/She 1 of 5 Status: Yý N UF]Seismic Walkdown Checklist (SWC)Equipment ID No, QIP17POOIB Equip. Class!Equipment Description CCW PUMP 1B SWING PUMP Location:

Bldg. AUXILIARY FloorEl. 100 Room, Area ___Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchoraze I. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

u t ( ( (- Z' /-V 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?

Yjý/NC Y)'*N[ U-" N/ACU'- N/AD 4. Is the anchorage free of visible cracks in the concrete near the anchors? Y"KNI" UE] N/AD]5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Y/NC UC- N/AC]YINI-I UE]' Enter the equipment class name from Appendix B: Classes of Equipment.

Page 301 of 562 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0 Sheet 2 of5,6 Status: YEf NO] U-]Seismic Walkdown Checklist (SWC)Equipment ID No, Q1P17POOIB Equip. Class'Equipment Description CCW PUMP 1B SWING PUMP Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage?10, Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?YPN/-- U0 N/AP-'UD N/AD1 Y9/NO0 U[" N/A Yk/0UO Other Adverse Conditions
11. Have you looked for and found no other seismic conditions that could YZNO U-adversely affect the safety functions of the equipment?

Cgmments (Additional pages may be added as necessary)

Evaluated by: I-WAI 1.& ZS: J,'40J Date: Is. Z,/, zc'/.-I2/ zJ 6 ,,...1 I Page 302 of 562 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0 ART ENPD .DISTANCES E. f SHOULDER AND~IN hAI LIMIT END FLOAT & L OIL LEVUt IN. ABOVE BOTTOM GF FEET 0c CL Page 303 of 562 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0 Page 304 of 562 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0'CT Dcc Page 305 of 562 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0 Sheet i ofy" 1 Status: Yd N[ UE]Seismic Walkdown Checklist (SWC)Equipment ID No. QIP17TO01 Equip. Class'Equipment Description SURGE TANK (CCW)Location:

Bldg. AUXILIARY Floor El. 179 Room, Area 0 Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one Yd 1 No of the 50% of SWEL items requiring such verification)?

2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?

YE4/NE] UD N/A[Yd NE U) N/AC 4. Is the anchorage free of visible cracks in the concrete near the anchors? YC' NCI UO N/AC 5. Is the anchorage configuration consistent with plant documentation?

Y9/N[] U[C N/AC (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

6. Based on the above anchorage evaluations, is the anchorage free of YO'NC UC-potentially adverse seismic conditions?

IEnter the equipment class name from Appendix B: Classes of Equipment Page 306 of 562 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0 Status: Y[I N[-] Ur-E Seismic Walkdown Checklist (SWC)Equipment ID No. QIP17TO01 Equip. Class, Equipment Description SURGE TANK (CCW)Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

Y 1ý/NC] U[] N/AE]8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Y[ý'N"] U'] N/AC]and masonry block walls not likely to collapse onto the equipment?

9. Do attached lines have adequate flexibility to avoid damage?Y[ NEI UO N/AC]10. Based on the above seismic interaction evaluations, is equipment free Y[f NEI UC]of potentially adverse seismic interaction effects?Other Adverse Conditions
11. Have you looked for and found no other seismic conditions that could YE[/NC] UC]adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary)

Evaluated by: Date: -') ni -12..-29 -I Z Page 307 of 562 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0 Page 308 of 562 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0 A I'1 S Page 309 of 562 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0 Page 310 of 562 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0 Page 311 of 562 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0 Page 312 of 562