IR 05000362/2011006

From kanterella
Revision as of 13:59, 28 July 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
San Onofre Nuclear Generating Station - NRC Integrated Inspection Report 05000362-11-006 Cancellation
ML12160A107
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 06/08/2012
From: Lantz R E
NRC/RGN-IV/DRP/RPB-D
To: Peter Dietrich
Southern California Edison Co
References
IR-11-006
Download: ML12160A107 (2)


Text

June 8, 2012

Mr. Peter Dietrich Senior Vice President and Chief Nuclear Officer Southern California Edison Company San Onofre Nuclear Generating Station P.O. Box 128 San Clemente, CA 92674

-0128

SUBJECT: SAN ONOFRE NUCLEAR GENERATING STATION

- NRC INTEGRATED INSPECTION REPORT 05000362/201 1006

Dear Mr. Dietrich:

NRC Inspection Report 05000362/201 1006 has been cancelled; therefore, no inspection report will be issued.

Sincerely,/RA/ Ryan E. Lantz, Chief Project Branch D Division of Reactor Projects

Docket Nos.

50-361, 50-362 License Nos.
NPF-10, NPF-15 U N I T E D S T A T E S N U C L E A R R E G U L A T O R Y C O M M I S S I O N R E G I O N I V1600 EAST LAMAR BLVD A R L I N G T O N , T E X A S 7 6 0 1 1-4511

-2- Electronic Distribution

Regional Administrator (Elmo.Collins@nrc.gov

) Deputy Regional Administrator (Art.Howell@nrc.gov)

DRP Director (Kriss.Kennedy@nrc.gov) Resident Inspector (John.Reynoso@nrc.gov)

Branch Chief, DRP/D (Ryan.Lantz@nrc.gov

) Senior Project Engineer (Nick.Taylor@nrc.gov)

Project Manager (Randy.Hall@nrc.gov)

Acting Branch Chief, DRS/TSB (Dale.Powers@nrc.gov)

RITS Coordinator (Marisa.Herrera@nrc.gov

) Technical Support Assistant (Loretta.Williams@nrc.gov)

File located:

S:\DRP\DRPDIR\_SONGS SUNSI Rev Compl.

Yes No ADAMS Yes No Reviewer Initials RL Publicly Avail.

Yes No Sensitive Yes No Sens. Type Initials RL RI:DRP/D BC:DRP/D JReynoso RLantz /RA via Email/

/RA/ 6/8/12 6/8/12 OFFICIAL RECORD COPY T=Telephone E=E

-mail F=Fax