December 11, 2012 Summary of Meeting Regarding Status of Degraded Concrete on Seabrook Station, Unit 1,
ML13004A178
Person / Time
Site: Seabrook NextEra Energy icon.png
Issue date: 01/04/2013
From: Trapp J M
Engineering Region 1 Branch 1
To:
References
Download: ML13004A178 (15)


Text

{{#Wiki_filter:-ffi UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 21OO RENAISSANCE BOULEVARD, SUITE lOO KING OF PRUSSIA, PENNSYLVANIA 1940G2713 January 4,2013 LICENSEE: NextEra Energy Seabrook, LLC (NextEra)FACILITY: Seabrook Station, Unit 1 (Seabrook)

SUBJECT:

SUMMARY

OF MEETING REGARDING STATUS OF DEGRADED CONCRETE HELD ON DECEMBER 11,2012 On December 11 ,2012, the U.S. Nuclear Regulatory Commission (NRC) conducted an open house, followed by a public meeting, at the One Liberty Lane Conference Center in Hampton, NH. The NRC conducted the open house and public meeting to discuss the safety implications and status of its review of NextEra's commitment actions related to the Alkali-Silica Reaction (ASR) conditions in safety-related structures at Seabrook Station. The commitments are documented in a May 16, 2012, Confirmatory Action Letter (CAL) No. 2012-002 (ADAMS Accession No. ML1 21 254172).A notice of the open house and public meeting was issued on November 19, 2012, and was posted on the NRC's external (public) web page (ADAMS Accession No. ML123244218). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).The NRC presented poster boards during the open house and answered questions from individuals. Following the open house, the NRC presented slides during the public meeting to discuss the results of its first CAL follow-up inspection related to the adequacy of NextEra's actions to address the impact of ASR on reinforced concrete structures, as documented in f nspection Report No. 0500044312012009 (ADAMS Accession No. M112338A283). The NRC slides presented (ADAMS Accession No. ML12356A043) included a description of the ASR process, virtual tour of the plant, safety implications, inspection results to date, and future inspection activities. Members of the public, local officials, state officials, and members of the media attended the meeting and were offered the opportunity to question the NRC regarding NextEra's commitments and the safety implications related to Seabrook. There were no "take-away" actions from this meeting for the NRC staff.A,.A-J) ffiFo, James M. Trapp, Chief Engineering Branch 1 Division of Reactor Safety

Enclosures:

1) List of Attendees 2) CAL Response Status 3) List of References cc Mencl: Distribution via ListServ LICENSEE:

NextEra Energy Seabrook, LLC (NextEra)FACILITY: Seabrook Station, Unit 1 (Seabrook)

SUBJECT:

SUMMARY

OF MEETING REGARDING STATUS OF DEGRADED CONCRETE HELD ON DECEMBER 1 1,2012 On December 11 ,2012, the U.S. Nuclear Regulatory Commission (NRC) conducted an open house, followed by a public meeting, at the One Liberty Lane Conference Center in Hampton, NH. The NRC conducted the open house and public meeting to discuss the safety implications and status of its review of NextEra's commitment actions related to the Alkali-Silica Reaction (ASR) conditions in safety-related structures at Seabrook Station. The commitments are documented in a May 16, 2012, Confirmatory Action Letter (CAL) No. 2012-002 (ADAMS Accession No. ML1 21 25A172).A notice of the open house and public meeting was issued on November 19, 2012, and was posted on the NRC's external (public) web page (ADAMS Accession No. M1123244218). ADAMS is accessible from the NRC Web site at http://rruww.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).The NRC presented poster boards during the open house and answered questions from individuals. Following the open house, the NRC presented slides during the public meeting to discuss the results of its first CAL follow-up inspection related to the adequacy of NextEra's actions to address the impact of ASR on reinforced concrete structures, as documented in Inspection Report No. 0500044312012009 (ADAMS Accession No. ML123384283). The NRC slides presented (ADAMS Accession No. M112356A043) included a description of the ASR process, virtual tour of the plant, safety implications, inspection results to date, and future inspection activities. Members of the public, local officials, state officials, and members of the media attended the meeting and were offered the opportunity to question the NRC regarding NextEra's commitments and the safety implicaticlns related to Seabrook. There were no "take-away" actions from this meeting for the NRC staff./RN James M. Trapp, Chief Engineering Branch 1 Division of Reactor Safety

Enclosures:

1) List of Attendees 2) CAL Response Status 3) List of References cc w/encl: Distribution via ListServ DOC NAME: c \DRS\SeabrooK Concrete\Media-Pub\For ShPt Pub Mtg 12-2012\Meeting Summary\SB Meeting Summary 12-11-2012.docx ADAMS Accession No.: ML130044178 tr SUNSI Review V Non-sensitive n Sensitive g D Publicly Available Non-Publicly Available OFFICE-RI/DRS-RYDRS RI/DRP RI/DRS NAME I\Fioyd-RConte DSchroeder JTrapp/RC DATE t2121t'12 12t27t12 1 /3/1 3 1t4113!AL COPY see previous concurrence OFFIC Distribution w/encl: (via E-mail)W. Dean, RA D. Lew, DRA D. Roberts, DRP P. Wilson, DRP C. Miller, DRS J. Clifford, DRS R. Conte, DRS J. Trapp, DRS D. Schroeder, DRP L. Cline, DRP R. Montgomery, DRP A. Turilin, DRP W. Raymond, DRP, SRI S. Rich, DRP, Acting SRI M. Jennerich, DRP, Rl A. Cass, DRP, AA C. Santos, Rl OEDO RidsNrrPMSeabrookResou rce RidsNrrDorlLpl 1 -2 Resource (RToRAMATL RESOURCE)(RToRAMATL RESOURCE)(RToRAMATL RESOURCE)(RToRAMATL RESOURCE)(RToRAMATL RESOURCE)(RToRAMATL RESOURCE)

ENCLOSURE 1$EABROOK STATION A$R PUBLIC MEETING DECEMBER 12,2A12 ATTENDANCE LIST Organization ft o nn a*-*-fa fu f,hf rrv1d 0R.rce s f'Jt Rr & r:atle*/Jtycl e r*fuexkr *"-\Ji" LeK,me"t*-/o d,i*i &"4 s. &-{2 t.,l - ^A I Ir- /) a lV ! Aa t/r?&r/t\ tl tftttLK r It-/a\,H t rv tz.t-tt{/plrsn o{ futu.rned i flrh an ?'*oq, fiqtu-K*t" M f^{S $^{*\-T; rL"t*Enclosure 1 ENCLOSURE 1 Att*ndse Srgmni:*limr-r

  • s*x; T*ou& u**{&-.,'w$ Pa4ter*$D q,rt,. .{o74fg Itq*ry &g**Jk *terri*'{;- ---l --'---- - 't "*[l<u.Jt"r'*r*'-

SXd{.y $.&*+ u*{W S#d$nsd/s ro,ry#r$"f, tk'ds{ltfff frs"$r"cx# rr-ENCLOSURE 1 Organization {,^6o*I ?, A S t t vnt-4, lf* t#5$*s"h#e"g,t*J,E R*r Ff Pt^*4*w*$t* #rn*A*E.,Yx&t*&*fr-ftsu,{} y'^o*##C*\t fluu*r*r h * .'* &*sry **.*5r{$t Ka",, K*k"r,tl e*izrrl; t.o_tt'q," ENCLOSURE 1 Organization N*&1fise*u1) trf uu Vrl ll.Ld.W{.tu'l ft sf i.xnh*S*7 1 ,froul,l, v*y"*/l f\ l --F L-rO \V-v+lLeJsm S^nJeo &u*+u Sran 8"".&r${1 i{.58 l"i}tt aK LLv,\W rl'Uxrefl* {)hut* GggsS L'nc\c* G"n" t*En"{RAl '*, ttA tcfing- U(SIlYi hlnv.a lileryi'*t{r;t"^ ENCLOSURE 1 Attend*e*rgxn{xalion {","{* $,;e**Tb*#k*dr -{* r,{qoq *Jx^1H Scrt-F A.ff*- f,.., lqr.f$- tf Tgr qfu&o*f"/;t'i dsdt $dlk"h Enclosure 1 ENCLOSURE 1 Organization 51(e(pornclzP+lc I d*{t"il-d a-x/ ill//rt r r ?ttt oF A"^.treul +'{^o{4do'^ An' U\"Y tfutnWr&*r,1

  • ,afu*J *w B u **Y?a {Zr L t TY (ourt.,l fl, k* tAltts 11 Ras,D*T-fi,A^ \re rs t basrJ"I r>t I l, //Ott"{ FaLflU1n ,f I"ob }JJ;\L Co^\,^- Co.L^n t{17{nGr*u A*l-ouu lrLT -f Enclosure 1

ENCLOSURE 1 SEABROOK STATION ASR PUBLIC MEFTING DESHMBER 12,2012 ATTENDANCE LIST Attendee Organization I ilA ryLRB /Yto/t<5,fr f t*Drr-rr****)4/ sh>",,, fit,' S, l4odwl Atxt e ru C^ &qc$i^'*--'"- u\J C *ro ,/-'y -J/ ^-A- { rt rr*'\ (' -t--..-L-1o I t.;, k\,'q. N Ufr.'^\--{u&"'\-cl au rt\g. a tz"')tu"tq-e 11\' uL{'t<*?e-Pr f - T.ttrno's t{o*F*r^ So*:ar*'l,- Ke{.nteen ()'Cmna--T:\,l*;{o,sscrc-ht*e-e*S S-+qJc*-FarSt **e:*14-f,)isfir*rC{ Enclosure 1 ENCLOSURE 1 Organization &1 H f{)c-t(/ Mr\*^ftr'r- ,/*,fr /'la/'"$b f,x'< {1"nry4 p Weuwv Ct.f \ ul f.l. t{ u4o"r* "-{Qw**,tal'*,*?r*,E 64s -sr'!f,.6r;,a, . rwr Q,aP.Pt,lz.,; Cos-re.Cu; g>f-r.r$- / {4y^.,?o ,') t-ENCLOSURE 2 CAL Response Status 12t3t12 STATUS Sub-LEAD OTHER LICENSEE DOC.CAL ITEM CL RPT 1 EB1 Lic.Compl.AR 581434 Rev. 2 uploaded to internal file 5123112 1. Revise the prompt operability determination (POD) associated with AR581 434,'Reduced Concrete Properties Below Grade in "8" Electrical Tunnel Exterior Wall,'by May 25,2012. NextEra Energy Seabrook will notify the site NRC Resident Inspector upon completion of this action.CL/OP RPTl EB1 Licensee Planning to Revise Ltr 5124112 - ADAMs Accession No.M112151A396 Ltr &Encl. 1 2. Submit the root cause for the organizational causes associated with the occurrence of ASR at Seabrook Station and related corrective actions by May 25,2012.CL RPTl DE/DLR Lic.Compl.ttr 5124112 - ADAMs Accession No.ML121514397 Encl. 2 3. Submit the evaluation, "lmpact of ASR on Concrete Structures and Attachments," (Foreign Print 1 0071 6)bv May 25,2012.Under NRC Review RPT2 DE/DLR Lic.Compl.Ltr 618112 - ADAMS Accession No.ML121714277 4 Submit the corrective action plan for the continued assessment of ASR in concrete structures at Seabrook Station including development of remedial actions to mitigate the affects of ASR, where warranted, by June 8, 2012.CL RPTl EB1 Lic.Compl.AR 01664399/AR 1757861 Rev. 2 uploaded to internal file6125112

5. Revise the POD associated with AR1 664399,'Reduced Concrete Modulus of Elasticity Below Grade in Containment Enclosure Building, RHR Equipment Vaults, EFW Pump House, and Diesel Generator Fuel Oil Storage Rooms,' by June 30, 2012. The expanded scope buildings will be included in this POD. NextEra Energy Seabrook will notify the site NRC Resident lnspector upon completion of this action.CL RPT 1 EB1 Lic.Compl.6129112FP 100734 uploaded to internal file.6. Complete short term aggregate expansion testing (ASTM C 1260 Mortar Bar Expansion Test) by June 30,2012. Results will be available for NRC review approximately 30 days after testinq is complete.Due June 2013 RPT 2 EB1 Licensee Planning to Revise NextEra discussed planned changes with inspection staff -Letter Revision, TBD 7. Complete long term aggregate expansion testing (ASTM C 1293 Concrete Prism Test) by June 30, 2013. Results will be available for NRC review approximately 30 days after testinq is comolete.Enclosure 2

ENCLOSURE 2 Re: Commitments made by NextEra in Letters, dated May 3 and May 10,2012 (Agencywide Documents and Management System (ADAMS) Accession Numbers ML121254022 and ML1 2 1 31 4479, respectively), Report No. 1 (RPT 1): 050004432012009, Ended 1112112 - lssued 1213112 Report No. 2 (RPT 2): 050004432012010 to End - TBD STATUS BRANCH LEAD OTHER LICENSEE DOC.CAL ITEM Under NRC Review RPT2 DE/DLR Lic.Compl.ttr 6121112 - ADAMS Accession No.ML121794281 and Encl. ML 1217gAZBz 8. Submit the technical details of the testing planned at the contracted research and development facility by June 30.2012.Under NRC Review RPT 2 EB1 DLR issuing AMP questions related to this area by end of Aus2012 Lic.Compl.7116t12 EDS 36180 uploaded to internal file.9. Update the Maintenance Rule Structures Monitoring Program to include monitoring requirements for selected locations in areas that exhibit ASR by July 15, 2012. NextEra Energy Seabrook will notify the site NRC Resident lnspector upon completion of this action.Under NRC Review RPT 112 EB1 Lic.Compl.7116112 FP 100738 uploaded to internal file.10. Perform the initial six-month interval crack measurements and crack indexing at 20 locations in areas that exhibit the highest crack indices by July 15,2012. Crack measurement will be performed at six-month intervals until a reliable trend of ASR progression is established. NextEra Energy Seabrook will notify the site NRC Resident lnspector upon completion of this action.Due Dec.2012 RPT 2 EB1 Licensee Planning to Revise At the FSEL -NextEra discussed planned changes with inspection staff -Letter Revision, TBD 11. Complete anchor test program by December 31. 2012. Results will be available for NRC review approximately 30 days after testing is complete.Under NRC Review.RPT,l/2 EB1 Ph I and ll Lic.Compl.Item in Phase lll Done last outaoe Walkdown Uploaded to internalfile as are Primary Containment Eng. Eval. & OD.Not a CAL item since it was assumed to be completed or new completion at the time of the management meeting of April 23,2012 - Phase lll was noted during the meeting a issue to be completed - this is where Primary Containment indications were noted and report to the ACRS.Enclosure 2 ENCLOSURE 3 Confirmatorv Action Letter for Alkali-silica Reaction Issue at Seabrook Related List of References and ML Nos.NRC Documents:

1. NRC lnspection Report No. 050043312011010, issued March 26,2012 (ADAMS Accession No. M1120480066)
2. Management Meeting of April 23,2010, Meeting Notice (ADAMS Accession No. ML1 132360175)
3. Management Meeting of April 23,2010, NRC Questions/Slides/Summary (ADAMS Accession Nos. ML1 210401021Mt121 1 60333, ML121 1 60433, and ML1 21 220109)4. Confirmatory Action Letter No. 2012'002, dated May 16, 2012 (ADAMS Accession No. M1121254172)
5. Transcript of Advisory Committee on Reactor Safety (ACRS) Plant License Renewal Subcommittee Meeting of July 10,2012, issued July 25, 2012 (ADAMS Accession No. M1122070401)
6. NRC Staff Alkali-silica Reaction (ASR) Working Group Charter, issued July 9, 2012 (ADAMS Accession No. ML121250588, publicly available September 14,2012)7. NRC Staff Memorandum, issued September 5,2012, on Request for Deviation from the Reactor Oversight Process Action Matrix to Provide Increased Oversight of the Alkali-Silica Reaction lssue at Seabrook (ADAMS Accession No. ML122424372)
8. Letter to NextEra, issued September 12,2012, Transmitting the Memorandum Related to the Deviation from the Reactor Oversight Process Action Matrix for Seabrook Station No. 1 (ADAMS Accession No. ML1 2242A363 (ADAMS Package))9. NRC Inspection Report No. 050043312012009, issued December 3,2012 (ADAMS Accession No. ML1 23384283)10. Letter to C-10, D. Grinnell, issued December 3,2012, Transmitting Answers to Questions Related to Seabrook ASR at Seabrook Station No. 1 (ADAMS Accession No.M1123394233) 1 1. Letter to C-10, S. Gavutis, issued December 3, 2012, Response to Letter of September 13, 2012 ( DAMS Accession No. ML 123394204)

Enclosure 3 ENCLOSURE 3 12. Letter to Union of Concerned Scientists - D. Wright, issued December 3,2012, Response to Letter of September 13, 2012 (ADAMS Accession No. ML 123394322) Licens ee D ocuments (Publiely Available)

13. Management Meeting of April 23, 2Q1A, NextEra/Consultant Slides (ADAMS Accession Nos. ML 1 2 1 1 60349, ML1 21 1 6041 4, and ML1 21 1 60422)14. NextEra letters, dated May 3, 2012, "Actions for Resolution of Alkali Silica Reaction (ASR)lssues" and, dated May 1 0, 2012, "Supplement to Actions for Resolution of Alkali Silica Reaction (ASR) lssues," (ADAMS Accession Nos. M112125A022 and M1121314479, respectively)
15. NextEra Letter of May 24,2012, Letter and Enclosure 1 for CAL ltem 5, "Submit the root cause for the organizational causes associated with the occurrence of ASR at Seabrook Station and related corrective actions by May 25,2012" (ADAMS Accession No. M1121514396)
16. NextEra Letter of May 24, 2012, Enclosure 2 tor CAL ltem 3, "Submit the evaluation, 'lmpact of ASR on Concrete Structures and Attachments' by May 25,2012" (Foreign Print 100716)by May 25,2012 (ADAMs Accession No. M112151A397)
17. NextEra Letter of June 8,2012, for CAL ltem 4, "Submit the corrective action plan for the continued assessment of ASR in concrete structures at Seabrook Station including development of remedial actions to mitigate the effects of ASR, where warranted, by June 8, 2012" (ADAMS Accession No. M112171A277)
18. NextEra Letter of June 21, 2012, for CAL ltem 8, "Submit the technical details of the testing planned at the contracted research and development facility by June 30,2012" (ADAMS Accession No. ML1 21 79A281 and ML1 21794282).

Enclosure 3}}