Mid-Cycle Assessment Letter for Byron Station, Unit 1 and 2
ML14245A092
Person / Time
Site: Byron  Constellation icon.png
Issue date: 09/02/2014
From: Duncan E R
Region 3 Branch 3
To: Pacilio M J
Exelon Generation Co, Exelon Nuclear
References
Download: ML14245A092 (5)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE RD. SUIT E 210 LISLE, IL 60532

-4352 September 2, 20 1 4 Mr. Michael J. Pacilio Senior VP, Exelon Generation Co., LL C President and CNO, Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555

SUBJECT:

MID-CYCLE ASSESSMENT LETTER FOR BYRON STATION, UNITS 1 AND 2

Dear Mr. Pacilio:

On August 5, 20 1 4, the U.S. Nuclear Regulatory Commission (NRC) completed its mid-cycle performance review of Byron Station, Units 1 and 2. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from July 1, 20 1 3 through June 30, 20 1 4. This letter informs you of the NRC's assessment of your facility during this period and its plans for future inspections at your facility.

The NRC determined that overall, B y ro n Station, Units 1 and 2, was operated in a manner that preserved public health and safety and met all cornerstone objectives.

The NRC determined that the performance at Byron Station

, Unit s 1 and 2 , during the most recent quarter

, as well as the previous three quarters of the assessment period, was within the Licensee Response column of the NRC's Reactor Oversight Process (ROP) Action Matrix, because all inspectio n findings had very low (i.e., Green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., Green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility. The NRC also plans to conduct infrequently performed inspection activities in accordance with Inspection Procedure 60855.1, "Operation of an ISFSI [Independent Spent Fuel Storage Installation] at Operating Plants," related to your ISFSI; and Inspection Procedure 71002, "License Renewal Inspection," associated with your license renewal application.

As a result of the Safety Culture Common Language Initiative, the terminology and coding of cross-cutting aspects were revised. All cross

-cutting aspects identified during inspections conducted in calendar year 2014 reflect this revision to Inspection Manual Chapter (IMC) 0310.

Cross-cutting aspects identified in 2013 using the 2013 terminology were converted to the latest revision in accordance with the cross

-reference in IMC 0310 during the mid

-cycle assessment review and evaluated for cross

-cutting themes and potential substantive cross

-cutting issues in accordance with IMC 0305.

The enclosed inspection plan lists the inspections scheduled through December 31, 20 1 5. Routine inspections performed by resident inspectors are not included in the inspection plan.

The inspections listed during the last 9

-months of the inspection plan are tentative and may be revised at the end

-of-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC M. Pacilio

will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security

-related inspections, which will be sent via separate, non

-publicly available correspondenc

e.

In accordance with Title 10 of the Code of Federal Regulations 2.390, "Public Inspections, Exemptions, Requests for Withholding," of the NRC's "Rules of Practice," a copy of this letter, its enclosure, and your response (if any) will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS).

ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading

-rm/adams.html (the Public Electronic Reading Room).

Please contact me at 630-829-9620 with any questions you may have regarding this letter or the inspection plan.

Sincerely, /RA/

Eric R. Duncan, Chief Branch 3 Division of Reactor Projects Docket Nos. 50

-45 4, 50-45 5 License Nos. NPF

-37, NPF-66

Enclosure:

Byron Station Inspection/Activity Plan cc w/encl: Distribution via LISTSERV

M. Pacilio will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security

-related inspections, which will be sent via separate, non

-publicly available correspondence

. In accordance with Title 10 of the Code of Federal Regulations 2.390, "Public Inspections, Exemptions, Requests for Withholding," of the NRC's "Rules of Practice," a copy of this letter, its enclosure, and your response (if any) will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS).

ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading

-rm/adams.html (the Public Electronic Reading Room).

Please contact me at 630

-829-9620 with any questions you may have regarding this letter or the inspection plan.

Sincerely, /RA/ Eric R. Duncan, Chief Branch 3 Division of Reactor Projects Docket Nos. 50

-454, 50-455 License Nos. NPF

-37, NPF-66

Enclosure:

Byron Station Inspection/Activity Plan cc w/encl: Distribution via LISTSERV DISTRIBUTION w/encl

Anthony Bowers RidsNrrDorlLpl3

-2 Resource RidsNrrPMByron Resource RidsNrrDirsIrib Resource Cynthia Pederson Darrell Roberts Steven Orth Allan Barker Carole Ariano Linda Linn DRPIII DRSIII Patricia Buckley Carmen Olteanu ROPassessment.Resource@nrc.gov DOCUMENT NAME: Byron 2014 MOC Letter Publicly Available Non-Publicly Available Sensitive Non-Sensitiv e To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII NAME Boston:mt EDuncan DATE 08/21/14 08/22/14 OFFICIAL RECORD COPY

Page 1 of 2 08/22/2014 09:31:25 Report 22 Unit NumberPlanned Dates Start EndInspection ActivityTitle No. of Staff on SiteByronInspection / Activity Plan 09/01/2014

-12/31/2015 BI ISI-INSERVICE INSPECTION UNIT 2 2 2 IP Inservice Inspection Activities - PWR7111108P 09/29/2014 10/23/2014 BI RP-RADIATION PROTECTION BASELINE INSPECTION 1 1, 2 IP Occupational ALARA Planning and Controls71124.02 10/06/2014 10/10/2014 1, 2 IP Performance Indicator Verification71151 10/06/2014 10/10/2014 BI EPRTN-EP ROUTINE INSPECTION / PI VERIFICATION 1 1, 2 IP A lert and Notification System Testing7111402 10/20/2014 10/24/2014 1, 2 IP Emergency Preparedness Organization Staffing and Augmentation System7111403 10/20/2014 10/24/2014 1, 2 IP Correction of Emergency Preparedness Weaknesses and Deficiencies7111405 10/20/2014 10/24/2014 1 IP Performance Indicator Verification71151 10/20/2014 10/24/2014 BI RP-RADIATION PROTECTION BASELINE INSPECTION 1 1, 2 IP Radiological Environmental Monitoring Program71124.0711/03/201411/07/2014 1 IP71151-BI0111/03/201411/07/2014 1 IP71151-OR0111/03/201411/07/2014 1 IP71151-PR0111/03/201411/07/2014 BI OLRQ-BIENNIAL REQUAL PROGRAM INSPECTION 2 1, 2 IP Licensed Operator Requalification Program7111111B 12/01/2014 12/05/2014 ISFSI-ISFSI 2 1, 2 IP Operation of an Independent Spent Fuel Storage Installation at Operating Plants 60855.1 02/01/2015 03/31/2015 BI RP-RADIATION PROTECTION BASELINE INSPECTION 1 1 IP Radioactive Gaseous and Liquid Effluent Treatment71124.06 02/23/2015 02/27/2015 BI CDBI-COMPONENT DESIGN BASIS INSPECTION 6 1 IP Component Design Bases Inspection7111121 04/20/2015 05/22/2015 BI RP-RADIATION PROTECTION BASELINE INSPECTION 1 1 IP Radiological Hazard Assessment and Exposure Controls71124.01 04/13/2015 04/17/2015 1 IP Occupational ALARA Planning and Controls71124.02 04/13/2015 04/17/2015BL EPX-EP EXERCISE INSPECTION / PI VERIFICATION 2 1, 2 IP Exercise Evaluation - Hostile Action (HA) Event7111407 04/13/2015 04/17/2015 1, 2 IP Exercise Evaluation - Scenario Review7111408 04/13/2015 04/17/2015 1 IP Performance Indicator Verification71151 04/13/2015 04/17/2015 BI RP-RADIATION PROTECTION BASELINE INSPECTION 1 1 IP In-Plant Airborne Radioactivity Control and Mitigation71124.0305/11/2015 05/15/2015 1 IP Occupational Dose Assessment71124.0405/11/2015 05/15/2015 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.

Page 2 of 2 08/22/2014 09:31:25 Report 22 Unit NumberPlanned Dates Start EndInspection ActivityTitle No. of Staff on SiteByronInspection / Activity Plan 09/01/2014

-12/31/2015 PI&R-PROBLEM I & R BIENNIAL 4 1, 2 IP Problem Identification and Resolution71152B 07/20/2015 08/07/2015 BI RP-RADIATION PROTECTION BASELINE INSPECTION 1 1 IP Radiological Hazard Assessment and Exposure Controls71124.01 08/17/2015 08/21/2015 1 IP71151-BI01 08/17/2015 08/21/2015 1 IP71151-OR01 08/17/2015 08/21/2015 1 IP71151-PR01 08/17/2015 08/21/2015 BI ISI-INSERVICE INSPECTION UNIT 1 1 1 IP Inservice Inspection Activities - PWR7111108P 09/08/2015 09/29/2015 BI RP-RADIATION PROTECTION BASELINE INSPECTION 1 1 IP Radiation Monitoring Instrumentation71124.0511/16/201511/20/2015 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.