ML17289A735

From kanterella
Revision as of 17:56, 6 July 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Revs to Sept 1991 & Apr 1992 Monthly Operating Repts for WNP-2
ML17289A735
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 06/10/1992
From: BAKER J W
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML17289A736 List:
References
GO2-92-155, NUDOCS 9207200164
Download: ML17289A735 (4)


Text

ACCELERATED DISTRJBUTION DEMON TION SYSTEM REGULB OY INFORMATION DISTRIBUTION ZSTEM (RIDE)ai ACCESSION NBR:9207200164 DOC.DATE: 92/06/10 NOTARIZED:

NO DOCKET FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH NAKE AUTHOR AFFILIATION BAKER,J.W.

Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Cont~ol Desk)

SUBJECT:

Forwards revs to Sept&Apr 1991&92 monthly operating repts for WNP-2.DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE: TITLE: Monthly Operating Report (per Tech Specs)NOTES: RECIPIENT ID CODE/NAME PD5 LA DEANFW.COPIES LTTR ENCL 3 3 1 1 RECIPIENT ID CODE/NAME PDS PD COPIES LTTR ENCL 1 1 INTERNAL: ACRS AEOD/DSP/TPAB NRR/DOEA/OEAB RGN5 EXTERNAL: EG&G BRYCEFJ.H NSIC 10 10 1 1 1 1 1 1 1 1 1 1 AEOD/DOA REG IL NRC PDR LPEB10 01 1 1 1 1 1 1 1 1 NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE!CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT.20079)TO ELIMINATE YOUR NAME FROM DISTRIBUTION LIPID FOR DOCUMENTS YOU DON'T NEED!TOTAL NUMBER OF COPIES REQUIRED: LTTR 24 ENCL 24 I

WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O.Box 968~3000 George Wasbtngton Way~Rtcbland, 1Vasbtngton 99352-0968

~509)372-5000 Docket No.50-397 June 10, 1992 G02-92-155 U.S.Nuclear Regulatory Commission Document Control Desk Washington, D.C.20555

Dear Sir:

Subject:

NUCLEAR PLANT NO.2 REVISION TO SEPTEMBER 1991 AND APRIL 1992 MONTHLY OPERATING REPORTS Transmitted herewith are revisions to the September 1991 and April 1992 Monthly Operating reports.These reports are required per our Technical Specifications 6.9.1.6.Very truly yo rs,~aker-2 Plant Manager (MD 927M)LBH:bap Enclosure CC: Mr.W.H.Lovelace, NRC, Washington DC Mr.J.B.Martin, NRC Region V Ms.Dottie Sherman, ANI, Farmington CT Mr.C.Sorensen, NRC Resident Inspector (901A)Mr.J.T.Wheelock, INPO Mr.F.Yost, Utility Data Institute 9207200ih4 920610 PDR ADOCK 050003'P7 R','".PDR gYP g I A~.i'9 C'b