Proposed Tech Specs Table 4.3-2,changing Main Steam Line Isolation Valve Manual Actuation Sys Surveillance Frequency from Monthly to Quarterly
ML17332A779
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 05/25/1995
From:
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To:
Shared Package
ML17332A778 List:
References
NUDOCS 9506060440
Download: ML17332A779 (13)


Text

ATTACHMENT 2 TO AEP:NRC:1200B EXISTING TECHNICAL SPECIFICATIONS WITH PAGES MARKED TO REFLECT PROPOSED CHANGES 950bOb0440 950525 PDR ADOCK"05000315 PDR TABLE 4.3-2 Continued gt ENCINEER D SAFETY FEATURE ACTUATION SY~r INSTRUMENTATZON SURVEILLANC REQUIRHKNTS FUNCTZONAI UNIT TRIP ACTUATING CK~'EVIC CHANNEL CHANNEL FUNCTIONAL OP~~TZONAL CIKCK CAf ZEBATEON TEST TEST MODES ZN WHICH SURVEILLANCE RE UIRED 9.Manual a.Safety Zn)ec ion (ECCS)Feedwater Isolation Reactor Trip (SZ)Containment Zsolation-Phase"A" Containment Purge and Exhaust Isolation Aux'liary Feedwater Pumps Essential Service Mater System h.Containment Spray Containment Zsolation-Phase"H" Containment Purge and Exhaust Zsolation~Containment Air Reci culatfon Pan c.Containment Zsolation-Phase"A" Containment Purge and Exhaust.Isolation d.Steam Line Zsolation N A N-A N A N.A N.A.N A N.A-N-A NA NAo N.A lp2,3,4 li2)3,4 1(2,3g4.1)2i 3 I I~K NULL PLANT-UNIT 1 3/4 3-33b u=NDmzr NO.153 TABLE 4.3-2 (Continuedl TABLE NOTATION switches shall be tes.d during shu down.All ot e.zssocia ed guards ac"uareceive a CHAHH~~on r 31 days.g<)<~p i once per 1B months<<'i h manual szfe-7 a-1eas~~'(2)Each train or logic chzrne1 shall be tested a least:every oker 31 days.(3)The CHANNERJNCTIOHAL T"-57 snail include cxer ising the ransmi t.r by applying either a vacuum or pressure to the appropriate side o the transmitter.

'0.C.CQCV.-JNET~/4 3-34 g~PATTON ON>TGKBX¹D~~A~LLJ~f TBXP ACXUAZZm ABODES m CELEB DEVI&CREWEL CRANKS.FQHCXXONAL OP~~CHAL SQKVc,~~%ACE CIKXlaXI'" M1=zat-a.Stean Generator Pater Level--Lov-t,ov b.Keactor Coolant Pmp Bus Undervoltage S H.A.HM 1, 2, Hm 1,2.3 8.LOSS OP PO~a.4 hv Bus Loss of Voltage b.4 kv'us Deg aded Voltage Kf H.A.1,2,3,<l-:1,'2,'3,~I a.Safety Xag ection (iCCS)Peedmater Xsolation Reactor Trip (SX)Coacz9~ent Xsola&on.Phase"A," Coataiaaeat Purge and Exhaust Xsolatioa.Aux1liary Fee&rate Pumps EsseatiaZ.

Service Rater Sys ea b.Coataiane t Spray Conoid'eat Xsolation-0 B It Coataiaaeat Pu ge aad Exhaust Xsolation Coacainmeat Air Rec&culatiaa Fan Coataiaaeat Xsolation-Phase"A" Coatai eat 8 ge and Ev.?aust Isolation N.A.H.A.H.A.H-A-H.A.H.A.H.A.H.A.N.A.1,2,3,~)Stean Li e Xsolation H.A.H.A.1, 2, 3 f'ae provisions of TecL~cal Specification 4.0.8 are appl cable.COOK NUCL:-MK PZ<~i-Uhx7 2 3/4 3-32~~i.HO.8",~,~~1~9 TAMIL~4.3-2 Continued)

TA5L~NOThTIOH Manua tuation svitchas shall be~ease once per 18 months during shut.o y associated with nanual sa<e guards accuas a 1 AHHZL MCTIONhL TEST at least once (2)Each t ain or logic channel shall be tasted at least every other 31 days.(3)Tha CHAHNZX RNCTZONAL TEST shall include exercising

'th>>t ansnittar by applying either a vacuum or pressure to the appropziata aide oi the t ansaittar.

COOK BUCLM PLRVi UNIT 2 3/4 3-33 Av~u~NO.gf~13~

ATTACHMENT 3 TO AEP'NRC:1200B REVISED TECHNICAL SPECIFICATIONS PAGES 3/4 LIMITING CONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS 3/4.3 INSTRUMENTATION TABLE 4.3-2 Continued ENGINEERED SAFETY FEATURE ACTUATION SYSTEM INSTRUMENTATION SURVEILLANCE RE UIREMENTS FUNCTIONAL UNlT 9.Manual TRIP ACTUATING MODES IN CHANNEL DEVICE WHICH CHANNEL CHANNEL FUNCTIONAL OPERATIONAL SURVEILLANCE CHECK CALIBRATION TEST a.Safety Injection (ECCS)Feedwater Isolation Reactor Trip (SI)Containment Isolation-Phase"A Containment Purge and Exhaust Isolation Auxiliary Feedwater Pumps Essential Service Water System N.A.N.A.N.A.R 1,2,3,4 b.Containment Spray Containment Isolation-Phase"B Containment Purge and Exhaust Isolation Containment Air Recirculation Fan N.A.N.A.N.A.R-1, 2, 3, 4 c.Containment Isolation-Phase"A" Containment Purge and Exhaust Isolation d.Steam Line Isolation N.A.N.A.N.A.N.A.N.A.R 1, 2, 3, 4 1, 2, 3 COOK NUCLEAR PLAiVI'-UNIT I Page 3/4 3-33b AMENDMENT 48k 3/4 LIMITING CONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS 3/4.3 INSTRUMENTATION TABLE 4.3-2 Continued TABLE NOTATION (I)Deleted (2)Each train or logic channel shall be tested at least every other 31 days.(3)The CHANNEL FUNCTIONAL TEST shall include exercising the transmitter by applying either a vacuum or pressure to the appropriate side of the transmitter.

COOK NUCLEAR PLANT-UNIT I Page 3/4 3-34 AME~tbIENT BQ 3/4 LIMITING CONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS 3/4.3 INSTRUMENTATION TABLE 4.3-2 Continued ENGINEERED SAFETY FEATURE ACTUATION SYSTEM INSTRUMENTATION SURVEILLANCE RE UIREMENTS FUNCTIONAL UNIT 7.TURBINE DRIVEN AUXILIARY FEEDWATER PUMP CHANNEL CHANNEL CHANNEL FUNCTIONAL CHECK CALIBRATION TEST TRIP ACTUATING MODES IN DEVICE WHICH OPERATIONAL SURVEILLANCE TEST~RE UIRED a.Steam Generator Water Level-Low-Low b.Reactor Coolant Pump Bus Undervoltage 8.LOSS OF POWER a.4 kv Bus Loss of Voltage b.4 kv Bus Degraded Voltage 9.MANUAL a.Safety Injection (ECCS)Fccdwater Isolation Reactor Trip (SII Containment Isolation-Phase A" Containment Purge and Exhaust Isolation Auxiliary Feedwater Pumps Essential Service Water System b.Containment Spray Containment Isolation-Phase"B" Containment Purge and Exhaust Isolation Containment Air Recirculation Fan c.Containment Isolation-Phase A Containment Purge and Exhaust Isolation d.Steam Line Isolation N.A.N.A.N.A.N.A.N.A.R N.A.N.A.N.A.N.A.N.A.N.A.N.A.N.A.N.A.N.A.N.A.I, 2, 3 I, 2, 3 1,2,3,4 I, 2, 3, 4 1,2,3,4 I, 2, 3, 4 1,2,3,4 I, 2, 3 COOK NUCLEAR PLANT-UNIT 2 Page 3/4 3-32 AIt'IENDMENT LI)&)444)4ÃEI)i49

3/4 LIMITING CONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS 3/4.3 INSTRUMENTATION TABLE 4.3-2 Continued TABLE NOTATION (1)Deleted (2)Each train or logic channel shall be tested at least every other 31 days.(3)The CHANNEL FUNCTIONAL TEST shall include exercising the transmitter by applying either a vacuum or pressure to the appropriate side of the transmitter.

COOK NUCLEAR PLANT-UNIT 2 Page 3/4 3-33 AAIENDib[EliT N M4 4~l~V j