ML13267A323

From kanterella
Revision as of 03:58, 4 July 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
SD-121023-001, Rev. 1, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Page C-601 Through Page C-700
ML13267A323
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 09/12/2013
From: Stoeva N
Stevenson & Associates
To:
American Electric Power, Indiana Michigan Power Co, Office of Nuclear Reactor Regulation
Shared Package
ML13267A279 List:
References
AEP-NRC-2013-074 SD-121023-001, Rev 1
Download: ML13267A323 (100)


Text

DC Cook Unit I & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: rYii NUSeismic Walkdown Checklist (SWC)Equipment ID No.:2-HV-SGRS-8 Equipment Class: (9) FansEquipment

==

Description:==

4KV ROOM 600 VOLT SWITCHGEAR TRANSFORMERS TR21AProject:

DC Cook 2 SWELLocation (Bldg, Elev,Room/Area):

AB2, 609.00 ft, 204Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.

Anchorane

1. Is anchorage configuration verification required (i.e., is the item one ofthe 50% of SWEL items requiring such verification)?

SQUG 2-HV-SGRS-8 REVO2. Is the anchorage free of bent, broken, missing or loose hardware?

YesYesYes3. Is the anchorage free of corrosion that is more than mild surfaceoxidation?

4. Is the anchorage free of visible cracks in the concrete near theanchors?Unistrut mounted5. Is the anchorage configuration consistent with plant documentation?

(Note: This question only applies if the item is one of the 50% for whichan anchorage configuration verification is required.)

6. Based on the above anchorage evaluations, is the anchorage free ofpotentially adverse seismic conditions?

Not Applicable YesYesC-601 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: jY NUSeismic Walkdown Checklist (SWC)Equipment ID No.:2-HV-SGRS-8 Equipment Class: (9) FansEquipment

==

Description:==

4KV ROOM 600 VOLT SWITCHGEAR TRANSFORMERS TR21AInteraction Effects7. Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution
systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment freeof potentially adverse seismic interaction effects?YesYesYesYesOther Adverse Conditions
11. Have you looked for and found no adverse seismic conditions that Yescould adversely affect the safety functions of the equipment?

CommentsEvaluated by: * -George G Thomas Date: 10/18/12C- s4 Neda Stoeva 10/18/12PhotosC-602 DC Cook Unit I & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: [j N USeismic Walkdown Checklist (SWC)Equipment ID No.: 2-HV-SGRS-8 Equipment Class: (9) FansE ui ment Descri tion: 4KV ROOM 600 VOLT SWITCHGEAR TRANSFORMERS TR21AP9170876 P9170877P9170878 P9170879C-603 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: [ N USeismic Walkdown Checklist (SWC)Equipment ID No.: 2-IFI-53Equipment Class: (18) Instruments on RacksEquipment

==

Description:==

BORON INJECTION TO REACTOR COOLANT LOOP #3 FLOWProject:

DC Cook 2 SWELLocation (Bldg, Elev,Room/Area):

CON2, 598.00 ft, 56Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1. Is anchorage configuration verification required (i.e., is the item one of Yesthe 50% of SWEL items requiring such verification)?

DWG. 2-557 1 G, Rev. 0 A2. Is the anchorage free of bent, broken, missing or loose hardware?

Yes3. Is the anchorage free of corrosion that is more than mild surface Yesoxidation?

4. Is the anchorage free of visible cracks in the concrete near the Yesanchors?5. Is the anchorage configuration consistent with plant documentation?

Yes(Note: This question only applies if the item is one of the 50% for whichan anchorage configuration verification is required.)

6. Based on the above anchorage evaluations, is the anchorage free of Yespotentially adverse seismic conditions?

C-604 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: F-] N USeismic Walkdown Checklist (SWC)Equipment ID No.:2-IFI-53Equipment Class: (18) Instruments on RacksEquipment

==

Description:==

BORON INJECTION TO REACTOR COOLANT LOOP #3 FLOWInteraction Effects7. Are soft targets free from impact by nearby equipment or structures?

Yes8. Are overhead equipment, distribution

systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Valve directly above but transmitter is water tight so even if fail openthere is no concern.9. Do attached lines have adequate flexibility to avoid damage?YesYes10. Based on the above seismic interaction evaluations, is equipment freeof potentially adverse seismic interaction effects?YesOther Adverse Conditions

11. Have you looked for and found no adverse seismic conditions that Yescould adversely affect the safety functions of the equipment?

Comments.. .,08/15/2013 Evaluated by:Oj-ý MAfmALindsay M. YatesDate:6 _k'ý`- Neda Stoeva08/15/2013 PhotosC-605 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: Y NUSeismic Walkdown Checklist (SWC)Equipment ID No.:Equipment Class:2-IFI-53(18) Instruments on RacksCTION TO RE.'TrlP (-Y'fl ANJT I (')OP IVA PI flXAIP9120168C-606 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: [1 N USeismic Walkdown Checklist (SWC)Equipment ID No.: 2-IFI-53Equipment Class: (18) Instruments on RacksEquipment

==

Description:==

BORON INJECTION TO REACTOR COOLANT LOOP #3 FLOWP9120170C-607 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: [IZ N USeismic Walkdown Checklist (SWC)Equipment ID No.:Equipment Class:2-IFI-53(18) Instruments on Racks:CTION TOP9120176C-608 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: [Y N USeismic Walkdown Checklist (SWC)Equipment ID No.:2-IMO-222 Equipment Class: (8) Motor-Operated and Solenoid-Operated ValvesEquipment

==

Description:==

WEST CONTAINMENT SPRAY PUMP PP-9W DISCHARGE TOProject:

DC Cook 2 SWELLocation (Bldg, Elev,Room/Area):

AB2, 573.00 ft, 52Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1. Is anchorage configuration verification required (i.e., is the item one ofthe 50% of SWEL items requiring such verification)?

No2. Is the anchorage free of bent, broken, missing or loose hardware?

3. Is the anchorage free of corrosion that is more than mild surfaceoxidation?
4. Is the anchorage free of visible cracks in the concrete near theanchors?5. Is the anchorage configuration consistent with plant documentation?

(Note: This question only applies if the item is one of the 50% for whichan anchorage configuration verification is required.)

Not Applicable Not Applicable Not Applicable Not Applicable

6. Based on the above anchorage evaluations, is the anchorage free ofpotentially adverse seismic conditions?

YesC-609 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: j-] NUSeismic Walkdown Checklist (SWC)Equipment ID No.:2-IMO-222 Equipment Class: (8) Motor-Operated and Solenoid-Operated ValvesEquipment

==

Description:==

WEST CONTAINMENT SPRAY PUMP PP-9W DISCHARGE TOInteraction Effects7. Are soft targets free from impact by nearby equipment or structures?

Yes8. Are overhead equipment, distribution

systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Block wall near by -OK per DWG 12-4025, Wall W-229. Do attached lines have adequate flexibility to avoid damage?YesYes10. Based on the above seismic interaction evaluations, is equipment freeof potentially adverse seismic interaction effects?YesOther Adverse Conditions

11. Have you looked for and found no adverse seismic conditions that Yescould adversely affect the safety functions of the equipment?

CommentsEvaluated by: -=--- George G Thomas Date: 10/18/12J& 4 " Neda Stoeva 10/18/12PhotosC-610 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: F] N USeismic Walkdown Checklist (SWC)Equipment ID No.: 2-IMO-222 Equipment Class: (8) Motor-Operated and Solenoid-Operated ValveshfU'I bUiZ4C-611 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: LY-] NUSeismic Walkdown Checklist (SWC)Equipment ID No.:2-IMO-225 Equipment Class: (8) Motor-Operated and Solenoid-Operated ValvesEquipment

==

Description:==

REFUELING WATER STORAGE TANK TO WEST CONTAINMENT Project:

DC Cook 2 SWELLocation (Bldg, Elev,Room/Area):

AB2, 573.00 ft, 52Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1. Is anchorage configuration verification required (i.e., is the item one ofthe 50% of SWEL items requiring such verification)?

No2. Is the anchorage free of bent, broken, missing or loose hardware?

3. Is the anchorage free of corrosion that is more than mild surfaceoxidation?
4. Is the anchorage free of visible cracks in the concrete near theanchors?5. Is the anchorage configuration consistent with plant documentation?

(Note: This question only applies if the item is one of the 50% for whichan anchorage configuration verification is required.)

Not Applicable Not Applicable Not Applicable Not Applicable

6. Based on the above anchorage evaluations, is the anchorage free ofpotentially adverse seismic conditions?

YesC-612 DC Cook Unit I & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: [] NUSeismic Walkdown Checklist (SWC)Equipment ID No.:2-IMO-225 Equipment Class: (8) Motor-Operated and Solenoid-Operated ValvesEquipment

==

Description:==

REFUELING WATER STORAGE TANK TO WEST CONTAINMENT Interaction Effects7. Are soft targets free from impact by nearby equipment or structures?

YesYes8. Are overhead equipment, distribution

systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Block wall nearby -OK per DWG 12-4025, Wall W-229. Do attached lines have adequate flexibility to avoid damage?Yes10. Based on the above seismic interaction evaluations, is equipment freeof potentially adverse seismic interaction effects?YesOther Adverse Conditions

11. Have you looked for and found no adverse seismic conditions that Yescould adversely affect the safety functions of the equipment?

CommentsEvaluated by: , George G Thomas Date: 10/18/12Neda Stoeva 10/18/12PhotosC-613 DC Cook Unit I & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: 7Y N USeismic Walkdown Checklist (SWC)Equipment ID No.: 2-IMO-225 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valvespment

Description:

REFUELING WATER STORAGE TANK TO WESTP9180803C-614 DC Cook Unit I & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: [Y NUSeismic Walkdown Checklist (SWC)Equipment ID No.:2-IMO-320 Equipment Class: (8) Motor-Operated and Solenoid-Operated ValvesEauirment

==

Description:==

WEST RESIDUAL HEAT REMOVAL PUMP PP-35W SUCTIONProject:

DC Cook 2 SWELLocation (Bldg, Elev,Room/Area):

AB2, 573.00 ft, 55Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1. Is anchorage configuration verification required (i.e., is the item one ofthe 50% of SWEL items requiring such verification)?

No2. Is the anchorage free of bent, broken, missing or loose hardware?

3. Is the anchorage free of corrosion that is more than mild surfaceoxidation?
4. Is the anchorage free of visible cracks in the concrete near theanchors?5. Is the anchorage configuration consistent with plant documentation?

(Note: This question only applies if the item is one of the 50% for whichan anchorage configuration verification is required.)

Not Applicable Not Applicable Not Applicable Not Applicable

6. Based on the above anchorage evaluations, is the anchorage free ofpotentially adverse seismic conditions?

YesC-615 DC Cook Unit I & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: NUSeismic Walkdown Checklist (SWC)Equipment ID No.:2-IMO-320 Equipment Class: (8) Motor-Operated and Solenoid-Operated ValvesEquipment

==

Description:==

WEST RESIDUAL HEAT REMOVAL PUMP PP-35W SUCTIONInteraction Effects7. Are soft targets free from impact by nearby equipment or structures?

Yes8. Are overhead equipment, distribution

systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Block wall -look at AR# 00863253-01

-OK per DWG 12-4025, WallW-249. Do attached lines have adequate flexibility to avoid damage?YesYes10. Based on the above seismic interaction evaluations, is equipment freeof potentially adverse seismic interaction effects?YesOther Adverse Conditions

11. Have you looked for and found no adverse seismic conditions that Yescould adversely affect the safety functions of the equipment?

CommentsEvaluated by: George G Thomas Date: 10/18/12-Neda Stoeva 10/18/12PhotosC-616 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: Y-] NUSeismic Walkdown Checklist (SWC)Equipment ID No.:Equipment Class:iDment

Description:

2-IMO-320 (8) Motor-Operated and Solenoid-Operated ValvesJAL HEAT01 IR/AD D0C-617 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: [-ý N USeismic Walkdown Checklist (SWC)Equipment ID No.: 2-IMO-320 Equipment Class: (8) Motor-Operated and Solenoid-Operated ValvesEquipment

==

Description:==

WEST RESIDUAL HEAT REMOVAL PUMP PP-35'C-618 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: F NUSeismic Walkdown Checklist (SWC)Equipment ID No.:2-IMO-331 Equipment Class: (8) Motor-Operated and Solenoid-Operated ValvesEquipment

==

Description:==

WEST RHR TO UPPER CONTAINMENT SPRAY SHUTOFF VALVEProject:

DC Cook 2 SWELLocation (Bldg, Elev,Room/Area):

AB2, 609.00 ft, 6Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results of judgments and findincis.

Additional space is provided at the end of this checklist for documentingc other comments.

Anchorage

1. Is anchorage configuration verification required (i.e., is the item one ofthe 50% of SWEL items requiring such verification)?

No2. Is the anchorage free of bent, broken, missing or loose hardware?

3. Is the anchorage free of corrosion that is more than mild surfaceoxidation?
4. Is the anchorage free of visible cracks in the concrete near theanchors?5. Is the anchorage configuration consistent with plant documentation?

(Note: This question only applies if the item is one of the 50% for whichan anchorage configuration verification is required.)

Not Applicable Not Applicable Not Applicable Not Applicable

6. Based on the above anchorage evaluations, is the anchorage free ofpotentially adverse seismic conditions?

YesC-619 DC Cook Unit I & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: 7Y N USeismic Walkdown Checklist (SWC)Equipment ID No.:2-IMO-331 Equipment Class: (8) Motor-Operated and Solenoid-Operated ValvesEquipment

==

Description:==

WEST RHR TO UPPER CONTAINMENT SPRAY SHUTOFF VALVEInteraction Effects7. Are soft targets free from impact by nearby equipment or structures?

Yes8. Are overhead equipment, distribution

systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Yes9. Do attached lines have adequate flexibility to avoid damage?Yes10. Based on the above seismic interaction evaluations, is equipment freeof potentially adverse seismic interaction effects?YesOther Adverse Conditions

11. Have you looked for and found no adverse seismic conditions that Yescould adversely affect the safety functions of the equipment?

CommentsEvaluated by: -George G Thomas Date: 10/18/12Neda Stoeva 10/18/12PhotosC-620 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: Y-] N USeismic Walkdown Checklist (SWC)Equipment ID No.: 2-IMO-331 Equipment Class: (8) Motor-Operated and Solenoid-Operated ValvesF RHR TO UPPER CONT,KIT QDDAV (2L-11 ITMCCI: X/AI '.IC-621 DC Cook Unit I & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: LjY N USeismic Walkdown Checklist (SWC)Equipment ID No.:2-IMO-350 Equipment Class: (8) Motor-Operated and Solenoid-Operated ValvesEquipment

==

Description:==

WEST RHR HEAT EXCHANGER OUTLET TO SAFETY INJECTION Project:

DC Cook 2 SWELLocation (Bldg, Elev,Room/Area):

AB2, 609.00 ft, 6Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1. Is anchorage configuration verification required (i.e., is the item one of Nothe 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware?
3. Is the anchorage free of corrosion that is more than mild surfaceoxidation?
4. Is the anchorage free of visible cracks in the concrete near theanchors?5. Is the anchorage configuration consistent with plant documentation?

(Note: This question only applies if the item is one of the 50% for whichan anchorage configuration verification is required.)

Not Applicable Not Applicable Not Applicable Not Applicable

6. Based on the above anchorage evaluations, is the anchorage free ofpotentially adverse seismic conditions?

YesC-622 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: [Y- NUSeismic Walkdown Checklist (SWC)Equipment ID No.:2-IMO-350 Equipment Class: (8) Motor-Operated and Solenoid-Operated ValvesEauiDment

==

Description:==

WEST RHR HEAT EXCHANGER OUTLET TO SAFETY INJECTION Interaction Effects7. Are soft targets free from impact by nearby equipment or structures?

YesYes8. Are overhead equipment, distribution

systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage?Yes10. Based on the above seismic interaction evaluations, is equipment freeof potentially adverse seismic interaction effects?YesOther Adverse Conditions
11. Have you looked for and found no adverse seismic conditions that Yescould adversely affect the safety functions of the equipment?

CommentsEvaluated by: -George G Thomas Date: 10/18/12Neda Stoeva 10/18/12PhotosC-623 DC Cook Unit I & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: FY] N USeismic Walkdown Checklist (SWC)Equipment ID No.: 2-IMO-350 Equipment Class: (8) Motor-Operated and Solenoid-Operated ValvesEquipment

==

Description:==

WEST RHR HEAT EXCHANGER OUTLET TO SAFETY INJECTION C-624 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: FY-] N USeismic Walkdown Checklist (SWC)Equipment ID No.: 2-IMO-350 Equipment Class: (8) Motor-Operated and Solenoid-Operated ValvesAT EXCH/" -10d -146C-625 DC Cook Unit I & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: N USeismic Walkdown Checklist (SWC)Equipment ID No.:2-IMO-52Equipment Class: (8) Motor-Operated and Solenoid-Operated ValvesEquipment

==

Description:==

BORON INJECTION TO REACTOR COOLANT LOOP #2 SHUTOFFProject:

DC Cook 2 SWELLocation (Bldg, Elev,Room/Area):

CON2, 598.00 ft, 59Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results of judgments and findinas.

Additional space is provided at the end of this checklist for documentina other comments.

Anchorage

1. Is anchorage configuration verification required (i.e., is the item one ofthe 50% of SWEL items requiring such verification)?

No2. Is the anchorage free of bent, broken, missing or loose hardware?

Yes3. Is the anchorage free of corrosion that is more than mild surfaceoxidation?

Yes4. Is the anchorage free of visible cracks in the concrete near theanchors?Yes5. Is the anchorage configuration consistent with plant documentation?

(Note: This question only applies if the item is one of the 50% for whichan anchorage configuration verification is required.)

Not Applicable

6. Based on the above anchorage evaluations, is the anchorage free ofpotentially adverse seismic conditions?

YesC-626 DC Cook Unit I & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: Y NUSeismic Walkdown Checklist (SWC)Equipment ID No.:2-IMO-52Equipment Class: (8) Motor-Operated and Solenoid-Operated ValvesEquipment

==

Description:==

BORON INJECTION TO REACTOR COOLANT LOOP #2 SHUTOFFInteraction Effects7. Are soft targets free from impact by nearby equipment or structures?

Yes8. Are overhead equipment, distribution

systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Yes9. Do attached lines have adequate flexibility to avoid damage?Yes10. Based on the above seismic interaction evaluations, is equipment freeof potentially adverse seismic interaction effects?YesOther Adverse Conditions

11. Have you looked for and found no adverse seismic conditions that Yescould adversely affect the safety functions of the equipment?

CommentsEvaluated by: ? At 08/15/2013 KS..... .-Lindsay M. YatesNeda StoevaDate:08/15/2013 PhotosC-627 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: F] N USeismic Walkdown Checklist (SWC)Equipment ID No.: 2-IMO-52Equipment Class: (8) Motor-Operated and Solenoid-Operated ValvesEquipment

==

Description:==

BORON INJECTION TO REACTOR COOLANT LOOP #2 SHUTOFFP9120111C-628 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1,09/12/13 Status: [] N USeismic Walkdown Checklist (SWC)Equipment ID No.:2-IMO-52Equipment Class:%-+n fnenr;nt;nm (8) Motor-Operated and Solenoid-Operated Valves,RON INJECTION TO REACTOR COOLr I /XC'n-I ZU I 10C-629 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: 7Y N USeismic Walkdown Checklist (SWC)Equipment ID No.: 2-IMO-52Equipment Class: (8) Motor-Operated and Solenoid-Operated ValvesEquipment

==

Description:==

BORON INJECTION TO REACTOR COOLANT LOOP #2 SHUTOFFP9120118P9120119C-630 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: [-7 N USeismic Walkdown Checklist (SWC)Equipment ID No.:2-IMO-911 Equipment Class: (8) Motor-Operated and Solenoid-Operated ValvesEquipment

==

Description:==

REFUELING WATER STORAGE TANK TO CVCS CHARGINGProject:

DC Cook 2 SWELLocation (Bldg, Elev,Room/Area):

AB2, 587.00 ft, 40Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1. Is anchorage configuration verification required (i.e., is the item one ofthe 50% of SWEL items requiring such verification)?

No2. Is the anchorage free of bent, broken, missing or loose hardware?

3. Is the anchorage free of corrosion that is more than mild surfaceoxidation?
4. Is the anchorage free of visible cracks in the concrete near theanchors?5. Is the anchorage configuration consistent with plant documentation?

(Note: This question only applies if the item is one of the 50% for whichan anchorage configuration verification is required.)

6. Based on the above anchorage evaluations, is the anchorage free ofpotentially adverse seismic conditions?

Not Applicable Not Applicable Not Applicable Not Applicable YesC-631 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: Y-- N USeismic Walkdown Checklist (SWC)Equipment ID No.:2-IMO-911 Equipment Class: (8) Motor-Operated and Solenoid-Operated ValvesEquipment

==

Description:==

REFUELING WATER STORAGE TANK TO CVCS CHARGINGInteraction Effects7. Are soft targets free from impact by nearby equipment or structures?

Yes8. Are overhead equipment, distribution

systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Yes9. Do attached lines have adequate flexibility to avoid damage?Yes10. Based on the above seismic interaction evaluations, is equipment freeof potentially adverse seismic interaction effects?YesOther Adverse Conditions

11. Have you looked for and found no adverse seismic conditions that Yescould adversely affect the safety functions of the equipment?

CommentsEvaluated by: George G Thomas Date: 10/18/12Neda Stoeva 10/18/12PhotosC-632 DC Cook Unit I & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: FY N USeismic Walkdown Checklist (SWC)Equipment ID No.: 2-IMO-911 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves'ERTAY "/nrZ IOU 101C-633 DC Cook Unit I & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: [Y- N USeismic Walkdown Checklist (SWC)Equipment ID No.: 2-IMO-911 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valvesr' -. ..J r- I: .. -_1: f-¶r~r-,

ar'l lax " IC ,lA 'l-r'f"%

r"%-rr-,"t-A r" a-" -lr"

  • lII,-rr, t% S Ir'r. flU' E I iA rflf'IlK IJL-LII'JU VV/- M 1 IU~MMU I /AINI\ IU uv& ý UO kP9180762C-634 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: Y N j---Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-MCABEquipment Class: (14) Distribution PanelsEquipment

==

Description:==

250VDC DISTRIBUTION PANEL MCABProject:

DC Cook 2 SWELLocation (Bldg, Elev,Room/Area):

AB2, 609.00 ft, 200Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1. Is anchorage configuration verification required (i.e., is the item one of Nothe 50% of SWEL items requiring such verification)?

CANNOT OPEN -CAN'T SEE ANCHORAGE

2. Is the anchorage free of bent, broken, missing or loose hardware?

Unknown3. Is the anchorage free of corrosion that is more than mild surface Unknownoxidation?

4. Is the anchorage free of visible cracks in the concrete near the Unknownanchors?5. Is the anchorage configuration consistent with plant documentation?

Unknown(Note: This question only applies if the item is one of the 50% for whichan anchorage configuration verification is required.)

6. Based on the above anchorage evaluations, is the anchorage free of Unknownpotentially adverse seismic conditions?

Cannot open -cannot see anchorage C-635 DC Cook Unit I & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: Y N Seismic Walkdown Checklist (SWC)Equipment ID No.:2-MCABEquipment Class: (14) Distribution PanelsEquipment

==

Description:==

250VDC DISTRIBUTION PANEL MCABInteraction Effects7. Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution
systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment freeof potentially adverse seismic interaction effects?YesYesYesYesOther Adverse Conditions
11. Have you looked for and found no adverse seismic conditions that Yescould adversely affect the safety functions of the equipment?

CANNOT OPENCommentsEvaluated by: George G Thomas Date: 10/18/12I -T ' Neda Stoeva 10/18/12PhotosC-636 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: Y N --]Seismic Walkdown Checklist (SWC)Equipment ID No.:Equipment Class:2-MCAB(14) Distribution Panels250VDC DISTRIBUTION PANEL MCABC-637 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: Y N FSeismic Walkdown Checklist (SWC)Equipment ID No.: 2-MCiEquipment Class: (14) Distribution PanelsNJ PANEL MCABJ I I1JIC-638 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: FY] N USeismic Walkdown Checklist (SWC)Equipment ID No.:2-MCM-221 Equipment Class: (8) Motor-Operated and Solenoid-Operated ValvesEquipment

==

Description:==

MAIN STEAM LEAD #2 TO AUXILIARY FEED PUMP TURBINEProject:

DC Cook 2 SWELLocation (Bldg, Elev,Room/Area):

AB2, 633.00 ft, 9Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1. Is anchorage configuration verification required (i.e., is the item one ofthe 50% of SWEL items requiring such verification)?

No2. Is the anchorage free of bent, broken, missing or loose hardware?

3. Is the anchorage free of corrosion that is more than mild surfaceoxidation?
4. Is the anchorage free of visible cracks in the concrete near theanchors?5. Is the anchorage configuration consistent with plant documentation?

(Note: This question only applies if the item is one of the 50% for whichan anchorage configuration verification is required.)

Not Applicable Not Applicable Not Applicable Not Applicable

6. Based on the above anchorage evaluations, is the anchorage free ofpotentially adverse seismic conditions?

YesC-639 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: Y] N USeismic Walkdown Checklist (SWC)Equipment ID No.:2-MCM-221 Equipment Class: (8) Motor-Operated and Solenoid-Operated ValvesEquipment

==

Description:==

MAIN STEAM LEAD #2 TO AUXILIARY FEED PUMP TURBINEInteraction Effects7. Are soft targets free from impact by nearby equipment or structures?

Yes8. Are overhead equipment, distribution

systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage?YesYesYes10. Based on the above seismic interaction evaluations, is equipment freeof potentially adverse seismic interaction effects?Other Adverse Conditions
11. Have you looked for and found no adverse seismic conditions that Yescould adversely affect the safety functions of the equipment?

CommentsEvaluated by: C --l George G Thomas Date: 10/18/12Neda Stoeva 10/18/12PhotosC-640 DC Cook Unit I & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: FYI N USeismic Walkdown Checklist (SWC)Equipment ID No.: 2-MCM-221 Equipment Class: (8) Motor-Operated and Solenoid-Operated ValvesMAIN S5 I I-AM LIEAU #2 I U AUXILIARY FEI- IC-641 DC Cook Unit I & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: Y] N USeismic Walkdown Checklist (SWC)Equipment ID No.:Equipment Class:2-MCM-221 (8) Motor-Operated and Solenoid-Operated Valves--i- r--D #2 TO AUXILIARY FEED PUMP TURBINEC-642 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: [Y N USeismic Walkdown Checklist (SWC)Equipment ID No.:2-MRV-243 Equipment Class: (7) Fluid-Operated ValvesEquipment

==

Description:==

STEAM GENERATOR OME-3-4 POWER OPERATED RELIEFProject:

DC Cook 2 SWELLocation (Bldg, Elev,Room/Area):

AB2,621.00ft, 10Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1. Is anchorage configuration verification required (i.e., is the item one of Nothe 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware?
3. Is the anchorage free of corrosion that is more than mild surfaceoxidation?
4. Is the anchorage free of visible cracks in the concrete near theanchors?5. Is the anchorage configuration consistent with plant documentation?

(Note: This question only applies if the item is one of the 50% for whichan anchorage configuration verification is required.)

Not Applicable Not Applicable Not Applicable Not Applicable

6. Based on the above anchorage evaluations, is the anchorage free ofpotentially adverse seismic conditions?

YesC-643 DC Cook Unit I & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: [] NUSeismic Walkdown Checklist (SWC)Equipment ID No.:2-MRV-243 Equipment Class: (7) Fluid-Operated ValvesEquipment

==

Description:==

STEAM GENERATOR OME-3-4 POWER OPERATED RELIEFInteraction Effects7. Are soft targets free from impact by nearby equipment or structures?

Yes8. Are overhead equipment, distribution

systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Yes9. Do attached lines have adequate flexibility to avoid damage?Yes10. Based on the above seismic interaction evaluations, is equipment freeof potentially adverse seismic interaction effects?YesOther Adverse Conditions

11. Have you looked for and found no adverse seismic conditions that Yescould adversely affect the safety functions of the equipment?

CommentsEvaluated by: =-George G Thomas Date: 10/18/12Neda Stoeva 10/18/12PhotosC-644 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: [-ý N USeismic Walkdown Checklist (SWC)Equipment ID No.: 2-MRV-243 Equipment Class: (7) Fluid-Operated ValvesRATOR OME-3-4 PC-645 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: FY-] N USeismic Walkdown Checklist (SWC)Equipment ID No.: 2-MRV-243 Equipment Class: (7) Fluid-Operated Valves.... & .. L rr-A V " r'". E -, l r A r, r\,A r-3-4 POWER OPERATED RELIEFI uIvlr"-,C-646 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: L-Z N USeismic Walkdown Checklist (SWC)Equipment ID No.: 2-NLP-153 Equipment Class: (18) Instruments on RacksEquipment

==

Description:==

PRESSURIZER OME-4 PROTECTION CHANNEL 3 LEVELProject:

DC Cook 2 SWELLocation (Bldg, Elev,Room/Area):

CON2, 612.00 ft, 67Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1. Is anchorage configuration verification required (i.e., is the item one of Nothe 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware?

YesOnly one U-bolt around pipe verify with dwgs -Pictures show that asingle U-bolt in conjuction with a weld are used -OK -Documents FCN49030-006, 2-558IJ-E049030.

3. Is the anchorage free of corrosion that is more than mild surface Yesoxidation?
4. Is the anchorage free of visible cracks in the concrete near the Yesanchors?5. Is the anchorage configuration consistent with plant documentation?

Not Applicable (Note: This question only applies if the item is one of the 50% for whichan anchorage configuration verification is required.)

6. Based on the above anchorage evaluations, is the anchorage free of Yespotentially adverse seismic conditions?

C-647 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: Y] NUSeismic Walkdown Checklist (SWC)Equipment ID No.:2-NLP-1 53Equipment Class: (18) Instruments on RacksEquipment

==

Description:==

PRESSURIZER OME-4 PROTECTION CHANNEL 3 LEVELInteraction Effects7. Are soft targets free from impact by nearby equipment or structures?

Yes8. Are overhead equipment, distribution

systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment freeof potentially adverse seismic interaction effects?YesYesYesOther Adverse Conditions
11. Have you looked for and found no adverse seismic conditions that Yescould adversely affect the safety functions of the equipment?

Comments,- ,08/15/2013 Evaluated by:V ,U , Lindsay M. YatesNeda StoevaDate:A08/15/2013 PhotosC-648 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: E-Z N USeismic Walkdown Checklist (SWC)Equipment ID No.: 2-NLP-153 Equipment Class: (18) Instruments on Racksnmrnt fll:rrintin DPl:I IPq171P fMI::A PP()TECTION CHANNEL 3 LEVELtILULI It-" I LUL I LC-649 DC Cook Unit I & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: FY- N USeismic Walkdown Checklist (SWC)Equipment ID No.:2-NLP-153 Equipment Class:(18) Instruments on RacksZER OME-4 PROTECTION CH)P9120216C-650 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: Y] N USeismic Walkdown Checklist (SWC)Equipment ID No.: 2-NLP-153 Equipment Class: (18) Instruments on RacksEquipment Descri tion: PRESSURIZER OME-4 PROTECTION CHANNEL 3 LEVELF,1lzUZ1h

'IzuzzuC-651 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: jY N USeismic Walkdown Checklist (SWC)Equipment ID No.: 2-NPS-111 Equipment Class: (18) Instruments on RacksEquipment

==

Description:==

REACTOR VESSEL TRAIN 'B' WIDE RANGE PRESSUREProject:

DC Cook 2 SWELLocation (Bldg, Elev,Room/Area):

AB2, 612.00 ft, 12Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1. Is anchorage configuration verification required (i.e., is the item one of Nothe 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware?

YesWelded plate to tube steel3. Is the anchorage free of corrosion that is more than mild surface Yesoxidation?

4. Is the anchorage free of visible cracks in the concrete near the Yesanchors?At base of rack5. Is the anchorage configuration consistent with plant documentation?

Not Applicable (Note: This question only applies if the item is one of the 50% for whichan anchorage configuration verification is required.)

6. Based on the above anchorage evaluations, is the anchorage free of Yespotentially adverse seismic conditions?

C-652 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: FY-] NUSeismic Walkdown Checklist (SWC)Equipment ID No.:2-NPS-1 11Equipment Class: (18) Instruments on RacksEquipment

==

Description:==

REACTOR VESSEL TRAIN 'B' WIDE RANGE PRESSUREInteraction Effects7. Are soft targets free from impact by nearby equipment or structures?

Yes8. Are overhead equipment, distribution

systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment freeof potentially adverse seismic interaction effects?YesYesYesOther Adverse Conditions
11. Have you looked for and found no adverse seismic conditions that Yescould adversely affect the safety functions of the equipment?

CommentsEvaluated by: George G Thomas Date: 10/18/12Neda Stoeva 10/18/12PhotosC-653 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: Y-] N USeismic Walkdown Checklist (SWC)Equipment ID No.: 2-NPS-111 Equipment Class: (18) Instruments on RacksEquipment

==

Description:==

REACTOR VESSEL TRAIN 'B' WIDE RANGE PRESSUREP9100242C-654 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: Y-ý N USeismic Walkdown Checklist (SWC)Equipment ID No.: 2-NPS-111 Equipment Class: (18) Instruments on RacksEaui)ment Descriotion:

REACTOR VESSEL TRAIN 'B' WIDE RANGE PRESSUREC-655 DC Cook Unit I & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: `] N USeismic Walkdown Checklist (SWC)Equipment ID No.: 2-OME-150-AB-EN Equipment Class: (17) Engine-Generators Equipment

==

Description:==

AB EMERGENCY DIESEL GENERATOR ENGINEProject:

DC Cook 2 SWELLocation (Bldg, Elev,Room/Area):

AB2, 587.00 ft, 121Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1. Is anchorage configuration verification required (i.e., is the item one of Yesthe 50% of SWEL items requiring such verification)?

DWG 2-AEP-WORT-W-501812AT

2. Is the anchorage free of bent, broken, missing or loose hardware?

YesThread engagement on middle bolt behind generator OK -evaluated byCR# 031391023. Is the anchorage free of corrosion that is more than mild surface Yesoxidation?

4. Is the anchorage free of visible cracks in the concrete near the Yesanchors?5. Is the anchorage configuration consistent with plant documentation?

Yes(Note: This question only applies if the item is one of the 50% for whichan anchorage configuration verification is required.)

6. Based on the above anchorage evaluations, is the anchorage free of Yespotentially adverse seismic conditions?

C-656 DC Cook Unit I & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: FY-] NUSeismic Walkdown Checklist (SWC)Equipment ID No.:2-OME-150-AB-EN Equipment Class: (17) Engine-Generators Equipment

==

Description:==

AB EMERGENCY DIESEL GENERATOR ENGINEInteraction Effects7. Are soft targets free from impact by nearby equipment or structures?

Yes8. Are overhead equipment, distribution

systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Yes9. Do attached lines have adequate flexibility to avoid damage?Yes10. Based on the above seismic interaction evaluations, is equipment freeof potentially adverse seismic interaction effects?YesOther Adverse Conditions

11. Have you looked for and found no adverse seismic conditions that Yescould adversely affect the safety functions of the equipment?

CommentsEvaluated by: George G Thomas Date: 10/18/12Neda Stoeva 10/18/12PhotosC-657 DC Cook Unit I & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: FY-] NUSeismic Walkdown Checklist (SWC)Equipment ID No.:Equipment Class:2-OME-1 50-AB-EN(17) Enqine-Generators

'Y DIEP9130381 P9130382C-658 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: T] N U2-OME-150-AB-EN Seismic Walkdown Checklist (SWC)Equipment ID No.:Equipment Class: (17) Engine-GenE

~rators/ flhQ, 1LJILF,1JUljub P9130388C-659 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: F-] N USeismic Walkdown Checklist (SWC)Equipment ID No.:Equipment Class:2-OME-1 50-AB-EN(17) Engine-Generators P9130389 P9130390C-660 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: F] N USeismic Walkdown Checklist (SWC)Equipment ID No.:Equipment Class:nmant ngn~rvrinfinn 2-OME-1 50-AB-EN(17) Engine-Generators AB EMERGENCY DIESEL GENERATOR ENGINEIC-661 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: EY] N USeismic Walkdown Checklist (SWC)Equipment ID No.: 2-OME-34W Equipment Class: (0) OtherEquipment

==

Description:==

WEST ESSENTIAL SERVICE WATER STRAINER OME-34WProject:

DC Cook 2 SWELLocation (Bldg, Elev,Room/Area):

SH2, 591.00 ft, 136Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1. Is anchorage configuration verification required (i.e., is the item one of Yesthe 50% of SWEL items requiring such verification)?

DWG 12-3684 REV142. Is the anchorage free of bent, broken, missing or loose hardware?

YesI bolt has full thread engagement but does not stick out over nut3. Is the anchorage free of corrosion that is more than mild surface Yesoxidation?

4. Is the anchorage free of visible cracks in the concrete near the Yesanchors?5. Is the anchorage configuration consistent with plant documentation?

Yes(Note: This question only applies if the item is one of the 50% for whichan anchorage configuration verification is required.)

6. Based on the above anchorage evaluations, is the anchorage free of Yespotentially adverse seismic conditions?

C-662 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: Y] NUSeismic Walkdown Checklist (SWC)Equipment ID No.:2-OME-34W Equipment Class: (0) OtherEquipment

==

Description:==

WEST ESSENTIAL SERVICE WATER STRAINER OME-34WInteraction Effects7. Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution
systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment freeof potentially adverse seismic interaction effects?YesYesYesYesOther Adverse Conditions
11. Have you looked for and found no adverse seismic conditions that Yescould adversely affect the safety functions of the equipment?

CommentsEvaluated by: George G Thomas Date: 10/18/12Neda Stoeva 10/18/12PhotosC-663 DC Cook Unit I & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: Y] N USeismic Walkdown Checklist (SWC)Equipment ID No.: 2-OME-34W Equipment Class: (0) OtherE ui ment Descri tion: WEST ESSENTIAL SERVICE WATER STRAINER OME-34WP9090058 P9090059P9090060 P9090061C-664 DC Cook Unit I & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: Y-] N USeismic Walkdown Checklist (SWC)Equipment ID No.:Equipment Class: (0) Other2-OME-34W C-665 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: Y] N USeismic Walkdown Checklist (SWC)Equipment ID No.: 2-PP-lOWEquipment Class: (5) Horizontal PumpsEquipment

==

Description:==

WEST COMPONENT COOLING WATER PUMPProject:

DC Cook 2 SWELLocation (Bldg, Elev,Room/Area):

AB2, 609.00 ft, 609Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1. Is anchorage configuration verification required (i.e., is the item one of Yesthe 50% of SWEL items requiring such verification)?

DWG 12-3286-9

& 12-3285-24

2. Is the anchorage free of bent, broken, missing or loose hardware?

Yes3. Is the anchorage free of corrosion that is more than mild surface Yesoxidation?

4. Is the anchorage free of visible cracks in the concrete near the Yesanchors?5. Is the anchorage configuration consistent with plant documentation?

Yes(Note: This question only applies if the item is one of the 50% for whichan anchorage configuration verification is required.)

6. Based on the above anchorage evaluations, is the anchorage free of Yespotentially adverse seismic conditions?

C-666 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: FYj] NUSeismic Walkdown Checklist (SWC)Equipment ID No.:2-PP-1 OWEquipment Class: (5) Horizontal PumpsEquipment

==

Description:==

WEST COMPONENT COOLING WATER PUMPInteraction Effects7. Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution
systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment freeof potentially adverse seismic interaction effects?YesYesYesYesOther Adverse Conditions
11. Have you looked for and found no adverse seismic conditions that Yescould adversely affect the safety functions of the equipment?

CommentsFire piping well supported Evaluated by: -George G Thomas Date: 10/18/12Neda Stoeva 10/18/12PhotosC-667 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: Y] N USeismic Walkdown Checklist (SWC)Equipment ID No.: 2-PP-OWEquipment Class: (5) Horizontal Pumps:NT COOLP9100061C-668 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: F-] N USeismic Walkdown Checklist (SWC)Equipment ID No.: 2-PP-lOWEquipment Class: (5) Horizontal PumpsONENT COOLING WATER PUMPFI-uuuubj C-669 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: [Y N USeismic Walkdown Checklist (SWC)Equipment ID No.: 2-PP-26SEquipment Class: (5) Horizontal PumpsEquipment

==

Description:==

SOUTH SAFETY INJECTION PUMPProject:

DC Cook 2 SWELLocation (Bldg, Elev,Room/Area):

AB2, 587.00 ft, 43Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1. Is anchorage configuration verification required (i.e., is the item one of Yesthe 50% of SWEL items requiring such verification)?

SQUG-2-PP-26S REV. I A2. Is the anchorage free of bent, broken, missing or loose hardware?

Yes3. Is the anchorage free of corrosion that is more than mild surface Yesoxidation?

PAINTED4. Is the anchorage free of visible cracks in the concrete near the Yesanchors?5. Is the anchorage configuration consistent with plant documentation?

Yes(Note: This question only applies if the item is one of the 50% for whichan anchorage configuration verification is required.)

6. Based on the above anchorage evaluations, is the anchorage free of Yespotentially adverse seismic conditions?

C-670 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: jT NUSeismic Walkdown Checklist (SWC)Equipment ID No.:2-PP-26SEquipment Class: (5) Horizontal PumpsEquioment

==

Description:==

SOUTH SAFETY INJECTION PUMPInteraction Effects7. Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution
systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Block wall with grate -DWG 12-4026, Wall W-119. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment freeof potentially adverse seismic interaction effects?YesYesYesYesOther Adverse Conditions

11. Have you looked for and found no adverse seismic conditions that Yescould adversely affect the safety functions of the equipment?

CommentsEvaluated by: George G Thomas Date: 08/15/2013 Neda Stoeva 08/15/2013 PhotosC-671 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: FY- N USeismic Walkdown Checklist (SWC)Equipment ID No.: 2-PP-26SEquipment Class: (5) Horizontal PumpsTY INJECTION FP9180873C-672 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: 7Y N USeismic Walkdown Checklist (SWC)Equipment ID No.: 2-PP-26SEquipment Class: (5) Horizontal Pumps,(Z 1 1 1 I-II Y INJIT I IUN PUMPýý'l OUZ5 1 foC-673 DC Cook Unit I & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: 11] N USeismic Walkdown Checklist (SWC)Equipment ID No.: 2-PP-35WEquipment Class: (6) Vertical PumpsEquipment

==

Description:==

WEST RESIDUAL HEAT REMOVAL PUMPProject:

DC Cook 2 SWELLocation (Bldg, Elev,Room/Area):

AB2, 573.00 ft, 55Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1. Is anchorage configuration verification required (i.e., is the item one of Yesthe 50% of SWEL items requiring such verification)?

SQUG 2-PP-35W, REV. 12. Is the anchorage free of bent, broken, missing or loose hardware?

Yes3. Is the anchorage free of corrosion that is more than mild surface Yesoxidation?

4. Is the anchorage free of visible cracks in the concrete near the Yesanchors?5. Is the anchorage configuration consistent with plant documentation?

Yes(Note: This question only applies if the item is one of the 50% for whichan anchorage configuration verification is required.)

6. Based on the above anchorage evaluations, is the anchorage free of Yespotentially adverse seismic conditions?

C-674 DC Cook Unit I & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: IYj N USeismic Walkdown Checklist (SWC)Equipment ID No.:2-PP-35WEquipment Class: (6) Vertical PumpsEquipment

==

Description:==

WEST RESIDUAL HEAT REMOVAL PUMPInteraction Effects7. Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution
systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Block wall -DWG 12-4025, Wall W-249. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment freeof potentially adverse seismic interaction effects?YesYesYesYesOther Adverse Conditions

11. Have you looked for and found no adverse seismic conditions that Yescould adversely affect the safety functions of the equipment?

CommentsEvaluated by--- George G Thomas Date: 08/15/2013 Neda Stoeva 08/15/2013 PhotosC-675 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: Y-] N USeismic Walkdown Checklist (SWC)Equipment ID No.: 2-PP-35WEquipment Class: (6) Vertical Pumps-HEC-676 DC Cook Unit I & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: F-] N USeismic Walkdown Checklist (SWC)Equipment ID No.: 2-PP-35WEquipment Class: (6) Vertical PumpsEnnlnmon rfoe~rl n inn. \AIIcQT DI:Q Irv IAl -IC:AT DItACn\IAI DI IMAD--I I I ulbU~bboC-677 DC Cook Unit I & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: FY] N USeismic Walkdown Checklist (SWC)Equipment ID No.:2-PP-3WEquipment Class: (5) Horizontal PumpsEauipment

==

Description:==

WEST MOTOR DRIVEN AUXILIARY FEEDWATER PUMPProject:

DC Cook 2 SWELLocation (Bldg, Elev,Room/Area):

TB2, 591.00 ft, 51Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1. Is anchorage configuration verification required (i.e., is the item one ofthe 50% of SWEL items requiring such verification)?

No2. Is the anchorage free of bent, broken, missing or loose hardware?

Yes3. Is the anchorage free of corrosion that is more than mild surfaceoxidation?

Yes4. Is the anchorage free of visible cracks in the concrete near theanchors?Yes5. Is the anchorage configuration consistent with plant documentation?

(Note: This question only applies if the item is one of the 50% for whichan anchorage configuration verification is required.)

6. Based on the above anchorage evaluations, is the anchorage free ofpotentially adverse seismic conditions?

Not Applicable YesC-678 DC Cook Unit I & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: jYJ NUSeismic Walkdown Checklist (SWC)Equipment ID No.:2-PP-3WEquipment Class: (5) Horizontal PumpsEquipment

==

Description:==

WEST MOTOR DRIVEN AUXILIARY FEEDWATER PUMPInteraction Effects7. Are soft targets free from impact by nearby equipment or structures?

Yes8. Are overhead equipment, distribution

systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Yes9. Do attached lines have adequate flexibility to avoid damage?Yes10. Based on the above seismic interaction evaluations, is equipment freeof potentially adverse seismic interaction effects?YesOther Adverse Conditions

11. Have you looked for and found no adverse seismic conditions that Yescould adversely affect the safety functions of the equipment?

CommentsEvaluated by: George G Thomas Date: 10/18/12Neda Stoeva 10/18/12PhotosC-679 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: Y-] N USeismic Walkdown Checklist (SWC)Equipment ID No.: 2-PP-3WEquipment Class: (5) Horizontal PumpstDRIVEN AU)P9191345C-680 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1,09/12/13 Status: FY-] N USeismic Walkdown Checklist (SWC)Equipment ID No.: 2-PP-3WEquipment Class: (5) Horizontal PumpsEquipment

==

Description:==

WEST MOTOR DRIVEN AUXILIARY FEEDWATER PUMP I I ouC-681 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: IY] N USeismic Walkdown Checklist (SWC)Equipment ID No.: 2-PP-4Equipment Class: (5) Horizontal PumpsEquipment

==

Description:==

TURBINE DRIVEN AUXILIARY FEED PUMPProject:

DC Cook 2 SWELLocation (Bldg, Elev,Room/Area):

TB2, 591.00 ft, 49Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1. Is anchorage configuration verification required (i.e., is the item one of Yesthe 50% of SWEL items requiring such verification)?

SQUG 2-PP-4 REVO2. Is the anchorage free of bent, broken, missing or loose hardware?

Yes3. Is the anchorage free of corrosion that is more than mild surface Yesoxidation?

4. Is the anchorage free of visible cracks in the concrete near the Yesanchors?5. Is the anchorage configuration consistent with plant documentation?

Yes(Note: This question only applies if the item is one of the 50% for whichan anchorage configuration verification is required.)

6. Based on the above anchorage evaluations, is the anchorage free of Yespotentially adverse seismic conditions?

C-682 DC Cook Unit I & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: [Y N USeismic Walkdown Checklist (SWC)Equipment ID No.:2-PP-4Equipment Class: (5) Horizontal PumpsEquipment

==

Description:==

TURBINE DRIVEN AUXILIARY FEED PUMPInteraction Effects7. Are soft targets free from impact by nearby equipment or structures?

Yes8. Are overhead equipment, distribution

systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Yes9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment freeof potentially adverse seismic interaction effects?YesYesOther Adverse Conditions

11. Have you looked for and found no adverse seismic conditions that Yescould adversely affect the safety functions of the equipment?

CommentsEvaluated by: '- George G Thomas Date: 10/18/12Neda Stoeva 10/18/12PhotosC-683 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: [Y N USeismic Walkdown Checklist (SWC)Equipment ID No.: 2-PP-4Equipment Class: (5) Horizontal PumpsAUI 1 -I ,15u tC-684 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: N USeismic Walkdown Checklist (SWC)Equipment ID No.: 2-PP-4Equipment Class: (5) Horizontal PumpsE ui ment Descri tion: TURBINE DRIVEN AUXILIARY FEED PUMPP9191310 P9191311P9191312P9191313C-685 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: FY-] N USeismic Walkdown Checklist (SWC)Equipment ID No.: 2-PP-4Equipment Class: (5) Horizontal PumpsEquipment

==

Description:==

TURBINE DRIVEN AUXILIARY FEED PUMPC-686 DC Cook Unit I & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: jjY] NUSeismic Walkdown Checklist (SWC)Equipment ID No.:2-PP-50WEquipment Class: (5) Horizontal PumpsEauirment

==

Description:==

WEST CENTRIFUGAL CHARGING PUMPProject:

DC Cook 2 SWELLocation (Bldg, Elev,Room/Area):

AB2, 587.00 ft, 41Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1. Is anchorage configuration verification required (i.e., is the item one of Nothe 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware?

Yes3. Is the anchorage free of corrosion that is more than mild surfaceoxidation?

Yes4. Is the anchorage free of visible cracks in the concrete near theanchors?Yes5. Is the anchorage configuration consistent with plant documentation?

(Note: This question only applies if the item is one of the 50% for whichan anchorage configuration verification is required.)

6. Based on the above anchorage evaluations, is the anchorage free ofpotentially adverse seismic conditions?

Not Applicable YesC-687 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: 7Y N USeismic Walkdown Checklist (SWC)Equipment ID No.:2-PP-50WEquipment Class: (5) Horizontal PumpsEquipment

==

Description:==

WEST CENTRIFUGAL CHARGING PUMPInteraction Effects7. Are soft targets free from impact by nearby equipment or structures?

Yes8. Are overhead equipment, distribution

systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage?YesYes10. Based on the above seismic interaction evaluations, is equipment freeof potentially adverse seismic interaction effects?YesOther Adverse Conditions
11. Have you looked for and found no adverse seismic conditions that Yescould adversely affect the safety functions of the equipment?

CommentsEvaluated by: , ,._ George G Thomas Date: 10/18/12Neda Stoeva 10/18/12PhotosC-688 DC Cook Unit I & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: Y] N USeismic Walkdown Checklist (SWC)Equipment ID No.: 2-PP-50WEquipment Class: (5) Horizontal Pumps:UGAL CHARP9180742C-689 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: EY-] NUSeismic Walkdown Checklist (SWC)Equipment ID No.: 2-PP-50WEquipment Class: (5) Horizontal PumpsE ui ment Descri tion: WESHI CENTRIt-I P9180743UGALCHAR(

P9180744C-690 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: Y N USeismic Walkdown Checklist (SWC)Equipment ID No.: 2-PP-7WEquipment Class: (6) Vertical PumpsEquipment

==

Description:==

WEST ESSENTIAL SERVICE WATER PUMPProject:

DC Cook 2 SWELLocation (Bldg, Elev,Room/Area):

SH2, 591.00 ft, 136Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1. Is anchorage configuration verification required (i.e., is the item one of Yesthe 50% of SWEL items requiring such verification)?

DWG 12-3684 REV142. Is the anchorage free of bent, broken, missing or loose hardware?

Yes3. Is the anchorage free of corrosion that is more than mild surface Yesoxidation?

4. Is the anchorage free of visible cracks in the concrete near the Yesanchors?5. Is the anchorage configuration consistent with plant documentation?

Yes.(Note: This question only applies if the item is one of the 50% for whichan anchorage configuration verification is required.)

6. Based on the above anchorage evaluations, is the anchorage free of Yespotentially adverse seismic conditions?

C-691 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: Y NUSeismic Walkdown Checklist (SWC)Equipment ID No.:2-PP-7WEquipment Class: (6) Vertical PumpsEquipment

==

Description:==

WEST ESSENTIAL SERVICE WATER PUMPInteraction Effects7. Are soft targets free from impact by nearby equipment or structures?

Permanent Scaffold

-Ref DWG 2-3113C.

General Notes8. Are overhead equipment, distribution

systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Light rod hung9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment freeof potentially adverse seismic interaction effects?YesYesYesYesOther Adverse Conditions

11. Have you looked for and found no adverse seismic conditions that Yescould adversely affect the safety functions of the equipment?

CommentsEvaluated by: George G Thomas Date: 10/18/12Neda Stoeva 10/18/12PhotosC-692 DC Cook Unit I & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: L-Y] N USeismic Walkdown Checklist (SWC)Equipment ID No.: 2-PP-7WEquipment Class: (6) Vertical PumpsE ui ment Descri tion: WEST ESSENTIAL SERVICE WATER PUMPP9090047 P9090048P9090049 P9090050C-693 DC Cook Unit I & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: [-] N USeismic Walkdown Checklist (SWC)Equipment ID No.: 2-PP-7WEquipment Class: (6) Vertical PumpsWEST ESSENTIAL SERVICE WATER PUMPC-695 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: [-Y N USeismic Walkdown Checklist (SWC)Equipment ID No.: 2-PP-7WEquipment Class: (6) Vertical PumpsEauioment

==

Description:==

WEST ESSENTIAL SERVICE WATER PUMPC-695 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: [-7 NUSeismic Walkdown Checklist (SWC)Equipment ID No.:2-PP-9WEquipment Class: (6) Vertical PumpsEquipment

==

Description:==

WEST CONTAINMENT SPRAY PUMPProject:

DC Cook 2 SWELLocation (Bldg, Elev,Room/Area):

AB2, 573.00 ft, 52Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1. Is anchorage configuration verification required (i.e., is the item one ofthe 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware?

NoYesYes3. Is the anchorage free of corrosion that is more than mild surfaceoxidation?

4. Is the anchorage free of visible cracks in the concrete near theanchors?Yes5. Is the anchorage configuration consistent with plant documentation?

(Note: This question only applies if the item is one of the 50% for whichan anchorage configuration verification is required.)

Not Applicable

6. Based on the above anchorage evaluations, is the anchorage free ofpotentially adverse seismic conditions?

YesC-696 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: Y] NUSeismic Walkdown Checklist (SWC)Equipment ID No.:2-PP-9WEquipment Class: (6) Vertical PumpsEquipment

==

Description:==

WEST CONTAINMENT SPRAY PUMPInteraction Effects7. Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution
systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Block wall behind pump -DWG 12-4025, Wall W-229. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment freeof potentially adverse seismic interaction effects?YesYesYesYesOther Adverse Conditions

11. Have you looked for and found no adverse seismic conditions that Yescould adversely affect the safety functions of the equipment?

Comments,,. "Y". -Evaluated by- George G Thomas Date: 10/18/12Neda Stoeva 10/18/12PhotosC-697 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: FY] N USeismic Walkdown Checklist (SWC)Equipment ID No.: 2-PP-9WEquipment Class: (6) Vertical PumpsEquipment

==

Description:==

WEST CONTAINMENT SPRAY PUMPP9180796C-698 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1,09/12/13 Status: Y-] N USeismic Walkdown Checklist (SWC)Equipment ID No.: 2-PP-9WEquipment Class: (6) Vertical Pumps:niiinmrnn I e, f rirftin-

\AIIf-T ("'C lTAIKIRA IlT Q IDPAV DI IMiADC-699 DC Cook Unit I & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: F] N USeismic Walkdown Checklist (SWC)Equipment ID No.: 2-PP-9WEquipment Class: (6) Vertical PumpsEauiroment

==

Description:==

WEST CONTAINMENT SPRAY PUMPC-700