ML13267A322

From kanterella
Jump to navigation Jump to search
SD-121023-001, Rev. 1, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Page C-501 Through Page C-600
ML13267A322
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 09/12/2013
From: Stoeva N
Stevenson & Associates
To:
American Electric Power, Indiana Michigan Power Co, Office of Nuclear Reactor Regulation
Shared Package
ML13267A279 List:
References
AEP-NRC-2013-074 SD-121023-001, Rev 1
Download: ML13267A322 (100)


Text

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: [Y N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-CLI-114 Equipment Class:

(18) Instruments on Racks Equipment

Description:

CONDENSATE STORAGE TANK TK-32 LEVEL INDICATOR Project:

DC Cook 2 SWEL Location (Bldg, Elev, Room/Area):

AB2, 586.00 ft, 24 Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1. Is anchorage configuration verification required (i.e., is the item one of No the 50% of SWEL items requiring such verification)?
2.

Is the anchorage free of bent, broken, missing or loose hardware?

Yes Supported off the wall

3.

Is the anchorage free of corrosion that is more than mild surface Yes oxidation?

4.

Is the anchorage free of visible cracks in the concrete near the Yes anchors?

5.

Is the anchorage configuration consistent with plant documentation?

Not Applicable (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

6.

Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?

C-501

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: jjJ N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-CLI-1 14 Equipment Class:

(18) Instruments on Racks Equipment

Description:

CONDENSATE STORAGE TANK TK-32 LEVEL INDICATOR Interaction Effects

7.

Are soft targets free from impact by nearby equipment or structures?

Yes

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Yes

9.

Do attached lines have adequate flexibility to avoid damage?

Yes

10.

Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

Yes Other Adverse Conditions

11.

Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?

Comments Tape - ribbon wrapped around it Evaluated by:

'4*----

George G Thomas Date:

10/18/12 Neda Stoeva 10/18/12 Photos C-502

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: [Y N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-CLI-114 Equipment Class:

(18) Instruments on Racks Equipment

Description:

CONDENSATE STORAGE TANK TK-32 LEVEL INDICATOR P9180889 C-503

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: [*

N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-CRID-3 Equipment Class:

(14) Distribution Panels Equipment

Description:

120VAC CONTROL ROOM INSTRUMENT DISTRIBUTION Project:

DC Cook 2 SWEL Location (Bldg, Elev, Room/Area):

AB2, 633.00 ft, 123 Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1. Is anchorage configuration verification required (i.e., is the item one of Yes the 50% of SWEL items requiring such verification)?

DWG 2-5540 REV5

2.

Is the anchorage free of bent, broken, missing or loose hardware?

Yes Could only see anchorage of angle to unistrut - Cannot open panel to see how it is attached to angle (whole face plate needs to be unscrewed to get in)

3.

Is the anchorage free of corrosion that is more than mild surface Yes oxidation?

4.

Is the anchorage free of visible cracks in the concrete near the Not Applicable anchors?

Angle bolted to unistrut, part of panel welded to embedded plate

5.

Is the anchorage configuration consistent with plant documentation?

Yes (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

6.

Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?

C-504

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y] N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-CRID-3 Equipment Class:

(14) Distribution Panels Equipment

Description:

120VAC CONTROL ROOM INSTRUMENT DISTRIBUTION Interaction Effects

7.

Are soft targets free from impact by nearby equipment or structures?

Yes

8.

Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Check ceiling tiles - Ceiling tiles OK per DWG 12-40 70

9.

Do attached lines have adequate flexibility to avoid damage?

Yes Yes

10.

Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

Yes Other Adverse Conditions

11.

Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?

Comments Evaluated by:

George G Thomas Date:

10/18/12 Neda Stoeva 10/18/12 Photos C-505

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: LY-] N U

Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-CRID-3 Equipment Class:

(14) Distribution Panels 120VAC CONTROL ROOM II P9181091 C-506

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status:

Y] N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-CRII Equipment Class:

(14) Distribution Panels ioment Descriotion:

120VAC CONTROL RO D-3 OM INSTRUMENT DISTRIBUTION C-507

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status:

Y-] N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-CRID-4-INV Equipment Class:

(16) Inverters Equipment

Description:

120VAC CONTROL ROOM INSTRUMENT DISTRIBUTION SYSTEM Project:

DC Cook 2 SWEL Location (Bldg, Elev, Room/Area):

AB2, 609.00 ft, 202 Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1.

Is anchorage configuration verification required (i.e., is the item one of No the 50% of SWEL items requiring such verification)?

2.

Is the anchorage free of bent, broken, missing or loose hardware?

Yes

3.

Is the anchorage free of corrosion that is more than mild surface oxidation?

Yes

4.

Is the anchorage free of visible cracks in the concrete near the anchors?

Yes

5.

Is the anchorage configuration consistent with plant documentation?

(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

6.

Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Not Applicable Yes C-508

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: [Y N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-CRID-4-INV Equipment Class:

(16) Inverters Equipment

Description:

120VAC CONTROL ROOM INSTRUMENT DISTRIBUTION SYSTEM Interaction Effects

7.

Are soft targets free from impact by nearby equipment or structures?

Yes

8.

Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Yes

9.

Do attached lines have adequate flexibility to avoid damage?

Yes

10.

Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

Yes Other Adverse Conditions

11.

Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?

Comments Evaluated by:

  • George G Thomas Date:

10/18/12 Neda Stoeva 10/18/12 Photos C-509

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: LY-N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-CRID-4-INV Equipment Class:

(16) Inverters Equipment

Description:

120VAC CONTROL ROOM INSTRUMENT DISTRIBUTION SYSTEM F'ýVl IUMA C-510

DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: [-Y N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-CRID-4-INV Equipment Class:

(16) Inverters Equipment

Description:

120VAC CONTROL ROOM INSTRUMENT DISTRIBUTION SYSTEM C-511

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: F N

U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-DGAB Equipment Class:

(20) Instrumentation and Control Panels and Cabinets Equipment

Description:

AB EMERGENCY DIESEL GENERATOR OME-150-AB CONTROL Project:

DC Cook 2 SWEL Location (Bldg, Elev, Room/Area):

AB2, 587.00 ft, 121 Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1.

Is anchorage configuration verification required (i.e., is the item one of No the 50% of SWEL items requiring such verification)?

2.

Is the anchorage free of bent, broken, missing or loose hardware?

Yes

3.

Is the anchorage free of corrosion that is more than mild surface Yes oxidation?

4.

Is the anchorage free of visible cracks in the concrete near the Yes anchors?

Spalled concrete on 2 front left bolts is OK by SEWS documents and ANCHOR evaluation does not credit those 2 bolts.

5.

Is the anchorage configuration consistent with plant documentation?

Not Applicable (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

6.

Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?

C-512

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: jY N U

Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-DGAB Equipment Class:

(20) Instrumentation and Control Panels and Cabinets Equipment

Description:

AB EMERGENCY DIESEL GENERATOR OME-150-AB CONTROL Interaction Effects

7.

Are soft targets free from impact by nearby equipment or structures?

Yes ROD HUNG light can swing into panel (separate box up on top right comer - beige) but would not be damaging

8.

Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Yes

9.

Do attached lines have adequate flexibility to avoid damage?

Yes

10.

Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

Yes Other Adverse Conditions

11.

Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?

Comments Evaluated by:

George G Thomas Date:

10/18/12 Neda Stoeva 10/18/12 Photos C-513

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status:

Y-] N U

Seismic Walkdown Checklist (SWC)

Equipment ID No.:

Equipment Class:

2-DGAB (20) Instrumentation and Control Panels and Cabinets

'Y DIE

1(1=x1=ATnD Cnh 110 (AR Q (r)NITPCnI "I,4U40I F

C-514

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: -Yj N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-DGAB Equipment Class:

(20) Instrumentation and Control Panels and Cabinets rM.

I A

  • I/

r-lK'rI

'EI:.IIED AT"rfB ffArI 4C

'1 AD ITDf'%

I T LJIrIOFL L P9140482

"-14U4t5, C-515

DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: F-ý N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-DGAB Equipment Class:

(20) Instrumentation and Control Panels and Cabinets

,Y DIESEL FU14U400 C-516

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: LY] N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-DGAB Equipment Class:

(20) Instrumentation and Control Panels and Cabinets Equipment

Description:

AB EMERGENCY DIESEL GENERATOR OME-150-AB CONTROL P9130471 C-517

DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: F]

N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-DGAB Equipment Class:

(20) Instrumentation and Control Panels and Cabinets

=RGENCY DIE

1 f'-C:K1C:DA-MD r)hAr-: Irfl-AD 1-nK1-rDn1 I-.'Ll'IAM Ila /P%

C-518

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: FJ N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-DGAB Equipment Class:

(20) Instrumentation and Control Panels and Cabinets Equipment

Description:

AB EMERGENCY DIESEL GENERATOR OME-150-AB CONTROL C-519

DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: LII] N U

Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-DGAB-INV Equipment Class:

(16) Inverters Equipment

Description:

AB EMERGENCY DIESEL GENERATOR OME-150-AB INVERTER Project:

DC Cook 2 SWEL Location (Bldg, Elev, Room/Area):

AB2, 587.00 ft, 121 Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1. Is anchorage configuration verification required (i.e., is the item one of Yes the 50% of SWEL items requiring such verification)?

SQUG 2-DGAB-INV REVO

2.

Is the anchorage free of bent, broken, missing or loose hardware?

Yes

3.

Is the anchorage free of corrosion that is more than mild surface Yes oxidation?

Discoloration of back right anchor bolt - very minor rust

4.

Is the anchorage free of visible cracks in the concrete near the Yes anchors?

5.

Is the anchorage configuration consistent with plant documentation?

Yes (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

6.

Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?

C-520

DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: FYj] N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-DGAB-INV Equipment Class:

(16) Inverters Equipment

Description:

AB EMERGENCY DIESEL GENERATOR OME-150-AB INVERTER Interaction Effects

7.

Are soft targets free from impact by nearby equipment or structures?

Yes

8.

Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Yes

9.

Do attached lines have adequate flexibility to avoid damage?

Yes

10.

Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

Yes Other Adverse Conditions

11.

Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?

Comments Evaluated by:

George G Thomas Date:

10/18/12 I*)

_Neda Stoeva 10/18/12 Photos C-521

DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status:

Y-] N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

Equipment Class:

(16) In 2-DGAB-INV ierters

'Y DIE FU1 U440 C-522

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: FY-] N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-DGAB-INV EauiDment Class:

(16) Inverters nment Descrintion:

IENCY DIESEL GENERATOR OME-1 P9130449 C-523

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: F-] N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-DGAB-INV Equipment Class:

(16) Inverters ICY DIE.

Iw%

-"-u l Iali I

C-524

DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: [Y N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-ECR-23 Equipment Class:

(7) Fluid-Operated Valves EauiDment DescriDtion:

CONTAINMENT LOWER VOLUME EAST AIR SAMPLE ESR-3 Project:

DC Cook 2 SWEL Location (Bldg, Elev, Room/Area):

AB2, 612.00 ft, 12 Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1.

Is anchorage configuration verification required (i.e., is the item one of No the 50% of SWEL items requiring such verification)?

2.

Is the anchorage free of bent, broken, missing or loose hardware?

3.

Is the anchorage free of corrosion that is more than mild surface oxidation?

4.

Is the anchorage free of visible cracks in the concrete near the anchors?

5.

Is the anchorage configuration consistent with plant documentation?

(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable Not Applicable Not Applicable Not Applicable

6.

Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes C-525

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status:

T N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-ECR-23 Equipment Class:

(7) Fluid-Operated Valves Equipment

Description:

CONTAINMENT LOWER VOLUME EAST AIR SAMPLE ESR-3 Interaction Effects

7.

Are soft targets free from impact by nearby equipment or structures?

Yes

8.

Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Yes

9.

Do attached lines have adequate flexibility to avoid damage?

Yes

10.

Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

Yes Other Adverse Conditions

11.

Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?

Comments Evaluated by:

George G Thomas Date:

10/18/12 Neda Stoeva 10/18/12 Photos C-526

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: []

N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-ECR-23 Equipment Class:

(7) Fluid-Operated Valves

NT LC C-527

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status:

Y WJ U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-ESW Equipment Class:

(20) Instrumentation and Control Panels and Cabinets Equipment

Description:

ESSENTIAL SERVICE WATER CONTROL PANEL Project:

DC Cook 2 SWEL Location (Bldg, Elev, Room/Area):

AB2, 633.00 ft, 123 Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1. Is anchorage configuration verification required (i.e., is the item one of Yes the 50% of SWEL items requiring such verification)?

SQUG 2-CCW AND 2-ESW REV3 A

2.

Is the anchorage free of bent, broken, missing or loose hardware?

Yes

3.

Is the anchorage free of corrosion that is more than mild surface Yes oxidation?

4.

Is the anchorage free of visible cracks in the concrete near the Not Applicable anchors?

Welded to embedded plate

5.

Is the anchorage configuration consistent with plant documentation?

No (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

A

6.

Based on the above anchorage evaluations, is the anchorage free of No potentially adverse seismic conditions?

C-528

DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y N] U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-ESW Equipment Class:

(20) Instrumentation and Control Panels and Cabinets Equipment

Description:

ESSENTIAL SERVICE WATER CONTROL PANEL Interaction Effects

7.

Are soft targets free from impact by nearby equipment or structures?

Yes

8.

Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Check ceiling tiles - Ceiling tiles OK per DWG 12-40 70

9.

Do attached lines have adequate flexibility to avoid damage?

Yes Yes

10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

Yes Other Adverse Conditions

11.

Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?

Comments Evaluated by:

-- George G Thomas Date:

08/15/2013 Neda Stoeva 08/15/2013 Photos C-529

DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status:

Y N-] U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-ESW Equipment Class:

(20) Instrumentation and Control Panels and Cabinets ipment

Description:

ESSENTIAL SERVICE WATER CONTROL PANEL C-530

DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status:

Y I U

Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-ESW Equipment Class:

(20) Instrumentation and Control Panels and Cabinets pm nt

Description:

ESSENTIAL SERVICE WATER CONTROL PANEL MlJId1 uI C-531

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status:

Y lN U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-ESW Equipment Class:

(20) Instrumentation and Control Panels and Cabinets Equipment

Description:

ESSENTIAL SERVICE WATER CONTROL PANEL C-532

DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1. 09/12/13 Status: F-Y N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-EZC-A Equipment Class:

(1) Motor Control Centers Equipment

Description:

600VAC MOTOR CONTROL CENTER EZC-A Project:

DC Cook 2 SWEL Location (Bldg, Elev, Room/Area):

AB2, 613.00 ft, 205 Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1.

Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

No

2.

Is the anchorage free of bent, broken, missing or loose hardware?

Yes

3.

Is the anchorage free of corrosion that is more than mild surface oxidation?

Yes

4.

Is the anchorage free of visible cracks in the concrete near the anchors?

Yes

5.

Is the anchorage configuration consistent with plant documentation?

(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable

6.

Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes C-533

DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: FT] N U

Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-EZC-A Equipment Class: (1) Motor Control Centers Equipment

Description:

600VAC MOTOR CONTROL CENTER EZC-A Interaction Effects

7.

Are soft targets free from impact by nearby equipment or structures?

Yes

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
9.

Do attached lines have adequate flexibility to avoid damage?

10.

Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

Yes Yes Yes Other Adverse Conditions

11.

Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?

Comments Evaluated by:

-- George G Thomas Date:

10/18/12 Neda Stoeva 10/18/12 Photos C-534

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: F]

N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-EZC-A Equipment Class:

(1) Motor Control Centers Equipment

Description:

600VAC MOTOR CONTROL CENTER EZC-A P9170775 C-535

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: FY] N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-EZC-A Equipment Class:

(1) Motor Control Centers IPrm dnmtfnt

-lerin+in gA1A\\IA(' hAC)TC'"P "nKITPr(I (KIT::

P FP7Tl: A C-536

DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: FY-] N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

Equipment Class:

Eauioment Descriotion:

2-EZC-A (1) Motor Control Centers R CONTROL IlI (Uff4 P9170785 C-537

DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: F-1 N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-EZC-A Equipment Class:

(1) Motor Control Centers Equipment

Description:

600VAC MOTOR CONTROL CENTER EZC-A C-538 I

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: FYI N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-EZC-A1 Equipment Class:

(1) Motor Control Centers Equipment

Description:

600VAC MOTOR CONTROL CENTER EZC-A1 Project:

DC Cook 2 SWEL Location (Bldg, Elev, Room/Area):

AB2, 613.00 ft, 205 Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1. Is anchorage configuration verification required (i.e., is the item one of Yes the 50% of SWEL items requiring such verification)?

DWG 12-3431A and 12-3073D

2.

Is the anchorage free of bent, broken, missing or loose hardware?

Yes

3.

Is the anchorage free of corrosion that is more than mild surface Yes oxidation?

4.

Is the anchorage free of visible cracks in the concrete near the Yes anchors?

5.

Is the anchorage configuration consistent with plant documentation?

Yes (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

6.

Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?

C-539

DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: FYI N U

Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-EZC-A1 Equipment Class:

(1) Motor Control Centers Equipment

Description:

600VAC MOTOR CONTROL CENTER EZC-A1 Interaction Effects

7.

Are soft targets free from impact by nearby equipment or structures?

Yes

8.

Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Ceiling light rod hung can impact panel 2-EZC-A I & 2-EZC-B 1 - NOT damaging - not that sensitive

9.

Do attached lines have adequate flexibility to avoid damage?

Yes Yes

10.

Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

Yes Other Adverse Conditions

11.

Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?

Comments Evaluated by:

George G Thomas Date:

10/18/12 Neda Stoeva 10/18/12 Photos C-540

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: F-Y] N U

Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-EZC-A1 Equipment Class:

(1) Motor Control Centers iDment

Description:

600VAC MOTOR CONTROlL CENTER EZC-A1 C-541

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: F-] N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

Equipment Class:

Prii i"nmant ner-rintinn 2-EZC-A1 (1) Motor Control Centers 600VAC MOTOR CONTROL CENTER EZC-A1 C-542

DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: F-* N U

Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-EZC-B Equipment Class:

(1) Motor Control Centers Equipment

Description:

600VAC MOTOR CONTROL CENTER EZC-B Project:

DC Cook 2 SWEL Location (Bldg, Elev, Room/Area):

AB2, 613.00 ft, 205 Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findinqs. Additional space is provided at the end of this checklist for documentinq other comments.

Anchorage

1.

Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

No

2.

Is the anchorage free of bent, broken, missing or loose hardware?

Yes

3.

Is the anchorage free of corrosion that is more than mild surface oxidation?

Yes

4.

Is the anchorage free of visible cracks in the concrete near the anchors?

Yes

5.

Is the anchorage configuration consistent with plant documentation?

(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable

6.

Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes C-543

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status:

Y N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-EZC-B Equipment Class:

(1) Motor Control Centers Equipment

Description:

600VAC MOTOR CONTROL CENTER EZC-B Interaction Effects

7.

Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
9.

Do attached lines have adequate flexibility to avoid damage?

Yes Yes Yes

10.

Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

Yes Other Adverse Conditions

11.

Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?

Comments INSULATION Debris inside 2-EZC-R5A Evaluated by:

George G Thomas Date:

10/18/12 Q-

,A. _.

Neda Stoeva 10/18/12 Photos C-544

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status:

Y] N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-EZC-B Equipment Class:

(1) Motor Control Centers Equipment

Description:

600VAC MOTOR CONTROL CENTER EZC-B C-545

DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: F]

N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-EZC-B Equipment Class:

(1) Motor Control Centers Equipment

Description:

600VAC MOTOR CONTROL CENTER EZC-B C-546

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: F]

N U

Seismic Walkdown Checklist (SWC)

Equipment ID No.:

Equipment Class:

2-EZC-B (1) Motor Control Centers 600VAC MOTOR CONTROL C I-'t1 (U/ll C-547

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: [-Y N

U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-EZC-B1 Equipment Class:

(1) Motor Control Centers Equipment

Description:

600VAC MOTOR CONTROL CENTER EZC-B1 Project:

DC Cook 2 SWEL Location (Bldg, Elev, Room/Area):

AB2, 613.00 ft, 205 Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1.

Is anchorage configuration verification required (i.e., is the item one of Yes the 50% of SWEL items requiring such verification)?

DWG 12-3431A and 12-3073D

2.

Is the anchorage free of bent, broken, missing or loose hardware?

Yes

3.

Is the anchorage free of corrosion that is more than mild surface Yes oxidation?

4.

Is the anchorage free of visible cracks in the concrete near the Yes anchors?

5.

Is the anchorage configuration consistent with plant documentation?

Yes (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

6.

Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?

C-548

DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: jY] N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-EZC-Bl Equipment Class:

(1) Motor Control Centers Eauipment

Description:

600VAC MOTOR CONTROL CENTER EZC-B1 Interaction Effects

7.

Are soft targets free from impact by nearby equipment or structures?

8.

Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Ceiling light rod hung can impact panel 2-EZC-A 1 & 2-EZC-B1 - NOT damaging - not that sensitive

9.

Do attached lines have adequate flexibility to avoid damage?

10.

Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

Yes Yes Yes Yes Other Adverse Conditions

11.

Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?

Comments Evaluated by:

George G Thomas Date:

10/18/12 Neda Stoeva 10/18/12 Photos C-549

DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: FY-- N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-EZC-BI Equipment Class: (1) Motor Control Centers

-nidrinmnfnt nlnerrintinn" RPn\\IA* IAfTIlP (llNNITPflI (I

NTITR P717.-R1 I"'1UI*

tuu C-550

DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status:

Y N

U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-FFI-240 Equipment Class:

(18) Instruments on Racks Equipment

Description:

AUXILIARY FEEDWATER TO STEAM GENERATOR OME-3-4 Project:

DC Cook 2 SWEL Location (Bldg, Elev, Room/Area):

AB2, 621.00 ft, 10 Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1.

Is anchorage configuration verification required (i.e., is the item one of Yes the 50% of SWEL items requiring such verification)?

DWG 2-5567A REV6

2.

Is the anchorage free of bent, broken, missing or loose hardware?

Yes

3.

Is the anchorage free of corrosion that is more than mild surface Yes oxidation?

4.

Is the anchorage free of visible cracks in the concrete near the Yes anchors?

5.

Is the anchorage configuration consistent with plant documentation?

Yes (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

6.

Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?

C-551

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: F-] N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-FFI-240 Equipment Class:

(18) Instruments on Racks Equipment

Description:

AUXILIARY FEEDWATER TO STEAM GENERATOR OME-3-4 Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures?

Yes

8.

Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Yes

9.

Do attached lines have adequate flexibility to avoid damage?

Yes

10.

Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

Yes Other Adverse Conditions

11.

Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?

Comments Evaluated by:

-- George G Thomas Date:

10/18/12 Neda Stoeva 10/18/12 Photos C-552

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: LI-I N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-FFI-240 Equipment Class:

(18) Instruments on Racks Eauinment

Description:

AUXILIARY FEEDWATER TO STEAM GENERATOR OME-3-4 i-HIuuzl t C-553

DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: F]

N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-FFI-240 Equipment Class:

(18) Instruments on Racks fIidnrimntn*nflrrintinn-AlIYll IAIRY FI:I:DWATFR TC *TFAM IFNFRATC)R OMF-3-4 m

/

C-554

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status:

Y-] N U

Seismic Walkdown Checklist (SWC)

Equipment ID No.:

Equipment Class:

2-FFI-240 (18) Instruments on Racks AUXILIARY FEEDWATER TO C-555

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status:

Y jN U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-HE-1 5W Equipment Class:

(21) Tanks and Heat Exchangers Equipment

Description:

WEST COMPONENT COOLING WATER HEAT EXCHANGER Project:

DC Cook 2 SWEL Location (Bldg, Elev, Room/Area):

AB2, 609.00 ft, 609 Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1. Is anchorage configuration verification required (i.e., is the item one of Yes the 50% of SWEL items requiring such verification)?

DWG 12-3285 REV24

2.

Is the anchorage free of bent, broken, missing or loose hardware?

Yes Thread engagement of north west bolt - OK by tag - And north east bolt - DOC# not visible - OK per SD-010405-001

3.

Is the anchorage free of corrosion that is more than mild surface Yes oxidation?

4.

Is the anchorage free of visible cracks in the concrete near the Yes anchors?

5.

Is the anchorage configuration consistent with plant documentation?

Yes (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

6.

Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?

C-556

DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status:

Y FN] U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-HE-1 5W Equipment Class:

(21) Tanks and Heat Exchangers Equipment

Description:

WEST COMPONENT COOLING WATER HEAT EXCHANGER Interaction Effects

7.

Are soft targets free from impact by nearby equipment or structures?

Yes

8.

Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Fire extinguishers on short hooks - AR 2012-11669 was issued.

9.

Do attached lines have adequate flexibility to avoid damage?

No Yes No

10.

Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

Other Adverse Conditions

11.

Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?

Comments Evaluated by:

George G Thomas Date:

10/18/12 Neda Stoeva 10/18/12 Photos C-557

DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status:

Y

] U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-HE-15W Equipment Class:

(21) Tanks and Heat Exchangers Fr inm~ntnflmcrinfin

\\AIFPT C.MPflNFNIT (l00)I IN( WATFR HFAT FXC.HANflFR P9100049 P9100050 C-558

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status:

Y EN] U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-HE-15W Equipment Class:

(21) Tanks and Heat Exchangers nment Descriotion:

WEST COMPONENT COOLING WATER HEAT EXCHANGER C-559

DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: [Y N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-HE-1 7W Equipment Class:

(21) Tanks and Heat Exchangers Eauinment Descriotion:

WEST RESIDUAL HEAT REMOVAL HEAT EXCHANGER Project:

DC Cook 2 SWEL Location (Bldg, Elev, Room/Area):

AB2, 609.00 ft, 6 Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1.

Is anchorage configuration verification required (i.e., is the item one of No the 50% of SWEL items requiring such verification)?

2.

Is the anchorage free of bent, broken, missing or loose hardware?

Yes

3.

Is the anchorage free of corrosion that is more than mild surface oxidation?

Yes

4.

Is the anchorage free of visible cracks in the concrete near the anchors?

Yes

5.

Is the anchorage configuration consistent with plant documentation?

(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable

6.

Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes C-560

DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: [j-N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-HE-17W Equipment Class:

(21) Tanks and Heat Exchangers Equipment

Description:

WEST RESIDUAL HEAT REMOVAL HEAT EXCHANGER Interaction Effects

7.

Are soft targets free from impact by nearby equipment or structures?

Yes

8.

Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Yes

9.

Do attached lines have adequate flexibility to avoid damage?

Yes

10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

Yes Other Adverse Conditions

11.

Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?

Comments Evaluated by-..

George G Thomas Date:

10/18/12 Neda Stoeva 10/18/12 Photos C-561

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: F-Y N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-HE-1 7W Equipment Class:

(21) Tanks and Heat Exchangers Equipment

Description:

WEST RESIDUAL HEAT REMOVAL HEAT EXCHANGER P9181131 P9181133 C-562

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: LI-N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-HE-17W Equipment Class:

(21) Tanks and Heat Exchangers Equipment

Description:

WEST RESIDUAL HEAT REMOVAL HEAT EXCHANGER P91b 11jI C-563

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status:

Y] N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-HE-17W Equipment Class:

(21) Tanks and Heat Exchangers Eaui(ment

Description:

WEST RESIDUAL HEAT REMOVAL HEAT EXCHANGER C-564

DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: FYj] N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-HE-18W Equipment Class:

(21) Tanks and Heat Exchangers Equipment

Description:

WEST CONTAINMENT SPRAY HEAT EXCHANGER Project:

DC Cook 2 SWEL Location (Bldg, Elev, Room/Area):

AB2, 609.00 ft, 4 Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findinqs. Additional space is provided at the end of this checklist for documentinq other comments.

Anchorage

1.

Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

No

2.

Is the anchorage free of bent, broken, missing or loose hardware?

Yes

3.

Is the anchorage free of corrosion that is more than mild surface oxidation?

Yes

4.

Is the anchorage free of visible cracks in the concrete near the anchors?

Yes

5.

Is the anchorage configuration consistent with plant documentation?

(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable

6.

Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes C-565

DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: j]

N U

Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-HE-18W Equipment Class:

(21) Tanks and Heat Exchangers Equipment

Description:

WEST CONTAINMENT SPRAY HEAT EXCHANGER Interaction Effects

7.

Are soft targets free from impact by nearby equipment or structures?

Yes

8.

Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Yes

9.

Do attached lines have adequate flexibility to avoid damage?

Yes

10.

Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

Yes Other Adverse Conditions

11.

Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?

Comments Evaluated by:

George G Thomas Date:

10/18/12

,h,,,4' Neda Stoeva 10/18/12 Photos C-566

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: []

N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-HE-18W Equipment Class:

(21) Tanks and Heat Exchangers Equipment

Description:

WEST CONTAINMENT SPRAY HEAT EXCHANGER P9180979 C-567

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: FY-] N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-HE-18W Equipment Class:

(21) Tanks and Heat Exchangers Equipment

Description:

WEST CONTAINMENT SPRAY HEAT EXCHANGER C-568

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y

]

N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-HE-18W Equipment Class:

(21) Tanks and Heat Exchangers Equipment

Description:

WEST CONTAINMENT SPRAY HEAT EXC C-569

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1,09/12/13 Status: F-] N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-HE-18W Equipment Class:

(21) Tanks and Heat Exchangers E ui ment Descri tion:

WEST CONTAINMENT SPRAY HEAT EXCHANGER P9180986 P9180987 P9180988 P9180989 C-570

DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status:

Y-] N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-HE-18W Equipment Class:

(21) Tanks and Heat Exchangers ELQT fCnKITAIP

-NT SPRAY HEAT EXCHANGER I.-JqI xfl lAM-lqI r-Z, I Outpz C-571

DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: [-Y N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-HE-18W Equipment Class:

(21) Tanks and Heat Exchangers

'EST CONTAINMENT SPRAY HEAT EXCHANGER C-572

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status:

Y--

] N U

Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-HV-ACRA-2 Equipment Class:

(10) Air Handlers Equipment

Description:

CONTROL ROOM VENTILATION SOUTH AIR CONDITIONING Project:

DC Cook 2 SWEL Location (Bldg, Elev, Room/Area):

AB2, 650.00 ft, 129 Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1.

Is anchorage configuration verification required (i.e., is the item one of Yes the 50% of SWEL items requiring such verification)?

DWG 12-3366 REV5

2.

Is the anchorage free of bent, broken, missing or loose hardware?

Yes

3.

Is the anchorage free of corrosion that is more than mild surface Yes oxidation?

4.

Is the anchorage free of visible cracks in the concrete near the Yes anchors?

5.

Is the anchorage configuration consistent with plant documentation?

Yes (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

6.

Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?

C-573

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: [-Y N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-HV-ACRA-2 Equipment Class:

(10) Air Handlers Equipment

Description:

CONTROL ROOM VENTILATION SOUTH AIR CONDITIONING Interaction Effects

7.

Are soft targets free from impact by nearby equipment or structures?

Yes

8.

Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Yes

9.

Do attached lines have adequate flexibility to avoid damage?

Yes

10.

Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

Yes Other Adverse Conditions

11.

Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?

Comments Evaluated by:

George G Thomas Date:

10/18/12 Neda Stoeva 10/18/12 Photos C-574

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: r-ý N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

Equipment Class:

2-H V-ACRA-2 (10) Air Handlers CONTROL ROOM VENTILATION SOUTH AIR CONDITIONING F-ý1UU141 I'B1UUI 4Z C-575

DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: []

N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-HV-ACRA-2 Equipment Class:

(10) Air Handlers Equipment

Description:

CONTROL ROOM VENTILATION SOUTH AIR CONDITIONING C-576

DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: EIY] N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-HV-AES-2 Equipment Class:

(10) Air Handlers Equipment

Description:

AUXILIARY BUILDING VENTILATION ENGINEERED SAFETY Project:

DC Cook 2 SWEL Location (Bldg, Elev, Room/Area):

AB2, 633.00 ft, 8 Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1. Is anchorage configuration verification required (i.e., is the item one of No the 50% of SWEL items requiring such verification)?
2.

Is the anchorage free of bent, broken, missing or loose hardware?

Yes 2 front middle bolts on filter do not have full thread engagement - OK per SD-991215-024 pg. 12

3.

Is the anchorage free of corrosion that is more than mild surface Yes oxidation?

4.

Is the anchorage free of visible cracks in the concrete near the Yes anchors?

5.

Is the anchorage configuration consistent with plant documentation?

Not Applicable (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

6.

Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?

C-577

DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: FY N

U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-HV-AES-2 Equipment Class:

(10) Air Handlers Equipment

Description:

AUXILIARY BUILDING VENTILATION ENGINEERED SAFETY Interaction Effects

7.

Are soft targets free from impact by nearby equipment or structures?

Yes

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Block wall behind component filter-DWG 12-4029, Wall W-7

9.

Do attached lines have adequate flexibility to avoid damage?

Yes Yes

10.

Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

Yes Other Adverse Conditions

11.

Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?

Comments Evaluated by:

George G Thomas Date:

10/18/12

  • v "

ti' Neda Stoeva 10/18/12 Photos C-578

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: [-ý N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-HV-AES-2 Equipment Class:

(10) Air Handlers Equipment

Description:

AUXILIARY BUILDING VENTILATION ENGINEERED SAFETY P9100191 P9100192 C-579

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: 7 N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-HV-AES-2 Equipment Class:

(10) Air Handlers JILDING V I -

11111

_1 1 P9100198 C-580

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status:

Y-] N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-HV-AES-2 Equipment Class:

(10) Air Handlers Equipment Descrption:

AUXILIARY BUILDING VENTILATION ENGINEERED SAFETY C-581

DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: FY] N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-HV-AES-2 Equipment Class:

(10) Air Handlers Equipment

Description:

AUXILIARY BUILDING VENTILATION ENGINEERED SAFETY C-582

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: FY] N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-HV-CEQ-1 Equipment Class:

(10) Air Handlers Equipment

Description:

CONTAINMENT HYDROGEN SKIMMER VENTILATION FAN #1 Project:

DC Cook 2 SWEL Location (Bldg, Elev, Room/Area):

CON2, 625.00 ft, 75 Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1. Is anchorage configuration verification required (i.e., is the item one of Yes the 50% of SWEL items requiring such verification)?

SQUG 2-HV-CEQ-1 REVO

2.

Is the anchorage free of bent, broken, missing or loose hardware?

Yes Missing bolt on backside as identified in SEWS - SQUG 2-HV-CEQ-1 REVO

3.

Is the anchorage free of corrosion that is more than mild surface Yes oxidation?

4.

Is the anchorage free of visible cracks in the concrete near the Not Applicable anchors?

Mounted to floor grate

5.

Is the anchorage configuration consistent with plant documentation?

Yes (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

6.

Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?

C-583

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status:

Y-] N U

Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-HV-CEQ-1 Equipment Class:

(10) Air Handlers Equipment

Description:

CONTAINMENT HYDROGEN SKIMMER VENTILATION FAN #1 Interaction Effects

7.

Are soft targets free from impact by nearby equipment or structures?

Yes

8.

Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

9.

Do attached lines have adequate flexibility to avoid damage?

10.

Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

Yes Yes Yes Other Adverse Conditions

11.

Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?

Comments 08/15/2013 Evaluated by:

a14,ýAt f&X Lindsay M. Yates Date:

A Neda Stoeva 08/15/2013 Photos C-584

DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y] N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-HV-CEQ-1 Equipment Class:

(10) Air Handlers T H' P9130260 C-585

DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: [y N U

Seismic Walkdown Checklist (SWC)

Equipment ID No.:

Equipment Class:

P~ni inmanf naer-rinfinn-2-H V-CEQ-1 (10) Air Handlers CONTAINMENT HYDROG P9130266 C-586

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: IT] N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

Equipment Class:

(10) Air Handlers 2-HV-CEQ-1 U ~

IN I iII U13iUZ(Z C-587

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: F-] N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

Equipment Class:

2-H V-CEQ-1 (10) Air Handlers HYDR(

I-' ZI [ U// 11 P9130275 P9130276 C-588

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: FY] N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

Equipment Class:

(10) Air Handlers Eauioment

Description:

CONTAINMENT t 2-HV-CEQ-1 H)

/

C-589

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: FY-] N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

Equipment Class:

(10) Air Handlers 2-HV-CEQ-1 I I*.lf JI MY[~

P9130284 C-590

DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: FY-N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-HV-CEQ-1 Equipment Class:

(10) Air Handlers Equipment

Description:

CONTAINMENT HYDROGEN SKIMMER VENTILATION FAN #1

"*I'JUZO "I 1UZZ50 C-591

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status:

Y] N U

Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-HV-CEQ-1 Equipment Class:

(10) Air Handlers EquipmentlDescri tion:

CONTAINMENT HYDROGEN SKIMMER VENTILATION FAN #1 P9130289 C-592

DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status:

Yj N U

Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-HV-CEQ-2 Equipment Class:

(10) Air Handlers Equipment

Description:

CONTAINMENT HYDROGEN SKIMMER VENTILATION FAN #2 Project:

DC Cook 2 SWEL Location (Bldg, Elev, Room/Area):

CON2, 625.00 ft, 74 Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documentinq other comments.

Anchorage

1.

Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

No

2.

Is the anchorage free of bent, broken, missing or loose hardware?

Missing bolt on support directly below 2-VMO-101 - OK per SEWS report - SQUG 2-HV-CEQ-2 REVO

3.

Is the anchorage free of corrosion that is more than mild surface oxidation?

Yes Yes

4.

Is the anchorage free of visible cracks in the concrete near the anchors?

5.

Is the anchorage configuration consistent with plant documentation?

(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable Not Applicable

6.

Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes C-593

DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status:

Y-] N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-HV-CEQ-2 Equipment Class:

(10) Air Handlers Equipment

Description:

CONTAINMENT HYDROGEN SKIMMER VENTILATION FAN #2 Interaction Effects

7.

Are soft targets free from impact by nearby equipment or structures?

Yes

8.

Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

9.

Do attached lines have adequate flexibility to avoid damage?

10.

Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

Yes Yes Yes Other Adverse Conditions

11.

Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?

Comments Evaluatedby:

  • eta Lindsay M. Yates Date:

08/15/2013 Neda Stoeva 08/15/2013 Photos A

C-594

DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y] N U

Seismic Walkdown Checklist (SWC)

Equipment ID No.:

Equipment Class:

2-H V-CEQ-2 (10) Air Handlers IT HYDRO P9130291 C-595

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status:

Y-] N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-HV-CEQ-2 Equipment Class:

(10) Air Handlers Equipment

Description:

CONTAINMENT HYDROGEN SKIMMER VENTILATION FAN #2 C-596

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: jY N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-HV-DGX-2 Equipment Class:

(9) Fans Equipment

Description:

AB EMERGENCY DIESEL GENERATOR ROOM VENTILATION Project:

DC Cook 2 SWEL Location (Bldg, Elev, Room/Area):

AB2, 587.00 ft, 121 Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1. Is anchorage configuration verification required (i.e., is the item one of No the 50% of SWEL items requiring such verification)?
2.

Is the anchorage free of bent, broken, missing or loose hardware?

Yes Limited visibility of anchorage, visible portions OK

3.

Is the anchorage free of corrosion that is more than mild surface Yes oxidation?

VERY LIMITED VISIBILITY

4.

Is the anchorage free of visible cracks in the concrete near the Yes anchors?

VERY LIMITED VISIBILITY

5.

Is the anchorage configuration consistent with plant documentation?

Not Applicable (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

6.

Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?

C-597

DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: 7-Y N

U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-HV-DGX-2 Equipment Class:

(9) Fans Equipment

Description:

AB EMERGENCY DIESEL GENERATOR ROOM VENTILATION Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures?

Yes Rod hung light can swing into fan - OK, because it will not affect function of equipment

8.

Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Yes

9.

Do attached lines have adequate flexibility to avoid damage?

Yes

10.

Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

Yes Other Adverse Conditions

11.

Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?

Comments Evaluated by:

George G Thomas Date:

10/18/12 Neda Stoeva 10/18/12 Photos C-598

DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status:

Y] N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

Equipment Class:

(9) Fans 2-HV-DGX-2 JCY DIED FI-13U4,J' fýU1I U43Z "1IU4ii C-599

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: 7-Y N

U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-HV-DGX-2 Equipment Class:

(9) Fans Equipment

Description:

AB EMERGENCY DIESEL GENERATOR ROOM VENTILATION P9130434 C-600