Letter Sequence Meeting |
---|
|
|
MONTHYEARML16077A1562016-03-22022 March 2016 Fleet: Pre-application Teleconference with Exelon to Discuss a Potential License Amendment Request Regarding Operating Training Standards Project stage: Meeting 2016-03-22
[Table View] |
Exelon Fleet: Pre-application Teleconference with Exelon to Discuss a Potential License Amendment Request Regarding Operating Training StandardsML16077A156 |
Person / Time |
---|
Site: |
Calvert Cliffs, Dresden, Peach Bottom, Nine Mile Point, Byron, Three Mile Island, Braidwood, Limerick, Ginna, Clinton, Quad Cities, LaSalle |
---|
Issue date: |
03/22/2016 |
---|
From: |
Hauser J Plant Licensing Branch III |
---|
To: |
Exelon Corp, Exelon Generation Co |
---|
Hauser J, NRR-DORL 415-1687 |
References |
---|
TAC MF7370, TAC MF7390 |
Download: ML16077A156 (15) |
|
Similar Documents at Calvert Cliffs, Dresden, Peach Bottom, Nine Mile Point, Byron, Three Mile Island, Braidwood, Limerick, Ginna, Clinton, Quad Cities, LaSalle |
---|
Category:Meeting Briefing Package/Handouts
MONTHYEARML24302A2422024-10-29029 October 2024 ECCS Compensated Level System Replacement Project Pre-Submittal Meeting Slides ML24267A0522024-09-24024 September 2024 Standby Gas Treatment Planned Amendment Preapplication Meeting Presentation ML24232A2052024-08-12012 August 2024 Presentation Slides for Dresden End-of-Cycle Meeting ML24172A1092024-08-0707 August 2024 Scoping Power Point Presentation ML24200A2312024-07-22022 July 2024 Constellations Pre-Submittal Meeting Presentation About Peach Bottom ECCS Compensated Level System Replacement Project - July 22, 2024 ML24137A1882024-05-16016 May 2024 Annual Assessment Meeting for Pa/Md/Ny/Nj Nuclear Power Plants - NRC Presentation Slides ML24134A2032024-05-14014 May 2024 Lessons Learned for ECCS Digital I&C License Amendment - Rev 0 ML24131A1282024-05-14014 May 2024 Lessons Learned for ECCS Digital I&C License Amendment ML24121A1862024-05-14014 May 2024 Attachment 3: Peach Bottom ECCS Compensated Level System Replacement Project Presentation Material (Non-Proprietary Information) ML24127A0952024-05-0606 May 2024 License Renewal Public Scoping Meeting May 2024 ML24100A7672024-04-11011 April 2024 Meeting Slides - Preapplication with Constellation on Planned Fleet Alternative Request to Adopt OMN-2 ML24089A2612024-04-0909 April 2024 Slides - Constellation - Pre-Application Regarding Hooded Masks 4/9/2024 Meeting Slides (L-2024-LLM-0041) ML24060A1692024-03-0707 March 2024 NRC Slides for March 7, 2024 Regulatory Conference with Constellation Nuclear Regarding Braidwood BW240007, Attachment 5: BW-MISC-062 Rev. 0 - Braidwood Station Unit 2 Diesel Driven AFW MAAP Calculations2024-02-29029 February 2024 Attachment 5: BW-MISC-062 Rev. 0 - Braidwood Station Unit 2 Diesel Driven AFW MAAP Calculations ML24057A3032024-02-26026 February 2024 Attachment 1: Braidwood Station Regulatory Conference Information ML24057A3062024-02-24024 February 2024 Attachment 4: BW-SDP-006 Rev. 0 - Braidwood 2B AF Pump Fuel Oil Leak SOP Sensitivities ML24040A0722024-02-13013 February 2024 – Energy Solution Feb 13 Pubic Meeting Slides on TMI-2 Decommissioning ML24029A1742024-01-30030 January 2024 Constellation Pre-Application January 30, 2024, Meeting Slides - Proposed Alternative to Utilize Code Case N-932, Alternative Requirements for Acceptance of Containment Base Metal Corrosion or Erosion ML24057A3042024-01-22022 January 2024 Attachment 2: EC 640630 Rev. 000 - Documentation of Test Results with Diluted Lube Oil from Fuel In-Leakage - 28 AF Diesel Engine Past Operability ML24003A1812024-01-0808 January 2024 Handout - Byron-Braidwood Core Monitoring and Support System LAR Pre-Submittal Meeting January 8,2024 ML24057A3052023-12-12012 December 2023 Attachment 3: EC 640287 Rev. 000 - Past Operability Test Plan Acceptance Related to 2AF01PB-K ML23345A0362023-12-11011 December 2023 ATWS Uet December 11, 2023 Pre-submittal Meeting Slides ML23317A0712023-11-14014 November 2023 NRC Pre-Submittal Meeting on November 14th, 2023 - TSTF-591 and Selected 50.69 License Condition Updates (EPID L-2023-LLM-0098) (Slides) ML23272A0622023-09-29029 September 2023 Ultimate Heat Sink Temperature Tech Spec Limit Change ML23262B2602023-09-19019 September 2023 Slides - Constellation - Pre-Application EP 9/25/2023 Meeting Handout ML23229A4832023-08-17017 August 2023 RR 20-Year ISI Pre-Submittal NRC Meeting Handout ML23229A0132023-08-17017 August 2023 Relief Request for Alternative Requirements for Byron Unit 1 Reactor Pressure Vessel Inservice Inspection Intervals NRC Meeting Handout ML23255A1042023-08-11011 August 2023 Slides - Constellation - Pre-Application EP 9/18/2023 Draft CEG Presubmittal SG Performance Monitoring Plan Meeting Handout ML23170A0082023-06-29029 June 2023 Decommissioning Presentation for NRC Pre-submittal Meeting, June 29, 2023 ML23172A2092023-06-28028 June 2023 LRA - NRC Pre-Submittal Meeting Slides ML23172A2102023-06-28028 June 2023 CPS Lr Pre-Submittal Meeting Presentation ML23173A0472023-06-28028 June 2023 SLRA - NRC Presubmittal Meeting Slides - 6-28-23 ML23173A0462023-06-28028 June 2023 DNPS SLR Pre-submittal Meeting Presentation Rev. 1 ML23165A0242023-06-27027 June 2023 June 27, 2023, Dresden Nuclear Power Station Subsequent License Renewal Environmental Pre-application Public Meeting - NRC Slides ML23145A1322023-06-27027 June 2023 June 27, 2023, Dresden Nuclear Power Station Subsequent License Renewal Environmental Pre-application Public Meeting - Constellation Slides ML23165A0162023-06-14014 June 2023 June 27, 2023, Clinton Power Station License Renewal Environmental Pre-application Public Meeting - NRC Slides ML23145A1342023-06-14014 June 2023 June 27, 2023, Clinton Power Station License Renewal Environmental Pre-application Public Meeting - Constellation Slides ML23163A1642023-06-12012 June 2023 2022 Braidwood/Byron End-of-Cycle Meeting Presentation ML23157A0352023-06-0606 June 2023 Annual Assessment Meeting for Pa/Md/Ny/Nj Nuclear Power Plants - NRC Presentation Slides ML23103A4072023-04-13013 April 2023 Presentation Slides for Information Call on 4/13/23 N2E Recirc Discharge Nozzle Weld Repair 2nd Request for Alternative ML23094A1492023-04-11011 April 2023 Licensee Presentation on Whr Exemption Request for Public Meeting on April 11, 2023 ML23076A0442023-03-16016 March 2023 Pb U2 Scram Barrier Presentation KT Session ML23055A2712023-03-0202 March 2023 March 2, 2023, Preapplication Meeting to Discuss Planned Amendments to Adopt TSTF-505 and 10 CFR 50.69 (EPID L-2023-LRM-0007) - Slides ML23053A1562023-02-23023 February 2023 NRC Presentation Slides for Public Meeting on February 23, 2023 - 10 CFR 50.69 Alternate Processes License Amendment Request Preliminary Partial Denial ML23076A2822023-02-23023 February 2023 Licensee Presentation on Defense-in-Depth Process ML23076A2812023-02-23023 February 2023 Licensee Presentation on Pressure Boundary Process ML23033A6662023-02-0909 February 2023 Summary of Public Meeting with Constellation Energy Generation, LLC (Constellation) to Discuss Its Request for Alternatives for Certain Steam Generator Weld Inspections for Calvert Cliffs 1 & 2, Byron 1 & 2, Braidwood 1 & 2, and Ginna ML23033A6672023-01-30030 January 2023 Public Call with Constellation January 30, 2023 (Slides) ML23006A2572023-01-10010 January 2023 Digital Modernization Project Installation Support License Amendment Request and Exemption Request Presentation - January 10, 2023 (EPID L-2022-LRM-0099) (Slides) ML22347A1532022-12-13013 December 2022 Public Meeting Presentation, December 15, 2022 Di&C License Amendment Request 2024-09-24
[Table view] Category:Slides and Viewgraphs
MONTHYEARML24302A2422024-10-29029 October 2024 ECCS Compensated Level System Replacement Project Pre-Submittal Meeting Slides ML24296B2132024-10-22022 October 2024 Slides for October 25, 2024, Meeting on Crane Clean Energy Center Regulatory Path to Restoring the Operating Reactor License Basis ML24267A0522024-09-24024 September 2024 Standby Gas Treatment Planned Amendment Preapplication Meeting Presentation ML24249A3092024-09-0606 September 2024 September 6, 2024, Public Meeting Related to Digital Instrumentation and Control Amendment Slides ML24232A2052024-08-12012 August 2024 Presentation Slides for Dresden End-of-Cycle Meeting ML24172A1092024-08-0707 August 2024 Scoping Power Point Presentation ML24200A2312024-07-22022 July 2024 Constellations Pre-Submittal Meeting Presentation About Peach Bottom ECCS Compensated Level System Replacement Project - July 22, 2024 ML24137A1882024-05-16016 May 2024 Annual Assessment Meeting for Pa/Md/Ny/Nj Nuclear Power Plants - NRC Presentation Slides ML24121A1862024-05-14014 May 2024 Attachment 3: Peach Bottom ECCS Compensated Level System Replacement Project Presentation Material (Non-Proprietary Information) ML24131A1282024-05-14014 May 2024 Lessons Learned for ECCS Digital I&C License Amendment ML24134A2032024-05-14014 May 2024 Lessons Learned for ECCS Digital I&C License Amendment - Rev 0 ML24127A0952024-05-0606 May 2024 License Renewal Public Scoping Meeting May 2024 ML24100A7672024-04-11011 April 2024 Meeting Slides - Preapplication with Constellation on Planned Fleet Alternative Request to Adopt OMN-2 ML24089A2612024-04-0909 April 2024 Slides - Constellation - Pre-Application Regarding Hooded Masks 4/9/2024 Meeting Slides (L-2024-LLM-0041) ML24060A1692024-03-0707 March 2024 NRC Slides for March 7, 2024 Regulatory Conference with Constellation Nuclear Regarding Braidwood ML24057A3032024-02-26026 February 2024 Attachment 1: Braidwood Station Regulatory Conference Information ML24040A0722024-02-13013 February 2024 – Energy Solution Feb 13 Pubic Meeting Slides on TMI-2 Decommissioning ML24029A1742024-01-30030 January 2024 Constellation Pre-Application January 30, 2024, Meeting Slides - Proposed Alternative to Utilize Code Case N-932, Alternative Requirements for Acceptance of Containment Base Metal Corrosion or Erosion ML24003A1812024-01-0808 January 2024 Handout - Byron-Braidwood Core Monitoring and Support System LAR Pre-Submittal Meeting January 8,2024 ML23345A0362023-12-11011 December 2023 ATWS Uet December 11, 2023 Pre-submittal Meeting Slides ML23317A0712023-11-14014 November 2023 NRC Pre-Submittal Meeting on November 14th, 2023 - TSTF-591 and Selected 50.69 License Condition Updates (EPID L-2023-LLM-0098) (Slides) ML24051A0462023-10-31031 October 2023 UFSAR Revision 17, Chapter 6, Figure 6.3-35-6.4-1, Redacted (2) ML24051A0472023-10-31031 October 2023 UFSAR Revision 17, Chapter 6, Figure 6.3-4-6.3-34, Redacted (1) ML23272A0622023-09-29029 September 2023 Ultimate Heat Sink Temperature Tech Spec Limit Change ML23262B2602023-09-19019 September 2023 Slides - Constellation - Pre-Application EP 9/25/2023 Meeting Handout ML23251A0782023-09-0606 September 2023 DRE1 Decom Pre-Submittal Slides ML23229A4832023-08-17017 August 2023 RR 20-Year ISI Pre-Submittal NRC Meeting Handout ML23229A1722023-08-17017 August 2023 RR Pen-75 Pre-Submittal NRC Meeting Handout ML23229A0132023-08-17017 August 2023 Relief Request for Alternative Requirements for Byron Unit 1 Reactor Pressure Vessel Inservice Inspection Intervals NRC Meeting Handout ML23255A1042023-08-11011 August 2023 Slides - Constellation - Pre-Application EP 9/18/2023 Draft CEG Presubmittal SG Performance Monitoring Plan Meeting Handout ML23170A0082023-06-29029 June 2023 Decommissioning Presentation for NRC Pre-submittal Meeting, June 29, 2023 ML23173A0472023-06-28028 June 2023 SLRA - NRC Presubmittal Meeting Slides - 6-28-23 ML23173A0462023-06-28028 June 2023 DNPS SLR Pre-submittal Meeting Presentation Rev. 1 ML23172A2102023-06-28028 June 2023 CPS Lr Pre-Submittal Meeting Presentation ML23172A2092023-06-28028 June 2023 LRA - NRC Pre-Submittal Meeting Slides ML23145A1322023-06-27027 June 2023 June 27, 2023, Dresden Nuclear Power Station Subsequent License Renewal Environmental Pre-application Public Meeting - Constellation Slides ML23165A0242023-06-27027 June 2023 June 27, 2023, Dresden Nuclear Power Station Subsequent License Renewal Environmental Pre-application Public Meeting - NRC Slides ML23165A0162023-06-14014 June 2023 June 27, 2023, Clinton Power Station License Renewal Environmental Pre-application Public Meeting - NRC Slides ML23145A1342023-06-14014 June 2023 June 27, 2023, Clinton Power Station License Renewal Environmental Pre-application Public Meeting - Constellation Slides ML23163A1642023-06-12012 June 2023 2022 Braidwood/Byron End-of-Cycle Meeting Presentation ML23157A0352023-06-0606 June 2023 Annual Assessment Meeting for Pa/Md/Ny/Nj Nuclear Power Plants - NRC Presentation Slides ML23103A4072023-04-13013 April 2023 Presentation Slides for Information Call on 4/13/23 N2E Recirc Discharge Nozzle Weld Repair 2nd Request for Alternative ML23094A1492023-04-11011 April 2023 Licensee Presentation on Whr Exemption Request for Public Meeting on April 11, 2023 ML23080A2972023-03-21021 March 2023 Presentation Slides for Information Call on 3/21/23 N2E Recirc Discharge Nozzle Weld Repair Request for Alternative ML23076A0442023-03-16016 March 2023 Pb U2 Scram Barrier Presentation KT Session ML23055A2712023-03-0202 March 2023 March 2, 2023, Preapplication Meeting to Discuss Planned Amendments to Adopt TSTF-505 and 10 CFR 50.69 (EPID L-2023-LRM-0007) - Slides ML23053A1562023-02-23023 February 2023 NRC Presentation Slides for Public Meeting on February 23, 2023 - 10 CFR 50.69 Alternate Processes License Amendment Request Preliminary Partial Denial ML23076A2812023-02-23023 February 2023 Licensee Presentation on Pressure Boundary Process ML23076A2822023-02-23023 February 2023 Licensee Presentation on Defense-in-Depth Process NEI 99-01, Slides - Constellation - Pre-Application EP 2/23/2023 Meeting Slides2023-02-21021 February 2023 Slides - Constellation - Pre-Application EP 2/23/2023 Meeting Slides 2024-09-06
[Table view] |
Text
Exelon Pre
-Submittal Meeting for LAR to adopt ANSI 3.1
-2014March 22, 2016 Purpose for DiscussionLicense Amendment Request (LAR) pre
-submittal meetingDiscuss proposed Technical Specification wordingIdentify issues prior to submittal Discuss two exceptions being taken to ANSI/ANS
-3.1-2014Alignment for consistent wording / Delete STA Commission Policy StatementDiscuss LAR with respect to proposed changes to RG 1.8, Rev. 4Discuss Instant SRO hiring impactDiscuss logistics of timing of submittal and implementation period2 Opening RemarksExecutive Sponsor for LAR -Julie SickleChair of the ANS working level committee that developed ANSI/ANS-3.1-20143 License Amendment Request (LAR) TeamExecutive Sponsor
-Julie SickleLicensing Manager
-Dave Helker Lead Licensing Engineer
-Frank MascitelliMW Licensing Engineer
-Ken Nicely LAR Technical Lead
-Heather DavisSite team consisting of Regulatory Assurance personnel and Training Managers 4
OverviewANSI/ANS-3.1-2014 is the standard for "Selection, Qualification, and Training of Personnel for Nuclear Power Plants." This version was approved 11/20/14 by the American National Standards Institute. This standard is currently with the NRC for review, with NRC endorsement via Regulatory Guide 1.8, Rev. 4 by middle of 2016.Exelon will be submitting the license amendment for all sites (excluding Oyster Creek) in the July 2016 time frame following the issuance of the draft RG 1.8 Rev. 4 for public comments. Fort Calhoun Station will be submitting separately.The purpose of the 2014 revision was to update the standard in the following areas:align the American Nuclear Society, the U.S. Nuclear Regulatory Commission, and the Institute of Nuclear Power Operations with industry training and standards provide a common language across the industry incorporate the past 20 years of learning and experience with nuclear power plant training program implementation and performance better address supplemental training and qualification update positions in light of new nuclear power plant construction, current position terminology, and evolving technology 5
Technical Specification ChangesCurrent Technical Specification Requirements
- ANS-3.1/N18.1
-1971Braidwood, Byron, Calvert Cliffs, Dresden, Ginna, LaSalle, Peach Bottom, Nine Mile Point Unit 1, Quad Cities ANSI/ANS-3.1-1978Clinton, Limerick, Nine Mile Point Unit 2, Three Mile Island Unit 1Proposed Technical Specification Requirements:ANSI/ANS-3.1-2014 (with exceptions)Alignment for consistent wording Delete STA policy statementfor Engineering Expertise on Shift 6
Development of a Comparison MatrixAs part of the Exelon internal review process, a Comparison Matrix was developed.The document compared the existing 1971 and 1978 Standards to the 2014 Standard.Gap analyses were performed.Process resulted in an interpretation document that ensured consistent application of the 2014 Standard for such items as education and experience.Comparison Matrix was shared with industry peers.
7 Tech Spec Changes
-ANSI/ANS-3.1-2014 (with exceptions
)Proposed Typical Change to TS 5.3.1(For Braidwood, Byron, Calvert Cliffs, Clinton, Dresden, LaSalle, Nine Mile Point-2, Peach Bottom, Quad Cities, R.E. Ginna)Proposed Typical Change to TS 6.3.1(For Limerick, Nine Mile Point
-1, Three Mile Island)Change from:Each member of the staff shall meet or exceed the minimum qualifications of ANSI N18.1-1971 (or ANSI/ANS 3.1
-1978), with specified exceptions- Change to
- Each member of the unit/facility/plant staff shall meet or exceed the minimum qualifications of ANSI/ANS
-3.1-2014, except
- those who were actively in role prior to implementation of this standard
.non-licensed operators, who shall meet or exceed the minimum qualifications of ANSI/ANS
-3.1-1978 or ANSI-3.1/N18.1
-1971.8 ANSI/ANS-3.1-2014 (with exceptions)There is a need for a "grandfather" clause if no exception is taken in RG 1.8 Rev. 4 for individuals in their current job positions that were qualified to previous standards.This is a verbatim Technical Specification compliance issue; thus, the need for exception. Exelon does not plan to requalify existing individuals in current roles to new standard. Exelon will qualify individuals to new positions, moving forward.If RG 1.8 Rev. 4 addresses this issue, then no exception will be taken in the Technical Specification wording.Exception to the ANSI/ANS
-3.1-2014 Non-Licensed Operator ( NLO) Requirements for power plant experience.Exelon will submit an exception to keep current standards for NLO position (1978/1971 as applicable).
9 ANSI/ANS-3.1-2014 Non-Licensed Operator (NLO) RequirementsMinimum experience for the position:
- Power plant experience which shall include: 2 years Nuclear power plant experience: 1 year On-site experience: 0.50 yearANSI/ANS-3.12014 Standard does not count classroom training towards nuclear power plant experience, although On
-the-Job-Training / Task Performance Evaluation (OJT/TPE) can be counted. Exelon current NLO program is set up to count all time in initial training towards nuclear power plant experience:Classroom Training
-22 weeksOJT/TPE -30 weeks 10ANSI/ANS-3.1-2014 (with exceptions)"Extracted from American National Standard ANSI/ANS
-3.1-2014 with permission of the publisher, the American Nuclear Society."
Alignment for consistent wording STS 5.2.2.d (Facility Staff)The operations manager or assistant operations manager shall hold an SRO license.ANSI/ANS-3.1-2014, 4.2.2If the operations manager does not hold a senior operator's license, then the operations middle manager shall hold a senior operator's license.Exelon proposed wording:The operations manager or one of the operations middle managers shall hold an SRO license.For Exelon: Operations Manager = Operations DirectorAssistant Operations Manager = Shift Operations Supervisor (SOS)One of the Operations Middle Managers =SOS orSenior Manager Operations Support & Services orOperations Support Manager orOperations Services Manager 11 Alignment for consistent wording / Delete STA Commission policySTS 5.2.2.e (Facility Staff)An individual shall provide advisory technical support to the unit operations shift crew in the areas of thermal hydraulics, reactor engineering, and plant analysis with regard to the safe operation of the unit. This individual shall meet the qualifications specified by the Commission Policy Statement on Engineering Expertise on Shift
.Exelon Proposed wording:The Shift Technical Advisor (STA) shall provide advisory technical support to the unit operations shift crew in the areas of thermal hydraulics, reactor engineering, and plant analysis with regard to the safe operation of the facility.Delete policy statement since the qualification requirements are redundant to the qualification requirements provided in ANSI/ANS
-3.1-2014. 12 Instant SRO hiring impact Section 4.4.1 Senior Operator One of the requirements in this section is for "Responsible nuclear power plant experience of 1.5 years." Per 2014 ANSI standard, "Responsible" experience only acknowledges commercial power plant experience and not military; additionally, classroom training cannot count toward the 1.5 years
. If the word commercialwas not specified in the definition, then military experience could be counted using the nuclear power plant experience definition, provided they met specific criteria.The requirement for commercial experience in Section 4.4.1 is in conflict with Section 4.1.2.3 #5 under senior reactor operator candidates, which states: "2 years in a position equivalent to reactor operator position at a military power reactor (qualified to manipulate or direct the manipulation of control rods)," which establishes nuclear power plant experience. The purpose of the ANSI 3.1
-2014 revision, as stated in the forward of the document, was to update the standard in the following areas: align the American Nuclear Society, the U.S. Nuclear Regulatory Commission, and the Institute of Nuclear Power Operations with industry training and standards.
13Training Impact Review Concerns / Resolutions Responsible nuclear power plant experience is also defined in ACAD 10-001 Rev. 0 for Direct SROs:When a candidate does not have commercial power experience at a reactor facility, >2years or more in a position equivalent to reactor operator position at a military reactor can be substituted for responsible nuclear experience. Military positions that can be applied are:Reactor OperatorEngineering Officer of the WatchPropulsion Plant Watch OfficerEngineering Watch SupervisorPropulsionPlantWatchSupervisorExelon will continue to use the screening criteria for Instant SROs as outlined in ACAD 10
-001 Rev 0 (Figure 2
-2.). 14Training Impact Review Concerns / Resolutions Submit LAR after draft RG 1.8 Rev. 4 issued for public comments and prior to final issuance of RG 1.8 Rev. 4 (July 2016).Plan to supplement, as applicable, for any significant changes that evolve from public review / comment cycle.All required activities for the TS amendment implementation period can be accomplished within 180 days from the date of NRC issuing the approved license amendments
.Updates for implementation:Quality Assurance Topical ReportUpdated Final Safety Analysis Report (UFSAR) Chapter 13 training discussionsTraining Program Procedures/Documents/LessonsHuman Resources Documents 15LAR Logistics / Implementation