May 4, 2017, Summary of Annual Assessment Meeting for Susquehanna Steam Electric Station Held
ML17153A101
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 06/02/2017
From: Schroeder D L
Reactor Projects Region 1 Branch 4
To:
Schroeder D L
References
Download: ML17153A101 (2)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BLVD., SUITE 100 KING OF PRUSSIA, PA 19406-2713 June 2, 2017 MEETING SUMMARY LICENSEE: SUSQUEHANNA NUCLEAR, LLC.

FACILITY: SUSQUEHANNA STEAM ELECTRIC STATION, UNITS 1 AND 2

SUBJECT:

SUMMARY OF PUBLIC MEETING

On May 4, 2017, at 4:30 p.m., the U. S. Nuclear Regulatory Commission (NRC) conducted a public open house at the Susquehanna Energy Information Center in Berwick, PA. The NRC conducted the Annual Assessment Meeting to discuss its assessment of the safety performance at Susquehanna Steam Electric Station (SSES), Units 1 and 2 for 2016.

A notice of the open house was issued on April 5, 2017, and was posted on the NRC's external

(public) Web page. The meeting notice can be found in the NRC's Agencywide Documents Access and Management System (ADAMS) with Accession No. ML17090A133. ADAMS is accessible from the NRC Web page at: http://www.nrc.gov/reading-rm/adams.html

. The NRC presented poster boards and handouts during the open house to discuss its assessment of the safety performance of SSES Units 1 and 2 for the period of January 1 through December 31, 2016, as documented in our letter dated March 1, 2017 (ADAMS Accession No. ML17055B944). The NRC poster boar ds presented included background on the Reactor Oversight Process and SSES performance highlights. Additional information relative to the NRC's Annual Assessment Process and the safety performance of SSES Units 1 and 2 can be found on the NRC's web site at: www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html

. SSES nuclear officials attended the open-house and were offered the opportunity to question the NRC regarding SSES Units 1 and 2's performance and the role of the agency in ensuring safe plant operations.

________

/RA/______________

Daniel L. Schroeder, Chief Projects Branch 4

Division of Reactor Projects

Enclosure:

Attendee List (ML17128A027)

ML17153A101 SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available OFFICE RI/DRP RI/DRP NAME ATurilin DSchroeder DATE 6/1/17 6/2/17