04/06/2016 Summary of Public Meeting Re Peach Bottom Atomic Power Station, Units 2 and 3
ML16103A188
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 04/12/2016
From: Schroeder D L
Reactor Projects Region 1 Branch 4
To:
SCHROEDER, DL
Shared Package
ML16039A098 List:
References
Download: ML16103A188 (2)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BLVD., SUITE 100 KING OF PRUSSIA, PA 19406-2713 April 12, 2016 MEETING SUMMARY LICENSEE: EXELON GENERATION CO., LLC.

FACILITY: PEACH BOTTOM ATOMIC POWER STATION, UNITS 2 AND 3

SUBJECT:

SUMMARY OF PUBLIC MEETING

On April 6, 2016, at 5:30 p.m., the U. S. Nuclear Regulatory Commission (NRC) conducted a public open house at the Peach Bottom Inn in Delta, PA. The NRC conducted the Annual Assessment Meeting to discuss its assessment of the safety performance at Peach Bottom Atomic Power Station for 2015.

A notice of the open house was issued on March 21, 2016, and was posted on the NRC's external (public) Web page. The meeting notice can be found in the NRC's Agencywide Documents Access and Management System (ADAMS) with Accession No. ML16081A349. ADAMS is accessible from the NRC Web page at: http://www.nrc.gov/reading-rm/adams.html. The NRC presented poster boards and handouts and met with members of the public to discuss its assessment of the safety performance of Peach Bottom (PB) Units 2 and 3 for the period of January 1 through December 31, 2015, as documented in our letter dated March 2, 2016 (ADAMS Accession No. ML16060A376). The NRC poster boards presented included background on the Reactor Oversight Process (ROP) and PB performance highlights.

Additional information relative to the NRC's Annual Assessment Process and the safety performance of Peach Bottom Units 2 and 3 can be found on the NRC's web site at:

www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html. A member of the public, a State official, and Exelon officials attended the open-house and were offered the opportunity to question the NRC regarding Peach Bottom's performance and the role of the agency in ensuring safe plant operations.

/RA/ ______________________ Daniel L. Schroeder, Chief Projects Branch 4 Division of Reactor Projects Enclosures Attendee List (ML16102A115)

ML16060A376). The NRC poster boards presented included background on the Reactor Oversight Process (ROP) and PB performance highlights. Additional information relative to the NRC's Annual Assessment Process and the safety performance of Peach Bottom Units 2 and 3 can be found on the NRC's web site at:

www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html. A member of the public, a State official, and Exelon officials attended the open-house and were offered the opportunity to question the NRC regarding Peach Bottom's performance and the role of the agency in ensuring safe plant operations. /RA/ Daniel L. Schroeder, Chief Projects Branch 4 Division of Reactor Projects

Enclosures:

Attendee List (ML16102A115)

DISTRIBUTION w/encl: (via E-mail) DDorman, RA DLew, DRA MScott, DRP RMcKinley, DRP RLorson, DRS BSmith, DRS DSchroeder, DRP SBarber, DRP ATurilin, DRP BLin, DRP PMeier, DRP JHeinly, DRP, SRI BSmith, DRP, RI SSchmitt, DRP, AA JBowen, RI, OEDO RidsNrrPMPeachBottom Res RidsNrrDorlLpl1-2 Res ROPreports Res DOC NAME: G:\DRP\BRANCH4\Communications\Public Meetings\2016\2016 PB Annual Assessment Meeting Summary.docx ADAMS Accession No.: ML16103A188 SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available OFFICE RI/DRP RI/DRP NAME SBarber / GSB DSchroeder/ DLS DATE 04/ 11 /16 04/ 11 /16 UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BLVD., SUITE 100 KING OF PRUSSIA, PA 19406-2713 April 12, 2016 MEETING SUMMARY LICENSEE: EXELON GENERATION CO., LLC.

FACILITY: PEACH BOTTOM ATOMIC POWER STATION, UNITS 2 AND 3

SUBJECT:

SUMMARY OF PUBLIC MEETING

On April 6, 2016, at 5:30 p.m., the U. S. Nuclear Regulatory Commission (NRC) conducted a public open house at the Peach Bottom Inn in Delta, PA. The NRC conducted the Annual Assessment Meeting to discuss its assessment of the safety performance at Peach Bottom Atomic Power Station for 2015.

A notice of the open house was issued on March 21, 2016, and was posted on the NRC's external (public) Web page. The meeting notice can be found in the NRC's Agencywide Documents Access and Management System (ADAMS) with Accession No. ML16081A349. ADAMS is accessible from the NRC Web page at: http://www.nrc.gov/reading-rm/adams.html. The NRC presented poster boards and handouts and met with members of the public to discuss its assessment of the safety performance of Peach Bottom (PB) Units 2 and 3 for the period of January 1 through December 31, 2015, as documented in our letter dated March 2, 2016 (ADAMS Accession No. ML16060A376). The NRC poster boards presented included background on the Reactor Oversight Process (ROP) and PB performance highlights.

Additional information relative to the NRC's Annual Assessment Process and the safety performance of Peach Bottom Units 2 and 3 can be found on the NRC's web site at:

www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html. A member of the public, a State official, and Exelon officials attended the open-house and were offered the opportunity to question the NRC regarding Peach Bottom's performance and the role of the agency in ensuring safe plant operations.

/RA/ ______________________ Daniel L. Schroeder, Chief Projects Branch 4 Division of Reactor Projects Enclosures Attendee List (ML16102A115)

ML16060A376). The NRC poster boards presented included background on the Reactor Oversight Process (ROP) and PB performance highlights. Additional information relative to the NRC's Annual Assessment Process and the safety performance of Peach Bottom Units 2 and 3 can be found on the NRC's web site at:

www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html. A member of the public, a State official, and Exelon officials attended the open-house and were offered the opportunity to question the NRC regarding Peach Bottom's performance and the role of the agency in ensuring safe plant operations. /RA/ Daniel L. Schroeder, Chief Projects Branch 4 Division of Reactor Projects

Enclosures:

Attendee List (ML16102A115)

DISTRIBUTION w/encl: (via E-mail) DDorman, RA DLew, DRA MScott, DRP RMcKinley, DRP RLorson, DRS BSmith, DRS DSchroeder, DRP SBarber, DRP ATurilin, DRP BLin, DRP PMeier, DRP JHeinly, DRP, SRI BSmith, DRP, RI SSchmitt, DRP, AA JBowen, RI, OEDO RidsNrrPMPeachBottom Res RidsNrrDorlLpl1-2 Res ROPreports Res DOC NAME: G:\DRP\BRANCH4\Communications\Public Meetings\2016\2016 PB Annual Assessment Meeting Summary.docx ADAMS Accession No.: ML16103A188 SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available OFFICE RI/DRP RI/DRP NAME SBarber / GSB DSchroeder/ DLS DATE 04/ 11 /16 04/ 11 /16