ML16257A136
ML16257A136 | |
Person / Time | |
---|---|
Site: | Waterford |
Issue date: | 08/25/2016 |
From: | Entergy Operations |
To: | Office of Nuclear Reactor Regulation |
Shared Package | |
ML16256A115 | List:
|
References | |
W3F1-2016-0053 | |
Download: ML16257A136 (136) | |
Text
WSES-FSAR-UNIT-3 Revision 14 (12/05)(DRN 05-543, R14)Figure 15.6-1 has been deleted. (DRN 05-543, R14)
Revision 14 (12/05)Waterford Steam Electric Station #3 Letdown Line Break Outside Containment Core Power vs. Time Figure15.6-1a Revision 14 (12/05)Waterford Steam Electric Station #3 Letdown Line Break Outside Containment Core Average Heat Flux vs. Time Figure15.6-1b Revision 14 (12/05)Waterford Steam Electric Station #3 Letdown Line Break Outside Containment Reactor Coolant System Pressure vs. Time Figure15.6-1c
Revision 304 (06/10)Waterford Steam Electric Station #3 Letdown Line Break Outside Containment Minimum DNBR vs. Time Figure 15.6-1d Revision 14 (12/05)Waterford Steam Electric Station #3 Letdown Line Break Outside Containment Reactor Coolant System Temperatures vs. Time Figure15.6-1e Revision 14 (12/05)Waterford Steam Electric Station #3 Letdown Line Break Outside Containment Pressurizer Level vs. Time Figure15.6-1f Revision 14 (12/05)Waterford Steam Electric Station #3 Letdown Line Break Outside Containment Steam Generator Pressure vs. Time Figure15.6-1g Revision 14 (12/05)Waterford Steam Electric Station #3 Letdown Line Break Outside Containment Break Flow vs. Time Figure15.6-1h Revision 14 (12/05)Waterford Steam Electric Station #3 Letdown Line Break Outside Containment Integrated Break Flow vs. Time Figure15.6-1i WSES-FSAR-UNIT-3 Revision 14 (12/05)(DRN 05-543, R14)Figures 15.6-2 through 15.6-31 have been intentionally deleted. (DRN 05-543, R14)
THISFIGURE INTENTIONALLY DELETEDREVISION 5Waterford SteamElectric Station Figure15.6-32 THIS FIGURE INTENTIONALLY DELETEDREVISION 5Waterford SteamElectric Station Figure15.6-33 THISFIGURE INTENTIONALLY DELETEDREVISION 5 IIIWaterford SteomElectric Station Figure15.6-34 THISFIGURE INTENTIONALLY DELETEDREVISION 5 Woterford SteamElectric Station 3Figure15.6-35 Revision 14 (12/05)Waterford Steam Electric Station #3 SGTR with LOOP Core Power vs. Time Figure15.6-35A Revision 14 (12/05)Waterford Steam Electric Station #3 SGTR with LOOP Core Heat Flux vs. Time Figure15.6-35B WSES-FSAR-UNIT-3 Revision 14 (12/05)(DRN 05-543, R14)Figure 15.6-35C has been deleted. (DRN 05-543, R14)
Revision 14 (12/05)Waterford Steam Electric Station #3 SGTR with LOOP RCS Pressure vs. Time Figure15.6-35D WSES-FSAR-UNIT-3 Revision 14 (12/05)(DRN 05-543, R14)Figure 15.6-35E has been deleted. (DRN 05-543, R14)
Revision 14 (12/05)Waterford Steam Electric Station #3 SGTR with LOOP RCS Temperatures vs. Time Figure15.6-35F WSES-FSAR-UNIT-3 Revision 14 (12/05)(DRN 05-543, R14)Figure 15.6-35G has been deleted. (DRN 05-543, R14)
Revision 14 (12/05)Waterford Steam Electric Station #3 SGTR with LOOP Pressurizer Water Volume vs. Time Figure15.6-35H
Revision 14 (12/05)Waterford Steam Electric Station #3 SGTR with LOOP RCS Inventory vs. Time Figure 15.6-35I WSES-FSAR-UNIT-3 Revision 14 (12/05)(DRN 05-543, R14)Figure 15.6-35J has been deleted. (DRN 05-543, R14)
Revision 14 (12/05)Waterford Steam Electric Station #3 SGTR with LOOP SG Pressure vs. Time Figure15.6-35K Revision 14 (12/05)Waterford Steam Electric Station #3 SGTR with LOOP Feedwater Flowrate per SG vs. Time Figure15.6-35L WSES-FSAR-UNIT-3 Revision 14 (12/05)(DRN 05-543, R14)Figure 15.6-35M has been deleted. (DRN 05-543, R14)
Revision 14 (12/05)Waterford Steam Electric Station #3 SGTR with LOOP Primary-to-Secondary Leak Rate vs. Time Figure15.6-35N WSES-FSAR-UNIT-3 Revision 14 (12/05)(DRN 05-543, R14)Figure 15.6-35O has been deleted. (DRN 05-543, R14)
Revision 14 (12/05)Waterford Steam Electric Station #3 SGTR with LOOP SG Liquid Mass vs. Time Figure15.6-35P Revision 14 (12/05)Waterford Steam Electric Station #3 SGTR with LOOP Integrated Steam Mass Through ADVs vs. Time Figure15.6-35Q Revision 14 (12/05)Waterford Steam Electric Station #3 SGTR with LOOP Integrated Primary-to-Secondary Leak Flow vs. Time Figure15.6-35R
Revision 304 (06/10)Waterford Steam Electric Station #3 SGTR with LOOP Minimum DNBR vs. Time Figure 15.6-35S WSES-FSAR-UNIT-3 Revision 14 (12/05)(DRN 05-543, R14)Figures 15.6-36 through 15.6-91 have been intentionally deleted. (DRN 05-543, R14)
Revision 307 (07/13)Waterford Steam Electric Station #3 Large Break LOCA ECCS Performance Analysis 1.0 DEG/PD Break Core Power Figure 15.6-92
Revision 307 (07/13)Waterford Steam Electric Station #3 Large Break LOCA ECCS Performance Analysis 1.0 DEG/PD Break Pressure in Center Hot Assembly Node Figure 15.6-93
Revision 307 (07/13)Waterford Steam Electric Station #3 Large Break LOCA ECCS Performance Analysis 1.0 DEG/PD Break Leak Flow Rate Figure 15.6-94
Revision 307 (07/13)Waterford Steam Electric Station #3 Large Break LOCA ECCS Performance Analysis 1.0 DEG/PD Break Hot Assembly Flow Rate (Below and Above Hot Spot) Figure 15.6-95 WSES-FSAR-UNIT-3 Revision 14 (12/05)(DRN 05-543, R14)Figure 15.6-96 has been deleted. (DRN 05-543, R14)
Revision 307 (07/13)Waterford Steam Electric Station #3 Large Break LOCA ECCS Performance Analysis 1.0 DEG/PD Break Hot Assembly Quality Figure 15.6-97
Revision 307 (07/13)Waterford Steam Electric Station #3 Large Break LOCA ECCS Performance Analysis 1.0 DEG/PD Break Containment Pressure Figure 15.6-98
Revision 307 (07/13)Waterford Steam Electric Station #3 Large Break LOCA ECCS Performance Analysis 1.0 DEG/PD Break Mass Added to Core During Reflood Figure 15.6-99
Revision 307 (07/13)Waterford Steam Electric Station #3 Large Break LOCA ECCS Performance Analysis 1.0 DEG/PD Break Peak Cladding Temperature Figure 15.6-100
Revision 307 (07/13)Waterford Steam Electric Station #3 LBLOCA ECCS Performance Analysis 1.0 DEG/PD Break Mid Annulus Flow Rate Figure 15.6-100a
Revision 307 (07/13)Waterford Steam Electric Station #3 LBLOCA ECCS Performance Analysis 1.0 DEG/PD Break Quality Above and Below the Core Figure 15.6-100b
Revision 307 (07/13)Waterford Steam Electric Station #3 LBLOCA ECCS Performance Analysis 1.0 DEG/PD Break Core Pressure Drop Figure 15.6-100c
Revision 307 (07/13)Waterford Steam Electric Station #3 LBLOCA ECCS Performance Analysis 1.0 DEG/PD Break Safety Injection Flow Rate Into Intact Discharge Legs Figure 15.6-100d
Revision 307 (07/13)Waterford Steam Electric Station #3 LBLOCA ECCS Performance Analysis 1.0 DEG/PD Break Water Level in Downcomer During Reflood Figure 15.6-100e
Revision 307 (07/13)Waterford Steam Electric Station #3 LBLOCA ECCS Performance Analysis 1.0 DEG/PD Break Hot Spot Gap Conductance Figure 15.6-100f
Revision 307 (07/13)Waterford Steam Electric Station #3 LBLOCA ECCS Performance Analysis 1.0 DEG/PD Break Maximum Local Cladding Oxidation Percentage Figure 15.6-100g
Revision 307 (07/13)Waterford Steam Electric Station #3 LBLOCA ECCS Performance Analysis 1.0 DEG/PD Break Fuel Centerline, Fuel Average, Cladding, and Coolant Temperature at the Hot Spot Figure 15.6-100h
Revision 307 (07/13)Waterford Steam Electric Station #3 LBLOCA ECCS Performance Analysis 1.0 DEG/PD Break Hot Spot Heat Transfer Coefficient Figure 15.6-100i
Revision 307 (07/13)Waterford Steam Electric Station #3 LBLOCA ECCS Performance Analysis 1.0 DEG/PD Break Hot Pin Pressure Figure 15.6-100j
Revision 307 (07/13)Waterford Steam Electric Station #3 LBLOCA ECCS Performance Analysis 1.0 DEG/PD Break Core Bulk Channel Flow Rate Figure 15.6-100k
Revision 307 (07/13)Waterford Steam Electric Station #3 LBLOCA ECCS Performance Analysis 0.8 DEG/PD Break Core Power Figure 15.6-101
Revision 307 (07/13)Waterford Steam Electric Station #3 LBLOCA ECCS Performance Analysis 0.8 DEG/PD Break Pressure in Center Hot Assembly Node Figure 15.6-102
Revision 307 (07/13)Waterford Steam Electric Station #3 LBLOCA ECCS Performance Analysis 0.8 DEG/PD Break Leak Flow Rate Figure 15.6-103
Revision 307 (07/13)Waterford Steam Electric Station #3 Large Break LOCA ECCS Performance Analysis 0.8 DEG/PD Break Hot Assembly Flow Rate (Above and Below Hot Spot) Figure 15.6-104 WSES-FSAR-UNIT-3 Revision 14 (12/05)(DRN 05-543, R14)Figure 15.6-105 has been deleted. (DRN 05-543, R14)
Revision 307 (07/13)Waterford Steam Electric Station #3 Large Break LOCA ECCS Performance Analysis 0.8 DEG/PD Break Hot Assembly Quality Figure 15.6-106
Revision 307 (07/13)Waterford Steam Electric Station #3 Large Break LOCA ECCS Performance Analysis 0.8 DEG/PD Break Containment Pressure Figure 15.6-107
Revision 307 (07/13)Waterford Steam Electric Station #3 Large Break LOCA ECCS Performance Analysis 0.8 DEG/PD Break Mass Added to Core During Reflood Figure 15.6-108
Revision 307 (07/13)Waterford Steam Electric Station #3 Large Break LOCA ECCS Performance Analysis 0.8 DEG/PD Break Peak Cladding Temperature Figure 15.6-109 WSES-FSAR-UNIT-3 Revision 15 (03/07) (DRN 06-1062, R15) Figure 15.6-109a has been intentionally deleted. (DRN 06-1062, R15)
WSES-FSAR-UNIT-3 Revision 15 (03/07) (DRN 06-1062, R15) Figure 15.6-109b has been intentionally deleted. (DRN 06-1062, R15)
WSES-FSAR-UNIT-3 Revision 15 (03/07) (DRN 06-1062, R15) Figure 15.6-109c has been intentionally deleted. (DRN 06-1062, R15)
WSES-FSAR-UNIT-3 Revision 15 (03/07) (DRN 06-1062, R15) Figure 15.6-109d has been intentionally deleted. (DRN 06-1062, R15)
WSES-FSAR-UNIT-3 Revision 15 (03/07) (DRN 06-1062, R15) Figure 15.6-109e has been intentionally deleted. (DRN 06-1062, R15)
WSES-FSAR-UNIT-3 Revision 15 (03/07) (DRN 06-1062, R15) Figure 15.6-109f has been intentionally deleted. (DRN 06-1062, R15)
WSES-FSAR-UNIT-3 Revision 15 (03/07) (DRN 06-1062, R15) Figure 15.6-109g has been intentionally deleted. (DRN 06-1062, R15)
WSES-FSAR-UNIT-3 Revision 15 (03/07) (DRN 06-1062, R15) Figure 15.6-109h has been intentionally deleted. (DRN 06-1062, R15)
WSES-FSAR-UNIT-3 Revision 15 (03/07) (DRN 06-1062, R15) Figure 15.6-109i has been intentionally deleted. (DRN 06-1062, R15)
WSES-FSAR-UNIT-3 Revision 15 (03/07) (DRN 06-1062, R15) Figure 15.6-109j has been intentionally deleted. (DRN 06-1062, R15)
WSES-FSAR-UNIT-3 Revision 15 (03/07) (DRN 06-1062, R15) Figure 15.6-109k has been intentionally deleted. (DRN 06-1062, R15)
FIGUREHAS BEEN INTENTIONALLYDELETED SteamElectricCYCLE 6 ECCS ANALYSISPEAK CLAD TEMPERATUREVERSUSTIME FOR THE HOT SPOT LOCATION
Revision 307 (07/13)Waterford Steam Electric Station #3 Large Break LOCA ECCS Performance Analysis 0.6 DEG/PD Break Core Power Figure 15.6-110
Revision 307 (07/13)Waterford Steam Electric Station #3 Large Break LOCA ECCS Performance Analysis 0.6 DEG/PD Break Pressure in Center Hot Assembly Node Figure 15.6-111
Revision 307 (07/13)Waterford Steam Electric Station #3 Large Break LOCA ECCS Performance Analysis 0.6 DEG/PD Break Leak Flow Rate Figure 15.6-112
Revision 307 (07/13)Waterford Steam Electric Station #3 Large Break LOCA ECCS Performance Analysis 0.6 DEG/PD Break Hot Assembly Flow Rate (Above and Below Hot Spot) Figure 15.6-113 WSES-FSAR-UNIT-3 Revision 14 (12/05)(DRN 05-543, R14)Figure 15.6-114 has been deleted. (DRN 05-543, R14)
Revision 307 (07/13)Waterford Steam Electric Station #3 Large Break LOCA ECCS Performance Analysis 0.6 DEG/PD Break Hot Assembly Quality Figure 15.6-115
Revision 307 (07/13)Waterford Steam Electric Station #3 Large Break LOCA ECCS Performance Analysis 0.6 DEG/PD Break Containment Pressure Figure 15.6-116
Revision 307 (07/13)Waterford Steam Electric Station #3 LBLOCA ECCS Performance Analysis 0.6 DEG/PD Break Mass Added to Core During Reflood Figure 15.6-117
Revision 307 (07/13)Waterford Steam Electric Station #3 LBLOCA ECCS Performance Analysis 0.6 DEG/PD Break Peak Cladding Temperature Figure 15.6-118 WSES-FSAR-UNIT-3 Revision 302 (12/08) (EC-9533, R302) Figure 15.6-118a through Figure 15.6-127 have been deleted. (EC-9533, R302)
LOUISIANAPOWER 8 LIGHT CO. StationFIGURES THROUGH HAVE BEEN INTENTIONALLYDELETED
Revision 307 (07/13)Waterford Steam Electric Station #3 LBLOCA ECCS Performance Analysis 0.4 DEG/PD Break Core Power Figure 15.6-127a
Revision 307 (07/13)Waterford Steam Electric Station #3 LBLOCA ECCS Performance Analysis 0.4 DEG/PD Break Pressure in Center Hot Assembly Node Figure 15.6-127b
Revision 307 (07/13)Waterford Steam Electric Station #3 LBLOCA ECCS Performance Analysis 0.4 DEG/PD Break Leak Flow Rate Figure 15.6-127c
Revision 307 (07/13)Waterford Steam Electric Station #3 Large Break LOCA ECCS Performance Analysis 0.4 DEG/PD Break Hot Assembly Flow Rate (Below and Above Hot Spot) Figure 15.6-127d
Revision 307 (07/13)Waterford Steam Electric Station #3 Large Break LOCA ECCS Performance Analysis 0.4 DEG/PD Break Hot Assembly Quality Figure 15.6-127e
Revision 307 (07/13)Waterford Steam Electric Station #3 LBLOCA ECCS Performance Analysis 0.4 DEG/PD Break Containment Pressure Figure 15.6-127f
Revision 307 (07/13)Waterford Steam Electric Station #3 LBLOCA ECCS Performance Analysis 0.4 DEG/PD Break Mass Added to Core During Reflood Figure 15.6-127g
Revision 307 (7/13)Waterford Steam Electric Station #3 LBLOCA ECCS Performance Analysis 0.4 DEG/PD Break Peak Cladding Temperature Figure 15.6-127h
Revision 307 (07/13)Waterford Steam Electric Station #3 Large Break LOCA ECCS Performance Analysis Peak Cladding Temperature Versus Break Size Figure 15.6-128 WSES-FSAR-UNIT-3 Revision 14 (12/05)(DRN 05-543, R14)Figures 15.6-129 through 15.6-176 have been intentionally deleted. (DRN 05-543, R14)
Revision 307 (07/13)Waterford Steam Electric Station #3 SBLOCA ECCS Performance Analysis Peak Cladding Temperature vs. Break Size Figure 15.6-177 0.251200240036006000TIME,SECONDSLOUISIANAPOWER LIGHT CO. SteamElectric StationINADVERTENT OPENING OF A PRESSURIZER SAFETY VALVENORMALIZED TOTAL CORE POWERFigure15.6-178J 24002000 16001200800400120024003600TIME, SECONDS4800LOUISIANAIPOWER LIGHT CO.INADVERTENTWaterford SteamINNER VEElectric Station OF A PRESSURIZER SAFETY VALVE -- PRESSUREFigure15.6-179II 600III1200240036006000TIME, SECONDSLOUISIANAPOWER LIGHT CO.Waterford SteamElectric StationINADVERTENT OPENING OF A PRESSURIZER SAFETY VALVELEAK FLOW RATEFigure 6000045000 300000240048006000TIME,SECONDSLOUISIANAPOWER LIGHT CO.Waterford SteamElectric StationINADVERTENT OPENING OF A PRESSURIZER SAFETY VALVEINNER VESSEL INLET FLOW RATEFigure15.6-181 LOUISIANAPOWER LIGHT CO.Waterford SteamElectric StationINADVERTENT OPENING OF A PRESSURIZER SAFETY VALVEINNER VESSEL TWO-PHASE MIXTURE HEIGHTFigure15.6-l 82 CORE------------ -------12002400TIME, SECONDS6,000 1IIIII1200240036006000LOUISIANAPOWER LIGHT CO.Waterford SteamElectric StationTIME,SECONDSFigureINADVERTENT OPENINGOF A PRESSURIZER SAFETY VALVEHEAT TRANSFER AT HOT SPOT15.6-183 600IIII120024003600TIME, SECONDS6000LOUISIANAPOWER LIGHT CO.Waterford SteamINADVERTENT OPENING OF A PRESSURIZER SAFETY VALVECOOLANT TEMPERATURE AT HOT SPOTFigure15.6-184Electric StationII CLAD SURFACETEMPERATURE, WSES-FSAR-UNIT-3 Revision 14 (12/05)(DRN 05-543, R14)Figures 15.6-186 through 15.6-205 have been intentionally deleted. (DRN 05-543, R14)
Revision 307 (07/13)Waterford Steam Electric Station #3 SBLOCA ECCS Performance Analysis 0.06 ft2/PD Break Core Power Figure 15.6-206
Revision 307 (07/13)Waterford Steam Electric Station #3 SBLOCA ECCS Performance Analysis 0.06 ft2/PD Break Inner Vessel Pressure Figure 15.6-207
Revision 307 (07/13)Waterford Steam Electric Station #3 SBLOCA ECCS Performance Analysis 0.06 ft2/PD Break Break Flow Rate Figure 15.6-208
Revision 307 (07/13)Waterford Steam Electric Station #3 SBLOCA ECCS Performance Analysis 0.06 ft2/PD Break Inner Vessel Inlet Flow Rate Figure 15.6-209
Revision 307 (07/13)Waterford Steam Electric Station #3 SBLOCA ECCS Performance Analysis 0.06 ft2/PD Break Inner Vessel Two-Phase Mixture Level Figure 15.6-210
Revision 307 (07/13)Waterford Steam Electric Station #3 SBLOCA ECCS Performance Analysis 0.06 ft2/PD Break Heat Transfer Coefficient at Hot Spot Figure 15.6-211
Revision 307 (07/13)Waterford Steam Electric Station #3 SBLOCA ECCS Performance Analysis 0.06 ft2/PD Break Coolant Temperature at Hot Spot Figure 15.6-212
Revision 307 (07/13)Waterford Steam Electric Station #3 SBLOCA ECCS Performance Analysis 0.06 ft2/PD Break Cladding Temperature at Hot Spot Figure 15.6-213
Revision 307 (07/13)Waterford Steam Electric Station #3 SBLOCA ECCS Performance Analysis 0.05 ft2/PD Break Core Power Figure 15.6-214
Revision 307 (07/13)Waterford Steam Electric Station #3 SBLOCA ECCS Performance Analysis 0.05 ft2/PD Break Inner Vessel Pressure Figure 15.6-215
Revision 307 (07/13)Waterford Steam Electric Station #3 SBLOCA ECCS Performance Analysis 0.05 ft2/PD Break Break Flow Rate Figure 15.6-216
Revision 307 (07/13)Waterford Steam Electric Station #3 SBLOCA ECCS Performance Analysis 0.05 ft2/PD Break Inner Vessel Inlet Flow Rate Figure 15.6-217
Revision 307 (07/13)Waterford Steam Electric Station #3 SBLOCA ECCS Performance Analysis 0.05 ft2/PD Break Inner Vessel Two-Phase Mixture Level Figure 15.6-218
Revision 307 (07/13)Waterford Steam Electric Station #3 SBLOCA ECCS Performance Analysis 0.05 ft2/PD Break Heat Transfer Coefficient at Hot Spot Figure 15.6-219
Revision 307 (07/13)Waterford Steam Electric Station #3 SBLOCA ECCS Performance Analysis 0.05 ft2/PD Break Coolant Temperature at Hot Spot Figure 15.6-220
Revision 307 (07/13)Waterford Steam Electric Station #3 SBLOCA ECCS Performance Analysis 0.05 ft2/PD Break Cladding Temperature at Hot Spot Figure 15.6-221
Revision 307 (07/13)Waterford Steam Electric Station #3 SBLOCA ECCS Performance Analysis 0.05 ft2/PD Break Steam Generator No. 1 Pressure Figure 15.6-221a
Revision 307 (07/13)Waterford Steam Electric Station #3 SBLOCA ECCS Performance Analysis 0.05 ft2/PD Break Steam Generator No. 2 Pressure Figure 15.6-221b
Revision 307 (07/13)Waterford Steam Electric Station #3 SBLOCA ECCS Performance Analysis 0.05 ft2/PD Break Steam Generator No. 1 Secondary Flow Rate Figure 15.6-221c
Revision 307 (07/13)Waterford Steam Electric Station #3 SBLOCA ECCS Performance Analysis 0.05 ft2/PD Break Steam Generator No. 2 Secondary Flow Rate Figure 15.6-221d WSES-FSAR-UNIT-3 Revision 307 (07/13) (EC-8458, R307) Figure 15.6-222 through Figure 15.6-233 have been intentionally deleted. (EC-8458, R307)
Revision 307 (07/13)Waterford Steam Electric Station #3 SBLOCA ECCS Performance Analysis 0.04 ft2/PD Break Core Power Figure 15.6-234
Revision 307 (07/13)Waterford Steam Electric Station #3 SBLOCA ECCS Performance Analysis 0.04 ft2/PD Break Inner Vessel Pressure Figure 15.6-235
Revision 307 (07/13)Waterford Steam Electric Station #3 SBLOCA ECCS Performance Analysis 0.04 ft2/PD Break Flow Rate Figure 15.6-236
Revision 307 (07/13)Waterford Steam Electric Station #3 SBLOCA ECCS Performance Analysis 0.04 ft2/PD Break Inner Vessel Inlet Flow Rate Figure 15.6-237
Revision 307 (07/13)Waterford Steam Electric Station #3 SBLOCA ECCS Performance Analysis 0.04 ft2/PD Break Inner Vessel Two-Phase Mixture Level Figure 15.6-238
Revision 307 (07/13)Waterford Steam Electric Station #3 SBLOCA ECCS Performance Analysis 0.04 ft2/PD Break Heat Transfer Coefficient at Hot Spot Figure 15.6-239
Revision 307 (07/13)Waterford Steam Electric Station #3 SBLOCA ECCS Performance Analysis 0.04 ft2/PD Break Coolant Temperature at Hot Spot Figure 15.6-240
Revision 307 (07/13)Waterford Steam Electric Station #3 SBLOCA ECCS Performance Analysis 0.04 ft2/PD Break Cladding Temperature at Hot Spot Figure 15.6-241