ML16257A136
| ML16257A136 | |
| Person / Time | |
|---|---|
| Site: | Waterford |
| Issue date: | 08/25/2016 |
| From: | Entergy Operations |
| To: | Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML16256A115 | List:
|
| References | |
| W3F1-2016-0053 | |
| Download: ML16257A136 (136) | |
Text
WSES-FSAR-UNIT-3 Revision 14 (12/05)
(DRN 05-543, R14)
Figure 15.6-1 has been deleted.
(DRN 05-543, R14)
Revision 14 (12/05)
Waterford Steam Electric Station #3 Letdown Line Break Outside Containment Core Power vs. Time Figure 15.6-1a
Revision 14 (12/05)
Waterford Steam Electric Station #3 Letdown Line Break Outside Containment Core Average Heat Flux vs. Time Figure 15.6-1b
Revision 14 (12/05)
Waterford Steam Electric Station #3 Letdown Line Break Outside Containment Reactor Coolant System Pressure vs. Time Figure 15.6-1c
Revision 304 (06/10)
Waterford Steam Electric Station #3 Letdown Line Break Outside Containment Minimum DNBR vs. Time Figure 15.6-1d
Revision 14 (12/05)
Waterford Steam Electric Station #3 Letdown Line Break Outside Containment Reactor Coolant System Temperatures vs. Time Figure 15.6-1e
Revision 14 (12/05)
Waterford Steam Electric Station #3 Letdown Line Break Outside Containment Pressurizer Level vs. Time Figure 15.6-1f
Revision 14 (12/05)
Waterford Steam Electric Station #3 Letdown Line Break Outside Containment Steam Generator Pressure vs. Time Figure 15.6-1g
Revision 14 (12/05)
Waterford Steam Electric Station #3 Letdown Line Break Outside Containment Break Flow vs. Time Figure 15.6-1h
Revision 14 (12/05)
Waterford Steam Electric Station #3 Letdown Line Break Outside Containment Integrated Break Flow vs. Time Figure 15.6-1i
WSES-FSAR-UNIT-3 Revision 14 (12/05)
(DRN 05-543, R14)
Figures 15.6-2 through 15.6-31 have been intentionally deleted.
(DRN 05-543, R14)
THIS FIGURE INTENTIONALLY DELETED R E V I S I O N 5 Waterford Steam Electric Station Figure 15.6-32
T H I S F I G U R E I N T E N T I O N A L L Y D E L E T E D R E V I S I O N 5 Waterford Steam Electric Station Figure 15.6-33
THIS FIGURE INTENTIONALLY DELETED REVISION 5 I
I I
Waterford Steom Electric Station Figure 15.6-34
THIS F I G U R E I N T E N T I O N A L L Y D E L E T E D R E V I S I O N 5 Woterford Steam Electric Station 3 Figure 15.6-35
Revision 14 (12/05)
Waterford Steam Electric Station #3 SGTR with LOOP Core Power vs. Time Figure 15.6-35A
Revision 14 (12/05)
Waterford Steam Electric Station #3 SGTR with LOOP Core Heat Flux vs. Time Figure 15.6-35B
WSES-FSAR-UNIT-3 Revision 14 (12/05)
(DRN 05-543, R14)
Figure 15.6-35C has been deleted.
(DRN 05-543, R14)
Revision 14 (12/05)
Waterford Steam Electric Station #3 SGTR with LOOP RCS Pressure vs. Time Figure 15.6-35D
WSES-FSAR-UNIT-3 Revision 14 (12/05)
(DRN 05-543, R14)
Figure 15.6-35E has been deleted.
(DRN 05-543, R14)
Revision 14 (12/05)
Waterford Steam Electric Station #3 SGTR with LOOP RCS Temperatures vs. Time Figure 15.6-35F
WSES-FSAR-UNIT-3 Revision 14 (12/05)
(DRN 05-543, R14)
Figure 15.6-35G has been deleted.
(DRN 05-543, R14)
Revision 14 (12/05)
Waterford Steam Electric Station #3 SGTR with LOOP Pressurizer Water Volume vs. Time Figure 15.6-35H
Revision 14 (12/05)
Waterford Steam Electric Station #3 SGTR with LOOP RCS Inventory vs. Time Figure 15.6-35I
WSES-FSAR-UNIT-3 Revision 14 (12/05)
(DRN 05-543, R14)
Figure 15.6-35J has been deleted.
(DRN 05-543, R14)
Revision 14 (12/05)
Waterford Steam Electric Station #3 SGTR with LOOP SG Pressure vs. Time Figure 15.6-35K
Revision 14 (12/05)
Waterford Steam Electric Station #3 SGTR with LOOP Feedwater Flowrate per SG vs. Time Figure 15.6-35L
WSES-FSAR-UNIT-3 Revision 14 (12/05)
(DRN 05-543, R14)
Figure 15.6-35M has been deleted.
(DRN 05-543, R14)
Revision 14 (12/05)
Waterford Steam Electric Station #3 SGTR with LOOP Primary-to-Secondary Leak Rate vs. Time Figure 15.6-35N
WSES-FSAR-UNIT-3 Revision 14 (12/05)
(DRN 05-543, R14)
Figure 15.6-35O has been deleted.
(DRN 05-543, R14)
Revision 14 (12/05)
Waterford Steam Electric Station #3 SGTR with LOOP SG Liquid Mass vs. Time Figure 15.6-35P
Revision 14 (12/05)
Waterford Steam Electric Station #3 SGTR with LOOP Integrated Steam Mass Through ADVs vs. Time Figure 15.6-35Q
Revision 14 (12/05)
Waterford Steam Electric Station #3 SGTR with LOOP Integrated Primary-to-Secondary Leak Flow vs. Time Figure 15.6-35R
Revision 304 (06/10)
Waterford Steam Electric Station #3 SGTR with LOOP Minimum DNBR vs. Time Figure 15.6-35S
WSES-FSAR-UNIT-3 Revision 14 (12/05)
(DRN 05-543, R14)
Figures 15.6-36 through 15.6-91 have been intentionally deleted.
(DRN 05-543, R14)
Revision 307 (07/13)
Waterford Steam Electric Station #3 Large Break LOCA ECCS Performance Analysis 1.0 DEG/PD Break Core Power Figure 15.6-92
Revision 307 (07/13)
Waterford Steam Electric Station #3 Large Break LOCA ECCS Performance Analysis 1.0 DEG/PD Break Pressure in Center Hot Assembly Node Figure 15.6-93
Revision 307 (07/13)
Waterford Steam Electric Station #3 Large Break LOCA ECCS Performance Analysis 1.0 DEG/PD Break Leak Flow Rate Figure 15.6-94
Revision 307 (07/13)
Waterford Steam Electric Station #3 Large Break LOCA ECCS Performance Analysis 1.0 DEG/PD Break Hot Assembly Flow Rate (Below and Above Hot Spot)
Figure 15.6-95
WSES-FSAR-UNIT-3 Revision 14 (12/05)
(DRN 05-543, R14)
Figure 15.6-96 has been deleted.
(DRN 05-543, R14)
Revision 307 (07/13)
Waterford Steam Electric Station #3 Large Break LOCA ECCS Performance Analysis 1.0 DEG/PD Break Hot Assembly Quality Figure 15.6-97
Revision 307 (07/13)
Waterford Steam Electric Station #3 Large Break LOCA ECCS Performance Analysis 1.0 DEG/PD Break Containment Pressure Figure 15.6-98
Revision 307 (07/13)
Waterford Steam Electric Station #3 Large Break LOCA ECCS Performance Analysis 1.0 DEG/PD Break Mass Added to Core During Reflood Figure 15.6-99
Revision 307 (07/13)
Waterford Steam Electric Station #3 Large Break LOCA ECCS Performance Analysis 1.0 DEG/PD Break Peak Cladding Temperature Figure 15.6-100
Revision 307 (07/13)
Waterford Steam Electric Station #3 LBLOCA ECCS Performance Analysis 1.0 DEG/PD Break Mid Annulus Flow Rate Figure 15.6-100a
Revision 307 (07/13)
Waterford Steam Electric Station #3 LBLOCA ECCS Performance Analysis 1.0 DEG/PD Break Quality Above and Below the Core Figure 15.6-100b
Revision 307 (07/13)
Waterford Steam Electric Station #3 LBLOCA ECCS Performance Analysis 1.0 DEG/PD Break Core Pressure Drop Figure 15.6-100c
Revision 307 (07/13)
Waterford Steam Electric Station #3 LBLOCA ECCS Performance Analysis 1.0 DEG/PD Break Safety Injection Flow Rate Into Intact Discharge Legs Figure 15.6-100d
Revision 307 (07/13)
Waterford Steam Electric Station #3 LBLOCA ECCS Performance Analysis 1.0 DEG/PD Break Water Level in Downcomer During Reflood Figure 15.6-100e
Revision 307 (07/13)
Waterford Steam Electric Station #3 LBLOCA ECCS Performance Analysis 1.0 DEG/PD Break Hot Spot Gap Conductance Figure 15.6-100f
Revision 307 (07/13)
Waterford Steam Electric Station #3 LBLOCA ECCS Performance Analysis 1.0 DEG/PD Break Maximum Local Cladding Oxidation Percentage Figure 15.6-100g
Revision 307 (07/13)
Waterford Steam Electric Station #3 LBLOCA ECCS Performance Analysis 1.0 DEG/PD Break Fuel Centerline, Fuel Average, Cladding, and Coolant Temperature at the Hot Spot Figure 15.6-100h
Revision 307 (07/13)
Waterford Steam Electric Station #3 LBLOCA ECCS Performance Analysis 1.0 DEG/PD Break Hot Spot Heat Transfer Coefficient Figure 15.6-100i
Revision 307 (07/13)
Waterford Steam Electric Station #3 LBLOCA ECCS Performance Analysis 1.0 DEG/PD Break Hot Pin Pressure Figure 15.6-100j
Revision 307 (07/13)
Waterford Steam Electric Station #3 LBLOCA ECCS Performance Analysis 1.0 DEG/PD Break Core Bulk Channel Flow Rate Figure 15.6-100k
Revision 307 (07/13)
Waterford Steam Electric Station #3 LBLOCA ECCS Performance Analysis 0.8 DEG/PD Break Core Power Figure 15.6-101
Revision 307 (07/13)
Waterford Steam Electric Station #3 LBLOCA ECCS Performance Analysis 0.8 DEG/PD Break Pressure in Center Hot Assembly Node Figure 15.6-102
Revision 307 (07/13)
Waterford Steam Electric Station #3 LBLOCA ECCS Performance Analysis 0.8 DEG/PD Break Leak Flow Rate Figure 15.6-103
Revision 307 (07/13)
Waterford Steam Electric Station #3 Large Break LOCA ECCS Performance Analysis 0.8 DEG/PD Break Hot Assembly Flow Rate (Above and Below Hot Spot)
Figure 15.6-104
WSES-FSAR-UNIT-3 Revision 14 (12/05)
(DRN 05-543, R14)
Figure 15.6-105 has been deleted.
(DRN 05-543, R14)
Revision 307 (07/13)
Waterford Steam Electric Station #3 Large Break LOCA ECCS Performance Analysis 0.8 DEG/PD Break Hot Assembly Quality Figure 15.6-106
Revision 307 (07/13)
Waterford Steam Electric Station #3 Large Break LOCA ECCS Performance Analysis 0.8 DEG/PD Break Containment Pressure Figure 15.6-107
Revision 307 (07/13)
Waterford Steam Electric Station #3 Large Break LOCA ECCS Performance Analysis 0.8 DEG/PD Break Mass Added to Core During Reflood Figure 15.6-108
Revision 307 (07/13)
Waterford Steam Electric Station #3 Large Break LOCA ECCS Performance Analysis 0.8 DEG/PD Break Peak Cladding Temperature Figure 15.6-109
WSES-FSAR-UNIT-3 Revision 15 (03/07)
(DRN 06-1062, R15)
Figure 15.6-109a has been intentionally deleted.
(DRN 06-1062, R15)
WSES-FSAR-UNIT-3 Revision 15 (03/07)
(DRN 06-1062, R15)
Figure 15.6-109b has been intentionally deleted.
(DRN 06-1062, R15)
WSES-FSAR-UNIT-3 Revision 15 (03/07)
(DRN 06-1062, R15)
Figure 15.6-109c has been intentionally deleted.
(DRN 06-1062, R15)
WSES-FSAR-UNIT-3 Revision 15 (03/07)
(DRN 06-1062, R15)
Figure 15.6-109d has been intentionally deleted.
(DRN 06-1062, R15)
WSES-FSAR-UNIT-3 Revision 15 (03/07)
(DRN 06-1062, R15)
Figure 15.6-109e has been intentionally deleted.
(DRN 06-1062, R15)
WSES-FSAR-UNIT-3 Revision 15 (03/07)
(DRN 06-1062, R15)
Figure 15.6-109f has been intentionally deleted.
(DRN 06-1062, R15)
WSES-FSAR-UNIT-3 Revision 15 (03/07)
(DRN 06-1062, R15)
Figure 15.6-109g has been intentionally deleted.
(DRN 06-1062, R15)
WSES-FSAR-UNIT-3 Revision 15 (03/07)
(DRN 06-1062, R15)
Figure 15.6-109h has been intentionally deleted.
(DRN 06-1062, R15)
WSES-FSAR-UNIT-3 Revision 15 (03/07)
(DRN 06-1062, R15)
Figure 15.6-109i has been intentionally deleted.
(DRN 06-1062, R15)
WSES-FSAR-UNIT-3 Revision 15 (03/07)
(DRN 06-1062, R15)
Figure 15.6-109j has been intentionally deleted.
(DRN 06-1062, R15)
WSES-FSAR-UNIT-3 Revision 15 (03/07)
(DRN 06-1062, R15)
Figure 15.6-109k has been intentionally deleted.
(DRN 06-1062, R15)
F I G U R E HAS BEEN INTENTIONALLY DELETED S t e a m E l e c t r i c CYCLE 6 ECCS ANALYSIS PEAK CLAD TEMPERATURE VERSUS TIME FOR THE HOT SPOT LOCATION
Revision 307 (07/13)
Waterford Steam Electric Station #3 Large Break LOCA ECCS Performance Analysis 0.6 DEG/PD Break Core Power Figure 15.6-110
Revision 307 (07/13)
Waterford Steam Electric Station #3 Large Break LOCA ECCS Performance Analysis 0.6 DEG/PD Break Pressure in Center Hot Assembly Node Figure 15.6-111
Revision 307 (07/13)
Waterford Steam Electric Station #3 Large Break LOCA ECCS Performance Analysis 0.6 DEG/PD Break Leak Flow Rate Figure 15.6-112
Revision 307 (07/13)
Waterford Steam Electric Station #3 Large Break LOCA ECCS Performance Analysis 0.6 DEG/PD Break Hot Assembly Flow Rate (Above and Below Hot Spot)
Figure 15.6-113
WSES-FSAR-UNIT-3 Revision 14 (12/05)
(DRN 05-543, R14)
Figure 15.6-114 has been deleted.
(DRN 05-543, R14)
Revision 307 (07/13)
Waterford Steam Electric Station #3 Large Break LOCA ECCS Performance Analysis 0.6 DEG/PD Break Hot Assembly Quality Figure 15.6-115
Revision 307 (07/13)
Waterford Steam Electric Station #3 Large Break LOCA ECCS Performance Analysis 0.6 DEG/PD Break Containment Pressure Figure 15.6-116
Revision 307 (07/13)
Waterford Steam Electric Station #3 LBLOCA ECCS Performance Analysis 0.6 DEG/PD Break Mass Added to Core During Reflood Figure 15.6-117
Revision 307 (07/13)
Waterford Steam Electric Station #3 LBLOCA ECCS Performance Analysis 0.6 DEG/PD Break Peak Cladding Temperature Figure 15.6-118
WSES-FSAR-UNIT-3 Revision 302 (12/08)
<<(EC-9533, R302)
Figure 15.6-118a through Figure 15.6-127 have been deleted.
ø(EC-9533, R302)
LOUISIANA POWER 8 LIGHT CO.
Station F I G U R E S T H R O U G H H A V E B E E N I N T E N T I O N A L L Y D E L E T E D
Revision 307 (07/13)
Waterford Steam Electric Station #3 LBLOCA ECCS Performance Analysis 0.4 DEG/PD Break Core Power Figure 15.6-127a
Revision 307 (07/13)
Waterford Steam Electric Station #3 LBLOCA ECCS Performance Analysis 0.4 DEG/PD Break Pressure in Center Hot Assembly Node Figure 15.6-127b
Revision 307 (07/13)
Waterford Steam Electric Station #3 LBLOCA ECCS Performance Analysis 0.4 DEG/PD Break Leak Flow Rate Figure 15.6-127c
Revision 307 (07/13)
Waterford Steam Electric Station #3 Large Break LOCA ECCS Performance Analysis 0.4 DEG/PD Break Hot Assembly Flow Rate (Below and Above Hot Spot)
Figure 15.6-127d
Revision 307 (07/13)
Waterford Steam Electric Station #3 Large Break LOCA ECCS Performance Analysis 0.4 DEG/PD Break Hot Assembly Quality Figure 15.6-127e
Revision 307 (07/13)
Waterford Steam Electric Station #3 LBLOCA ECCS Performance Analysis 0.4 DEG/PD Break Containment Pressure Figure 15.6-127f
Revision 307 (07/13)
Waterford Steam Electric Station #3 LBLOCA ECCS Performance Analysis 0.4 DEG/PD Break Mass Added to Core During Reflood Figure 15.6-127g
Revision 307 (7/13)
Waterford Steam Electric Station #3 LBLOCA ECCS Performance Analysis 0.4 DEG/PD Break Peak Cladding Temperature Figure 15.6-127h
Revision 307 (07/13)
Waterford Steam Electric Station #3 Large Break LOCA ECCS Performance Analysis Peak Cladding Temperature Versus Break Size Figure 15.6-128
WSES-FSAR-UNIT-3 Revision 14 (12/05)
(DRN 05-543, R14)
Figures 15.6-129 through 15.6-176 have been intentionally deleted.
(DRN 05-543, R14)
Revision 307 (07/13)
Waterford Steam Electric Station #3 SBLOCA ECCS Performance Analysis Peak Cladding Temperature vs. Break Size Figure 15.6-177
0.25 1200 2400 3600 6000 TIME, SECONDS LOUISIANA POWER LIGHT CO.
Steam Electric Station INADVERTENT OPENING OF A PRESSURIZER SAFETY VALVE NORMALIZED TOTAL CORE POWER Figure 15.6-178 J
2400 2000 1600 1200 800 400 1200 2400 3600 TIME, SECONDS 4800 LOUISIANA I
POWER LIGHT CO.
INADVERTENT Waterford Steam INNER VE Electric Station OF A PRESSURIZER SAFETY VALVE PRESSURE Figure 15.6-179 I
I
600 I
I I
1200 2400 3600 6000 TIME, SECONDS LOUISIANA POWER LIGHT CO.
Waterford Steam Electric Station INADVERTENT OPENING OF A PRESSURIZER SAFETY VALVE LEAK FLOW RATE Figure
60000 45000 30000 0
2400 4800 6000 TIME, SECONDS LOUISIANA POWER LIGHT CO.
Waterford Steam Electric Station INADVERTENT OPENING OF A PRESSURIZER SAFETY VALVE INNER VESSEL INLET FLOW RATE Figure 15.6-181
LOUISIANA POWER LIGHT CO.
Waterford Steam Electric Station INADVERTENT OPENING OF A PRESSURIZER SAFETY VALVE INNER VESSEL TWO-PHASE MIXTURE HEIGHT Figure 15.6-l 82 CORE 1200 2400 TIME, SECONDS 6,000
1 I
I I
I I
1200 2400 3600 6000 LOUISIANA POWER LIGHT CO.
Waterford Steam Electric Station TIME, SECONDS Figure INADVERTENT OPENINGOF A PRESSURIZER SAFETY VALVE HEAT TRANSFER AT HOT SPOT 15.6-183
600 I
I I
I 1200 2400 3600 TIME, SECONDS 6000 LOUISIANA POWER LIGHT CO.
Waterford Steam INADVERTENT OPENING OF A PRESSURIZER SAFETY VALVE COOLANT TEMPERATURE AT HOT SPOT Figure 15.6-184 Electric Station I
I
CLAD SURFACETEMPERATURE,
WSES-FSAR-UNIT-3 Revision 14 (12/05)
(DRN 05-543, R14)
Figures 15.6-186 through 15.6-205 have been intentionally deleted.
(DRN 05-543, R14)
Revision 307 (07/13)
Waterford Steam Electric Station #3 SBLOCA ECCS Performance Analysis 0.06 ft2/PD Break Core Power Figure 15.6-206
Revision 307 (07/13)
Waterford Steam Electric Station #3 SBLOCA ECCS Performance Analysis 0.06 ft2/PD Break Inner Vessel Pressure Figure 15.6-207
Revision 307 (07/13)
Waterford Steam Electric Station #3 SBLOCA ECCS Performance Analysis 0.06 ft2/PD Break Break Flow Rate Figure 15.6-208
Revision 307 (07/13)
Waterford Steam Electric Station #3 SBLOCA ECCS Performance Analysis 0.06 ft2/PD Break Inner Vessel Inlet Flow Rate Figure 15.6-209
Revision 307 (07/13)
Waterford Steam Electric Station #3 SBLOCA ECCS Performance Analysis 0.06 ft2/PD Break Inner Vessel Two-Phase Mixture Level Figure 15.6-210
Revision 307 (07/13)
Waterford Steam Electric Station #3 SBLOCA ECCS Performance Analysis 0.06 ft2/PD Break Heat Transfer Coefficient at Hot Spot Figure 15.6-211
Revision 307 (07/13)
Waterford Steam Electric Station #3 SBLOCA ECCS Performance Analysis 0.06 ft2/PD Break Coolant Temperature at Hot Spot Figure 15.6-212
Revision 307 (07/13)
Waterford Steam Electric Station #3 SBLOCA ECCS Performance Analysis 0.06 ft2/PD Break Cladding Temperature at Hot Spot Figure 15.6-213
Revision 307 (07/13)
Waterford Steam Electric Station #3 SBLOCA ECCS Performance Analysis 0.05 ft2/PD Break Core Power Figure 15.6-214
Revision 307 (07/13)
Waterford Steam Electric Station #3 SBLOCA ECCS Performance Analysis 0.05 ft2/PD Break Inner Vessel Pressure Figure 15.6-215
Revision 307 (07/13)
Waterford Steam Electric Station #3 SBLOCA ECCS Performance Analysis 0.05 ft2/PD Break Break Flow Rate Figure 15.6-216
Revision 307 (07/13)
Waterford Steam Electric Station #3 SBLOCA ECCS Performance Analysis 0.05 ft2/PD Break Inner Vessel Inlet Flow Rate Figure 15.6-217
Revision 307 (07/13)
Waterford Steam Electric Station #3 SBLOCA ECCS Performance Analysis 0.05 ft2/PD Break Inner Vessel Two-Phase Mixture Level Figure 15.6-218
Revision 307 (07/13)
Waterford Steam Electric Station #3 SBLOCA ECCS Performance Analysis 0.05 ft2/PD Break Heat Transfer Coefficient at Hot Spot Figure 15.6-219
Revision 307 (07/13)
Waterford Steam Electric Station #3 SBLOCA ECCS Performance Analysis 0.05 ft2/PD Break Coolant Temperature at Hot Spot Figure 15.6-220
Revision 307 (07/13)
Waterford Steam Electric Station #3 SBLOCA ECCS Performance Analysis 0.05 ft2/PD Break Cladding Temperature at Hot Spot Figure 15.6-221
Revision 307 (07/13)
Waterford Steam Electric Station #3 SBLOCA ECCS Performance Analysis 0.05 ft2/PD Break Steam Generator No. 1 Pressure Figure 15.6-221a
Revision 307 (07/13)
Waterford Steam Electric Station #3 SBLOCA ECCS Performance Analysis 0.05 ft2/PD Break Steam Generator No. 2 Pressure Figure 15.6-221b
Revision 307 (07/13)
Waterford Steam Electric Station #3 SBLOCA ECCS Performance Analysis 0.05 ft2/PD Break Steam Generator No. 1 Secondary Flow Rate Figure 15.6-221c
Revision 307 (07/13)
Waterford Steam Electric Station #3 SBLOCA ECCS Performance Analysis 0.05 ft2/PD Break Steam Generator No. 2 Secondary Flow Rate Figure 15.6-221d
WSES-FSAR-UNIT-3 Revision 307 (07/13)
(EC-8458, R307)
Figure 15.6-222 through Figure 15.6-233 have been intentionally deleted.
(EC-8458, R307)
Revision 307 (07/13)
Waterford Steam Electric Station #3 SBLOCA ECCS Performance Analysis 0.04 ft2/PD Break Core Power Figure 15.6-234
Revision 307 (07/13)
Waterford Steam Electric Station #3 SBLOCA ECCS Performance Analysis 0.04 ft2/PD Break Inner Vessel Pressure Figure 15.6-235
Revision 307 (07/13)
Waterford Steam Electric Station #3 SBLOCA ECCS Performance Analysis 0.04 ft2/PD Break Flow Rate Figure 15.6-236
Revision 307 (07/13)
Waterford Steam Electric Station #3 SBLOCA ECCS Performance Analysis 0.04 ft2/PD Break Inner Vessel Inlet Flow Rate Figure 15.6-237
Revision 307 (07/13)
Waterford Steam Electric Station #3 SBLOCA ECCS Performance Analysis 0.04 ft2/PD Break Inner Vessel Two-Phase Mixture Level Figure 15.6-238
Revision 307 (07/13)
Waterford Steam Electric Station #3 SBLOCA ECCS Performance Analysis 0.04 ft2/PD Break Heat Transfer Coefficient at Hot Spot Figure 15.6-239
Revision 307 (07/13)
Waterford Steam Electric Station #3 SBLOCA ECCS Performance Analysis 0.04 ft2/PD Break Coolant Temperature at Hot Spot Figure 15.6-240
Revision 307 (07/13)
Waterford Steam Electric Station #3 SBLOCA ECCS Performance Analysis 0.04 ft2/PD Break Cladding Temperature at Hot Spot Figure 15.6-241