|
---|
Category:Inspection Plan
MONTHYEARML24152A1542024-05-31031 May 2024 Document Request for Sequoyah Nuclear Plant - Radiation Protection Inspection - Inspection Report 2024-03 ML24059A4052024-02-28028 February 2024 Document Request for Sequoyah Nuclear Plant - Radiation Protection Inspection - Inspection Report 2024-02 IR 05000327/20230052023-08-29029 August 2023 Updated Inspection Plan for Sequoyah Nuclear Plant, Units 1 and 2 - Report 05000327/2023005 and 05000328/2023005 IR 05000327/20220062023-03-0101 March 2023 Annual Assessment Letter for Sequoyah Nuclear Plant, Units 1 and 2 Report 05000327/2022006 and 05000328/2022006 ML23026A0282023-01-12012 January 2023 001 Radiation Safety Baseline Inspection Information Request IR 05000327/20220052022-08-30030 August 2022 Updated Inspection Plan for Sequoyah Nuclear Plant, Units 1 and 2 - Report 05000327 2022005 and 05000328 2022005 - Final IR 05000327/20210062022-03-0202 March 2022 Annual Assessment Letter for Sequoyah Nuclear Plant, Units 1 and 2 - (Report No. 05000327/2021006 and 05000328/2021006) ML21160A0352021-06-0303 June 2021 Document Request for Sequoyah Nuclear Plant - Radiation Protection Inspection - Inspection Report 2021-03 ML21092A0972021-04-0202 April 2021 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection ML20259A4782020-09-15015 September 2020 Emergency Preparedness Program Inspection Request for Information IR 05000327/20200052020-08-18018 August 2020 Updated Inspection Plan for Sequoyah Nuclear Plant, Units 1 and 2 - Report 05000327/2020005 and 05000328/2020005 ML20227A0082020-08-14014 August 2020 Requalification Program Inspection - Sequoyah Nuclear Plant ML19324E9992019-11-20020 November 2019 2020 SQN - POV Inspection Information Request - Rev. 1 ML19235A1972019-08-23023 August 2019 ISI 2019004 RFI Ajb ML19063D0842019-03-0404 March 2019 Annual Assessment Letter for Sequoyah Nuclear Plant, Units 1 and 2 - Report 05000327/2018006 and 05000328/2018006 IR 05000327/20180062019-03-0404 March 2019 Annual Assessment Letter for Sequoyah Nuclear Plant, Units 1 and 2 - Report 05000327/2018006 and 05000328/2018006 ML18283A6232018-09-25025 September 2018 04 RP Inspection Document Request ML18240A3602018-08-24024 August 2018 Requalification Program Inspection ML18172A1182018-06-21021 June 2018 Notification of Inspection and Request for Information ML18059A1432018-02-28028 February 2018 EOC Assessment Letter ML18058B1632018-02-27027 February 2018 Emailed U1 ISI 2018002 RFI - Bcc IR 05000327/20170052017-08-24024 August 2017 Updated Inspection Plan for Sequoyah Updated Inspection Plant Units 1 and 2, Report 05000327/2017005 and 05000328/2017005 ML17146A1002017-05-25025 May 2017 Notification of Inspection and Request for Documents Dated May 25, 2017 ML17107A2602017-04-17017 April 2017 Notification of Inspection and Request for Information for NRC PI&R ML17115A4452017-04-17017 April 2017 Emergency Preparedness Inspection and Request for Information ML17067A4792017-03-0707 March 2017 Notification of Inspection and Request for Documents IR 05000327/20160062017-03-0101 March 2017 Annual Assessment Letter for Sequoyah Nuclear Plant, Units 1 & 2 (Report 05000327/2016006 and 05000328/2016006) ML16286A0622016-10-0606 October 2016 Notification of Inspection and Request for Information IR 05000327/20160052016-08-31031 August 2016 Mid-Cycle Assessment Letter for Sequoyah Nuclear Plant Units 1 and 2, NRC Inspection Report 05000327/2016005, 05000328/2016005 ML16076A0612016-03-15015 March 2016 Notification of Sequoyah Nuclear Plant - Component Design Bases Inspection - NRC Inspection Report 05000327/2016007, 05000328/2016007 ML16062A2622016-03-0202 March 2016 Annual Assessment Letter IR 05000327/20150052015-09-0101 September 2015 Mid-Cycle Assessment Letter for the Sequoyah Nuclear Plant Units 1 and 2, NRC Inspection Report 005000327/2015005, 005000328/2015005 ML15084A4022015-03-25025 March 2015 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection IR 05000327/20140012015-03-0404 March 2015 Annual Assessment Letter for Sequoyah Nuclear Plant Units 1 and 2, NRC Inspection Report 05000327/2014001, 05000328/2014001 IR 05000327/20140062014-09-0202 September 2014 Mid-Cycle Assessment Letter for Sequoyah, Units 1 and 2, Inspection Report 05000327/2014006, 05000328/2014003 ML14245A1212014-09-0202 September 2014 Mid-Cycle Assessment Letter for Sequoyah, Units 1 and 2, Inspection Report 05000327/2014006, 05000328/2014003 ML14072A0352014-03-10010 March 2014 Notification of Inspection and Request for Information ML14063A2472014-03-0404 March 2014 2013 Annual Assessment Letter for Sequoyah Nuclear Plant Units 1 and 2 ML13297A0732013-10-23023 October 2013 IR 05000327-14-007 & 05000328-14-007.Sequoyah Nuclear Plant, Units 1 & 2, Notification of a Triennial Fire Protection Baseline Inspection ML13246A1952013-09-0303 September 2013 Mid Cycle Assessment Letter IR 05000327/20120012013-03-0404 March 2013 Annual Assessment Letter for Sequoyah Nuclear Plant Units 1 and 2 (Report 05000327/2012001 and 05000328/2012001) ML12248A1042012-09-0404 September 2012 Mid Cycle Assessment Letter Sequoyah 2012 IR 05000327/20120062012-09-0404 September 2012 Mid Cycle Assessment Letter Sequoyah 2012 ML12065A3292012-03-0505 March 2012 RPT 22, Inspection/Activity Plan IR 05000382/20120012012-03-0505 March 2012 Annual Assessment Letter for Waterford Steam Electric Station-Unit 3 (Report 05000382-12-001) ML1124401842011-09-0101 September 2011 Inspection/Activity Report 22, 09/01/2011 - 12/31/2012 ML1106303542011-03-0404 March 2011 Inspection / Activity Plan, Report 22 ML1024408442010-09-0101 September 2010 Report 22 Inspection/Activity Plan 09/01/2010 - 12/31/2011 ML1006209872010-03-0303 March 2010 Inspection/Activity Plan 03/01/2010 - 06/30/2011 ML0924406512009-09-0101 September 2009 Inspection/Activity Plan 03/01/2009 - 12/31/2010 2024-05-31
[Table view] Category:Letter
MONTHYEARML24298A1172024-10-24024 October 2024 Cycle 26, 180-Day Steam Generator Tube Inspection Report CNL-24-074, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-10-23023 October 2024 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions 05000327/LER-2024-001, Reactor Trip Due to a Turbine Trip2024-10-17017 October 2024 Reactor Trip Due to a Turbine Trip ML24282B0412024-10-15015 October 2024 Request for Withholding Information from Public Disclosure for Sequoyah Nuclear Plant, Units 1 and 2 and Watts Bar Nuclear Plant, Units 1 and 2 ML24260A1682024-10-0404 October 2024 Regulatory Audit Summary Related to Request to Add and Revise Notes Related to Technical Specification Table 3.3.2-1, Function 5 ML24284A1072024-09-26026 September 2024 Affidavit for Request for Withholding Information from Public Disclosure for Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2 05000328/LER-2024-001, Reactor Trip Due to an Electrical Trouble Turbine Trip2024-09-25025 September 2024 Reactor Trip Due to an Electrical Trouble Turbine Trip CNL-24-060, Supplement to Request for Approval of the Tennessee Valley Authority Nuclear Quality Assurance Program Description2024-09-24024 September 2024 Supplement to Request for Approval of the Tennessee Valley Authority Nuclear Quality Assurance Program Description CNL-24-047, Decommitment of Flood Mode Mitigation Improvement Systems2024-09-24024 September 2024 Decommitment of Flood Mode Mitigation Improvement Systems ML24262A0602024-09-23023 September 2024 Summary of August 19, 2024, Meeting with Tennessee Valley Authority Regarding a Proposed Supplement to the Tennessee Valley Authority Nuclear Quality Assurance Plan ML24267A0402024-09-19019 September 2024 Cycle 27 Core Operating Limits Report Revision 0 ML24185A1742024-09-18018 September 2024 Cover Letter - Issuance of Exemption Related to Non-Destructive Examination Compliance Regarding Sequoyah Nuclear Plant Independent Spent Fuel Storage Installation CNL-24-065, Tennessee Valley Authority – Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-09-18018 September 2024 Tennessee Valley Authority – Central Emergency Control Center Emergency Plan Implementing Procedure Revisions ML24253A0152024-09-0808 September 2024 Emergency Plan Implementing Procedure Revisions ML24247A2212024-08-29029 August 2024 Notification of Deviation from Pressurized Water Reactor Owners Group (PWROG) Letter OG-21-160, NEI 03-08 Needed Guidance: PWR Lower Radial Support Clevis Insert X-750 Bolt Inspection Requirements, September 1, 2021 ML24247A1802024-08-28028 August 2024 Application to Revise the Fuel Handling Accident Analysis, to Delete Technical Specification 3.9.4, Containment Penetrations, and to Modify Technical Specification 3.3.6, Containment Ventilation Isolation Instrumentation for Sequoyah Nuclea IR 05000327/20240052024-08-26026 August 2024 Updated Inspection Plan for Sequoyah Nuclear Plant, Units 1 and 2 - Report 05000327/2024005 and 05000328/2024005 ML24239A3972024-08-23023 August 2024 Rssc Wire & Cable LLC Dba Marmon - Part 21 Final Notification - 57243-EN 57243 CNL-24-061, Supplement to Application to Revise Function 5 of Technical Specification Table 3.3.2-1, ‘Engineered Safety Feature Actuation System Instrumentation,’ for the Sequoyah and Watts Bar (SQN-TS-23-02 and WBN-TS-23-08),2024-08-19019 August 2024 Supplement to Application to Revise Function 5 of Technical Specification Table 3.3.2-1, ‘Engineered Safety Feature Actuation System Instrumentation,’ for the Sequoyah and Watts Bar (SQN-TS-23-02 and WBN-TS-23-08), IR 05000327/20240022024-07-31031 July 2024 Integrated Inspection Report 05000327/2024002 and 05000328/2024002 ML24211A0572024-07-29029 July 2024 Submittal of Emergency Plan Implementing Procedure Revision ML24211A0542024-07-29029 July 2024 Operator License Examination Report ML24211A0412024-07-26026 July 2024 Unit 1 Cycle 26 Refueling Outage - 90-Day Inservice Inspection Summary Report ML24199A0012024-07-22022 July 2024 Clarification and Correction to Exemption from Requirement of 10 CFR 37.11(c)(2) ML24172A1342024-07-15015 July 2024 Exemptions from 10 CFR 37.11(C)(2) (EPID L-2023-LLE-0024) - Letter ML24191A4652024-07-0909 July 2024 Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations ML24177A0282024-06-25025 June 2024 Emergency Plan Implementing Procedure Revisions ML24176A0222024-06-24024 June 2024 Retraction of Interim Report of a Deviation or Failure to Comply – Transducer Model 8005N ML24089A1152024-06-21021 June 2024 Transmittal Letter, Environmental Assessments and Findings of No Significant Impact Related to Exemption Requests from 10 CFR 37.11(c)(2) ML24145A0852024-05-30030 May 2024 1B-B Diesel Generator Failure - Final Significance Determination Letter ML24145A1052024-05-29029 May 2024 301 Exam Approval Letter ML24134A1762024-05-13013 May 2024 Submittal of 2023 Annual Radiological Environmental Operating Report CNL-24-040, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-05-0808 May 2024 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions ML24128A0352024-05-0707 May 2024 Providing Supplemental Information to Apparent Violation ML24120A0582024-04-26026 April 2024 10 CFR 50.46 Annual Report for Sequoyah Nuclear Plant Units 1 and 2 ML24116A2612024-04-25025 April 2024 Interim Report of a Deviation or Failure to Comply - Transducer Model 8005N ML24114A0482024-04-23023 April 2024 Annual Radioactive Effluent Release Report for 2023 Monitoring Period CNL-24-037, Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Unit 1 and 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 422024-04-22022 April 2024 Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Unit 1 and 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 42 ML24144A2322024-04-20020 April 2024 Tennessee Multi-Sector Permit (Tmsp), 2024 Annual Discharge Monitoring Report for Outfalls SW-3, SW-3, and SW-9 ML24144A2362024-04-20020 April 2024 Discharge Monitoring Report (Dmr), March 2024 ML24089A0882024-04-18018 April 2024 – Exemption from Select Requirements of 10 CFR Part 73; Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting ML24102A1212024-04-18018 April 2024 Summary of Conference Call with Tennessee Valley Authority Regarding Sequoyah Nuclear Plant, Unit 1 Spring 2024 Steam Generator Tube Inspections CNL-24-024, Hydrologic Engineering Center River Analysis System Project Milestone Status Update2024-04-17017 April 2024 Hydrologic Engineering Center River Analysis System Project Milestone Status Update CNL-24-033, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-04-17017 April 2024 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions IR 05000327/20240012024-04-17017 April 2024 Integrated Inspection Report 05000327/2024001 and 05000328/2024001 ML24109A0272024-04-16016 April 2024 Cycle 27 Core Operating Limits Report Revision 0 CNL-23-006, Application to Modify Technical Specifications 3.8.1, AC Sources – Operating, and 3.8.2, AC Sources – Shutdown, for Sequoyah Nuclear Plant (SQN-TSC-22-03)2024-04-15015 April 2024 Application to Modify Technical Specifications 3.8.1, AC Sources – Operating, and 3.8.2, AC Sources – Shutdown, for Sequoyah Nuclear Plant (SQN-TSC-22-03) ML24106A0502024-04-12012 April 2024 Discharge Monitoring Report (Dmr), February 2024 ML24100A0162024-04-11011 April 2024 Request for Regulatory Conference (Tennessee Valley Authority - Sequoyah Nuclear Plant) CNL-24-020, Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Units 1 and 2, Request for Approval of Quality Assurance Program Description and Application to Revise the Technical Specifications Associated with QAPD Requirements2024-04-0101 April 2024 Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Units 1 and 2, Request for Approval of Quality Assurance Program Description and Application to Revise the Technical Specifications Associated with QAPD Requirements 2024-09-08
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 April 17, 2017 Mr. Joseph W. Shea Vice President, Nuclear Licensing Tennessee Valley Authority 1101 Market Street, LP 3R-C Chattanooga, TN 37402-2801
SUBJECT:
SEQUOYAH NUCLEAR PLANT - EMERGENCY PREPAREDNESS INSPECTION AND REQUEST FOR INFORMATION
Dear Mr. Shea:
From September 11-15, 2017, the U.S. Nuclear Regulatory Commission (NRC) will perform a baseline Emergency Preparedness program inspection at the Sequoyah Nuclear Plant. The inspection will evaluate activities in the Emergency Preparedness cornerstone using NRC Inspection Procedures (IPs) 71114.02, Alert and Notification System Evaluation; 71114.03, Emergency Response Organization Staffing and Augmentation System; 71114.04, Emergency Action Level and Emergency Plan Changes; 71114.05, Maintenance of Emergency Preparedness; and Emergency Preparedness sections of 71151 Performance Indicator Verification.
Experience has shown that this inspection is resource-intensive for both the NRC inspectors and your staff. To minimize the impact to your onsite resources and to ensure a productive inspection, we have enclosed a request for documents needed for this inspection. It is important that all of these documents are up-to-date, and complete, to minimize the number of additional documents requested during the preparation, and/or the onsite portions of the inspection.
We have discussed the schedule for these inspection activities with your staff, and understand that our regulatory contact for this inspection will be Mr. Paul Gain (423-843-7088) of your organization. If there are any questions about this inspection or the material requested, please contact the lead inspector, Steven Sanchez at 404-997-4418 (Steven.Sanchez@nrc.gov), or the Chief, Plant Support Branch 1, Brian Bonser at 404-997-4653.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, "Public inspections, exemptions, requests for withholding," of the NRC's "Agency Rules of Practice and Procedure," a copy of this letter, and its Enclosure, will be available electronically for public inspection in the NRC Public Document Room, or from the Publicly Available Records(PARS)
J. Shea 2 component of NRC's Agencywide Documents Access and Management System (ADAMS); accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Sincerely,
/RA/
Brian R. Bonser, Chief Plant Support Branch 1 Division of Reactor Safety
Docket Nos. 50-327 and 50-328 License Nos. DPR-77 and DPR-79
Enclosure:
Document Request List cc: Distribution via Listserv J. Shea 3
SUBJECT:
SEQUOYAH NUCLEAR PLANT - EMERGENCY PREPAREDNESS INSPECTION AND REQUEST FOR INFORMATION DISTRIBUTION: A. Blamey, RII, DRP C. Rapp, RII, SR PE J. Seat, RII, PE G. Smith, RII, SRI W. Deschaine, RII, RI S. Price, RII, ORA/RC K. Sloan, RII, EICS RIDSNRRDIRS Public
PUBLICLY AVAILABLE NON-PUBLICLY AVAILABLE SENSITIVE NON-SENSITIVE ADAMS: Yes ACCESSION NUMBER: SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRS/PSB1 RII:DRS/PSB1 RII:DRS/PSB1 SIGNATURE JDH9 VIA EMAIL SPS VIA EMAILBRB1 NAME J. Hickman S. Sanchez B. Bonser DATE 4/ 7 /2017 4/ 6/2017 4/17/2017 E-MAIL COPY YES NO YES NO YES NO OFFICIAL RECORD COPY DOCUMENT NAME: G:\DRSII\PSB1\RFI INFORMATION REQUEST LETTERS\SEQUOYAH\2017\SEQUOYAH EP RFI 2017.DOCX Enclosure Document Request List Inspection Dates: September 11-15, 2017 Inspection Procedures (IPs): 71114.02 Alert and Notification System Evaluation 71114.03 Emergency Response Organization Staffing and Augmentation System 71114.04 Emergency Action Level and Emergency Plan Changes 71114.05 Maintenance of Emergency Preparedness 71151 Performance Indicator Verification Note: This is a list of the documents to be provided to the inspectors. The current version of these documents is expected unless specified otherwise. About 3 weeks prior to the inspection, provide, as a minimum, an electronic version of the Emergency Plan (E-Plan), 10 CFR 50.54(q) evaluation/screening packages of changed Emergency Action Level (EAL), E-Plan, and EP implementing procedures, and Corrective Action Program (CAP) entries relating to EP, for the 2-year inspection period (including those written by Corporate). The preferred file format is Word or searchable ".pdf" files on CDROM. [Note that the inspectors cannot accept data provided on USB or "flash" drives due to NRC IT security policies.] Please organize the information as it is arranged below (e.g., a folder labeled "Miscellaneous"). It is not the intent that large or burdensome data be scanned for this purpose (e.g., Performance Indicator documents). This data will be inspected using original documentation. Material can be provided prior to the inspection to the NRC Region II Office (ATTN: Steven Sanchez), 245 Peachtree Center Avenue, NE, Suite 1200, Atlanta, GA 30303-1257. If there are questions regarding the documents requested, please do not hesitate to contact the lead inspector. 71114.02 Alert and Notification System Evaluation Federal Emergency Management Agency (FEMA) approved Alert and Notification System (ANS) report and any currently associated correspondence ANS testing procedure ANS equipment technical manual ANS equipment testing results (raw data) for the 2-year inspection period ANS equipment maintenance records for the 2-year inspection period Changes to the ANS system, implementing procedures, testing procedures, and the maintenance program including any supporting FEMA approval letters for the past 2 years Information provided to the public inside the 10-mile plume exposure pathway CAP entries related to the ANS for the 2-year inspection period (including those written by Corporate) 71114.03 Emergency Response Organization Staffing and Augmentation System Current Emergency Response Organization (ERO) roster ERO Duty Roster in-effect during the week of the inspection (can be provided upon arrival) ERO and augmentation implementing procedures and changes made over the past 2 years NUREG 0654 Table B1 site equivalent and On-shift Staffing Analysis ERO training program procedure Emergency Preparedness (EP) staff training program and qualification records ERO augmentation testing results for the 2-year inspection period CAP entries related to ERO staffing and augmentation for the 2-year inspection period (including those written by Corporate) 2 71114.04 Emergency Action Level and Emergency Plan Changes Governing document for 10 CFR 50.54(q) evaluation process 10 CFR 50.54(q) evaluator training program and qualification records 10 CFR 50.54(q) evaluation/screening packages of changed Emergency Action Level (EAL), E-Plan, and EP implementing procedures (including corporate procedures) Current and immediately previous revisions of EAL, E-Plan, and EP procedures (electronic version of current E-Plan requested about 3 weeks before inspection) CAP entries related to EAL and E-Plan changes since the last NRC EP inspection (including those written by Corporate) 71114.05 Maintenance of Emergency Preparedness Governing documents for the assessment process All EP program assessments, not including INPO performed assessments, for the 2-year inspection period 10 CFR 50.54(t) audits, audit checklists, and subsequent State/local correspondence for the 2-year inspection period Drill and exercise critiques for the 2-year inspection period Critiques of actual events resulting in implementation of the E-Plan over the past 2 years Governing documents for 10 CFR 50.54(q) evaluation process Emergency Response Facility (ERF) activation procedures, including backup and alternate facilities Completed maintenance records and availability-tracking information for equipment important to EP (e.g., Heating and Ventilation system in ERFs and Radiation Monitors called out in EALs, etc.) for the 2-year inspection period Last Evacuation Time Estimates Analysis and annual review documentation CAP governing procedures CAP entries relating to EP (abbreviated format, i.e., identifier and brief description only) for the 2-year inspection period with the risk-significant related entries separated (including those written by Corporate) 71151 Performance Indicator Verification Governing document for the performance indicator (PI) process Drill and Exercise Performance (DEP), ERO, and ANS PI data submitted since the last NRC EP inspection (hard copies can be provided upon arrival) DEP documentation and evaluations since the last NRC EP inspection CAP entries related to PIs, that is DEP, ERO training and participation, and ANS since the last NRC EP inspection (including those written by Corporate) Miscellaneous Procedures and Records Safety Evaluation Report approved E-Plan and EALs Corporate and Departmental processes or procedures for EP staff Matrix of Drill Types performed and accounted for during the 8-year cycle Lead Inspector Contact Information: Steven Sanchez 404-997-4418 Steven.Sanchez@nrc.gov