Letter Sequence Other |
---|
|
|
MONTHYEARML11350A0532012-01-0404 January 2012 Plan for the Scoping and Screening Regulatory Audit Regarding the Grand Gulf Nuclear Station, Unit 1 License Renewal Application Review Project stage: Other ML12009A1052012-01-18018 January 2012 Plan for the Aging Management Program Regulatory Audit Regarding the Grand Gulf Nuclear Station, Unit 1, License Renewal Application Review Project stage: Other ML12067A2352012-04-0303 April 2012 Requests for Additional Information for the Review of the Grand Gulf Nuclear Station License Renewal Application Project stage: RAI ML12068A2332012-04-0404 April 2012 Requests for Additional Information for the Review of the Grand Gulf Nuclear Station License Renewal Application Project stage: RAI ML12080A1912012-04-11011 April 2012 Request for Additional Information for the Review of the Grand Gulf Nuclear Station License Renewal Application Grand Gulf LRA RAI Set 3 Project stage: RAI ML12074A0082012-04-12012 April 2012 Requests for Additional Information for the Review of the Grand Gulf Nuclear Station License Renewal Application Project stage: RAI ML12076A0142012-04-16016 April 2012 Request for Additional Information for the Review of the Grand Gulf Nuclear Station License Renewal Application (TAC No. ME7493) Grand Gulf LRA Draft RAI Set 5 Project stage: Draft RAI ML12076A0092012-04-17017 April 2012 Requests for Additional Information for the Review of the Grand Gulf Nuclear Station License Renewal (TAC ME7493) Grand Gulf LRA Draft RAI Set 6 Project stage: Draft RAI ML12087A0012012-04-18018 April 2012 Requests for Additional Information for the Review of the Grand Gulf Nuclear Station License Renewal Application (TAC ME7493)Grand Gulf LRA RAI Set 07 Project stage: RAI ML12094A0092012-04-25025 April 2012 Requests for Additional Information for the Review of the Grand Gulf Nulcear Station Licesne Renewal Application Project stage: RAI ML12101A3602012-04-26026 April 2012 Request for Additional Information for the Review of Th Grand Gulf Nuclear Station License Renewal Application (TAC No. ME7493) Grand Gulf LRA RAI Set 09 Project stage: RAI ML12104A2192012-04-30030 April 2012 Request for Additional Information for the Review of the Grand Gulf Nuclear Station License Renewal Application (TAC No. ME7493)LRA RAI Set 10 Project stage: RAI GNRO-2012/00029, Response to Request for Additional Information (RAI) Regarding the License Renewal Application2012-05-0101 May 2012 Response to Request for Additional Information (RAI) Regarding the License Renewal Application Project stage: Response to RAI ML12109A2132012-05-0303 May 2012 Requests for Additional Information for the Review of the Grand Gulf Nuclear Station License Renewal Application (TAC No. ME7493) Grand Gulf LRA RAI Set 11 Project stage: RAI GNRO-2012/00036, Response to Request for Additional Information (RAI) Dated April 12, 20122012-05-0909 May 2012 Response to Request for Additional Information (RAI) Dated April 12, 2012 Project stage: Response to RAI ML12118A5392012-05-15015 May 2012 Requests for Additional Information for the Review of the Grand Gulf Nuclear Station License Renewal Application Project stage: RAI ML12125A3732012-05-24024 May 2012 Requests for Additional Information for the Review of the Grant Gulf Nuclear Station License Renewal Application (TAC No. ME7493)Grand Gulf LRA RAI Set 17 Project stage: RAI ML12139A0552012-05-29029 May 2012 LRA RAI Set 19 Project stage: RAI ML12151A2652012-06-15015 June 2012 Request for Additional Information for the Review of the Grand Gulf Nuclear Station License Renewal Application (TAC No. ME7493) Grand Gulf LRA RAI Set 20 Project stage: RAI ML12165A3872012-06-20020 June 2012 Scoping and Screening Methodology Audit Report Regarding the Grand Gulf Nuclear Station, Unit 1, License Renewal Application Project stage: Other ML12151A3682012-06-20020 June 2012 Requests for Additional Information for the Review of the Grand Gulf Nuclear Station License Renewal Application Project stage: RAI ML12152A3932012-06-22022 June 2012 Request for Additional Information for the Review of the Grand Gulf Nuclear Station License Renewal Application Project stage: RAI ML12152A3452012-06-22022 June 2012 Request for Additional Information for the Review of the Grand Gulf Nuclear Station License Renewal Application (Tac No. ME7493) Project stage: RAI ML12157A0562012-06-27027 June 2012 Request for Additional Information for the Review of the Grand Gulf Nuclear Station License Renewal Application (TAC No. ME7493)Grand Gulf LRA RAI Set 24 Project stage: RAI ML12164A7262012-06-27027 June 2012 RAI for the Review of the Grand Gulf Nuclear Station License Renewal Application Project stage: RAI ML12180A5412012-07-17017 July 2012 Summary of Telephone Conference Call Held on March 14, 2012, Between NRC and Entergy Operations, Inc., Concerning RAI Pertaining to the Grand Gulf Nuclear Station, LRA Project stage: RAI ML12188A7062012-07-17017 July 2012 Requests for Additional Information for the Review of the Grand Gulf Nuclear Station License Renewal Application Project stage: RAI ML12188A5162012-07-23023 July 2012 Requests for Additional Information for the Review of the Grand Gulf Nuclear Station License Renewal Application Project stage: RAI ML12200A1382012-07-27027 July 2012 Requests for Additional Information for the Review of the Grand Gulf Nuclear Station License Renewal Application Project stage: RAI ML12201B4762012-07-27027 July 2012 LRA RAI Set 30 Project stage: RAI ML12191A1872012-07-31031 July 2012 LRA RAI Telecon 2012-04-13 Project stage: RAI ML12208A2672012-08-0707 August 2012 RAI for the Review of the Grand Gulf Nuclear Station License Renewal Application Project stage: RAI ML12193A0712012-08-15015 August 2012 Summary of Telephone Conference Call Held on 5/15/12 Between the U.S. Nuclear Regulatory Commission and Entergy Operations, Inc., Concerning Requests for Additional Information Pertaining to the Grand Gulf Nuclear Station, LRA Project stage: RAI ML12220A3372012-08-15015 August 2012 RAI for the Review of the Grand Gulf Nuclear Station License Renewal Application Project stage: RAI ML12201B5042012-08-15015 August 2012 Summary of Telephone Conference Call Held on 5/23/12 Between the U.S. Nuclear Regulatory Commission and Entergy Operations, Inc., Concerning the RAIs Pertaining to the Grand Gulf Nuclear Station License Renewal Application Project stage: RAI ML12202A2142012-08-15015 August 2012 5/30/12 Summary of Telephone Conference Call Held Between the U.S. Nuclear Regulatory Commission and Entergy Operations, Inc., Concerning Requests for Additional Information Pertaining to the Grand Gulf Nuclear Station, LRA Project stage: RAI ML12230A3102012-08-21021 August 2012 Correction to Requests for Additional Information for the Review of the Grand Gulf Nuclear Station License Renewal Application Project stage: RAI ML12201B5452012-08-28028 August 2012 Summary of Telephone Conference Call Held on 6/5/12, Between NRC and Entergy, Concerning RAI Pertaining to the Grand Gulf Nuclear Station, LRA Project stage: RAI ML12209A1482012-08-28028 August 2012 6/8/12 Summary of Telephone Conference Call Held Between the U.S. Nuclear Regulatory Commission and Entergy Operations, Inc., Concerning Requests for Additional Information Pertaining to the Grand Gulf Nuclear Station, LRA Project stage: RAI ML12234A6712012-09-0505 September 2012 Requests for Additional Information for the Review of the Grand Gulf Nuclear Station License Renewal Application Project stage: RAI ML12242A5452012-09-0707 September 2012 Revision of Schedule for the Conduct of Review of the Grand Gulf Nuclear Station, LRA Project stage: Approval ML12230A2472012-09-0707 September 2012 Requests for Additional Information for the Review of the Grand Gulf Nuclear Station License Renewal Application Project stage: RAI ML12214A5482012-09-14014 September 2012 7/18/12 Summary of Telephone Conference Call Held Between the U.S. Nuclear Regulatory Commission and Entergy Operations, Inc., Concerning Requests for Additional Information Pertaining to the Grand Gulf Nuclear Station, LRA Project stage: RAI ML12248A1582012-09-14014 September 2012 Requests for Additional Information for the Review of the Grand Gulf Nuclear Station License Renewal Application Project stage: RAI ML12270A2492012-10-0303 October 2012 Requests for Additional Information for the Review of the Grand Gulf Nuclear Station License Renewal Application Project stage: RAI ML12278A0362012-10-17017 October 2012 Requests for Additional Information for the Review of the Grand Gulf Nuclear Station License Renewal Application Project stage: RAI ML12286A0242012-10-19019 October 2012 RAI for the Review of the Grand Gulf Nuclear Station LRA Project stage: RAI GNRO-2012/00128, Response to Requests for Additional Information (RAI) Set 38 Dated 10/03/20122012-10-22022 October 2012 Response to Requests for Additional Information (RAI) Set 38 Dated 10/03/2012 Project stage: Response to RAI ML12264A3872012-10-31031 October 2012 Summary of Telephone Conference Call Held on 8/21/12, Between the U.S. Nuclear Regulatory Commission and Entergy Nuclear Operations, Inc., Concerning Requests for Additional Information Pertaining to the Grand Gulf Nuclear Station, LRA Project stage: RAI ML12250A1052012-10-31031 October 2012 Summary of Telephone Conference Call Held on 8/15/12 Between the U.S. Nuclear Regulatory Commission and Entergy Operations, Inc., Concerning Requests for Additional Information Pertaining to the Grand Gulf Nuclear Station, LRA Project stage: RAI 2012-05-15
[Table View] |
|
---|
Category:Letter
MONTHYEARIR 05000416/20240112024-10-16016 October 2024 – Fire Protection Team Inspection Report 05000416/2024011 ML24263A2712024-09-19019 September 2024 Application to Revise Technical Specifications to Adopt TSTF-592, Revise Automatic Depressurization System (ADS) Instrumentation Requirements ML24257A0172024-09-17017 September 2024 Request for Withholding Information from Public Disclosure Unit 1 IR 05000416/20240122024-09-17017 September 2024 License Renewal Post Approval Phase 2 Inspection Report 05000416/2024012 ML24254A3602024-09-10010 September 2024 Pre-Submittal Slides for License Amendment Request, Criticality Safety Analysis, Technical Specification 4.3.1, Criticality and Technical Specification 5.5.14, Spent Fuel Storage Rack Neutron Absorber Monitoring Program IR 05000416/20244022024-09-0909 September 2024 Security Baseline Inspection Report 05000416/2024402 05000416/LER-2024-003, Feedwater Inlet Check Valve Incorrectly Determined Operable2024-08-26026 August 2024 Feedwater Inlet Check Valve Incorrectly Determined Operable ML24235A0832024-08-22022 August 2024 Evaluations Performed in Accordance with 10 CFR 50.54(q) for Changes to Emergency Planning Documents IR 05000416/20240052024-08-21021 August 2024 Updated Inspection Plan for Grand Gulf Nuclear Station (Report 05000416/2024005) ML24220A2642024-08-20020 August 2024 Entergy Operations, Inc. - Entergy Fleet Project Manager Assignment ML24185A1522024-08-13013 August 2024 Issuance of Amendment Nos. 334, 235, and 215, Respectively, to Revise TSs to Adopt TSTF-205 IR 05000416/20240022024-07-29029 July 2024 Integrated Inspection Report 05000416/2024002 ML24176A1202024-07-29029 July 2024 Issuance of Amendment 234 Revision to Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times – RITSTF Initiative 4b ML24172A2502024-07-29029 July 2024 – Issuance of Amendment No. 233 Adoption of 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors ML24204A2432024-07-23023 July 2024 Notification of Cyber Security Baseline Inspection and Request for Information (05000416/2024403) ML24191A2432024-07-0909 July 2024 Completion of License Renewal Activities Prior to Entering the Period of Extended Operations IR 05000416/20240102024-06-27027 June 2024 Biennial Problem Identification and Resolution Inspection Report 05000416/2024010 ML24156A1762024-06-24024 June 2024 Regulatory Audit Summary in Support of License Amendment Requests to Adopt TSTF-505, Revision 2 and 10 CFR 50.69 (Epids L-2023-LLA-0081 and L-2023-LLA-0080) ML24165A1512024-06-13013 June 2024 Second Supplement to License Amendment Request to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times – RITSTF Initiative 4b and Application to Adopt 10 CFR 50.69, Risk-Informe ML24163A2652024-06-11011 June 2024 Inservice Inspection Summary Report ML24060A2192024-05-30030 May 2024 Authorization of Alternative to Use EN-RR-01 Concerning Proposed Alternative to Adopt Code Case N-752 05000416/LER-2024-002, Automatic Actuation of Reactor Protection System2024-05-28028 May 2024 Automatic Actuation of Reactor Protection System ML24128A1512024-05-0909 May 2024 Project Manager Assignment ML24130A0912024-05-0909 May 2024 Request for Information Letter License Renewal Phase 2 Inspection ML24128A0422024-05-0707 May 2024 License Amendment Request to Remove Obsolete License Conditions IR 05000416/20240012024-05-0202 May 2024 Integrated Inspection Report 05000416 2024001 ML24122C6112024-05-0101 May 2024 Supplement to License Amendment Request to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - Ritstf. ML24116A0372024-04-25025 April 2024 Report of Technical Specification Bases Changes ML24113A0972024-04-22022 April 2024 Annual Report of Individual Monitoring - NRC Form 5 for 2023 Per 1 0 CFR 20.2206 ML24113A0952024-04-22022 April 2024 Annual Radioactive Effluent Release Report for 2023 ML24107B0402024-04-16016 April 2024 Notification by Entergy Operations, Inc., of Proposed Economic Performance Incentive and Reliance on Post-Event Improvements in Plant Procedures And/Or Methods of Operation in FERC ML24107A8872024-04-16016 April 2024 2023 Annual Radiological Environmental Operating Report (AREOR) ML24101A3882024-04-10010 April 2024 Response to Request for Confirmation of Information by the Office of Nuclear Reactor Regulation Proposed Alternative Request EN-RR-22-001 Risk-Informed Categorization and Treatment for Repair ML24100A0692024-04-0909 April 2024 Report of Changes or Errors to 10 CFR 50.46 Analysis ML24094A0992024-04-0303 April 2024 (GGNS) Core Operating Limits Report (COLR) Cycle 25, Revision O ML24089A2262024-03-29029 March 2024 Entergy Response to Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Exams 05000416/LER-2024-001, High Pressure Core Spray Inoperable Due to Minimum Flow Valve Failure to Close2024-03-27027 March 2024 High Pressure Core Spray Inoperable Due to Minimum Flow Valve Failure to Close ML24075A1712024-03-15015 March 2024 Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3)) ML24074A2892024-03-14014 March 2024 Proof of Financial Protection (10 CFR 140.15) IR 05000416/20230062024-02-28028 February 2024 Annual Assessment Letter for Grand Gulf Nuclear Station - Report 05000416/2023006 ML24058A3512024-02-28028 February 2024 Notification of Biennial Problem Identification and Resolution Inspection and Request for Information IR 05000416/20233012024-02-26026 February 2024 NRC Examination Report 05000416-2023301 05000416/LER-2023-002, Reactor Scram Due to Generator Stator Fault to Ground2024-02-13013 February 2024 Reactor Scram Due to Generator Stator Fault to Ground ML24043A1892024-02-12012 February 2024 Spent Fuel Storage Radioactive Effluent Release Report for 2023 ML24012A1422024-01-31031 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0051 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML24043A0732024-01-29029 January 2024 2024-01 Post Examination Comments IR 05000416/20230042024-01-25025 January 2024 Integrated Inspection Report 5000416/2023004 IR 05000416/20234012024-01-18018 January 2024 Cyber Security Inspection Report 05000416/2023401 (Public) ML24018A0222024-01-18018 January 2024 Core Operating Limits Report (COLR) Cycle 24, Revision 2 ML24012A1962024-01-12012 January 2024 Response to 2nd Round Request for Additional Information Concerning Relief Request Number EN-RR-22-001 – Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and 2024-09-09
[Table view] Category:Task Action Plan
MONTHYEARML12009A1052012-01-18018 January 2012 Plan for the Aging Management Program Regulatory Audit Regarding the Grand Gulf Nuclear Station, Unit 1, License Renewal Application Review 2012-01-18
[Table view] |
Text
UNITED NUCLEAR REGULATORY WASHINGTON, D.C. 20555-0001 January 18, 2012 Mr. Michael Perito Site Vice President Entergy Operations, Inc. P.O. Box 756 Port Gibson, MS 39150 PLAN FOR THE AGING MANAGEMENT PROGRAM REGULATORY AUDIT REGARDING THE GRAND GULF NUCLEAR STATION, UNIT 1, LICENSE RENEWAL APPLICATION REVIEW (TAC NO. ME7493)
Dear Mr. Perito:
By letter, dated October 28, 2011, Entergy Operations, Inc. (Entergy or the applicant) submitted an application for renewal of operating license NPF-29 for Grand Gulf Nuclear Station, Unit 1 (GGNS). The staff of the U.S. Nuclear Regulatory Commission (NRC or the staff) is reviewing this application in accordance with the guidance in NUREG-1800, "Standard Review Plan for Review of License Renewal Applications for Nuclear Power Plants." The staff plans to conduct its Aging Management Program regulatory audit at GGNS during the weeks of January 23 and January 30, 2012, in accordance with the enclosed regulatory audit plan. If you have any questions, please contact me by telephone at 301-415-1045 or bye-mail at nathaniel. ferrer@nrc.gov. Sincerely, athaniel Ferrer, Project Manager Reactor Projects Branch 1 Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-416
Enclosure:
Audit Plan cc w/encl: Listserv Audit Aging Management Program for the Grand Gulf Nuclear Station, Unit License Renewal January 23 -February 3, Division of License Renewal Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission ENCLOSURE License Renewal Aging Management Program Audit Grand Gulf Nuclear 1. Background By letter dated October 28, 2011, Entergy Operations, Inc. (Entergy or the applicant), submitted to the U.S. Nuclear Regulatory Commission (NRC or the staff) its application for renewal of Operating License No. NPF-29 for the Grand Gulf Nuclear Station (GGNS) Unit 1. The applicant requested renewal of the operating license for an additional 20 years beyond the 40-year current license term, which expires on November 1, 2024. The staff from the Division of License Renewal will lead a regulatory audit to gain a better understanding of applicant's Aging Management Programs, Aging Management Reviews, and associated bases and documentation as applicable. 2. Regulatory Audit Bases License renewal requirements are specified in Title 10 of the Code of Federal Regulations (CFR), Part 54 (10 CFR Part 54), "Requirements for Renewal of Operating Licenses for Nuclear Power Plants." Guidance is provided in NUREG-1800, Rev. 2, "Standard Review Plan for Review of License Renewal Applications for Nuclear Power Plants" (SRP-LR), dated December 2010, and in NUREG-1801, Rev. 2, "Generic Aging Lessons Learned (GALL) Report," dated December 2010. 3. Regulatory Audit Scope The scope of this regulatory audit is to: (a) examine the applicant's Aging Management Programs (AMPs) for GGNS; and (b) verify the applicant's claims of consistency with the corresponding GALL Report AMPs. Enhancements to AMPs will be evaluated on a case basis. Exceptions to the GALL Report AMP elements will be evaluated separately as part of the NRC staff's review of the license renewal application (LRA), and will be documented in the staff's Safety Evaluation Report (SER). The SRP-LR allows an applicant's LRA to reference its AMPs as being consistent with the AMPs described in the GALL Report. By referencing the GALL Report AMPs in this manner, the applicant is concluding that its AMPs correspond to those AMPs and that no further staff review should be required. If an applicant credits an AMP for being consistent with a GALL Report program, it is incumbent on the applicant to ensure that the plant program contains all of the elements of the referenced GALL Report program. The applicant's determination shall be documented and maintained in an auditable, retrievable form. During this audit, the staff will audit program elements 1 -6 (scope, preventive actions, parameters monitored or inspected, detection of aging effects, monitoring and trending, and acceptance criteria), and program element 10, (operating experience), of the applicant's AMPs claimed to be consistent with the GALL Report against the equivalent elements of the associated AMP described in the GALL Report, unless otherwise indicated. Program elements 7 -9 (corrective actions, confirmation process, and administrative controls) are audited by another NRC project team during the scoping and screening methodology audit, and are evaluated separately. In addition, the staff will verify that the conditions at the plant are bounded by the conditions for which the GALL Report program was evaluated. The staff will also examine the applicant's program bases documents and related references for these AMPs, perform selected in-plant walkdowns, and interview applicant representatives to obtain additional clarification related to the AMPs
-4. Information and Other Material Necessary for the Regulatory Audit The project team will review the LRA, the AMP basis documents and other applicant supporting documents as appropriate. The project team would like for at least one hard-copy set of AMPs, AMP basis documents, and all other relevant documentation to be available in the team's work room. Work space and team support logistics: One general team work area with seating and laptop space for the audit team. Break-out rooms for question/answer/small group sessions and meetings, so that work in the main room will not be disrupted. Telephone access for in-plant and/or outside business-related calls. The break-out rooms should also have speaker phone capability for conference calls. Access to printers. Access to a copier. 5. Team Assignments Staff participation is projected as follows. Some deletions, additions or substitutions may occur on an as-needed basis: Week of January 23,2012 Branch Chief Bo Pham Jim Gavula Bill Holston John Klos Cirnberly Nickell Robert Sun John Wise Aloysius Obodoako Mechanical Emma Wong Bart Fu Matt Homiack Roger Kalikian Seung Min Ching Ng OnYee Pat Purtchser Operating Don Brittner
-Week of January 30,2012 Area , .,.....,.... Project Manager Nathaniel Ferrer Branch Chief Raj Auluck Dan Naus (Oak Ridge National Laboratory) Abdul Sheikh Structural Bryce Lehman Angela Buford Andrew Prinaris Ata Istar Cliff Doutt Electrical Duc Nguyen Rui Li I Operating Experience Don Brittner 6. Logistics The audit will be conducted at GGNS during the weeks of January 23 and January 30, 2012. Entrance and exit briefings will be held at the beginning and end of this audit, respectively. 7. Special Requests The staff requests the applicant to make available their condition report database for independent searches by the regulatory audit team. 8. Deliverables An audit report should be issued to the applicant within 90 days from the end of the audit.
Mr. Michael Perito Site Vice President Entergy Operations, Inc. P.O. Box 756 Port Gibson, MS 39150 PLAN FOR THE AGING MANAGEMENT PROGRAM REGULATORY AUDIT REGARDING THE GRAND GULF NUCLEAR STATION, UNIT 1, LICENSE RENEWAL APPLICATION REVIEW (TAC NO. ME7493)
Dear Mr. Perito:
By letter, dated October 28, 2011, Entergy Operations, Inc. (Entergy or the applicant) submitted an application for renewal of operating license NPF-29 for Grand Gulf Nuclear Station, Unit 1 (GGNS). The staff of the U.S. Nuclear Regulatory Commission (NRC or the staff) is reviewing this application in accordance with the guidance in NUREG-1800, "Standard Review Plan for Review of License Renewal Applications for Nuclear Power Plants." The staff plans to conduct its Aging Management Program regulatory audit at GGNS during the weeks of January 23 and January 30, 2012, in accordance with the enclosed regulatory audit plan. If you have any questions, please contact me by telephone at 301-415-1045 or bye-mail at nathanieIJerrer@nrc.gov. Sincerely, IRAI Nathaniel Ferrer, Project Manager Reactor Projects Branch 1 Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-416
Enclosure:
Audit Plan cc w/encl: Listserv DISTRIBUTION: See next page DLR PM:RPB1 :DLR NFerrer 011 18/12 YEdmonds 011 18/12 OFFICIAL RECORD COpy Letter to M. Perito from N. Ferrer dated January 18, 2012 PLAN FOR THE AGING MANAGEMENT PROGRAM REGULATORY AUDIT REGARDING THE GRAND GULF NUCLEAR STATION, UNIT 1, LICENSE RENEWAL APPLICATION REVIEW (TAC NO. ME7493) DISTRIBUTION: E-MAIL: RidsNrrDlr Resource RidsNrrDlrRpb1 Resource RidsNrrDlrRpb2 Resource RidsNrrDlrRarb Resource RidsNrrDlrRapb Resource RidsNrrDlrRasb Resource RidsNrrDlrRerb Resource RidsNrrDlrRpob Resource NFerrer DDrucker DWrona DMorey AWang RSmith, RIV BRice, RIV ICouret, OPA