Letter Sequence Response to RAI | |
---|---|
TAC:ME5208, (Approved, Closed) | |
Initiation
Administration Results Other: 3F0911-01, Drawing No. 522-041-024, EC70139, Rev. 0, Attachment Z122R0, Vertical Bracing Connections, ML11314A119, ML11314A121, ML11314A122, ML11314A123, ML11314A124, ML11314A125, ML11314A126, ML11314A127, ML11314A128, ML11314A129, ML11314A130, ML11314A131, ML11314A132, ML11314A133, ML11314A134, ML11314A135, ML11314A136, ML11314A137, ML11314A138, ML11314A139, ML11314A140, ML11314A141, ML11314A142, ML11314A143, ML11314A144, ML11314A145, ML11314A146, ML11314A147, ML11314A148, ML11314A149, ML11314A150, ML11314A151, ML11314A152, ML11314A153, ML11314A154, ML11314A155, ML11314A156 | |
MONTHYEARML1105506632011-02-23023 February 2011
[Table View]E-mail, ME5208 Final RAIs Re Departure from a Method of Evaluation for the Auxiliary Building Overhead Crane and Revisions to Associated Commitments Project stage: RAI ML11256A0742011-07-20020 July 2011 License Amendment Request #310, Revision 1, Departure from a Method of Evaluation for the Auxiliary Building Overhead Crane, Revisions to Associated Commitments, and Response to Request for Additional Information Project stage: Response to RAI ML11314A1212011-08-0505 August 2011 Calculation No. S10-0063, Auxiliary Building Overhead Crane (FHCR-5) Supporting Steel Structure - Connection Evaluation Project stage: Other ML11314A1222011-08-0808 August 2011 FPC118-PR-001, Revision 2, Design Criteria Document Regarding Auxiliary Building Evaluation for Crane Upgrade Project stage: Other ML11314A1382011-09-0101 September 2011 Drawing No. 522-041-019, Rev. 0, EC70139, Rev. 0, Attachment Z95R0, Column Connections to Concrete Floor Project stage: Other ML11314A1152011-09-0101 September 2011 License Amendment Request #310, Revision 1 Departure from a Method of Evaluation for the Auxiliary Building Overhead Crane - Response to Request for Additional Information Project stage: Response to RAI ML11314A1372011-09-0101 September 2011 Drawing No. 522-041-018, EC70139, Rev. 0, Attachment Z93R0, Column Connections to Concrete Floor Project stage: Other ML11314A1362011-09-0101 September 2011 Drawing No. 522-041-016, EC70139, Rev. 0, Attachment Z92R0, N-S Member Connections at El. 162'-0 Project stage: Other ML11314A1352011-09-0101 September 2011 Drawing No. 522-041-015, EC70139, Rev. 0, Attachment Z91R0, N-S Member Connections at El. 162'-0 Project stage: Other ML11314A1342011-09-0101 September 2011 Drawing No. 522-041-014, EC70139, Rev. 0, Attachment Z73R0, N-S Member Connections at El. 162'-0 Project stage: Other ML11314A1332011-09-0101 September 2011 Drawing No. 522-041-013, EC70139, Rev. 0, Attachment Z72R0, E-W Member Moment Connections at Floor, El. 162'-0 Project stage: Other ML11314A1322011-09-0101 September 2011 Drawing No. 522-041-012, EC70139, Rev. 0, Attachment Z70R0, E-W Member Moment Connections at Floor, El. 162'-0 Project stage: Other ML11314A1312011-09-0101 September 2011 Drawing No. 522-041-011, EC70139, Rev. 0, Attachment Z52R0, Crane Girder Bracket Connections Project stage: Other ML11314A1302011-09-0101 September 2011 Drawing No. 522-041-010, EC70139, Rev. 0, Attachment Z52R0, E-W Member Moment Connections at Floor El. 162'-0 Project stage: Other ML11314A1292011-09-0101 September 2011 Drawing No. 522-041-009, EC70139, Rev. 0, Attachment Z51R0, Vertical Bracing Connections Project stage: Other ML11314A1282011-09-0101 September 2011 Drawing No. 522-041-008, EC70139, Rev. 0, Attachment Z50R0, Vertical Bracing Connections Project stage: Other ML11314A1272011-09-0101 September 2011 Drawing No. 522-041-007, EC70139, Rev. 0, Attachment Z49R0, Vertical Bracing Connections Project stage: Other ML11314A1262011-09-0101 September 2011 Drawing No. 522-041-006, EC70139, Rev. 0, Attachment Z48R0, Vertical Bracing Connections Project stage: Other ML11314A1252011-09-0101 September 2011 Drawing No. 522-041-005, EC70139, Rev. 0, Attachment Z47R0, Vertical Bracing Connections Project stage: Other ML11314A1242011-09-0101 September 2011 Drawing No. 522-041-004, EC70139, Rev. 0, Attachment Z46R0, Vertical Bracing Connections Project stage: Other ML11314A1232011-09-0101 September 2011 Drawing No. 522-041-003, EC70139, Rev. 0, Attachment Z45R0, Vertical Bracing Connections Project stage: Other ML11314A1192011-09-0101 September 2011 Calculation No. S09-0036, Auxiliary Building Overhead Crane (FHCR-5) Supporting Steel Structure - Analysis Project stage: Other ML11314A1402011-09-0101 September 2011 Drawing No. S-521-102, EC70139, Rev. 0, Attachment Z96R0, N-S Member Connections (Purlin) at Roof El. 209'-1 Project stage: Other 3F0911-01, Drawing No. 522-041-024, EC70139, Rev. 0, Attachment Z122R0, Vertical Bracing Connections2011-09-0101 September 2011 Drawing No. 522-041-024, EC70139, Rev. 0, Attachment Z122R0, Vertical Bracing Connections Project stage: Other ML11314A1562011-09-0101 September 2011 Drawing No. 522-041-023, EC70139, Rev. 0, Attachment Z121R0, E-W Member Moment Connections at Floor El. 162'-0 Project stage: Other ML11314A1552011-09-0101 September 2011 Drawing No. 522-041-022, EC70139, Rev. 0, Attachment Z120R0, Crane Girder Bracket Connections Project stage: Other ML11314A1542011-09-0101 September 2011 Drawing No. 422-057-001, EC70139, Rev. 0, Attachment Z119R0, Concrete Tie Beam Between 301-S, and 302A-S Concrete Column Pier Project stage: Other ML11314A1532011-09-0101 September 2011 Drawing No. 521-142-006, EC70139, Rev. 0, Attachment Z118R0, Crane Girder Bracket Connections Project stage: Other ML11314A1522011-09-0101 September 2011 Drawing No. 521-142-005, EC70139, Rev. 0, Attachment Z117R0, Crane Girder Bracket Connection Project stage: Other ML11314A1512011-09-0101 September 2011 Drawing No. 522-041-021, EC70139, Rev. 0, Attachment Z111R0, Crane Girder Bracket Connections Project stage: Other ML11314A1502011-09-0101 September 2011 Drawing No. 521-142-004, EC70139, Rev. 0, Attachment Z110R0,Column Connections to Concrete Floor Project stage: Other ML11314A1492011-09-0101 September 2011 Drawing No. 521-142-003, EC70139, Rev. 0, Attachment Z109R0, Column Connections to Concrete Floor Project stage: Other ML11314A1482011-09-0101 September 2011 Drawing No. 522-041-002, EC70139, Rev. 0, Attachment Z108R0, Vertical Bracing Connections Project stage: Other ML11314A1472011-09-0101 September 2011 Drawing No. 522-041 Sheet 001, EC 70139, Rev. 0, Attachment Z107R0, Vertical Bracing Member Replacement, Vertical Bracing Connections, N-S Member Connections at Roof El. 209'-1 (Between Column Line P1 & Q1), E-W Member.. Project stage: Other ML11314A1462011-09-0101 September 2011 Drawing No. 522-041-020, EC70139, Rev. 0, Attachment Z106R0, Vertical Bracing Member Replacement and Vertical Bracing Connections Project stage: Other ML11314A1452011-09-0101 September 2011 Drawing No. 521-142-002, EC70139, Rev. 0, Attachment Z105R0, Crane Girder Bracket Connections Project stage: Other ML11314A1442011-09-0101 September 2011 Drawing No. 522-041-017, EC70139, Rev. 0, Attachment Z104R0, Miscellaneous N-S Member Connections and E-W Member Connections at El. 189'-9 (at Column Line S1) Project stage: Other ML11314A1432011-09-0101 September 2011 Drawing No. S-522-006, EC70139, Rev. 0, Attachment Z103R0, Vertical Bracing Member Replacement and Vertical Bracing Connections Project stage: Other ML11314A1422011-09-0101 September 2011 Drawing No. S-522-004 EC70139, Rev. 0, Attachment Z102R0, E-W Member Connections at Roof El. 209'- 1 (at Column Line S1), N-S Member Connections at Roof El. 209'-1 (Between Column Line P1 & Q1)., N-S Member Connections.. Project stage: Other ML11314A1412011-09-0101 September 2011 Drawing No. S-522-003, EC70139, Rev. 0, Attachment Z101R0, E-W Member Moment Connections at Floor El. 162'-0, E-W Member Connections at El. 162'-0 (at Column Line L, at Column Line S1, and Between Column Line M1 and N1), N-S.. Project stage: Other ML11314A1392011-09-0101 September 2011 Drawing No. 521-142-001, EC70139, Rev. 0, Attachment Z100R0, Horizontal Bracing Connections at Roof El. 209'-1 (Between Column Line I1 & J1) Project stage: Other 3F1011-04, License Amendment Request 310, Rev. 1, Departure from Method of Evaluation for Auxiliary Building Overhead Crane - Response to Request for Additional Information2011-10-0505 October 2011 License Amendment Request #310, Rev. 1, Departure from Method of Evaluation for Auxiliary Building Overhead Crane - Response to Request for Additional Information Project stage: Response to RAI ML11321A1652011-12-27027 December 2011 Nuclear Generating Plant - Issuance of Amendment 239 Regarding Departure from a Method for Evaluating the Auxiliary Building Overhead Crane and Revisions to Associated Commitments Project stage: Approval ML12081A2792012-03-19019 March 2012 License Amendment Request #312, Revision 0, Departure from a Method of Evaluation for the Auxiliary Building Overhead Crane - Implementation Schedule Change Request Project stage: Request 2011-07-20 |
ML11256A074 | |
Person / Time | |
---|---|
Site: | Crystal River |
Issue date: | 07/20/2011 |
From: | Franke J A Progress Energy Florida |
To: | Document Control Desk, Office of Nuclear Reactor Regulation |
References | |
3F0711-04, TAC ME5208 | |
Download: ML11256A074 (54) | |
Similar Documents at Crystal River | |
---|---|
Category:Letter
MONTHYEARIR 05000302/20240012024-09-23023 September 2024
[Table view]Accelerated Decommissioning Partners (ADP) CR3, LLC, Crystal River Unit 3, NRC Inspection Report No. 05000302/2024001 ML24240A1692024-09-18018 September 2024 Cy 2023 Summary of Decommissioning Trust Fund Status ML24226B2392024-08-27027 August 2024 Application for License Amendment Request to Add License Condition to Include License Termination Plan Requirements – Acknowledgement of Withdrawal ML24179A0702024-07-26026 July 2024 SHPO S106 Completion Crystal River Unit 3 ML24205A2192024-07-24024 July 2024 Tribal S106 Completion Crystal River Unit 3: Muscogee Nation ML24205A2182024-07-24024 July 2024 Tribal S106 Completion Crystal River Unit 3: Seminole Nation of Oklahoma ML24179A0912024-07-24024 July 2024 Tribal S106 Completion Crystal River Unit 3: Seminole Tribe of Florida ML24205A2202024-07-24024 July 2024 Tribal S106 Completion Crystal River Unit 3_Miccosukee Tribe of Florida ML24190A1912024-07-0808 July 2024 Fws Concurrence for Crystal River Unit 3 ML24172A2552024-06-20020 June 2024 Fws to NRC Species List: Florida Ecological Services Field Office 06/20/2024 ML24170A9242024-06-18018 June 2024 024-0023697 Crystal River License Termination Plan Unit 3 ML24151A6482024-06-0303 June 2024 Changes in Reactor Decommissioning Branch Project Management Assignments for Some Decommissioning Facilities ML24114A2262024-04-24024 April 2024 Amended Special Package Authorization for the Cr3 Middle Package (Crystal River 3 Middle Package - Docket No. 71-9393) IR 05000302/20230022024-04-17017 April 2024 Accelerated Decommissioning Partners (ADP) CR3, LLC, Crystal River Unit 3 - NRC Inspection Report No. 05000302/2023002 ML24054A0612024-04-0202 April 2024 Request to Initiate Section 106 Consultation Regarding the License Termination Plan for Crystal River Unit 3 in Citrus County, Florida ML24079A2492024-04-0202 April 2024 Tribal S106 Initiation Crystal River Unit 3-Johnson, Lewis Johnson ML24054A0582024-04-0202 April 2024 Achp S106 Initiation Crystal River Unit 3 - Letter 1 ML24079A2472024-04-0202 April 2024 Tribal S106 Initiation Crystal River Unit 3-Cypress, Talbert ML24079A2482024-04-0202 April 2024 Tribal S106 Initiation Crystal River Unit 3-Hill, David Hill ML24054A0812024-04-0202 April 2024 Tribal S106 Initiation Crystal River Unit 3-Osceola, Marcellus ML24089A0362024-03-29029 March 2024 Response to Audit Plan in Support of Accelerated Decommissioning Partners and Request to Add License Condition to Include License Termination Plan Requirements. W/Enclosures 1 to 5 ML24073A1922024-03-11011 March 2024 Fws to NRC, List of Threatened and Endangered Species That May Occur in Your Proposed Project Location or May Be Affected by Your Proposed Project ML24054A6452024-02-29029 February 2024 Letter - Reply to Request for RAI Extension Related to the Crystal River License Termination Plan ML24030A7482024-02-12012 February 2024 Audit Report Cover Letter and Report - Crystal River Unit 3 Nuclear Generating Plant LTP ML23342A0942024-01-0909 January 2024 – Independent Spent Fuel Storage Installation Security Inspection Plan ML23354A0632023-12-22022 December 2023 Cover Letter - Crystal River License Termination Plan Request for Additional Information ML23345A1882023-12-0606 December 2023 Fws to NRC Crystal River Species List of Threatened and Endangered Species That May Occur in Your Proposed Project Location or May Be Affected by Your Proposed Project ML23320A2592023-11-17017 November 2023 STC-23 077 Notification of the Crystal River Unit 3 Generating Plant License Termination Plan Public Meeting and Federal Register Notice ML23313A1322023-11-15015 November 2023 Request for Additional Information for the Environmental Assessment of the License Termination Plan for Crystal River Unit 3 Nuclear Generating Plant ML23310A0712023-11-0707 November 2023 Audit Plan Cover Letter - Crystal River Unit 3 Nuclear Generating Plant LTP ML23187A1112023-07-25025 July 2023 Acceptance of Requested Licensing Action License Request to Add License Condition to Include License Termination Plan Requirements ML23107A2722023-06-13013 June 2023 Letter Transmitting NRC Survey Results for East Settling Pond ML23160A2962023-06-0909 June 2023 Response to Crystal River, Unit 3 – Supplemental Information Needed for Acceptance on the Application for a License Amendment Regarding Approval of the License Termination Plan ML23107A2732023-06-0707 June 2023 Orise Independent Survey Report Dcn 5366-SR-01-0 IR 05000302/20220032023-05-25025 May 2023 Accelerated Decommissioning Partners (ADP) CR3, LLC, Crystal River Unit 3 - NRC Inspection Report No. 05000302/2022003 ML23103A1902023-04-19019 April 2023 Request for Supplemental Information Cover Letter ML23058A2532023-03-22022 March 2023 Accelerated Decommissioning Partners (ADP) CR3, LLC, Crystal River, Unit 3 - NRC Inspection Report No. 05000302/2022003 ML22361A1022023-02-24024 February 2023 Reactor Decommissioning Branch Project Management Changes for Some Decommissioning Facilities and Establishment of Backup Project Manager for All Decommissioning Facilities ML22265A0192022-09-26026 September 2022 Nuclear Generating Plant - U.S. Nuclear Regulatory Commissions Analysis of ADP CR3, LLCs Decommissioning Funding Status Report (License No. DPR-72, Docket Nos. 50-302 and 72-1035) IR 05000302/20220022022-08-0909 August 2022 Accelerated Decommissioning Partners (ADP) CR3, LLC, Crystal River Unit 3 - NRC Inspection Report 05000302/2022002 IR 05000302/20220012022-05-0303 May 2022 Accelerated Decommissioning Partners (ADP) CR3, LLC, Crystal River Unit 3 - NRC Inspection Report 05000302/2022001 ML22116A1752022-04-27027 April 2022 Accelerated Decommissioning Partners (ADP) CR3, LLC, Crystal River Unit 3- Independent Spent Fuel Storage Installation Security Inspection Report 07201035/2022401 ML22105A3992022-04-18018 April 2022 Nuclear Generating Plant - Change in NRC Project Manager ML22011A1362022-01-31031 January 2022 Independent Spent Fuel Storage Installation Security Inspection Plan ML22024A2142022-01-24024 January 2022 Nuclear Generating Plant - NMFS NRC Letter - Crystal River Energy Complex Biological Opinion Status (License No. DPR-72, Docket Nos. 50-302 and 72-1035) IR 05000302/20210042022-01-24024 January 2022 Accelerated Decommissioning Partners (ADP) CR3, LLC, Crystal River Unit 3 - NRC Inspection Report No. 05000302/2021004 ML21351A0052021-12-20020 December 2021 NRC Analysis of ADP CR3, LLC Decommissioning Funding Status Report for the Crystal River Unit 3 Nuclear Generating Plant (License No. DPR-72, Docket Nos. 50-302 and 72-1035) ML21322A2702021-11-24024 November 2021 Nuclear Generating Plant - Issuance of Amendment No. 260 Approving the Independent Spent Fuel Storage Installation Only Security Plan, Rev 3 IR 05000302/20210032021-11-0909 November 2021 Accelerated Decommissioning Partners (ADP) CR3, LLC, Crystal River Unit 3 - NRC Inspection Report Nos. 05000302/2021003 and 07201035/2021001 ML21288A4292021-10-18018 October 2021 Letter - Crystal River Unit 3 Nuclear Generating Plant - Correction to Safety Evaluation Related to the Issuance of Amendment No. 259 Approving the Independent Spent Fuel Storage Installation Only Emergency Plan 2024-09-23 |