ML110550663
From kanterella
Jump to navigation
Jump to search
Letter Sequence RAI | |
---|---|
TAC:ME5208, (Approved, Closed) | |
Initiation
Administration Results Other: 3F0911-01, Drawing No. 522-041-024, EC70139, Rev. 0, Attachment Z122R0, Vertical Bracing Connections, ML11314A119, ML11314A121, ML11314A122, ML11314A123, ML11314A124, ML11314A125, ML11314A126, ML11314A127, ML11314A128, ML11314A129, ML11314A130, ML11314A131, ML11314A132, ML11314A133, ML11314A134, ML11314A135, ML11314A136, ML11314A137, ML11314A138, ML11314A139, ML11314A140, ML11314A141, ML11314A142, ML11314A143, ML11314A144, ML11314A145, ML11314A146, ML11314A147, ML11314A148, ML11314A149, ML11314A150, ML11314A151, ML11314A152, ML11314A153, ML11314A154, ML11314A155, ML11314A156 | |
MONTHYEARML1105506632011-02-23023 February 2011
[Table View]E-mail, ME5208 Final RAIs Re Departure from a Method of Evaluation for the Auxiliary Building Overhead Crane and Revisions to Associated Commitments Project stage: RAI ML11256A0742011-07-20020 July 2011 License Amendment Request #310, Revision 1, Departure from a Method of Evaluation for the Auxiliary Building Overhead Crane, Revisions to Associated Commitments, and Response to Request for Additional Information Project stage: Response to RAI ML11314A1212011-08-0505 August 2011 Calculation No. S10-0063, Auxiliary Building Overhead Crane (FHCR-5) Supporting Steel Structure - Connection Evaluation Project stage: Other ML11314A1222011-08-0808 August 2011 FPC118-PR-001, Revision 2, Design Criteria Document Regarding Auxiliary Building Evaluation for Crane Upgrade Project stage: Other ML11314A1382011-09-0101 September 2011 Drawing No. 522-041-019, Rev. 0, EC70139, Rev. 0, Attachment Z95R0, Column Connections to Concrete Floor Project stage: Other ML11314A1152011-09-0101 September 2011 License Amendment Request #310, Revision 1 Departure from a Method of Evaluation for the Auxiliary Building Overhead Crane - Response to Request for Additional Information Project stage: Response to RAI ML11314A1372011-09-0101 September 2011 Drawing No. 522-041-018, EC70139, Rev. 0, Attachment Z93R0, Column Connections to Concrete Floor Project stage: Other ML11314A1362011-09-0101 September 2011 Drawing No. 522-041-016, EC70139, Rev. 0, Attachment Z92R0, N-S Member Connections at El. 162'-0 Project stage: Other ML11314A1352011-09-0101 September 2011 Drawing No. 522-041-015, EC70139, Rev. 0, Attachment Z91R0, N-S Member Connections at El. 162'-0 Project stage: Other ML11314A1342011-09-0101 September 2011 Drawing No. 522-041-014, EC70139, Rev. 0, Attachment Z73R0, N-S Member Connections at El. 162'-0 Project stage: Other ML11314A1332011-09-0101 September 2011 Drawing No. 522-041-013, EC70139, Rev. 0, Attachment Z72R0, E-W Member Moment Connections at Floor, El. 162'-0 Project stage: Other ML11314A1322011-09-0101 September 2011 Drawing No. 522-041-012, EC70139, Rev. 0, Attachment Z70R0, E-W Member Moment Connections at Floor, El. 162'-0 Project stage: Other ML11314A1312011-09-0101 September 2011 Drawing No. 522-041-011, EC70139, Rev. 0, Attachment Z52R0, Crane Girder Bracket Connections Project stage: Other ML11314A1302011-09-0101 September 2011 Drawing No. 522-041-010, EC70139, Rev. 0, Attachment Z52R0, E-W Member Moment Connections at Floor El. 162'-0 Project stage: Other ML11314A1292011-09-0101 September 2011 Drawing No. 522-041-009, EC70139, Rev. 0, Attachment Z51R0, Vertical Bracing Connections Project stage: Other ML11314A1282011-09-0101 September 2011 Drawing No. 522-041-008, EC70139, Rev. 0, Attachment Z50R0, Vertical Bracing Connections Project stage: Other ML11314A1272011-09-0101 September 2011 Drawing No. 522-041-007, EC70139, Rev. 0, Attachment Z49R0, Vertical Bracing Connections Project stage: Other ML11314A1262011-09-0101 September 2011 Drawing No. 522-041-006, EC70139, Rev. 0, Attachment Z48R0, Vertical Bracing Connections Project stage: Other ML11314A1252011-09-0101 September 2011 Drawing No. 522-041-005, EC70139, Rev. 0, Attachment Z47R0, Vertical Bracing Connections Project stage: Other ML11314A1242011-09-0101 September 2011 Drawing No. 522-041-004, EC70139, Rev. 0, Attachment Z46R0, Vertical Bracing Connections Project stage: Other ML11314A1232011-09-0101 September 2011 Drawing No. 522-041-003, EC70139, Rev. 0, Attachment Z45R0, Vertical Bracing Connections Project stage: Other ML11314A1192011-09-0101 September 2011 Calculation No. S09-0036, Auxiliary Building Overhead Crane (FHCR-5) Supporting Steel Structure - Analysis Project stage: Other ML11314A1402011-09-0101 September 2011 Drawing No. S-521-102, EC70139, Rev. 0, Attachment Z96R0, N-S Member Connections (Purlin) at Roof El. 209'-1 Project stage: Other 3F0911-01, Drawing No. 522-041-024, EC70139, Rev. 0, Attachment Z122R0, Vertical Bracing Connections2011-09-0101 September 2011 Drawing No. 522-041-024, EC70139, Rev. 0, Attachment Z122R0, Vertical Bracing Connections Project stage: Other ML11314A1562011-09-0101 September 2011 Drawing No. 522-041-023, EC70139, Rev. 0, Attachment Z121R0, E-W Member Moment Connections at Floor El. 162'-0 Project stage: Other ML11314A1552011-09-0101 September 2011 Drawing No. 522-041-022, EC70139, Rev. 0, Attachment Z120R0, Crane Girder Bracket Connections Project stage: Other ML11314A1542011-09-0101 September 2011 Drawing No. 422-057-001, EC70139, Rev. 0, Attachment Z119R0, Concrete Tie Beam Between 301-S, and 302A-S Concrete Column Pier Project stage: Other ML11314A1532011-09-0101 September 2011 Drawing No. 521-142-006, EC70139, Rev. 0, Attachment Z118R0, Crane Girder Bracket Connections Project stage: Other ML11314A1522011-09-0101 September 2011 Drawing No. 521-142-005, EC70139, Rev. 0, Attachment Z117R0, Crane Girder Bracket Connection Project stage: Other ML11314A1512011-09-0101 September 2011 Drawing No. 522-041-021, EC70139, Rev. 0, Attachment Z111R0, Crane Girder Bracket Connections Project stage: Other ML11314A1502011-09-0101 September 2011 Drawing No. 521-142-004, EC70139, Rev. 0, Attachment Z110R0,Column Connections to Concrete Floor Project stage: Other ML11314A1492011-09-0101 September 2011 Drawing No. 521-142-003, EC70139, Rev. 0, Attachment Z109R0, Column Connections to Concrete Floor Project stage: Other ML11314A1482011-09-0101 September 2011 Drawing No. 522-041-002, EC70139, Rev. 0, Attachment Z108R0, Vertical Bracing Connections Project stage: Other ML11314A1472011-09-0101 September 2011 Drawing No. 522-041 Sheet 001, EC 70139, Rev. 0, Attachment Z107R0, Vertical Bracing Member Replacement, Vertical Bracing Connections, N-S Member Connections at Roof El. 209'-1 (Between Column Line P1 & Q1), E-W Member.. Project stage: Other ML11314A1462011-09-0101 September 2011 Drawing No. 522-041-020, EC70139, Rev. 0, Attachment Z106R0, Vertical Bracing Member Replacement and Vertical Bracing Connections Project stage: Other ML11314A1452011-09-0101 September 2011 Drawing No. 521-142-002, EC70139, Rev. 0, Attachment Z105R0, Crane Girder Bracket Connections Project stage: Other ML11314A1442011-09-0101 September 2011 Drawing No. 522-041-017, EC70139, Rev. 0, Attachment Z104R0, Miscellaneous N-S Member Connections and E-W Member Connections at El. 189'-9 (at Column Line S1) Project stage: Other ML11314A1432011-09-0101 September 2011 Drawing No. S-522-006, EC70139, Rev. 0, Attachment Z103R0, Vertical Bracing Member Replacement and Vertical Bracing Connections Project stage: Other ML11314A1422011-09-0101 September 2011 Drawing No. S-522-004 EC70139, Rev. 0, Attachment Z102R0, E-W Member Connections at Roof El. 209'- 1 (at Column Line S1), N-S Member Connections at Roof El. 209'-1 (Between Column Line P1 & Q1)., N-S Member Connections.. Project stage: Other ML11314A1412011-09-0101 September 2011 Drawing No. S-522-003, EC70139, Rev. 0, Attachment Z101R0, E-W Member Moment Connections at Floor El. 162'-0, E-W Member Connections at El. 162'-0 (at Column Line L, at Column Line S1, and Between Column Line M1 and N1), N-S.. Project stage: Other ML11314A1392011-09-0101 September 2011 Drawing No. 521-142-001, EC70139, Rev. 0, Attachment Z100R0, Horizontal Bracing Connections at Roof El. 209'-1 (Between Column Line I1 & J1) Project stage: Other 3F1011-04, License Amendment Request 310, Rev. 1, Departure from Method of Evaluation for Auxiliary Building Overhead Crane - Response to Request for Additional Information2011-10-0505 October 2011 License Amendment Request #310, Rev. 1, Departure from Method of Evaluation for Auxiliary Building Overhead Crane - Response to Request for Additional Information Project stage: Response to RAI ML11321A1652011-12-27027 December 2011 Nuclear Generating Plant - Issuance of Amendment 239 Regarding Departure from a Method for Evaluating the Auxiliary Building Overhead Crane and Revisions to Associated Commitments Project stage: Approval ML12081A2792012-03-19019 March 2012 License Amendment Request #312, Revision 0, Departure from a Method of Evaluation for the Auxiliary Building Overhead Crane - Implementation Schedule Change Request Project stage: Request 2011-07-20 |
ML110550663 | |
Person / Time | |
---|---|
Site: | Crystal River |
Issue date: | 02/23/2011 |
From: | Farideh Saba Plant Licensing Branch II |
To: | Herrin D, Rose P, Westcott D Progress Energy Florida |
Saba F | |
References | |
TAC ME5208 | |
Download: ML110550663 (1) | |
Similar Documents at Crystal River | |
---|---|
Category:E-Mail
MONTHYEARML24191A4232024-07-0303 July 2024
[Table view]RAI2 NRC Response to Fws ESA Crystal River Unit 3 LTP ML24190A1382024-06-18018 June 2024 Supplement to NRC Request for Concurrence with ESA Determinations for Crystal River Unit 3 LTP ML24170A9242024-06-18018 June 2024 024-0023697 Crystal River License Termination Plan Unit 3 ML24143A0242024-05-20020 May 2024 Draft EA for Crystal River Unit 3 Opportunity for Flhealth Review and Comment ML24143A0132024-05-20020 May 2024 Achp Response for Crystal River Unit 3 (Achp Project No. 020794) ML24143A0212024-05-20020 May 2024 SHPO Response to Initiate Section 106 Consultation for Crystal River Unit 3 ML24120A3312024-04-24024 April 2024 Seminole Tribe of Florida Email - Initiation ML24054A6462024-02-29029 February 2024 Request for RAI Extension Related to the Crystal River License Termination Plan ML24060A0862024-02-29029 February 2024 NRC Request for Concurrence with Endangered Species Act Determinations for Crystal River Unit 3 Nuclear Generating Plant License Termination Plan (Consultation Code: 2024-0023697) ML24025A0952024-01-24024 January 2024 Clarifications Related to the NRC Staffs EA for Crystal River ML23180A0562023-06-13013 June 2023 ADP-CR3, Crystal River Unit 3 Email from J. Jernigan to Tim Barvitskie Confirmation That Enclosure 22 Radiological Groundwater Characterization Report ML21117A2902021-04-26026 April 2021 Acceptance of License Amendment Request Related to the ISFSI-Only Physical Securityplan ML21096A0432021-04-0505 April 2021 Acceptance of License Amendment Request Related to the ISFSI-Only Emergency Plan ML19344C8052019-11-12012 November 2019 Response from NEIMA Local Community Advisory Board Questionnaire 11-12-2019 H Danenhower ML19310D8602019-10-24024 October 2019 E-Mail Dated October 24, 2019, from Mark Vansicklen, Duke Energy Florida, to John Hickman, NRC, Providing Background Information for the Crystal River Partial Site Release Request ML19344C7872019-10-0303 October 2019 Response from NEIMA Local Community Advisory Board Questionnaire 10-03-2019 D Taylor ML19310D8212019-09-13013 September 2019 E-Mail Dated September 13, 2019, from John Hickman, NRC, to Mark Vansicklen, Duke Energy Florida, Requesting Background Information for the Crystal River Partial Site Release Request ML19130A2082019-05-0808 May 2019 Email - NRC Email to FEMA Dated May 8, 2019: NRC Response to Comment on FEMA Review of Proposed Changes to DBNPS Emergency Plan for Permanently Defueled Condition ML19071A0662019-03-0606 March 2019 E-Mail Dated 3/6/2019 from John Hickman, NRC, to Phyllis Dixon, Duke Energy Florida, LLC, Regarding NRC Acceptance Review of a Request to Revise the ISFSI Only Emergency Plan for Crystal River Unit 3 ML19070A3112019-03-0606 March 2019 Document Title or Accession No. E-Mail Dated 3/6/2019 from John Hickman, NRC, to Phyllis Dixon, Duke Energy Florida, LLC, Regarding NRC Acceptance Review of Partial Site Release Request for Crystal River Unit 3 ML18263A1462018-09-11011 September 2018 NRR E-mail Capture - Logbook Entry: 09/11/2018 a Kemp'S Ridley Sea Turtle (Federal Endangered Species) Carcass Was Recovered from the Crystal River Energy Complex Unit 2 Fossil Unit ML16054A2402015-12-10010 December 2015 E-44108 Attachment 10 E-mail from Steven Edwards (Due Energy) to Don Shaw (Areva) for Brunswick Nuclear Plant, Oconee Nuclear Station, and Robinson Nuclear Plant ML15176A2692015-06-25025 June 2015 NRR E-mail Capture - NRC Acceptance Review for LAR #317 Regarding Changes in Managment Titles ML15043A1042015-02-0505 February 2015 NRR E-mail Capture - Mf Crystal River TAC ML15015A6722015-01-15015 January 2015 NRR E-mail Capture - NRC Acceptance Review for LAR - Application for Order Approving Transfer of License and for Conforming License Amendment ML14344A9992014-12-0909 December 2014 NRR E-mail Capture - Severe Weather Exemption ML14258A7432014-09-0505 September 2014 NRR E-mail Capture - FW: Comparison of Crystal River'S Exemption Secy Paper with Kewaunee'S ML14290A1992014-08-27027 August 2014 NRR E-mail Capture - Draft RAIs for Ep/Eal LAR ML14163A2512014-06-0303 June 2014 NRR E-mail Capture - Request for Additional Information - Exemption for Conducting Annual force-on-force Exercises ML14153A0842014-05-29029 May 2014 NRR E-mail Capture - Logbook Entry: 05/29/2014 ML14153A6912014-05-21021 May 2014 NRR E-mail Capture - Request for Additional Information - Decommissionign Trust Fund Exemption Request ML14132A2052014-05-0909 May 2014 NRR E-mail Capture - MF3089 - Defueled TS Amendment Request for Additrional Information ML14114A2792014-04-10010 April 2014 NRR E-mail Capture - MF3089 Defueled TS Request for Additional Information ML14113A3632014-04-10010 April 2014 NRR E-mail Capture - MF3415/MF2981 RAI on EP Exemptions, EAL Scheme Change and E Plan Amendment ML14118A2872014-02-20020 February 2014 NRR E-mail Capture - Request for Additional Information: Exemptions to the Radiological Emergency Plan Requirements ML14045A0012014-02-12012 February 2014 NRR E-mail Capture - RAI: Adminstrative Controls ML14031A1752014-01-27027 January 2014 NRR E-mail Capture - CR3 Certified Fuel Handler Training and Retraining Program Approval - RAI Request ML14017A0772014-01-16016 January 2014 NRR E-mail Capture - Brunswick 1 and 2, Crystal River Unit 3, Harris Unit 1, and Robinson Unit 2 - Acceptance for Review of License Amendment Request for Cyber Security Plan Implementaion Milestone 8 (TAC Nos. MF3263 - MF3267) ML14027A0332013-12-16016 December 2013 NRR E-mail Capture - Eplan and EAL Scheme Change Request for Additional Information (LAR #315) ML13336A9112013-12-0202 December 2013 NRR E-mail Capture - Periodic Update to the Crystal River 3 Containment Petition ML13198A1422013-07-17017 July 2013 NRR E-mail Capture - Draft RAI - Request to Amend Section 5.0 of the CR-3 Technical Specifications (MF1504) ML13157A2062013-05-31031 May 2013 NRR E-mail Capture - Logbook Entry: 5/31/2013 ML13155A2062013-05-29029 May 2013 NRR E-mail Capture - Petition Status Update - Containment for Crystal River ML13120A0412013-04-29029 April 2013 NRR E-mail Capture - Status Update for Petition on Crystal River 3 ML13095A4002013-04-0505 April 2013 E-mail - Acceptance of Requested Licensing Action Change of Licensee Name ML13052A2402013-02-0808 February 2013 LTR-13-0131 - E-mail Tom Gurdziel Concerns Crystal River, Unit 3 ML13015A2832013-01-14014 January 2013 NRR E-mail Capture - Status of 10 CFR 2.206 Petition Related to Crystal River 3 ML13011A1482013-01-10010 January 2013 NRR E-mail Capture - CR-3 EPU LAR - Additional RAI from Eeeb (ME6527) ML12304A0682012-10-26026 October 2012 NRR E-mail Capture - RAIs Regarding Crystal River 30-day Report for ECCS Model Changes Pursuant to 10 CFR 50.46 Requirements (ME8408) ML12297A3922012-10-23023 October 2012 NRR E-mail Capture - Draft Bypass Test Plan 2024-07-03 |
Text
From: Saba, Farideh Sent: Wednesday, February 23, 2011 5:47 PM To: Daniel Westcott; Herrin, Dennis W.; Rose, Philip
Subject:
ME5208_ Final RAIs.docx Attachments: ME5208_ Final RAIs.docx Please see the attached RAIs regarding Departure from a Method of Evaluation for the Auxiliary Building Overhead Crane and Revisions to Associated Commitments (ME5208). Please let me know if you have any questions or comments.
- Thanks, Farideh
Retrieved from "https://kanterella.com/w/index.php?title=ML110550663&oldid=2121510"