ML11314A141

From kanterella
Jump to navigation Jump to search

Drawing No. S-522-003, EC70139, Rev. 0, Attachment Z101R0, E-W Member Moment Connections at Floor El. 162-0, E-W Member Connections at El. 162-0 (at Column Line L, at Column Line S1, and Between Column Line M1 and N1), N-S
ML11314A141
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 09/01/2011
From:
Progress Energy Florida
To:
Office of Nuclear Reactor Regulation
References
3F0911-01, TAC ME5208 S-522-003
Download: ML11314A141 (1)


Text

PCHG-DESG Engineering Change 0000070139R0 Z101R0 Page 1 of 1