ML15328A216
From kanterella
Revision as of 13:08, 27 February 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
ML15328A216 | |
Person / Time | |
---|---|
Site: | Cooper |
Issue date: | 11/24/2015 |
From: | Vincent Gaddy Operations Branch IV |
To: | Limpias O A Nebraska Public Power District (NPPD) |
References | |
50-298/15-303 50-298/15-303 | |
Download: ML15328A216 (3) | |
Similar Documents at Cooper | |
---|---|
Category:Letter
MONTHYEARIR 05000298/20240032024-11-0505 November 2024
[Table view]Integrated Inspection Report 05000298/2024003 ML24250A2052024-10-0808 October 2024 Issuance of Amendment No. 278 Regarding Revision to Technical Specification Table 3.3.2.1-1 and Transfer of Minimum Critical Power Ratio Values to Core Operating Limit Report ML24227A0822024-09-0303 September 2024 Summary of Regulatory Audit in Support of License Amendment Request to Modify the High Pressure Coolant Injection Low Flow Value IR 05000298/20240052024-08-22022 August 2024 Updated Inspection Plan for Cooper Nuclear Station (Report 05000298/2024005) IR 05000298/20240022024-07-25025 July 2024 Integrated Inspection Report 05000298/2024002 ML24183A1722024-07-17017 July 2024 Issuance of Amendment No. 277 to Adopt TSTF-374, Revision to TS 5.5.13 and Associated TS Bases for Diesel Fuel Oil ML24197A1462024-07-15015 July 2024 NRC Region IV Ltr to Cooper Nuclear Station Re FEMA Level 1 Finding ML24134A1782024-07-0303 July 2024 Issuance of Amendment No. 276 Revision to Technical Specification 3.8.3, Diesel Fuel Oil, Lube Oil and Starting Air, to Allow for Cleaning, Inspection and Any Needed Repairs During Refuel Outage 33 ML24197A0682024-06-24024 June 2024 FEMA Ltr to Missouri State Emergency Management Agency - Level 1 Finding, 24 June 2024 ML24192A0112024-06-13013 June 2024 2024-06-Post Exam Comments 05000298/LER-2023-002-01, Secondary Containment Differential Pressure Perturbation Exceeds Technical Specifications2024-06-0606 June 2024 Secondary Containment Differential Pressure Perturbation Exceeds Technical Specifications IR 05000298/20244012024-06-0404 June 2024 Security Baseline Inspection Report 05000298/2024401 ML24151A1082024-05-30030 May 2024 NRC Initial Operator Licensing Examination Approval 05000298/2024301 ML24137A0942024-05-17017 May 2024 Regulatory Audit Plan in Support of License Amendment Request to Modify Allowable Value Regarding Technical Specification for High Pressure Coolant Injection Pump Discharge Low Flow 05000298/LER-2024-005, High Pressure Coolant Injection Pressure Switch Installation Causes Condition That Could Have Prevented Fulfillment of a Safety Function and a Condition Prohibited B Technical2024-05-13013 May 2024 High Pressure Coolant Injection Pressure Switch Installation Causes Condition That Could Have Prevented Fulfillment of a Safety Function and a Condition Prohibited B Technical. 05000298/LER-2024-004, Main Turbine Stop Valve Position Switches Do Not Meet Channel Independence Criteria Results in Two Channels Being Declared Inoperable and a Condition Prohibited by Technical Specifications2024-05-0909 May 2024 Main Turbine Stop Valve Position Switches Do Not Meet Channel Independence Criteria Results in Two Channels Being Declared Inoperable and a Condition Prohibited by Technical Specifications IR 05000298/20240012024-05-0303 May 2024 Integrated Inspection Report 05000298/2024001 ML24129A0952024-04-25025 April 2024 Preparation and Scheduling of Operator Licensing Examinations IR 05000298/20240102024-04-24024 April 2024 Comprehensive Engineering Team Inspection Report 05000298/2024010 05000298/LER-2024-003, High Pressure Coolant Injection Steam Leak Causes Condition That Could Have Prevented Fulfillment of a Safety Function and a Condition Prohibited by Technical Specifications2024-04-22022 April 2024 High Pressure Coolant Injection Steam Leak Causes Condition That Could Have Prevented Fulfillment of a Safety Function and a Condition Prohibited by Technical Specifications ML24096A1202024-04-0505 April 2024 Issuance of Amendment No. 275 Revision to Technical Specification 3.3.1.1 (Emergency Circumstances) ML24093A2282024-04-0202 April 2024 Notice of Enforcement Discretion for Cooper Nuclear Station IR 05000298/20240902024-04-0101 April 2024 – Notice of Violation, NRC Inspection Report 05000298/2024090 05000298/LER-2024-002, Technical Specifications Prohibited Condition for Inoperable Service Water Booster Pump2024-03-0404 March 2024 Technical Specifications Prohibited Condition for Inoperable Service Water Booster Pump 05000298/LER-2024-001, Inoperable Turbine Stop Valve Limit Switch Causes Condition Prohibited by Technical Specifications2024-03-0404 March 2024 Inoperable Turbine Stop Valve Limit Switch Causes Condition Prohibited by Technical Specifications IR 05000298/20230062024-02-28028 February 2024 Annual Assessment Letter for Cooper Nuclear Station - Report 05000298/2023006 IR 05000298/20230042024-02-12012 February 2024 Integrated Inspection Report 05000298/2023004 IR 05000298/20230122024-02-12012 February 2024 NRC Inspection Report 05000298/2023012 ML24033A3092024-02-12012 February 2024 Summary of Regulatory Audit Regarding the Relief Request RC3-02 Regarding Drywell Head Bolting ML23334A2012024-01-0303 January 2024 Issuance of Amendment No. 274 Revision to Technical Specifications to Adopt TSTF-551, Revision 3, Revise Secondary Containment Surveillance Requirements 05000298/LER-2023-002, Secondary Containment Differential Pressure Perturbation Exceeds Technical Specifications2023-12-20020 December 2023 Secondary Containment Differential Pressure Perturbation Exceeds Technical Specifications ML23311A1122023-11-0909 November 2023 Project Manager Assignment ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV IR 05000298/20230032023-11-0202 November 2023 Integrated Inspection Report 05000298/2023003 IR 05000298/20234012023-11-0101 November 2023 Cyber Security Report 05000298/2023401 Public ML23264A8052023-10-11011 October 2023 Issuance of Amendment No. 273 Revision to Technical Specifications to Adopt TSTF-580, Revision 1, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling ML23233A1882023-09-0505 September 2023 Regulatory Audit Plan in Support of Relief Request RC3-02 Regarding Drywell Head Bolting IR 05000298/20243012023-09-0101 September 2023 Notification of NRC Initial Operator Licensing Examination 05000298/2024301 IR 05000298/20230052023-08-21021 August 2023 Updated Inspection Plan for Cooper Nuclear Station (Report 05000298/2023005)- Mid Cycle Letter IR 05000298/20230022023-08-0808 August 2023 Integrated Inspection Report 05000298/2023002 IR 05000298/20234022023-08-0303 August 2023 NRC Security Inspection Report 05000298/2023402 ML23214A2742023-08-0303 August 2023 Nuclear Station - Notification of Inspection (NRC Inspection Report 05000298/2023004) and Request for Information IR 05000298/20234202023-08-0101 August 2023 Security Baseline Inspection Report 05000298/2023420 05000298/LER-2022-002-01, Manual Core Spray Injection to Restore Skimmer Surge Tank Level2023-06-29029 June 2023 Manual Core Spray Injection to Restore Skimmer Surge Tank Level ML23173A0862023-06-26026 June 2023 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000298/2023401 IR 05000298/20230102023-05-17017 May 2023 Biennial Problem Identification and Resolution Inspection Report 05000298/2023010 05000298/LER-2022-004-01, 1 for Cooper Nuclear Station, Manual Reactor Scram and Group I Isolation Due to Main Turbine Bypass Valve Failing Open2023-05-11011 May 2023 1 for Cooper Nuclear Station, Manual Reactor Scram and Group I Isolation Due to Main Turbine Bypass Valve Failing Open 05000298/LER-2023-001, Valve Test Failures Result in Condition Prohibited by Technical Specifications2023-05-0808 May 2023 Valve Test Failures Result in Condition Prohibited by Technical Specifications IR 05000298/20234032023-05-0404 May 2023 Security Baseline Inspection Report 05000298/2023403 ML23129A2822023-04-20020 April 2023 Submittal of Revision 31 to Updated Safety Analysis Report 2024-09-03 Category:License-Operator MONTHYEARML24192A0112024-06-13013 June 2024
[Table view]2024-06-Post Exam Comments ML24197A0752024-06-12012 June 2024 2024-06-Public Forms ML24151A1082024-05-30030 May 2024 NRC Initial Operator Licensing Examination Approval 05000298/2024301 ML24129A0952024-04-25025 April 2024 Preparation and Scheduling of Operator Licensing Examinations NLS2024033, Preparation and Scheduling of Operator Licensing Examinations2024-04-25025 April 2024 Preparation and Scheduling of Operator Licensing Examinations IR 05000298/20243012023-09-0101 September 2023 Notification of NRC Initial Operator Licensing Examination 05000298/2024301 NLS2022054, Preparation and Scheduling of Operator Licensing Examinations2023-01-0505 January 2023 Preparation and Scheduling of Operator Licensing Examinations NLS2022053, CNS-2022-11 Post Exam Submittal2022-11-22022 November 2022 CNS-2022-11 Post Exam Submittal ML23018A0192022-11-22022 November 2022 CNS-2022-11 Public Forms NLS2022028, 10 CNS-2022-06 Post Exam Comments2022-07-0505 July 2022 10_CNS-2022-06 Post Exam Comments ML22228A2602022-06-21021 June 2022 11_CNS-2022-06 Public Documents ML22228A2572022-05-12012 May 2022 11 CNS-2022-06 Public Documents ML21230A3522021-06-30030 June 2021 CN-2021-06-DRAFT Outline Comments Rev 0 ML21230A3472021-06-25025 June 2021 Initial Licensing Retake Examination Material Cover Letter ML21230A3252021-06-25025 June 2021 CN-2021-06 Public Forms ML21208A4192021-06-25025 June 2021 CN-2021-06 Post Exam Analysis ML21230A3512021-06-25025 June 2021 CN-2021-06-DRAFT Op Test Comments kdc-rev1-final ML21208A4212021-06-25025 June 2021 CN-2021-06 Final Op Test ML21230A3492021-06-25025 June 2021 CN-2021-06 Draft Written Exam ML21208A4222021-06-25025 June 2021 CN-2021-06 Final Written Exam ML21230A3502021-06-25025 June 2021 CN-2021-06 Final Outlines ML21230A3462021-06-25025 June 2021 CN 2021-06 Draft Written Comments kdc-rev1 Final ML21055A1822021-02-24024 February 2021 CNS2021301-Corp Notification LTR of NRC Retake Initial Operator Licensing Examination 05000298/2021301 kdc1 NLS2021019, CN-2021-06 Draft Outlines2021-02-22022 February 2021 CN-2021-06 Draft Outlines ML20288A2042020-10-12012 October 2020 CN-2020-09-Post Exam Comments ML20324A0442020-09-29029 September 2020 CN-2020-09-Public Forms, Exam Assignment Tickler ML20324A0382020-09-29029 September 2020 CN-2020-09-DRAFT Outline Comments ML20324A0422020-09-29029 September 2020 CN-2020-09-FINAL Outlines ML20324A0402020-09-29029 September 2020 CN-2020-09-DRAFT Written Exam Comments ML20324A0392020-09-29029 September 2020 CN-2020-09-DRAFT Outlines ML20324A0372020-09-29029 September 2020 CN-2020-09-DRAFT Op Test ML20288A1982020-09-29029 September 2020 CN-2020-09-FINAL Written Exam ML20288A1962020-09-29029 September 2020 CN-2020-09-FINAL Op Test ML20324A0412020-09-29029 September 2020 CN-2020-09-DRAFT Written Exam ML20324A0362020-09-29029 September 2020 CN-2020-09-DRAFT Op Test Comments ML20241A2412020-08-0404 August 2020 1-CN-2020-04-Draft Outlines 1-2-3 ML20241A2442020-08-0404 August 2020 4-CN-2020-04 Written Exam Comments ML20241A2452020-08-0404 August 2020 5-CN-2020-04-Draft Operating Test 1-2-3 ML20241A2422020-08-0404 August 2020 2-CN-2020-04 Draft Outline Comments 1-2-3, Written Exam Outline ML20241A2432020-08-0404 August 2020 3-CN-2020-04-Draft Written Exam ML20241A2462020-08-0404 August 2020 6-CN-2020-04 Operating Test Comments Final 1-2-3 ML20241A2472020-08-0404 August 2020 7-CN-2020-04 Final Outlines ML20241A2482020-08-0404 August 2020 8-CN-2020-04 Final Written Exam ML20241A2492020-08-0404 August 2020 9-CN-2020-04 Final Operating Test, Cooper Nuclear Station, Administrative Topics Outline ML20252A1102020-08-0404 August 2020 11-Public Forms ML20241A2502020-08-0404 August 2020 CN-2020-04 Post Exam Comments NLS2020013, Preparation and Scheduling of Operator Licensing Examinations2020-03-12012 March 2020 Preparation and Scheduling of Operator Licensing Examinations ML19011A3712019-01-10010 January 2019 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2019 NLS2018019, Preparation and Scheduling of Operator Licensing Examinations2018-04-0404 April 2018 Preparation and Scheduling of Operator Licensing Examinations ML18009A9852018-01-0808 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 2024-06-13 Category:Part 55 Examination Related Material MONTHYEARML24192A0112024-06-13013 June 2024
[Table view]2024-06-Post Exam Comments ML24197A0752024-06-12012 June 2024 2024-06-Public Forms ML24151A1082024-05-30030 May 2024 NRC Initial Operator Licensing Examination Approval 05000298/2024301 ML24129A0952024-04-25025 April 2024 Preparation and Scheduling of Operator Licensing Examinations NLS2024033, Preparation and Scheduling of Operator Licensing Examinations2024-04-25025 April 2024 Preparation and Scheduling of Operator Licensing Examinations IR 05000298/20243012023-09-0101 September 2023 Notification of NRC Initial Operator Licensing Examination 05000298/2024301 NLS2022054, Preparation and Scheduling of Operator Licensing Examinations2023-01-0505 January 2023 Preparation and Scheduling of Operator Licensing Examinations ML23018A0192022-11-22022 November 2022 CNS-2022-11 Public Forms NLS2022053, CNS-2022-11 Post Exam Submittal2022-11-22022 November 2022 CNS-2022-11 Post Exam Submittal NLS2022028, 10 CNS-2022-06 Post Exam Comments2022-07-0505 July 2022 10_CNS-2022-06 Post Exam Comments ML22228A2602022-06-21021 June 2022 11_CNS-2022-06 Public Documents ML22228A2572022-05-12012 May 2022 11 CNS-2022-06 Public Documents ML21230A3522021-06-30030 June 2021 CN-2021-06-DRAFT Outline Comments Rev 0 ML21230A3472021-06-25025 June 2021 Initial Licensing Retake Examination Material Cover Letter ML21230A3462021-06-25025 June 2021 CN 2021-06 Draft Written Comments kdc-rev1 Final ML21208A4192021-06-25025 June 2021 CN-2021-06 Post Exam Analysis ML21230A3492021-06-25025 June 2021 CN-2021-06 Draft Written Exam ML21230A3252021-06-25025 June 2021 CN-2021-06 Public Forms ML21208A4212021-06-25025 June 2021 CN-2021-06 Final Op Test ML21208A4222021-06-25025 June 2021 CN-2021-06 Final Written Exam ML21230A3502021-06-25025 June 2021 CN-2021-06 Final Outlines ML21230A3512021-06-25025 June 2021 CN-2021-06-DRAFT Op Test Comments kdc-rev1-final ML21055A1822021-02-24024 February 2021 CNS2021301-Corp Notification LTR of NRC Retake Initial Operator Licensing Examination 05000298/2021301 kdc1 NLS2021019, CN-2021-06 Draft Outlines2021-02-22022 February 2021 CN-2021-06 Draft Outlines ML20288A2042020-10-12012 October 2020 CN-2020-09-Post Exam Comments ML20324A0422020-09-29029 September 2020 CN-2020-09-FINAL Outlines ML20324A0442020-09-29029 September 2020 CN-2020-09-Public Forms, Exam Assignment Tickler ML20324A0362020-09-29029 September 2020 CN-2020-09-DRAFT Op Test Comments ML20324A0412020-09-29029 September 2020 CN-2020-09-DRAFT Written Exam ML20324A0402020-09-29029 September 2020 CN-2020-09-DRAFT Written Exam Comments ML20324A0372020-09-29029 September 2020 CN-2020-09-DRAFT Op Test ML20324A0392020-09-29029 September 2020 CN-2020-09-DRAFT Outlines ML20324A0382020-09-29029 September 2020 CN-2020-09-DRAFT Outline Comments ML20288A1962020-09-29029 September 2020 CN-2020-09-FINAL Op Test ML20288A1982020-09-29029 September 2020 CN-2020-09-FINAL Written Exam ML20241A2502020-08-0404 August 2020 CN-2020-04 Post Exam Comments ML20241A2412020-08-0404 August 2020 1-CN-2020-04-Draft Outlines 1-2-3 ML20241A2422020-08-0404 August 2020 2-CN-2020-04 Draft Outline Comments 1-2-3, Written Exam Outline ML20252A1102020-08-0404 August 2020 11-Public Forms ML20241A2432020-08-0404 August 2020 3-CN-2020-04-Draft Written Exam ML20241A2442020-08-0404 August 2020 4-CN-2020-04 Written Exam Comments ML20241A2482020-08-0404 August 2020 8-CN-2020-04 Final Written Exam ML20241A2462020-08-0404 August 2020 6-CN-2020-04 Operating Test Comments Final 1-2-3 ML20241A2472020-08-0404 August 2020 7-CN-2020-04 Final Outlines ML20241A2492020-08-0404 August 2020 9-CN-2020-04 Final Operating Test, Cooper Nuclear Station, Administrative Topics Outline ML20241A2452020-08-0404 August 2020 5-CN-2020-04-Draft Operating Test 1-2-3 NLS2020013, Preparation and Scheduling of Operator Licensing Examinations2020-03-12012 March 2020 Preparation and Scheduling of Operator Licensing Examinations NLS2018019, Preparation and Scheduling of Operator Licensing Examinations2018-04-0404 April 2018 Preparation and Scheduling of Operator Licensing Examinations ML18009A9852018-01-0808 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 NLS2017037, 2017-03 Post Exam Comments & Analysis2017-03-24024 March 2017 2017-03 Post Exam Comments & Analysis 2024-06-13 |
Retrieved from "https://kanterella.com/w/index.php?title=ML15328A216&oldid=387777"