Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
IR 05000298/20243011 September 2023Notification of NRC Initial Operator Licensing Examination 05000298/2024301
NLS2022054, Preparation and Scheduling of Operator Licensing Examinations5 January 2023Preparation and Scheduling of Operator Licensing Examinations
ML23018A01922 November 2022CNS-2022-11 Public FormsJob Performance Measure
NLS2022053, CNS-2022-11 Post Exam Submittal22 November 2022CNS-2022-11 Post Exam Submittal
NLS2022028, 10 CNS-2022-06 Post Exam Comments5 July 202210_CNS-2022-06 Post Exam Comments
ML22228A26021 June 202211_CNS-2022-06 Public Documents
ML22228A25712 May 202211 CNS-2022-06 Public Documents
ML21230A35230 June 2021CN-2021-06-DRAFT Outline Comments Rev 0
ML21230A34925 June 2021CN-2021-06 Draft Written ExamSafe Shutdown
High winds
Shutdown Margin
Reactor Vessel Water Level
Loop seal
Half scram
Temporary Modification
Squib
FLEX
Earthquake
Fuel cladding
Power change
Coast down
ML21230A35025 June 2021CN-2021-06 Final OutlinesShutdown Margin
Failure to Scram
ML21208A41925 June 2021CN-2021-06 Post Exam Analysis
ML21230A32525 June 2021CN-2021-06 Public Forms
ML21230A34725 June 2021Initial Licensing Retake Examination Material Cover LetterWater Inventory Control
Job Performance Measure
Operability Determination
Overtravel
Failure to Scram
ML21208A42225 June 2021CN-2021-06 Final Written ExamSafe Shutdown
High winds
Shutdown Margin
Reactor Vessel Water Level
Loop seal
Half scram
Temporary Modification
Squib
FLEX
Earthquake
Fuel cladding
Power change
Coast down
ML21208A42125 June 2021CN-2021-06 Final Op TestWater Inventory Control
Job Performance Measure
Operability Determination
Overtravel
Failure to Scram
ML21230A34625 June 2021CN 2021-06 Draft Written Comments kdc-rev1 Final
ML21230A35125 June 2021CN-2021-06-DRAFT Op Test Comments kdc-rev1-final
ML21055A18224 February 2021CNS2021301-Corp Notification LTR of NRC Retake Initial Operator Licensing Examination 05000298/2021301 kdc1
NLS2021019, CN-2021-06 Draft Outlines22 February 2021CN-2021-06 Draft OutlinesShutdown Margin
ML20288A20412 October 2020CN-2020-09-Post Exam CommentsPower change
ML20324A04029 September 2020CN-2020-09-DRAFT Written Exam Comments
ML20324A03629 September 2020CN-2020-09-DRAFT Op Test CommentsScram Discharge Volume
ML20324A04429 September 2020CN-2020-09-Public Forms, Exam Assignment TicklerProbabilistic Risk Assessment
ML20324A04229 September 2020CN-2020-09-FINAL OutlinesShutdown Margin
Temporary Modification
Squib
Scram Discharge Volume
Earthquake
ML20324A04129 September 2020CN-2020-09-DRAFT Written ExamSafe Shutdown
Time of Discovery
High winds
Shutdown Margin
Reactor Vessel Water Level
Time to boil
Post Accident Monitoring
Temporary Modification
Squib
Missed surveillance
Earthquake
Pressure Boundary Leakage
ML20324A03729 September 2020CN-2020-09-DRAFT Op TestSafe Shutdown
Shutdown Margin
Packing leak
High Radiation Area
Half scram
Grab sample
Stroke time
Water Inventory Control
Temporary Modification
Squib
Job Performance Measure
Earthquake
Power change
ML20324A03929 September 2020CN-2020-09-DRAFT OutlinesShutdown Margin
Reactor Vessel Water Level
Half scram
Earthquake
Fuel cladding
Power change
ML20324A03829 September 2020CN-2020-09-DRAFT Outline Comments
ML20288A19629 September 2020CN-2020-09-FINAL Op TestSafe Shutdown
Shutdown Margin
Packing leak
High Radiation Area
Half scram
Grab sample
Stroke time
Water Inventory Control
Temporary Modification
Squib
Job Performance Measure
Scram Discharge Volume
Earthquake
Offsite Circuit
Power change
ML20288A19829 September 2020CN-2020-09-FINAL Written ExamSafe Shutdown
Time of Discovery
High winds
Shutdown Margin
Reactor Vessel Water Level
Time to boil
Post Accident Monitoring
Temporary Modification
Squib
Missed surveillance
Earthquake
Pressure Boundary Leakage
ML20241A2504 August 2020CN-2020-04 Post Exam Comments
ML20241A2414 August 20201-CN-2020-04-Draft Outlines 1-2-3Stroke time
Water Inventory Control
Scram Discharge Volume
Power change
Downpower
ML20241A2424 August 20202-CN-2020-04 Draft Outline Comments 1-2-3, Written Exam Outline
ML20252A1104 August 202011-Public Forms
ML20241A2434 August 20203-CN-2020-04-Draft Written ExamSafe Shutdown
Shutdown Margin
Half scram
Temporary Modification
Squib
FLEX
Surveillance Frequency Control Program
Offsite Circuit
Power change
ML20241A2444 August 20204-CN-2020-04 Written Exam CommentsSquib
ML20241A2484 August 20208-CN-2020-04 Final Written ExamSafe Shutdown
Shutdown Margin
Half scram
Temporary Modification
Squib
FLEX
Surveillance Frequency Control Program
Feedwater Controller Failure
Offsite Circuit
Power change
ML20241A2464 August 20206-CN-2020-04 Operating Test Comments Final 1-2-3Shutdown Margin
ML20241A2474 August 20207-CN-2020-04 Final OutlinesStroke time
Scram Discharge Volume
Power change
ML20241A2494 August 20209-CN-2020-04 Final Operating Test, Cooper Nuclear Station, Administrative Topics OutlineUnanalyzed Condition
Time of Discovery
Fitness for Duty
Shutdown Margin
High Radiation Area
Stroke time
Water Inventory Control
Squib
Job Performance Measure
Scram Discharge Volume
Overtravel
Fuel cladding
Offsite Circuit
Power change
Downpower
Failure to Scram
ML20241A2454 August 20205-CN-2020-04-Draft Operating Test 1-2-3Unanalyzed Condition
Time of Discovery
Fitness for Duty
Shutdown Margin
High Radiation Area
Stroke time
Water Inventory Control
Squib
Job Performance Measure
Scram Discharge Volume
Overtravel
Fuel cladding
Offsite Circuit
Power change
Downpower
Failure to Scram
NLS2020013, Preparation and Scheduling of Operator Licensing Examinations12 March 2020Preparation and Scheduling of Operator Licensing Examinations
NLS2018019, Preparation and Scheduling of Operator Licensing Examinations4 April 2018Preparation and Scheduling of Operator Licensing Examinations
ML18009A9858 January 2018Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018Generic Fundamentals Examination
NLS2017037, 2017-03 Post Exam Comments & Analysis24 March 20172017-03 Post Exam Comments & Analysis
ML17122A08716 March 20172017-03 Final Written ExamTime of Discovery
Shutdown Margin
High Radiation Area
Fire Barrier
Internal Flooding
FLEX
Earthquake
Pressure Boundary Leakage
Offsite Circuit
Continuous fire watch
Fire Protection Program
Fire Watch
Hourly Fire Watch
Power change
ML17122A08416 March 20172017-03 Proposed Written ExamTime of Discovery
Shutdown Margin
High Radiation Area
Internal Flooding
FLEX
Earthquake
Pressure Boundary Leakage
Offsite Circuit
Power change
ML17122A08516 March 20172017-03 Final Operating TestUnanalyzed Condition
Fitness for Duty
Half scram
Grab sample
Stroke time
Water Inventory Control
Squib
Job Performance Measure
Scram Discharge Volume
Fuel cladding
Power change
ML17122A08116 March 20172017-03 Proposed Outline CommentsTime Critical Operator Action
ML17122A08316 March 20172017-03 Proposed Written Exam CommentsContinuous fire watch