Category:Letter
MONTHYEARIR 05000397/20240032024-11-12012 November 2024 Integrated Inspection Report 05000397/2024003 ML24298A2092024-11-0606 November 2024 – Alternative Requests 5IST-01 (RP01), 5IST-02 (RP02), and 5IST-03 (RP03) – Fifth Interval Inservice Testing Program ML24234A0292024-11-0505 November 2024 Environmental Assessment and Finding of No Significant Impact Related to License Amendment Request to Revise Emergency Plan (EPID L-2024-LLA-0011) - Letter GO2-24-100, Response to Request for Additional Information Regarding Request for Fourth Ten-Year Interval Inservice Testing2024-11-0404 November 2024 Response to Request for Additional Information Regarding Request for Fourth Ten-Year Interval Inservice Testing GO2-24-110, Summary of Changes and Analysis for Revision 45 of Plant Procedures Manual 13.4.1, Emergency Notification2024-11-0404 November 2024 Summary of Changes and Analysis for Revision 45 of Plant Procedures Manual 13.4.1, Emergency Notification GO2-24-109, Summary of Changes and Analysis for Revision 42 of Plant Procedures Manual 13.8.1, Emergency Dose Projection System Operations2024-11-0404 November 2024 Summary of Changes and Analysis for Revision 42 of Plant Procedures Manual 13.8.1, Emergency Dose Projection System Operations ML24290A1142024-10-17017 October 2024 CGS FPTI 2024011 GO2-24-088, Supplement to Response to Request for Additional Information Regarding License Amendment Request to Revise Columbia Emergency Plan2024-09-24024 September 2024 Supplement to Response to Request for Additional Information Regarding License Amendment Request to Revise Columbia Emergency Plan GO2-24-051, Application to Revise Technical Specifications to Adopt TSTF-592, Revise Automatic Depressurization System (ADS) Instrumentation Requirements2024-09-23023 September 2024 Application to Revise Technical Specifications to Adopt TSTF-592, Revise Automatic Depressurization System (ADS) Instrumentation Requirements ML24247A1572024-09-12012 September 2024 Withholding Determination Letter for Presentation Materials for Energy Northwest Pre-application Meeting 8-9-2024 ML24255A1012024-09-12012 September 2024 Request for Withholding Information from Public Disclosure Energy Northwest Regulatory Engagement Plan, Revision 0 GO2-24-082, Response to Request for Additional Information Regarding License Amendment Request to Revise Columbia Emergency Plan2024-09-10010 September 2024 Response to Request for Additional Information Regarding License Amendment Request to Revise Columbia Emergency Plan IR 05000397/20240052024-08-22022 August 2024 Updated Inspection Plan for Columbia Generating Station (Report 05000397/2024005) IR 07200035/20244012024-08-19019 August 2024 Security Baseline Inspection Report 07200035/2024401 IR 05000397/20244022024-08-13013 August 2024 Security Baseline Inspection Report 05000397/2024402 IR 05000397/20240022024-08-0909 August 2024 Integrated Inspection Report 05000397/2024002 GO2-24-060, Reply to a Notice of Violation, EA-21-170 and EA-23-0542024-07-30030 July 2024 Reply to a Notice of Violation, EA-21-170 and EA-23-054 GO2-24-070, Response to Request for Additional Information Regarding Fifth Interval Inservice Testing Program2024-07-29029 July 2024 Response to Request for Additional Information Regarding Fifth Interval Inservice Testing Program GO2-24-063, Notification of Extension to Columbias Fourth 10-Year Interval Inservice Testing Program Plan2024-07-15015 July 2024 Notification of Extension to Columbias Fourth 10-Year Interval Inservice Testing Program Plan IR 05000397/20240122024-07-10010 July 2024 – Safety Conscious Work Environment Issue of Concern Follow-up Inspection 05000397/2024012 ML24180A1482024-06-28028 June 2024 Notification of an NRC Fire Protection Baseline Inspection (NRC Inspection Report 05000397/2024011) and Request for Information IR 05000397/20244202024-06-27027 June 2024 – Security Baseline Inspection Report 05000397 2024420 Cover Letter GO2-24-057, Notice of Readiness for Supplemental Inspection2024-06-19019 June 2024 Notice of Readiness for Supplemental Inspection ML24099A2232024-06-12012 June 2024 Issuance of Amendment No. 275 to Adopt TSTF-230, Revision 1, Add New Condition B to LCO 3.6.2.3, RHR Suppression Pool Cooling GO2-24-056, Relief Request for the Columbia Generating Station Fourth Ten-Year Interval Inservice Testing2024-06-11011 June 2024 Relief Request for the Columbia Generating Station Fourth Ten-Year Interval Inservice Testing ML24128A2242024-05-31031 May 2024 Issuance of Amendment No. 274 to Revise Technical Specifications to Adopt TSTF-584, Eliminate Automatic RWCU System Isolation on SLC Initiation GO2-24-049, 2023 Annual Radiological Environmental Operating Report2024-05-13013 May 2024 2023 Annual Radiological Environmental Operating Report GO2-24-050, Annual Environmental Operating Report2024-04-30030 April 2024 Annual Environmental Operating Report IR 05000397/20240012024-04-24024 April 2024 Integrated Inspection Report 05000397/2024001 GO2-24-042, 2023 Annual Radioactive Effluent Release Report2024-04-22022 April 2024 2023 Annual Radioactive Effluent Release Report ML24089A2282024-04-15015 April 2024 – Acceptance of Requested Licensing Action License Amendment Request to Revise Columbia Generating Station Emergency Plan ML24074A4532024-04-11011 April 2024 Request for Withholding Information from Public Disclosure GO2-24-044, Voluntary Response to Regulatory Issue Summary 2024-012024-04-11011 April 2024 Voluntary Response to Regulatory Issue Summary 2024-01 IR 05000397/20244012024-04-0202 April 2024 – Security Baseline Inspection Report 05000397/2024401 (Cover Letter Only) IR 05000397/20244032024-03-28028 March 2024 Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000397/2024403 GO2-24-034, Supplement to License Amendment Request to Revise Columbia Generating Station Emergency Plan2024-03-20020 March 2024 Supplement to License Amendment Request to Revise Columbia Generating Station Emergency Plan ML24058A0692024-03-14014 March 2024 Supplemental Information Needed for Acceptance of Requested Licensing Action Amendment Request for Emergency Plan ML24044A0492024-03-12012 March 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0064 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) GO2-24-041, Level of Financial Protection - Annual Reporting Requirement2024-03-12012 March 2024 Level of Financial Protection - Annual Reporting Requirement GO2-24-036, Presentation Information for Pre-Application Meeting Regarding Columbia’S Replacement Steam Dryer Evaluation Approach for Extended Power Uprate2024-03-11011 March 2024 Presentation Information for Pre-Application Meeting Regarding Columbia’S Replacement Steam Dryer Evaluation Approach for Extended Power Uprate GO2-24-039, Report of Changes or Errors in Emergency Core Cooling System Loss of Coolant Accident Analysis Models Pursuant to 10 CFR 50.462024-03-11011 March 2024 Report of Changes or Errors in Emergency Core Cooling System Loss of Coolant Accident Analysis Models Pursuant to 10 CFR 50.46 ML24047A0422024-03-0707 March 2024 Issuance of Amendment No. 273 Renewed Facility Operating License and Technical Specification Clean Up IR 05000397/20230062024-02-28028 February 2024 Annual Assessment Letter for Columbia Generating Station (Report 05000397/2023006) IR 05000397/20253012024-02-14014 February 2024 Notification of NRC Initial Operator Licensing Examination 05000397/2025301 GO2-24-004, License Amendment Request to Revise Emergency Plan2024-01-30030 January 2024 License Amendment Request to Revise Emergency Plan IR 05000397/20230042024-01-29029 January 2024 Integrated Inspection and Independent Spent Fuel Storage Installation Report 05000397/2023004 and 07200035/2023001 GO2-24-003, Relief Requests for the Columbia Generating Station Fifth Ten-Year Interval Inservice Testing2024-01-29029 January 2024 Relief Requests for the Columbia Generating Station Fifth Ten-Year Interval Inservice Testing 05000397/LER-2024-001, Failure to Track Operability of Requirements of Transversing In-Core Probe Valves2024-01-22022 January 2024 Failure to Track Operability of Requirements of Transversing In-Core Probe Valves GO2-24-014, Independent Spent Fuel Storage Installation, Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2024-01-15015 January 2024 Independent Spent Fuel Storage Installation, Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML24011A1522024-01-10010 January 2024 March 2024 Emergency Preparedness Exercise Inspection-Request for Information 2024-09-24
[Table view] Category:License-Operating (New/Renewal/Amendments) DKT 50
MONTHYEARML24099A2232024-06-12012 June 2024 Issuance of Amendment No. 275 to Adopt TSTF-230, Revision 1, Add New Condition B to LCO 3.6.2.3, RHR Suppression Pool Cooling ML24128A2242024-05-31031 May 2024 Issuance of Amendment No. 274 to Revise Technical Specifications to Adopt TSTF-584, Eliminate Automatic RWCU System Isolation on SLC Initiation ML24089A2282024-04-15015 April 2024 – Acceptance of Requested Licensing Action License Amendment Request to Revise Columbia Generating Station Emergency Plan ML23288A0002023-12-0707 December 2023 Issuance of Amendment No. 272 to Adopt TSTF-541, Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position ML23083B4012023-04-27027 April 2023 Issuance of Amendment No. 271 to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling ML23013A0812023-03-15015 March 2023 Issuance of Amendment No. 270 Revision to Technical Specifications to Adopt TSTF 505, Revision 2, Provide Risk-Informed Extended Completion Times-RITSTF Initiative 4B ML22340A6892022-12-20020 December 2022 Regulatory Audit Summary in Support of Review for LAR to Revise Technical Specifications to Adopt TSTF-505, Rev. 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4B ML22308A0962022-12-15015 December 2022 Issuance of Amendment No. 269 License Amendment to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors ML22263A4452022-11-23023 November 2022 Issuance of Amendment No. 268 to Revise Technical Specification 3.4.11 RCS Pressure and Temperature (P/T) Limits ML22098A0642022-05-0909 May 2022 Issuance of Amendment No. 267 to Adopt Technical Specifications Task Force (TSTF) 546, Revision 0, Revise APRM Channel Adjustment Surveillance Requirement ML21293A1642022-01-13013 January 2022 Issuance of Amendment No. 266 License Amendment Request to Remove License Condition 2.C.(34) and Revise License Condition 2.C.(35) ML21273A1672021-11-22022 November 2021 Issuance of Amendment No. 265 Adoption of TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO ML21053A3162021-03-0303 March 2021 Issuance of Amendment No. 264 to Revise Technical Specification to Adopt Traveler TSTF-582, Revision 0, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements ML21005A1782021-01-25025 January 2021 Issuance of Amendment No. 263 to Revise Technical Specifications to Adopt TSTF-566, Revise Actions for Inoperable RHR Shutdown Cooling Subsystems Using the Consolidated Line Item Improvement Process ML20302A0262020-12-15015 December 2020 Issuance of Amendment No. 262 to Revise Technical Specifications to Adopt TSTF-564, Safety Limit MCPR ML20242A0022020-09-0404 September 2020 Issuance of Amendment No. 261 Revise Technical Specification 3.8.7, Distribution Systems - Operating (Exigent Circumstances) ML20135H0842020-06-29029 June 2020 Issuance of Amendment No. 260 Revise Technical Specifications to Adopt TSTF-563, Revision 0, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program ML20136A3472020-06-22022 June 2020 Issuance of Amendment No. 259 Revise Technical Specifications Per TSTF-529, Revision 4, Clarify Use and Application Rules ML20125A0802020-05-12012 May 2020 Issuance of Amendment No. 258 Changes to Technical Specification Limiting Conditions for Operation 3.8.4 and 3.8.7 (Exigent Circumstances) ML20113E9842020-05-0404 May 2020 Issuance of Amendment No. 257 to Extend Implementation Date for Amendment No. 255 Control Room Air Conditioning System (Exigent Circumstances) ML19234A0162019-08-26026 August 2019 Issuance of Amendment No. 254 Change to Technical Specification 3.8.7, Distribution Systems - Operating (Exigent Circumstances) ML19063A5792019-06-20020 June 2019 Issuance of Amendment No. 253 Renewed Facility Operating License and Technical Specification Clean-Up ML18317A0052018-11-27027 November 2018 Correction to Safety Evaluation Pages 5 and 24 for Amendment No. 199 Dated November 27, 2006 Related to Alternative Source Term ML18283A1252018-11-0808 November 2018 Issuance of Amendment No. 252 Update Appendix B to Renewed Facility Operating License to Incorporate the 2017 Biological Opinion ML18255A3502018-10-30030 October 2018 Issuance of Amendment No. 251 Revision to the Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control ML18100A1992018-05-0202 May 2018 Issuance of Amendment No. 249 Change to Technical Specification 3.5.1 ECCS - Operating (CAC No. MG0015; EPID L-2017-LLA-0277) ML17290A1272017-10-30030 October 2017 Columbia Generating Station - Issuance of Amendment No. 245 Re: Request for a One-Time Extension of the Residual Heat Removal Train A Completion Time (CAC No. MF8794; EPID L-2016-LLA-0016) ML17188A2302017-08-28028 August 2017 Issuance of Amendment No. 244 Emergency Action Level Scheme Change to Nuclear Energy Institute 99-01, Revision 6 ML17187A2572017-07-24024 July 2017 Columbia Generating Station - Issuance of Amendment No. 243 Re: Adoption of Technical Specifications Task Force Traveler TSTF 545, Revision 3 (CAC No. MF8148) ML0531303192017-07-0505 July 2017 Current Facility Operating License NPF-21, Technical Specifications, Revised 11/01/2017 ML17131A0712017-06-27027 June 2017 Columbia Generating Station - Issuance of Amendment No. 242 Re: Reduction of Reactor Steam Dome Pressure Specified in the Technical Specification 2.1.1, "Reactor Core SLs (Safety Limits)" (CAC No. MF8116) ML17095A1172017-05-11011 May 2017 Columbia Generating Station - Issuance Of Amendment No. 241 Re: Measurement Uncertainty Recapture (CAC No. MF8060) ML17052A1252017-03-0909 March 2017 Issuance of Amendment No. 240 Request to Modify Technical Specification Surveillance Requirement 3.4.3.1 and 3.4.4.1 Safety/Relief Valve Setpoint Lower Tolerance ML16357A6462017-01-31031 January 2017 Issuance of Amendment No. 239, Adopt Technical Specification Task Force (TSTF)-522, Revision 0, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month ML16253A0252016-11-0303 November 2016 Issuance of Amendment No. 238, Adopt Technical Specification Task Force Traveler TSTF-425, Revision 3, Relocate Surveillance Frequencies to Licensee Control - RITSTF Initiative 5b ML16020A0312016-02-16016 February 2016 Issuance of Amendment No. 237, Adopt TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability, Using Consolidated Line Item Improvement Process ML15216A2662016-02-0303 February 2016 Issuance of Amendment No. 236, Adoption of Technical Specification Task Force Traveler TSTF-423, Revision 1, Technical Specifications End States, as Part of Consolidated Line Item Improvement Process ML15154A8002015-06-11011 June 2015 Issuance of Amendment No. 235, Extension of Implementation Period for Amendment 232 Changing Technical Specification Table 3.3.1.1-1, Function 7, Scram Discharge Volume Water Level - High (Exigent Circumstances) ML15098A2542015-05-11011 May 2015 Issuance of Amendment No. 234, Request to Revise Technical Specification 2.1.1.2 to Change Safety Limit Minimum Critical Power Ratio Values ML15076A1222015-04-15015 April 2015 Issuance of Amendment No. 233, Request to Revise Technical Specification Surveillance Requirement 3.7.1.1 Related to the Ultimate Heat Sink ML15063A0102015-03-27027 March 2015 Issuance of Amendment No. 232, Request to Revise Technical Specification Table 3.3.1.1-1 Function 7, Scram Discharge Volume Water Level - High ML15042A4642015-03-27027 March 2015 Issuance of Amendment No. 231, Request to Revise License Condition Related to Approval of Revised Cyber Security Plan Implementation Schedule ML15030A5012015-02-0101 February 2015 Issuance of Amendment No. 230, Revise Technical Specifications for One-Time Extension of Completion Time Required Actions Related to Residual Heat Removal System B Inoperability (Emergency Circumstances) ML14335A1892015-01-0707 January 2015 Redacted, Issuance of Amendment No. 229, Revise Emergency Core Cooling Systems Surveillance Requirements for Low Pressure Core Spray and Low Pressure Coolant Injection Pump Flows ML14290A3602014-11-12012 November 2014 Issuance of Amendment No. 228, Request to Adopt Technical Specification Task Force (TSTF)-535, Revision 0, Revise Shutdown Margin Definition to Address Advanced Fuel Designs ML14010A0302014-02-11011 February 2014 Issuance of Amendment No. 227, Request to Adopt Technical Specification Task Force (TSTF)-477, Revision 3, Adding an Action Statement for Two Inoperable Control Room Air Conditioning Subsystem ML13317B6232014-01-31031 January 2014 Redacted - Issuance of Amendment No. 226, Technical Specification Changes to Support Installation of GE Hitachi Power Range Neutron Monitoring System; Implementation of Arts/Mellla ML13030A4572013-03-0101 March 2013 Correction to Amendment Letter and Safety Evaluation Pages for Amendment No. 225, Administrative and Editorial Changes to Technical Specifications Related to Change in Software and to Adopt TSTF-GG-05-01 Revision 2 Writer'S Guide ML12269A2542013-01-29029 January 2013 Issuance of Amendment No. 225, Administrative and Editorial Changes to Technical Specifications Related to Change in Software and to Adopt TSTF-GG-05-01 Revision 2 Writer'S Guide ML12089A0432012-05-22022 May 2012 Issuance of Renewed Facility Operating License No. NPF-21 for Columbia Generating Station. Columbia Lr Ltr to Applicant 2024-06-12
[Table view] Category:Safety Evaluation
MONTHYEARML24298A2092024-11-0606 November 2024 – Alternative Requests 5IST-01 (RP01), 5IST-02 (RP02), and 5IST-03 (RP03) – Fifth Interval Inservice Testing Program ML24128A2242024-05-31031 May 2024 Issuance of Amendment No. 274 to Revise Technical Specifications to Adopt TSTF-584, Eliminate Automatic RWCU System Isolation on SLC Initiation ML24047A0422024-03-0707 March 2024 Issuance of Amendment No. 273 Renewed Facility Operating License and Technical Specification Clean Up ML23288A0002023-12-0707 December 2023 Issuance of Amendment No. 272 to Adopt TSTF-541, Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position ML23143A1202023-06-27027 June 2023 Request Number 4ISI-11 to the American Society of Mechanical Engineers Boiler and Pressure Vessel Code Regarding Alternate Examination of Reactor Vessel Welds ML23083B4012023-04-27027 April 2023 Issuance of Amendment No. 271 to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling ML23013A0812023-03-15015 March 2023 Issuance of Amendment No. 270 Revision to Technical Specifications to Adopt TSTF 505, Revision 2, Provide Risk-Informed Extended Completion Times-RITSTF Initiative 4B ML22308A0962022-12-15015 December 2022 Issuance of Amendment No. 269 License Amendment to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors ML22263A4452022-11-23023 November 2022 Issuance of Amendment No. 268 to Revise Technical Specification 3.4.11 RCS Pressure and Temperature (P/T) Limits ML22109A0922022-05-18018 May 2022 Correction Letter - Approval for Alternate Disposal Procedures for the Continued Onsite Disposal of Cooling Tower and Spray Pond Sludge in the Existing Sediment Disposal Area ML22098A0642022-05-0909 May 2022 Issuance of Amendment No. 267 to Adopt Technical Specifications Task Force (TSTF) 546, Revision 0, Revise APRM Channel Adjustment Surveillance Requirement ML22004A1852022-03-11011 March 2022 Approval for Alternate Disposal Procedures for the Continued Onsite Disposal of Cooling Tower and Spray Pond Sludge in the Existing Sediment Disposal Area ML21293A1642022-01-13013 January 2022 Issuance of Amendment No. 266 License Amendment Request to Remove License Condition 2.C.(34) and Revise License Condition 2.C.(35) ML21273A1672021-11-22022 November 2021 Issuance of Amendment No. 265 Adoption of TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO ML21081A1502021-03-25025 March 2021 Approval for Request to Use a Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML21053A3162021-03-0303 March 2021 Issuance of Amendment No. 264 to Revise Technical Specification to Adopt Traveler TSTF-582, Revision 0, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements ML21005A1782021-01-25025 January 2021 Issuance of Amendment No. 263 to Revise Technical Specifications to Adopt TSTF-566, Revise Actions for Inoperable RHR Shutdown Cooling Subsystems Using the Consolidated Line Item Improvement Process ML20302A0262020-12-15015 December 2020 Issuance of Amendment No. 262 to Revise Technical Specifications to Adopt TSTF-564, Safety Limit MCPR ML20282A7322020-10-27027 October 2020 Proposed Alternative Request No. 4ISI-08 Applicable to the Fourth Inservice Inspection Interval ML20242A0022020-09-0404 September 2020 Issuance of Amendment No. 261 Revise Technical Specification 3.8.7, Distribution Systems - Operating (Exigent Circumstances) ML20203K8762020-07-22022 July 2020 Correction to Reduction in Commitment to the Operational Quality Assurance Program Description (EPID L-2020-LLQ-0003 (COVID-19)) ML20181A4452020-07-0707 July 2020 Reduction in Commitment to the Operational Quality Assurance Program Description (EPID L-2020-LLQ-0003)(Covid-19) ML20135H0842020-06-29029 June 2020 Issuance of Amendment No. 260 Revise Technical Specifications to Adopt TSTF-563, Revision 0, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program ML20136A3472020-06-22022 June 2020 Issuance of Amendment No. 259 Revise Technical Specifications Per TSTF-529, Revision 4, Clarify Use and Application Rules ML20125A0802020-05-12012 May 2020 Issuance of Amendment No. 258 Changes to Technical Specification Limiting Conditions for Operation 3.8.4 and 3.8.7 (Exigent Circumstances) ML20113E9842020-05-0404 May 2020 Issuance of Amendment No. 257 to Extend Implementation Date for Amendment No. 255 Control Room Air Conditioning System (Exigent Circumstances) ML19350B5792020-01-0202 January 2020 Generation Station - Safety Evaluation Regarding Implementation of Hardened Containment Vents Capable of Operation Under Severe Accident Conditions Related to Order EA-13-109 (CAC No. MF4383; EPID L-2014-JLD-0045) ML19063A5792019-06-20020 June 2019 Issuance of Amendment No. 253 Renewed Facility Operating License and Technical Specification Clean-Up ML18317A0052018-11-27027 November 2018 Correction to Safety Evaluation Pages 5 and 24 for Amendment No. 199 Dated November 27, 2006 Related to Alternative Source Term ML18283A1252018-11-0808 November 2018 Issuance of Amendment No. 252 Update Appendix B to Renewed Facility Operating License to Incorporate the 2017 Biological Opinion ML18255A3502018-10-30030 October 2018 Issuance of Amendment No. 251 Revision to the Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control ML18100A1992018-05-0202 May 2018 Issuance of Amendment No. 249 Change to Technical Specification 3.5.1 ECCS - Operating (CAC No. MG0015; EPID L-2017-LLA-0277) ML17333A8882018-02-22022 February 2018 Safety Evaluation Regarding Implementation of Mitigating Strategies and Reliable Spent Fuel Pool Instrumentation Related to Orders EA-12-049 and EA-12-051 ML17318A0422017-11-20020 November 2017 Relief Request No. 3ISI-17 from the Requirements of the ASME Code, Section XI for the Third 10-Year Inservice Inspection Interval (CAC No. MF8923; EPID L-2016 LLR-0005) ML17290A1272017-10-30030 October 2017 Columbia Generating Station - Issuance of Amendment No. 245 Re: Request for a One-Time Extension of the Residual Heat Removal Train A Completion Time (CAC No. MF8794; EPID L-2016-LLA-0016) ML17188A2302017-08-28028 August 2017 Issuance of Amendment No. 244 Emergency Action Level Scheme Change to Nuclear Energy Institute 99-01, Revision 6 ML17187A2572017-07-24024 July 2017 Columbia Generating Station - Issuance of Amendment No. 243 Re: Adoption of Technical Specifications Task Force Traveler TSTF 545, Revision 3 (CAC No. MF8148) ML17131A0712017-06-27027 June 2017 Columbia Generating Station - Issuance of Amendment No. 242 Re: Reduction of Reactor Steam Dome Pressure Specified in the Technical Specification 2.1.1, "Reactor Core SLs (Safety Limits)" (CAC No. MF8116) ML17095A1172017-05-11011 May 2017 Columbia Generating Station - Issuance Of Amendment No. 241 Re: Measurement Uncertainty Recapture (CAC No. MF8060) ML17046A5072017-02-16016 February 2017 Relief Request for Alternative 4ISI-07 Applicable to the Fourth 10-Year Inservice Inspection Program Interval ML16357A6462017-01-31031 January 2017 Issuance of Amendment No. 239, Adopt Technical Specification Task Force (TSTF)-522, Revision 0, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month ML17018A0822017-01-24024 January 2017 Relief Request for Alternative 4ISI-05 Applicable to the Fourth 10-Year Inservice Inspection Program Interval ML16292A8722016-11-0303 November 2016 Relief Request 4ISI-06, Use of Code Case N-666-1 on Socket Welded Connections Requiring Repair Due to Vibration Fatigue, Fourth 10-Year Inservice Inspection Interval ML16295A2122016-10-31031 October 2016 Relief Request 4ISI-02, Use of Code Case N-795 Following Repair/Replacement Activities, Fourth 10-Year Inservice Inspection Interval ML16263A2332016-10-0505 October 2016 Relief Request 4ISI-04, Reduced Percentage Requirements for Nozzle to Vessel Welds and Inner Radius Exams, for the Fourth 10-Year Inservice Inspection Interval ML16175A4602016-06-24024 June 2016 Relief Request 4ISI-03, Relief from ASME Code Requirements to Allow Use of Existing Procedures That Implement Repair/Replacement Activities, for the Fourth 10-Year ISI Interval ML16020A0312016-02-16016 February 2016 Issuance of Amendment No. 237, Adopt TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability, Using Consolidated Line Item Improvement Process ML15216A2662016-02-0303 February 2016 Issuance of Amendment No. 236, Adoption of Technical Specification Task Force Traveler TSTF-423, Revision 1, Technical Specifications End States, as Part of Consolidated Line Item Improvement Process ML15154A8002015-06-11011 June 2015 Issuance of Amendment No. 235, Extension of Implementation Period for Amendment 232 Changing Technical Specification Table 3.3.1.1-1, Function 7, Scram Discharge Volume Water Level - High (Exigent Circumstances) ML15098A2542015-05-11011 May 2015 Issuance of Amendment No. 234, Request to Revise Technical Specification 2.1.1.2 to Change Safety Limit Minimum Critical Power Ratio Values 2024-05-31
[Table view] Category:Technical Specifications
MONTHYEARML24128A2242024-05-31031 May 2024 Issuance of Amendment No. 274 to Revise Technical Specifications to Adopt TSTF-584, Eliminate Automatic RWCU System Isolation on SLC Initiation ML23288A0002023-12-0707 December 2023 Issuance of Amendment No. 272 to Adopt TSTF-541, Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position GO2-23-012, Application to Revise Technical Specifications to Adopt Tstf-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position2023-03-27027 March 2023 Application to Revise Technical Specifications to Adopt Tstf-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position ML22308A0962022-12-15015 December 2022 Issuance of Amendment No. 269 License Amendment to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors ML21053A3162021-03-0303 March 2021 Issuance of Amendment No. 264 to Revise Technical Specification to Adopt Traveler TSTF-582, Revision 0, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements ML21005A1782021-01-25025 January 2021 Issuance of Amendment No. 263 to Revise Technical Specifications to Adopt TSTF-566, Revise Actions for Inoperable RHR Shutdown Cooling Subsystems Using the Consolidated Line Item Improvement Process ML20242A0022020-09-0404 September 2020 Issuance of Amendment No. 261 Revise Technical Specification 3.8.7, Distribution Systems - Operating (Exigent Circumstances) ML20135H0842020-06-29029 June 2020 Issuance of Amendment No. 260 Revise Technical Specifications to Adopt TSTF-563, Revision 0, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program ML20125A0802020-05-12012 May 2020 Issuance of Amendment No. 258 Changes to Technical Specification Limiting Conditions for Operation 3.8.4 and 3.8.7 (Exigent Circumstances) ML18100A1992018-05-0202 May 2018 Issuance of Amendment No. 249 Change to Technical Specification 3.5.1 ECCS - Operating (CAC No. MG0015; EPID L-2017-LLA-0277) GO2-17-124, Final Technical Specification Markup and Clean Pages for Application to Revise Technical Specifications to Adopt TSTF-545, Revision 32017-07-0505 July 2017 Final Technical Specification Markup and Clean Pages for Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3 ML0531303192017-07-0505 July 2017 Current Facility Operating License NPF-21, Technical Specifications, Revised 11/01/2017 ML17095A1172017-05-11011 May 2017 Columbia Generating Station - Issuance Of Amendment No. 241 Re: Measurement Uncertainty Recapture (CAC No. MF8060) GO2-16-071, Final Technical Specification Markup and Clean Pages for License Amendment Request to Adopt Technical Specification Task Force (TSTF)-425, Revision 3 to Relocate Specific Surveillance Frequencies to a Licensee Controlled Program2016-05-11011 May 2016 Final Technical Specification Markup and Clean Pages for License Amendment Request to Adopt Technical Specification Task Force (TSTF)-425, Revision 3 to Relocate Specific Surveillance Frequencies to a Licensee Controlled Program ML15216A2662016-02-0303 February 2016 Issuance of Amendment No. 236, Adoption of Technical Specification Task Force Traveler TSTF-423, Revision 1, Technical Specifications End States, as Part of Consolidated Line Item Improvement Process GO2-15-173, Supplement to Response to Second Request for Additional Information on License Amendment Request for Adoption of Technical Specification Task Force (TSTF)-425, Revision 32015-12-28028 December 2015 Supplement to Response to Second Request for Additional Information on License Amendment Request for Adoption of Technical Specification Task Force (TSTF)-425, Revision 3 ML15154A8002015-06-11011 June 2015 Issuance of Amendment No. 235, Extension of Implementation Period for Amendment 232 Changing Technical Specification Table 3.3.1.1-1, Function 7, Scram Discharge Volume Water Level - High (Exigent Circumstances) ML15076A1222015-04-15015 April 2015 Issuance of Amendment No. 233, Request to Revise Technical Specification Surveillance Requirement 3.7.1.1 Related to the Ultimate Heat Sink ML15030A5012015-02-0101 February 2015 Issuance of Amendment No. 230, Revise Technical Specifications for One-Time Extension of Completion Time Required Actions Related to Residual Heat Removal System B Inoperability (Emergency Circumstances) ML15031A0022015-01-30030 January 2015 Emergency License Amendment Associated with Technical Specifications 3.5.1.A, 3.6.1.5.A, and 3.6.2.3.A, Request for CT Extension on RHR-B Inoperability ML14335A1892015-01-0707 January 2015 Redacted, Issuance of Amendment No. 229, Revise Emergency Core Cooling Systems Surveillance Requirements for Low Pressure Core Spray and Low Pressure Coolant Injection Pump Flows ML14290A3602014-11-12012 November 2014 Issuance of Amendment No. 228, Request to Adopt Technical Specification Task Force (TSTF)-535, Revision 0, Revise Shutdown Margin Definition to Address Advanced Fuel Designs ML14127A4002014-06-13013 June 2014 Request for Technical Specification Interpretation Regarding the Offsite Power Supplies to the Onsite Class 1E Alternating Current Power Distribution System GO2-14-043, License Amendment Request for Changing Technical Specification Table 3.3.1.1-1 Function 7, Scram Discharge Volume Water Level-High2014-03-24024 March 2014 License Amendment Request for Changing Technical Specification Table 3.3.1.1-1 Function 7, Scram Discharge Volume Water Level-High GO2-12-104, Response to Request for Additional Information for License Amendment Request to Make Administrative and Editorial Changes to Technical Specifications and the Operating License2012-07-30030 July 2012 Response to Request for Additional Information for License Amendment Request to Make Administrative and Editorial Changes to Technical Specifications and the Operating License GO2-12-003, License Amendment Request to Make Administrative and Editorial Changes to Technical Specifications and the Operating License2012-01-0909 January 2012 License Amendment Request to Make Administrative and Editorial Changes to Technical Specifications and the Operating License GO2-10-098, Request for Approval of the Cyber Security Plan2010-07-22022 July 2010 Request for Approval of the Cyber Security Plan ML1013903692010-05-11011 May 2010 Columbia Generating Station, License Amendment Request to Change Technical Specifications in Support of Prnm/Arts/Mella Implementation GO2-10-024, License Amendment Request to Change Technical Specifications Relating to Control Rod Operability and Control Rod Scram Accumulators2010-02-0808 February 2010 License Amendment Request to Change Technical Specifications Relating to Control Rod Operability and Control Rod Scram Accumulators GO2-09-043, Independent Spent Fuel Storage Installation - Offsite Dose Calculation Manual, Including Revision Made During 20082009-02-27027 February 2009 Independent Spent Fuel Storage Installation - Offsite Dose Calculation Manual, Including Revision Made During 2008 ML0823800182008-09-16016 September 2008 Tech Spec Pages for Amendment No. 209 TSTF-484, Use of TS 3.10.1 for Scram Time Testing Activities. ML0819005982008-09-15015 September 2008 Tech Spec Pages for Amendment No. 208 Adoption of Approved Generic Technical Specification Changes Associated with Containment Isolation Valves GO2-08-122, Supplement to Adoption of Approved Generic Technical Specification Changes Associated with Containment Isolation Valves2008-08-28028 August 2008 Supplement to Adoption of Approved Generic Technical Specification Changes Associated with Containment Isolation Valves ML0817702012008-06-30030 June 2008 Tech Spec Pages for Amendment No. 207 Control Room Habitability in Accordance with TSTF-448-A, Rev 3 ML0810602972008-04-15015 April 2008 License Page 3 and Technical Specification Page 10 for Amendment No. 206 Eliminate Condition 2.F GO2-07-156, Supplement to License Amendment Request for Proposed Changes to Technical Specifications: Miscellaneous Administrative Changes Including Adoption of Approved TSTF Travelers 284, 479, and 4852007-11-0606 November 2007 Supplement to License Amendment Request for Proposed Changes to Technical Specifications: Miscellaneous Administrative Changes Including Adoption of Approved TSTF Travelers 284, 479, and 485 ML0703802052007-02-27027 February 2007 License and Technical Spec Pages - Amendment No. 202 Under Exigent Circumstances TS 3.6.1.7, Suppression Chamber-to-Drywell Vacuum Breakers-Allow One-time Extension to Current Closure Verification SR ML0705203982007-02-13013 February 2007 Supplemental Information Regarding License Amendment Request to Technical Specifications Associated with AC and DC Electrical Power ML0703000212007-02-0909 February 2007 Technical Specifications, Issuance of Amendment No. 201 to Facility Operating License Suppression Chamber-to-Drywell Vacuum Breakers and Drywell-to-Suppression Chamber Bypass Leakage Test ML0632800532006-11-27027 November 2006 Tech Spec Pages for Amendment 199 Changes to Technical Specifications to Replace the Current Accident Source Term Used in Design Basis Radiological Analyses ML0624301412006-07-11011 July 2006 Issuance of Technical Specification Pages Re Inoperability of Snubbers GO2-06-060, Application for Technical Specification Change to Add LCO 3.0.8 on the Inoperability of Snubbers (TSTF-372) Using the Consolidated Line Item Improvement Process2006-04-17017 April 2006 Application for Technical Specification Change to Add LCO 3.0.8 on the Inoperability of Snubbers (TSTF-372) Using the Consolidated Line Item Improvement Process ML0610202712006-03-13013 March 2006 E-mail 3/13/2006 - Clean TS Pages for DG AOT ML0630400372005-12-0808 December 2005 Technical Specifications, One Time Extension of the 72- Hour Completion Time (CT) for the Required Action of Condition B Technical Specification (TS) 3.7.1 ML0534101872005-12-0808 December 2005 Issuance of Amendment One Time Extension of the 72- Hour Completion Time (CT) for the Required Action of Condition B Technical Specification (TS) 3.7.1 TAC No. MC8421 GO2-05-186, Supplement to the License Amendment Request for a One-Time Change to Technical Specifications2005-11-30030 November 2005 Supplement to the License Amendment Request for a One-Time Change to Technical Specifications ML0527300232005-09-29029 September 2005 Tech Spec Pages for Amendment 194 Regarding Technical Specification Improvement to Revise Control Rod Scram Time Testing Frequency Using the Consolidated Line Item Improvement Process GO2-05-099, License Amendment Request to Technical Specifications Associated with AC and DC Electrical Power2005-05-31031 May 2005 License Amendment Request to Technical Specifications Associated with AC and DC Electrical Power ML0513602142005-05-12012 May 2005 Technical Specification Pages Reactor Coolant System (RCS) Pressure and Temperature Limits (Tac. MC3591) ML0510301872005-04-12012 April 2005 Technical Specifications, One-Time Extension of Appendix J Type a Integrated Leakage Rate Test Interval 2024-05-31
[Table view] |
Text
May 31, 2024
Mr. Robert Schuetz Chief Executive Officer Energy Northwest MD 1023 76 North Power Plant Loop P.O. Box 968 Richland, WA 99352
SUBJECT:
COLUMBIA GENERATING STAT ION - ISSUANCE OF AMENDMENT NO. 274 TO REVISE TECHNICAL SPECIFICATIONS TO ADOPT TSTF-584, ELIMINATE AUTOMATIC RWCU SYSTEM ISOLATION ON SLC INITIATION (EPID L-2023-LLA-0170)
Dear Robert Schuetz:
The U.S. Nuclear Regulatory Commission (NRC, the Commission) has issued the enclosed Amendment No. 274 to Renewed Facility Operating License No. NPF-21 for the Columbia Generating Station (Columbia). The amendment consists of changes to the Technical Specifications (TSs) in response to your application dated December 5, 2023.
The amendment revises Columbia TS 3.3.6.1, P rimary Containment Isolation Instrumentation, to remove the requirement that the reactor water cleanup (RWCU) system automatically isolate on manual initiation of the standby liquid control (SLC) system. The SLC system is manually actuated in response to an anticipated transient without scram event. The amendment is based on NRC-approved Technical Specifications Task Force (TSTF) Traveler TSTF-584, Eliminate Automatic RWCU System Isolation on SLC Initiation.
R. Schuetz
A copy of the related safety evaluation is also enclosed. Notice of Issuance will be included in the Commissions monthly Federal Register notice.
Sincerely,
/RA/
Mahesh L. Chawla, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
Docket No. 50-397
Enclosures:
- 1. Amendment No. 274 to NPF-21
- 2. Safety Evaluation
- 3. Notices and Environmental Findings
cc: Listserv
ENERGY NORTHWEST
DOCKET NO. 50-397
COLUMBIA GENERATING STATION
AMENDMENT TO RENEWED FACI LITY OPERATING LICENSE
Amendment No. 274 License No. NPF-21
- 1. The Nuclear Regulatory Commission (the Commission) has found that:
A. The application for amendment by Energy Northwest (the licensee), dated December 5, 2023, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commissions rules and regulations set forth in 10 CFR Chapter I;
B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission;
C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commissions regulations;
D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and
E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commissions regulations and all applicable requirements have been satisfied.
Enclosure 1
- 2. Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Renewed Facility Operating License No. NPF-21 is hereby amended to read as follows:
(2) Technical Specifications and Environmental Protection Plan
The Technical Specifications contained in Appendix A, as revised through Amendment No. 274 and the Environmental Protection Plan contained in Appendix B, are hereby incorporated in the renewed license. The licensee shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
- 3. The license amendment is effective as of its date of issuance and shall be implemented within 90 days from the date of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION
Jennivine K. Rankin, Chief Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
Attachment:
Changes to Renewed Facility Operating License No. NPF-21 and the Technical Specifications
Date of Issuance: May 31, 2024 ATTACHMENT TO LICENSE AMENDMENT NO. 274
RENEWED FACILITY OPERATING LICENSE NO. NPF-21
COLUMBIA GENERATING STATION
DOCKET NO. 50-397
Replace the following pages of Renewed Facility Operating License No. NPF-21 and the Appendix A, Technical Specifications, with the attached revised pages. The revised pages are identified by amendment number and contain vertical lines indicating the areas of change.
Renewed Facility Operating License
REMOVE INSERT Technical Specification
REMOVE INSERT 3.3.6.1-3 3.3.6.1-3 3.3.6.1-9 3.3.6.1-9 3.3.6.1-10 3.3.6.1-10
(2) Technical Specifications and Environmental Protection Plan
The Technical Specifications contained in Appendix A, as revised through Amendment No. 274 and the Environmental Protection Plan contained in Appendix B, are hereby incorporated in the renewed license. The licensee shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
- a. For Surveillance Requirements (SRs) not previously performed by existing SRs or other plant tests, the requirement will be considered met on the implementation date and the next required test will be at the interval specified in the Technical Specifications as revised in Amendment No. 149.
(3) Deleted.
(4) Deleted.
(5) Deleted.
(6) Deleted.
(7) Deleted.
(8) Deleted.
(9) Deleted.
(10) Deleted.
(11) Deleted.
(12) Deleted.
(13) Deleted.
Renewed License No. NPF-21 Amendment No. 274 Primary Containment Isolation Instrumentation 3.3.6.1
ACTIONS
CONDITION REQUIRED ACTION COMPLETION TIME
H. Required Action and H.1 Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> associated Completion Time of Condition F or G AND not met.
H.2 Be in MODE 4. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> OR
As required by Required Action C.1 and referenced in Table 3.3.6.1-1.
I. As required by RequiredI.1 Initiate action to restore Immediately Action C.1 and channel to OPERABLE referenced in status.
Table 3.3.6.1-1.
SURVEILLANCE REQUIREMENTS
NOTES----------------------------------------------------------
- 1. Refer to Table 3.3.6.1-1 to determine which SRs apply for each Primary Containment Isolation Function.
- 2. When a channel is placed in an inoperable status solely for performance of required Surveillances, entry into associated Conditions and Required Actions may be delayed for up to 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> provided the associated Function maintains isolation capability.
Columbia Generating Station 3.3.6.1-3 Amendment No. 149,169 225 238 264 270 274 Primary Containment Isolation Instrumentation 3.3.6.1
Table 3.3.6.1-1 (page 4 of 6)
Primary Containment Isolation Instrumentation
APPLICABLE CONDITIONS MODES OR REQUIRED REFERENCED OTHER CHANNELS FROM SPECIFIED PER TRIP REQUIRED SURVEILLANCE ALLOWABLE FUNCTION CONDITIONS SYSTEM ACTION C.1 REQUIREMENTS VALUE
- 4. RWCU System Isolation
- e. Heat Exchanger 1, 2, 3 1 F SR 3.3.6.1.3 70F Room Area SR 3.3.6.1.4 Ventilation SR 3.3.6.1.6 Differential Temperature - High
- f. Pump Room Area 1, 2, 3 1 per room F SR 3.3.6.1.3 180F Temperature - High SR 3.3.6.1.4 SR 3.3.6.1.6
- g. Pump Room Area 1, 2, 3 1 per room F SR 3.3.6.1.3 100F Ventilation SR 3.3.6.1.4 Differential SR 3.3.6.1.6 Temperature - High
- h. RWCU/RCIC Line 1, 2, 3 1 F SR 3.3.6.1.3 180F Routing Area SR 3.3.6.1.4 Temperature - High SR 3.3.6.1.6
- i. RWCU Line Routing 1, 2, 3 1 per room F SR 3.3.6.1.3 Area Temperature - SR 3.3.6.1.4 High SR 3.3.6.1.6
Room 409, 509 175F Areas
Room 408, 511 180F Areas
- j. Reactor Vessel 1, 2, 3 2 F SR 3.3.6.1.2 -58 inches Water Level - Low SR 3.3.6.1.4 Low, Level 2 SR 3.3.6.1.6
- k. Manual Initiation 1, 2, 3 2 G SR 3.3.6.1.6 NA
(c) Deleted
Columbia Generating Station 3.3.6.1-9 Amendment No. 161,169 225 251 253 270 274 Primary Containment Isolation Instrumentation 3.3.6.1
Table 3.3.6.1-1 (page 5 of 6)
Primary Containment Isolation Instrumentation
APPLICABLE CONDITIONS MODES OR REQUIRED REFERENCED OTHER CHANNELS FROM SPECIFIED PER TRIP REQUIRED SURVEILLANCE ALLOWABLE FUNCTION CONDITIONS SYSTEM ACTION C.1 REQUIREMENTS VALUE
- 5. Residual Heat Removal (RHR) Shutdown Cooling (SDC) System Isolation
- a. Pump Room Area 3 1 per room F SR 3.3.6.1.3 150F Temperature - High SR 3.3.6.1.4 SR 3.3.6.1.6
- b. Pump Room Area 3 1 per room F SR 3.3.6.1.3 70F Ventilation SR 3.3.6.1.4 Differential SR 3.3.6.1.6 Temperature - High
- c. Heat Exchanger 3 1 per room F SR 3.3.6.1.3 Area Temperature - SR 3.3.6.1.4 High SR 3.3.6.1.6
Room 505 Area 140F
Room 507 Area 160F
Room 605 Area 150F
Room 606 Area 140F
- d. Reactor Vessel 3 2 I SR 3.3.6.1.1 9.5 inches Water Level - Low, SR 3.3.6.1.2 Level 3 SR 3.3.6.1.4 SR 3.3.6.1.6
- e. Reactor Vessel 1, 2, 3 1 F SR 3.3.6.1.2 135 psig Pressure - High SR 3.3.6.1.4 SR 3.3.6.1.6
- f. Manual Initiation 1, 2, 3 2 G SR 3.3.6.1.6 NA
(d) Deleted
Columbia Generating Station 3.3.6.1-10 Amendment No. 208,220 225 270 274 SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELATED TO AMENDMENT NO. 274 TO RENEWED FACILITY OPERATING LICENSE NO. NPF-21 ENERGY NORTHWEST COLUMBIA GENERATING STATION DOCKET NO. 50-397
Application Safety Evaluation Date December 5, 2023, ML23339A124 May 31, 2024 Principal Contributor to Safety Evaluation Tarico Sweat
1.0 PROPOSED CHANGE
S
Energy Northwest (the licensee) requested changes to the technical specifications (TSs) for Columbia Generating Station (Columbia) by lic ense amendment request (LAR, application),
dated December 5, 2023. The proposed amendment would revise the primary containment isolation instrumentation technical specification based on Technical Specifications Task Force (TSTF) Traveler TSTF-584, Revision 0, Eliminate Automatic RWCU [Reactor Water Cleanup]
System Isolation on SLC [Standby Liquid Control] Initiation (Agencywide Documents Access and Management System (ADAMS) Accession No. ML22054A292), and the associated U.S.
Nuclear Regulatory Commission (NRC, the Commission), staff safety evaluation (SE) of TSTF-584 (ML23206A076). In its application, the licensee requested that the U.S. Nuclear Regulatory Commission (NRC, the Commission) process the proposed amendment under the Consolidated Line Item Improvement Process (CLIIP).
Columbia Technical Specification (TS) 3.3.6.1, Primary Containment Isolation Instrumentation, would be revised to remove the requirement that the RWCU system automatically isolate on manual initiation of the SLC system. The SLC system is manually actuated in response to an anticipated transient without scram (ATWS) event. Additionally, the licensee confirmed that the emergency operating procedures only credit manual initiation of the SLC system.
Enclosure 2
Reactor Water Cleanup System
The following automatic signals to the RWCU system supply and/or return isolation valves indicate that the RWCU piping or components have been breached:
Low reactor vessel water level; RWCU system high differential flow; Main steam tunnel penetration area temperature high; and RWCU heat exchanger/pump/filter demineralizer unit area high temperature.
The TSs require the above functions to be operable. The automatic closure of the supply and/or return isolation valves, coupled with the dual check valves in each RWCU system return line isolates the RWCU system from the reactor coolant pressure boundary. The automatic signal for RWCU system isolation on SLC system initiation, which is proposed to be removed, is not used to indicate any breach of RWCU piping or components.
Standby Liquid Control System
During an ATWS event, the SLC system would bring the reactor from full power to a subcritical condition without crediting the control rods. The SLC system injects a quantity of borated water into the reactor core that adds negative reactivity sufficient to compensate for all of the various positive reactivity effects that could occur during shutdown. The licensee confirmed that the plant response to an ATWS event, which requires SLC system actuation, would also result in automatic isolation of RWCU.
1.1 Proposed TS Changes to Adopt TSTF-584
In accordance with the NRC staff-approved TSTF-584 under the CLIIP by letter dated July 31, 2023 (ML23206A124), the licensee proposed changes that would revise TS 3.3.6.1, Primary Containment Isolation Instrumentation for Columbia. Specifically, the licensee proposed the following changes to adopt TSTF-584:
Technical Change:
Table 3.3.6.1-1, Function 4.k, RWCU System Isolation - Standby Liquid Control (SLC)
System Initiation, is deleted.
Editorial changes needed for consistency:
Table 3.3.6.1-1, Function 4.l, Manual Initiation, is renumbered as Function 4.k.
Table 3.3.6.1-1, Function 5.d, reference to Action J is revised to reference Action I.
TS 3.3.6.1, Action I, which is only referenced in Function 4.k, is deleted.
TS 3.3.6.1, Action J, is renumbered Action I.
1.2 Additional Proposed TS Changes
In addition to the changes proposed consistent with the traveler as discussed in section 1.1 above, the licensee proposed the following editorial variation:
The licensee noted that Columbia TSs have different numbering and titles than standard technical specifications (STSs).
2.0 REGULATORY EVALUATION
The categories of items required to be in the TSs are listed in Title 10 of the Code of Federal Regulations (10CFR) Section50.36(c). The regulation at 10CFR50.36(c)(2) requires that TSs include limiting conditions for operation (LCOs). The regulation at 10 CFR 50.36(c)(2)(i), states, in part that LCOs are the lowest functional capability or performance levels of equipment required for safe operation of the facility. The regulation further states, in part, that [w]hen a limiting condition for operation of a nuclear reactor is not met, the licensee shall shut down the reactor or follow any remedial action permitted by the technical specifications until the condition can be met.
The regulation at 10 CFR 50.62(b) defines an ATWS as an anticipated operational occurrence as defined in appendix A of this part followed by the failure of the reactor trip portion of the protection system specified in General Design Criterion 20 of appendix A of this part.
The NRC staffs guidance for the review of TSs is in Chapter16.0, Revision 3, Technical Specifications, of NUREG-0800, Standard Review Plan for the Review of Safety Analysis Reports for Nuclear Power Plants: LWR [Light Water Reactor] Edition (SRP), dated March2010 (ML100351425). Accordingly, the NRC staffs review includes consideration of whether the proposed changes are consistent with the traveler TSTF-584, which was approved under the CLIIP.
3.0 TECHNICAL EVALUATION
3.1 Proposed TS Changes to Adopt TSTF-584
The NRC staff compared the licensee s proposed TS changes in section1.1 of this SE against the changes approved in TSTF-584. In accordance with the SRP Chapter 16.0, the NRC staff determined that the STS changes approved in TSTF-584 are applicable because Columbia is a boiling water reactor (BWR) design plant, and the NRC staff approved the TSTF-584 changes for BWR designs. The NRC staff finds that the licensees proposed changes to the Columbia TSs in section1.1 of this SE are consistent with those found acceptable in TSTF-584.
In the NRC SE of TSTF-584, the NRC staff concluded that the proposal to eliminate automatic isolation of the RWCU system on the initiation of the SLC system by deleting table 3.3.6.1-1, Function4.k is acceptable because the specified acceptable fuel design limits will not be affected during an ATWS event. Therefore, 10 CFR 50.62(b) will continue to be met.
Additionally, 10 CFR 50.36(c)(2)(i) will continue to be met because TS 3.3.6.1 continues to provide remedial actions and shuts down the reactor if the remedial actions cannot be met.
Thus, the proposed changes continue to meet the requirements of 10 CFR 50.62(b) and 10 CFR50.36(c)(2)(i) as discussed in section3.0 of the NRC staffs SE of TSTF-584.
3.2 Additional Proposed TS Changes
3.2.1 Editorial Variations
The licensee proposed renumbering and deletion of Func tions and Actions in TS 3.3.6.1, which are described above in section 1.2. These changes are acceptable because they are conforming changes resulting from the deletion of table 3.3.6.1-1, Function 4.k, and do not alter
the way the TSs are implemented. Furthermore, the NRC staff finds this change is acceptable since it is editorial and provides the correct numbering sequence.
The licensee noted that Columbia TSs have different numbering and titles than STS. The NRC staff finds that the different TS numbering and title changes are acceptable because they do not substantively alter TS requirements.
3.3 TS Change Consistency
The NRC staff reviewed the proposed TS changes for technical clarity and consistency with the existing requirements for customary terminology and formatting. The NRC staff finds that the proposed changes are consistent with Chapter 16.0 of the SRP and are therefore acceptable.
4.0 CONCLUSION
The Commission has concluded, based on the considerations discussed above, that: (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2)there is reasonable assurance that such activities will be conducted in compliance with the Commissions regulations, and (3) the issuance of the amendment will not be inimical to the common defense and security or to the health and safety of the public.
NOTICES AND ENVIRONMENTAL FINDINGS RELATED TO AMENDMENT NO. 274 TO RENEWED FACILITY OPERATING LICENSE NO. NPF-21 ENERGY NORTHWEST COLUMBIA GENERATING STATION DOCKET NO. 50-397
Application Safety Evaluation Date December 5, 2023, ML23339A124 May 31, 2024
1.0 INTRODUCTION
Energy Northwest (the licensee) requested changes to the technical specifications (TSs) for Columbia Generating Station by license amendment request (application), dated December 5, 2023. The proposed amendment would revise the primary containment isolation instrumentation TS based on Technical Specifications Task Force (TSTF) Traveler TSTF-584, Revision 0, Eliminate Automatic RWCU [Reactor Water Cleanup] System Isolation on SLC [Standby Liquid Control] Initiation (Agencywide Docum ents Access and Management System (ADAMS)
Accession No.ML22054A292), and the associated U.S. Nuclear Regulatory Commission (NRC, the Commission), staff safety evaluation (SE) of TSTF-584 (ML23206A076). In its application, the licensee requested that the U.S. Nuclear Regulatory Commission (NRC, the Commission) process the proposed amendment under the Consolidated Line Item Improvement Process (CLIIP).
2.0 STATE CONSULTATION
In accordance with the Commissions regulations, the Washington State official was notified of the proposed issuance of the amendment on May 6, 2024. The State official had no comments.
3.0 ENVIRONMENTAL CONSIDERATION
The amendment changes a requirement with respect to installation or use of a facility component located within the restricted area as defined in 10 CFR Part 20. The NRC staff has determined that the amendment involves no significant increase in the amounts, and no significant change in the types, of any effluents that may be released offsite, and that there is no significant increase in individual or cumulative occupational radiation exposure. The Commission has previously issued a proposed finding that the amendment involves no significant hazards consideration as published in the Federal Register on February 20, 2024 (89 FR 12875), and there has been no public comment on such finding. Accordingly, the amendment meets the eligibility criteria for catego rical exclusion set forth in 10 CFR 51.22(c)(9).
Pursuant to 10 CFR 51.22(b), no environmental impact statement or environmental assessment need be prepared in connection with the issuance of the amendment.
Enclosure 3
ML24128A224 *concurrence via email OFFICE NRR/DORL/LPL4/PM NRR/DORL/LPL4/LA NRR/DSS/STSB/BC*
NAME MChawla PBlechman SMehta DATE 5/13/2024 5/13/2024 5/3/2024 OFFICE OGC - NLO NRR/DORL/LPL4/BC NRR/DORL/LPL4/PM NAME MASpencer JRankin MChawla DATE 5/23/2024 5/31/2024 5/31/2024