{{#Wiki_filter:ENERGY NORTHWEST DOCKET NO. 50-397 COLUMBIA GENERATING STATION RENEWED FACILITY OPERATING LICENSE Renewed License No. NPF-21
- 1. The Nuclear Regulatory Commission (the Commission or the NRC) has found that:
A. The application for renewed license filed by Energy Northwest (also the licensee), complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's regulations set forth in 10 CFR Chapter I, and all required notifications to other agencies or bodies have been duly made; B. Construction of Energy Northwest, Columbia Generating Station (the facility) has been substantially completed in conformity with Construction Permit No. CPPR-93 and the application, as amended, the provisions of the Act, and the regulations of the Commission; C. The facility will operate in conformity with the application, as amended, the provisions of the Act, and the regulations of the Commission (except as exempted from compliance in Section 2.0. below); D. There is reasonable assurance: (i) that the activities authorized by this renewed operating license can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations set forth in 10 CFR Chapter I (except as exempted from compliance in Section 2.0. below); E. Energy Northwest is technically qualified to engage in the activities authorized by this renewed license in accordance with the Commission's regulations set forth in 10 CFR Chapter I; F. Energy Northwest has satisfied the applicable provisions of 10 CFR Part 140, "Financial Protection Requirements and Indemnity Agreements", of the Commission's regUlations; Renewed License No. NPF-21 Amendment No. 225
- 2 G. The issuance of this renewed license will not be inimical to the common defense and security or to the health and safety of the public; H. After weighing the environmental, economic, technical, and other benefits of the facility against environmental and other costs and considering available alternatives, the issuance of this Renewed Facility Operating License No. NPF-21, subject to the conditions for protection of the environment set forth in the Environmental Protection Plan attached as Appendix B, is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied; and I. The receipt, possession, and use of source, byproduct and special nuclear material as authorized by this renewed license will be in accordance with the Commission's regulations in 10 CFR Parts 30, 40 and 70.
J. Actions have been identified and have been or will be taken with respect to (1) managing the effects of aging during the period of extended operation on the functionality of structures and components that have been identified to require review under 10 CFR 54.21 (a)(1), and (2) time-limited aging analyses that have been identified to require review under 10 CFR 54.21 (c), such that there is reasonable assurance that the activities authorized by the renewed operating license will continue to be conducted in accordance with the current licensing basis, as defined in 10 CFR 54.3, for the facility, and that any changes made to the facility's current licensing basis in order to comply with 10 CFR 54.29(a) are in accordance with the Act and the Commission's regulations.
- 2. Based on the foregoing findings regarding this facility, Renewed Facility Operating License NPF-21 is hereby issued to Energy Northwest (the licensee) to read as follows:
A. This renewed operating license applies to Columbia Generating Station, a boiling water nuclear reactor and associated equipment, owned by Energy Northwest. The facility is located on Hanford Reservation in Benton County near Richland, Washington, and is described in the licensee's "Final Safety Analysis Report", as supplemented and amended, and in the licensee's Environmental Report, as supplemented and amended. B. Subject to the conditions and requirements incorporated herein, the Commission hereby licenses Energy Northwest: (1) Pursuant to Section 103 of the Act and 10 CFR Part 50, to possess, use, and operate the facility at the deSignated location on Hanford Reservation, Benton County, Washington, in accordance with the procedures and limitations set forth in this renewed license; Renewed License No. NPF-21 Amendment No. 225
(2) Pursuant to the Act and 10 CFR Part 70, to receive, possess and use at any time special nuclear material as reactor fuel, in accordance with the limitations for storage and amounts required for reactor operation, as described in the Final Safety Analysis Report, as supplemented and amended; (3) Pursuant to the Act and 10 CFR Parts 30, 40 and 70, to receive, possess, and use at any time any byproduct, source and special nuclear material as sealed neutron sources for reactor startup, sealed sources for reactor instrumentation and radiation monitoring equipment calibration, and as fission detectors in amounts as required; (4) Pursuant to the Act and 10 CFR Parts 30, 40 and 70, to receive, possess, and use in amounts as required any byproduct, source of special nuclear material without restriction to chemical or physical form, for sample analysis or instrument calibration or associated with radioactive apparatus or components; and (5) Pursuant to the Act and 10 CFR Parts 30, 40 and 70, to possess, but not separate, such byproduct and special nuclear materials as may be produced by the operation of the facility. (6) Pursuant to the Act and 10 CFR Parts 30, 40 and 70, to store byproduct, source and special nuclear materials not intended for use at Columbia Generating Station. The materials shall be no more than 9 sealed neutron radiation sources designed for insertion into pressurized water reactors and no more than 40 sealed beta radiation sources designed for use in area radiation monitors. The total inventory shall not exceed 24 microcuries of strontium-90, 20 microcuries of uranium-235, 30 curies of plutonium-238, and 3 curies of americium-241. C. This renewed license shall be deemed to contain and is subject to the conditions specified in the Commission's regulations set forth in 10 CFR Chapter I and is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below: (1) Maximum Power Level The licensee is authorized to operate the facility at reactor core power levels not in excess of full power (3544 megawatts thermal). Renewed License No. NPF-21 Amendment No. ~. 241
(2) Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No. 249 and the Environmental Protection Plan contained in Appendix B, are hereby incorporated in the renewed license. The licensee shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
- a. For Surveillance Requirements (SRs) not previously performed by existing SRs or other plant tests, the requirement will be considered met on the implementation date and the next required test will be at the interval specified in the Technical Specifications as revised in Amendment No. 149.
(3) Deleted. (4) Deleted. ( 5) Deleted. (6) Deleted. (7) Deleted. (8) Deleted. (9) Deleted. (10) Deleted. (11) Shield Wall Deferral (Section 12.3.2, SSER #4, License Amendment #7) The licensee shall complete construction of the deferred shield walls and window as identified in Attachment 3, as amended by this license amendment. (12) Deleted. (13) Deleted.
- The parenthetical notation following the title of many license conditions denotes the section of the Safety Evaluation Report and/or its supplements wherein the license condition is discussed.
Renewed License No. NPF-21 Amendment No. 249
-5 (14) Fire Protection Program (Generic Letter 86-10)
The licensee shall implement and maintain in effect all provisions of the approved fire protection program as described in Section 9.5.1 and Appendix F of the Final Safety Analysis Report (FSAR) for the facility thru Amendment #39 and as described in subsequent letters to the staff through November 30, 1988, referenced in the May 22, 1989 safety evaluation and in other pertinent sections of the FSAR referenced in either Section 9.5.1 or Appendix F and as approved in the Safety Evaluation Report issued in March 1982 (NUREG 0892) and in Supplements 3, issued in May 1983, and 4, issued in December 1983, and in safety evaluations issued with letters dated November 11, 1987 and May 22, 1989 subject to the following provision: The licensee may make changes to the approved fire protection program without prior approval of the Commission only if those changes would not adversely affect the ability to achieve and maintain safe shutdown in the event of a fire. (15) Deleted. (16) Deleted. (17) Deleted. (18) Deleted. (19) Deleted. (20) Deleted. (21 ) Deleted. (22) Deleted. (23) Deleted. (24) Deleted. (25) Deleted. (26) Deleted. (27) Deleted. (28) Deleted. Renewed License No. NPF-21 Amendment No. 225
-6 (29) Protection of the Environment (FES)
Before engaging in additional construction or operational activities which may result in a significant adverse environmental impact that was not evaluated or that is significantly greater than the evaluation in the Final Environmental Statement the licensee shall provide a written notification to the Director of the Office of Nuclear Reactor Regulation and receive written approval from that office before proceeding with such activities. (30) Deleted. (31) Mitigation Strategy License Condition Develop and maintain strategies for addressing large fires and explosions and that include the following key areas: (a) Fire fighting response strategy with the following elements:
- 1. Pre-defined coordinated fire response strategy and guidance
- 2. Assessment of mutual aid fire fighting assets
- 3. Designated staging areas for equipment and materials
- 4. Command and control
- 5. Training of response personnel (b) Operations to mitigate fuel damage considering the following:
- 1. Protection and use of personnel assets
- 2. Communications
- 3. Minimizing fire spread
- 4. Procedures for implementing integrated fire response strategy
- 5. Identification of readily-available pre-staged equipment
- 6. Training on integrated fire response strategy
- 7. Spent fuel pool mitigation measures (c) Actions to minimize release to include consideration of:
- 1. Water spray scrubbing
- 2. Dose to onsite responders (32) The licensee shall implement and maintain all Actions required by Attachment 2 to NRC Order EA-06-137, issued June 20,2006, except the last action that requires incorporation of the strategies into the site security plan, contingency plan, emergency plan and/or guard training and qualification plan, as appropriate.
Renewed License No. NPF-21 Amendment No. 225
-7 (33) Control Room Envelope Habitability Program (CRE)
Upon implementation of Amendment No. 207 adopting TSTF-448, Revision 3, the determination of eRE unfiltered air inleakage as required by SR 3.7.3.4, in accordance with TS S.S.14.c.(O, the assessment of eRE habitability as required by Specification S.S.14.c.{ii), and the measurement of eRE pressure as required by Specification S.S.14.d, shall be considered met. Following implementation: (a) The first performance of SR 3.7.3.4, in accordance with Specification S.S.14.c.(i), shall be within the specified Frequency of 6 years, plus the 18-month allowance of SR 3.0.2, as measured from November 6,2003, the date of the most recent successful tracer gas test, or within the next 18 months if the time period since the most recent successful tracer gas test is greater than 6 years. (b) The first performance of the periodic assessment of CRE habitability, Specification S.S.14.c.(ii), shall be within 3 years, plus the 9-month allowance of SR 3.0.2, as measured from November 6, 2003, the date of the most recent successful tracer gas test, or within the next 9 months if the time period since the most recent successful tracer gas test is greater than 3 years. (c) The first performance of the periodic measurement of eRE pressure, Specification S.S.14.d, shall be within 24 months, plus the 184 days allowed by SR 3.0.2, as measured from March 23, 2006, the date of the most recent successful pressure measurement test, or within 184 days if not performed previously. Renewed License No. NPF-21 Amendment No. 22S
- 8 (34) The information in the FSAR supplement, submitted pursuant to 10 CFR 54.21 (d), as supplemented by Commitment Nos. 1,5, 13, 14, 17, 18,23,24,26, 27,28,32,36,38,40,41,42,43,48,49,50,53,55,58, 59,60, 61,63,64,65, 66,67,68,69, and 70 of Appendix A of NUREG-2123, "Safety Evaluation Report Related to the License Renewal of Columbia Generating Station" dated May 2012, is henceforth part of the FSAR which will be updated in accordance with 10 CFR 50.71 (e). As such, the licensee may make changes to the programs and activities described in the UFSAR supplement and Commitment Nos. 1, 5, 13, 14,17,18,23,24,26,27,28,32,36, 38,40,41,42,43,48,49, 50, 53,55,58, 59,60,61,63,64,65,66,67,68,69, and 70 of Appendix A of NUREG-2123 provided the licensee evaluates such changes pursuant to the criteria set forth in 10 CFR 50.59 and otherwise complies with the requirements in that section.
(35) The licensee's FSAR supplement submitted pursuant to 10 CFR 54.21(d), as revised during the license renewal application review process, and as supplemented by Commitment Nos. 1,5,13,14,17, 18,23,24,26,27,28,32, 36,38,40,41,42,43,48,49,50,53, 55,58, 59,60,61,63,64,65,66,67,68, 69, and 70 of Appendix A of NUREG-2123, describes certain future programs and activities to be completed before the period of extended operation. Energy Northwest shall complete these activities no later than June 20, 2023, and shall notify the NRC in writing when implementation of these activities is complete. (36) To prevent lateral motion of the core plate, the licensee shall install core plate wedges around the periphery of the core plate within the shroud on or before December 20,2021. Upon completion of the core plate wedge installation, the licensee shall submit a written report to the NRC staff summarizing the results of the installation. The licensee shall also submit a written report regarding any corrective action taken related to core plate rim hold-down bolts or core plate wedges and the results of extent of condition reviews on or before December 20, 2021. Renewed License No. NPF-21 Amendment No. 225
D. Exemptions from certain requirements of Appendices G, H and J to 10 CFR Part 50, are described in the Safety Evaluation Report. These exemptions are authorized by law and will not endanger life or property or the common defense and security and are otherwise in the public interest. Therefore, these exemptions are hereby granted pursuant to 10 CFR 50.12. With the granting of this exemption the facility will operate, to the extent authorized herein, in conformity with the application, as amended, the provisions of the Act, and the rules and regulations of the Commission. E. The licensee shall fully implement and maintain in effect all provisions of the Commission-approved physical security, training and qualification, and safeguards contingency plans including amendments made pursuant to provisions of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822) and to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The plan, which contains Safeguards Information protected under 10 CFR 73.21, is entitled:
"Columbia Generating Station Physical Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Plan."
Energy Northwest shall fully implement and maintain in effect all provisions of the Commission-approved cyber security plan (CSP), including changes made pursuant to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The Energy Northwest CSP and associated Implementation Schedule were approved by License Amendment No. 222, and the Implementation Schedule was revised by License Amendment No. 231. F. Deleted. G. The licensee shall notify the Commission, as soon as possible but not later than one hour, of any accident at this facility which could result in an unplanned release of quantities of fission products in excess of allowable limits for normal operation established by the Commission. H. The licensee shall have and maintain financial protection of such type and in such amounts as the Commission shall require in accordance with Section 170 of the Atomic Energy Act of 1954, as amended, to cover public liability claims. Renewed License No. NPF-21 Amendment No. 22-6, 231
- 10 I. This renewed license is effective as of the date of issuance and shall expire at midnight on December 20,2043.
FOR THE NUCLEAR REGULATORY COMMISSION (Original Signed By) Eric J. Leeds, Director Office of Nuclear Reactor Regulation
Enclosures:
- 1. Appendix A Technical Specifications
- 2. Appendix B Environmental Protection Plan
- 3. Appendix C Additional Conditions Date of Issuance: May 22, 2012 Renewed License No. NPF-21 Amendment No. 225
ATTACHMENT 1 TO OPERATING LICENSE NPF-21 Deleted Amendment No. 157,223 225
AITACHMENT 2 Deleted Amendment No. 162,223 225
ATTACHMENT 3 LIST OF SHIELD WALLS
- 1. Deleted.
- 2. Deleted.
- 3. Deleted.
- 4. Deleted.
- 5. FSAR Figure 12.3-12, Zone G The access blockout to duplicate centrifuge room.
- 6. FSAR Figure 12.3-12, Zone F Same as above for the duplicate centrifuge.
- 7. FSAR Figure 12.3-13, Zone J The blockout for one of the two decon concentrators.
- 8. FSAR Figure 12.3-11, Zone D The two block walls at the north end of the truck loading bay.
- 9. FSAR Figure 12.3-11, Zone E The leaded glass viewing window in the radwaste area.
- Shield walls and window identified in items 5, 6, 7, 8, and 9 will be installed if the associated radiation levels at these locations exceed 2.5mR/hr as dictated by the ongoing ALARA reviews.
Amendment No. ~ 225
LICENSE AUfliOITYXFll COaGU DPINOI U, APPENDIX A TECHNICAL SPECIFICATIONS FOR COLUMBIA GENERATING STATION
TABLE OF CONTENTS 1.0 USE AND APPLICATION 1.1 Definitions .............................................................................................................. 1.1-1 1.2 Logical Connectors ................................................................................................ 1.2-1 1.3 Completion Ti mes .................................................................................................1.3-1 1.4 Frequency ............................................................................................................. 1.4-1 2.0 SAFETY LIMITS (SLs) 2.1 SLs ........................................................................................................................2.0-1 2.2 SL Violations .........................................................................................................2.0-1 3.0 LIMITING CONDITION FOR OPERATION (LCO) APPLICABILITY ..................... 3.0-1 3.0 SURVEILLANCE REQUIREMENT (SR) APPLICABILITY .................................... 3.0-4 3.1 REACTIVITY CONTROL SYSTEMS 3.1.1 SHUTDOWN MARGIN (SDM) ............................................................................3.1.1-1 3.1.2 Reactivity Anomalies .......................................................................................... 3.1.2-1 3.1.3 Control Rod OPERABILITY ................................................................................ 3.1.3-1 3.1.4 Control Rod Scram Times .................................................................................. 3.1.4-1 3.1.5 Control Rod Scram Accumulators ...................................................................... 3.1.5-1 3.1.6 Rod Pattern Control. ...........................................................................................3.1.6-1 3.1.7 Standby Liquid Control (SLC) System ................................................................ 3.1.7-1 3.1.8 Scram Discharge Volume (SDV) Vent and Drain Valves ................................... 3.1.8-1 3.2 POWER DISTRIBUTION LIMITS 3.2.1 AVERAGE PLANAR LINEAR HEAT GENERATION RATE (APLHGR) ............. 3.2.1-1 3.2.2 MINIMUM CRITICAL POWER RATIO (MCPR) ................................................. 3.2.2-1 3.2.3 LINEAR HEAT GENERATION RATE (LHGR) ................................................... 3.2.3-1 3.2.4 Average Power Range Monitor (APRM) Gain and Setpoint ............................... 3.2.4-1 3.3 INSTRUMENTATION 3.3.1.1 Reactor Protection System (RPS) Instrumentation ......................................... 3.3.1.1-1 3.3.1.2 Source Range Monitor (SRM) Instrumentation ............................................... 3.3.1.2-1 3.3.1.3 Oscillation Power Range Monitor (OPRM) Instrumentation ............................ 3.3.1.3-1 3.3.2.1 Control Rod Block Instrumentation .................................................................. 3.3.2.1-1 3.3.2.2 Feedwater and Main Turbine High Water Level Trip Instrumentation ............. 3.3.2.2-1 3.3.3.1 Post Accident Monitoring (PAM) Instrumentation ............................................ 3.3.3. 1-1 3.3.3.2 Remote Shutdown System .............................................................................. 3.3.3.2-1 3.3.4.1 End of Cycle Recirculation Pump Trip (EOC-RPT) Instrumentation ............... 3.3.4.1-1 3.3.4.2 Anticipated Transient Without Scram Recirculation Pump Trip (ATWS-RPT) Instrumentation ....................................................................3.3.4.2-1 3.3.5.1 Emergency Core Cooling System (ECCS) Instrumentation ............................ 3.3.5.1-1 3.3.5.2 Reactor Core Isolation Cooling (RCIC) System Instrumentation ..................... 3.3.5.2-1 Columbia Generating Station Amendment -+69,-+74 225
TABLE OF CONTENTS 3.3 INSTRUMENTATION (continued) 3.3.6.1 Primary Containment Isolation Instrumentation .............................................. 3.3.6.1-1 3.3.6.2 Secondary Containment Isolation Instrumentation ......................................... 3.3.6.2-1 3.3.7.1 Control Room Emergency Filtration (CREF) System Instrumentation ............ 3.3.7.1-1 3.3.8.1 Loss of Power (LOP) Instrumentation ............................................................. 3.3.8.1-1 3.3.8.2 Reactor Protection System (RPS) Electric Power Monitoring ......................... 3.3.8.2-1 3.4 REACTOR COOLANT SYSTEM (RCS) 3.4.1 Recirculation Loops Operating ........................................................................... 3.4.1-1 3.4.2 Jet Pumps .......................................................................................................... 3.4.2-1 3.4.3 Safety/Relief Valves (SRVs) - C!: 25% RTP ........................................................ 3.4.3-1 3.4.4 Safety/Relief Valves (SRVs) - < 25% RTP ........................................................ 3.4.4-1 3.4.5 RCS Operational LEAKAGE .............................................................................. 3.4.5-1 3.4.6 RCS Pressure Isolation Valve (PIV) Leakage .................................................... 3.4.6-1 3.4.7 RCS Leakage Detection Instrumentation ........................................................... 3.4.7-1 3.4.8 RCS Specific Activity .......................................................................................... 3.4.8-1 3.4.9 Residual Heat Removal (RHR) Shutdown Cooling System - Hot Shutdown ..... 3.4.9-1 3.4.10 Residual Heat Removal (RHR) Shutdown Cooling System - Cold Shutdown .. 3.4.1 0-1 3.4.11 RCS Pressure and Temperature (PIT) Limits .................................................. 3.4.11-1 3.4.12 Reactor Steam Dome Pressure ....................................................................... 3.4.12-1 3.5 EMERGENCY CORE COOLING SYSTEMS (ECCS) AND REACTOR CORE ISOLATION COOLING (RCIC) SYSTEM 3.5.1 ECCS - Operating .............................................................................................. 3.5.1-1 3.5.2 ECCS - Shutdown .............................................................................................. 3.5.2-1 3.5.3 RCIC System ..................................................................................................... 3.5.3-1 3.6 CONTAINMENT SYSTEMS 3.6.1.1 Primary Containment ...................................................................................... 3.6.1.1-1 3.6.1.2 Primary Containment Air Lock ........................................................................ 3.6.1.2-1 3.6.1.3 Primary Containment Isolation Valves (PCIVs) ............................................... 3.6.1.3-1 3.6.1.4 Drywell Air Temperature ................................................................................. 3.6.1.4-1 3.6.1.5 Residual Heat Removal (RHR) Drywell Spray ................................................ 3.6.1.5-1 3.6.1.6 Reactor Building-to-Suppression Chamber Vacuum Breakers ....................... 3.6.1.6-1 3.6.1.7 Suppression Chamber-to-Drywell Vacuum Breakers ...................................... 3.6.1.7-1 3.6.2.1 Suppression Pool Average Temperature ........................................................ 3.6.2.1-1 3.6.2.2 Suppression Pool Water Level. ....................................................................... 3.6.2.2-1 3.6.2.3 Residual Heat Removal (RHR) Suppression Pool Cooling ............................. 3.6.2.3-1 3.6.3.1 Deleted 3.6.3.2 Primary Containment Atmosphere Mixing System .......................................... 3.6.3.2-1 3.6.3.3 Primary Containment Oxygen Concentration .................................................. 3.6.3.3-1 3.6.4.1 Secondary Containment.. ................................................................................ 3.6.4.1-1 3.6.4.2 Secondary Containment Isolation Valves (SCIVs) .......................................... 3.6.4.2-1 3.6.4.3 Standby Gas Treatment (SGT) System .......................................................... 3.6.4.3-1 Columbia Generating Station ii Amendment 169,1 QQ 225
TABLE OF CONTENTS 3.7 PLANT SYSTEMS 3.7.1 Standby Service Water (SW) System and Ultimate Heat Sink (UHS) ................ 3.7.1-1 3.7.2 High Pressure Core Spray (HPCS) Service Water (SW) System ...................... 3.7.2-1 3.7.3 Control Room Emergency Filtration (CREF) System ......................................... 3.7.3-1 3.7.4 Control Room Air Conditioning (AC) System ...................................................... 3.7.4-1 3.7.5 Main Condenser Offgas ..................................................................................... 3.7.5-1 3.7.6 Main Turbine Bypass System .............................................................................3.7.6-1 3.7.7 Spent Fuel Storage Pool Water Level ................................................................ 3.7.7-1 3.8 ELECTRICAL POWER SYSTEMS 3.8.1 AC Sources - Operating .....................................................................................3.8.1-1 3.8.2 AC Sources - Shutdown .....................................................................................3.8.2-1 3.8.3 Diesel Fuel Oil, Lube Oil, and Starting Air .......................................................... 3.8.3-1 3.8.4 DC Sources - Operating .................................................................................... 3.8.4-1 3.8.5 DC Sources - Shutdown ..................................................................................... 3.8.5-1 3.8.6 Battery Parameters ............................................................................................ 3.8.6-1 3.8.7 Distribution Systems - Operating ........................................................................3.8.7-1 3.8.8 Distribution Systems - Shutdown ........................................................................3.8.8-1 3.9 REFUELING OPERATIONS 3.9.1 Refueling Equipment Interlocks ..........................................................................3.9.1-1 3.9.2 Refuel Position One-Rod-Out Interlock .............................................................. 3.9.2-1 3.9.3 Control Rod Position .......................................................................................... 3.9.3-1 3.9.4 Control Rod Position Indication ..........................................................................3.9.4-1 3.9.5 Control Rod OPERABILITY - Refueling ............................................................. 3.9.5-1 3.9.6 Reactor Pressure Vessel (RPV) Water Level - Irradiated Fuel .......................... 3.9.6-1 3.9.7 Reactor Pressure Vessel (RPV) Water Level- New Fuel or Control Rods ........ 3.9.7-1 3.9.8 Residual Heat Removal (RHR) - High Water Level. ........................................... 3.9.8-1 3.9.9 Residual Heat Removal (RHR) - Low Water Level ............................................. 3.9.9-1 3.9.10 Decay Time ......................................................................................................3.9.10-1 3.10 SPECIAL OPERATIONS 3.10.1 Inservice Leak and Hydrostatic Testing Operation ........................................... 3.10.1-1 3.10.2 Reactor Mode Switch Interlock Testing ............................................................ 3.10.2-1 3.10.3 Single Control Rod Withdrawal - Hot Shutdown ............................................... 3.10.3-1 3.10.4 Single Control Rod Withdrawal - Cold Shutdown ............................................. 3.10.4-1 3.10.5 Single Control Rod Drive (CRD) Removal- Refueling ..................................... 3.10.5-1 3.10.6 Multiple Control Rod Withdrawal - Refueling .................................................... 3.10.6-1 3.10.7 Control Rod Testing - Operating ....................................................................... 3.10.7-1 3.10.8 SHUTDOWN MARGIN (SDM) Test - Refueling .............................................. 3.10.8-1 4.0 DESIGN FEATURES 4.1 Site Location .........................................................................................................4.0-1 4.2 Reactor Core .........................................................................................................4.0-1 4.3 Fuel Storage ..........................................................................................................4.0-2 Columbia Generating Station iii Amendment 199,204 225
TABLE OF CONTENTS 5.0 ADMINISTRATIVE CONTROLS 5.1 Responsibility ........................................................................................................ 5.1-1 5.2 Organization .......................................................................................................... 5.2-1 5.3 Unit Staff Qualifications ......................................................................................... 5.3-1 5.4 Procedures ............................................................................................................ 5.4-1 5.5 Programs and Manuals ......................................................................................... 5.5-1 5.6 Reporting Requirements ....................................................................................... 5.6-1 5.7 High Radiation Area .............................................................................................. 5.7-1 Columbia Generating Station iv Amendment 149,169225
Definitions 1.1 1.0 USE AND APPLICATION 1.1 Definitions
NOTE------------------------------------------------------
The defined terms of this section appear in capitalized type and are applicable throughout these Technical Specifications and Bases. Definition ACTIONS ACTIONS shall be that part of a Specification that prescribes Required Actions to be taken under designated Conditions within specified Completion Times. AVERAGE PLANAR LINEAR The APLHGR shall be applicable to a specific planar height HEAT GENERATION RATE and is equal to the sum of the LHGRs for all the fuel rods in (APLHGR) the specified bundle at the specified height divided by the number of fuel rods in the fuel bundle at the height. CHANNEL CALIBRATION A CHANNEL CALIBRATION shall be the adjustment, as necessary, of the channel output such that it responds within the necessary range and accuracy to known values of the parameter that the channel monitors. The CHANNEL CALIBRATION shall encompass the entire channel, including the required sensor, alarm, display, and trip functions, and shall include the CHANNEL FUNCTIONAL TEST. Calibration of instrument channels with resistance temperature detector (RTD) or thermocouple sensors may consist of an inplace qualitative assessment of sensor behavior and normal calibration of the remaining adjustable devices in the channel. The CHANNEL CALIBRATION may be performed by means of any series of sequential, overlapping, or total channel steps so that the entire channel is calibrated. CHANNEL CHECK A CHANNEL CHECK shall be the qualitative assessment, by observation, of channel behavior during operation. This determination shall include, where possible, comparison of the channel indication and status to other indications or status derived from independent instrument channels measuring the same parameter. CHANNEL FUNCTIONAL A CHANNEL FUNCTIONAL TEST shall be the injection of a TEST simulated or actual signal into the channel as close to the sensor as practicable to verify OPERABILITY, including required alarm, interlock, display, and trip functions, and channel failure trips. The CHANNEL FUNCTIONAL TEST may be performed by means of any series of sequential, overlapping, or total channel steps so that the entire channel is tested. Columbia Generating Station 1.1-1 Amendment No . .:1-49,.:tS9 225
Definitions 1.1 1.1 Definitions CORE ALTERATION CORE ALTERATION shall be the movement of any fuel, sources, or reactivity control components within the reactor vessel with the vessel head removed and fuel in the vessel. The following exceptions are not considered to be CORE ALTERATIONS:
- a. Movement of source range monitors, local power range monitors, intermediate range monitors, traversing incore probes, or special movable detectors (including undervessel replacement); and
- b. Control rod movement, provided there are no fuel assemblies in the associated core cell.
Suspension of CORE ALTERATIONS shall not preclude completion of movement of a component to a safe position. CORE OPERATING LIMITS The COLR is the unit specific document that provides cycle REPORT (COLR) specific parameter limits for the current reload cycle. These cycle specific limits shall be determined for each reload cycle in accordance with Specification 5.6.3. Plant operation within these limits is addressed in individual Specifications. DOSE EQUIVALENT 1-131 DOSE EQUIVALENT 1-131 shall be that concentration of 1-131 (microcuries/gram) that alone would produce the same Total Effective Dose Equivalent (TEDE) dose as the quantity and isotopic mixture of 1-131,1-132,1-133,1-134, and 1-135 actually present. The dose conversion factors used for this calculation shall be those listed in Federal Guidance Report (FGR) 11, "Limiting Values of Radionuclide Intake and Air Concentration and Dose Conversion Factors for Inhalation, Submersion, and Ingestion," 1988. EMERGENCY CORE The ECCS RESPONSE TIME shall be that time interval from COOLING SYSTEM (ECCS) when the monitored parameter exceeds its ECCS initiation RESPONSE TIME setpoint at the channel sensor until the ECCS equipment is capable of performing its safety function {i.e., the valves travel to their required positions, pump discharge pressures reach their required values, etc.}. Times shall include diesel generator starting and sequence loading delays, where applicable. The response time may be measured by means of any series of sequential, overlapping, or total steps so that the entire response time is measured. Columbia Generating Station 1.1-2 Amendment No. 49Q,4Q9 225
Definitions 1 .1 1.1 Definitions END OF CYCLE The EOC-RPT SYSTEM RESPONSE TIME shall be that time RECIRCULATION PUMP interval from initial signal generation by the associated turbine TRIP (EOC-RPT) SYSTEM throttle valve limit switch or from when the turbine governor RESPONSE TIME valve hydraulic control oil pressure drops below the pressure switch setpoint to complete suppression of the electric arc between the fully open contacts of the recirculation pump circuit breaker. The response time may be measured by means of any series of sequential, overlapping, or total steps so that the entire response time is measured. INSERVICE TESTING The INSERVICE TESTING PROGRAM is the licensee PROGRAM program that fulfills the requirements of 10 CFR 50.55a(f). ISOLATION SYSTEM The ISOLATION SYSTEM RESPONSE TIME shall be that RESPONSE TIME time interval from when the monitored parameter exceeds its isolation initiation setpoint at the channel sensor until the isolation valves travel to their required positions. The response time may be measured by means of any series of sequential, overlapping, or total steps so that the entire response time is measured. LEAKAGE LEAKAGE shall be:
- a. Identified LEAKAGE
- 1. LEAKAGE into the drywell such as that from pump seals or valve packing, that is captured and conducted to a sump or collecting tank; or
- 2. LEAKAGE into the drywell atmosphere from sources that are both specifically located and known either not to interfere with the operation of leakage detection systems or not to be pressure boundary LEAKAGE;
- b. Unidentified LEAKAGE All LEAKAGE into the drywell that is not identified LEAKAGE;
- c. Total LEAKAGE Sum of the identified and unidentified LEAKAGE; and
- d. Pressure Boundary LEAKAGE LEAKAGE through a nonisolable fault in a Reactor Coolant System (RCS) component body, pipe wall, or vessel wall.
Columbia Generating Station 1.1-3 Amendment No. 449-,.+W ~. 243
Definitions 1.1 1.1 Definitions LINEAR HEAT GENERATION The LHGR shall be the heat generation rate per unit length of RATE (LHGR) fuel rod. It is the integral of the heat flux over the heat transfer area associated with the unit length. LOGIC SYSTEM A LOGIC SYSTEM FUNCTIONAL TEST shall be a test of all FUNCTIONAL TEST required logic components (Le .. all required relays and contacts. trip units. solid state logic elements. etc.) of a logic circuit. from as close to the sensor as practicable up to. but not including. the actuated device, to verify OPERABILITY. The LOGIC SYSTEM FUNCTIONAL TEST may be performed by means of any series of sequential. overlapping, or total system steps so that the entire logic system is tested. MAXIMUM FRACTION OF The MFLPD shall be the largest value of the fraction of limiting LIMITING POWER DENSITY power density (FLPD) in the core. The FLPD shall be the (MFLPD) LHGR existing at a given location divided by the specified LHGR limit for that bundle type. MINIMUM CRITICAL POWER The MCPR shall be the smallest critical power ratio (CPR) that RATIO (MCPR) exists in the core for each class of fuel. The CPR is that power in the assembly that is calculated by application of the appropriate correlation(s) to cause some point in the assembly to experience boiling transition. divided by the actual assembly operating power. MODE A MODE shall correspond to anyone inclusive combination of mode switch position. average reactor coolant temperature, and reactor vessel head closure bolt tensioning specified in Table 1.1-1 with fuel in the reactor vessel. OPERABLE - OPERABILITY A system, subsystem. division. component, or device shall be OPERABLE or have OPERABILITY when it is capable of performing its specified safety function(s) and when all necessary attendant instrumentation, controls, normal or emergency electrical power, cooling and seal water, lubrication. and other auxiliary equipment that are required for the system, subsystem, division, component, or device to perform its specified safety function(s) are also capable of performing their related support function(s). PHYSICS TESTS PHYSICS TESTS shall be those tests performed to measure the fundamental nuclear characteristics of the reactor core and related instrumentation. These tests are:
- a. Described in Chapter 14. Initial Test Program of the FSAR;
- b. Authorized under the provisions of 10 CFR 50.59; or Columbia Generating Station 1.1-4 Amendment No . .:t49,4S9 225
Definitions 1.1 1.1 Definitions PHYSICS TESTS (continued)
- c. Otherwise approved by the Nuclear Regulatory Commission.
RATED THERMAL POWER RTP shall be a total reactor core heat transfer rate to the (RTP) reactor coolant of 3544 MWt. REACTOR PROTECTION The RPS RESPONSE TIME shall be that time interval from SYSTEM(RPS)RESPONSE when the monitored parameter exceeds its RPS trip setpoint at TIME the channel sensor until de-energization of the scram pilot valve solenoids. The response time may be measured by means of any series of sequential, overlapping, or total steps so that the entire response time is measured. SHUTDOWN MARGIN (SOM) SOM shall be the amount of reactivity by which the reactor is subcritical or would be subcritical throughout the operating cycle assuming that:
- a. The reactor is xenon free;
- b. The moderator temperature is;::; 68°F, corresponding to the most reactive state; and
- c. All control rods are fully inserted except for the single control rod of highest reactivity worth, which is assumed to be fully withdrawn. With control rods not capable of being fully inserted, the reactivity worth of these control rods must be accounted for in the determination of SOM.
STAGGERED TEST BASIS A STAGGERED TEST BASIS shall consist of the testing of one of the systems, subsystems, channels, or other designated components during the interval specified by the Surveillance Frequency, so that all systems, subsystems, channels, or other designated components are tested during n Surveillance Frequency intervals, where n is the total number of systems, subsystems, channels, or other designated components in the associated function. THERMAL POWER THERMAL POWER shall be the total reactor core heat transfer rate to the reactor coolant. Columbia Generating Station 1.1-5 Amendment No ...1-99 ~. ~ 241
Definitions 1.1 1.1 Definitions TURBINE BYPASS SYSTEM The TURBINE BYPASS SYSTEM RESPONSE TIME shall be RESPONSE TIME the time from when the turbine bypass control unit generates a turbine bypass valve flow signal until 80% of the turbine bypass capacity is established. The response time may be measured by means of any series of sequential, overlapping, or total steps so that the entire response time is measured. Columbia Generating Station 1.1-6 Amendment No. 149,169225
Definitions 1.1 Table 1.1-1 (page 1 of 1) MODES AVERAGE REACTOR COOLANT REACTOR MODE TEMPERATURE MODE TITLE SWITCH POSITION (OF) 1 Power Operation Run NA 2 Startup Refuel(a) or Startup/Hot Standby NA 3 Hot Shutdown(a) Shutdown > 200 4 Cold Shutdown(a) Shutdown :.:; 200 5 Refueling(b) Shutdown or Refuel NA (a) All reactor vessel head closure bolts fully tensioned. (b) One or more reactor vessel head closure bolts less than fully tensioned. Columbia Generating Station 1.1-7 Amendment No. 449,169 225
Logical Connectors 1.2 1.0 USE AND APPLICATION 1.2 Logical Connectors PURPOSE The purpose of this section is to explain the meaning of logical connectors. Logical connectors are used in Technical Specifications (TS) to discriminate between, and yet connect, discrete Conditions, Required Actions, Completion Times, Surveillances, and Frequencies. The only logical connectors that appear in TS are AND and OR. The physical arrangement of these connectors constitutes logical conventions with specific meanings. BACKGROUND Several levels of logic may be used to state Required Actions. These levels are identified by the placement (or nesting) of the logical connectors and by the number assigned to each Required Action. The first level of logic is identified by the first digit of the number assigned to a Required Action and the placement of the logical connector in the first level of nesting (Le., left justified with the number of the Required Action). The successive levels of logic are identified by additional digits of the Required Action number and by successive indentions of the logical connectors. . When logical connectors are used to state a Condition, Completion Time, Surveillance, or Frequency, only the first level of logic is used, and the logical connector is left justified with the statement of the Condition, Completion Time, Surveillance. or Frequency. EXAMPLES The following examples illustrate the use of logical connectors. 1.2 Logical Connectors EXAM PLE 1.2-1 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. LCO not met. A.1 Verify . .. A2 Restore ... In this example, the logical connector AND is used to indicate that, when in Condition A, both Required Actions A 1 and A.2 must be completed. Columbia Generating Station 1.2-1 Amendment No. +49,.te9 225
Logical Connectors 1.2 1.2 Logical Connectors EXAMPLES (continued) EXAMPLE 1.2-2 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. LCO not met. A.1 Trip ... A.2.1 Verify ... A.2.2.1 Reduce ... A.2.2.2 Perform ... A.3 Align ... This example represents a more complicated use of logical connectors. Required Actions A.1, A.2, and A.3 are alternative choices, only one of which must be performed as indicated by the use of the logical connector OR and the left justified placement. Anyone of these three Actions may be chosen. If A.2 is chosen, then both A.2.1 and A.2.2 must be performed as indicated by the logical connector AND. Required Action A.2.2 is met by performing A.2.2.1 or A.2.2.2. The indented position of the logical connector OR indicates that A.2.2.1 and A.2.2.2 are alternative choices, only one of which must be performed. Columbia Generating Station 1.2-2 Amendment No. 449,4-69 225
Completion Times 1.3 1.0 USE AND APPLICATION 1.3 Completion Times PURPOSE The purpose of this section is to establish the Completion Time convention and to provide guidance for its use. BACKGROUND Limiting Conditions for Operation (LCOs) specify minimum requirements for ensuring safe operation of the unit. The ACTIONS associated with an LCO state Conditions that typically describe the ways in which the requirements of the LCO can fail to be met. Specified with each stated Condition are Required Action(s) and Completion Time(s). DESCRIPTION The Completion Time is the amount of time allowed for completing a Required Action. It is referenced to the time of discovery of a situation (e.g., inoperable equipment or variable not within limits) that requires entering an ACTIONS Condition unless otherwise specified, providing the unit is in a MODE or specified condition stated in the Applicability of the LCO. Required Actions must be completed prior to the expiration of the specified Completion Time. An ACTIONS Condition remains in effect and the Required Actions apply until the Condition no longer exists or the unit is not within the LCO Applicability. If situations are discovered that require entry into more than one Condition at a time within a single LCO (multiple Conditions), the Required Actions for each Condition must be performed within the associated Completion Time. When in multiple Conditions, separate Completion Times are tracked for each Condition starting from the time of discovery of the situation that required entry into the Condition. Once a Condition has been entered, subsequent divisions, subsystems, components, or variables expressed in the Condition, discovered to be inoperable or not within limits, will not result in separate entry into the Condition unless specifically stated. The Required Actions of the Condition continue to apply to each additional failure, with Completion Times based on initial entry into the Condition. However, when a subsequent division, subsystem, component, or variable expressed in the Condition is discovered to be inoperable or not within limits, the Completion Time(s) may be extended. To apply this Completion Time extension, two criteria must first be met. The subsequent inoperability:
- a. Must exist concurrent with the first inoperability; and
- b. Must remain inoperable or not within limits after the first inoperability is resolved.
Columbia Generating Station 1.3-1 Amendment No. 449,4$ 225
Completion Times 1.3 1.3 Completion Times DESCRIPTION (continued) The total Completion Time allowed for completing a Required Action to address the subsequent inoperability shall be limited to the more restrictive of either:
- a. The stated Completion Time, as measured from the initial entry into the Condition, plus an additional 24 hours; or
- b. The stated Completion Time as measured from discovery of the subsequent inoperability.
The above Completion Time extension does not apply to those Specifications that have exceptions that allow completely separate re entry into the Condition (for each division, subsystem, component, or variable expressed in the Condition) and separate tracking of Completion Times based on this re-entry. These exceptions are stated in individual Specifications. The above Completion Time extension does not apply to a Completion Time with a modified "time zero." This modified "time zero" may be expressed as a repetitive time (Le., "once per 8 hours," where the Completion Time is referenced from a previous completion of the Required Action versus the time of Condition entry) or as a time modified by the phrase "from discovery ... " Example 1.3-3 illustrates one use of this type of Completion Time. The 10 day Completion Time specified for Conditions A and B in Example 1.3-3 may not be extended. EXAMPLES The following examples illustrate the use of Completion Times with different types of Conditions and changing Conditions. EXAMPLE 1.3-1 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME B. Required B.1 Be in MODE 3. 12 hours Action and associated Completion Time not met. B.2 Be in MODE 4. 36 hours Condition B has two Required Actions. Each Required Action has its own separate Completion Time. Each Completion Time is referenced to the time that Condition B is entered. Columbia Generating Station 1.3-2 Amendment No. 449,469 225
Completion Times 1.3 1.3 Completion Times EXAMPLES (continued) The Required Actions of Condition B are to be in MODE 3 within 12 hours AND in MODE 4 within 36 hours. A total of 12 hours is allowed for reaching MODE 3 and a total of 36 hours (not 48 hours) is allowed for reaching MODE 4 from the time that Condition B was entered. If MODE 3 is reached within 6 hours, the time allowed for reaching MODE 4 is the next 30 hours because the total time allowed for reaching MODE 4 is 36 hours. If Condition B is entered while in MODE 3, the time allowed for reaching MODE 4 is the next 36 hours. EXAMPLE 1.3-2 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One pump A.1 Restore pump to 7 days inoperable. OPERABLE status. B. Required B.1 Be in MODE 3. 12 hours Action and associated AND Completion Time not met. B.2 Be in MODE 4. 36 hours When a pump is declared inoperable, Condition A is entered. If the pump is not restored to OPERABLE status within 7 days, Condition B is also entered and the Completion Time clocks for Required Actions B.1 and B.2 start. If the inoperable pump is restored to OPERABLE status after Condition B is entered, Conditions A and B are exited, and therefore, the Required Actions of Condition B may be terminated. When a second pump is declared inoperable while the first pump is still inoperable, Condition A is not re-entered for the second pump. LCO 3.0.3 is entered, since the ACTIONS do not include a Condition for more than one inoperable pump. The Completion Time clock for Condition A does not stop after LCO 3.0.3 is entered, but continues to be tracked from the time Condition A was initially entered. Columbia Generating Station 1.3-3 Amendment No. .:t49,+e9 225
Completion Times 1.3 1.3 Completion Times EXAMPLES (continued) While in LCO 3.0.3, if one of the inoperable pumps is restored to OPERABLE status and the Completion Time for Condition A has not expired, LCO 3.0.3 may be exited and operation continued in accordance with Condition A. While in LCO 3.0.3, if one of the inoperable pumps is restored to OPERABLE status and the Completion Time for Condition A has expired, LCO 3.0.3 may be exited and operation continued in accordance with Condition B. The Completion Time for Condition B is tracked from the time the Condition A Completion Time expired. On restoring one of the pumps to OPERABLE status, the Condition A Completion Time is not reset, but continues from the time the first pump was declared inoperable. This Completion Time may be extended if the pump restored to OPERABLE status was the first inoperable pump. A 24 hour extension to the stated 7 days is allowed, provided this does not result in the second pump being inoperable for> 7 days. Columbia Generating Station 1.3-4 Amendment No. 44B,4W 225
Completion Times 1.3 1.3 Completion Times EXAMPLES (continued) EXAMPLE 1.3-3 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One A.1 Restore Function X 7 days Function X subsystem to subsystem OPERABLE status. AND inoperable. 10 days from discovery of failure to meet the LCO B. One B.1 Restore Function Y 72 hours Function Y subsystem to subsystem OPERABLE status. AND inoperable. 10 days from discovery of failure to meet the LCO C. One C.1 Restore Function X 72 hours Function X subsystem to subsystem OPERABLE status. inoperable. OR AND C.2 Restore Function Y 72 hours One subsystem to Function Y OPERABLE status. subsystem inoperable. When one Function X subsystem and one Function Y subsystem are inoperable, Condition A and Condition B are concurrently applicable. The Completion Times for Condition A and Condition B are tracked separately for each subsystem, starting from the time each subsystem was declared inoperable and the Condition was entered. A separate Completion Time is established for Condition C and tracked from the time the second subsystem was declared inoperable (I.e., the time the situation described in Condition C was discovered). Columbia Generating Station 1.3-5 Amendment No. 449,499 225
Completion Times 1.3 1.3 Completion Times EXAMPLES (continued) If Required Action C.2 is completed within the specified Completion Time, Conditions Band C are exited. If the Completion Time for Required Action A.1 has not expired, operation may continue in accordance with Condition A. The remaining Completion Time in Condition A is measured from the time the affected subsystem was declared inoperable (i.e., initial entry into Condition A). The Completion Times of Conditions A and B are modified by a logical connector, with a separate 10 day Completion Time measured from the time it was discovered the LCO was not met. In this example. without the separate Completion Time, it would be possible to alternate between Conditions A, B, and C in such a manner that operation could continue indefinitely without ever restoring systems to meet the LCO. The separate Completion Time modified by the phrase "from discovery of failure to meet the LCO" is designed to prevent indefinite continued operation while not meeting the LCO. This Completion Time allows for an exception to the normal "time zero" for beginning the Completion Time "clock". In this instance, the Completion Time "time zero" is specified as commencing at the time the LCO was initially not met, instead of at the time the associated Condition was entered. ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One or more A.1 Restore valve(s) to 4 hours valves OPERABLE status. inoperable. B. Required B.1 Be in MODE 3. 12 hours Action and associated AND Completion Time not met. B.2 Be in MODE 4. 36 hours A single Completion Time is used for any number of valves inoperable at the same time. The Completion Time associated with Condition A is based on the initial entry into Condition A and is not tracked on a per valve basis. Declaring subsequent valves inoperable, while Condition A is still in effect, does not trigger the tracking of separate Completion Times. Columbia Generating Station Amendment No. +49,469 225
Completion Times 1.3 1.3 Completion Times EXAMPLES (continued) Once one of the valves has been restored to OPERABLE status, the Condition A Completion Time is not reset, but continues from the time the first valve was declared inoperable. The Completion Time may be extended if the valve restored to OPERABLE status was the first inoperable valve. The Condition A Completion Time may be extended for up to 4 hours provided this does not result in any subsequent valve being inoperable for> 4 hours. If the Completion Time of 4 hours (pi us the extension) expires while one or more valves are still inoperable, Condition B is entered. EXAMPLE 1.3-5 ACTIONS
--------------------------------------------NOTE-------------------------------------------
Separate Condition entry is allowed for each inoperable valve. CONDITION REQUIRED ACTION COMPLETION TIME A. One or more A.1 Restore valve to 4 hours valves OPERABLE status. inoperable. B. Required B.1 Be in MODE 3. 12 hours Action and associated AND Completion Time not met. B.2 Be in MODE 4. 36 hours The Note above the ACTIONS Table is a method of modifying how the Completion Time is tracked. If this method of modifying how the Completion Time is tracked was applicable only to a specific Condition, the Note would appear in that Condition rather than at the top of the ACTIONS Table. Columbia Generating Station 1.3-7 Amendment No. -149,+SB 225
Completion Times 1.3 1.3 Completion Times EXAMPLES (continued) The Note allows Condition A to be entered separately for each inoperable valve, and Completion Times tracked on a per valve basis. When a valve is declared inoperable, Condition A is entered and its Completion Time starts. If subsequent valves are declared inoperable, Condition A is entered for each valve and separate Completion Times start and are tracked for each valve. If the Completion Time associated with a valve in Condition A expires, Condition B is entered for that valve. If the Completion Times associated with subsequent valves in Condition A expire, Condition B is entered separately for each valve and separate Completion Times start and are tracked for each valve. If a valve that caused entry into Condition B is restored to OPERABLE status, Condition B is exited for that valve. Since the Note in this example allows multiple Condition entry and tracking of separate Completion Times, Completion Time extensions do not apply. EXAMPLE 1.3-6 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One channel A.1 Perform SR 3.x.x.x. Once per 8 hours inoperable. OR A.2 Reduce THERMAL 8 hours POWER to
- 50% RTP.
B. Required B.1 Be in MODE 3. 12 hours Action and associated Completion Time not met. Columbia Generating Station 1.3-8 Amendment No. 449-,-lS9 225
Completion Times 1.3 1.3 Completion Times EXAMPLES (continued) Entry into Condition A offers a choice between Required Action A.1 or A.2. Required Action A.1 has a "once per" Completion Time, which qualifies for the 25% extension, per SR 3.0.2, to each performance after the initial performance. The initial 8 hour interval of Required Action A.1 begins when Condition A is entered and the initial performance of Required Action A.1 must be completed within the first 8 hour interval. If Required Action A.1 is followed and the Required Action is not met within the Completion Time (plus the extension allowed by SR 3.0.2), Condition B is entered. If Required Action A.2 is followed and the Completion Time of 8 hours is not met, Condition B is entered. If after entry into Condition B, Required Action A.1 or A.2 is met, Condition B is exited and operation may then continue in Condition A. EXAMPLE 1.3-7 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One A.1 Verify affected 1 hour subsystem subsystem isolated. inoperable. AND Once per 8 hours thereafter AND A.2 Restore subsystem 72 hours to OPERABLE status. B. Required B.1 Be in MODE 3. 12 hours Action and associated AND Completion Time not met. B.2 Be in MODE 4. 36 hours Columbia Generating Station 1.3-9 Amendment No. 449,4(3.9 225
Completion Times 1.3 1.3 Completion Times EXAMPLES (continued) Required Action A.1 has two Completion Times. The 1 hour Completion Time begins at the time the Condition is entered and each "Once per 8 hours thereafter" interval begins upon performance of Required Action A.1. If after Condition A is entered, Required Action A.1 is not met within either the initial 1 hour or any subsequent 8 hour interval from the previous performance (plus the extension allowed by SR 3.0.2), Condition B is entered. The Completion Time clock for Condition A does not stop after Condition B is entered, but continues from the time Condition A was initially entered. If Required Action A.1 is met after Condition B is entered, Condition B is exited and operation may continue in accordance with Condition A, provided the Completion Time for Required Action A.2 has not expired. IMMEDIATE When "Immediately" is used as a Completion Time, the Required Action COMPLETION TIME should be pursued without delay and in a controlled manner. Columbia Generating Station 1.3-10 Amendment No. 449,469 225
Frequency 1.4 1.0 USE AND APPLICATION 1.4 Frequency PURPOSE The purpose of this section is to define the proper use and application of Frequency requirements. DESCRIPTION Each Surveillance Requirement (SR) has a specified Frequency in which the Surveillance must be met in order to meet the associated Limiting Conditions for Operation (LCO). An understanding of the correct application of the specified Frequency is necessary for compliance with the SR. The "specified Frequency" is referred to throughout this section and each of the Specifications of Section 3.0, "Surveillance Requirement (SR) Applicability." The "specified Frequency" consists of the requirements of the Frequency column of each SR, as well as certain Notes in the Surveillance column that modify performance requirements. Sometimes special situations dictate when the requirements of a Surveillance are to be met. They are "otherwise stated" conditions allowed by SR 3.0.1. They may be stated as clarifying Notes in the Surveillance, as part of the Surveillance, or both. Situations where a Surveillance could be required (Le., its Frequency could expire), but where it is not possible or not desired that it be performed until sometime after the associated LCO is within its Applicability, represent potential SR 3.0.4 conflicts. To avoid these conflicts, the SR (Le., the Surveillance or the Frequency) is stated such that it is only "required" when it can be and should be performed. With an SR satisfied, SR 3.0.4 imposes no restriction. The use of "met" or "performed" in these instances conveys specified meanings. A Surveillance is "met" only when the acceptance criteria are satisfied. Known failure of the requirements of a Surveillance, even without a Surveillance specifically being "performed," constitutes a Surveillance not "met." "Performance" refers only to the requirement to specifically determine the ability to meet the acceptance criteria. Some Surveillances contain notes that modify the Frequency of performance or the conditions during which the acceptance criteria must be satisfied. For these Surveillances, the MODE-entry restrictions of SR 3.0.4 may not apply. Such a Surveillance is not required to be performed prior to entering a MODE or other specified condition in the Applicability of the associated LCO if any of the following three conditions are satisfied:
- a. The Surveillance is not required to be met in the MODE or other specified condition to be entered; or Columbia Generating Station 1.4-1 Amendment No. 4$,:wa 225
Frequency 1.4 1.4 Frequency DESCRIPTION (continued)
- b. The Surveillance is required to be met in the MODE or other specified condition to be entered, but has been performed within the speci'fied Frequency (Le., it is current) and is known not to be failed; or
- c. The Surveillance is required to be met, but not performed, in the MODE or other specified condition to be entered, and is known not to be failed.
Examples 1.4-3, 1.4-4, 1.4-5, and 1.4-6 discusses these special situations. EXAMPLES The following examples illustrate the various ways that Frequencies are specified. In these examples, the Applicability of the LCO (LCO not shown) is MODES 1, 2, and 3. EXAMPLE 1.4-1 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY Perform CHANNEL CHECK. 12 hours Example 1.4-1 contains the type of SR most often encountered in the Technical Specifications (TS). The Frequency specifies an interval (12 hours) during which the associated Surveillance must be performed at least one time. Performance of the Surveillance initiates the subsequent interval. Although the Frequency is stated as 12 hours, an extension of the time interval to 1.25 times the interval specified in the Frequency is allowed by SR 3.0.2 for operational flexibility. The measurement of this interval continues at all times, even when the SR is not required to be met per SR 3.0.1 (such as when the equipment is inoperable, a variable is outside specified limits, or the unit is outside the Applicability of the LCO). If the interval specified by SR 3.0.2 is exceeded while the unit is in a MODE or other specified condition in the Applicability of the LCO, and the performance of the Surveillance is not otherwise modified (refer to Examples 1.4-3 and 1.4-4), then SR 3.0.3 becomes applicable. Columbia Generating Station 1.4-2 Amendment No. 4S9,2Q& 225
Frequency 1.4 1.4 Frequency EXAMPLES (continued) If the interval as specified by SR 3.0.2 is exceeded while the unit is not in a MODE or other specified condition in the Applicability of the LCO for which performance of the SR is required, then SR 3.0.4 becomes applicable. The Surveillance must be performed within the Frequency requirements of SR 3.0.2, as modified by SR 3.0.3, prior to entry into the MODE or other specified condition or the LCO is considered not met (in accordance with SR 3.0.1) and LCO 3.0.4 becomes applicable. EXAMPLE 1.4-2 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY Verify flow is within limits. Once within 12 hours after
;::::25% RTP 24 hours thereafter Example 1.4-2 has two Frequencies. The first is a one time performance Frequency, and the second is of the type shown in Example 1.4-1. The logical connector "AND" indicates that both Frequency requirements must be met. Each time reactor power is increased from a power level < 25% RTP to ~ 25% RTP, the Surveillance must be performed within 12 hours.
The use of "once" indicates a single performance will satisfy the specified Frequency (assuming no other Frequencies are connected by "AND"). This type of Frequency does not qualify for the extension allowed by SR 3.0.2.
"Thereafter" indicates future performances must be established per SR 3.0.2, but only after a specified condition is first met (Le., the "once" performance in this example). If reactor power decreases to < 25% RTP, the measurement of both intervals stops. New intervals start upon reactor power reaching 25% RTP.
Columbia Generating Station 1.4-3 Amendment No. -+W,~ 225
Frequency 1.4 1.4 Frequency EXAMPLES (continued) EXAMPLE 1.4-3 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY
----------------------------N OTE ---------------------------
Not required to be performed until 12 hours after
~ 25% RTP.
Perform channel adjustment. 7 days The interval continues whether or not the unit operation is < 25% RTP between performances. As the Note modifies the required performance of the Surveillance, it is construed to be part of the "specified Frequency." Should the 7 day interval be exceeded while operation is < 25% RTP, this Note allows 12 hours after power reaches ~ 25% RTP to perform the Surveillance. The Surveillance is still considered to be within the "specified Frequency." Therefore, if the Surveillance were not performed within the 7 day interval (plus the extension allowed by SR 3.0.2), but operation was < 25% RTP, it would not constitute a failure of the SR or failure to meet the LCO. Also, no violation of SR 3.0.4 occurs when changing MODES, even with the 7 day Frequency not met, provided operation does not exceed 12 hours (plus the extension allowed by SR 3.0.2) with power
~ 25% RTP.
Once the unit reaches 25% RTP, 12 hours would be allowed for completing the Surveillance. If the Surveillance were not performed within this 12 hour interval (plus the extension allowed by SR 3.0.2), there would then be a failure to perform a Surveillance within the specified Frequency, and the provisions of SR 3.0.3 would apply. Columbia Generating Station 1.4-4 Amendment No. ~,~ 225
Frequency 1.4 1.4 Frequency EXAMPLES (continued) EXAMPLE 1.4~4 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY
~---------------------------NOTE---------------------------
Only required to be met in MODE 1. Verify leakage rates are within limits. 24 hours Example 1.4-4 specifies that the requirements of this Surveillance do not have to be met until the unit is in MODE 1. The interval measurement for the Frequency of this Surveillance continues at all times, as described in Example 1.4-1. However, the Note constitutes an "otherwise stated" exception to the Applicability of this Surveillance. Therefore, if the Surveillance were not performed within the 24 hour interval (plus the extension allowed by SR 3.0.2), but the unit was not in MODE 1, there would be no failure of the SR nor failure to meet the LCO. Therefore, no violation of SR 3.0.4 occurs when changing MODES, even with the 24 hour Frequency exceeded, provided the MODE change was not made into MODE 1. Prior to entering MODE 1 (assuming again that the 24 hour Frequency were not met). SR 3.0.4 would require satisfying the SR. Columbia Generating Station 1.4-5 Amendment No. ~,~ 225
Frequency 1.4 1.4 Frequency EXAMPLES (continued) EXAMPLE 1.4-5 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY
-------------------------NO TE-----------------------------
Only required to be performed in MODE 1. Perform complete cycle of the valve. 7 days The interval continues, whether or not the unit operation is in MODE 1, 2, or 3 (the assumed Applicability of the associated LCO) between performances. As the Note modifies the required performance of the Surveillance, the Note is construed to be part of the "specified Frequency." Should the 7 day interval be exceeded while operation is not in MODE 1, this Note allows entry into and operation in MODES 2 and 3 to perform the Surveillance. The Surveillance is still considered to be performed within the "specified Frequency" if completed prior to entering MODE 1. Therefore. if the Surveillance were not performed within the 7 day (plus the extension allowed by SR 3.0.2) interval, but operation was not in MODE 1, it would not constitute a failure of the SR or failure to meet the LCO. Also no violation of SR 3.0.4 occurs when changing MODES. even with the 7 day Frequency not met, provided operation does not result in entry into MODE 1. Once the unit reaches MODE 1, the requirement for the Surveillance to be performed within its specified Frequency applies and would require that the Surveillance had been performed. If the Surveillance were not performed prior to entering MODE 1, there would then be a failure to perform a Surveillance within the specified Frequency, and the provisions of SR 3.0.3 would apply. Columbia Generating Station 1.4-6 Amendment No. ~,242 225
Frequency 1.4 1.4 Frequency EXAMPLES (continued) EXAMPLE 1.4-6 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY
--------------------------NO TE ----------------------------
Not required to be met in MODE 3. Verify parameter is within limits. 24 hours Example 1.4-6 specifies that the requirements of this Surveillance do not have to be met while the unit is in MODE 3 (the assumed Applicability of the associated LCO is MODES 1, 2, and 3). The interval measurement for the Frequency of this Surveillance continues at all times, as described in Example 1.4-1. However, the Note constitutes an "otherwise stated" exception to the Applicability of this Surveillance. Therefore, if the Surveillance were not performed within the 24 hour interval (plus the extension allowed by SR 3.0.2), and the unit was in MODE 3, there would be no failure of the SR nor failure to meet the LCO. Therefore, no violation of SR 3.0.4 occurs when changing MODES to enter MODE 3, even with the 24 hour Frequency exceeded, provided the MODE change does not result in entry into MODE 2. Prior to entering MODE 2 (assuming again that the 24 hour Frequency were not met), SR 3.0.4 would require satisfying the SR. Columbia Generating Station 1.4-7 Amendment No. ~,~ 225
SLs 2.0 2.0 SAFETY LIMITS (SLs) 2.1 SLs 2.1.1 Reactor Core SLs 2.1.1.1 With the reactor steam dome pressure < 686 psig or core flow < 10% rated core flow: THERMAL POWER shall be :s; 25% RTP. 2.1.1.2 With the reactor steam dome pressure ~ 686 psig and core flow~ 10% rated core flow: The MCPR shall be ~ 1.1 O for two recirculation loop operation or~ 1.13 for single recirculation loop operation. 2.1.1.3 Reactor vessel water level shall be greater than the top of active irradiated fuel. 2.1.2 Reactor Coolant System Pressure SL Reactor steam dome pressure shall be :s; 1325 psig. 2.2 SL Violations With any SL violation, the following actions shall be completed within 2 hours: 2.2.1 Restore compliance with all SLs; and 2.2.2 Insert all insertable control rods. Columbia Generating Station 2.0-1 Amendment No. +eQ,-1-00 ~ 2-J4., 242
LCO Applicability 3.0 3.0 LIMITING CONDITION FOR OPERATION (LCO) APPLICABILITY LCO 3.0.1 LCOs shall be met during the MODES or other specified conditions in the Applicability, except as provided in LCO 3.0.2, LCO 3.0.7, LCO 3.0.8, and LCO 3.0.9. LCO 3.0.2 Upon discovery of a failure to meet an LCO, the Required Actions of the associated Conditions shall be met, except as provided in LCO 3.0.5 and LCO 3.0.6. If the LCO is met or is no longer applicable prior to expiration of the specified Completion Time(s), completion of the Required Action(s) is not required, unless otherwise stated. LCO 3.0.3 When an LCO is not met and the associated ACTIONS are not met, an associated ACTION is not provided, or if directed by the associated ACTIONS, the unit shall be placed in a MODE or other specified condition in which the LCO is not applicable. Action shall be initiated within 1 hour to place the unit, as applicable, in:
- a. MODE 2 within 7 hours;
- b. MODE 3 within 13 hours; and
- c. MODE 4 within 37 hours.
Exceptions to this Specification are stated in the individual Specifications. Where corrective measures are completed that permit operation in accordance with the LCO or ACTIONS, completion of the actions required by LCO 3.0.3 is not required. LCO 3.0.3 is only applicable in MODES 1, 2, and 3. LCO 3.0.4 When an LCO is not met, entry into a MODE or other specified condition in the Applicability shall only be made:
- a. When the associated ACTIONS to be entered permit continued operation in the MODE or other specified condition in the Applicability for an unlimited period of time;
- b. After performance of a risk assessment addressing inoperable systems and components, consideration of the results, determination of the acceptability of entering the MODE or other specified condition in the Applicability, and establishment of risk management actions, if appropriate; exceptions to this Specification are stated in the individual Specifications, or Columbia Generating Station 3.0-1 Amendment No.+98, 2-2-a 237
LCO Applicability 3.0 LCO Applicability LCO 3.0.4 (continued)
- c. When an allowance is stated in the individual value, parameter, or other Specification.
This Specification shall not prevent changes in MODES or other specified conditions in the Applicability that are required to comply with ACTIONS or that are part of a shutdown of the unit. LCO 3.0.5 Equipment removed from service or declared inoperable to comply with ACTIONS may be returned to service under administrative control solely to perform testing required to demonstrate its OPERABILITY or the OPERABILITY of other equipment. This IS an exception to LCO 3.0.2 for the system returned to service under administrative control to perform the testing required to demonstrate OPERABILITY. LCO 3.0.6 When a supported system LCO is not met solely due to a support system LCO not being met, the Conditions and Required Actions associated with this supported system are not required to be entered. Only the support system LCO ACTIONS are required to be entered. This is an exception to LCO 3.0.2 for the supported system. In this event, additional evaluations and limitations may be required in accordance with Specification 5.5.11, "Safety Function Determination Program (SFDP)." If a loss of safety function is determined to exist by this program, the appropriate Conditions and Required Actions of the LCO in which the loss of safety function exists are required to be entered. When a support system's Required Action directs a supported system to be declared inoperable or directs entry into Conditions and Required Actions for a supported system, the applicable Conditions and Required Actions shall be entered in accordance with LCO 3.0.2. LCO 3.0.7 Special Operations LCOs in Section 3.10 allow specified Technical Specifications (TS) requirements to be changed to permit performance of special tests and operations. Unless otherwise specified, all other TS requirements remain unchanged. Compliance with Special Operations LCOs is optional. When a Special Operations LCO is desired to be met but is not met, the ACTIONS of the Special Operations LCO shall be met. When a Special Operations LCO is not desired to be met, entry into a MODE or other specified condition in the Applicability shall only be made in accordance with the other applicable Specifications. Columbia Generating Station 3.0-2 Amendment No. 4W,4S+ 225
LCO Applicability 3.0 LCO Applicability LCO 3.0.8 When one or more required snubbers are unable to perform their associated support function(s), any affected supported LCO(s) are not required to be declared not met solely for this reason if risk is assessed and managed, and:
- a. The snubbers not able to perform their associated support function(s) are associated with only one division or subsystem of a multiple division or subsystem supported system or are associated with a single division or subsystem supported system and are able to perform their associated support function within 72 hours; or
- b. The snubbers not able to perform their associated support function(s) are associated with more than one division or subsystem of a multiple division or subsystem supported system and are able to perform their associated support function within 12 hours.
At the end of the specified period the required snubbers must be able to perform their associated support function(s), or the affected supported system LCO(s) shall be declared not met. LCO 3.0.9 When one or more required barriers are unable to perform their related support function(s), any supported system LCO(s) are not required to be declared not met solely for this reason for up to 30 days provided that at least one division or subsystem of the supported system is OPERABLE and supported by barriers capable of providing their related support function(s), and risk is assessed and managed. This specification may be concurrently applied to more than one division or subsystem of a multiple division or subsystem supported system provided at least one division or subsystem of the supported system is OPERABLE and the barriers supporting each of these divisions or subsystems provide their related support function(s) for different categories of initiating events. For the purposes of this specification, the High Pressure Core Spray (HPCS) system, the Reactor Core Isolation Cooling (RCIC) system, and the Automatic Depressurization System (ADS) are considered independent subsystems of a single system. If the required OPERABLE division or subsystem becomes inoperable while this specification is in use, it must be restored to OPERABLE status within 24 hours or the provisions of this specification cannot be applied to the divisions or subsystems supported by the barriers that cannot perform their related support function(s). At the end of the specified period, the required barriers must be able to perform their related support function(s) or the supported system LCO(s) shall be declared not met. Columbia Generating Station 3.0-3 Amendment No.4-Qg, ~ 237
SR Applicability 3.0 3.0 SURVEILLANCE REQUIREMENT (SR) APPLICABILITY SR 3.0.1 SRs shall be met during the MODES or other specified conditions in the Applicability for individual LCOs, unless otherwise stated in the SR. Failure to meet a Surveillance, whether such failure is experienced during the performance of the Surveillance or between performances of the Surveillance, shall be failure to meet the LCO. Failure to perform a Surveillance within the specified Frequency shall be failure to meet the LCO except as provided in SR 3.0.3. Surveillances do not have to be performed on inoperable equipment or variables outside specified limits. SR 3.0.2 The specified Frequency for each SR is met if the Surveillance is performed within 1.25 times the interval specified in the Frequency, as measured from the previous performance or as measured from the time a specified condition of the Frequency is met. For Frequencies specified as "once," the above interval extension does not apply. If a Completion Time requires periodic performance on a "once per ..." basis, the above Frequency extension applies to each performance after the initial performance. Exceptions to this Specification are stated in the individual Specifications. SR 3.0.3 If it is discovered that a Surveillance was not performed within its specified Frequency, then compliance with the requirement to declare the LCO not met may be delayed, from the time of discovery, up to 24 hours or up to the limit of the specified Frequency, whichever is greater. This delay period is permitted to allow performance of the Surveillance. A risk evaluation shall be performed for any Surveillance delayed greater than 24 hours and the risk impact shall be managed. If the Surveillance is not performed within the delay period, the LCO must immediately be declared not met, and the applicable Condition(s) must be entered. When the Surveillance is performed within the delay period and the Surveillance is not met, the LCO must immediately be declared not met, and the applicable Condition(s) must be entered. SR 3.0.4 Entry into a MODE or other specified condition in the Applicability of an LCO shall only be made when the LCO's Surveillances have been met within their specified Frequency, except as provided by SR 3.0.3. When an LCO is not met due to Surveillances not having been met, entry into a MODE or other specified condition in the Applicability shall only be made in accordance with LCO 3.0.4. Columbia Generating Station 3.0-4 Amendment No. -WB,-+W 225
SR Applicability 3.0 SR Applicability SR 3.0.4 (continued) This provision shall not prevent entry into MODES or other specified conditions in the Applicability that are required to comply with ACTIONS or that are part of a shutdown of the unit. Columbia Generating Station 3.0-5 Amendment No. +00,-1-8+ 225
SDM 3.1.1 3.1 REACTIVITY CONTROL SYSTEMS 3.1.1 SHUTDOWN MARGIN (SDM) LCO 3.1.1 SDM shall be:
- a. ~ 0.38% Aklk, with the highest worth control rod analytically determined; or
- b. ~ 0.28% Ak/k, with the highest worth control rod determined by test.
APPLICABILITY: MODES 1, 2, 3, 4, and 5. ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A, SDM not within limits in A,1 Restore SDM to within 6 hours MODE 1 or 2. limits. _ _ _ff B. Required Action and B.1 Be in MODE 3. 12 hours associated Completion Time of Condition A not met. C. SDM not within limits in C.1 Initiate action to fully insert Immediately MODE 3. all insertable control rods. D. SDM not within limits in 0.1 Initiate action to fully insert Immediately MODE4. all insertable control rods. AND 0.2 Initiate action to restore 1 hour secondary containment to OPERABLE status. AND Columbia Generating Station 3.1.1-1 Amendment No. 449,~ 225
SDM 3.1.1 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME D. (continued) D.3 Initiate action to restore one 1 hour standby gas treatment (SGT) subsystem to OPERABLE status. AND D.4 Initiate action to restore 1 hour isolation capability in each required secondary containment penetration flow path not isolated. E. SDM not within limits in E.1 Suspend CORE Immediately MODE 5. ALTERATIONS except for control rod insertion and fuel assembly removal. E.2 Initiate action to fully insert Immediately all insertable control rods in core cells containing one or more fuel assemblies. AND E.3 Initiate action to restore 1 hour secondary containment to OPERABLE status. E.4 Initiate action to restore one 1 hour SGT subsystem to OPERABLE status. Columbia Generating Station 3.1.1-2 Amendment No. 449,499 225
SDM 3.1.1 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME E. (continued) E.5 Initiate action to restore 1 hour isolation capability in each required secondary containment penetration flow path not isolated. SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.1.1.1 Verify SDM is: Prior to each in vessel fuel
- a. ~ 0.38% ilklk with the highest worth control rod movement during analytically determined; or fuel loading sequence
- b. ~ 0.28% ilklk with the highest worth control rod determined by test. AND Once within 4 hours after criticality following fuel movement within the reactor pressure vessel or control rod replacement Columbia Generating Station 3.1.1-3 Amendment No. :t49,-ie9 225
Reactivity Anomalies 3.1.2 3.1 REACTIVITY CONTROL SYSTEMS 3.1.2 Reactivity Anomalies LCO 3.1.2 The reactivity difference between the monitored core kef! and the predicted core kef! shall be within +/- 1% ~k/k. APPLICABILITY: MODES 1 and 2. ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. Core reactivity difference A.1 Restore core reactivity 72 hours not within limit. difference to within limit. B. Required Action and B.1 Be in MODE 3. 12 hours associated Completion Time not met. Columbia Generating Station 3.1.2-1 Amendment No. 449,+69 225
Reactivity Anomalies 3.1.2 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.1.2.1 Verify core reactivity difference between the Once within monitored core kelf and the predicted core kelf is 24 hours after within +/- 1% dklk. reaching equilibrium conditions following startup after fuel movement within the reactor pressure vessel or control rod replacement AND 1000 MWDIT thereafter during operations in MODE 1 Columbia Generating Station 3.1.2-2 Amendment No . .t49,4G9 225
Control Rod OPERABILITY 3.1.3 3.1 REACTIVITY CONTROL SYSTEMS 3.1.3 Control Rod OPERABILITY LCO 3.1.3 Each control rod shall be OPERABLE. APPLICABILITY: MODES 1 and 2. ACTIONS
NOTE----------------------------------------------------------
Separate Condition entry is allowed for each control rod. CONDITION REQUIRED ACTION I COMPLETION TIME A. One withd rawn control --------------------NOTE----------------- rod stuck. Rod Worth Minimizer (RWM) may be bypassed as allowed by LCO 3.3.2.1, "Control Rod Block Instrumentation," if required, to allow continued operation. A.1 Verify stuck control rod Immediately separation criteria are met. AND A.2 Disarm the associated 2 hours control rod drive (CRD). Columbia Generating Station 3.1.3-1 Amendment No. ~,4W 225
Control Rod OPERABILITY 3.1.3 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. (continued) A.3 Perform SR 3.1.3.2 for 24 hours from each withdrawn discovery of OPERABLE control rod. Condition A concurrent with THERMAL POWER greater than the low power setpoint (LPSP) of the RWM AND A.4 Perform SR 3.1.1.1. 72 hours B. Two or more withdrawn B.1 Be in MODE 3. 12 hours control rods stuck. C. One or more control C.1 ---------------NO TE ------------- rods inoperable for RWM may be bypassed as reasons other than allowed by LCO 3.3.2.1. if Condition A or B. required, to allow insertion of inoperable control rod and continued operation. Fully insert inoperable 3 hours control rod. AND C.2 Disarm the associated 4 hours CRD. Columbia Generating Station 3.1.3-2 Amendment No. 24-2,2+e 225
Control Rod OPERABILITY 3.1.3 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME D. ------------N 0 TE ----------- 0.1 Restore compliance with 4 hours Not applicable when BPWS. THERMAL POWER
> 10% RTP. OR 0.2 Restore control rod to 4 hours Two or more inoperable OPERABLE status.
control rods not in compliance with banked position withdrawal sequence (BPWS) and not separated by two or more OPERABLE control rods. E. ------------N 0 TE ----------- E.1 Restore the control rod to 4 hours Not applicable when OPERABLE status. THERMAL POWER
> 10% RTP.
One or more groups with four or more inoperable control rods. F. Required Action and F.1 Be in MODE 3. 12 hours associated Completion Time of Condition A, C, D. or E not met. OR Nine or more control rods inoperable. Columbia Generating Station 3.1.3-3 Amendment No. ~,24e 225
Control Rod OPERABILITY 3.1.3 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.1.3.1 Determine the position of each control rod. In accordance with the Surveillance Frequency Control Program SR 3.1.3.2 --------------------- ----------NOTE------------------------------ Not required to be performed until 31 days after the control rod is withdrawn and THERMAL POWER is greater than the LPSP of the RWM. Insert each partially withdrawn control rod at least In accordance one notch. with the Surveillance Frequency Control Program SR 3.1.3.3 Verify each control rod scram time from fully In accordance withdrawn to notch position 5 is ~ 7 seconds. with SR 3.1 .4.1, SR 3.1.4.2, SR 3.1.4.3, and SR 3.1.4.4 SR 3.1.3.4 Verify each control rod does not go to the withdrawn Each time the overtravel position. control rod is withdrawn to "full out" position Prior to declaring control rod OPERABLE after work on control rod or CRD System that could affect coupling Columbia Generating Station 3.1.3-4 Amendment No. a:t-2,~ ~ 238
Control Rod Scram Times 3.1.4 3.1 REACTIVITY CONTROL SYSTEMS 3.1.4 Control Rod Scram Times LCO 3.1.4 a. No more than 13 OPERABLE control rods shall be "slow," in accordance with Table 3.1.4-1, and
- b. No more than 2 OPERABLE control rods that are "slow" shall occupy adjacent locations.
APPLICABILITY: MODES 1 and 2. ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A, Requirements of the A,1 Be in MODE 3. 12 hours LCO not met. Columbia Generating Station 3.1.4-1 Amendment No. 4e9,;M4 225
Control Rod Scram Times 3.1.4 SURVEILLANCE REQUIREMENTS
----------------------- ----------- -----N 0 TE--------------- --------------------------------------------
During single control rod scram time Surveillances, the control rod drive (CRD) pumps shall be isolated from the associated scram accumulator. SURVEILLANCE FREQUENCY SR 3.1.4.1 Verify each control rod scram time is within the limits Prior to exceeding of Table 3.1.4-1 with reactor steam dome pressure 40% RTP after
~ 800 psig. each reactor shutdown <:: 120 days SR 3.1.4.2 Verify, for a representative sample, each tested In accordance control rod scram time is within the limits of with the Table 3.1.4-1 with reactor steam dome pressure Surveillance ~ 800 psig. Frequency Control Program SR 3.1.4.3 Verify each affected control rod scram time is within Prior to declaring the limits of Table 3.1.4-1 with any reactor steam control rod dome pressure. OPERABLE after work on control rod or CRD System that could affect scram time SR 3.1.4.4 Verify each affected control rod scram time is within Prior to exceeding the limits of Table 3.1.4-1 with reactor steam dome 40% RTP after pressure~ 800 psig. fuel movement within the affected core cell Prior to exceeding 40% RTP after work on control rod or CRD System that could affect scram time Columbia Generating Station 3.1.4-2 Amendment No. +94,2-++ ~ 238
Control Rod Scram Times 3.1.4 Table 3.1.4-1 (page 1 of 1) Control Rod Scram Times
NOTES------------------------------------------------------
- 1. OPERABLE control rods with scram times not within the limits of this Table are considered "slow."
- 2. Enter applicable Conditions and Required Actions of LCO 3.1.3, "Control Rod OPERABILITY," for control rods with scram times> 7 seconds to notch position 5. These control rods are inoperable, in accordance with SR 3.1.3.3, and are not considered "slow."
SCRAM TIMES(a)(b) (seconds) WHEN REACTOR STEAM DOME PRESSURE NOTCH POSITION ~ 800 psig 45 0.528 39 0.866 25 1.917 5 3.437 (a) Maximum scram time from fully withdrawn position, based on de-energization of scram pilot valve solenoids at time zero. (b) Scram times as a function of reactor steam dome pressure, when < 800 psig, are within established limits. Columbia Generating Station 3.1.4-3 Amendment No. 2-1-+,2-1-2 225
Control Rod Scram Accumulators 3.1.5 3.1 REACTIVITY CONTROL SYSTEMS 3.1.5 Control Rod Scram Accumulators LCO 3.1.5 Each control rod scram accumulator shall be OPERABLE. APPLICABILITY: MODES 1 and 2. ACTIONS
NOTE----------------------------------------------------------
Separate Condition entry is allowed for each control rod scram accumulator. CONDITION REQUIRED ACTION COMPLETION TIME A. One control rod scram A.1 ---------------NOTE------------- accumulator inoperable Only applicable if the with reactor steam dome associated control rod pressure ~ 900 psig. scram time was within the limits of Table 3.1.4-1 during the last scram time Surveillance. Declare the associated 8 hours control rod scram time "slow." OR A.2 Declare the associated 8 hours control rod inoperable. Columbia Generating Station 3.1.5-1 Amendment No. ~,~1-9 225
Control Rod Scram Accumulators 3.1.5 ACTIONS I CONDITION REQUIRED ACTION COMPLETION TIME B. Two or more control rod B.1 Restore charging water 20 minutes from scram accumulators header pressure to discovery of inoperable with reactor ~ 940 psig. Condition B steam dome pressure concurrent with
~ 900 psig. charging water header pressure < 940 psig AND B.2.1 ---------------NOTE-------------
Only applicable if the associated control rod scram time was within the limits of Table 3.1.4-1 during the last scram time Surveillance. Declare the associated 1 hour control rod scram time "slow." B.2.2 Declare the associated 1 hour control rod inoperable. Columbia Generating Station 3.1.5-2 Amendment No. ~.249 225
Control Rod Scram Accumulators 3.1.5 ACTION CONDITION REQUIRED ACTION COMPLETION TIME C. One or more control rod C.1 Verify the associated Immediately upon scram accumulators control rod is fully inserted. discovery of charging inoperable with reactor water header steam dome pressure pressure < 940 psig
< 900 psig.
AND C.2 Declare the associated 1 hour control rod inoperable. D. Required Action B.1 or D.1 ---------------NOTE-------------- C.1 and associated Not applicable if all Completion Time not inoperable control rod met. scram accumulators are associated with fully inserted control rods. Place the reactor mode Immediately switch in the shutdown position. SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.1.5.1 Verify each control rod scram accumulator pressure In accordance is 2 940 psig. with the Surveillance Frequency Control Program Columbia Generating Station 3.1.5-3 Amendment No . .WS,a+e 2ae 238
Rod Pattern Control 3.1.6 3.1 REACTIVITY CONTROL SYSTEMS 3.1.6 Rod Pattern Control LCO 3.1.6 OPERABLE control rods shall comply with the requirements of the banked position withdrawal sequence (BPWS). APPLICABILITY: MODES 1 and 2 with THERMAL POWER s 10% RTP. ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A, One or more A,1 --------------N 0 TE------------ OPERABLE control rods Rod Worth Minimizer not in compliance with (RWM) may be bypassed BPWS. as allowed by LCO 3.3.2.1, "Control Rod Block Instrumentation." Move associated control 8 hours rod(s) to correct position. OR A,2 Declare associated control 8 hours rod(s) inoperable. B. Nine or more B.1 ---------------NOTE------------- OPERABLE control rods RWM may be bypassed as not in compliance with allowed by LCO 3.3.2.1. BPWS. ------------------------------------ Suspend withdrawal of Immediately control rods. AND Columbia Generating Station 3.1.6-1 Amendment No. .:t49,~ 225
Rod Pattern Control 3.1.6 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME B (continued) B.2 Place the reactor mode 1 hour switch in the shutdown position. SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.1.6.1 Verify all OPERABLE control rods comply with In accordance BPWS. with the Surveillance Frequency Control Program Columbia Generating Station 3.1.6-2 Amendment No. +49,.+w 2aa 238
SLC System 3.1.7 3.1 REACTIVITY CONTROL SYSTEMS 3.1.7 Standby Liquid Control (SLC) System LCO 3.1. 7 Two SLC subsystems shall be OPERABLE. APPLICABILITY: MODES 1, 2, and 3. ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One SLC subsystem A.1 Restore SLC subsystem to 7 days inoperable. OPERABLE status. B. Two SLC subsystems B.1 Restore one SLC 8 hours inoperable. subsystem to OPERABLE status. C. Required Action and C.1 Be in MODE 3. 12 hours associated Completion Time not met. AND C.2 Be in MODE 4. 36 hours SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.1.7.1 Verify available volume of sodium pentaborate In accordance solution is ~ 4587 gallons. with the Surveillance Frequency Control Program Columbia Generating Station 3.1.7-1 Amendment No. +e9,+9-9 ~ 238
SLC System 3.1.7 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.1.7.2 Verify temperature of sodium pentaborate solution is In accordance within the limits of Figure 3.1. 7-1. with the Surveillance Frequency Control Program SR 3.1.7.3 Verify continuity of explosive charge. In accordance with the Surveillance Frequency Control Program SR 3.1.7.4 Verify the concentration of boron in solution is within In accordance the limits of Figure 3.1. 7-1. with the Surveillance Frequency Control Program Once within 24 hours after water or boron is added to solution AND Once within 24 hours after solution temperature is restored within the limits of Figure 3.1.7-1 SR 3.1.7.5 Verify each SLC subsystem manual and power In accordance operated valve in the flow path that is not locked, with the sealed, or otherwise secured in position, is in the Surveillance correct position or can be aligned to the correct Frequency position. Control Program Columbia Generating Station 3.1.7-2 Amendment No. +es,.:t-99 ~ 238
SLC System 3.1.7 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.1.7.6 Verify each pump develops a flow rate 2 41.2 gpm In accordance at a discharge pressure 2 1220 psig. with the INSERVICE TESTING PROGRAM SR 3.1.7.7 Verify flow through one SLC subsystem from pump In accordance into reactor pressure vessel. with the Surveillance Frequency Control Program SR 3.1.7.8 Verify all heat traced piping between storage tank In accordance and pump suction valve is unblocked. with the Surveillance Frequency Control Program AND Once within 24 hours after solution temperature is restored within the limits of Figure 3.1.7-1 SR 3.1.7.9 Verify sodium pentaborate enrichment is 2 44.0 Prior to addition to atom percent B-10. SLC Tank Columbia Generating Station 3.1.7-3 Amendment No. -iQ.9,2 ~ ~. 243
SLC System 3.1.7 150 I
-{ 13.60;0, 150 0 F)~..."..,..."..~I--t 150;0,150 I 0 F)-+-----I 140 I----r-----I 130 I---r-------b 120 1----1-------1 110 1---+-----1 100 1---+-----1:
90 1----+-----1 80 1-----+----; 70 I---I-----f, 15%,70 0 F t - - - - - I r - - - - - I (13.6%, 64 0 F) 60 1----~~--_4----_+----~----4_--~ 50 I----~----~----_+----_r----~--~ 401___-+-_ _-+--_---+_UNACCEPTABLE OPERATION 10.8 12.2 13.6 15 16.4 17.8 Tank Concentration (% by weight) 950462 Figure 3.1.7-1 (page 1 of 1) Sodium Pentaborate Solution Temperature/Concentration Requirements Columbia Generating Station 3.1.7-4 Amendment No. 449,+99 225
SDV Vent and Drain Valves 3.1.8 3.1 REACTIVITY CONTROL SYSTEMS 3.1.8 Scram Discharge Volume (SDV) Vent and Drain Valves LCO 3.1.8 Each SDV vent and drain valve shall be OPERABLE. APPLICABILITY: MODES 1 and 2. ACTIONS
NOTES-----------------------------------------------------
- 1. Separate Condition entry is allowed for each SDV vent and drain line.
- 2. An isolated line may be unisolated under administrative control to allow draining and venting of the SDV.
CONDITION REQUIRED ACTION COMPLETION TIME A. One or more SDV vent A.1 Isolate the associated line. 7 days or drain lines with one valve inoperable. B. One or more SDV vent B.1 Isolate the associated line. 8 hours or drain lines with both valves inoperable. C. Required Action and C.1 Be in MODE 3. 12 hours associated Completion Time not met. Columbia Generating Station 3.1.8-1 Amendment No. 449,.:t-99 225
SDV Vent and Drain Valves 3.1.8 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.1.8.1 --------------------- ----------NOTE--------------------------- --- Not required to be met on vent and drain valves closed during performance of SR 3.1 .8.2. Verify each SDV vent and drain valve is open. In accordance with the Surveillance Frequency Control Program SR 3.1.8.2 Cycle each SDV vent and drain valve to the fully In accordance closed and fully open positiqn. with the Surveillance Frequency Control Program SR 3.1.8.3 Verify each SDV vent and drain valve: In accordance with the
- a. Closes in s; 30 seconds after receipt of an Surveillance actual or simulated scram signal; and Frequency Control Program
- b. Opens when the actual or simulated scram signal is reset.
Columbia Generating Station 3.1.8-2 Amendment No. +49-,+e9 ~ 238
APLHGR 3.2.1 3.2 POWER DISTRIBUTION LIMITS 3.2.1 AVERAGE PLANAR LINEAR HEAT GENERATION RATE (APLHGR) LCO 3.2.1 All APLHGRs shall be less than or equal to the limits specified in the COLR. APPLICABILITY: THERMAL POWER :2: 25% RTP. ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. Any APLHGR not within A.1 Restore APLHGR(s) to 2 hours limits. within limits. B. Required Action and B.1 Reduce THERMAL 4 hours associated Completion POWER to< 25% RTP. Time not met. SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.2.1.1 Verify all APLHGRs are less than or equal to the Once within limits specified in the COLR. 12 hours after
- 2:25% RTP In accordance with the Surveillance Frequency Control Program Columbia Generating Station 3.2.1-1 Amendment No. +49,-+W ~ 238
MCPR 3.2.2 3.2 POWER DISTRIBUTION LIMITS 3.2.2 MINIMUM CRITICAL POWER RATIO (MCPR) LCO 3.2.2 All MCPRs shall be greater than or equal to the MCPR operating limits specified in the COLR. APPLICABILITY: THERMAL POWER :2'. 25% RTP. ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. Any MCPR not within A.1 Restore MCPR(s) to within 2 hours limits. limits. B. Required Action and B.1 Reduce THERMAL 4 hours associated Completion POWER to< 25% RTP. Time not met. SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.2.2.1 Verify all MCPRs are greater than or equal to the Once within limits specified in the COLR. 12 hours after
- 2'. 25% RTP AND In accordance with the Surveillance Frequency Control Program Columbia Generating Station 3.2.2-1 Amendment No. +w,a++ ~ 238
MCPR 3.2.2 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.2.2.2 Determine the MCPR limits. Once within 72 hours after each completion of SR 3.1.4.1 Once within 72 hours after each completion of SR 3.1.4.2 Once within 72 hours after each completion of SR 3.1.4.4 Columbia Generating Station 3.2.2-2 Amendment No. 2-14 225
LHGR 3.2.3 3.2 POWER DISTRIBUTION LIMITS 3.2.3 LINEAR HEAT GENERATION RATE (LHGR) LCO 3.2.3 All LHGRs shall be less than or equal to the limits specified in the COLR. APPLICABILITY: THERMAL POWER 2 25% RTP. ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. Any LHGR not within A.1 Restore LHGR(s) to within 2 hours limits. limits. B. Required Action and B.1 Reduce THERMAL 4 hours associated Completion POWER to< 25% RTP. Time not met. SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.2.3.1 Verify all LHGRs are less than or equal to the limits Once within specified in the COLR. 12 hours after 2 25% RTP In accordance with the Surveillance Frequency Control Program Columbia Generating Station 3.2.3-1 Amendment No. +49,+w 22-§ 238
APRM Gain and Setpoint (Prior to Implementation of PRNM Upgrade) 3.2.4 3.2 POWER DISTRIBUTION LIMITS 3.2.4 Average Power Range Monitor (APRM) Gain and Setpoint LCO 3.2.4 a. MFLPD shall be less than or equal to Fraction of RTP (FRTP); or
- b. Each required APRM Flow Biased Simulated Thermal Power - High Function Allowable Value shall be modified by greater than or equal to the ratio of FRTP and the MFLPD; or
- c. Each required APRM gain shall be adjusted such that the APRM readings are~ 100% times MFLPD.
APPLICABILITY: THERMAL POWER ~ 25% RTP prior to implementation of Power Range Neutron Monitor (PRNM) upgrade. ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. Requirements of the A.1 Satisfy the requirements of 6 hours LCO not met. the LCO. B. Required Action and B.1 Reduce THERMAL 4 hours associated Completion POWER to< 25% RTP. Time not met. Columbia Generating Station 3.2.4-1 Amendment No. +e9 ~ 226
APRM Gain and Setpoint (Prior to Implementation of PRNM Upgrade) 3.2.4 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.2.4.1 -------------------------------NC>TE------------------------------ Not required to be met if SR 3.2.4.2 is satisfied for LCC> 3.2.4.b or LCC> 3.2.4.c requirements. Verify MFLPD is within limits. ()nee within 12 hours after
;;:: 25% RTP 24 hours thereafter SR 3.2.4.2 -------------------------------NC>TE------------------------------
Not required to be met if SR 3.2.4.1 is satisfied for LCC> 3.2.4.a requirements. Verify each required: 12 hours
- a. APRM Flow Biased Simulated Thermal Power -
High Function Allowable Value is modified by greater than or equal to the ratio of FRTP and the MFLPD; or
- b. APRM gain is adjusted such that the APRM reading is ;;:: 100% times MFLPD.
Columbia Generating Station 3.2.4-2 Amendment No. 4-eS ~ 226
RPS Instrumentation (Prior to Implementation of PRNM Upgrade) 3.3.1.1 3.3 INSTRUMENTATION 3.3.1.1 Reactor Protection System (RPS) Instrumentation LCO 3.3.1.1 The RPS instrumentation for each Function in Table 3.3.1.1-1 shall be OPERABLE. APPLICABILITY: According to Table 3.3.1.1-1 prior to implementation of Power Range Neutron Monitor (PRNM) upgrade. ACTIONS
NOTE-----------------------------------------------------------
Separate Condition entry is allowed for each channel. CONDITION REQUIRED ACTION COMPLETION TIME A. One or more required A.1 Place channel in trip. 12 hours channels inoperable. OR A.2 Place associated trip 12 hours system in trip. B. One or more Functions B.1 Place channel in one trip 6 hours with one or more system in trip. required channels inoperable in both trip OR systems. B.2 Place one trip system in 6 hours trip. C. One or more Functions C.1 Restore RPS trip capability. 1 hour with RPS trip capability not maintained. D. Required Action and D.1 Enter the Condition Immediately associated Completion referenced in Time of Condition A, B, Table 3.3.1.1-1 for the or C not met. channel. Columbia Generating Station 3.3.1.1-1 Amendment No. ~~ 226
RPS Instrumentation (Prior to Implementation of PRNM Upgrade) 3.3.1.1 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME E. As required by Required E.1 Reduce THERMAL 4 hours Action D.1 and POWER to< 30% RTP. referenced in Table 3.3.1.1-1. F. As required by Required F.1 Be in MODE 2. 6 hours Action D .1 and referenced in Table 3.3.1.1-1. G. As required by Required G.1 Be in MODE 3. 12 hours Action D .1 and referenced in Table 3.3.1.1-1. H. As required by Required H.1 Initiate action to fully insert Immediately Action D.1 and all insertable control rods in referenced in core cells containing one or Table 3.3.1.1-1. more fuel assemblies. SURVEILLANCE REQUIREMENTS
NOTES----------------------------------------------------------
- 1. Refer to Table 3.3.1.1-1 to determine which SRs apply for each RPS Function.
- 2. When a channel is placed in an inoperable status solely for performance of required Surveillances, entry into associated Conditions and Required Actions may be delayed for up to 6 hours provided the associated Function maintains RPS trip capability.
SURVEILLANCE FREQUENCY SR 3.3.1.1.1 Perform CHANNEL CHECK. 12 hours Columbia Generating Station 3.3.1.1-2 Amendment No. 99 ~ 226
RPS Instrumentation (Prior to Implementation of PRNM Upgrade) 3.3.1.1 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.3.1.1.2 -------------------------------NC>TE------------------------------ Not required to be performed until 12 hours after THERMAL PC>WER 2 25% RTP. Verify the absolute difference between the average 7 days power range monitor (APRM) channels and the calculated power :s; 2% RTP plus any gain adjustment required by LC() 3.2.4, "Average Power Range Monitor (APRM) Gain and Setpoint," while operating at 2 25% RTP. SR 3.3.1.1.3 -------------------------------NC>TE------------------------------ Not required to be performed when entering MC>DE 2 from MC>DE 1 until 12 hours after entering MC>DE 2. Perform CHANNEL FUNCTIC>NAL TEST. 7 days SR 3.3.1.1.4 Perform CHANNEL FUNCTIC>NAL TEST. 7 days SR 3.3.1.1.5 Verify the source range monitor (SRM) and Prior to intermediate range monitor (IRM) channels overlap. withdrawing SRMs from the fully inserted position SR 3.3.1.1.6 -------------------------------NC>TE------------------------------ ()nly required to be met during entry into MC>DE 2 from MC>DE 1. Verify the IRM and APRM channels overlap. 7 days SR 3.3.1.1.7 Calibrate the local power range monitors. 1130 MWD/T average core exposure Columbia Generating Station 3.3.1.1-3 Amendment No. 4-eS ~ 226
RPS Instrumentation (Prior to Implementation of PRNM Upgrade) 3.3.1.1 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.3.1.1.8 Perform CHANNEL FUNCTIONAL TEST. 92 days SR 3.3.1.1.9 ------------------------------NOTES-----------------------------
- 1. Neutron detectors are excluded.
- 2. For Function 2.a, not required to be performed when entering MODE 2 from MODE 1 until 12 hours after entering MODE 2.
Perform CHANNEL CALIBRATION. 184 days SR 3.3.1.1.10 ------------------------------NOTES-----------------------------
- 1. Neutron detectors are excluded.
- 2. For Function 1, not required to be performed when entering MODE 2 from MODE 1 until 12 hours after entering MODE 2.
Perform CHANNEL CALIBRATION. 18 months for Functions 1 through 4, 6, 7, and 9 through 11 AND 24 months for Functions 5 and 8 SR 3.3.1.1.11 Verify the APRM Flow Biased Simulated Thermal 18 months Power - High Function time constant is ::;; 7 seconds. SR 3.3.1.1.12 Verify Turbine Throttle Valve- Closure, and Turbine 18 months Governor Valve Fast Closure Trip Oil Pressure-Low Functions are not bypassed when THERMAL POWER is~ 30% RTP. SR 3.3.1.1.13 Perform CHANNEL FUNCTIONAL TEST. 24 months Columbia Generating Station 3.3.1.1-4 Amendment No . .:t-79 ~ 226
RPS Instrumentation (Prior to Implementation of PRNM Upgrade) 3.3.1.1 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.3.1.1.14 Perform LOGIC SYSTEM FUNCTIONAL TEST. 24 months SR 3.3.1.1.15 ------------------------------NOTES----------------------------- 1 Neutron detectors are excluded.
- 2. Channel sensors for Functions 3 and 4 are excluded.
- 3. For Function 5, "n" equals 4 channels for the purpose of determining the STAGGERED TEST BASIS Frequency.
Verify the RPS RESPONSE TIME is within limits. 24 months on a STAGGERED TEST BASIS Columbia Generating Station 3.3.1.1-5 Amendment No. 4-69 ~ 226
RPS Instrumentation (Prior to Implementation of PRNM Upgrade) 3.3.1.1 Table 3.3.1.1-1 (page 1 of3) Reactor Protection System Instrumentation APPLICABLE CONDITIONS MODES OR REQUIRED REFERENCED OTHER CHANNELS FROM SPECIFIED PER TRIP REQUIRED SURVEILLANCE ALLOWABLE FUNCTION CONDITIONS SYSTEM ACTION D.1 REQUIREMENTS VALUE
- 1. Intermediate Range Monitors
- a. Neutron Flux- High 2 3 G SR 3.3.1.1.1 <; 122/125 SR 3.3.1.1.3 divisions of full SR 3.3.1.1.5 scale SR 3.3.1.1.6 SR 3.3.1.1.10 SR 3.3.1.1.14 5(a) 3 H SR 33.1.11 <; 122/125 SR 3.3.1.1.4 divisions of full SR 3.3.1.1.10 scale SR 3.3.1.1.14
- b. lnop 2 3 G SR 3.3.1.1.3 NA SR 3.3.1.1.14 5(a) 3 H SR 3.3.1.1.4 NA SR 3.3.1.1.14
- 2. Average Power Range Monitors
- a. Neutron Flux- High, 2 2 G SR 3.3.1.1.1 .,; 20% RTP Setdown SR 3.3.1.1.3 SR 3.3.1.1.6 SR 3.3.1.1.7 SR 3.3.1.1.9 SR 3.3.1.1.14
- b. Flow Biased Simulated 2 F SR 3.3.1.1.1 <; 0.58 W + 62% RTP Thermal Power- High SR 3.3.1.1.2 and.,; 114.9% RTP SR 3.3.1.1.7 SR 3.3.1.1.8 SR 3.3.1.1.9 SR 3.3.1.1.11 SR 3.3.11.14
- c. Fixed Neutron Flux - 2 F SR 3.3.1.1.1 .,; 120% RTP High SR 3.3.1.1.2 SR 3.3.1.1.7 SR 3.3.1.1.8 SR 3.3.1.1.9 SR 3.3.1.1.14 SR 3.3.1.1.15
- d. lnop 1,2 2 G SR 3.3.1.1.7 NA SR 3.3.1.1.8 SR 3.3.1.1.14 (a) With any control rod withdrawn from a core cell containing one or more fuel assemblies.
Columbia Generating Station 3.3.1.1-6 Amendment No. +e9 ~ 226
RPS Instrumentation (Prior to Implementation of PRNM Upgrade) 3.3.1.1 Table 3.3.1.1-1(page2of3) Reactor Protection System Instrumentation APPLICABLE CONDITIONS MODES OR REQUIRED REFERENCED OTHER CHANNELS FROM SPECIFIED PER TRIP REQUIRED SURVEILLANCE ALLOWABLE FUNCTION CONDITIONS SYSTEM ACTION D.1 REQUIREMENTS VALUE
- 3. Reactor Vessel Steam 1,2 2 G SR 3.3.1.1.8 s 1079 psig Dome Pressure - High SR 3.3.1.1.10 SR 3.3.1.1.14 SR 3.3.1.1.15
- 4. Reactor Vessel Water Level 1,2 2 G SR 3.3.1.1.1 ;,,, 9.5 inches
- Low, Level 3 SR 3.3.1.1.8 SR 3.3.1.1.10 SR 3.3.1.1.14 SR 3.3.1.1.15
- 5. Main Steam Isolation Valve 8 F SR 3.3.1.1.8 s 12.5% closed
- Closure SR 3.3.1.1.10 SR 3.3.1.1.14 SR 3.3.1.1.15
- 6. Primary Containment 1,2 2 G SR 3.3.1.1.8 s 1.88 psig Pressure - High SR 3.3.1.1.10 SR 3.3.1.1.14
- 7. Scram Discharge Volume Water Level - High
- a. Transmitter/ Level 1,2 2 G SR 3.3.1.1.1 s 529 ft 9 inches Indicating Switch SR 3.3.1.1.8 elevation SR 3.3.1.1.10 SR 3.3.1.1.14 51*) 2 H SR 3.3.1.1.1 s 529 ft 9 inches SR 3.3.1.1.8 elevation SR 3.3.1.1.10 SR 3.3.1.1.14
- b. Transmitter/Level 1,2 2 G SR 3.3.1.1.8 s 529 ft 9 inches Switch SR 3.3.1.1.1 otdll*l elevation SR 3.3.1.1.14 51*) 2 H SR 3.3.1.1.8 s 529 ft 9 inches SR 3.3.1.1.1 o<dll*l elevation SR 3.3.1.1.14 (a) With any control rod withdrawn from a core cell containing one or more fuel assemblies.
(d) If the as-found channel setpoint is outside its predefined as-found tolerance, then the channel shall be evaluated to verify that it is functioning as required before returning the channel to service. (e) The instrument channel setpoint shall be reset to a value that is within the as-left tolerance around the Limiting Trip Setpoint (LTSP) at the completion of the surveillance; otherwise, the channel shall be declared inoperable. Setpoints more conservative than the LTSP are acceptable provided that the as-found and as-left tolerances apply to the actual setpoint implemented in the surveillance procedures (Nominal Trip Setpoint) to confirm channel performance. The LTSP and the methodologies used to determine the as-found and the as-left tolerances are specified in the Licensee Controlled Specifications. Columbia Generating Station 3.3.1.1-7 Amendment No. ~~ 232
RPS Instrumentation (Prior to Implementation of PRNM Upgrade) 3.3.1.1 Table3.3.1.1-1 (page3of3) Reactor Protection System Instrumentation APPLICABLE CONDITIONS MODES OR REQUIRED REFERENCED OTHER CHANNELS FROM SPECIFIED PER TRIP REQUIRED SURVEILLANCE ALLOWABLE FUNCTION CONDITIONS SYSTEM ACTION D.1 REQUIREMENTS VALUE
- 8. Turbine Throttle Valve - ;,,30% RTP 4 E SR 3.3.1.1.8 ,, 7% closed Closure SR 3.3.1.1.10 SR 3.3.1.1.12 SR 3.3.1.1.14 SR 3.3.1.1.15
- 9. Turbine Governor Valve ;,,30% RTP 2 E SR 3.3.1.1.8 ;,, 1000 psig Fast Closure, Trip Oil SR 3.3.1.1.10 Pressure - Low SR 3.3.1.1.12 SR 3.3.1.1.14 SR 3.3.1.1.15
- 10. Reactor Mode Switch - 1,2 2 G SR 3.3.1.1.13 NA Shutdown Position SR 3.3.1.1.14 51*) 2 H SR 3.3.1.1.13 SR 3.3.1.1.14 NA
- 11. Manual Scram 1,2 2 G SR 3.3.1.1.4 NA SR 3.3.1.1.14 51*) 2 H SR 3.3.1.1.4 NA SR 3.3.1.1.14 (a) With any control rod withdrawn from a core cell containing one or more fuel assemblies.
Columbia Generating Station 3.3.1.1-8 Amendment No. ~ 229 232
RPS Instrumentation (After Implementation of PRNM Upgrade) 3.3.1.1 3.3 INSTRUMENTATION 3.3.1.1 Reactor Protection System (RPS) Instrumentation LCO 3.3.1.1 The RPS instrumentation for each Function in Table 3.3.1.1-1 shall be OPERABLE. APPLICABILITY: According to Table 3.3.1.1-1 after implementation of Power Range Neutron Monitor (PRNM) upgrade. ACTIONS
NOTE-----------------------------------------------------------
Separate Condition entry is allowed for each channel. CONDITION REQUIRED ACTION COMPLETION TIME A. One or more required A.1 Place channel in trip. 12 hours channels inoperable. OR
-------------NOTE---------------
Not applicable for Functions 2.a, 2.b, 2.c, 2.d, or 2.f. A.2 Place associated trip 12 hours system in trip.
---------------NOTE-------------- B.1 Place channel in one trip 6 hours Not applicable for system in trip.
Functions 2.a, 2.b, 2.c, 2.d, or 2.f. OR B.2 Place one trip system in 6 hours B. One or more Functions trip. with one or more required channels inoperable in both trip systems. Columbia Generating Station 3.3.1.1-9 Amendment No. +eQ. 225 226
RPS Instrumentation (After Implementation of PRNM Upgrade) 3.3.1.1 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME C. One or more Functions C.1 Restore RPS trip capability. 1 hour with RPS trip capability not maintained. D. Required Action and D.1 Enter the Condition Immediately associated Completion referenced in Time of Condition A, B, Table3.3.1.1-1 for the or C not met. channel. E. As required by Required E.1 Reduce THERMAL 4 hours Action D.1 and POWER to< 29.5% RTP. referenced in Table 3.3.1.1-1. F. As required by Required F.1 Be in MODE 2. 6 hours Action D.1 and referenced in Table 3.3.1.1-1. G. As required by Required G.1 Be in MODE 3. 12 hours Action D.1 and referenced in Table 3.3.1.1-1. H. As required by Required H.1 Initiate action to fully insert Immediately Action D.1 and all insertable control rods in referenced in core cells containing one or Table 3.3.1.1-1. more fuel assemblies. Columbia Generating Station 3.3.1.1-10 Amendment No. +99~~ 241
RPS Instrumentation (After Implementation of PRNM Upgrade) 3.3.1.1 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME I. As required by Required 1.1 Initiate alternate method to 12 hours Action D .1 and detect and suppress referenced in thermal hydraulic instability Table 3.3.1.1-1. oscillations. AND
----- ---- ---- --N 0 TE------------ -
LCO 3.0.4 is not applicable. 1.2 Restore required channels 120 days to OPERABLE J. Required Action and J.1 Reduce THERMAL 4 hours associated Completion POWER to less than the Time of Condition I not value specified in the met. COLR. SURVEILLANCE REQUIREMENTS
NOTES----------------------------------------------------------
- 1. Refer to Table 3.3.1.1-1 to determine which SRs apply for each RPS Function.
- 2. When a channel is placed in an inoperable status solely for performance of required Surveillances, entry into associated Conditions and Required Actions may be delayed for up to 6 hours provided the associated Function maintains RPS trip capability.
SURVEILLANCE FREQUENCY SR 3.3.1.1.1 Perform CHANNEL CHECK. In accordance with the Surveillance Frequency Control Program Columbia Generating Station 3.3.1.1-11 Amendment No. +e9 ~ ~ 238
RPS Instrumentation (After Implementation of PRNM Upgrade) 3.3.1.1 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.3.1.1.2 -------------------------------NOTE------------------------------ Not required to be performed until 12 hours after THERMAL POWER 2 25% RTP. Verify the absolute difference between the average In accordance power range monitor (APRM) channels and the with the Surveillance calculated power ::=:; 2% RTP while operating at Frequency 225% RTP. Control Program SR 3.3.1 .1 .3 ------------------------ ---- ---N 0 TE------------ -- ----- ---- ------- Not required to be performed when entering MODE 2 from MODE 1 until 12 hours after entering MODE 2. Perform CHANNEL FUNCTIONAL TEST. In accordance with the Surveillance Frequency Control Program SR 3.3.1.1.4 Perform CHANNEL FUNCTIONAL TEST. In accordance with the Surveillance Frequency Control Program SR 3.3.1 .1 .5 Verify the source range monitor (SRM) and Prior to intermediate range monitor (IRM) channels overlap. withdrawing SRMs from the fully inserted position SR 3.3.1.1.6 --------- ------------ --- ---- ---N 0 TE--------------------------- --- 0 n ly required to be met during entry into MODE 2 from MODE 1. Verify the IRM and APRM channels overlap. In accordance with the Surveillance Frequency Control Program Columbia Generating Station 3.3.1.1-12 Amendment No. +SQ.~ 2ae 238
RPS Instrumentation (After Implementation of PRNM Upgrade) 3.3.1.1 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.3.1.1.7 Calibrate the local power range monitors. In accordance with the Surveillance Frequency Control Program SR 3.3.1.1.8 Perform CHANNEL FUNCTIONAL TEST. In accordance with the Surveillance Frequency Control Program SR 3.3.1.1.9 Deleted. SR 3.3.1.1.10 ------------------------------NOTES---------------------------
- 1. Neutron detectors are excluded.
- 2. For Function 1, not required to be performed when entering MODE 2 from MODE 1 until 12 hours after entering MODE 2.
- 3. For Functions 2.b and 2.f, the recirculation flow transmitters that feed the APRMs are included.
Perform CHANNEL CALIBRATION. In accordance with the Surveillance Frequency Control Program SR 3.3.1.1.11 Deleted. SR 3.3.1.1.12 Verify Turbine Throttle Valve - Closure, and In accordance with Turbine Governor Valve Fast Closure Trip Oil the Surveillance Pressure - Low Functions are not bypassed when Frequency Control THERMAL POWER is ;:c: 29.5% RTP. Program SR 3.3.1.1.13 Perform CHANNEL FUNCTIONAL TEST. In accordance with the Surveillance Frequency Control Program Columbia Generating Station 3.3.1.1-13 Amendment No. 4-79~~~ 241
RPS Instrumentation (After Implementation of PRNM Upgrade) 3.3.1.1 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.3.1.1.14 Perform LOGIC SYSTEM FUNCTIONAL TEST. In accordance with the Surveillance Frequency Control Program SR 3.3.1.1.15 ------------------------------NOTES-----------------------------
- 1. Neutron detectors are excluded.
- 2. Channel sensors for Functions 3 and 4 are excluded.
Verify the RPS RESPONSE TIME is within limits. In accordance with the Surveillance Frequency Control Program SR 3.3.1.1.16 ------------------------------NOTES-----------------------------
- 1. For Function 2.a, not required to be performed when entering MODE 2 from MODE 1 until 12 hours after entering MODE 2.
- 2. For Functions 2.b and 2.f, the CHANNEL FUNCTIONAL TEST includes the recirculation flow input processing, excluding the flow transmitters.
Perform CHANNEL FUNCTIONAL TEST. In accordance with the Surveillance Frequency Control Program SR 3.3.1.1.17 Verify the OPRM is not bypassed when APRM In accordance Simulated Thermal Power is greater than or equal to with the the value specified in the COLR and recirculation Surveillance drive flow is less than the value specified in the Frequency COLR. Control Program Columbia Generating Station 3.3.1.1-14 Amendment No. +w ~ ~ 238
RPS Instrumentation (After Implementation of PRNM Upgrade) 3.3.1.1 Table 3.3.1.1-1(page1 of4) Reactor Protection System Instrumentation APPLICABLE CONDITIONS MODES OR REQUIRED REFERENCED OTHER CHANNELS FROM SPECIFIED PER TRIP REQUIRED SURVEILLANCE ALLOWABLE FUNCTION CONDITIONS SYSTEM ACTION D.1 REQUIREMENTS VALUE
- 1. Intermediate Range Monitors
- a. Neutron Flux - High 2 3 G SR 3.3.1.1.1 <'._ 122/125 SR 3.3.1.1.3 divisions of full SR 3.3.1.1.5 scale SR 3.3.1.1.6 SR 3.3.1.1.10 SR 3.3.1.1.14 5(*) 3 H SR 3.3.1.1.1 <'._ 122/125 SR 3.3.1.1.4 divisions of full SR 3.3.1.1.10 scale SR 3.3.1.1.14
- b. lnop 2 3 G SR 3.3.1.1.3 NA SR 3.3.1.1.14 51*) 3 H SR 3.3.1.1.4 NA SR 3.3.1.1.14
- 2. Average Power Range Monitors
- a. Neutron Flux - High 2 3lb) G SR 3.3.1.1.1 <::. 20% RTP (Setdown) SR 3.3.1.1.6 SR 3.3.1.1.7 SR 3.3.1.1.1 old).le>
SR 3.3.1.1.16
- b. Simulated Thermal 3lb) F SR 3.3.1.1.1 <::. 0.62W + 62.9% RTP Power- High SR 3.3.1.1.2 and<'.. 114.9% RTPlc)
SR 3.3.1.1.7 SR 3.3.1.1.101d).le> SR 3.3.1.1.16 (a) With any control rod withdrawn from a core cell containing one or more fuel assemblies. (b) Each APRM/OPRM channel provides inputs to both trip systems. (c) :5 0.62W + 59.8% RTP and::; 114.9% RTP when reset for single loop operation per LCO 3.4.1, "Recirculation Loops Operating." (d) If the as-found channel setpoint is outside its predefined as-found tolerance, then the channel shall be evaluated to verify that it is functioning as required before returning the channel to service. (e) The instrument channel setpoint shall be reset to a value that is within the as-left tolerance around the Limiting Trip Setpoint (L TSP) at the completion of the surveillance; otherwise, the channel shall be declared inoperable. Setpoints more conservative than the LTSP are acceptable provided that the as-found and as-left tolerances apply to the actual setpoint implemented in the surveillance procedures (Nominal Trip Setpoint) to confirm channel performance. The LTSP and the methodologies used to determine the as-found and as-left tolerances are specified in the Licensee Controlled Specifications Columbia Generating Station 3.3.1.1-15 Amendment No. W ~ ~ 241
RPS Instrumentation (After Implementation of PRNM Upgrade) 3.3.1.1 Table3.3.1.1-1 (page2of4) Reactor Protection System Instrumentation APPLICABLE CONDITIONS MODES OR REQUIRED REFERENCED OTHER CHANNELS FROM SPECIFIED PER TRIP REQUIRED SURVEILLANCE ALLOWABLE FUNCTION CONDITIONS SYSTEM ACTION D.1 REQUIREMENTS VALUE
- 2. Average Power Range Monitors
- c. Neutron Flux - High F SR 3.3.1.1.1 :-:; 120% RTP SR 3.3.1.1.2 SR 3.3.1.1.7 SR 3.3.1.1.1 o<dl.<*>
SR 3.3.1.1.16
- d. lnop 1,2 G SR 3.3.1.1.16 NA
- e. 2-0ut-of-4 Voter 1,2 2 G SR 3.3.1.1.1 NA SR 3.3.1.114 SR 3.3.1.1.15 SR 3.3.1.116
- f. OPRM Upscale (f) SR 3.3.1.11 NA<9 >
SR 3.3.1.1.7 SR 3.3.1.1.1 o<d>.<*> SR 3.3.1.1.16 SR 3.3.1.117 (b) Each APRM/OPRM channel provides inputs to both trip systems. (d) If the as-found channel setpoint is outside its predefined as-found tolerance, then the channel shall be evaluated to verify that it is functioning as required before returning the channel to service. (e) The instrument channel setpoint shall be reset to a value that is within the as-left tolerance around the Limiting Trip Setpoint (LTSP) at the completion of the surveillance; otherwise, the channel shall be declared inoperable. Setpoints more conservative than the LTSP are acceptable provided that the as-found and as-left tolerances apply to the actual setpoint implemented in the surveillance procedures (Nominal Trip Setpoint) to confirm channel performance. The LTSP and the methodologies used to determine the as-found and as-left tolerances are specified in the Licensee Controlled Specifications. (f) THERMAL POWER greater than or equal to the value specified in the COLR. (g) The OPRM Upscale does not have an Allowable Value. The Period Based Detection Algorithm (PBDA) trip setpoints are specified in the COLR. Columbia Generating Station 3.3.1.1-16 Amendment No. 69 ~ 226
RPS Instrumentation (After Implementation of PRNM Upgrade) 3.3.1.1 Table 3.3.1.1-1(page3of4) Reactor Protection System Instrumentation APPLICABLE CONDITIONS MODES OR REQUIRED REFERENCED OTHER CHANNELS FROM SPECIFIED PER TRIP REQUIRED SURVEILLANCE ALLOWABLE FUNCTION CONDITIONS SYSTEM ACTION D.1 REQUIREMENTS VALUE
- 3. Reactor Vessel Steam 1,2 2 G SR 3.3.1.1.8 s 1079 psig Dome Pressure - High SR 3.3.1.1.10 SR 3.3.1.1.14 SR 3.3.1.1.15
- 4. Reactor Vessel Water 1,2 2 G SR 3.3.1.1.1 ~ 9.5 inches Level - Low, Level 3 SR 3.3.1.1.8 SR 3.3.1.1.10 SR 3.3.1.1.14 SR 3.3.1.1.15
- 5. Main Steam Isolation Valve 8 F SR 3.3.1.1.8 s 12.5% closed
- Closure SR 3.3.1.1.10 SR 3.3.1.1.14 SR 3.3.1.1.15
- 6. Primary Containment 1,2 2 G SR 3.3.1.1.8 s 1.88 psig Pressure - High SR 3.3.1.1.10 SR 3.3.1.1.14
- 7. Scram Discharge Volume Water Level - High
- a. Transmitter/Level 1,2 2 G SR 3.3.1.1.1 s 529 ft 9 inches Indicating Switch SR 3.3.1.1.8 elevation SR 3.3.1.1.10 SR 3.3.1.1.14 5<*1 2 H SR 3.3.1.1.1 s 529 ft 9 inches SR 3.3.1.1.8 elevation SR 3.3.1.1.10 SR 3.3.1.1.14
- b. Transmitter/Level 1,2 2 G SR 3.3.1.1.8 s 529 ft 9 inches Switch SR 3.3.1.1.1 o<dl<*I elevation SR 3.3.1.1.14 5<*1 2 H SR 3.3.1.1.8 s 529 ft 9 inches SR 3.3.1.1.1 o<dll*I elevation SR 3.3.1.1.14 (a) With any control rod withdrawn from a core cell containing one or more fuel assemblies.
(d) If the as-found channel setpoint is outside its predefined as-found tolerance, then the channel shall be evaluated to verify that it is functioning as required before returning the channel to service. (e) The instrument channel setpoint shall be reset to a value that is within the as-left tolerance around the Limiting Trip Setpoint (LTSP) at the completion of the surveillance; otherwise, the channel shall be declared inoperable. Setpoints more conservative than the LTSP are acceptable provided that the as-found and as-left tolerances apply to the actual setpoint implemented in the surveillance procedures (Nominal Trip Setpoint) to confirm channel performance. The LTSP and the methodologies used to determine the as-found and the as-left tolerances are specified in the Licensee Controlled Specifications. Columbia Generating Station 3.3.1.1-17 Amendment No. ~~ 232
RPS Instrumentation (After Implementation of PRNM Upgrade) 3.3.1.f Table 3.3.1.1-1 (page 4 of 4) Reactor Protection System Instrumentation APPLICABLE CONDITIONS MODES OR REQUIRED REFERENCED OTHER CHANNELS FROM SPECIFIED PER TRIP REQUIRED SURVEILLANCE ALLOWABLE FUNCTION CONDITIONS SYSTEM ACTION D.1 REQUIREMENTS VALUE
- 8. Turbine Throttle Valve - 2 29.5% RTP 4 E SR 3.3.1.1.8 ~ 7% closed Closure SR 3.3.1.1.10 SR 3.3.1.1.12 SR 3.3.1.1.14 SR 3.3.1.1.15
- 9. Turbine Governor Valve 2 29.5% RTP 2 E SR 3.3.1.1.8 2 1000 psig Fast Closure, Trip Oil SR 3.3.1.1.10 Pressure - Low SR 3.3.1.1.12 SR 3.3.1.1.14 SR 3.3.1.1.15
- 10. Reactor Mode Switch - 1,2 2 G SR 3.3.1.1.13 NA Shutdown Position SR 3.3.1.1.14 5<*) 2 H SR 3.3.1.1.13 SR 3.3.1.1.14 NA
- 11. Manual Scram 1,2 2 G SR 3.3.1.1.4 NA SR 3.3.1.1.14 5<*) 2 H SR 3.3.1.1.4 NA SR 3.3.1.1.14 (a) With any control rod withdrawn from a core cell containing one or more fuel assemblies.
Columbia Generating Station 3.3.1.1-18 Amendment No. ~~~ 241
SRM Instrumentation 3.3.1.2 3.3 INSTRUMENTATION 3.3.1.2 Source Range Monitor (SRM) Instrumentation LCO 3.3.1.2 The SRM instrumentation in Table 3.3.1.2-1 shall be OPERABLE. APPLICABILITY: According to Table 3.3.1.2-1. ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One or more required A,1 Restore required SRMs to 4 hours SRMs inoperable in OPERABLE status. MODE 2 with intermediate range monitors (lRMs) on Range 2 or below. B. Three required SRMs 8.1 Suspend control rod Immediately inoperable in MODE 2 withdrawal. with IRMs on Range 2 or below. C. Required Action and C.1 Be in MODE 3. 12 hours associated Completion Time of Condition A or B not met. D. One or more required D.1 Fully insert all insertable 1 hour SRMs inoperable in control rods. MODE 3 or 4. AND D.2 Place reactor mode switch 1 hour in the shutdown position. Columbia Generating Station 3.3.1.2-1 Amendment No. 449,4-@.B 225
SRM Instrumentation 3.3.1.2 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME E. One or more required E.1 Suspend CORE Immediately SRMs inoperable in AL TE RATIONS except for MODE 5. control rod insertion. E.2 Initiate action to fully insert Immediately all insertable control rods in core cells containing one or more fuel assemblies. SURVEILLANCE REQUIREMENTS
NOTE-----------------------------------------------------------
Refer to Table 3.3.1.2-1 to determine which SRs apply for each applicable MODE or other specified conditions. SURVEILLANCE FREQUENCY SR 3.3.1.2.1 Perform CHANNEL CHECK. In accordance with the Surveillance Frequency Control Program Columbia Generating Station 3.3.1.2-2 Amendment No. +49,+e9 ~ 238
SRM Instrumentation 3.3.1 .2 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.3.1.2.2 ------------------------------NOTES----------------------------- 1 . Only required to be met during CORE AL TE RATIONS.
- 2. One SRM may be used to satisfy more than one of the following.
Verify an OPERABLE SRM detector is located in: In accordance with the
- a. The fueled region; Surveillance Frequency
- b. The core quadrant where CORE Control Program AL TE RATIONS are being performed when the associated SRM is included in the fueled region; and
- c. A core quadrant adjacent to where CORE ALTERATIONS are being performed, when the associated SRM is included in the fueled region.
SR 3.3.1.2.3 Perform CHANNEL CHECK. In accordance with the Surveillance Frequency Control Program . SR 3.3.1 .2.4 --------- ---- ----------- ---- ---N 0 TE--------------------------- --- Not required to be met with less than or equal to four fuel assemblies adjacent to the SRM and no other fuel assemblies in the associated core quadrant. Verify count rate is: In accordance with the
- a. 2 3.0 cps with a signal to noise ratio 2 2:1 or Surveillance Frequency
- b. 2 0.7 cps with a signal to noise ratio 2 20:1. Control Program Columbia Generating Station 3.3.1.2-3 Amendment No. +49,.:t-W 22-§ 238
SRM Instrumentation 3.3.1.2 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.3.1.2.5 ------------- ------------------N 0 TE--------------------------- -- - The determination of signal to noise ratio is not required to be met with less than or equal to four fuel assemblies adjacent to the SRM and no other fuel assemblies in the associated core quadrant. Perform CHANNEL FUNCTIONAL TEST and In accordance determination of signal to noise ratio. with the Surveillance Frequency Control Program SR 3.3.1 .2.6 -------------------------------NOTE------------------------------ Not required to be performed until 12 hours after IRMs on Range 2 or below. Perform CHANNEL FUNCTIONAL TEST and In accordance determination of signal to noise ratio. with the Surveillance Frequency Control Program SR 3.3.1.2.7 ----------------- -------------NOTES-----------------------------
- 1. Neutron detectors are excluded.
- 2. Not required to be performed until 12 hours after IRMs on Range 2 or below.
Perform CHANNEL CALIBRATION. In accordance with the Surveillance Frequency Control Program Columbia Generating Station 3.3.1.2-4 Amendment No. -+49,.+w 22-9 238
SRM Instrumentation 3.3.1.2 Table 3.3.1.2-1 (page 1 of 1) Source Range Monitor Instrumentation APPLICABLE MODES OR OTHER SPECIFIED REQUIRED SURVEILLANCE FUNCTION CONDITIONS CHANNELS REQUIREMENTS
- 1. Source Range Monitor 3 SR 3.3.1.2.1 SR 3.3.1.2.4 SR 3.3.1.2.6 SR 3.3.1.2.7 3.4 2 SR 3.3.1.2.3 SR 3.3.1.2.4 SR 3.3.1.2.6 SR 3.3.1.2.7 5 2(b). (c) SR 3.3.1.2.1 SR 3.3.1.2.2 SR 3.3.1.2.4 SR 3.3.1.2.5 SR 3.3.1.2.7 (a) With IRMs on Range 2 or below.
(b) Only one SRM channel is required to be OPERABLE during spiral offload or reload when the fueled region includes only that SRM detector. (c) Special movable detectors may be used in place of SRMs if connected to normal SRM circuits. Columbia Generating Station 3.3.1.2-5 Amendment No . .:J.49,-+e9 225
OPRM Instrumentation (Prior to Implementation of PRNM Upgrade) 3.3.1.3 3.3 INSTRUMENTATION 3.3.1.3 Oscillation Power Range Monitor (OPRM) Instrumentation LCO 3.3.1.3 Four channels of the OPRM instrumentation shall be OPERABLE within the limits as specified in the COLR. APPLICABILITY: THERMAL POWER ;::.; 25% RTP prior to implementation of Power Range Neutron Monitor (PRNM) upgrade. ACTIONS
NOTE-----------------------------------------------------------
Separate Condition entry is allowed for each channel. CONDITION REQUIRED ACTION COMPLETION TIME A. One or more required A.1 Place channel in trip. 30 days channels inoperable. OR A.2 Place associated RPS trip 30 days system in trip. OR A.3 Initiate alternate method to 30 days detect and suppress thermal hydraulic instability oscillations. B. OPRM trip capability not B.1 Initiate alternate method to 12 hours maintained. detect and suppress thermal hydraulic instability oscillations. C. Required Action and C.1 Reduce THERMAL 4 hours associated Completion POWER< 25% RTP. Time not met. Columbia Generating Station 3.3.1.3-1 Amendment No. 4-7 ~ 226
OPRM Instrumentation (Prior to Implementation of PRNM Upgrade) 3.3.1.3 SURVEILLANCE REQUIREMENTS
NOTE-----------------------------------------------------------
When a channel is placed in an inoperable status solely for performance of required Surveillances, entry into associated Conditions and Required Actions may be delayed for up to 6 hours, provided the OPRM System maintains trip capability. SURVEILLANCE FREQUENCY SR 3.3.1.3.1 Perform CHANNEL FUNCTIONAL TEST. 184 days SR 3.3.1.3.2 Calibrate the local power range monitors. 1130 MWD/T average core exposure SR 3.3.1.3.3 -------------------------------NOTE------------------------------ Neutron detectors are excluded. Perform CHANNEL CALIBRATION. 24 months SR 3.3.1.3.4 Perform LOGIC SYSTEM FUNCTIONAL TEST. 24 months SR 3.3.1.3.5 Verify OPRM is not bypassed when THERMAL 24 months POWER is ::::: 30% RTP and core flow ~ 60% rated core flow. SR 3.3.1.3.6 -----------------------------NOTE-------------------------------- Neutron detectors are excluded. Verify the RPS RESPONSE TIME is within limits. 24 months on a STAGGERED TEST BASIS Columbia Generating Station 3.3.1.3-2 Amendment No . .:t-86 ~ 226
Control Rod Block Instrumentation (Prior to Implementation of PRNM Upgrade) 3.3.2.1 3.3 INSTRUMENTATION 3.3.2.1 Control Rod Block Instrumentation LCO 3.3.2.1 The control rod block instrumentation for each Function in Table 3.3.2.1-1 shall be OPERABLE. APPLICABILITY: According to Table 3.3.2.1-1 prior to implementation of Power Range Neutron Monitor (PRNM) upgrade. ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One rod block monitor A.1 Restore RBM channel to 24 hours (RBM) channel OPERABLE status. inoperable. B. Required Action and B.1 Place one RBM channel in 1 hour associated Completion trip. Time of Condition A not met. OR Two RBM channels inoperable. C. Rod worth minimizer C.1 Suspend control rod Immediately (RWM) inoperable movement except by during reactor startup. scram. OR C.2.1.1 Verify~ 12 rods withdrawn. Immediately OR Columbia Generating Station 3.3.2.1-1 Amendment No. ~~226
Control Rod Block Instrumentation (Prior to Implementation of PRNM Upgrade) 3.3.2.1 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME C. (continued) C.2.1.2 Verify by administrative Immediately methods that startup with RWM inoperable has not been performed in the last calendar year. AND C.2.2 Verify movement of control During control rod rods is in compliance with movement banked position withdrawal sequence (BPWS) by a second licensed operator or other qualified member of the technical staff. D. RWM inoperable during D.1 Verify movement of control During control rod reactor shutdown. rods is in compliance with movement BPWS by a second licensed operator or other qualified member of the technical staff. E. One or more Reactor E.1 Suspend control rod Immediately Mode Switch - Shutdown withdrawal. Position channels inoperable. AND E.2 Initiate action to fully insert Immediately all insertable control rods in core cells containing one or more fuel assemblies. Columbia Generating Station 3.3.2.1-2 Amendment No. 4-e9 ~ 226
Control Rod Block Instrumentation (Prior to Implementation of PRNM Upgrade) 3.3.2.1 SURVEILLANCE REQUIREMENTS
N()TES----------------------------------------------------------
- 1. Refer to Table 3.3.2.1-1 to determine which SRs apply for each Control Rod Block Function.
- 2. When an RBM channel is placed in an inoperable status solely for performance of required Surveillances, entry into associated Conditions and Required Actions may be delayed for up to 6 hours provided the associated Function maintains control rod block capability.
SURVEILLANCE FREQUENCY SR 3.3.2.1.1 Perform CHANNEL FUNCTI()NAL TEST. 92 days SR 3.3.2.1.2 -------------------------------N()TE------------------------------ Not required to be performed until 1 hour after any control rod is withdrawn at ::;; 10% RTP in M()DE 2. Perform CHANNEL FUNCTI()NAL TEST. 92 days SR 3.3.2.1.3 -------------------------------N()TE------------------------------ Not required to be performed until 1 hour after THERMAL P()WER is::;; 10% RTP in M()DE 1. Perform CHANNEL FUNCTI()NAL TEST. 92 days SR 3.3.2.1.4 -------------------------------N()TE------------------------------ Neutron detectors are excluded. Verify the RBM is not bypassed: 92 days
- a. When THERMAL P()WER is~ 30% RTP; and
- b. When a peripheral control rod is not selected.
Columbia Generating Station 3.3.2.1-3 Amendment No. +e9 ~ 226
Control Rod Block Instrumentation (Prior to Implementation of PRNM Upgrade) 3.3.2.1 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.3.2.1.5 -------------------------------N()TE------------------------------ Neutron detectors are excluded. Perform CHANNEL CALIBRATI()N. 92 days SR 3.3.2.1.6 Verify the RWM is not bypassed when THERMAL 24 months P()WER is::;; 10% RTP. SR 3.3.2.1.7 -------------------------------N()TE------------------------------ Not required to be performed until 1 hour after reactor mode switch is in the shutdown position. Perform CHANNEL FUNCTI()NAL TEST. 24 months SR 3.3.2.1.8 Verify control rod sequences input to the RWM are Prior to declaring in conformance with BPWS. RWM ()PERABLE following loading of sequence into RWM Columbia Generating Station 3.3.2.1-4 Amendment No. -'1-79 ~ 226
Control Rod Block Instrumentation (Prior to Implementation of PRNM Upgrade) 3.3.2.1 Table 3.3.2.1-1 (page 1 of 1) Control Rod Block Instrumentation APPLICABLE MODES OR OTHER SPECIFIED REQUIRED SURVEILLANCE ALLOWABLE FUNCTION CONDITIONS CHANNELS REQUIREMENTS VALUE
- 1. Rod Block Monitor
- a. Upscale (a) 2 SR 3.3.2.1.1 :o; 0.58W +51%
SR 3.3.2.1.4 RTP SR 3.3.2.1.5
- b. lnop (a) 2 SR 3.3.2.1.1 NA SR 3.3.2.1.4
- c. Downscale (a) 2 SR 3.3.2.1.1 ~ 3% RTP SR 3.3.2.1.4 SR 3.3.2.1.5
- 2. Rod Worth Minimizer SR 3.3.2.1.2 NA SR 3.3.2.1.3 SR 3.3.2.1.6 SR 3.3.2.1.8
- 3. Reactor Mode Switch - Shutdown (c) 2 SR 3.3.2.1. 7 NA Position (a) THERMAL POWER ~ 30% RTP and no peripheral control rod selected.
(b) With THERMAL POWER :o; 10% RTP. (c) Reactor mode switch in the shutdown position. Columbia Generating Station 3.3.2.1-5 Amendment No. 4-eS ~ 226
Control Rod Block Instrumentation (Prior to Implementation of PRNM Upgrade) 3.3.2.1 (This page intentionally blank) Columbia Generating Station 3.3.2.1-6 Amendment No. 226
Control Rod Block Instrumentation {After Implementation of PRNM Upgrade) 3.3.2.1 3.3 INSTRUMENTATION 3.3.2.1 Control Rod Block Instrumentation LCO 3.3.2.1 The control rod block instrumentation for each Function in Table 3.3.2.1-1 shall be OPERABLE. APPLICABILITY: According to Table 3.3.2.1-1 after implementation of Power Range Neutron Monitor (PRNM) upgrade. ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One rod block monitor A.1 Restore RBM channel to 24 hours (RBM) channel OPERABLE status. inoperable. B. Required Action and B.1 Place one RBM channel in 1 hour associated Completion trip. Time of Condition A not met. OR Two RBM channels inoperable.
- c. Rod worth minimizer C.1 Suspend control rod Immediately (RWM) inoperable movement except by during reactor startup. scram.
OR C.2.1.1 Verify~ 12 rods withdrawn. Immediately OR Columbia Generating Station 3.3.2.1-7 Amendment No. +.w. 22e 226
Control Rod Block Instrumentation (After Implementation of PRNM Upgrade) 3.3.2.1 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME C. (continued) C.2.1.2 Verify by administrative Immediately methods that startup with RWM inoperable has not been performed in the last calendar year. AND C.2.2 Verify movement of control During control rod rods is in compliance with movement banked position withdrawal sequence (BPWS) by a second licensed operator or other qualified member of the technical staff. D. RWM inoperable during D.1 Verify movement of control During control rod reactor shutdown. rods is in compliance with movement BPWS by a second licensed operator or other qualified member of the technical staff. E. One or more Reactor E.1 Suspend control rod Immediately Mode Switch - Shutdown withdrawal. Position channels inoperable. AND E.2 Initiate action to fully insert Immediately all insertable control rods in core cells containing one or more fuel assemblies. Columbia Generating Station 3.3.2.1-8 Amendment No. +W- ~ 226
Control Rod Block Instrumentation (After Implementation of PRNM Upgrade) 3.3.2.1 SURVEILLANCE REQUIREMENTS
NOTES----------------------------------------------------------
- 1. Refer to Table 3.3.2.1-1 to determine which SRs apply for each Control Rod Block Function.
- 2. When an RBM channel is placed in an inoperable status solely for performance of required Surveillances, entry into associated Conditions and Required Actions may be delayed for up to 6 hours provided the associated Function maintains control rod block capability.
SURVEILLANCE FREQUENCY SR 3.3.2.1 .1 Perform CHANNEL FUNCTIONAL TEST. In accordance with the Surveillance Frequency Control Program SR 3.3.2.1.2 ----- ---- ---- ---- ------- ---- ---N 0 TE--------------------------- --- Not required to be performed until 1 hour after any control rod is withdrawn at ~ 10% RTP in MODE 2. Perform CHANNEL FUNCTIONAL TEST. In accordance with the Surveillance Frequency Control Program SR 3.3.2.1 .3 --------- -------- ---- --- ---- ---N 0 TE--------------------------- --- Not required to be performed until 1 hour after THERMAL POWER is:.::: 10% RTP in MODE 1. Perform CHANNEL FUNCTIONAL TEST. In accordance with the Surveillance Frequency Control Program Columbia Generating Station 3.3.2.1-9 Amendment No. +SQ. 2ae 2ae 238
Control Rod Block Instrumentation (After Implementation of PRNM Upgrade) 3.3.2.1 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.3.2.1.4 -------------------------------NOTE------------------------------ Neutron detectors are excluded. Verify the RBM is not bypassed: In accordance with the
- a. Low Power Range - Upscale Function is not Surveillance bypassed when APRM Simulated Thermal Frequency Power is ;;:: 28% and < 63% RTP and peripheral Control Program control rod is not selected.
- b. Intermediate Power Range - Upscale Function is not bypassed when APRM Simulated Thermal Power is ;;:: 63% and < 83% RTP and peripheral control rod is not selected.
- c. High Power Range - Upscale Function is not bypassed when APRM Simulated Thermal Power is ;;:: 83% and peripheral control rod is not selected.
SR 3.3.2.1.5 ------------- ------------------N 0 TE--------------------------- --- Neutron detectors are excluded. Perform CHANNEL CALIBRATION. In accordance with the Surveillance Frequency Control Program SR 3.3.2.1.6 Verify the RWM is not bypassed when THERMAL In accordance POWER is:::;; 10% RTP. with the Surveillance Frequency Control Program Columbia Generating Station 3.3.2.1-10 Amendment No. +79 ~ ~ 238
Control Rod Block Instrumentation (After Implementation of PRNM Upgrade) 3.3.2.1 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.3.2.1.7 -------------------------------N 0 TE--------------------------- --- Not required to be performed until 1 hour after reactor mode switch is in the shutdown position. Perform CHANNEL FUNCTIONAL TEST. In accordance with the Surveillance Frequency Control Program SR 3.3.2.1.8 Verify control rod sequences input to the RWM are Prior to declaring in conformance with BPWS. RWM OPERABLE following loading of sequence into RWM Columbia Generating Station 3.3.2.1-11 Amendment No. ~ 238
Control Rod Block Instrumentation (After Implementation of PRNM Upgrade) 3.3.2.1 Table 3.3.2.1-1 (page 1 of 2) Control Rod Block Instrumentation APPLICABLE MODES OR OTHER SPECIFIED REQUIRED SURVEILLANCE ALLOWABLE FUNCTION CONDITIONS CHANNELS REQUIREMENTS VALUE
- 1. Rod Block Monitor
- a. Low Power Range - Upscale (a) 2 SR 3.3.2.1.1 (f)
SR 3.3.2.1.4 SR 3.3.2.1.5 1dl.lel
- b. Intermediate Power Range - (b) 2 SR 3.3.2.1.1 (f)
Upscale SR 3.3.2.1.4 SR 3.3.2.1.5 1di.lel
- c. High Power Range - Upscale (c) 2 SR 3.3.2.1.1 (f)
SR 3.3.2.1.4 SR 3.3.2.1.5 1dJ,leJ
- d. lnop (a),(b),(c) 2 SR 3.3.2.1.1 NA (a) APRM Simulated Thermal Power is ;e: 28% and< 63% RTP and MCPR is less than the limit specified in the COLR and no peripheral control rod selected.
(b) APRM Simulated Thermal Power is ;e: 63% and< 83% RTP and MCPR is less than the limit specified in the COLR and no peripheral control rod selected. (c) APRM Simulated Thermal Power is ;e: 83% and MCPR is less than the limit specified in the COLR and no peripheral control rod selected. (d) If the as-found channel setpoint is outside its predefined as-found tolerance, then the channel shall be evaluated to verify that it is functioning as required before returning the channel to service. (e) The instrument channel setpoint shall be reset to a value that is within the as-left tolerance around the Limiting Trip Setpoint (LTSP) at the completion of the surveillance; otherwise, the channel shall be declared inoperable. Setpoints more conservative than the LTSP are acceptable provided that the as-found and as-left tolerances apply to the actual setpoint implemented in the surveillance procedures (Nominal Trip Setpoint) to confirm channel performance. The LTSP and the methodologies used to determine the as-found and as-left tolerances are specified in the Licensee Controlled Specifications. (f) Allowable Value Specified in the COLR. Columbia Generating Station 3.3.2.1-12 Amendment No. 226 238
Control Rod Block Instrumentation (After Implementation of PRNM Upgrade) 3.3.2.1 Table 3.3.2.1-1 (page 2 of 2) Control Rod Block Instrumentation APPLICABLE MODES OR OTHER SPECIFIED REQUIRED SURVEILLANCE ALLOWABLE FUNCTION CONDITIONS CHANNELS REQUIREMENTS VALUE
- 2. Rod Worth Minimizer 1191, 2191 SR 3.3.2.1.2 NA SR 3.3.2.1.3 SR 3.3.2.1.6 SR 3.3.2.1.8
- 3. Reactor Mode Switch - Shutdown (h) 2 SR 3.3.2.1.7 NA Position (g) With THERMAL POWER~ 10% RTP.
(h) Reactor mode switch in the shutdown position. Columbia Generating Station 3.3.2.1-13 Amendment No. 238
Feedwater and Main Turbine High Water Level Trip Instrumentation 3.3.2.2 3.3 INSTRUMENTATION 3.3.2.2 Feedwater and Main Turbine High Water Level Trip Instrumentation LCO 3.3.2.2 Three channels of feedwater and main turbine high water level trip instrumentation shall be OPERABLE. APPLICABILITY: THERMAL POWER;::: 25% RTP. ACTIONS
NOTE----------------------------------------------------------
Separate Condition entry is allowed for each channel. CONDITION REQUIRED ACTION COMPLETION TIME A. One feedwater and main A.1 Place channel in trip. 7 days turbine high water level trip channel inoperable. B. Two or more feedwater B.1 Restore feedwater and 2 hours and main turbine high main turbine high water water level trip channels level trip capability. inoperable. C. Required Action and C.1 Reduce THERMAL associated Completion POWER to < 25% RTP. i 4 hours Time not met. I Columbia Generating Station 3.3.2.2-1 Amendment No. -i4Q,49Q. 225
Feedwater and Main Turbine High Water Level Trip Instrumentation 3.3.2.2 SURVEILLANCE REQUIREMENTS
NOTE-----------------------------------------------------------
When a channel is placed in an inoperable status solely for performance of required Surveillances, entry into associated Conditions and Required Actions may be delayed for up to 6 hours provided feedwater and main turbine high water level trip capability is maintained. SURVEILLANCE FREQUENCY SR 3.3.2.2.1 Perform CHANNEL CHECK. In accordance with the Surveillance Frequency Control Program SR 3.3.2.2.2 Perform CHANNEL FUNCTIONAL TEST. In accordance with the Surveillance Frequency Control Program SR 3.3.2.2.3 Perform CHANNEL CALIBRATION. The Allowable In accordance Value shall be~ 56.0 inches. with the Surveillance Frequency Control Program SR 3.3.2.2.4 Perform LOGIC SYSTEM FUNCTIONAL TEST, In accordance including valve actuation. with the Surveillance Frequency Control Program Columbia Gene.rating Station 3.3.2.2-2 Amendment No. +49,.:f.6.9 22§ 238
PAM Instrumentation 3.3.3.1 3.3 INSTRUMENTATION 3.3.3.1 Post Accident Monitoring (PAM) Instrumentation LCO 3.3.3.1 The PAM instrumentation for each Function in Table 3.3.3.1-1 shall be OPERABLE. APPLICABILITY: MODES 1 and 2. ACTIONS
NOT E----------------------------------------------------------
Separate Condition entry is allowed for each Function. CONDITION REQUIRED ACTION COMPLETION TIME A. One or more Functions A.1 Restore required channel to 30 days with one required OPERABLE status. channel inoperable. B. Required Action and B.1 Initiate action in accordance Immediately associated Completion with Specification 5.6.4. Time of Condition A not met. C. One or more Functions C.1 Restore all but one required 7 days with two or more channel to OPERABLE required channels status. inoperable. D. Required Action and D.1 Enter the Condition Immediately associated Completion referenced in Time of Condition C not Table 3.3.3.1-1 for the met. channel. Columbia Generating Station 3.3.3.1-1 Amendment No. 487.4-QG 225
PAM Instrumentation 3.3.3.1 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME E. As required by Required E.1 Be in MODE 3. 12 hours Action D.1 and referenced in Table 3.3.3.1-1. F. As required by Required F.1 Initiate action in accordance Immediately Action D.1 and with Specification 5.6.4. referenced in Table 3.3.3.1-1. SURVEILLANCE REQUIREMENTS
NOTES----------------------------------------------------------
- 1. These SRs apply to each Function in Table 3.3.3.1-1.
- 2. When a channel is placed in an inoperable status solely for performance of required Surveillances, entry into associated Conditions and Required Actions may be delayed for up to 6 hours provided the other required channel(s) in the associated Function is OPERABLE.
SURVEILLANCE FREQUENCY SR 3.3.3.1 .1 Perform CHANNEL CHECK. In accordance with the Surveillance Frequency Control Program SR 3.3.3.1 .2 Deleted SR 3.3.3.1.3 Perform CHANNEL CALIBRATION for Functions 1, In accordance 2, 4, 5, and 10. with the Surveillance Frequency Control Program Columbia Generating Station 3.3.3.1-2 Amendment No ..:t-89,+w- 22-6 238
PAM Instrumentation 3.3.3.1 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.3.3.1.4 Perform CHANNEL CALIBRATION for In accordance Functions 3, 6, and 7. with the Surveillance Frequency Control Program Columbia Generating Station 3.3.3.1-3 Amendment No.+39,200 ~ 238
PAM Instrumentation 3.3.3.1 Table 3.3.3.1-1 (page 1 of 1) Post Accident Monitoring Instrumentation CONDITIONS REFERENCED REQUIRED FROM REQUIRED FUNCTION CHANNELS ACTION D.1
- 1. Reactor Vessel Pressure 2 E
- 2. Reactor Vessel Water Level
- a. -150 inches to +60 inches 2 E
- b. -310 inches to -110 inches 2 E
- 3. Suppression Pool Water Level
- a. -25 inches to +25 inches 2 E
- b. 2 ft to 52 ft 2 E
- 4. Suppression Chamber Pressure 2 E
- 5. Drywell Pressure
- a. -5 psig to +3 psig 2 E
- b. O psig to 25 psig 2 E
- c. 0 psig to 180 psig 2 E
- 6. Primary Containment Area Radiation 2 F
- 7. Penetration Flow Path PCIV Position 2 per penetration flow E path(a) (bl
- 8. Deleted
- 9. Deleted
- 10. ECCS Pump Room Flood Level 5 E (a) Not required for isolation valves whose associated penetration flow path is isolated by at least one closed and de-activated automatic valve, closed manual valve, blind flange, or check valve with flow through the valve secured.
(b) Only one position indication channel is required for penetration flow paths with only one installed control room indication channel. Columbia Generating Station 3.3.3.1-4 Amendment No. 238
Remote Shutdown System 3.3.3.2 3.3 INSTRUMENTATION 3.3.3.2 Remote Shutdown System LCO 3.3.3.2 The Remote Shutdown System Functions shall be OPERABLE. APPLICABILITY: MODES 1 and 2. ACTIONS
N 0 T E-----------------------------------------------------------
Separate Condition entry is allowed for each Function. CONDITION REQUIRED ACTION COMPLETION TIME A. One or more required A.1 Restore required Function 30 days Functions inoperable. to OPERABLE status. B. Required Action and B.1 Be in MODE 3. 12 hours associated Completion Time not met. SURVEILLANCE REQUIREMENTS
NOTE-----------------------------------------------------------
When a channel is placed in an inoperable status solely for performance of required Surveillances, entry into associated Conditions and Required Actions may be delayed for up to 6 hours. SURVEILLANCE FREQUENCY SR 3.3.3.2.1 Perform CHANNEL CHECK for each required In accordance instrumentation channel that is normally energized. with the Surveillance Frequency Control Program Columbia Generating Station 3.3.3.2-1 Amendment No. +es,+&7 a29 238
Remote Shutdown System 3.3.3.2 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.3.3.2.2 Perform CHANNEL CALIBRATION for each In accordance required instrumentation channel, except the with the suppression pool water level instrumentation Surveillance channel. Frequency Control Program SR 3.3.3.2.3 Perform CHANNEL CALIBRATION tor the In accordance suppression pool water level instrumentation with the channel. Surveillance Frequency Control Program SR 3.3.3.2.4 Verify each required control circuit and transfer In accordance switch is capable of performing the intended with the functions. Surveillance Frequency Control Program Columbia Generating Station 3.3.3.2-2 Amendment No. +49,-+W ~ 238
EOC-RPT Instrumentation 3.3.4.1 3.3 INSTRUMENTATION 3.3.4.1 End of Cycle Recirculation Pump Trip (EOC-RPT) Instrumentation LCO 3.3.4.1 a. Two channels per trip system for each EOC-RPT instrumentation Function listed below shall be OPERABLE:
- 1. Turbine Throttle Valve (TTV) - Closure; and
- 2. Turbine Governor Valve (TGV) Fast Closure, Trip Oil Pressure
- Low.
- b. LCO 3.2.2, "MINIMUM CRITICAL POWER RATIO (MCPR}," limits for inoperable EOC-RPT as specified in the COLR are made applicable.
APPLICABILITY: THERMAL POWER~ 29.5% RTP. ACTIONS
N 0 TE-----------------------------------------------------------
S e para t e Condition entry is allowed for each channel. CONDITION REQUIRED ACTION COMPLETION TIME A. One or more required A.1 Restore channel to 72 hours channels inoperable. OPERABLE status. OR A. 2 ---------------N 0 TE-------------- Not applicable if inoperable channel is the result of an inoperable breaker. Place channel in trip. 72 hours Columbia Generating Station 3.3.4.1-1 Amendment No. +M1,4-99 22-5 241
EOC-RPT Instrumentation 3.3.4.1 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME B. One or more Functions B.1 Restore EOC-RPT trip 2 hours with EOC-RPT trip capability. capability not maintained. OR AND B.2 Apply the MCPR limit for 2 hours inoperable EOC-RPT as MCPR limit for specified in the COLR. inoperable EOC-RPT not made applicable. C. Required Action and C.1 Remove the associated 4 hours associated Completion recirculation pump from Time not met. service. OR C.2 Reduce THERMAL 4 hours POWER to< 29.5% RTP. SURVEILLANCE REQUIREMENTS
N 0 TE-----------------------------------------------------------
Wh en a channel is placed in an inoperable status solely for performance of required Surveillances, entry into associated Conditions and Required Actions may be delayed for up to 6 hours provided the associated Function maintains EOC-RPT trip capability. SURVEILLANCE FREQUENCY SR 3.3.4.1.1 Perform CHANNEL FUNCTIONAL TEST. In accordance with the Surveillance Frequency Control Program Columbia Generating Station 3.3.4.1-2 Amendment No. ~.+99 ~ ~ 241
EOC-RPT Instrumentation 3.3.4.1 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.3.4.1.2.a Perform CHANNEL CALIBRATION. The Allowable In accordance with Value shall be: the Surveillance Frequency Control TTV - Closure: ~ 7% closed. Program SR 3.3.4.1.2.b Perform CHANNEL CALIBRATION. The Allowable In accordance with Value shall be: the Surveillance Frequency Control TGV Fast Closure, Trip Oil Pressure - Low: Program
~ 1000 psig.
SR 3.3.4.1.3 Verify TTV - Closure and TGV Fast Closure, Trip In accordance with Oil Pressure - Low Functions are not bypassed the Surveillance when THERMAL POWER is~ 29.5% RTP. Frequency Control Program SR 3.3.4.1.4 Perform LOGIC SYSTEM FUNCTIONAL TEST, In accordance with including breaker actuation. the Surveillance Frequency Control Program SR 3.3.4.1.5 -------------------------------N 0 TE------------------------------ Breaker arc suppression time may be assumed from the most recent performance of SR 3.3.4.1.6. Verify the EOC-RPT SYSTEM RESPONSE TIME is In accordance with within limits. the Surveillance Frequency Control Program SR 3.3.4.1.6 Determine RPT breaker arc suppression time. In accordance with the Surveillance Frequency Control Program Columbia Generating Station 3.3.4.1-3 Amendment No. 168,169 225 2-J8 241
A TWS-RPT Instrumentation 3.3.4.2 3.3 INSTRUMENTATION 3.3.4.2 Anticipated Transient Without Scram Recirculation Pump Trip (ATWS-RPT) Instrumentation LCO 3.3.4.2 Two channels per trip system for each ATWS-RPT instrumentation Function listed below shall be OPERABLE:
- a. Reactor Vessel Water Level- Low Low, Level 2; and
- b. Reactor Vessel Steam Dome Pressure - High.
APPLICABILITY: MODE 1. ACTIONS
NOTE----------------------------------------------------------
Separate Condition entry is allowed for each channel. CONDITION REQUIRED ACTION COMPLETION TIME A. One or more channels A.1 Restore channel to 7 days inoperable. OPERABLE status. OR A.2 ---------------N OTE ------------- Not applicable if inoperable channel is the result of an inoperable breaker. Place channel in trip. I 7 days B. One Function with B.1 Restore ATWS-RPT trip 72 hours A TWS-RPT trip capability. capability not maintained. Columbia Generating Station 3.3.4.2-1 Amendment No. 44Q,.:f.6Q 225
A TWS-RPT Instrumentation 3.3.4.2 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME C. Both Functions with C.1 Restore A TWS-RPT trip 1 hour A TWS-RPT trip capability for one Function. capability not maintained. D. Required Action and D.1 Remove the associated 6 hours associated Completion recirculation pump from Time not met. service. OR D.2 Be in MODE 2. 6 hours SURVEILLANCE REQUIREMENTS
NOTE-----------------------------------------------------------
When a channel is placed in an inoperable status solely for performance of required Surveillances, entry into associated Conditions and Required Actions may be delayed for up to 6 hours provided the associated Function maintains A TWS-RPT trip capability. SURVEILLANCE FREQUENCY SR 3.3.4.2.1 Perform CHANNEL CHECK for Reactor Vessel In accordance Water Level - Low Low, Level 2 Function. with the Surveillance Frequency Control Program SR 3.3.4.2.2 Perform CHANNEL FUNCTIONAL TEST. In accordance with the Surveillance Frequency Control Program Columbia Generating Station 3.3.4.2-2 Amendment No. +49,+w ~ 238
A TWS-RPT Instrumentation 3.3.4.2 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.3.4.2.3 Perform CHANNEL CALIBRATION. The Allowable In accordance Values shall be: with the Surveillance
- a. Reactor Vessel Water Level - Low Low, Level 2: Frequency 2". -58 inches; and Control Program
- b. Reactor Vessel Steam Dome Pressure - High:
- 1143 psig.
SR 3.3.4.2.4 Perform LOGIC SYSTEM FUNCTIONAL TEST, In accordance including breaker actuation. with the Surveillance Frequency Control Program Columbia Generating Station 3.3.4.2-3 Amendment No . .:t-49,+69 22§ 238
ECCS Instrumentation 3.3.5.1 3.3 INSTRUMENTATION 3.3.5.1 Emergency Core Cooling System (ECCS) Instrumentation LCO 3.3.5.1 The ECCS instrumentation for each Function in Table 3.3.5.1-1 shall be OPERABLE. APPLICABILITY: According to Table 3.3.5.1-1. ACTIONS
NOTE----------------------------------------------------------
Separate Condition entry is allowed for each channel. CONDITION REQUIRED ACTION COMPLETION TIME A. One or more channels A.1 Enter the Condition Immediately inoperable. referenced in Table 3.3.5.1-1 for the channel. B. As required by Required B.1 --------------NO TES------------ Action A.1 and 1. Only applicable in referenced in MODES 1, 2, and 3. Table 3.3.5.1-1.
- 2. Only applicable for Functions 1.a, 1.b, 2.a, and 2.b .
Declare supported 1 hour from discovery feature(s) inoperable when of loss of initiation its redundant feature ECCS capability for initiation capability is feature(s) in both inoperable. divisions AND Columbia Generating Station 3.3.5.1-1 Amendment No. 449,~ 225
ECCS Instrumentation 3.3.5.1 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME B. (continued) B.2 --------------N OTES------------
- 1. Only applicable in MODES 1, 2, and 3.
- 2. Only applicable for Functions 3.a and 3.b.
Declare High Pressure 1 hour from discovery Core Spray (HPCS) System of loss of HPCS inoperable. initiation capability AND B.3 Place channel in trip. 24 hours C. As required by Required C.1 ,--------------NOTES------------ Action A.1 and 1. Only applicable in referenced in MODES 1, 2, and 3. Table 3.3.5.1-1.
- 2. Only applicable for Functions 1.c, 1.d, 1.e, 1.f, 2.c, 2.d, 2.e, and 2.f.
Declare supported 1 hour from discovery feature(s) inoperable when of loss of initiation its redundant feature ECCS capability for initiation capability is feature(s) in both inoperable. divisions AND C.2 Restore channel to /24 hours OPERABLE status. . Columbia Generating Station 3.3.5.1-2 Amendment No. 449,.:1-99 225
ECCS Instrumentation 3.3.5.1 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME D. As required by Required 0.1 w _____________ NOTE ------------- Action A.1 and Only applicable if HPCS referenced in pump suction is not aligned Table 3.3.5.1-1. to the suppression pool. Declare HPCS System 1 hour from discovery inoperable. of loss of HPCS initiation capability AND 0.2.1 Place channel in trip. 24 hours OR 0.2.2 Align the HPCS pump 24 hours suction to the suppression pool. E. As required by Required E.1 --------------NO TES------------ Action A.1 and 1. Only applicable in referenced in MODES 1, 2, and 3. Table 3.3.5.1-1.
- 2. Only applicable for Functions 1.g, 1.h, and 2.g.
Declare supported 1 hour from discovery feature(s) inoperable when of loss of initiation its redundant feature ECCS capability for initiation capability is feature(s) in both inoperable. divisions AND E.2 Restore channel to 7 days OPERABLE status. Columbia Generating Station 3.3.5.1-3 Amendment No. 449,+69 225
ECCS Instrumentation 3.3.5.1 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME F. As required by Required F.1 Declare Automatic 1 hour from discovery Action A.1 and Depressurization System of loss of ADS referenced in (ADS) valves inoperable. initiation capability in Table 3.3.5.1-1. both trip systems AND F.2 Place channel in trip. 96 hours from discovery of inoperable channel concurrent with HPCS or reactor core isolation cooling (RCIC) inoperable AND 8 days G. As required by Required G.1 ---------------N OTE ------------- Action A.1 and Only applicable for referenced in Functions 4.b, 4.d, 4.e, 5.b, Table 3.3.5.1-1. and 5.d . Declare ADS valves 1 hour from discovery inoperable. of loss of ADS initiation capability in both trip systems AND G.2 Restore channel to 96 hours from OPERABLE status. discovery of inoperable channel concurrent with HPCS or RCIC inoperable AND 8 days Columbia Generating Station 3.3.5.1-4 Amendment No. -MB,.:t-e9 225
ECCS Instrumentation 3.3.5.1 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME H. Required Action and H.1 Declare associated Immediately associated Completion supported feature(s) Time of Condition B, C, inoperable. D, E, F, or G not met. SURVEILLANCE REQUIREMENTS
NOTES----------------------------------------------------------
- 1. Refer to Table 3.3.5.1-1 to determine which SRs apply for each ECCS Function.
- 2. When a channel is placed in an inoperable status solely for performance of required Surveillances, entry into associated Conditions and Required Actions may be delayed as follows: (a) for up to 6 hours for Functions 3.c, 3.f, and 3.g; and (b) for up to 6 hours for Functions other than 3.c, 3.f, and 3.g provided the associated Function or the redundant Function maintains ECCS initiation capability.
SURVEILLANCE FREQUENCY SR 3.3.5.1 .1 Perform CHANNEL CHECK. In accordance with the Surveillance Frequency Control Program SR 3.3.5.1 .2 Perform CHANNEL FUNCTIONAL TEST. In accordance with the Surveillance Frequency Control Program SR 3.3.5.1.3 Perform CHANNEL CALIBRATION. In accordance with the Surveillance Frequency Control Program Columbia Generating Station 3.3.5.1-5 Amendment No . .:t-W,+e9 ~ 238
ECCS Instrumentation 3.3.5.1 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.3.5.1.4 Perform CHANNEL CALIBRATION. In accordance with the Surveillance Frequency Control Program SR 3.3.5.1.5 Perform CHANNEL CALIBRATION. In accordance with the Surveillance Frequency
*Control Program SR 3.3.5.1.6 Perform LOGIC SYSTEM FUNCTIONAL TEST. In accordance with the Surveillance Frequency Control Program Columbia Generating Station 3.3.5.1-6 Amendment No. +w +-72, ~ 238
ECCS Instrumentation 3.3.5.1 Table 3.3.5.1-1 (page 1 of 5) Emergency Core Cooling System Instrumentation APPLICABLE CONDITIONS MODES OR REQUIRED REFERENCED OTHER CHANNELS FROM SPECIFIED PER REQUIRED SURVEILLANCE ALLOWABLE FUNCTION CONDITIONS FUNCTION ACTION A.1 REQUIREMENTS VALUE
- 1. Low Pressure Coolant Injection-A (LPCI) and Low Pressure Core Spray (LPCS)
Subsystems 2(b)
- a. Reactor Vessel 1, 2, 3, B SR 3.3.5.1.1 ~ -142.3 inches Water Level - Low 4(a), 5(a) SR 3.3.5.1.2 Low Low, Level 1 SR 3.3.5.1.4 SR 3.3.5.1.6
- b. Drywell Pressure - 1, 2, 3 2(b) B SR 3.3.5.1.2 s 1.88 psig High SR 3.3.5.1.4 SR 3.3.5.1.6 1 (e) c
- c. LPCS Pump Start - 1, 2, 3, SR 3.3.5.1.5 ~ 8.53 seconds LOCA Time Delay (a), 1a) 4 5 SR 3.3.5.1.6 and Relay s 10.64 seconds 1 (e)
- d. LPCI Pump A Start - 1, 2, 3, 4lal, 5(a) c SR 3.3.5.1.5 ~ 17.24 seconds LOCA Time Delay SR 3.3.5.1.6 ands 21.53 Relay seconds
- e. LPCI Pump A Start - 1, 2, 3, c SR 3.3.5.1.2 ~ 3.04 seconds LOCA/LOOP Time 4 1a1, 5 1a1 SR 3.3.5.1.3 and Delay Relay SR 3.3.5.1.6 s 6.00 seconds
- f. Reactor Vessel 1, 2, 3 1 per valve c SR 3.3.5.1.2 ~ 448 psig and Pressure - Low SR 3.3.5.1.4 s 492 psig (Injection SR 3.3.5.1.6 Permissive) 4 1a1, 5(a) 1 per valve B SR 3.3.5.1.2 ~ 448 psig and SR 3.3.5.1.4 s 492 psig SR 3.3.5.1.6 (a) When associated subsystem(s) are required to be OPERABLE.
(b) Also required to initiate the associated diesel generator (DG). (e) Also supports OPERABILITY of 230 kV offsite power circuit pursuant to LCO 3.8.1 and LCO 3.8.2. Columbia Generating Station 3.3.5.1-7 Amendment No. +w,+72 2-2.a 238
ECCS Instrumentation 3.3.5.1 Table 3.3.5.1-1 (page 2 of 5) Emergency Core Cooling System Instrumentation APPLICABLE CONDITIONS MODES OR REQUIRED REFERENCED OTHER CHANNELS FROM SPECIFIED PER REQUIRED SURVEILLANCE ALLOWABLE FUNCTION CONDITIONS FUNCTION ACTION A.1 REQUIREMENTS VALUE
- 1. LPCI and LPCS Subsystems
- g. LPCS Pump 1, 2, 3, E SR 3.3.5.1.2 2 668 gpm and Discharge Flow - 4(a), 5(a) SR 3.3.5.1.4 s 1067 gpm Low (Minimum Flow) SR 3.3.5.1.6
- h. LPCI Pump A 1, 2, 3, E SR 3.3.5.1.2 2 605 gpm and Discharge Flow - (a), 1a) SR 3.3.5.1.4 4 5 s 984 gpm Low (Minimum Flow) SR 3.3.5.1.6
- i. Manual Initiation 1, 2, 3, 4(a), 5(a) 2 c SR 3.3.5.1.6 NA
- 2. LPCI Band LPCI C Subsystems
- a. Reactor Vessel 1, 2, 3, 2(b) B SR 3.3.5.1.1 2 -142.3 inches Water Level - Low 4(a), 5(a) SR 3.3.5.1.2 Low Low, Level 1 SR 3.3.5.1.4 SR 3.3.5.1.6
- b. Drywell Pressure - 1, 2, 3 2(b) B SR 3.3.5.1.2 s 1.88 psig High SR 3.3.5.1.4 SR 3.3.5.1.6 1(e)
- c. LPCI Pump B Start - 10 2, 3, a) (a) c SR 3.3.5.1.5 2 17.24 seconds LOCA Time Delay 4 5 SR 3.3.5.1.6 and Relay s 21.53 seconds
- d. LPCI Pump C Start - 1, 2, 3, 1 (e) c SR 3.3.5.1.5 ? 8.53 seconds LOCA Time Delay 4(a), 5(a) SR 3.3.5.1.6 and Relay s 1 0.64 seconds
- e. LPCI Pump B Start - 1, 2, 3, (a), (a) c SR 3.3.5.1.2 2 3.04 seconds LOCA/LOOP Time 4 5 SR 3.3.5.1.3 and Delay Relay SR 3.3.5.1.6 s 6.00 seconds (a) When associated subsystem(s) are required to be OPERABLE.
(b) Also required to initiate the associated DG. (e) Also supports OPERABILITY of 230 kV off site power circuit pursuant to LCO 3.8.1 and LCO 3.8.2. Columbia Generating Station 3.3.5.1-8 Amendment No.+ee,+e9 ~ 238
ECCS Instrumentation 3.3.5.1 Table 3.3.5.1-1 (page 3 of 5) Emergency Core Cooling System Instrumentation APPLICABLE CONDITIONS MODES OR REQUIRED REFERENCED OTHER CHANNELS FROM SPECIFIED PER REQUIRED SURVEILLANCE ALLOWABLE FUNCTION CONDITIONS FUNCTION ACTION A.1 REQUIREMENTS VALUE
- 2. LPCI B and LPCI C Subsystems
- f. Reactor Vessel 1, 2, 3, 1 per valve c SR 3.3.5.1.2 :::: 448 psig Pressure - Low SR 3.3.5.1.4 and (Injection SR 3.3.5.1.6 s 492 psig Permissive) 4(a), 5(a) 1 per valve B SR 3.3.5.1.2 :::: 448 psig SR 3.3.5.1.4 and SR 3.3.5.1.6 s 492 psig
- g. LPCI Pumps B & C 1, 2, 3, 1 per pump E SR 3.3.5.1.2 ::=: 605 gpm Discharge Flow - 4(a), 5(a) SR 3.3.5.1.4 and Low (Minimum flow) SR 3.3.5.1.6 s 984 gpm
- h. Manual Initiation 1, 2, 3, 2 c SR 3.3.5.1.6 NA 4(a), 5(a)
- 3. High Pressure Core Spray (HPCS) System
- a. Reactor Vessel 1, 2, 3, 4(b) B SR 3.3.5.1.1 :::: -58 inches Water Level - Low 4(a), 5(a) SR 3.3.5.1.2 Low, Level 2 SR 3.3.5.1.4 SR 3.3.5.1.6
- b. Drywell Pressure - 1, 2, 3 4(b) B SR 3.3.5.1.2 s 1.88 psig High SR 3.3.5.1.4 SR 3.3.5.1.6
- c. Reactor Vessel 1, 2, 3, 4(a), 5(a) 2 c SR 3.3.5.1.1 s 56.0 inches Water Level - High, SR 3.3.5.1.2 Level 8 SR 3.3.5.1.4 SR 3.3.5.1.6
- d. Condensate Storage 1, 2, 3, 2 D SR 3.3.5.1.2 ::=: 448 ft 1 inch Tank Level - Low 4(c), 5(c) SR 3.3.5.1.4 elevation SR 3.3.5.1.6 (a) When associated subsystem(s) are required to be OPERABLE.
(b) Also required to initiate the associated DG. (c) When HPCS is OPERABLE for compliance with LCO 3.5.2, "ECCS - Shutdown," and aligned to the condensate storage tank while tank water level is not within the limit of SR 3.5.2.2. Columbia Generating Station 3.3.5.1-9 Amendment No. +ee,+69 22§ 238
ECCS Instrumentation 3.3.5.1 Table 3.3.5.1-1 (page 4 of 5) Emergency Core Cooling System Instrumentation APPLICABLE CONDITIONS MODES OR REQUIRED REFERENCED OTHER CHANNELS FROM SPECIFIED PER REQUIRED SURVEILLANCE ALLOWABLE FUNCTION CONDITIONS FUNCTION ACTION A.1 REQUIREMENTS VALUE
- 3. HPCS System
- e. Suppression Pool 1, 2, 3 2 D SR 3.3.5.1.2 s 466 ft Water Level - High SR 3.3.5.1.4 11 inches SR 3.3.5.1.6 elevation
- f. HPCS System Flow 1, 2, 3, E SR 3.3.5.1.2 2 1200 gpm and Rate - Low 4ia), 5ia) SR 3.3.5.1.4 s 1512 gpm (Minimum Flow) SR 3.3.5.1.6
- g. Manual Initiation 1, 2, 3, 2 c SR 3.3.5.1.6 NA 4 1a), 5(a)
- 4. Automatic Depressurization System (ADS) Trip System A
- a. Reactor Vessel 1, 2ld), 3ld) 2 F SR 3.3.5.1.1 2 -142.3 inches Water Level - Low SR 3.3.5.1.2 Low Low, Level 1 SR 3.3.5.1.4 SR 3.3.5.1.6
- b. ADS Initiation Timer 1, 2ld), 3id) G SR 3.3.5.1.2 s 115.0 seconds SR 3.3.5.1.3 SR 3.3.5.1.6
- c. Reactor Vessel 1, 2ld), 3ld) F SR 3.3.5.1.1 2 9.5 inches Water Level - Low, SR 3.3.5.1.2 Level 3 (Permissive) SR 3.3.5.1.4 SR 3.3.5.1.6
- d. LPCS Pump 1, 2ld), 3ld) 2 G SR 3.3.5.1.2 2 119 psig and Discharge Pressure SR 3.3.5.1.4 s 171 psig
- High SR 3.3.5.1.6
- e. LPCI Pump A 1, 2ld), 3id) 2 G SR 3.3.5.1.2 2 11 6 psig and Discharge Pressure SR 3.3.5.1.4 s 134 psig
- High SR 3.3.5.1.6 (a) When associated subsystem(s) are required to be OPERABLE.
(d) With reactor steam dome pressure > 150 psig. Columbia Generating Station 3.3.5.1-10 Amendment No. +ee,+e9 ~ 238
ECCS Instrumentation 3.3.5.1 Table 3.3.5.1-1 (page 5 of 5) Emergency Core Cooling System Instrumentation APPLICABLE CONDITIONS MODES OR REQUIRED REFERENCED OTHER CHANNELS FROM SPECIFIED PER REQUIRED SURVEILLANCE ALLOWABLE FUNCTION CONDITIONS FUNCTION ACTION A.1 REQUIREMENTS VALUE
- 4. ADS Trip System A
- f. Accumulator Backup 1, 2'dl, 3(d) 3 F SR 3.3.5.1.2 2 151.4 psig Compressed Gas SR 3.3.5.1.4 System Pressure - SR 3.3.5.1.6 Low
- g. Manual Initiation 1, 2(d), 3(d) 4 G SR 3.3.5.1.6 NA
- 5. ADS Trip System B
- a. Reactor Vessel 1, 2(dl, 3(d) 2 F SR 3.3.5.1.1 2 -142.3 inches Water Level - Low SR 3.3.5.1.2 Low Low, Level 1 SR 3.3.5.1.4 SR 3.3.5.1.6
- b. ADS Initiation Timer 1 ' 2(d)' 3(d) G SR 3.3.5.1.2 :::: 115.0 seconds SR 3.3.5.1.3 SR 3.3.5.1.6
- c. Reactor Vessel 1, 2(d), 3(d) F SR 3.3.5.1.1 2 9.5 inches Water Level - SR 3.3.5.1.2 Low, Level 3 SR 3.3.5.1.4 (Permissive) SR 3.3.5.1.6
- d. LPCI Pumps B & C 1 , 2(d), 3(d) 2 per pump G SR 3.3.5.1.2 2 11 6 psig and Discharge Pressure SR 3.3.5.1.4 :::: 134 psig
- High SR 3.3.5.1.6
- e. Accumulator Backup 1' 2(d)' 3(d) 3 F SR 3.3.5.1.2 2 151.4 psig Compressed Gas SR 3.3.5.1.4 System Pressure - SR 3.3.5.1.6 Low
- f. Manual Initiation 1, 2(d), 3(d) 4 G SR 3.3.5.1.6 NA (d) With reactor steam dome pressure > 150 psig.
Columbia Generating Station 3.3.5.1-11 Amendment No. 238 I
RCIC System Instrumentation 3.3.5.2 3.3 INSTRUMENTATION 3.3.5.2 Reactor Core Isolation Cooling (RCIC) System Instrumentation LCO 3.3.5.2 The RCIC System instrumentation for each Function in Table 3.3.5.2-1 shall be OPERABLE. APPLICABILITY: MODE 1, MODES 2 and 3 with reactor steam dome pressure> 150 psig. ACTIONS
NOT E----------------------------------------------------------
Separate Condition entry is allowed for each channel. CONDITION REQUIRED ACTION COMPLETION TIME A. One or more channels A.1 Enter the Condition Immediately inoperable. referenced in Table 3.3.5.2-1 for the channel. B. As required by Required B.1 Declare RCIC System 1 hour from discovery Action A.1 and inoperable. of loss of RCIC referenced in initiation capability Table 3.3.5.2-1. AND B.2 Place channel in trip. 24 hours C. As required by Required C.1 Restore channel to 24 hours Action A.1 and OPERABLE status. referenced in Table 3.3.5.2-1. Columbia Generating Station 3.3.5.2-1 Amendment No. 44Q,~ 225
RCIC System Instrumentation 3.3.5.2 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME D. As required by Required 0.1 ---------------NOTE------------- Action A.1 and Only applicable if RCIC referenced in pump suction is not aligned Table 3.3.5.2-1. to the suppression pool. Declare RCIC System 1 hour from discovery inoperable. of loss of RCIC initiation capability AND 0.2.1 Place channel in trip. 24 hours OR 0.2.2 Align RCIC pump suction to 24 hours the suppression pool. E. Required Action and E.1 Declare RCIC System Immediately associated Completion inoperable. Time of Condition B, C, or 0 not met. Columbia Generating Station 3.3.5.2-2 Amendment No. 449,.:teS 225
RCIC System Instrumentation 3.3.5.2 SURVEILLANCE REQUIREMENTS
---------------N0 TES--------- ----------------------- --------------- -----------
- 1. Refer to Table 3.3.5.2-1 to determine which SRs apply for each RCIC Function.
- 2. When a channel is placed in an inoperable status solely for performance of required Surveillances, entry into associated Conditions and Required Actions may be delayed as follows: (a) for up to 6 hours for Functions 2 and 4; and (b) for up to 6 hours for Functions 1 and 3 provided the associated Function maintains RCIC initiation capability.
SURVEILLANCE FREQUENCY SR 3.3.5.2.1 Perform CHANNEL CHECK. In accordance with the Surveillance Frequency Control Program SR 3.3.5.2.2 Perform CHANNEL FUNCTIONAL TEST. In accordance with the Surveillance Frequency Control Program SR 3.3.5.2.3 Perform CHANNEL CALIBRATION. In accordance with the Surveillance Frequency Control Program SR 3.3.5.2.4 Perform LOGIC SYSTEM FUNCTIONAL TEST. In accordance with the Surveillance Frequency Control Program Columbia Generating Station 3.3.5.2-3 Amendment No. +49,+e9 ~ 238
RCIC System Instrumentation 3.3.5.2 Table 3.3.5.2-1 (page 1 of 1) Reactor Core Isolation Cooling System Instrumentation CONDITIONS REQUIRED REFERENCED CHANNELS PER FROM REQUIRED SURVEILLANCE ALLOWABLE FUNCTION FUNCTION ACTION A.1 REQUIREMENTS VALUE
- 1. Reactor Vessel Water 4 B SR 3.3.5.2.1 :?: -58 inches Level - Low Low, Level 2 SR 3.3.5.2.2 SR 3.3.5.2.3 SR 3.3.5.2.4
- 2. Reactor Vessel Water 2 C SR 3.3.5.2.1 556 inches Level - High, Level 8 SR 3.3.5.2.2 SR 3.3.5.2.3 SR 3.3.5.2.4
- 3. Condensate Storage Tank 2 D SR 3.3.5.2.1 ;;:. 447 ft 7 inches Level- Low SR 3.3.5.2.2 elevation SR 3.3.5.2.3 SR 3.3.5.2.4
- 4. Manual Initiation 2 C SR 3.3.5.2.4 NA Columbia Generating Station 3.3.5.2-4 Amendment No . .ffi.9,249 225
Primary Containment Isolation Instrumentation 3.3.6.1 3.3 INSTRUMENTATION 3.3.6.1 Primary Containment Isolation Instrumentation LCO 3.3.6.1 The primary containment isolation instrumentation for each Function in Table 3.3.6.1-1 shall be OPERABLE. APPLICABILITY: According to Table 3.3.6.1-1. ACTIONS
NOTES---------------------------------------------------------
- 1. Penetration flow paths may be unisolated intermittently under administrative controls.
- 2. Separate Condition entry is allowed for each channel.
CONDITION REQUIRED ACTION COMPLETION TIME A. One or more required A. 1 Place channel in trip. 12 hours for channels inoperable. Functions 2.a, 2.c, 5.d, 6.a, and 6.b AND 24 hours for Functions other than Functions 2.a, 2.c, 5.d, 6.a, and 6.b B. One or more automatic B.1 Restore isolation capability. 1 hour Functions with isolation capability not maintained. C. Required Action and C.1 Enter the Condition Immediately associated Completion referenced in Time of Condition A or B Table 3.3.6.1-1 for the not met. channel. Columbia Generating Station 3.3.6.1-1 Amendment No. +&9,200 225
Primary Containment Isolation Instrumentation 3.3.6.1 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME D. As required by Required D.1 Isolate associated main 12 hours Action C.1 and steam line (MSL). referenced in Table 3.3.6.1-1. OR D.2.1 Be in MODE 3. 12 hours AND D.2.2 Be in MODE 4. 36 hours E. As required by Required E.1 Be in MODE 2. 6 hours Action C.1 and referenced in Table 3.3.6.1-1. F. As required by Required F.1 Isolate the affected 1 hour Action C.1 and penetration flow path(s). referenced in Table 3.3.6.1-1. G. As required by Required G.1 Isolate the affected 24 hours Action C.1 and penetration flow path(s). referenced in Table 3.3.6.1-1. H. Required Action and H.1 Be in MODE 3. 12 hours associated Completion Time of Condition F or G AND not met. H.2 Be in MODE 4. 36 hours OR As required by Required Action C.1 and referenced in Table 3.3.6.1-1. Columbia Generating Station 3.3.6.1-2 Amendment No . .:149,469 225
Primary Containment Isolation Instrumentation 3.3.6.1 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME I. As required by Required 1.1 Declare associated standby 1 hour Action C.1 and liquid control (SLC) referenced in subsystem inoperable. Table 3.3.6.1-1. OR 1.2 Isolate the Reactor Water 1 hour Cleanup (RWCU) System. J. As required by Required J.1 Initiate action to restore Immediately Action C.1 and channel to OPERABLE referenced in status. Table 3.3.6.1-1. OR J.2 Initiate action to isolate the Immediately Residual Heat Removal (RHR) Shutdown Cooling (SOC) System. SURVEILLANCE REQUIREMENTS
NOTES----------------------------------------------------------
- 1. Refer to Table 3.3.6.1-1 to determine which SRs apply for each Primary Containment Isolation Function.
- 2. When a channel is placed in an inoperable status solely for performance of required Surveillances, entry into associated Conditions and Required Actions may be delayed for up to 6 hours provided the associated Function maintains isolation capability.
SURVEILLANCE FREQUENCY SR 3.3.6.1.1 Perform CHANNEL CHECK. In accordance with the Surveillance Frequency Control Program Columbia Generating Station 3.3.6.1-3 Amendment No. +49,+w 2-2-a 238
Primary Containment Isolation Instrumentation 3.3.6.1 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.3.6.1 .2 Perform CHANNEL FUNCTIONAL TEST. In accordance with the Surveillance Frequency Control Program SR 3.3.6.1 .3 Perform CHANNEL FUNCTIONAL TEST. In accordance with the Surveillance Frequency Control Program SR 3.3.6.1.4 Perform CHANNEL CALIBRATION. In accordance with the Surveillance Frequency Control Program SR 3.3.6.1 .5 Perform CHANNEL CALIBRATION In accordance with the Surveillance Frequency Control Program SR 3.3.6.1 .6 Perform LOGIC SYSTEM FUNCTIONAL TEST. In accordance with the Surveillance Frequency Control Program SR 3.3.6.1 .7 -------------------------------N 0 TE------------------------------ Channel sensors for Functions 1.a, 1 .b, and 1.c are excluded. Verify the ISOLATION SYSTEM RESPONSE TIME In accordance is within limits. with the Surveillance Frequency Control Program Columbia Generating Station 3.3.6.1-4 Amendment No. +w,+w 22a 238
Primary Containment Isolation Instrumentation 3.3.6.1 Table 3.3.6.1-1 (page 1 of 6) Primary Containment Isolation Instrumentation APPLICABLE CONDITIONS MODES OR REQUIRED REFERENCED OTHER CHANNELS FROM SPECIFIED PER TRIP REQUIRED SURVEILLANCE ALLOWABLE FUNCTION CONDITIONS SYSTEM ACTION C.1 REQUIREMENTS VALUE
- 1. Main Steam Line Isolation
- a. Reactor Vessel 1, 2, 3 2 D SR 3.3.6.1.1 ~ -142.3 inches Water Level - Low SR 3.3.6.1.2 Low Low, Level 1 SR 3.3.6.1.4 SR 3.3.6.1.6 SR 3.3.6.1.7
- b. Main Steam Line 2 E SR 3.3.6.1.2 ~ 804 psig Pressure - Low SR 3.3.6.1.4 SR 3.3.6.1.6 SR 3.3.6.1. 7
- c. Main Steam Line 1, 2, 3 2 per D SR 3.3.6.1.1 ~ 137.9 psid Flow- High MSL SR 3.3.6.1.2 SR 3.3.6.1.4 SR 3.3.6.1.6 SR 3.3.6.1.7
- d. Condenser Vacuum 1, 2(a), 3(a) 2 D SR 3.3.6.1.2 ~ 7.2 inches
- Low SR 3.3.6.1.4 Hg vacuum SR 3.3.6.1.6
- e. Main Steam Tunnel 1, 2, 3 2 D SR 3.3.6.1.3 ~ 170°F Temperature - High SR 3.3.6.1.4 SR 3.3.6.1.6
- f. Main Steam Tunnel 1,2,3 2 D SR 3.3.6.1.3 ~ 90°F Differential SR 3.3.6.1.4 Temperature - High SR 3.3.6.1.6
- g. Manual Initiation 1, 2, 3 4 G SR 3.3.6.1.6 NA
- 2. Primary Containment Isolation
- a. Reactor Vessel 1, 2, 3 2 F SR 3.3.6.1.1 ~ 9.5 inches Water Level - Low, SR 3.3.6.1.2 Level 3 SR 3.3.6.1.4 SR 3.3.6.1.6 (a) With any turbine throttle valve not closed.
Columbia Generating Station 3.3.6.1-5 Amendment No. 2-+4,2-:t-9,22a, 241
Primary Containment Isolation Instrumentation 3.3.6.1 Table 3.3.6.1-1 (page 2 of 6) Primary Containment Isolation Instrumentation APPLICABLE CONDITIONS MODES OR REQUIRED REFERENCED OTHER CHANNELS FROM SPECIFIED PER TRIP REQUIRED SURVEILLANCE ALLOWABLE FUNCTION CONDITIONS SYSTEM ACTION C.1 REQUIREMENTS VALUE
- 2. Primary Containment Isolation 1,2,3 2(0) SR 3.3.6.1.2
- b. Reactor Vessel H ~ -58 inches Water Level - Low SR 3.3.6.1.4 Low, Level 2 SR 3.3.6.1.6
- c. Drywell Pressure 1,2,3 2(0) H SR 3.3.6.1.2 :$ 1.88 psig High SR 3.3.6.1.4 SR 3.3.6.1.6
- d. Reactor Building 1,2,3 2 F SR 3.3.6.1.1 :$ 16.0 mR/hr Vent Exhaust SR 3.3.6.1.2 Plenum Radiation SR 3.3.6.1.4 High SR 3.3.6.1.6
- e. Manual Initiation 1,2,3 4 G SR 3.3.6.1.6 NA
- 3. Reactor Core Isolation Cooling (RCIC) System Isolation
- a. RCIC Steam Line 1,2,3 F SR 3.3.6.1.1 :$ 250 inches wg Flow - High SR 3.3.6.1.2 SR 3.3.6.1.4 SR 3.3.6.1.6
- b. RCIC Steam Line 1,2,3 F SR 3.3.6.1.2 :$ 3.00 seconds Flow - Time Delay SR 3.3.6.1.4 SR 3.3.6.1.6
- c. RCIC Steam Supply 1,2,3 2 F SR 3.3.6.1.2 ~ 61 pSig Pressure - Low SR 3.3.6.1.4 SR 3.3.6.1.6
- d. RCIC Turbine 1,2,3 2 F SR 3.3.6.1.2 :$ 20 psig Exhaust Diaphragm SR 3.3.6.1.4 Pressure - High SR 3.3.6.1.6 (e) Also required to initiate the associated LOCA Time Delay Relay Function pursuant to LCO 3.3.5.1.
Columbia Generating Station 3.3.6.1-6 Amendment No. 4W.~ 225
Primary Containment Isolation Instrumentation 3.3.6.1 Table 3.3.6.1-1 (page 3 of 6) Primary Containment Isolation Instrumentation APPLICABLE CONDITIONS MODES OR REQUIRED REFERENCED OTHER CHANNELS FROM SPECIFIED PER TRIP REQUIRED SURVEILLANCE ALLOWABLE FUNCTION CONDITIONS SYSTEM ACTION C.1 REQUIREMENTS VALUE
- 3. RCIC System Isolation
- e. RCIC Equipment 1,2,3 F SR 3.3.6.1.3 :-:; 180°F Room Area SR 3.3.6.1.4 Temperature - High SR 3.3.6.1.6
- f. RCIC Equipment 1,2,3 F SR 3.3.6.1.3 :-:; 60°F Room Area SR 3.3.6.1.4 Differential SR 3.3.6.1.6 Temperature - High
- g. RWCU/RCIC Steam 1,2,3 F SR 3.3.6.1.3 :-:; 180°F Line Routing Area SR 3.3.6.1.4 Temperature - High SR 3.3.6.1.6
- h. Manual Initiation 1,2,3 1(b) G SR 3.3.6.1.6 NA
- 4. RWCU System Isolation
- a. Differential Flow 1,2,3 F SR 3.3.6.1.1 :-:; 67.4 gpm High SR 3.3.6.1.2 SR 3.3.6.1.5 SR 3.3.6.1.6
- b. Differential Flow 1,2,3 F SR 3.3.6.1.2 :-:; 46.5 seconds Time Delay SR 3.3.6.1.5 SR 3.3.6.1.6
- c. Blowdown Flow 1,2,3 F SR 3.3.6.1.1 :-:; 271.7 gpm High SR 3.3.6.1.2 SR 3.3.6.1.5 SR 3.3.6.1.6 SR 3.3.6.1.7
- d. Heat Exchanger 1,2,3 F SR 3.3.6.1.3 :-:; 160°F Room Area SR 3.3.6.1.4 Temperature - High SR 3.3.6.1.6 (b) RCIC Manual Initiation only inputs into one of the two trip systems.
Columbia Generating Station 3.3.6.1-7 Amendment No. 4e9,~ 225
Primary Containment Isolation Instrumentation 3.3.6.1 Table 3.3.6.1-1 (page 4 of 6) Primary Containment Isolation Instrumentation APPLICABLE CONDITIONS MODES OR REQUIRED REFERENCED OTHER CHANNELS FROM SPECIFIED PER TRIP REQUIRED SURVEILLANCE ALLOWABLE FUNCTION CONDITIONS SYSTEM ACTION C,1 REQUIREMENTS VALUE
- 4. RWCU System Isolation
- e. Heat Exchanger 1,2,3 F SR 3.3.6.1.3 ~ 70 a F Room Area SR 3.3.6.1.4 Ventilation SR 3.3.6.1.6 Differential Temperature - High
- f. Pump Room Area 1,2,3 1 per room F SR 3.3,6.1.3 $ 180°F Temperature - High SR 3.3.6.1.4 SR 3.3.6.1.6
- g. Pump Room Area 1,2,3 1 per room F SR 3.3.6.1.3 :5 100°F Ventilation SR 3.3.6.1.4 Differential SR 3.3.6.1.6 Temperature - High
- h. RWCUlRCIC Line 1,2,3 F SR 3.3.6.1.3 ~ 180°F Routing Area SR 3.3.6.1.4 Temperature - High SR 3.3.6.1.6
- i. RWCU Line Routing 1,2,3 1 per room F SR 3.3.6.1.3 Area Temperature- SR 3,3.6.1.4 High SR 3.3.6.1.6 Room 409, 509 ~ 175°F Areas Room 408,511 :5 180 a F Areas
- j. Reactor Vessel 1,2,3 2 F SR 3.3.6.1.2 ;:: -58 inches Water Level - Low SR 3.3.6.1.4 Low, Level 2 SR 3.3.6.1.6
- k. SLC System 1,2,3 2'0) SR 3.3.6.1.6 NA Initiation I. Manual Initiation 1,2,3 2 G SR 3.3.6.1.6 NA (c) SLC System Initiation only inputs into one of the two trip systems.
Columbia Generating Station 3.3.6.1-8 Amendment No. 4+2AW 225
Primary Containment Isolation Instrumentation 3.3.6.1 Table 3.3.6.1-1 (page 5 of 6) Primary Containment Isolation Instrumentation APPLICABLE CONDITIONS MODES OR REQUIRED REFERENCED OTHER CHANNELS FROM SPECIFIED PER TRIP REQUIRED SURVEILLANCE ALLOWABLE FUNCTION CONDITIONS SYSTEM ACTION C.1 REQUIREMENTS VALUE
- 5. RHR SOC System Isolation
- a. Pump Room Area 3 1 per room F SR 3.3.6.1.3 ~ 150°F Temperature - High SR 3.3.6.1.4 SR 3.3.6.1.6
- b. Pump Room Area 3 1 per room F SR 3.3.6.1.3 ~ 70°F Ventilation SR 3.3.6.1.4 Differential SR 3.3.6.1.6 Temperature - High
- c. Heat Exchanger 3 1 per room F SR 3.3.6.1.3 Area Temperature SR 3.3.6.1.4 High SR 3.3.6.1.6 Room 505 Area ~ 140°F Room 507 Area ~ 160°F Room 605 Area ~ 150°F Room 606 Area ~ 140°F Reactor Vessel 3,4,5 2(d)
- d. J SR 3.3.6.1.1 ~ 9.5 inches Water Level - Low, SR 3.3.6.1.2 Level 3 SR 3.3.6.1.4 SR 3.3.6.1.6
- e. Reactor Vessel 1,2,3 F SR 3.3.6.1.2 ~ 135 psig Pressure - High SR 3.3.6.1.4 SR 3.3.6.1.6
- f. Manual Initiation 1,2,3 2 G SR 3.3.6.1.6 NA (d) Only one trip system required in MODES 4 and 5 with RHR Shutdown Cooling System integrity maintained.
Columbia Generating Station 3.3.6.1-9 Amendment No. e4-,4e9 225
Primary Containment Isolation Instrumentation 3.3.6.1 Table 3.3.6.1-1 (page 6 of 6) Primary Containment Isolation Instrumentation APPLICABLE CONDITIONS MODES OR REQUIRED REFERENCED OTHER CHANNELS FROM SPECIFIED PER TRIP REQUIRED SURVEILLANCE ALLOWABLE FUNCTION CONDITIONS SYSTEM ACTION C.1 REQUIREMENTS VALUE
- 6. Traversing Incore Probe Isolation
- a. Reactor Vessel 1,2,3 2 G SR 3.3.6.1.2 ~ -58 inches Water Level - Low, SR 3.3.6.1.4 Low, Level 2 SR 3.3.6.1.6
- b. Dryweli Pressure 1,2,3 2 G SR 3.3.6.1.2 .:; 1.88 psig High SR 3.3.6.1.4 SR 3.3.6.1.6 Columbia Generating Station 3.3.6.1-10 Amendment No. 200,22G 225
Secondary Containment Isolation Instrumentation 3.3.6.2 3.3 INSTRUMENTATION 3.3.6.2 Secondary Containment Isolation Instrumentation LCO 3.3.6.2 The secondary containment isolation instrumentation for each Function in Table 3.3.6.2-1 shall be OPERABLE. APPLICABILITY: According to Table 3.3.6.2-1. ACTIONS
NOT E----------------------------------------------------------
Separate Condition entry is allowed for each channel. CONDITION REQUIRED ACTION COMPLETION TIME A. One or more channels A.1 Place channel in trip. 12 hours for inoperable. Function 2 AND 24 hours for Functions other than Function 2 B. One or more automatic B.1 Restore isolation capability. 1 hour Functions with isolation capability not maintained. C. Required Action and C.1.1 Isolate the associated 1 hour associated Completion penetration flow path(s). Time not met. OR C.1.2 Declare associated 1 hour secondary containment isolation valve(s) inoperable. AND Columbia Generating Station 3.3.6.2-1 Amendment No. +49,4W 225
Secondary Containment Isolation Instrumentation 3.3.6.2 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME C. (continued) C.2.1 Place the associated 1 hour standby gas treatment (SGT) subsystem in operation. OR C.2.2 Declare associated SGT 1 hour subsystem inoperable. SURVEILLANCE REQUIREMENTS
N 0 T ES----------------------------------------------------------
- 1. Refer to Table 3.3.6.2-1 to determine which SRs apply for each Secondary Containment Isolation Function.
- 2. When a channel is placed in an inoperable status solely for performance of required Surveillances, entry into associated Conditions and Required Actions may be delayed tor up to 6 hours provided the associated Function maintains isolation capability.
SURVEILLANCE FREQUENCY SR 3.3.6.2.1 Perform CHANNEL CHECK. In accordance with the Surveillance Frequency Control Program SR 3.3.6.2.2 Perform CHANNEL FUNCTIONAL TEST. In accordance with the Surveillance Frequency Control Program Columbia Generating Station 3.3.6.2-2 Amendment No. +49,+w 225 238
Secondary Containment Isolation Instrumentation 3.3.6.2 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.3.6.2.3 Perform CHANNEL CALIBRATION. In accordance with the Surveillance Frequency Control Program SR 3.3.6.2.4 Perform LOGIC SYSTEM FUNCTIONAL TEST. In accordance with the Surveillance Frequency Control Program Columbia Generating Station 3.3.6.2-3 Amendment No. ~.+99 22§ 238
Secondary Containment Isolation Instrumentation 3.3.6.2 Table 3.3.6.2-1(page1of1) Secondary Containment Isolation Instrumentation APPLICABLE REQUIRED MODES OR CHANNELS OTHER PER SPECIFIED TRIP SURVEILLANCE ALLOWABLE FUNCTION CONDITIONS SYSTEM REQUIREMENTS VALUE
- 1. Reactor Vessel Water Level - Low 1, 2, 3, (a) SR 3.3.6.2.2 2 -58 inches Low, Level 2 SR 3.3.6.2.3 SR 3.3.6.2.4
- 2. Drywell Pressure - High 1, 2, 3 SR 3.3.6.2.2 :::; 1.88 psig SR 3.3.6.2.3 SR 3.3.6.2.4
- 3. Reactor Building Vent Exhaust 1, 2, 3, (a) 2 SR 3.3.6.2.1 :::; 16.0 mR/hr Plenum Radiation - High SR 3.3.6.2.2 SR 3.3.6.2.3 SR 3.3.6.2.4
- 4. Manual Initiation 1, 2, 3, (a) 4 SR 3.3.6.2.4 NA (a) During operations with a potential for draining the reactor vessel.
(b) Deleted (c) Also required to initiate the associated LOCA Time Delay Relay Function pursuant to LCO 3.3.5.1. Columbia Generating Station 3.3.6.2-4 Amendment No. 238
CREF System Instrumentation 3.3.7.1 3.3 INSTRUMENTATION 3.3.7.1 Control Room Emergency Filtration (CREF) System Instrumentation LCO 3.3.7.1 The CREF System instrumentation for each Function in Table 3.3.7.1-1 shall be OPERABLE. APPLICABILITY: According to Table 3.3.7.1-1. ACTIONS
NOTE----------------------------------------------------------
Separate Condition entry is allowed for each channel. CONDITION REQUIRED ACTION COMPLETION TIME A. One or more channels A.1 Enter the Condition Immediately inoperable. referenced in Table 3.3.7.1-1 for the channel. B. As required by Required B.1 Declare associated CREF 1 hour from discovery Action A.1 and subsystem inoperable. of loss of CREF referenced in initiation capability in Table 3.3.7.1-1. both trip systems AND B.2 Place channel in trip. 24 hours C. As required by Required C.1 Declare associated CREF 1 hour from discovery Action A.1 and subsystem inoperable. of loss of CREF referenced in initiation capability in Table 3.3.7.1-1. both trip systems AND C.2 Place channel in trip. 12 hours Columbia Generating Station 3.3.7.1-1 Amendment No. 449,-te9 225
CREF System Instrumentation 3.3.7.1 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME D. Required Action and D.1 Place associated CREF 1 hour associated Completion subsystem in the Time of Condition B or C pressurization mode of not met. operation. D.2 Declare associated CREF 1 hour subsystem inoperable. SURVEILLANCE REQUIREMENTS
---------------N0 TES----------------------------------------------------------
- 1. Refer to Table 3.3.7.1-1 to determine which SRs apply for each CREF System Function.
- 2. When a channel is placed in an inoperable status solely for performance of required Surveillances, entry into associated Conditions and Required Actions may be delayed for up to 6 hours provided the associated Function maintains CREF initiation capability.
SURVEILLANCE FREQUENCY SR 3.3.7.1.1 Perform CHANNEL CHECK. In accordance with the Surveillance Frequency Control Program SR 3.3.7.1.2 Perform CHANNEL FUNCTIONAL TEST. In accordance with the Surveillance Frequency Control Program SR 3.3.7.1.3 Perform CHANNEL CALIBRATION. In accordance with the Surveillance Frequency Control Program Columbia Generating Station 3.3.7.1-2 Amendment No. +8-7,+99 22a 238
CREF System Instrumentation 3.3.7.1 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.3.7.1.4 Perform LOGIC SYSTEM FUNCTIONAL TEST. In accordance with the Surveillance Frequency Control Program Columbia Generating Station 3.3.7.1-3 Amendment No. +e9,+99 22-9 238
CREF System Instrumentation 3.3.7.1 Table 3.3.7.1-1(page1of1) Control Room Emergency Filtration System Instrumentation APPLICABLE CONDITIONS MODES OR REQUIRED REFERENCED OTHER CHANNELS FROM SPECIFIED PER TRIP REQUIRED SURVEILLANCE ALLOWABLE FUNCTION CONDITIONS SYSTEM ACTION A.1 REQUIREMENTS VALUE
- 1. Reactor Vessel Water 1, 2, 3, (a) 2 B SR 3.3.7.1.1 ~-58inches Level - Low Low, Level 2 SR 3.3.7.1.2 SR 3.3.7.1.3 SR 3.3.7.1.4
- 2. Drywell Pressure - High 1, 2, 3 2 c SR 3.3.7.1.1 :s: 1.88 psig SR 3.3.7.1.2 SR 3.3.7.1.3 SR 3.3.7.1.4
- 3. Reactor Building Vent 1, 2, 3, (a) 2 B SR 3.3.7.1.1 :s: 16.0 mR/hr Exhaust Plenum SR 3.3.7.1.2 Radiation - High SR 3.3.7.1.3 SR 3.3.7.1.4 (a) During operations with a potential for draining the reactor vessel.
Columbia Generating Station 3.3.7.1-4 Amendment No. 238
LOP Instrumentation 3.3.8.1 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME D. Required Action and D.1 Declare associated DG Immediately associated Completion inoperable. Time of Condition B or C not met. OR
--------------------NOTE-------------------
Only applicable for Functions 1 .c and 1.d. D.2.1 Open offsite circuit supply Immediately breaker to associated 4.16 kV ESF bus. D.2.2 Declare associated offsite Immediately circuit inoperable. SURVEILLANCE REQUIREMENTS
N 0 TES----------------------------------------------------------
- 1. Refer to Table 3.3.8.1-1 to determine which SRs apply for each LOP Function.
- 2. When a channel is placed in an inoperable status solely for performance of required Surveillances, entry into associated Conditions and Required Actions may be delayed for up to 2 hours provided the associated Function maintains initiation capability.
SURVEILLANCE FREQUENCY SR 3.3.8.1.1 Perform CHANNEL FUNCTIONAL TEST. In accordance with the Surveillance Frequency Control Program Columbia Generating Station 3.3.8.1-2 Amendment No. +49,-+S9 2aa 238
LOP Instrumentation 3.3.8.1 3.3 INSTRUMENTATION 3.3.8.1 Loss of Power (LOP) Instrumentation LCO 3.3.8.1 The LOP instrumentation for each Function in Table 3.3.8.1-1 shall be OPERABLE. APPLICABILITY: MODES 1, 2, and 3, When the associated diesel generator (DG) is required to be OPERABLE by LCO 3.8.2, "AC Sources - Shutdown." ACTIONS
N0TE----------------------------------------------------------
Separate Condition entry is allowed for each channel. CONDITION REQUIRED ACTION COMPLETION TIME A. One or more required A.1 Enter the Condition Immediately channels inoperable. referenced in Table 3.3.8.1-1 for the channel. B. As required by Required B.1 Declare associated DG 1 hour from discovery Action A.1 and inoperable. of loss of initiation referenced in capability for the Table 3.3.8.1-1. associated DG AND B.2 Restore channel to 24 hours OPERABLE status. C. As required by Required C.1 Place channel in trip. 1 hour Action A.1 and referenced in Table 3.3.8.1-1. Columbia Generating Station 3.3.8.1-1 Amendment No. 44Q,-+W 225
LOP Instrumentation 3.3.8.1 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.3.8.1.2 Perform CHANNEL CALIBRATION. In accordance with the Surveillance Frequency Control Program SR 3.3.8.1 .3 Perform CHANNEL CALIBRATION In accordance with the Surveillance Frequency Control Program SR 3.3.8.1 .4 Perform LOGIC SYSTEM FUNCTIONAL TEST. In accordance with the Surveillance Frequency Control Program Columbia Generating Station 3.3.8.1-3 Amendment No. +49,-:t-eQ ~ 238
LOP Instrumentation 3.3.8.1 Table 3.3.8.1-1(page1of1) Loss of Power Instrumentation CONDITIONS REQUIRED REFERENCED CHANNELS FROM PER REQUIRED SURVEILLANCE ALLOWABLE FUNCTION DIVISION ACTION A.1 REQUIREMENTS VALUE
- 1. Divisions 1 and 2 - 4.16 kV Emergency Bus Undervoltage
- a. TR-S Loss of Voltage - 2 B SR 3.3.8.1.2 2 2450 V ands 3135 V 4.16 kV Basis SR 3.3.8.1.4
- b. TR-S Loss of Voltage - 2 B SR 3.3.8.1.3 2 2.95 seconds and Time Delay SR 3.3.8.1.4 s 7.1 seconds
- c. TR-B Loss of Voltage - c SR 3.3.8.1.3 2 2450 V ands 3135 V 4.16 kV Basis SR 3.3.8.1.4
- d. TR-B Loss of Voltage - c SR 3.3.8.1.3 2 3.06 seconds and Time Delay SR 3.3.8.1.4 s 9.28 seconds
- e. Degraded Voltage - 2(a) c SR 3.3.8.1.1 2 3685 V and s 3755 V
- 4. 16 kV Basis SR 3.3.8.1.2 SR 3.3.8.1.4
- f. Degraded Voltage - 2 1a) c SR 3.3.8.1.1 2 5.0 seconds and Primary Time Delay SR 3.3.8.1.2 s 5.3 seconds SR 3.3.8.1.4
- g. Degraded Voltage - c SR 3.3.8.1.2 2 2.63 seconds and Secondary Time Delay SR 3.3.8.1.4 s 3.39 seconds
- 2. Division 3 - 4.16 kV Emergency Bus Undervoltage
- a. Los of Voltage - 2 B SR 3.3.8.1.2 2 2450 V ands 3135 V 4.16 kV Basis SR 3.3.8.1.4
- b. Loss of voltage - 2 B SR 3.3.8.1.3 2 1.87 seconds and Time Delay SR 3.3.8.1.4 s 3. 73 seconds
- c. Degraded Voltage - 2 c SR 3.3.8.1.2 2 3685 V and s 3755 V
- 4. 16 kV Basis SR 3.3.8.1.4
- d. Degraded Voltage - 2 c SR 3.3.8.1.2 2 7.36 seconds and Time Delay SR 3.3.8.1.4 s 8.34 seconds (a) The Degraded Voltage - 4.16 kV Basis and - Primary Time Delay Functions must be associated with one another.
Columbia Generating Station 3.3.8.1-4 Amendment No. 238
RPS Electric Power Monitoring 3.3.8.2 3.3 INSTRUMENTATION 3.3.8.2 Reactor Protection System (RPS) Electric Power Monitoring LCO 3.3.8.2 Two RPS electric power monitoring assemblies shall be OPERABLE for each inservice RPS motor generator set or alternate power supply that supports equipment required to be OPERABLE. APPLICABILITY: MODES 1, 2, and 3, MODES 4 and 5 with both residual heat removal (RHR) shutdown cooling (SOC) suction isolation valves open, MODE 5 with any control rod withdrawn from a core cell containing one or more fuel assemblies. ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One or both required A.1 Remove associated 72 hours inservice power supplies inservice power supply(s) with one electric power from service. monitoring assembly inoperable. B. One or both required B.1 Remove associated 1 hour inservice power supplies inservice power supply(s) with both electric power from service. monitoring assemblies inoperable. C. Required Action and C.1 -------------N0 TE------------ associated Completion LCO 3.0.4.a is not Time of Condition A or B applicable when entering not met in MODE 1, 2, MODE 3. or 3. ---------------------------------- Be in MODE 3. 12 hours Columbia Generating Station 3.3.8.2-1 Amendment No. 44-B,169,225, 236
RPS Electric Power Monitoring 3.3.8.2 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME D. Required Action and D.1 Initiate action to restore one Immediately associated Completion electric power monitoring Time of Condition A or B assembly to OPERABLE not met in MODE 4 or 5 status for inservice power with both RHR SOC supply(s) supplying suction isolation valves required instrumentation. open. OR D.2 Initiate action to isolate the Immediately RHR SOC System. E. Required Action and E.1 Initiate action to fully insert Immediately associated Completion all insertable control rods in Time of Condition A or B core cells containing one or not met in MODE 5 with more fuel assemblies. any control rod withdrawn from a core cell containing one or more fuel assemblies. Columbia Generating Station 3.3.8.2-2 Amendment No . .:t-49,+w ~ 238
RPS Electric Power Monitoring 3.3.8.2 SURVEILLANCE REQUIREMENTS
----------- ------------------- ------------N 0 TE------- ---------------------------------- -------- -----------
When an RPS electric power monitoring assembly is placed in an inoperable status solely for performance of required Surveillances, entry into the associated Conditions and Required Actions may be delayed for up to 6 hours provided the other RPS electric power monitoring assembly for the associated power supply maintains trip capability. SURVEILLANCE FREQUENCY SR 3.3.8.2.1 -------------------------------N 0 TE------------------------------ On Iy required to be performed prior to entering MODE 2 or 3 from MODE 4, when in MODE 4 for 2". 24 hours. Perform CHANNEL FUNCTIONAL TEST. In accordance with the Surveillance Frequency Control Program SR 3.3.8.2.2 Perform CHANNEL CALIBRATION. The Allowable In accordance Values shall be: with the Surveillance
- a. Overvoltage :.: : 133.8 V, with time delay Frequency s 3.46 seconds; Control Program
- b. Undervoltage 2". 110.8 V, with time delay s 3.46 seconds; and
- c. Underfrequency ~ 57 Hz, with time delay s 3.46 seconds.
SR 3.3.8.2.3 Perform a system functional test. In accordance with the Surveillance Frequency Control Program Columbia Generating Station 3.3.8.2-3 Amendment No. +s9,+.79 ~ 238
Recirculation Loops Operating (Prior to Implementation of PRNM Upgrade) 3.4.1 3.4 REACTOR COOLANT SYSTEM (RCS) 3.4.1 Recirculation Loops Operating LCO 3.4.1 Two recirculation loops with matched flows shall be in operation. One recirculation loop shall be in operation provided that the following limits are applied when the associated LCO is applicable:
- a. LCO 3.2.1, "AVERAGE PLANAR LINEAR HEAT GENERATION RATE (APLHGR)," single loop operation limits specified in the COLR; and
- b. LCO 3.2.2, "MINIMUM CRITICAL POWER RATIO (MCPR)," single loop operation limits specified in the COLR.
APPLICABILITY: MODES 1 and 2 prior to implementation of Power Range Neutron Monitor (PRNM) upgrade. ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. Recirculation loop flow A.1 Declare the recirculation 2 hours mismatch not within loop with lower flow to be limits. "not in operation." B. Requirements of the B.1 Satisfy the requirements of 4 hours LCO not met for reasons the LCO. other than Condition A. C. Required Action and C.1 Be in MODE 3. 12 hours associated Completion Time of Condition A or B not met. OR No recirculation loops in operation. Columbia Generating Station 3.4.1-1 Amendment No. ~~ 226
Recirculation Loops Operating (Prior to Implementation of PRNM Upgrade) 3.4.1 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.4.1.1 -------------------------------N()TE------------------------------ Not required to be performed until 24 hours after both recirculation loops are in operation. Verify recirculation loop drive flow mismatch with 24 hours both recirculation loops in operation is:
- a. :-: ; 10% of rated recirculation loop drive flow when operating at < 70% of rated core flow; and
- b. :-: ; 5% of rated recirculation loop drive flow when operating at~ 70% of rated core flow.
Columbia Generating Station 3.4.1-2 Amendment No. 4-7+ ~ 226
Recirculation Loops Operating (After Implementation of PRNM Upgrade) 3.4.1 3.4 REACTOR COOLANT SYSTEM (RCS) 3.4.1 Recirculation Loops Operating LCO 3.4.1 Two recirculation loops with matched flows shall be in operation. One recirculation loop shall be in operation provided that the following limits are applied when the associated LCO is applicable:
- a. LCO 3.2.1, "AVERAGE PLANAR LINEAR HEAT GENERATION RATE (APLHGR)," single loop operation limits specified in the COLR;
- b. LCO 3.2.2, "MINIMUM CRITICAL POWER RATIO (MCPR)," single loop operation limits specified in the COLR; and
- c. LCO 3.3.1.1, "Reactor Protection System (RPS) Instrumentation,"
Function 2.b (Average Power Range Monitors, Simulated Thermal Power- High), Allowable Value of Table 3.3.1.1-1 is reset for single loop operation. APPLICABILITY: MODES 1 and 2 after implementation of Power Range Neutron Monitor (PRNM) upgrade. ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. Recirculation loop flow A.1 Declare the recirculation 2 hours mismatch not within loop with lower flow to be limits. "not in operation." B. Requirements of the 8.1 Satisfy the requirements of 4 hours LCO not met for reasons the LCO. other than Condition A. Columbia Generating Station 3.4.1-3 Amendment No. ~ 22a 226
Recirculation Loops Operating (After Implementation of PRNM Upgrade) 3.4.1 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME C. Required Action and C.1 Be in MODE 3. 12 hours associated Completion Time of Condition A or B not met. No recirculation loops in operation. SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.4.1.1 -------------------------------NOTE------------------------------ Not required to be performed until 24 hours after both recirculation loops are in operation. Verify recirculation loop drive flow mismatch with In accordance both recirculation loops in operation is: with the Surveillance
- a. ~ 10% of rated recirculation loop drive flow Frequency when operating at < 70% of rated core flow; and Control Program
- b. ~ 5% of rated recirculation loop drive flow when operating at ~ 70% of rated core flow.
Columbia Generating Station 3.4.1-4 Amendment No. +++ ~ ~ 238
Jet Pumps 3.4.2 3.4 REACTOR COOLANT SYSTEM (RCS) 3.4.2 Jet Pumps LCO 3.4.2 All jet pumps shall be OPERABLE. APPLICABILITY: MODES 1 and 2. ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One or more jet pumps A.1 Be in MODE 3. 12 hours inoperable. Columbia Generating Station 3.4.2-1 Amendment No. 449,400 225
Jet Pumps 3.4.2 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.4.2.1 ------------------------------NOTES-----------------------------
- 1. Not required to be performed until 4 hours after associated recirculation loop is in operation.
- 2. Not required to be performed until 24 hours after > 25% RTP.
Verify at least two of the following criteria (a, b, In accordance and c) are satisfied for each operating recirculation with the loop: Surveillance Frequency
- a. Recirculation loop drive flow versus Control Program recirculation pump speed differs by:<:;; 10% from established patterns.
- b. Recirculation loop drive flow versus total core flow differs by :<:; 10% from established patterns.
- c. Each jet pump diffuser to lower plenum differential pressure differs by :<:; 20% from established patterns, or each jet pump flow differs by :<:; 10% from established patterns.
Columbia Generating Station 3.4.2-2 Amendment No. +49,+w ~ 238
SRVs - ~ 25% RTP 3.4.3 3.4 REACTOR COOLANT SYSTEM (RCS) 3.4.3 Safety/Relief Valves (SRVs) - ~ 25% RTP LCO 3.4.3 The safety function of 12 SRVs shall be OPERABLE, with two SRVs in the lowest two lift setpoint groups OPERABLE. APPLICABILITY: THERMAL POWER 2 25% RTP. ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One or more required A.1 Reduce THERMAL 4 hours SRVs inoperable. POWER to< 25% RTP. SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.4.3.1 Verify the safety function lift setpoints of the required In accordance SRVs are as follows: with the INSERVICE Number of Setpoint TESTING SRVs JQfilgj PROGRAM 2 1165 + 34.9
- 58.2 4 1175 + 35.2 -58.7 4 1185 + 35.5 -59.2 4 1195 + 35.8 - 59.7 4 1205 +/- 36.1 -60.2 Following testing, lift settings shall be within .+/-3%.
- Columbia Generating Station 3.4.3-1 Amendment No. 449,4-99 225 238, ~. 243
SRVs - ~ 25% RTP 3.4.3 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.4.3.2 Verify each required SRV opens when manually In accordance actuated. with the Surveillance Frequency Control Program Columbia Generating Station 3.4.3-2 Amendment No. 240
SRVs - < 25% RTP 3.4.4 3.4 REACTOR COOLANT SYSTEM (RCS) 3.4.4 Safety/Relief Valves (SRVs) - < 25% RTP LCO 3.4.4 The safety function of four SRVs shall be OPERABLE. APPLICABILITY: MODE 1 with THERMAL POWER< 25% RTP, MODES 2 and 3. ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One required SRV A.1 -------------N 0 TE------------ inoperable. LCO 3.0.4.a is not applicable when entering MODE 3. Be in MODE 3. 12 hours B. Two or more required B.1 Be in MODE 3. 12 hours SRVs inoperable. AND B.2 Be in MODE 4. 36 hours Columbia Generating Station 3.4.4-1 Amendment No. 449,169,225, 236
SRVs - < 25% RTP 3.4.4 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.4.4.1 Verify the safety function lift setpoints of the required In accordance SRVs are as follows: with the INSERVICE Number of Setpoint TESTING SRVs ~ PROGRAM 2 1165 + 34.9
-58.2 4 1175 + 35.2 -58.7 4 1185 + 35.5 -59.2 4 1195 + 35.8 -59.7 4 1205+/-36.1 -60.2 Following testing, lift settings shall be within ~3%.
SR 3.4.4.2 -------------------------------NOTE------------------------------ Not required to be performed until 12 hours after reactor steam pressure and flow are adequate to perform the test. Verify each required SRV opens when manually In accordance actuated. with the Surveillance Frequency Control Program Columbia Generating Station 3.4.4-2 Amendment No. 449,4-W,~,236,238,240, 243
RCS Operational LEAKAGE 3.4.5 3.4 REACTOR COOLANT SYSTEM (RCS) 3.4.5 RCS Operational LEAKAGE LCO 3.4.5 RCS operational LEAKAGE shall be limited to:
- a. No pressure boundary LEAKAGE;
- b. S; 5 gpm unidentified LEAKAGE;
- c. S; 25 gpm total LEAKAGE averaged over the previous 24 hour period; and
- d. S; 2 gpm increase in unidentified LEAKAGE within the previous 24 hour period in MODE 1.
APPLICABILITY: MODES 1, 2, and 3. ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. Unidentified LEAKAGE A.1 Reduce LEAKAGE to within 4 hours not within limit. limits. OR Total LEAKAGE not within limit. B. Unidentified LEAKAGE B.1 Reduced unidentified 4 hours increase not within limit. LEAKAGE increase to within limit. OR B.2 Verify source of unidentified 4 hours LEAKAGE increase is not service sensitive type 304 or type 316 austenitic stainless steel. Columbia Generating Station 3.4.5-1 Amendment No. 449,499 225
RCS Operational LEAKAGE 3.4.5 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME C. Required Action and C.1 Be in MODE 3. 12 hours associated Completion Time of Condition A or B AND not met. C.2 Be in MODE 4. 36 hours Pressure boundary LEAKAGE exists. SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.4.5.1 Verify RCS unidentified and total LEAKAGE and In accordance unidentified LEAKAGE increase are within limits. with the Surveillance Frequency Control Program Columbia Generating Station 3.4.5-2 Amendment No . .:t-49-,+69 ~ 238
RCS PIV Leakage 3.4.6 3.4 REACTOR COOLANT SYSTEM (RCS) 3.4.6 RCS Pressure Isolation Valve (PIV) Leakage LCO 3.4.6 The leakage from each RCS PIV shall be within limit. APPLICABILITY: MODES 1 and 2, MODE 3, except valves in the residual heat removal shutdown cooling flowpath when in, or during transition to or from, the shutdown cooling mode of operation. ACTIONS
NOTES---------------------------------------------------------
- 1. Separate Condition entry is allowed for each flow path.
- 2. Enter applicable Conditions and Required Actions for systems made inoperable by PIVs.
CONDITION REQUIRED ACTION COMPLETION TIME A. One or more flow paths ------------------NOTE----------------- with leakage from one or Each check valve used to satisfy more RCS PIVs not Required Action A.1 shall have within limit. been verified to meet SR 3.4.6.1 and be in the reactor coolant pressure boundary. A.1 Isolate the high pressure 4 hours portion of the affected system from the low pressure portion by use of one closed manual, deactivated automatic, or check valve. Columbia Generating Station 3.4.6-1 Amendment No. -~,4eQ. 225
RCS PIV Leakage 3.4.6 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME B. Required Action and B.1 Be in MODE 3. 12 hours associated Completion Time not met. AND B.2 Be in MODE 4. 36 hours SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.4.6.1 -------------------------------NOTE------------------------------ Only required to be performed in MODES 1 and 2. Verify equivalent leakage of each RCS PIV is In accordance s 0.5 gpm per nominal inch of valve size up to a with the maximum of 5 gpm, at an RCS pressure of INSERVICE 1035 psig. The actual test pressure shall be TESTING 2 935 psig. PROGRAM Columbia Generating Station 3.4.6-2 Amendment No. +49,.:t-99 ~. 243
RCS Leakage Detection Instrumentation 3.4.7 3.4 REACTOR COOLANT SYSTEM (RCS) 3.4.7 RCS Leakage Detection Instrumentation LCO 3.4.7 The following RCS leakage detection instrumentation shall be OPERABLE:
- a. Drywell floor drain sump flow monitoring system; and
- b. One channel of either drywell atmospheric particulate or atmospheric gaseous monitoring system.
APPLICABILITY: MODES 1, 2, and 3. ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. Drywell floor drain sump A.1 Restore drywell floor drain 30 days flow monitoring system sump flow monitoring inoperable. system to OPERABLE status. B. Required drywell B.1 Analyze grab samples of Once per 12 hours atmospheric monitoring drywell atmosphere. system inoperable. AND B.2 Restore required drywell 30 days atmospheric monitoring system to OPERABLE status. Columbia Generating Station 3.4.7-1 Amendment No. -+eg,+37 225
RCS Leakage Detection Instrumentation 3.4.7 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME
-------------NOTE-------------- C.1 Analyze grab samples of Once per 12 hours Only applicable when the the drywell atmosphere.
drywell atmospheric gaseous monitoring system AND is the only OPERABLE monitor. C.2 Monitor RCS LEAKAGE by Once per 12 hours
............... __... __... _------- ... _---- ... --------_....... administrative means .
C. Drywell floor drain sump AND flow monitoring system inoperable. C.3 Restore drywell floor drain 7 days sump flow monitoring system to OPERABLE status. D. Required Action and 0.1 Be in MODE 3. 12 hours associated Completion Time of Condition A, B, AND or C not met. 0.2 Be in MODE 4. 36 hours E. All required leakage E.1 Enter LCO 3.0.3. Immediately detection systems inoperable. Columbia Generating Station 3.4.7-2 Amendment No . ..:t87,~ 225
RCS Leakage Detection Instrumentation 3.4.7 SURVEILLANCE REQUIREMENTS
NOTE------------------------------------------------------------
When a channel is placed in an inoperable status solely for performance of required Surveillances, entry into associated Conditions and Required Actions may be delayed for up to 6 hours provided the other required leakage detection instrumentation is OPERABLE. SURVEILLANCE FREQUENCY SR 3.4.7.1 Perform CHANNEL CHECK of required drywell In accordance atmospheric monitoring system. with the Surveillance Frequency Control Program SR 3.4.7.2 Perform CHANNEL FUNCTIONAL TEST of required In accordance leakage detection instrumentation. with the Surveillance Frequency Control Program SR 3.4.7.3 Perform CHANNEL CALIBRATION of required In accordance leakage detection instrumentation. with the Surveillance Frequency Control Program Columbia Generating Station 3.4.7-3 Amendment No . .:t-49,+w 2ae 238
RCS Specific Activity 3.4.8 3.4 REACTOR COOLANT SYSTEM (RCS) 3.4.8 RCS Specific Activity LCO 3.4.8 The specific activity of the reactor coolant shall be limited to DOSE EQUIVALENT 1-131 specific activity S 0.2 ~Ci/gm. APPLICABILITY: MODE 1, MODES 2 and 3 with any main steam line not isolated. ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. Reactor coolant specific --------------------NOT E------------------ activity> 0.2 ~Ci/gm and LCO 3.0.4.c is applicable.
- -:; 4.0 J.lCi/gm DOSE -----------------------------------------------
EQUIVALENT 1-131. A.1 Determine DOSE Once per 4 hours EQUIVALENT 1-131. AND A.2 Restore DOSE 48 hours EQUIVALENT 1-131 to within limits. B. Required Action and B.1 Determine DOSE Once per 4 hours associated Completion EQUIVALENT 1-131. Time of Condition A not met. AND OR B.2.1 Isolate all main steam lines. 12 hours Reactor coolant specific OR activity> 4.0 J.lCi/gm DOSE B.2.2.1 Be in MODE 3. 12 hours EQUIVALENT 1-131. AND B.2.2.2 Be in MODE 4. 36 hours Columbia Generating Station 3.4.8-1 Amendment No. 4W,.:l37 225
RCS Specific Activity 3.4.8 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.4.8.1 ----- ---- -------- --------------NOTE--------------------------- --- Only required to be performed in MODE 1. Verify reactor coolant DOSE EQUIVALENT 1-131 In accordance specific activity is ~ 0.2 µCi/gm. with the Surveillance Frequency Control Program Columbia Generating Station 3.4.8-2 Amendment No. +49,-+W 2.aa 238
RHR Shutdown Cooling System - Hot Shutdown 3.4.9 3.4 REACTOR COOLANT SYSTEM (RCS) 3.4.9 Residual Heat Removal (RHR) Shutdown Cooling System - Hot Shutdown LCO 3.4.9 Two RHR shutdown cooling subsystems shall be OPERABLE, and, with no recirculation pump in operation, at least one RHR shutdown cooling subsystem shall be in operation.
--------------------------------------------NOT ES------------------------------------------
- 1. Both RHR shutdown cooling subsystems and recirculation pumps may be removed from operation for up to 2 hours per 8 hour period.
- 2. One RHR shutdown cooling subsystem may be inoperable for up to 2 hours for performance of Surveillances.
APPLICABILITY: MODE 3 with reactor steam dome pressure less than 48 psig. ACTIONS
NOT E----------------------------------------------------------
Separate Condition entry is allowed for each RHR shutdown cooling subsystem. CONDITION REQUIRED ACTION COMPLETION TIME A. One or two RHR A.1 Initiate action to restore Immediately shutdown cooling RHR shutdown cooling subsystems inoperable. subsystem to OPERABLE status. AND A.2 Verify an alternate method 1 hour of decay heat removal is available for each inoperable RHR shutdown cooling subsystem. AND A.3 Be in MODE 4. 24 hours Columbia Generating Station 3.4.9-1 Amendment No. 4$,4-8+ 225
RHR Shutdown Cooling System - Hot Shutdown 3.4.9 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME
- 8. No RHR shutdown 8.1 Initiate action to restore one Immediately cooling subsystem in RHR shutdown cooling operation. subsystem or one recirculation pump to AND operation.
No recirculation pump in AND operation. 8.2 Verify reactor coolant 1 hour from discovery circulation by an alternate of no reactor coolant method. circulation AND Once per 12 hours thereafter AND 8.3 Monitor reactor coolant Once per hour temperature and pressure. SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.4.9.1 -------------------------------NO TE------------------------------ Not required to be met until 2 hours after reactor steam dome pressure is less than 48 psig. Verify one RHR shutdown cooling subsystem or In accordance recirculation pump is operating. with the Surveillance Frequency Control Program Columbia Generating Station 3.4.9-2 Amendment No. 484,499 ~ ~ 246
RHR Shutdown Cooling System - Hot Shutdown 3.4.9 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.4.9.2 -------------------------------NOTE------------------------------ Not required to be performed until 12 hours after reactor steam dome pressure is < 48 psig. Verify RHR shutdown cooling subsystem locations In accordance susceptible to gas accumulation are sufficiently filled with the with water. Surveillance Frequency Control Program Columbia Generating Station 3.4.9-3 Amendment No. 246
RHR Shutdown Cooling System - Cold Shutdown 3.4.10 3.4 REACTOR COOLANT SYSTEM (RCS) 3.4.10 Residual Heat Removal (RHR) Shutdown Cooling System - Cold Shutdown LCO 3.4.10 Two RHR shutdown cooling subsystems shall be OPERABLE, and, with no recirculation pump in operation, at least one RHR shutdown cooling subsystem shall be in operation.
--------------------------------------------NOTES------------------------------------------
- 1. Both RHR shutdown cooling subsystems and recirculation pumps may be removed from operation for up to 2 hours per 8 hour period.
- 2. One RHR shutdown cooling subsystem may be inoperable for up to 2 hours for the performance of Surveillances.
APPLICABILITY: MODE 4. ACTIONS
NOTE---------------------------------------------------------
Separate Condition entry is allowed for each RHR shutdown cooling subsystem. CONDITION REQUIRED ACTION COMPLETION TIME A. One or two RH R A.1 Verify an alternate method 1 hour shutdown cooling of decay heat removal is subsystems inoperable. available for each inoperable RHR shutdown cooling subsystem. Once per 24 hours thereafter Columbia Generating Station 3.4.10-1 Amendment No. 44Q,~ 225
RHR Shutdown Cooling System - Cold Shutdown 3.4.10 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME
- 8. No RHR shutdown 8.1 Verify reactor coolant 1 hour from discovery cooling subsystem in circulating by an alternate of no reactor coolant operation. method. circulation AND AND No recirculation pump in Once per 12 hours operation. thereafter AND 8.2 Monitor reactor coolant Once per hour temperature and pressure.
SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.4.10.1 Verify one RHR shutdown cooling subsystem or In accordance recirculation pump is operating. with the Surveillance Frequency Control Program SR 3.4.10.2 Verify RHR shutdown cooling subsystem locations In accordance susceptible to gas accumulation are sufficiently filled with the with water. Surveillance Frequency Control Program Columbia Generating Station 3.4.10-2 Amendment No. 449,489 ~ ~ 246
RCS PIT Limits 3.4.11 3.4 REACTOR COOLANT SYSTEM (RCS) 3.4.11 RCS Pressure and Temperature (PIT) Limits LCO 3.4.11 RCS pressure, RCS temperature, RCS heatup and cooldown rates, and the recirculation loop temperature requirements shall be maintained within limits. APPLICABI LlTY: At all times. ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. -----------NOTE---------- A.1 Restore parameter( s) to 30 minutes Required Action A.2 within limits. shall be completed if this Condition is entered . AND A.2 Determine RCS is 72 hours Requirements of the acceptable for continued LCO not met in operation. MODE 1, 2, or 3. B. Required Action and B.1 Be in MODE 3. 12 hours associated Completion Time of Condition A not AND met. B.2 Be in MODE4. 36 hours C. ------------NOTE----------- C.1 Initiate action to restore Immediately Required Action C.2 parameter(s) to within shall be completed if this limits. Condition is entered.
-------------------------------- AND Requirements of the C.2 Determine RCS is Prior to entering LCO not met in other acceptable for operation. MODE 2 or 3 than MODES 1, 2, and 3.
Columbia Generating Station 3.4.11-1 Amendment No. .::t49,-W9 225
RCS PIT Limits 3.4.11 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.4.11.1 -------------------------------NOTE------------------------------ Only required to be performed during RCS heatup and cooldown operations, and RCS inservice leak and hydrostatic testing. Verify: In accordance with the
- a. RCS pressure and RCS temperature are within Surveillance the applicable limits specified in Frequency Figures 3.4.11-1, 3.4.11-2, and 3.4.11-3; Control Program
- b. RCS heatup and cooldown rates are ~ 100 "F in any 1 hour period; and
- c. RCS temperature change during inservice leak and hydrostatic testing is ~ 20 "F in any 1 hour period when the RCS pressure and RCS temperature are not within the limits of Figure 3.4.11-2.
SR 3.4.11.2 Verify RCS pressure and RCS temperature are Once within within the criticality limits specified in 15 minutes prior Figure 3.4.11-3. to control rod withdrawal for the purpose of achieving criticality SR 3.4.11.3 ----- ---------------- --- ---- ---N 0 TE------------------------------ Only required to be met in MODES 1, 2, 3, and 4 during recirculation pump startup. Verify the difference between the bottom head Once within coolant temperature and the reactor pressure vessel 15 minutes prior (RPV) coolant temperature is~ 145"F. to each startup of a recirculation pump Columbia Generating Station 3.4.11-2 Amendment No. +49,-+W ~ 238
RCS PIT Limits 3.4.11 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.4.11.4 -------------------------------N0 TE-----------.----------------- Only required to be met in MODES 1, 2, 3, and 4 during recirculation pump startup. Verify the difference between the reactor coolant Once within temperature in the recirculation loop to be started 15 minutes prior and the RPV coolant temperature is s 50°F. to each startup of a recirculation pump SR 3.4.11.5 ------------------------------NOTE---------------------------- Only required to be met in a single loop operation with THERMAL POWER ~ 25% RTP or the operating recirculation loop flow s 10% rated loop flow. Verify the difference between the bottom head Once within coolant temperature and the RPV coolant 15 minutes prior temperature is ~ 145°F. to an increase in THERMAL POWER or an increase in loop flow SR 3.4.11.6 -------------------------------NOTE ----------------------------- Only required to be met in single loop operation when the idle recirculation loop is not isolated from the RPV, and with THERMAL POWER ~ 25% RTP or the operating recirculation loop flow ~ 10% rated loop flow. Verify the difference between the reactor coolant Once within temperature in the recirculation loop not in operation 15 minutes prior and the RPV coolant temperature is s 50°F. to an increase in THERMAL POWERoran increase in loop flow Columbia Generating Station 3.4.11-3 Amendment No. 449,~ 225
RCS PIT Limits 3.4.11 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.4.11.7 -------------------------------NOTE------------------------------ Only required to be performed when tensioning the reactor vessel head bolting studs. Verify reactor vessel flange and head flange In accordance temperatures are ~ 80 °F. with the Surveillance Frequency Control Program SR 3.4.11.8 -------------------------------NOTE------------------------------ Not required to be performed until 30 minutes after RCS temperatures 90°F in MODE 4. Verify reactor vessel flange and head flange In accordance temperatures are ~ 80 °F. with the Surveillance Frequency Control Program SR 3.4.11.9 -------------------------------NO TE--------------------------- --- Not required to be performed until 12 hours after RCS temperature s 100°F in MODE 4. Verify reactor vessel flange and head flange In accordance temperatures are~ 80°F. with the Surveillance Frequency Control Program Columbia Generating Station 3.4.11-4 Amendment No. +49,+e-9 22-9 238
RCS PIT Limits 3.4.11 1400 INITIAL RTndt VALUES ARE 28°F FOR BEL TUNE. 1300 34°F FOR UPPER VESSEL. AND 34°F FOR BOTTOM HEAD 1200 BELTLINE CURVES 1100 L. ADJUSTED AS SHOWN: Ii i I EFPV SHIFT (OF)
'iii i I 33.1 35
- 1000 / !
w I:' i HEATUP/COOLDOWN
- z: ;i ,. : j g 900
- ,f . RATE OF COOLANT
~ 20"F/HR ..J ~ lSOOPSIGI { .
(./) 800 ee"F
~ ~ 700 ~
w a:: 600 ACCEPTABLE AREA OF
.... OPERA TION TO THE i RIGHT OF THIS CURVE
- i SOD BOTTOM w HEAO a::
;:)
ee'F fJ) 0 400 w a: Q. 300 .,
. -UPPER VESSEL I 200 *~ ...--v FLANGE REGION 8O"F '-r----'
- AND BELTUNE i LIMITS
*** ". -BOTTOM HEAD 100 CURVE 1t 0
0 25 50
- 75 100 125 150 175 200 MINIMUM REACTOR VESSEL METAL TEMPERATURE C-F)
Figure 3.4.11-1 (page 1 of 1) Inservice Leak and Hydrostatic Testing Curve Columbia Generating Station 3.4.11-5 Amendment No. 9Q,-1-Q3 225
RCS prr Limits 3.4.11 1400 INITIAL RTndt VALUES ARE 2soF FOR BELTLiNE. 34"F FOR UPPER VESSEL, 1300 AND 34"F FOR BOTTOM HEAD 1200 BEL TLINE CURVES ADJUSTED AS SHOWN: 1100 EFPY SHIFT (OF) 33.1 35 HEATUP/COOLDOWN
+----I-t-----+----- ---1-----+---1 RATE OF COOLANT
- ! 100"FIHR
, 790PSIG - - - , - i---r---t--i-- --- - r-- - 1400F - -+---,----1 I :
700 +----tl---,----+: -+-------+--+-. ---L--------r--+---- I 600 6OO;.~IG----~/-+______+ ______+I__-I-~I___ ACCEPTABLE AREA OF OPERATION TO THE I RIGHT OF THIS CURVE 1------- ----+, r-400 300
-_-_~_~~':,~i~~~L !
200
-__ - LIMITS I. ***** - BOTTOM HEAD 100
[_ CURVE
--~-~ ~
o o 25 50 75 100 125 150 175 200 225 250 MINIMUM REACTOR VESSEL METAL TEMPERATURE (OF) Figure 3.4.11-2 (page 1 of 1) Non-Nuclear Heating and Cool down Curve Columbia Generating Station 3.4.11-6 Amendment No . .:l$* .m 225
RCS PIT Limits 3.4.11 1400 INITIAL RTndt VALUES ARE 1300 2soF FOR BEL TLINE. 34°F FOR UPPER VESSEL. 1200 AND 34°F FOR BOTTOM HEAD Ii
~
1100 1000 BELTLINE CURVE ADJUSTED AS SHOWN: w EFPY SHIFT (OF)
- z:
g 900 33.1 35
...J W
CI') Soo CI') HEATUP/COOLDOWN
~ RATE OF COOLANT 0:: ~ 100°F/HR 0 700 I ~
W a:: 600
~
- II!
- i 500 w ACCEPTABLE AREA OF a::
- )
- II!
OPERATION TO THE CI') 400 RIGHT OF THIS CURVE CI') w I a:: t:L 312PSIGI ! I 300 . i ..-1-___ii--"'~~~-.-~ . 200 L~c_Oy 'JL, 11---4i--,j--~-~ Temperature 80°F 1/ -BELTLINE AND NON* BEL TUNE 100 LIMITS 0 o 25 50 75 100 125 150 175 200 225 250 275 300 MINIMUM REACTOR VESSEL METAL TEMPERATURE (OF) Figure 3.4.11-3 (page 1 of 1) Nuclear Heating and Cooldown Curve Columbia Generating Station 3.4.11-7 Amendment No. 4e9,4-Q3 225
Reactor Steam Dome Pressure 3.4.12 3.4 REACTOR COOLANT SYSTEM (RCS) 3.4.12 Reactor Steam Dome Pressure LCO 3.4.12 The reactor steam dome pressure shall be~ 1035 psig. APPLICABILITY: MODES 1 and 2. ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. Reactor steam dome A.1 Restore reactor steam 15 minutes pressure not within limit. dome pressure to within limit. B. Required Action and B.1 Be in MODE 3. 12 hours associated Completion Time not met. SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.4.12.1 Verify reactor steam dome pressure is~ 1035 psig. In accordance with the Surveillance Frequency Control Program Columbia Generating Station 3.4.12-1 Amendment No. -+49,+e9 ~ 238
ECCS - Operating 3.5.1 3.5 EMERGENCY CORE COOLING SYSTEMS (ECCS) AND REACTOR CORE ISOLATION COOLING (RCIC) SYSTEM 3.5.1 ECCS - Operating LCO 3.5.1 Each ECCS injection/spray subsystem and the Automatic Depressurization System (ADS) function of six safety/relief valves shall be OPERABLE. APPLICABILITY: MODE 1, MODES 2 and 3, except ADS valves are not required to be OPERABLE with reactor steam dome pressure ~ 150 psig. ACTIONS
N 0 TE-----------------------------------------------------------
LCO 3.0.4.b is not applicable to HPCS. CONDITION REQUIRED ACTION COMPLETION TIME A. One low pressure ECCS A.1 Restore low pressure 7 days< 1> injection/spray ECCS injection/spray subsystem inoperable. subsystem to OPERABLE status. B High Pressure Core B.1 Verify by administrative Immediately Spray (HPCS) System means RCIC System is inoperable. OPERABLE when RCIC System is required to be OPERABLE. AND B.2 Restore HPCS System to 14 days OPERABLE status. <1> The Completion Time that one train of RHR (RHR-A) can be inoperable as specified by Required Action A.1 may be extended beyond the 7 day completion time up to 7 days to support restoration of RHR-A following pump and motor replacement. This footnote will expire at 23:59 PST February 28, 2019. Columbia Generating Station 3.5.1-1 Amendment No. +37 ~ 2JG 245
ECCS - Operating 3.5.1 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME C. Two ECCS injection C.1 Restore ECCS 72 hours subsystems inoperable. injection/spray subsystem to OPERABLE status. OR One ECCS injection and one ECCS spray subsystem inoperable. D. Required Action and D.1 --------------N 0 TE-------------- associated Completion LCO 3.0.4.a is not Time of Condition A, B, applicable when entering or C not met. MODE 3. Be in MODE 3. 12 hours E. One required ADS valve E.1 Restore ADS valve to 14 days inoperable. OPERABLE status. F. One required ADS valve F.1 Restore ADS valve to 72 hours inoperable. OPERABLE status. AND OR One low pressure ECCS F.2 Restore low pressure 72 hours injection/spray ECCS injection/spray subsystem inoperable. subsystem to OPERABLE status. Columbia Generating Station 3.5.1-2 Amendment No. -149,-+69,~. 236
ECCS - Operating 3.5.1 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME G. Required Action and G.1 -------------- N0 TE-------------- associated Completion LCO 3.0.4.a is not Time of Condition E or F applicable when entering not met. MODE 3. OR Be in MODE 3. 12 hours Two or more required ADS valves inoperable. H. HPCS and Low H.1 Enter LCO 3.0.3. Immediately Pressure Core Spray (LPCS) Systems inoperable. OR Three or more ECCS injection/spray subsystems inoperable. OR HPCS System and one or more required ADS valves inoperable. OR Two or more ECCS injection/spray subsystems and one or more required ADS valves inoperable. Columbia Generating Station 3.5.1-3 Amendment No. 449,4B9,~, 236
ECCS - Operating 3.5.1 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.5.1.1 Verify, for each ECCS injection/spray subsystem, In accordance locations susceptible to gas accumulation are with the sufficiently filled with water. Surveillance Frequency Control Program SR 3.5.1.2 ------------------------------NO TE--------------------------- N ot required to be met for system vent flow paths opened under administrative controls. Verify each ECCS injection/spray subsystem In accordance manual, power operated, and automatic valve in the with the flow path, that is not locked, sealed, or otherwise Surveillance secured in position, is in the correct position. Frequency Control Program SR 3.5.1.3 Verify ADS accumulator backup compressed gas In accordance system average pressure in the required bottles is with the 2': 2200 psig. Surveillance Frequency Control Program SR 3.5.1.4 Verify each ECCS pump develops the specified flow In accordance rate with the specified differential pressure between with the reactor and suction source. INSERVICE TESTING DIFFERENTIAL PROGRAM PRESSURE BETWEEN REACTOR AND SYSTEM FLOW RATE SUCTION SOURCE LPCS ::::: 6200 gpm ::::: 128 psid LPCI 2>: 7200 gpm 2>: 26 psid HPCS 2>: 6350 gpm ::::: 200 psid Columbia Generating Station 3.5.1-4 Amendment No. 169,205,225,229,236 :233 243
-24e 249
ECCS - Operating 3.5.1 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.5.1.5 -------------------------------NOTE------------------------------ Vessel injection/spray may be excluded. Verify each ECCS injection/spray subsystem In accordance actuates on an actual or simulated automatic with the initiation signal. Surveillance Frequency Control Program SR 3.5.1.6 -------------------------------NOTE------------------------------ Va Ive actuation may be excluded. Verify the ADS actuates on an actual or simulated In accordance automatic initiation signal. with the Surveillance Frequency Control Program SR 3.5.1.7 -------------------------------NOTE------------------------------ Not required to be performed until 12 hours after reactor steam pressure and flow are adequate to perform the test. Verify each required ADS valve opens when In accordance manually actuated. with the Surveillance Frequency Control Program SR 3.5.1.8 -------------------------------NOTE------------------------------ EC CS actuation instrumentation is excluded. Verify the ECCS RESPONSE TIME for each ECCS In accordance injection/spray subsystem is within limits. with the Surveillance Frequency Control Program Columbia Generating Station 3.5.1-5 Amendment No. 169,205,225,236 ' 246 249
ECCS - Shutdown 3.5.2 3.5 EMERGENCY CORE COOLING SYSTEMS (ECCS) AND REACTOR CORE ISOLATION COOLING (RCIC) SYSTEM 3.5.2 ECCS - Shutdown LCO 3.5.2 Two ECCS injection/spray subsystems shall be OPERABLE. APPLICABILITY: MODE 4, MODE 5 except with the spent fuel storage pool gates removed and water level ~ 22 ft over the top of the reactor pressure vessel flange. ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One required ECCS A.1 Restore required ECCS 4 hours injection/spray injection/spray subsystem subsystem inoperable. to OPERABLE status. B. Required Action and B.1 Initiate action to suspend Immediately associated Completion operations with a potential Time of Condition A not for draining the reactor met. vessel (OPDRVs). C. Two required ECCS C.1 Initiate action to suspend Immediately injection/spray OPDRVs. subsystems inoperable. AND C.2 Restore one ECCS 4 hours injection/spray subsystem to OPERABLE status. Columbia Generating Station 3.5.2-1 Amendment No. -taG,4W 225
ECCS - Shutdown 3.5.2 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME D. Required Action C.2 and D.1 Initiate action to restore Immediately associated Completion secondary containment to Time not met. OPERABLE status. D.2 Initiate action to restore one Immediately standby gas treatment subsystem to OPERABLE status. AND D.3 Initiate action to restore Immediately isolation capability in each required secondary containment penetration flow path not isolated. SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.5.2.1 Verify, for each required low pressure ECCS In accordance injection/spray subsystem, the suppression pool with the water level is~ 18 ft 6 inches. Surveillance Frequency Control Program SR 3.5.2.2 Verify, for the required High Pressure Core Spray In accordance (HPCS) System, the: with the Surveillance
- a. Suppression pool water level is;?: 18 ft 6 inches; Frequency or Control Program
- b. Condensate storage tank (CST) water level is
;?: 16.5 ft in a single CST or;?: 10.5 ft in each CST.
Columbia Generating Station 3.5.2-2 Amendment No. -WQ.,a+-0 22a 238
ECCS - Shutdown 3.5.2 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.5.2.3 Verify, for each required ECCS injection/spray In accordance subsystem, locations susceptible to gas with the accumulation are sufficiently filled with water. Surveillance Frequency Control Program SR 3.5.2.4 ------------------------------NOTES-----------------------------
- 1. One low pressure coolant injection (LPCI) subsystem may be considered OPERABLE during alignment and operation for decay heat removal, if capable of being manually realigned and not otherwise inoperable.
- 2. Not required to be met for system vent flow paths opened under administrative controls.
Verify each required ECCS injection/spray In accordance subsystem manual, power operated, and automatic with the valve in the flow path, that is not locked, sealed, or Surveillance otherwise secured in position, is in the correct Frequency position. Control Program SR 3.5.2.5 Verify each required ECCS pump develops the In accordance specified flow rate with the specified differential with the pressure between reactor and suction source. INSERVICE TESTING DIFFERENTIAL PROGRAM PRESSURE BETWEEN REACTOR AND SYSTEM FLOW RATE SUCTION SOURCE LPCS 2 6200 gpm 2 128 psid LPCI 2 7200 gpm 2 26 psid HPCS 2 6350 gpm 2 200 psid Columbia Generating Station 3.5.2-3 Amendment No. 499,~ ~ ~ ~.~ 246
ECCS - Shutdown 3.5.2 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.5.2.6 -------------------------------NOTE--------------------------- --- Vesse I injection/spray may be excluded. Verify each required ECCS injection/spray In accordance subsystem actuates on an actual or simulated with the automatic initiation signal. Surveillance Frequency Control Program Columbia Generating Station 3.5.2-4 Amendment No. 238
RCIC System 3.5.3 3.5 EMERGENCY CORE COOLING SYSTEMS (ECCS) AND REACTOR CORE ISOLATION COOLING (RCIC) SYSTEM 3.5.3 RCIC System LCO 3.5.3 The RCIC System shall be OPERABLE. APPLICABILITY: MODE 1, MODES 2 and 3 with reactor steam dome pressure> 150 psig. ACTIONS
NOTE----------------------------------------------------------
LCO 3.0.4.b is not applicable to RCIC. CONDITION REQUIRED ACTION COMPLETION TIME A. RCIC System A.1 Verify by administrative Immediately inoperable. means High Pressure Core Spray System is OPERABLE. AND A.2 Restore RCIC System to 14 days OPERABLE status. B. Required Action and B.1 Be in MODE 3. 12 hours associated Completion Time not met. AND B.2 Reduce reactor steam 36 hours dome pressure to
- 150 psig.
Columbia Generating Station 3.5.3-1 Amendment No . .:te9,+87 225
RCIC System 3.5.3 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.5.3.1 Verify the RCIC System locations susceptible to gas In accordance accumulation are sufficiently filled with water. with the Surveillance Frequency Control Program SR 3.5.3.2 -------------------------------NOTE------------------------------ Not required to be met for system vent flow paths opened under administrative control. Verify each RCIC System manual, power operated, In accordance and automatic valve in the flow path, that is not with the locked, sealed, or otherwise secured in position, is Surveillance in the correct position. Frequency Control Program SR 3.5.3.3 -------------------------------NOTE------------------------------ Not required to be performed until 12 hours after reactor steam pressure and flow are adequate to perform the test. Verify, with reactor pressure ~ 1035 psig and In accordance z 935 psig, the RCIC pump can develop a flow rate with the 2 600 gpm against a system head corresponding to Surveillance reactor pressure. Frequency Control Program SR 3.5.3.4 -------------------------------NOTE------------------------------ Not required to be performed until 12 hours after reactor steam pressure and flow are adequate to perform the test. Verify, with reactor pressure~ 165 psig, the RCIC In accordance pump can develop a flow rate z 600 gpm against a with the system head corresponding to reactor pressure. Surveillance Frequency Control Program Columbia Generating Station 3.5.3-2 Amendment No. 4-W,489 ~ ~ 246
RCIC System 3.5.3 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.5.3.5 --------- ---- ---- ------- ---- ---N 0 TE------------------------------ Vesse I injection may be excluded. Verify the RCIC System actuates on an actual or In accordance simulated automatic initiation signal. with the Surveillance Frequency Control Program Columbia Generating Station 3.5.3-3 Amendment No. 238
Primary Containment 3.6.1.1 3.6 CONTAINMENT SYSTEMS 3.6.1.1 Primary Containment LCO 3.6.1.1 Primary containment shall be OPERABLE. APPLICABILITY: MODES 1, 2, and 3. ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. Primary containment A.1 Restore primary 1 hour inoperable. containment to OPERABLE status. B. Required Action and B.1 Be in MODE 3. 12 hours associated Completion Time not met. AND B.2 Be in MODE 4. 36 hours SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.6.1.1.1 Perform required visual examinations and leakage In accordance rate testing except for primary containment air lock with the Primary testing, in accordance with the Primary Containment Containment Leakage Rate Testing Program. Leakage Rate Testing Program Columbia Generating Station 3.6.1.1-1 Amendment No . .:t49,:ffi9 225
Primary Containment 3.6.1.1 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.6.1.1.2 Verify drywell to suppression chamber bypass In accordance leakage is s; 1 0% of the acceptable A I JK design with the value of 0.050 ft 2 at an initial differential pressure of Surveillance
- ?: 1.5 psid. Frequency Control Program 48 months following a test with bypass leakage greater than the bypass leakage limit 24 months following two consecutive tests with bypass leakage greater than the bypass leakage limit until two consecutive tests are less than or equal to the bypass leakage limit SR 3.6.1.1.3 --------- ---- ---- ------- ---- ---N 0 TE--------------------------- ---
Performance of SR 3.6.1.1.2 satisfies this surveillance. Verify individual drywell to suppression chamber In accordance vacuum relief valve bypass pathway leakage is with the s; 1 .2% of the acceptable A I JK design value of Surveillance 2 0.050 ft at an initial differential pressure of Frequency
~ 1.5 psid. Control Program Columbia Generating Station 3.6.1.1-2 Amendment No. +w-,~ ~ 238
Primary Containment 3.6.1.1 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.6.1.1.4 -------------------------------NOTE------------------------------ Performance of SR 3.6.1.1.2 satisfies this surveillance. Verify total drywell to suppression chamber vacuum In accordance relief valve bypass leakage is s. 3.0% of the with the acceptable A I ,JK design value of 0.050 ft2 at an Surveillance initial differential pressure of ~ 1.5 psid. Frequency Control Program Columbia Generating Station 3.6.1.1-3 Amendment No. 2Q.:I.- 229 238
Primary Containment Air Lock 3.6.1.2 3.6 CONTAINMENT SYSTEMS 3.6.1.2 Primary Containment Air Lock LCO 3.6.1.2 The primary containment air lock shall be OPERABLE. APPLICABILITY: MODES 1, 2, and 3. ACTIONS
NOTES---------------------------------------------------------
- 1. Entry and exit is permissible to perform repairs of the air lock components.
- 2. Enter applicable Conditions and Required Actions of LCO 3.6.1.1, "Primary Containment:'
.when air lock leakage results in exceeding overall containment leakage rate acceptance criteria.
CONDITION REQUIRED ACTION COMPLETION TIME A. One pri mary -------------------NOTES----------------- containment air lock 1. Required Actions A.1 A.2, t door inoperable. and A.3 are not applicable if both doors in the air lock are inoperable and Condition C is entered.
- 2. Entry and exit is permissible for 7 days under administrative controls.
A.1 Verify the OPERABLE door 1 hour is closed. AND A.2 Lock the OPERABLE door 24 hours closed. Columbia Generating Station 3.6.1.2-1 Amendment No. ~,~ 225
Primary Containment Air Lock 3.6.1.2 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. (continued) A.3 ---------------N OTE------------- Air lock doors in high radiation areas or areas with limited access due to inerting may be verified locked closed by administrative means. Verify the OPERABLE door Once per 31 days is locked closed. B. Primary containment air -------------------NOTES----------------- lock interlock 1. Required Actions B.1, B.2, mechanism inoperable. and B.3 are not applicable if both doors in the air lock are inoperable and Condition C is entered.
- 2. Entry into and exit from primary containment is permissible under the control of a dedicated individual.
B.1 Verify an OPERABLE door 1 hour is closed. AND B.2 Lock an OPERABLE door 24 hours closed. AND Columbia Generating Station 3.6.1.2-2 Amendment No. 449,499 225
Primary Containment Air Lock 3.6.1.2 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME B. (continued) B.3 ---------------NOTE ------------ Air lock doors in high radiation areas or areas with limited access due to inerting may be verified locked closed by administrative means. Verify an OPERABLE door Once per 31 days is locked closed. C. Primary containment air C.1 Initiate action to evaluate Immediately lock inoperable for primary containment overall reasons other than leakage rate per Condition A or B. LCO 3.6.1.1, using current air lock test results. AND C.2 Verify a door is closed. 1 hour AND C.3 Restore air lock to 24 hours OPERABLE status. D. Required Action and D.1 Be in MODE 3. 12 hours associated Completion Time not met. AND D.2 Be in MODE 4. 36 hours Columbia Generating Station 3.6.1.2-3 Amendment No . .:t4Q.,+99 225
Primary Containment Air Lock 3.6.1.2 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.6.1.2.1 ------------------------------NOTES-----------------------------
- 1. An inoperable air lock door does not invalidate the previous successful performance of the overall air lock leakage test.
- 2. Results shall be evaluated against acceptance criteria applicable to SR 3.6.1.1.1.
Perform required primary containment air lock In accordance leakage rate testing in accordance with the Primary with the Primary Containment Leakage Rate Testing Program. Containment Leakage Rate Testing Program SR 3.6.1 .2.2 Verify only one door in the primary containment air In accordance lock can be opened at a time. with the Surveillance Frequency Control Program Columbia Generating Station 3.6.1.2-4 Amendment No. +49-,+w 22-e 238
PCIVs 3.6.1.3 3.6 CONTAINMENT SYSTEMS 3.6.1.3 Primary Containment Isolation Valves (PCIVs) LCO 3.6.1.3 Each PCIV, except reactor building-to-suppression chamber vacuum breakers, shall be OPERABLE. APPLICABILITY: MODES 1, 2, and 3, When associated instrumentation is required to be OPERABLE per LCO 3.3.6.1, "Primary Containment Isolation Instrumentation." ACTIONS
NOT ES ---------------------------------------------------------
- 1. Penetration flow paths may be unisolated intermittently under administrative controls.
- 2. Separate Condition entry is allowed for each penetration flow path.
- 3. Enter applicable Conditions and Required Actions for systems made inoperable by PCIVs.
- 4. Enter applicable Conditions and Required Actions of LCO 3.6.1.1, "Primary Containment,"
when PCIV leakage results in exceeding overall containment leakage rate acceptance criteria. CONDITION REQUIRED ACTION COMPLETION TIME A -----------NOTE----------- A1 Isolate the affected 4 hours except for Only applicable to penetration flow path by main steam line penetration flow paths use of at least one closed with two PCIVs. and de-activated automatic AND
-------------------------------- valve, closed manual valve, blind flange, or check valve 8 hours for main One or more penetration with flow through the valve steam line flow paths with one secured.
PCIV inoperable for reasons other than AND Condition D. Columbia Generating Station 3.6.1.3-1 Amendment No. 4e9,200 225
PCIVs 3.6.1.3 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. (continued) A.2 --------------N OTE-------------
- 1. Isolation devices in high radiation areas may be verified by use of administrative means.
- 2. Isolation devices that are locked, sealed, or otherwise secured may be verified by use of administrative means.
Verify the affected Once per 31 days for penetration flow path is isolation devices isolated. outside primary containment Prior to entering MODE 2 or 3 from MODE 4 if primary containment was de inerted while in MODE 4, if not performed within the previous 92 days, for isolation devices inside primary containment Columbia Generating Station 3.6.1.3-2 Amendment No. 469,200 225
PCIVs 3.6.1.3 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME B. ------------NOTE ----------- B.1 Isolate the affected 1 hour Only applicable to penetration flow path by penetration flow paths use of at least one closed with two PCIVs. and de-activated automatic
------------------_...--...----_... _-- valve, closed manual valve, or blind flange.
One or more penetration flow paths with two PCIVs inoperable for reasons other than Condition D. C. ------------NOTE ----------- C.1 Isolate the affected 4 hours except for Only applicable to penetration flow path by excess flow check penetration flow paths use of at least one closed valves (EFCVs) with only one PCIV. and de-activated automatic
-------------------------------- valve, closed manual valve, AND or blind flange.
One or more penetration 72 hours for EFCVs flow paths with one PCIV inoperable for AND reasons other than Condition D. Columbia Generating Station 3.6.1.3-3 Amendment No . .:ffi9.,2Q8 225
PCIVs 3.6.1.3 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME C. (continued) C.2 --------------N 0 TE S------------
- 1. Isolation devices in high radiation areas may be verified by use of administrative means.
- 2. Isolation devices that are locked, sealed, or otherwise secured may be verified by use of administrative means.
Verify the affected penetration flow path is Once per 31 days for isolated. isolation devices outside primary containment Prior to entering MODE 2 or 3 from MODE 4 if primary containment was de inerted while in MODE 4, if not performed within the previous 92 days, for isolation devices inside primary containment Columbia Generating Station 3.6.1.3-4 Amendment No. 4e9,~ 225
PCIVs 3.6.1.3 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME D. One or more secondary D.1 Restore leakage rate to 4 hours for containment bypass within limit. hydrostatically tested leakage rate, MSIV line leakage not on a leakage rate, or closed system hydrostatically tested lines leakage rate not AND within limit. 4 hours for secondary containment bypass leakage AND 8 hours for MSIV leakage AND 72 hours for hydrostatically tested line leakage on a closed system E. Required Action and E.1 Be in MODE 3. 12 hours associated Completion Time of Condition A, B, AND C, or D not met in MODE 1, 2, or 3. E.2 Be in MODE 4. 36 hours F. Required Action and F.1 Initiate action to suspend Immediately associated Completion operations with a potential Time of Condition A, B. for draining the reactor C. or D not met for vessel (OPDRVs). PCIV(s) required to be OPERABLE during OR MODE4 or 5. F.2 Initiate action to restore Immediately valve(s) to OPERABLE status. Columbia Generating Station 3.6.1.3-5 Amendment No. 4S9,~ 225
PC IVs 3.6.1 .3 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.6.1.3.1 --------- ---- ---- ------- -------N 0 TE--------------------------- --- Not required to be met when the 24 inch and 30 inch primary containment purge valves are open for inerting, de-inerting, pressure control, ALARA or air quality considerations for personnel entry, or Surveillances that require the valves to be open. Verify each 24 inch and 30 inch primary In accordance containment purge valve is closed. with the Surveillance Frequency Control Program SR 3.6.1 .3.2 ------------------------ ------N 0 TES---------- -------------------
- 1. Valves and blind flanges in high radiation areas may be verified by use of administrative means.
- 2. Not required to be met for PCIVs that are open under administrative controls.
Verify each primary containment isolation manual In accordance valve and blind flange that is located outside primary with the containment and not locked, sealed, or otherwise Surveillance secured and is required to be closed during accident Frequency conditions is closed. Control Program Columbia Generating Station 3.6.1.3-6 Amendment No. +-69,~ 22e 238
PC IVs 3.6.1.3 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.6.1.3.3 ------------------------------N 0 TES-----------------------------
- 1. Valves and blind flanges in high radiation areas may be verified by use of administrative means.
- 2. Not required to be met for PCIVs that are open under administrative controls.
Verify each primary containment isolation manual Prior to entering valve and blind flange that is located inside primary MODE 2 or 3 from containment and not locked, sealed, or otherwise MODE 4 if secured and is required to be closed during accident primary conditions is closed. containment was de-inerted while in MODE 4, if not performed within the previous 92 days SR 3.6.1.3.4 Verify continuity of the traversing incore probe (TIP) In accordance shear isolation valve explosive charge. with the Surveillance Frequency Control Program SR 3.6.1.3.5 Verify the isolation time of each power operated, In accordance automatic PCIV, except for MSIVs, is within limits. with the INSERVICE TESTING PROGRAM SR 3.6.1.3.6 Verify the isolation time of each MSIV is In accordance
- 3 seconds and ~ 5 seconds. with the INSERVICE TESTING PROGRAM Columbia Generating Station 3.6.1.3-7 Amendment No. +w,~ ~ ~.243
PC IVs 3.6.1.3 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.6.1.3.7 Verify each automatic PCIV actuates to the isolation In accordance position on an actual or simulated isolation signal. with the Surveillance Frequency Control Program SR 3.6.1.3.8 Verify a representative sample of reactor instrument In accordance line EFCVs actuate to the isolation position on an with the actual or simulated instrument line break signal. Surveillance Frequency Control Program SR 3.6.1.3.9 Remove and test the explosive squib from each In accordance shear isolation valve of the TIP System. with the Surveillance Frequency Control Program SR 3.6.1.3.10 Verify the combined leakage rate for all secondary In accordance containment bypass leakage paths is::::; 0.04% with the Primary primary containment volume/day when pressurized Containment to 2 Pa. Leakage Rate Testing Program SR 3.6.1.3.11 Verify leakage rate through each MSIV is In accordance
- <:: 16.0 scfh when tested at 2 25.0 psig. with the Primary Containment Leakage Rate Testing Program SR 3.6.1.3.12 Verify combined leakage rate through hydrostatically In accordance tested lines that penetrate the primary containment with the Primary is within limits. Containment Leakage Rate Testing Program Columbia Generating Station 3.6.1.3-8 Amendment No. 4-99,2-W ~ ~. 243
Drywell Air Temperature 3.6.1.4 3.6 CONTAINMENT SYSTEMS 3.6.1.4 Drywell Air Temperature LCO 3.6.1.4 Drywell average air temperature shall be~ 135 "F. APPLICABILITY: MODES 1, 2, and 3. ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. Drywell average air A.1 Restore drywell average air 8 hours temperature not within temperature to within limit. limit. B. Required Action and B.1 Be in MODE 3. 12 hours associated Completion Time not met. AND B.2 Be in MODE 4. 36 hours SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.6.1 .4.1 Verify drywell average air temperature is within limit. In accordance with the Surveillance Frequency Control Program Columbia Generating Station 3.6.1.4-1 Amendment No. +49,.+w ~ 238
RHR Drywell Spray 3.6.1.5 3.6 CONTAINMENT SYSTEMS 3.6.1.5 Residual Heat Removal (RHR) Drywell Spray LCO 3.6.1.5 Two RHR drywell spray subsystems shall be OPERABLE. APPLICABILITY: MODES 1, 2, and 3. ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One RHR drywell spray A.1 Restore RHR drywell spray 7 days< 1> subsystem inoperable. subsystem to OPERABLE status. B. Two RHR drywell spray B.1 Restore one RHR drywell 8 hours subsystems inoperable. spray subsystem to OPERABLE status.
- c. Required Action and C.1 --------------N 0 TE--------------
associated Completion LCO 3.0.4.a is not Time not met. applicable when entering MODE 3. Be in MODE 3. 12 hours <1> The Completion Time that one train of RHR (RHR-A) can be inoperable as specified by Required Action A.1 may be extended beyond the 7 day completion time up to 7 days to support restoration of RHR-A following pump and motor replacement. This footnote will expire at 23:59 PST February 28, 2019. Columbia Generating Station 3.6.1.5-1 Amendment No. 449,+99,~.~.2-Je 245
RHR Drywell Spray 3.6.1.5 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.6.1.5.1 Verify each RHR drywell spray subsystem manual, In accordance power operated, and automatic valve in the flow with the path that is not locked, sealed, or otherwise secured Surveillance in position, is in the correct position or can be Frequency aligned to the correct position. Control Program SR 3.6.1.5.2 Verify each spray nozzle is unobstructed. In accordance with the Surveillance Frequency Control Program SR 3.6.1.5.3 Verify RHR drywell spray subsystem locations In accordance susceptible to gas accumulation are sufficiently filled with the with water. Surveillance Frequency Control Program Columbia Generating Station 3.6.1.5-2 Amendment No. 2-JO ~ 246
Reactor Building-to-Suppression Chamber Vacuum Breakers 3.6.1 .6 3.6 CONTAINMENT SYSTEMS 3.6.1.6 Reactor Building-to-Suppression Chamber Vacuum Breakers LCO 3.6.1.6 Each reactor building-to-suppression chamber vacuum breaker shall be OPERABLE. APPLICABILITY: MODES 1, 2, and 3. ACTIONS
N 0 TE-----------------------------------------------------------
Separa te Condition entry is allowed for each line. CONDITION REQUIRED ACTION COMPLETION TIME A. One or more lines with A.1 Close the open vacuum 72 hours one reactor building-to- breaker. suppression chamber vacuum breaker not closed. B. One or more lines with B.1 Close one open vacuum 1 hour two reactor building-to- breaker. suppression chamber vacuum breakers not closed. C. One line with one or C.1 Restore the vacuum 72 hours more reactor building-to- breaker(s) to OPERABLE suppression chamber status. vacuum breakers inoperable for opening. D. Required Action and D.1 -------------N 0 TE------------ associated Completion LCO 3.0.4.a is not Time of Condition C applicable when entering not met. MODE 3. Be in MODE 3. 12 hours. Columbia Generating Station 3.6.1.6-1 Amendment No. 449,4-69,~. 236
Reactor Building-to-Suppression Chamber Vacuum Breakers 3.6.1.6 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME E. Two or more lines with E.1 Restore all vacuum 1 hour one or more reactor breakers in two lines to building-to-suppression OPERABLE status. chamber vacuum breakers inoperable for opening. F. Required Action and F.1 Be in MODE 3. 12 hours associated Completion Time of Condition A, B AND or E not met. F.2 Be in MODE 4. 36 hours SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.6.1.6.1 ------------------------------NOTES-----------------------------
- 1. Not required to be met for vacuum breakers that are open during Surveillances.
- 2. Not required to be met for vacuum breakers open when performing their intended function.
Verify each vacuum breaker is closed. In accordance with the Surveillance Frequency Control Program SR 3.6.1.6.2 Perform a functional test of each vacuum breaker. In accordance with the INSERVICE TESTING PROGRAM Columbia Generating Station 3.6.1.6-2 Amendment No. 149,169,225,236 '* 243
Reactor Building-to-Suppression Chamber Vacuum Breakers 3.6.1 .6 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.6.1.6.3 Verify the full open setpoint of each vacuum breaker In accordance is s 0.5 psid. with the Surveillance Frequency Control Program Columbia Generating Station 3.6.1.6-3 Amendment No. 238
Suppression Chamber-to-Drywell Vacuum Breakers 3.6.1.7 3.6 CONTAINMENT SYSTEMS 3.6.1.7 Suppression Chamber-to-Drywell Vacuum Breakers LCO 3.6.1.7 Seven suppression chamber-to-drywell vacuum breakers shall be OPERABLE for opening. Nine suppression chamber-to-drywell vacuum breakers shall be closed, except when performing their intended function. APPLICABILITY: MODES 1, 2, and 3. ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One required A.1 Restore one vacuum 72 hours suppression chamber-to- breaker to OPERABLE drywell vacuum breaker status. inoperable for opening. B. Required Action and B.1 --------------N 0 TE-------------- associated Completion LCO 3.0.4.a is not Time of Condition A applicable when entering not met. MODE 3. Be in MODE 3. 12 hours C. ------------ N 0 TE------------ C.1 Close the open vacuum 72 hours Separate Condition entry breaker disk. is allowed for each suppression chamber-to-drywell vacuum breaker. One or more suppression chamber-to-drywell vacuum breakers with one disk not closed. Columbia Generating Station 3.6.1.7-1 Amendment No. 449,4-W.~. 236
Suppression Chamber-to-Drywell Vacuum Breakers 3.6.1.7 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME D. One or more D.1 Close one open vacuum 2 hours suppression chamber-to- breaker disk. drywell vacuum breakers with two disks not closed. E. Required Action and E.1 Be in MODE 3. 12 hours associated Completion Time of Condition C or D AND not met. E.2 Be in MODE 4. 36 hours SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.6.1.7.1 --------- ---- ---- ------- -------N 0 TE------------------------------ Not required to be met for vacuum breakers that are open during Surveillances. Verify each vacuum breaker is closed. In accordance with the Surveillance Frequency Control Program Columbia Generating Station 3.6.1.7-2 Amendment No. 169,202,225,236 238
Suppression Chamber-to-Drywell Vacuum Breakers 3.6.1.7 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.6.1.7.2 Perform a functional test of each required vacuum In accordance breaker. with the Surveillance Frequency Control Program Within 12 hours after any discharge of steam to the suppression chamber from the safety/relief valves SR 3.6.1.7.3 Verify the full open setpoint of each required In accordance vacuum breaker is ~ 0.5 psid. with the Surveillance Frequency Control Program Columbia Generating Station 3.6.1.7-3 Amendment No. 238
Suppression Pool Average Temperature 3.6.2.1 3.6 CONTAINMENT SYSTEMS 3.6.2.1 Suppression Pool Average Temperature LCO 3.6.2.1 Suppression pool average temperature shall be:
- a. ~ gO°F when THERMAL POWER is > 1% RTP and no testing that adds heat to the suppression pool is being performed;
- b. ~ 105°F when THERMAL POWER is > 1% RTP and testing that adds heat to the suppression pool is being performed; and
- c. ~ 110°F when THERMAL POWER is ~ 1% RTP.
APPLICABILITY: MODES 1, 2, and 3. ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. Suppression pool A.1 Verify suppression pool Once per hour average temperature average temperature
> gO°F but ~ 110°F. ~ 110°F.
AND AND THERMAL POWER A.2 Restore suppression pool 24 hours
> 1% RTP. average temperature to ~ gO°F.
AND Not performing testing that adds heat to the suppression pool. B. Required Action and B.1 Reduce THERMAL 12 hours associated Completion POWER to ~ 1% RTP. Time of Condition A not met. Columbia Generating Station 3.6.2.1-1 Amendment No. 449,+99 225
Suppression Pool Average Temperature 3.6.2.1 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME C. Suppression pool C.1 Suspend all testing that Immediately average temperature adds heat to the
> 105°F. suppression pool.
AND THERMAL POWER
> 1% RTP.
AND Performing testing that adds heat to the suppression pool. D. Suppression pool D.1 Place the reactor mode Immediately average temperature switch in the shutdown
> 110°F but s; 120°F. position.
I AND D.2 Verify suppression pool Once per 30 minutes average temperature S; 120°F. AND D.3 Be in MODE 4. 36 hours Suppression pool E.1 Depressurize the reactor 12 hours average temperature vessel to < 200 psig.
> 120°F.
AND E.2 Be in MODE 4. 36 hours Columbia Generating Station 3.6.2.1-2 Amendment No. 449,-1-99 225
Suppression Pool Average Temperature 3.6.2.1 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.6.2.1.1 Verify suppression pool average temperature is In accordance within the applicable limits. with the Surveillance Frequency Control Program 5 minutes when performing testing that adds heat to the suppression pool Columbia Generating Station 3.6.2.1-3 Amendment No. +49,+w ~ 238
Suppression Pool Water Level 3.6.2.2 3.6 CONTAINMENT SYSTEMS 3.6.2.2 Suppression Pool Water Level LCO 3.6.2.2 Suppression pool water level shall be ~ 30 ft 9. 75 inches and
- .: : 31 ft 1.75 inches.
APPLICABILITY: MODES 1 , 2, and 3. ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. Suppression pool water A.1 Restore suppression pool 2 hours level not within limits. water level to within limits. B. Required Action and B.1 Be in MODE 3. 12 hours associated Completion Time not met. AND B.2 Be in MODE 4. 36 hours SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.6.2.2.1 Verify suppression pool water level is within limits. In accordance with the Surveillance Frequency Control Program Columbia Generating Station 3.6.2.2-1 Amendment No. +49,+e.Q 2ae 238
RHR Suppression Pool Cooling 3.6.2.3 3.6 CONTAINMENT SYSTEMS 3.6.2.3 Residual Heat Removal (RHR) Suppression Pool Cooling LCO 3.6.2.3 Two RHR suppression pool cooling subsystems shall be OPERABLE. APPLICABILITY: MODES 1, 2, and 3. ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One RHR suppression A.1 Restore RHR suppression 7 days< 1> pool cooling subsystem pool cooling subsystem to inoperable. OPERABLE status. B. Required Action and B.1 ---------------N 0 TE-------------- associated Completion LCO 3.0.4.a is not Time of Condition A not applicable when entering met. MODE 3. Be in MODE 3. 12 hours C. Two RHR suppression C.1 Be in MODE 3. 12 hours pool cooling subsystems inoperable. AND C.2 Be in MODE 4. 36 hours <1> The Completion Time that one train of RHR (RHR-A) can be inoperable as specified by Required Action A.1 may be extended beyond the 7 day completion time up to 7 days to support restoration of RHR-A following pump and motor replacement. This footnote will expire at 23:59 PST February 28, 2019. Columbia Generating Station 3.6.2.3-1 Amendment No. +49,4-9-9,~.~.~ 245
RHR Suppression Pool Cooling 3.6.2.3 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.6.2.3.1 Verify each RHR suppression pool cooling In accordance subsystem manual, power operated, and automatic with the valve in the flow path that is not locked, sealed, or Surveillance otherwise secured in position, is in the correct Frequency position or can be aligned to the correct position. Control Program SR 3.6.2.3.2 Verify each RHR pump develops a flow rate In accordance
~ 7100 gpm through the associated heat exchanger with the while operating in the suppression pool cooling INSERVICE mode. TESTING PROGRAM SR 3.6.2.3.3 Verify RHR suppression pool cooling subsystem In accordance locations susceptible to gas accumulation are with the sufficiently filled with water. Surveillance Frequency Control Program Columbia Generating Station 3.6.2.3-2 Amendment No. 169 225 230 '* 243 246
Primary Containment Atmosphere Mixing System 3.6.3.2 3.6 CONTAINMENT SYSTEMS 3.6.3.2 Primary Containment Atmosphere Mixing System LCO 3.6.3.2 Two head area return fans shall be OPERABLE. APPLICABILITY: MODES 1 and 2. ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One head area return A.1 Restore head area return 30 days fan inoperable. fan to OPERABLE status. B. Two head area return B.1 Verify by administrative 1 hour fans inoperable. means that the hydrogen and oxygen control function is maintained. AND B.2 Restore one head area 7 days return fan to OPERABLE status. C. Required Action and C.1 Be in MODE 3. 12 hours associated Completion Time not met. Columbia Generating Station 3.6.3.2-1 Amendment No. -+W,+87 226 238
Primary Containment Atmosphere Mixing System 3.6.3.2 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.6.3.2.1 Operate each head area return fan for ~ 15 minutes. In accordance with the Surveillance Frequency Control Program Columbia Generating Station 3.6.3.2-2 Amendment No. 238
Primary Containment Oxygen Concentration 3.6.3.3 3.6 CONTAINMENT SYSTEMS 3.6.3.3 Primary Containment Oxygen Concentration LCO 3.6.3.3 The primary containment oxygen concentration shall be < 3.5 volume percent. APPLICABILITY: MODE 1 during the time period:
- a. From 24 hours after THERMAL POWER is > 15% RTP following startup, to
- b. 24 hours prior to reducing THERMAL POWER to< 15% RTP prior to the next scheduled reactor shutdown.
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. Primary containment A.1 Restore oxygen 24 hours oxygen concentration concentration to within limit. not within limit. B. Required Action and B.1 Reduce THERMAL 8 hours associated Completion POWER to::;; 15% RTP. Time not met. SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.6.3.3.1 Verify primary containment oxygen concentration is In accordance within limits. with the Surveillance Frequency Control Program Columbia Generating Station 3.6.3.3-1 Amendment No. -+49,+es 22§ 238
Secondary Containment 3.6.4.1 3.6 CONTAINMENT SYSTEMS 3.6.4.1 Secondary Containment LCO 3.6.4.1 The secondary containment shall be OPERABLE. APPLICABILITY: MODES 1, 2, and 3, During operations with a potential for draining the reactor vessel (OPDRVs). ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. Secondary containment A.1 Restore secondary 4 hours inoperable in MODE 1, containment to OPERABLE 2, or 3. status. B. Required Action and B.1 --------------N 0 TE-------------- associated Completion LCO 3.0.4.a is not Time of Condition A not applicable when entering met. MODE 3. Be in MODE 3. 12 hours C. Secondary containment C.1 Initiate action to suspend Immediately inoperable during OPDRVs. OPDRVs. Columbia Generating Station 3.6.4.1-1 Amendment No . .+e-9,+w.~. 236
Secondary Containment 3.6.4.1 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.6.4.1.1 Verify secondary containment vacuum is 2:: 0.25 inch In accordance of vacuum water gauge. with the Surveillance Frequency Control Program SR 3.6.4.1 .2 Verify all secondary containment equipment hatches In accordance are closed and sealed. with the Surveillance Frequency Control Program SR 3.6.4.1.3 Verify each secondary containment access inner In accordance door or each secondary containment access outer with the door in each access opening is closed. Surveillance Frequency Control Program SR 3.6.4.1 .4 Verify each standby gas treatment (SGT) subsystem In accordance will draw down the secondary containment to with the 2:: 0.25 inch of vacuum water gauge in Surveillance
~ 120 seconds. Frequency Control Program SR 3.6.4.1.5 Verify each SGT subsystem can maintain In accordance ~ 0.25 inch of vacuum water gauge in the secondary with the containment for 1 hour at a flow rate ~ 2240 cfm. Surveillance Frequency Control Program Columbia Generating Station 3.6.4.1-2 Amendment No. +w,-+99 22-6 238
SCIVs 3.6.4.2 3.6 CONTAINMENT SYSTEMS 3.6.4.2 Secondary Containment Isolation Valves (SCIVs) LCO 3.6.4.2 Each SCIV shall be OPERABLE. APPLICABILITY: MODES 1, 2, and 3, During operations with a potential for draining the reactor vessel (OPDRVs). ACTIONS
NOTES-----------------------------------------------------
- 1. Penetration flow paths may be un isolated intermittently under administrative controls.
- 2. Separate Condition entry is allowed for each penetration flow path.
- 3. Enter applicable Conditions and Required Actions for systems made inoperable by SCIVs.
CONDITION REQUIRED ACTION COMPLETION TIME A. One or more penetration A.1 Isolate the affected 8 hours flow paths with one penetration flow path by SCIV inoperable. use of at least one closed and de-activated automatic valve, closed manual valve, or blind flange. Columbia Generating Station 3.6.4.2-1 Amendment No. ~,4Q.9 225
SCIVs 3.6.4.2 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. (continued) A.2 -------------NOTES-------------
- 1. Isolation devices in high radiation areas may be verified by use of administrative means.
- 2. Isolation devices that are locked, sealed, or otherwise secured may be verified by use of administrative means.
Verify the affected Once per 31 days penetration flow path is isolated. B. -----------NOTE----------- B.1 Isolate the affected 4 hours Only applicable to penetration flow path by penetration flow paths use of at least one closed with two isolation valves. and de-activated automatic
------_... __ ...------------------- valve, closed manual valve, or blind flange.
One or more penetration flow paths with two SCIVs inoperable. C. Required Action and C.1 Be in MODE 3. 12 hours associated Completion Time of Condition A or B AND not met in MODE 1. 2, or 3. C.2 Be in MODE 4. 36 hours D. Required Action and 0.1 Initiate action to suspend Immediately associated Completion OPDRVs. Time of Condition A or B not met during OPDRVs. Columbia Generating Station 3.6.4.2-2 Amendment No. 4-99,~ 225
SCI Vs 3.6.4.2 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.6.4.2.1 ------------------------------N 0 TES-----------------------------
- 1. Valves and blind flanges in high radiation areas may be verified by use of administrative controls.
- 2. Not required to be met for SCIVs that are open under administrative controls.
Verify each secondary containment isolation manual In accordance valve and blind flange that is not locked, sealed, or with the otherwise secured, and is required to be closed Surveillance during accident conditions is closed. Frequency Control Program SR 3.6.4.2.2 Verify the isolation time of each power operated, In accordance automatic SCIV is within limits. with the INSERVICE TESTING PROGRAM SR 3.6.4.2.3 Verify each automatic SCIV actuates to the isolation In accordance position on an actual or simulated automatic with the isolation signal. Surveillance Frequency Control Program Columbia Generating Station 3.6.4.2-3 Amendment No. ;wg ~ ~.243
SGT System 3.6.4.3 3.6 CONTAINMENT SYSTEMS 3.6.4.3 Standby Gas Treatment (SGT) System LCO 3.6.4.3 Two SGT subsystems shall be OPERABLE. APPLICABILITY: MODES 1, 2, and 3, During operations with a potential for draining the reactor vessel (OPDRVs). ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A One SGT subsystem A.1 Restore SGT subsystem to 7 days inoperable. OPERABLE status. B. Required Action and B.1 --------------N 0 TE--------------- associated Completion LCO 3.0.4.a is not Time of Condition A not applicable when entering met in MODE 1, 2, or 3. MODE 3. Be in MODE 3. 12 hours
- c. Required Action and C.1 Place OPERABLE SGT Immediately associated Completion subsystem in operation.
Time of Condition A not met during OPDRVs. OR C.2 Initiate action to suspend Immediately OPDRVs. D. Two SGT subsystems D.1 -------------N 0 TE--------------- inoperable in MODE 1, LCO 3.0.4.a is not 2, or 3. applicable when entering MODE 3. Be in MODE 3. 12 hours Columbia Generating Station 3.6.4.3-1 Amendment No. +as,~,~. 236
SGT System 3.6.4.3 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME E. Two SGT subsystems E.1 Initiate action to suspend Immediately inoperable during OPDRVs. OPDRVs. SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.6.4.3.1 Operate each SGT subsystem for~ 15 continuous In accordance minutes with heaters operating. with the Surveillance Frequency Control Program SR 3.6.4.3.2 Perform required SGT filter testing in accordance In accordance with the Ventilation Filter Testing Program (VFTP). with the VFTP SR 3.6.4.3.3 Verify each SGT subsystem actuates on an actual In accordance or simulated initiation signal. with the Surveillance Frequency Control Program SR 3.6.4.3.4 Verify each SGT filter cooling recirculation valve can In accordance be opened and the fan started. with the Surveillance Frequency Control Program Columbia Generating Station 3.6.4.3-2 Amendment No. +69,4-99 ~ 2JS 239
SW System and UHS 3.7.1 3.7 PLANT SYSTEMS 3.7.1 Standby Service Water (SW) System and Ultimate Heat Sink (UHS) LCO 3.7.1 Division 1 and 2 SW subsystems and UHS shall be OPERABLE. APPLICABILITY: MODES 1, 2, and 3. ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. Average sediment depth A.1 Restore average sediment 30 days in one or both spray depth to within limits. ponds 2: 0.5 ft and
< 1.0 ft.
B. One SW subsystem B.1 --------------NOTES----------- inoperable. 1. Enter applicable Conditions and Required Actions of LCO 3.8.1, nAC Sources Operating," for diesel generator made inoperable by SW System.
- 2. Enter applicable Conditions and Required Actions of LCO 3.4.9, "Residual Heat Removal (RHR)
Shutdown Cooling System - Hot Shutdown," for RHR shutdown cooling subsystem made inoperable by SW System. Restore SW subsystem to 72 hours OPERABLE status. Columbia Generating Station 3.7.1-1 Amendment No. 49&,2Qa 225
SW System and UHS 3.7.1 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME C. Required Action and C.1 --------------NO TE--------------- associated Completion LCO 3.0.4.a is not Time of Condition B not applicable when entering met. MODE 3. Be in MODE 3. 12 hours D. Required Action and D.1 Be in MODE 3. 12 hours associated Completion Time of Condition A not AND met. D.2 Be in MODE 4. 36 hours OR Both SW subsystems inoperable. OR UHS inoperable for reasons other than Condition A. SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.7.1.1 Verify the average water level in the UHS spray In accordance ponds is ~ 432 feet 9 inches mean sea level. with the Surveillance Frequency Control Program SR 3.7.1.2 Verify the average water temperature of each UHS In accordance spray pond is::;; 77°F. with the Surveillance Frequency Control Program Columbia Generating Station 3.7.1-2 Amendment No. +49,169,225,2:3:3,2:36 238
SW System and UHS 3.7.1 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.7.1.3 -------------------------------NOTE------------------------------ lsolation of flow to individual components does not render SW subsystem inoperable. Verify each SW subsystem manual, power In accordance operated, and automatic valve in the flow path with the servicing safety related systems or components, Surveillance that is not locked, sealed, or otherwise secured in Frequency position, is in the correct position. Control Program SR 3.7.1.4 Verify average sediment depth in each UHS spray In accordance pond is < 0.5 ft. with the Surveillance Frequency Control Program SR 3.7.1.5 Verify each SW subsystem actuates on an actual or In accordance simulated initiation signal. with the Surveillance Frequency Control Program Columbia Generating Station 3.7.1-3 Amendment No. 149,169,225,236 238
HPCS SW System 3.7.2
- 3. 7 PLANT SYSTEMS 3.7.2 High Pressure Core Spray (HPCS) Service Water (SW) System LCO 3.7.2 The HPCS SW System shall be OPERABLE.
APPLICABILITY: MODES 1, 2, and 3. ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. HPCS SW System A.1 Declare HPCS System Immediately inoperable. inoperable. SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.7.2.1 ----- ---- ---- ---- ------- ---- ---N 0 TE------------ --- ---- ---- ---- --- lso Ia tio n of flow to individual components does not render HPCS SW System inoperable. Verify each HPCS SW System manual, power In accordance operated, and automatic valve in the flow path, that with the is not locked, sealed, or otherwise secured in Surveillance position, is in the correct position. Frequency Control Program SR 3.7.2.2 Verify the HPCS SW System actuates on an actual In accordance or simulated initiation signal. with the Surveillance Frequency Control Program Columbia Generating Station 3.7.2-1 Amendment No. +49,+e9 22§ 238
CREF System 3.7.3 3.7 PLANT SYSTEMS 3.7.3 Control Room Emergency Filtration (CREF) System LCO 3.7.3 Two CREF subsystems shall be OPERABLE.
--------------------------------------------NO TE ------------------------------------------
The control room envelope (CRE) boundary may be opened intermittently under administrative control. APPLICABILITY: MODES 1, 2, and 3, During operations with a potential for draining the reactor vessel (OPDRVs). ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One CREF subsystem A.1 Restore CREF subsystem 7 days inoperable for reasons to OPERABLE status. other than Condition B. B. One or more CREF B.1 Initiate action to implement Immediately subsystems inoperable mitigating actions. due to inoperable CRE boundary in MODE 1, 2, AND and 3. B.2 Verify mitigating actions ensure CRE occupant 24 hours exposures to radiological, chemical, and smoke hazards will not exceed limits. AND 90 days B.3 Restore CRE boundary to OPERABLE status. Columbia Generating Station 3.7.3-1 Amendment No. 99,207 225
CREF System 3.7.3 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME C. Required Action and C.1 --------------N 0 TE------------ associated Completion LCO 3.0.4.a is not Time of Condition A or B applicable when entering not met in MODE 1, 2, MODE 3. or 3. ---------------------------------- Be in MODE 3. 12 hours D. Required Action and D.1 Place OPERABLE CREF Immediately associated Completion subsystem in pressurization Time of Condition A not mode. met during OPDRVs. OR D.2 Initiate action to suspend Immediately OPDRVs. E. Two CREF subsystems E.1 --------------N 0 TE------------ inoperable in MODE 1, LCO 3.0.4.a is not 2, or 3 for reasons other applicable when entering than Condition B. MODE 3. Be in MODE 3. 12 hours F. Two CREF subsystems F.1 Initiate action to suspend Immediately inoperable during OPDRVs. OPDRVs. OR One or more CREF subsystems inoperable due to inoperable CRE boundary during OPDRVs. Columbia Generating Station 3.7.3-2 Amendment No. 2-0+,24-e,~, 236
CREF System 3.7.3 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.7.3.1 Operate each CREF subsystem for ?: 15 continuous In accordance minutes with the heaters operating. with the Surveillance Frequency Control Program SR 3.7.3.2 Perform required CREF filter testing in accordance In accordance with the Ventilation Filter Testing Program (VFTP). with the VFTP SR 3.7.3.3 Verify each CREF subsystem actuates on an actual In accordance or simulated initiation signal. with the Surveillance Frequency Control Program SR 3.7.3.4 Perform required CRE unfiltered air inleakage In accordance testing in accordance with the Control Room with the Control Envelope Habitability Program. Room Envelope Habitability Program Columbia Generating Station 3.7.3-3 Amendment No. WQ,207 225 ' 239
Control Room AC System 3.7.4 3.7 PLANT SYSTEMS 3.7.4 Control Room Air Conditioning (AC) System LCO 3. 7.4 Two control room AC subsystems shall be OPERABLE. APPLICABILITY: MODES 1, 2, and 3, During operations with a potential for draining the reactor vessel (OPDRVs). ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One control room AC A.1 Restore control room AC 30 days subsystem inoperable. subsystem to OPERABLE status. B. Two control room AC B.1 Verify control room area Once per 4 hours subsystems inoperable. temperature < 90°F. AND B.2 Restore one control room 72 hours AC subsystem to OPERABLE status. C. Required Action and C.1 --------------N 0 TE-------------- associated Completion LCO 3.0.4.a is not Time of Condition A or B applicable when entering not met in MODE 1, 2, or MODE 3.
- 3. -------------------------------------
Be in MODE 3. 12 hours Columbia Generating Station 3.7.4-1 Amendment No. 4-e-9,4-99.~.~. 236
Control Room AC System 3.7.4 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME D. Required Action and D.1 Place OPERABLE control Immediately associated Completion room AC subsystem in Time of Condition A not operation. met during OPDRVs. OR D.2 Initiate action to suspend Immediately OPDRVs. E. Required Action and E.1 Initiate action to suspend Immediately associated Completion OPDRVs. Time of Condition B not met during OPDRVs. SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.7.4.1 Verify each control room AC subsystem has the In accordance capability to remove the assumed heat load. with the Surveillance Frequency Control Program Columbia Generating Station 3.7.4-2 Amendment No. 169,199,225,227,236 238
Main Condenser Offgas 3.7.5 3.7 PLANT SYSTEMS 3.7.5 Main Condenser Offgas LCO 3.7.5 The gross gamma activity rate of the noble gases measured at the main condenser air ejector shall be ~ 332 mCi/second after decay of 30 minutes. APPLICABILITY: MODE 1, MODES 2 and 3 with any main steam line not isolated and steam jet air ejector (SJAE) in operation. ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. Gross gamma activity A.1 Restore gross gamma 72 hours rate of the noble gases activity rate of the noble not within limit. gases to within limit. B. Required Action and B.1 Isolate all main steam lines. 12 hours associated Completion Time not met. OR B.2 Isolate SJAE. 12 hours OR B.3 --------------N 0 TE-------------- LCO 3.0.4.a is not applicable when entering MODE3 Be in MODE 3. 12 hours Columbia Generating Station 3.7.5-1 Amendment No. 449,~.~. 236
Main Condenser Offgas 3.7.5 SURVEILLANCE REQUIR5EMENTS SURVEILLANCE FREQUENCY SR 3.7.5.1 ------------- ---- ------- -------N 0 TE--------------------------- --- Not required to be performed until 31 days after any main steam line not isolated and SJAE in operation. Verify the gross gamma activity rate of the noble gases is ~ 332 mCi/second after decay of In accordance 30 minutes. with the Surveillance Frequency Control Program Once within 4 hours after a
~ 50% increase in the nominal steady state fission gas release after factoring out increases due to changes in THERMAL POWER level Columbia Generating Station 3.7.5-2 Amendment No. +49,-+W ~ 238
Main Turbine Bypass System 3.7.6
- 3. 7 PLANT SYSTEMS 3.7.6 Main Turbine Bypass System LCO 3.7.6 The Main Turbine Bypass System shall be OPERABLE.
LCO 3.2.2, "MINIMUM CRITICAL POWER RATIO (MCPR)," limits for an inoperable Main Turbine Bypass System, as specified in the COLR, are made applicable. APPLICABILITY: THERMAL POWER 2 25% RTP. ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. Requirements of the A.1 Satisfy the requirements of 2 hours LCO not met. the LCO. B. Required Action and B.1 Reduce THERMAL 4 hours associated Completion POWER to< 25% RTP. Time not met. SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.7.6.1 Verify one complete cycle of each main turbine In accordance bypass valve. with the Surveillance Frequency Control Program Columbia Generating Station 3.7.6-1 Amendment No. +49,+e9 225 238
Main Turbine Bypass System 3.7.6 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.7.6.2 Perform a system functional test. In accordance with the Surveillance Frequency Control Program SR 3.7.6.3 Verify the TURBINE BYPASS SYSTEM In accordance RESPONSE TIME is within limits. with the Surveillance Frequency Control Program Columbia Generating Station 3.7.6-2 Amendment No. 238
Spent Fuel Storage Pool Water Level 3.7.7 3.7 PLANT SYSTEMS 3.7.7 Spent Fuel Storage Pool Water Level LCO 3.7.7 The spent fuel storage pool water level shall be~ 22 ft over the top of irradiated fuel assemblies seated in the spent fuel storage pool racks. APPLICABILITY: During movement of irradiated fuel assemblies in the spent fuel storage pool. ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. Spent fuel storage pool A.1 ------------- --N 0 TE------------ -- water level not within L CO 3.0.3 is not applicable. limit. Suspend movement of Immediately irradiated fuel assemblies in the spent fuel storage pool. SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.7.7.1 Verify the spent fuel storage pool water level is In accordance
~ 22 ft over the top of irradiated fuel assemblies with the seated in the spent fuel storage pool racks. Surveillance Frequency Control Program Columbia Generating Station 3.7.7-1 Amendment No. +49,-+W 2aa 238
AC Sources - Operating 3.8.1 3.8 ELECTRICAL POWER SYSTEMS 3.8.1 AC Sources - Operating LCO 3.8.1 The following AC electrical power sources shall be OPERABLE:
- a. Two qualified circuits between the offsite transmission network and the onsite Class 1E AC Electric Power Distribution System; and
- b. Three diesel generators (DGs).
APPLICABILITY: MODES 1, 2, and 3.
--------------------------------------------N0TE-----------------------------------------
Division 3 AC electrical power sources are not required to be OPERABLE when High Pressure Core Spray System is inoperable. ACTIONS
NOTE---------------------------------------------------------
LCO 3.0A.b is not applicable to DGs. CONDITION REQUIRED ACTION COMPLETION TIME A. One offsite circuit A.1 Perform SR 3.8.1.1 for 1 hour inoperable. OPERABLE offsite circuit. Once per 8 hours thereafter Columbia Generating Station 3.8.1-1 Amendment No. 4-99,487 225
AC Sources - Operating 3.8.1 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. (continued) A.2 Declare required feature(s) 24 hours from with no offsite power discovery of no offsite available inoperable when power to one division the redundant required concurrent with feature(s) are inoperable. inoperability of redundant required feature(s) AND A.3 Restore offsite circuit to 72 hours OPERABLE status. AND 6 days from discovery of failure to meet LCO when not associated with Required Action B.4.2.2 AND 17 days from discovery of failure to meet LCO B. One required DG B.1 Perform SR 3.8.1.1 for 1 hour inoperable. OPERABLE offsite circuit(s). AND Once per 8 hours thereafter AND B.2 Declare required feature(s), 4 hours from supported by the inoperable discovery of DG, inoperable when the Condition B redundant required concurrent with feature(s) are inoperable. inoperability of redundant required feature(s) Columbia Generating Station 3.8.1-2 Amendment No. 4-9&,497 225
AC Sources - Operating 3.8.1 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME B. (continued) B.3.1 Determine OPERABLE 24 hours DG(s) are not inoperable due to common cause failure. B.3.2 Perform SR 3.8.1.2 for 24 hours if not OPERABLE DG(s). performed within the past 24 hours B.4.1 Restore required DG to 72 hours from OPERABLE status. discovery of an inoperable DG 6 days from discovery of failure to meet LCO B.4.2.1 Establish risk management 72 hours actions for the alternate AC sources. B.4.2.2 Restore required DG to 14 days OPERABLE status. 17 days from discovery of failure to meet LCO Columbia Generating Station Amendment No. 49+,~ 225
AC Sources - Operating 3.8.1 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME C. Two offsite circuits C.1 Declare required feature(s) 12 hours from inoperable. inoperable when the discovery of redundant required Condition C feature(s) are inoperable. concurrent with inoperability of redundant required feature(s) AND C.2 Restore one offsite circuit to 24 hours OPERABLE status. D. One offsite circuit --------------------NOTE------------------ inoperable. Enter applicable Conditions and Required Actions of LCO 3.8.7. AND "Distribution Systems - Operating." when Condition D is entered with no One required DG AC power source to any division. inoperable. ----------------------_ ... _---------------------- D.1 Restore offsite circuit to 12 hours OPERABLE status. OR D.2 Restore required DG to 12 hours OPERABLE status. E. Two required DGs E.1 Restore one required DG to 2 hours inoperable. OPERABLE status. OR 24 hours if Division 3 DG is inoperable I Columbia Generating Station 3.8.1-4 Amendment No. 469,49-7225
AC Sources - Operating 3.8.1 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME F. Required Action and F.1 ---------------NOTE-------------- associated Completion LCO 3.0.4.a is not Time of Condition A, B, applicable when entering C, D, or E not met. MODE 3. Be in MODE 3. 12 hours G. Three or more required G.1 Enter LCO 3.0.3. Immediately AC sources inoperable. SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.8.1.1 Verify correct breaker alignment and indicated In accordance with power availability for each offsite circuit. the Surveillance Frequency Control Program SR 3.8.1.2 ------------------------------NOTES----------------------------
- 1. All DG starts may be preceded by an engine prelube period and followed by a warmup period prior to loading.
- 2. A modified DG start involving idling and gradual acceleration to synchronous speed may be used for this SR as recommended by the manufacturer. When modified start procedures are not used, the time, voltage, and frequency tolerances of SR 3.8.1. 7 must be met.
Verify each required DG starts from standby In accordance with conditions and achieves steady state: the Surveillance Frequency Control
- a. Voltage 2". 3910 V and ~ 4400 V and frequency Program 2". 58 .8 Hz and ~ 61.2 Hz for DG-1 and DG-2; and
- b. Voltage 2". 3910 V and ~ 4400 V and frequency 2". 58.8 Hz and~ 61.2 Hz for DG-3.
Columbia Generating Station 3.8.1-5 Amendment No. 169,181,225,236 238
AC Sources - Operating 3.8.1 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.8.1.3 ------------------------------N 0 TES-----------------------------
- 1. DG loadings may include gradual loading as recommended by the manufacturer.
- 2. Momentary transients outside the load range do not invalidate this test.
- 3. This Surveillance shall be conducted on only one DG at a time.
- 4. This SR shall be preceded by, and immediately follow, without shutdown, a successful performance of SR 3.8.1.2 or SR 3.8.1.7.
- 5. The endurance test of SR 3.8.1 .14 may be performed in lieu of the load-run test in SR 3.8.1.3 provided the requirements, except the upper load limits, of SR 3.8.1.3 are met.
Verify each required DG is synchronized and loaded In accordance and operates for;:::: 60 minutes at a load ;:::: 4000 kW with the and :s; 4400 kW for DG-1 and DG-2, and ;:::: 2340 kW Surveillance and :s; 2600 kW for DG-3. Frequency Control Program SR 3.8.1.4 Verify each required day tank contains fuel oil to In accordance support greater than or equal to one hour of with the operation at full load plus 10%. Surveillance Frequency Control Program SR 3.8.1.5 Check for and remove accumulated water from each In accordance required day tank. with the Surveillance Frequency Control Program Columbia Generating Station 3.8.1-6 Amendment No. ~.a+a ~ 238
AC Sources - Operating 3.8.1 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.8.1.6 Verify each required fuel oil transfer subsystem In accordance operates to automatically transfer fuel oil from the with the storage tank to the day tank. Surveillance Frequency Control Program SR 3.8.1.7 -------------------------------N 0 TE----------------- -- ---- ---- --- All DG starts may be preceded by an engine prelube period. Verify each required DG starts from standby In accordance condition and achieves: with the Surveillance
- a. For DG-1 and DG-2 in s 15 seconds, voltage Frequency z 3910 V and frequency z 58.8 Hz, and after Control Program steady state conditions are reached, maintains voltage z 3910 V and s 4400 V and frequency z 58.8 Hz ands 61.2 Hz; and
- b. For DG-3, in s 15 seconds, voltage z 3910 V and frequency z 58.8 Hz, and after steady state conditions are reached, maintains voltage z 3910 V and s 4400 V and frequency z 58.8 Hz ands 61.2 Hz.
SR 3.8.1.8 -------------------------------N 0 TE--------------------------- --- The automatic transfer function of this Surveillance shall not normally be performed in MODE 1 or 2. However, this Surveillance may be performed to re-establish OPERABILITY provided an assessment determines the safety of the plant is maintained or enhanced. Credit may be taken for unplanned events that satisfy this SR. Verify automatic and manual transfer of the power In accordance supply to safety related buses from the startup with the offsite circuit to the backup offsite circuit. Surveillance Frequency Control Program Columbia Generating Station 3.8.1-7 Amendment No . .+s+,204 225 238
AC Sources - Operating 3.8.1 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.8.1.9 ------------------------------NOTES----------------------------- 1 . Credit may be taken for unplanned events that satisfy this SR.
- 2. If performed with the DG synchronized with offsite power, it shall be performed at a power factor as close to the power factor of the single largest post-accident load as practicable.
However, if grid conditions do not permit, the power factor limit is not required to be met. Under this condition, the power factor shall be maintained as close to the limit as practicable. Verify each required DG rejects a load greater than In accordance or equal to its associated single largest post- with the accident load, and following load rejection, the Surveillance frequency is:::::; 66.75 Hz. Frequency Control Program SR 3.8.1.10 ------------------------------NOTES-----------------------------
- 1. Credit may be taken for unplanned events that satisfy this SR.
- 2. If performed with the DG synchronized with offsite power, it shall be performed at a power factor of : : :; 0.9 for DG-1 and DG-2, and : : :; 0.91 for DG-3. However, if grid conditions do not permit, the power factor limit is not required to be met. Under this condition, the power factor shall be maintained as close to the limit as practicable.
Verify each required DG does not trip and voltage is In accordance maintained:::::; 4784 V during and following a load with the rejection of a load 2': 4400 kW for DG-1 and DG-2 Surveillance and 2': 2600 kW for DG-3. Frequency Control Program Columbia Generating Station 3.8.1-8 Amendment No. aw,2G4 22§ 238
AC Sources - Operating 3.8.1 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.8.1.11 ------------------------------NOTES-----------------------------
- 1. All DG starts may be preceded by an engine prelube period.
- 2. This Surveillance shall not normally be performed in MODE 1, 2, or 3 (not applicable to DG-3). However, portions of the Surveillance may be performed to re-establish OPERABILITY provided an assessment determines the safety of the plant is maintained or enhanced. Credit may be taken for unplanned events that satisfy this SR.
Verify on an actual or simulated loss of offsite power In accordance signal: with the Surveillance
- a. De-energization of emergency buses; Frequency Control Program
- b. Load shedding from emergency buses for Divisions 1 and 2; and
- c. DG auto-starts from standby condition and:
- 1. energizes permanently connected loads in ~ 15 seconds for DG-1 and DG-2, and in ~ 18 seconds for DG-3,
- 2. energizes auto-connected shutdown loads,
- 3. maintains steady state voltage 2'. 3910 Vand ~4400 V,
- 4. maintains steady state frequency 2'. 58.8 Hz and ~ 61.2 Hz, and
- 5. supplies permanently connected and auto-connected shutdown loads for 2'. 5 minutes.
Columbia Generating Station 3.8.1-9 Amendment No. 2W,~ ~ 238
AC Sources - Operating 3.8.1 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.8.1.12 ------------------------------NOTES-----------------------------
- 1. All DG starts may be preceded by an engine prelube period.
- 2. This Surveillance shall not normally be performed in MODE 1 or 2 (not applicable to DG-3). However, portions of the Surveillance may be performed to re-establish OPERABILITY provided an assessment determines the safety of the plant is maintained or enhanced. Credit may be taken for unplanned events that satisfy this SR.
Verify on an actual or simulated Emergency Core In accordance Cooling System (ECCS) initiation signal each with the required DG auto-starts from standby condition and: Surveillance Frequency
- a. For DG-1 and DG-2, ins 15 seconds achieves Control Program voltage 2 3910 V, and after steady state conditions are reached, maintains voltage 2 3910 V and s 4400 V and, for DG-3, in s 15 seconds achieves voltage 2 3910 V, and after steady state conditions are reached, maintains voltage 2 391 O V and s 4400 V;
- b. In s 15 seconds, achieves frequency 2 58.8 Hz and after steady state conditions are achieved, maintains frequency 2 58.8 Hz ands 61.2 Hz;
- c. Operates for 2 5 minutes;
- d. Permanently connected loads remain energized from the offsite power system; and
- e. Emergency loads are auto-connected to the offsite power system.
Columbia Generating Station 3.8.1-10 Amendment No. ~.2G4 ~ 238
AC Sources - Operating 3.8.1 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.8.1.13 ----- ---- ---- ---- ------- -------N 0 TE--------------------------- --- Credit may be taken for unplanned events that satisfy this SR. Verify each required DG's automatic trips are In accordance bypassed on an actual or simulated ECCS initiation with the signal except: Surveillance Frequency
- a. Engine overspeed; Control Program
- b. Generator differential current; and
- c. Incomplete starting sequence.
SR 3.8.1.14 --------- ---- ---- -------------NO TES-------------------------- ---
- 1. Momentary transients outside the load, excitation current, and power factor ranges do not invalidate this test.
- 2. Credit may be taken for unplanned events that satisfy this SR.
- 3. If performed with the DG synchronized with offsite power, it shall be performed at a power factor of~ 0.9 for DG-1 and DG-2, and~ 0.91 for DG-3. However, if grid conditions do not permit, the power factor limit is not required to be met. Under this condition, the power factor shall be maintained as close to the limit as practicable.
Verify each required DG operates for 2 24 hours: In accordance with the
- a. For 2 2 hours loaded 2 4650 kW for DG-1 and Surveillance DG-2, and 2 2850 kW for DG-3; and Frequency Control Program
- b. For the remaining hours of the test loaded 2 4400 kW for DG-1 and DG-2, and 2 2600 kW for DG-3.
Columbia Generating Station 3.8.1-11 Amendment No. +8+,:w4 ~ 238
AC Sources - Operating 3.8.1 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.8.1.15 ------------------------------NOTES-----------------------------
- 1. This Surveillance shall be performed within 5 minutes of shutting down the DG after the DG has operated 2 1 hour loaded 2 4000 kW for DG-1 and DG-2, and 2 2340 kW for DG-3.
Momentary transients outside of load range do not invalidate this test.
- 2. All DG starts may be preceded by an engine prelube period.
Verify each required DG starts and achieves: In accordance with the
- a. For DG-1 and DG-2, in s 15 seconds, voltage Surveillance 2 391 O V and frequency 2 58.8 Hz, and after Frequency steady state conditions are reached, maintains Control Program voltage 2 391 O V and s 4400 V and frequency 2 58.8 Hz ands 61.2 Hz; and
- b. For DG-3, in s 15 seconds, voltage 2 3910 V and frequency 2 58.8 Hz, and after steady state conditions are reached, maintains voltage 2 3910 V and s 4400 V and frequency 2 58.8 Hz ands 61.2 Hz.
Columbia Generating Station 3.8.1-12 Amendment No. 2W,2M 226 238
AC Sources - Operating 3.8.1 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.8.1.16 -------------------------------NOTE------------------------------ Th is Surveillance shall not normally be performed in MODE 1, 2, or 3 (not applicable to DG-3). However, this Surveillance may be performed to re-establish OPERABILITY provided an assessment determines the safety of the plant is maintained or enhanced. Credit may be taken for unplanned events that satisfy this SR. Verify each required DG: In accordance with the
- a. Synchronizes with offsite power source while Surveillance loaded with emergency loads upon a simulated Frequency restoration of offsite power; Control Program
- b. Transfers loads to offsite power source; and
- c. Returns to ready-to-load operation.
SR 3.8.1.17 -------------------------------NOTE------------------------------ Credit may be taken for unplanned events that satisfy this SR. Verify, with a DG operating in test mode and In accordance connected to its bus, an actual or simulated ECCS with the initiation signal overrides the test mode by: Surveillance Frequency
- a. Returning DG to ready-to-load operation; and Control Program
- b. Automatically energizing the emergency load from offsite power.
Columbia Generating Station 3.8.1-13 Amendment No. 2-W,204 225 238
AC Sources - Operating 3.8.1 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.8.1.18 -------------------------------NOTE------------------------------ This Surveillance shall not normally be performed in MODE 1, 2, or 3. However, this Surveillance may be performed to re-establish OPERABILITY provided an assessment determines the safety of the plant is maintained or enhanced. Credit may be taken for unplanned events that satisfy this SR. Verify interval between each sequenced load block In accordance is within +/- 10% of design interval for each time delay with the relay. Surveillance Frequency Control Program Columbia Generating Station 3.8.1-14 Amendment No. 2W,2G4 ~ 238
AC Sources - Operating 3.8.1 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.8.1.19 ------------------------------NOTES-----------------------------
- 1. All DG starts may be preceded by an engine prelube period.
- 2. This Surveillance shall not normally be performed in MODE 1, 2, or 3 (not applicable to DG-3). However, portions of the Surveillance may be performed to re-establish OPERABILITY provided an assessment determines the safety of the plant is maintained or enhanced. Credit may be taken for unplanned events that satisfy this SR.
Verify, on an actual or simulated loss of offsite In accordance power signal in conjunction with an actual or with the simulated ECCS initiation signal: Surveillance Frequency
- a. De-energization of emergency buses; Control Program
- b. Load shedding from emergency buses for DG-1 and DG-2; and
- c. DG auto-starts from standby condition and:
- 1. energizes permanently connected loads in s 15 seconds,
- 2. energizes auto-connected emergency loads,
- 3. maintains steady state voltage 2:'. 3910 V ands 4400 V,
- 4. maintains steady state frequency 2:'. 58.8 Hz ands 61.2 Hz, and
- 5. supplies permanently connected and auto-connected emergency loads for 2:'. 5 minutes.
Columbia Generating Station 3.8.1-15 Amendment No. 2W,204 225 238
AC Sources - Operating 3.8.1 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.8.1.20 --------- ---- ----------- ---- ---N 0 TE------------ --- ---- ---- ---- --- All DG starts may be preceded by an engine prelube period. Verify, when started simultaneously from standby In accordance condition, DG-1 and DG-2 achieves, in with the
- 15 seconds, voltage
- :::: 391 O V and frequency Surveillance
- 58.8 Hz, and DG-3 achieves, in :::;: 15 seconds, Frequency voltage ::::: 391 O V and frequency ::::: 58.8 Hz. Control Program Columbia Generating Station 3.8.1-16 Amendment No. 2:G4 22§ 238
AC Sources - Shutdown 3.8.2 3.8 ELECTRICAL POWER SYSTEMS 3.8.2 AC Sources - Shutdown LCO 3.8.2 The following AC electrical power sources shall be OPERABLE:
- a. One qualified circuit between the offsite transmission network and the onsite Class 1E AC electrical power distribution subsystem(s) required by LCO 3.8.8, "Distribution Systems - Shutdown;"
- b. One diesel generator (DG) capable of supplying one division of the Division 1 or 2 onsite Class 1E AC electrical power distribution subsystem(s) required by LCO 3.8.8; and
- c. The Division 3 DG capable of supplying the Division 3 onsite Class 1E AC electrical power distribution subsystem, when the Division 3 onsite Class 1 E electrical power distribution subsystem is required by LCO 3.B.B.
APPLICABILITY: MODES 4 and 5. ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. Required offsite circuit --------------------N0TE ------------------ inoperable. Enter applicable Condition and Required Actions of LCO 3.8.8, when any required division is de energized as a result of Condition A. A.1 Declare affected required Immediately feature(s) with no offsite power available inoperable. Columbia Generating Station 3.B.2-1 Amendment No. 4-e9,.:t-99 225
AC Sources - Shutdown 3.8.2 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. (continued) A.2.1 Initiate action to suspend Immediately operations with a potential for draining the reactor vessel (OPDRVs). AND A.2.2 Initiate action to restore Immediately required offsite power circuit to OPERABLE status. B. Division 1 or 2 required B.1 Initiate action to suspend Immediately DG inoperable. OPDRVs. AND B.2 Initiate action to restore Immediately required DG to OPERABLE status. C. Required Division 3 DG C.1 Declare High Pressure 72 hours inoperable. Core Spray System inoperable. Columbia Generating Station 3.8.2-2 Amendment No . .:t-S9,499 225
AC Sources - Shutdown 3.8.2 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.8.2.1 -------------------------------NOTE ----------------------------- The following SRs are not required to be performed: SR 3.8.1.3, SR 3.8.1.9 through SR 3.8.1.11, SR 3.8.1.13 through SR 3.8.1.16, SR 3.8.1.18, and SR 3.8.1.19. For AC sources required to be OPERABLE, the SRs In accordance for Specification 3.8.1, except SR 3.8.1.8, with applicable SR 3.8.1.17, and SR 3.8.1.20, are applicable. SRs Columbia Generating Station 3.8.2-3 Amendment No. 4-99,~ 225
Diesel Fuel Oil, Lube Oil, and Starting Air 3.8.3 3.8 ELECTRICAL POWER SYSTEMS 3.8.3 Diesel Fuel Oil, Lube Oil. and Starting Air LCO 3.8.3 The stored diesel fuel oil, lube oil. and starting air subsystem shall be within limits for each required diesel generator (DG). APPLICABILITY: When associated DG is required to be OPERABLE. ACTIONS
NOTE----------------------------------------------------------
Separate Condition entry is allowed for each DG. CONDITION REQUIRED ACTION COMPLETION TIME A. One or more DGs with A.1 Restore stored fuel oil level 48 hours fuel oil level less than a to within limit. 7 day supply and greater than a 6 day supply. B. One or more DGs with 8.1 Restore lube oil inventory to 48 hours lube oil inventory less within limit. than a 7 day supply and greater than a 6 day supply. C. One or more DGs with C.1 Restore stored fuel oil total 7 days stored fuel oil total particulates to within limit. particulates not within limit. D. One or more DGs with D.1 Restore stored fuel oil 30 days new fuel oil properties properties to within limits. not within limits. Columbia Generating Station 3.8.3-1 Amendment No. ~.~ 225
Diesel Fuel Oil, Lube Oil, and Starting Air 3.8.3 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME E. One or more DGs with E.1 Restore required starting air 48 hours required starting air receiver pressure to within receiver pressure: limit.
- 1. For DG-1 and DG-2,
< 230 psig and ~ 150 psig; and
- 2. For DG-3, < 223 psig and ~ 150 psig.
F. Required Action and F.1 Declare associated DG Immediately associated Completion inoperable. Time of Condition A, B, C, D, or E not met. OR One or more DGs with stored diesel fuel oil, lube oil, or starting air subsystem not within limits for reasons other than Condition A, B, C, D, or E. SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.8.3.1 Verify each fuel oil storage subsystem contains In accordance greater than or equal to a seven day supply of fuel. with the Surveillance Frequency Control Program Columbia Generating Station 3.8.3-2 Amendment No. +w,a+-9 ~ 238
Diesel Fuel Oil, Lube Oil, and Starting Air 3.8.3 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.8.3.2 Verify lube oil inventory is greater than or equal to a In accordance seven day supply. with the Surveillance Frequency Control Program SR 3.8.3.3 Verify fuel oil properties of new and stored fuel oil In accordance are tested in accordance with, and maintained within with the Diesel the limits of, the Diesel Fuel Oil Testing Program. Fuel Oil Testing Program SR 3.8.3.4 Verify each required DG air start receiver pressure In accordance is: with the Surveillance
- a. :2'. 230 psig for DG-1 and DG-2; and Frequency Control Program
- b. :2'. 223 psig for DG-3.
SR 3.8.3.5
- Check for and remove accumulated water from each In accordance fuel oil storage tank. with the Surveillance Frequency Control Program Columbia Generating Station 3.8.3-3 Amendment No . ..f.69.,2-+e 2aa 238
DC Sources - Operating 3.8.4 3.8 ELECTRICAL POWER SYSTEMS 3.8.4 DC Sources - Operating LCO 3.8.4 The Division 1, Division 2, and Division 3 DC electrical power subsystems shall be OPERABLE. APPLICABILITY: MODES 1, 2, and 3. ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One required Division 1 A.1 Restore battery terminal 2 hours or 2 125 V DC battery voltage to greater than or charger inoperable. equal to the minimum established float voltage. AND A.2 Verify battery float current Once per 12 hours
- 2 amps.
AND A.3 Restore required battery 72 hours charger to OPERABLE status. B. One required Division 3 B.1 Restore battery terminal 2 hours 125 V DC battery voltage to greater than or charger inoperable. equal to the minimum established float voltage. AND B.2 Verify battery float current Once per 12 hours
- 2 amps.
AND B.3 Restore required battery 72 hours charger to OPERABLE status. Columbia Generating Station 3.8.4*1 Amendment 4-S9,~ 225
DC Sources - Operating 3.8.4 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME C. One required Division 1 C.1 Restore battery terminal 2 hours 250 V DC battery voltage to greater than or charger inoperable. equal to the minimum established float voltage. AND C.2 Verify battery float current Once per 12 hours s; 2 amps. AND C.3 Restore required battery 72 hours charger to OPERABLE status. D. One required Division 1 D.1 Restore battery to 2 hours or 2 125 V DC battery OPERABLE status. inoperable. One required Division 3 E.1 Restore battery to 2 hours 125 V DC battery OPERABLE status. inoperable. F. One required Division 1 F.1 Restore battery to 2 hours 250 V DC battery OPERABLE status. inoperable. G. Division 1 or 2 125 V DC G.1 Restore Division 1 and 2 2 hours electrical power 125 V DC electrical power subsystem inoperable subsystems to OPERABLE for reasons other than status. Condition A or D. Columbia Generating Station 3.8.4-2 Amendment 4-69,2G4 225
DC Sources - Operating 3.8.4 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME H. Required Action and H.1 Declare High Pressure Immediately associated Completion Core Spray System Time of Condition B or E inoperable. not met. OR Division 3 DC electrical power subsystem inoperable for reasons other than Condition B or E. I. Required Action and 1.1 Declare associated Immediately associated Completion supported features Time of Condition C or F inoperable. not met. OR Division 1 250 V DC electrical power subsystem inoperable for reasons other than Condition C or F. J. Required Action and J.1 ---------------N 0 TE------------- associated Completion LCO 3.0.4.a is not Time of Condition A or D applicable when entering not met. MODE 3. OR Be in MODE 3. 12 hours Required Action and associated Completion Time of Condition G not met. Columbia Generating Station 3.8.4-3 Amendment ~.2-04.~. 236
DC Sources - Operating 3.8.4 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.8.4.1 Verify battery terminal voltage is greater than or In accordance equal to the minimum established float voltage. with the Surveillance Frequency Control Program SR 3.8.4.2 Verify each required battery charger supplies the In accordance required load for;:?: 1.5 hours at: with the Surveillance
- a. ;:?: 126 V for the 125 V battery chargers; and Frequency Control Program
- b. ;:?: 252 V for the 250 V battery charger.
SR 3.8.4.3 ------------------------------NOTES-----------------------------
- 1. The modified performance discharge test in SR 3.8.6.6 may be performed in lieu of SR 3.8.4.3.
- 2. This Surveillance shall not be performed in MODE 1, 2, or 3 for the Division 1 and 2 125 V DC batteries. However, credit may be taken for unplanned events that satisfy this SR.
Verify battery capacity is adequate to supply, and In accordance maintain in OPERABLE status, the required with the emergency loads for the design duty cycle when Surveillance subjected to a battery service test. Frequency Control Program Columbia Generating Station 3.8.4-4 Amendment +s9,2G4 ~ 238
DC Sources - Shutdown 3.8.5 3.8 ELECTRICAL POWER SYSTEMS 3.8.5 DC Sources - Shutdown LCO 3.8.5 DC electrical power subsystem(s) shall be OPERABLE to support the electrical power distribution subsystem(s) required by LCO 3.8.8, "Distribution Systems - Shutdown." APPLICABILITY: MODES 4 and 5. ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A One required battery A1 Restore battery terminal 2 hours charger inoperable. voltage to greater than or equal to the minimum AND established float voltage. The redundant division AND battery and battery charger OPERABLE. A2 Verify battery float current Once per 12 hours
- S 2 amps.
AND A3 Restore required battery 7 days charger to OPERABLE status. Columbia Generating Station 3.8.5-1 Amendment 499,:w4 225
DC Sources - Shutdown 3.8.5 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME B. One or more required B.1 Declare affected required Immediately DC electrical power feature(s) inoperable. subsystems inoperable, for reasons other than Condition A. B.2.1 Initiate action to suspend Immediately operations with a potential for draining the reactor Required Action and vessel. Completion Time of Condition A not met. B.2.2 Initiate action to restore Immediately required DC electrical power subsystems to OPERABLE status. SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.8.5.1 -------------------------------NOT E----------------------------- The following SRs are not required to be performed: SR 3.8.4.2, and SR 3.8.4.3. For DC electrical power subsystems required to be In accordance OPERABLE the following SRs are applicable: with applicable SRs SR 3.8.4.1, SR 3.8.4.2, and SR 3.8.4.3. Columbia Generating Station 3.8.5-2 Amendment +W,~ 225
Battery Parameters 3.8.6 3.8 ELECTRICAL POWER SYSTEMS 3.8.6 Battery Parameters LCO 3.8.6 Battery parameters for the Division 1, 2, and 3 batteries shall be within limits. APPLICABILITY: When associated DC electrical power subsystems are required to be OPERABLE. ACTIONS
NOT E----------------------------------------------------------
Separate Condition entry is allowed for each battery. CONDITION REQUIRED ACTION COMPLETION TIME A. One or more batteries A.1 Perform SR 3.8.4.1. 2 hours with one or more battery cells float voltage AND
< 2.07 V.
A.2 Perform SR 3.8.6.1. 2 hours AND A.3 Restore affected cell 24 hours voltage ~ 2.07 V. B. One or more batteries B.1 Perform SR 3.8.4.1. 2 hours with float current
> 2 amps. AND B.2 Restore battery float current 12 hours to ~ 2 amps.
Columbia Generating Station 3.8.6-1 Amendment +e9,~ 225
Battery Parameters 3.8.6 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME
---------------NOTE------------- --------------------NOTE------------------
Required Action C.2 shall be Required Actions C.1 and C.2 are completed if electrolyte level only applicable if electrolyte level was below the top of plates. was below the top of plates. C. One or more batteries C.1 Restore electrolyte level to 8 hours with one or more cells above top of plates. electrolyte level less than minimum AND established design limits. C.2 Verify no evidence of 12 hours leakage. AND C.3 Restore electrolyte level to 31 days greater than or equal to minimum established design limits. D. One or more batteries 0.1 Restore battery pilot cell 12 hours with pilot cell electrolyte temperature to greater than temperature less than or equal to minimum minimum established. established design limits. E. Two or more redundant E.1 Restore battery parameters 2 hours division batteries with for affected battery in one battery parameters not division to within limits. within limits. Columbia Generating Station 3.8.6-2 Amendment W,2W 225
Battery Parameters 3.8.6 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME F. One or more batteries F.1 Declare associated battery Immediately with a required battery inoperable. parameter not met for reasons other than Condition A, B, C, D, or E. OR Required Action and associated Completion Time of Condition A, B, C, D, or E not met. OR One or more batteries with one or more battery cell(s) float voltage
< 2.07 V and float current> 2 amps.
SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.8.6.1 -------------------------------NOTE------------------------------ Not required to be met when battery terminal voltage is less than the minimum established float voltage of SR 3.8.4.1. Verify each battery float current is~ 2 amps. In accordance with the Surveillance Frequency Control Program Columbia Generating Station 3.8.6-3 Amendment +69,2G4 22a 238
Battery Parameters 3.8.6 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.8.6.2 Verify each battery pilot cell voltage is ~ 2.07 V. In accordance with the Surveillance Frequency Control Program SR 3.8.6.3 Verify each battery connected cell electrolyte level is In accordance greater than or equal to minimum established with the design limits. Surveillance Frequency Control Program SR 3.8.6.4 Verify each battery pilot cell temperature is greater In accordance than or equal to minimum established design limits. with the Surveillance Frequency Control Program SR 3.8.6.5 Verify each battery connected cell voltage is In accordance
~ 2.07 V. with the Surveillance Frequency Control Program Columbia Generating Station 3.8.6-4 Amendment +e-9,294 ~ 238
Battery Parameters 3.8.6 SURVEILLANCE FREQUENCY SR 3.8.6.6 -------------------------------N 0 TE------------------------------ Th is Surveillance shall not be performed in MODE 1 , 2, or 3 for the Division 1 and 2 125 V DC batteries. However, credit may be taken for unplanned events that satisfy this SR. Verify battery capacity is ~ 80% of the In accordance manufacturer's rating for the 125 V batteries and with the
- 83.4% of the manufacturer's rating for the 250 V Surveillance battery, when subjected to a performance discharge Frequency test or a modified performance discharge test. Control Program 12 months when battery shows degradation or has reached 85%
of expected life with capacity
< 100% of manufacturer's rating 24 months when battery has reached 85% of the expected life with capacity ~ 100% of manufacturer's rating Columbia Generating Station 3.8.6-5 Amendment 238
Distribution Systems - Operating 3.8.7 3.8 ELECTRICAL POWER SYSTEMS 3.8.7 Distribution Systems - Operating LCO 3.8.7 The following AC and DC electrical power distribution subsystems shall be OPERABLE:
- a. Division 1 and Division 2 AC electrical power distribution subsystems;
- b. Division 1 and Division 2 125 V DC electrical power distribution subsystems;
- c. Division 1 250 V DC electrical power distribution subsystem; and
- d. Division 3 AC and DC electrical power distribution sUbsystems.
APPLICABILITY: MODES 1, 2, and 3. ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. Division 1 or 2 AC A.1 Restore Division 1 and 2 8 hours electrical power AC electrical power distribution subsystem distribution subsystems to AND inoperable. OPERABLE status. 16 hours from discovery of failure to meet LCO 3.8.7.a or b B. Division 1 or 2 125 V DC B.1 Restore Division 1 and 2 2 hours electrical power 125 V DC electrical power distribution subsystem distribution subsystems to AND inoperable. OPERABLE status. 16 hours from discovery of failure to meet LCO 3.8.7.a or b Columbia Generating Station 3.8.7-1 Amendment .:J4.9,~ 225
Distribution Systems - Operating 3.8.7 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME C. Required Action and C.1 ---------------NOTE-------------- associated Completion LCO 3.0.4.a is not Time of Condition A or B applicable when entering not met. MODE 3. Be in MODE 3. 12 hours D. Division 1 250 V DC D.1 Declare associated Immediately electrical power supported feature(s) distribution subsystem inoperable. inoperable. E. One or more Division 3 E.1 Declare High Pressure Immediately AC or DC electrical Core Spray System power distribution inoperable. subsystems inoperable. F. Two or more divisions F.1 Enter LCO 3.0.3. Immediately with inoperable electrical power distribution subsystems that result in a loss of function. SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.8.7.1 Verify correct breaker alignments and indicated In accordance power availability to required AC and DC electrical with the power distribution subsystems. Surveillance Frequency Control Program Columbia Generating Station 3.8.7-2 Amendment No. 149,169,225,236 238
Distribution Systems - Shutdown 3.8.8 3.8 ELECTRICAL POWER SYSTEMS 3.8.8 Distribution Systems - Shutdown LCO 3.8.8 The necessary portions of the Division 1, Division 2, and Division 3 AC and DC electrical power distribution subsystems shall be OPERABLE to support equipment required to be OPERABLE. APPLICABILITY: MODES 4 and 5. ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One or more required A.1 Declare associated Immediately AC or DC electrical supported required power distribution feature(s) inoperable. subsystems inoperable. A.2.1 Initiate action to suspend Immediately operations with a potential for draining the reactor vessel. A.2.2 Initiate actions to restore Immediately required AC and DC electrical power distribution subsystems to OPERABLE status. A.2.3 Declare associated Immediately required shutdown cooling subsystem(s) inoperable and not in operation. Columbia Generating Station 3.8.8-1 Amendment -%9,-1-99 225
Distribution Systems - Shutdown 3.8.8 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.8.8.1 Verify correct breaker alignments and indicated In accordance power availability to required AC and DC electrical with the power distribution subsystems. Surveillance Frequency Control Program Columbia Generating Station 3.8.8-2 Amendment +e9,+w 2ae 238
Refueling Equipment Interlocks 3.9.1 3.9 REFUELING OPERATIONS 3.9.1 Refueling Equipment Interlocks LCO 3.9.1 The refueling equipment interlocks associated with the refuel position shall be OPERABLE. APPLICABILITY: During in-vessel fuel movement with equipment associated with the interlocks when the reactor mode switch is in the refuel position. ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One or more required A.1 Suspend in-vessel fuel Immediately refueling equipment movement with equipment interlocks inoperable. associated with the inoperable interlock(s). SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.9.1.1 Perform CHANNEL FUNCTIONAL TEST on each of In accordance the following required refueling equipment interlock with the inputs: Surveillance Frequency
- a. All-rods-in, Control Program
- b. Refueling platform position,
- c. Refueling platform fuel grapple fuel-loaded,
- d. Refueling platform frame-mounted hoist fuel-loaded, and
- e. Refueling platform trolley-mounted hoist fuel-loaded.
Columbia Generating Station 3.9.1-1 Amendment +49,+69 ~ 238
Refuel Position One-Rod-Out Interlock 3.9.2 3.9 REFUELING OPERATIONS 3.9.2 Refuel Position One-Rod-Out Interlock LCO 3.9.2 The refuel position one-rod-out interlock shall be OPERABLE. APPLICABILITY: MODE 5 with the reactor mode switch in the refuel position and any control rod withdrawn. ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. Refuel position one-rod- A.1 Suspend control rod Immediately out interlock inoperable. withdrawal. AND A.2 Initiate action to fully insert Immediately all insertable control rods in core cells containing one or more fuel assemblies. SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.9.2.1 Verify reactor mode switch locked in refuel position. In accordance with the Surveillance Frequency Control Program Columbia Generating Station 3.9.2-1 Amendment +49,+09 ~ 238
Refuel Position One-Rod-Out Interlock 3.9.2 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.9.2.2 --------------------- ----------N 0 TE--------------------------- --- Not required to be performed until 1 hour after any control rod is withdrawn. Perform CHANNEL FUNCTIONAL TEST. In accordance with the Surveillance Frequency Control Program Columbia Generating Station 3.9.2-2 Amendment 238
Control Rod Position 3.9.3 3.9 REFUELING OPERATIONS 3.9.3 Control Rod Position LCO 3.9.3 All control rods shall be fully inserted. APPLICABILITY: When loading fuel assemblies into the core. ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One or more control A.1 Suspend loading fuel Immediately rods not fully inserted. assemblies into the core. SURVEILLANCE REQUIREMENTS SURVEILLANCE .FREQUENCY SR 3.9.3.1 Verify all control rods are fully inserted. In accordance with the Surveillance Frequency Control Program Columbia Generating Station 3.9.3-1 Amendment +49,+eB ~ 238
Control Rod Position Indication 3.9.4 3.9 REFUELING OPERATIONS 3.9.4 Control Rod Position Indication LCO 3.9.4 Each control rod "full-in" position indication channel shall be OPERABLE. APPLICABILITY: MODE 5. ACTIONS
NOTE---------------------------------------------------------
Separate Condition entry is allowed for each required channel. CONDITION REQUIRED ACTION COMPLETION TIME A. One or more required A.1.1 Suspend in-vessel fuel Immediately control rod position movement. indication channels inoperable. A.1.2 Suspend control rod Immediately withdrawal. A.1.3 Initiate action to fully insert Immediately all insertable control rods in core cells containing one or more fuel assemblies. A.2.1 Initiate action to fully insert Immediately the control rod associated with the inoperable position indicator. Columbia Generating Station 3.9.4-1 Amendment 449,-1-99 225
Control Rod Position Indication 3.9.4 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. (continued) A.2.2 Initiate action to disarm the Immediately control rod drive associated with the fully inserted control rod. SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.9.4.1 Verify each channel has no "full-in" indication on Each time the each control rod that is not "full-in." control rod is withdrawn from the "full-in" position Columbia Generating Station 3.9.4-2 Amendment 449,-1-99 225
Control Rod OPERABILITY - Refueling 3.9.5 3.9 REFUELING OPERATIONS 3.9.5 Control Rod OPERABILITY - Refueling LCO 3.9.5 Each withdrawn control rod shall be OPERABLE. APPLICABILITY: MODE 5. ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One or more withdrawn A.1 Initiate action to fully insert Immediately control rods inoperable. inoperable withdrawn control rods. SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.9.5.1 -------------------------------N 0 TE------------------------------ Not required to be performed until 7 days after the control rod is withdrawn. Insert each withdrawn control rod at least one notch. In accordance with the Surveillance Frequency Control Program SR 3.9.5.2 Verify each withdrawn control rod scram In accordance accumulator pressure is;;::: 940 psig. with the Surveillance Frequency Control Program Columbia Generating Station 3.9.5-1 Amendment +49,+e9 22-§ 238
RPV Water Level - Irradiated Fuel 3.9.6 3.9 REFUELING OPERATIONS 3.9.6 Reactor Pressure Vessel (RPV) Water Level - Irradiated Fuel LCO 3.9.6 RPV water level shall be ~ 22 ft above the top of the RPV flange. APPLICABILITY: During movement of irradiated fuel assemblies within the RPV. ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. RPV water level not A.1 Suspend movement of Immediately within limit. irradiated fuel assemblies within the RPV. SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.9.6.1 Verify RPV water level is~ 22 ft above the top of the In accordance RPV flange. with the Surveillance Frequency Control Program Columbia Generating Station 3.9.6-1 Amendment .:t-49,+e9 2ae 238
RPV Water Level - New Fuel or Control Rods 3.9.7 3.9 REFUELING OPERATIONS 3.9.7 Reactor Pressure Vessel (RPV) Water Level - New Fuel or Control Rods LCO 3.9.7 RPV water level shall be::?: 23 ft above the top of irradiated fuel assemblies seated within the RPV. APPLICABILITY: During movement of new fuel assemblies or handling of control rods within the RPV when irradiated fuel assemblies are seated within the RPV. ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. RPV water level not A.1 Suspend movement of new Immediately within limit. fuel assemblies and handling of control rods within the RPV. SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.9.7.1 Verify RPV water level is::?: 23 ft above the top of In accordance irradiated fuel assemblies seated within the RPV. with the Surveillance Frequency Control Program Columbia Generating Station 3.9.7-1 Amendment .:t-69,.+99 ~ 238
RHR - High Water Level 3.9.8 3.9 REFUELING OPERATIONS 3.9.8 Residual Heat Removal (RHR) - High Water Level LCO 3.9.8 One RHR shutdown cooling subsystem shall be OPERABLE and in operation.
---------------------------------------------NOT E-------------------------------------------
The required RHR shutdown cooling subsystem may be removed from operation for up to 2 hours per 8 hour period. APPLICABILITY: MODE 5 with irradiated fuel in the reactor pressure vessel (RPV) and with the water level ~ 22 ft above the top of the RPV flange. ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. Required RHR shutdown A.1 Verify an alternate method 1 hour cooling subsystem of decay heat removal is inoperable. available. AND Once per 24 hours thereafter B. Required Action and B.1 Suspend loading irradiated Immediately associated Completion fuel assemblies into the Time of Condition A not RPV. met. AND B.2 Initiate action to restore Immediately secondary containment to OPERABLE status. AND Columbia Generating Station 3.9.8-1 Amendment +49,499 225
RHR - High Water Level 3.9.8 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME B. (continued) B.3 Initiate action to restore one Immediately standby gas treatment subsystem to OPERABLE status. AND B.4 Initiate action to restore Immediately isolation capability in each required secondary containment penetration flow path not isolated. C. No RHR shutdown C.1 Verify reactor coolant 1 hour from discovery cooling subsystem in circulation by an alternate of no reactor coolant operation. method. circulation AND Once per 12 hours thereafter AND C.2 Monitor reactor coolant Once per hour tern peratu re. SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.9.8.1 Verify one RHR shutdown cooling subsystem is In accordance operating. with the Surveillance Frequency Control Program Columbia Generating Station 3.9.8-2 Amendment 449,4-W ~ 2J8 246
RHR - High Water Level 3.9.8 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.9.8.2 Verify required RHR shutdown cooling subsystem In accordance locations susceptible to gas accumulation are with the sufficiently filled with water. Surveillance Frequency Control Program Columbia Generating Station 3.9.8-3 Amendment 246
RHR - Low Water Level 3.9.9 3.9 REFUELING OPERATIONS 3.9.9 Residual Heat Removal (RHR) - Low Water Level LCO 3.9.9 Two RHR shutdown cooling subsystems shall be OPERABLE, and one RHR shutdown cooling subsystem shall be in operation.
--------------------------------------------NOTE------------------------------------------
The required operating shutdown cooling subsystem may be removed from operation for up to 2 hours per 8 hour period. APPLICABILITY: MODE 5 with irradiated fuel in the reactor pressure vessel (RPV) and with the water level < 22 ft above the top of the RPV flange. ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One or two RH R A.1 Verify an alternate method 1 hour sh utdown cooli ng of decay heat removal is subsystems inoperable. available for each AND inoperable RHR shutdown cooling subsystem. Once per 24 hours thereafter B. Required Action and B.1 Initiate action to restore Immediately associated Completion secondary containment to Time of Condition A not OPERABLE status. met. AND B.2 Initiate action to restore one Immediately standby gas treatment subsystem to OPERABLE status. AND Columbia Generating Station 3.9.9-1 Amendment ..:t49,.:J..e9 225
RHR - Low Water Level 3.9.9 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME B. (continued) B.3 Initiate action to restore Immediately isolation capability in each required secondary containment penetration flow path not isolated. C. No RHR shutdown C.1 Verify reactor coolant 1 hour from discovery cooling subsystem in circulation by an alternate of no reactor coolant operation. method. circulation AND Once per 12 hours thereafter AND C.2 Monitor reactor coolant Once per hour temperature. SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.9.9.1 Verify one RHR shutdown cooling subsystem is In accordance operating. with the Surveillance Frequency Control Program SR 3.9.9.2 Verify RHR shutdown cooling subsystem locations In accordance susceptible to gas accumulation are sufficiently filled with the with water. Surveillance Frequency Control Program Columbia Generating Station 3.9.9-2 Amendment 449,499 ~ ~ 246
Decay Time 3.9.10 3.9 REFUELING OPERATIONS 3.9.10 Decay Time LCO 3.9.10 The reactor shall be subcritical for at least 24 hours. APPLICABILITY: During in-vessel fuel movement. ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. With the reactor A.1 Suspend in-vessel fuel Immediately subcritical for less than movement. 24 hours. SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.9.10.1 Verify the reactor has been subcritical for at least Once prior to the 24 hours. movement of irradiated fuel in the reactor vessel. Columbia Generating Station 3.9.10-1 Amendment +99 225
Inservice Leak and Hydrostatic Testing Operation 3.10.1 3.10 SPECIAL OPERATIONS 3.10.1 Inservice Leak and Hydrostatic Testing Operation LCO 3.10.1 The average reactor coolant temperature specified in Table 1.1-1 for MODE 4 may be changed to "NA," and operation considered not to be in MODE 3; and the requirements of LCO 3.4.10, "Residual Heat Removal (RHR) Shutdown Cooling System - Cold Shutdown," may be suspended to allow reactor coolant temperature> 200°F:
- For performance of an inservice leak or hydrostatic test,
- As a consequence of maintaining adequate pressure for an inservice leak or hydrostatic test, or
- As a consequence of maintaining adequate pressure for control rod scram time testing initiated in conjunction with an inservice leak or hydrostatic test, provided the following MODE 3 LCOs are met:
- a. LCO 3.3.6.2, "Secondary Containment Isolation Instrumentation,"
Functions 1, 3, and 4 of Table 3.3.6.2-1;
- b. LCO 3.6.4.1, "Secondary Containment";
- c. LCO 3.6.4.2, "Secondary Containment Isolation Valves (SCIVs)";
and
- d. LCO 3.6.4.3, "Standby Gas Treatment (SGT) System."
APPLICABILITY: MODE 4 with average reactor coolant temperature> 200°F. Columbia Generating Station 3.10.1-1 Amendment 99,200 225
Inservice Leak and Hydrostatic Testing Operation 3.10.1 ACTIONS
NOTE----------------------------------------------------------
Separate Condition entry is allowed for each requirement of the LCO. CONDITION REQUIRED ACTION COMPLETION TIME A. One or more of the A.1 ---------------NOTE------------- above requirements not Required Actions to be in met. MODE 4 include reducing average reactor coolant temperature to :5 200°F. Enter the applicable Immediately Condition of the affected LCO. A.2.1 Suspend activities that Immediately could increase the average reactor coolant temperature or pressure. A.2.2 Reduce average reactor 24 hours coolant temperature to
- 5 200°F.
SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.10.1.1 Perform the applicable SRs for the required According to the MODE 3 LCOs. applicable SRs Columbia Generating Station 3.10.1-2 Amendment ~.499 225
Reactor Mode Switch Interlock Testing 3.10.2 3.10 SPECIAL OPERATIONS 3.10.2 Reactor Mode Switch Interlock Testing LCO 3.10.2 The reactor mode switch position specified in Table 1.1-1 for MODES 3, 4, and 5 may be changed to include the run, startup/hot standby, and refuel position, and operation considered not to be in MODE 1 or 2, to allow testing of instrumentation associated with the reactor mode switch interlock functions, provided:
- a. All control rods remain fully inserted in core cells containing one or more fuel assemblies; and
- b. No CORE ALTERATIONS are in progress.
APPLICABILITY: MODES 3 and 4 with the reactor mode switch in the run, startup/hot standby, or refuel position, MODE 5 with the reactor mode switch in the run or startup/hot standby position. ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One or more of the A.1 Suspend CORE Immediately above requirements not ALTERATIONS except for met. control rod insertion. A.2 Fully insert all insertable 1 hour control rods in core cells containing one or more fuel assemblies. A.3.1 Place the reactor mode 1 hour switch in the shutdown position. Columbia Generating Station 3.10.2-1 Amendment 449,499 225
Reactor Mode Switch Interlock Testing 3.10.2 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. (continued) A .3 .2 ---------------NOTE-------------- On ly applicable in MODE 5. Place the reactor mode 1 hour switch in the refuel position. SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.10.2.1 Verity all control rods are fully inserted in core cells In accordance containing one or more fuel assemblies. with the Surveillance Frequency Control Program SR 3.10.2.2 Verity no CORE ALTERATIONS are in progress. In accordance with the Surveillance Frequency Control Program Columbia Generating Station 3.10.2-2 Amendment +49,+w 22a 238
Single Control Rod Withdrawal - Hot Shutdown 3.10.3 3.10 SPECIAL OPERATIONS 3.10.3 Single Control Rod Withdrawal- Hot Shutdown LCO 3.10.3 The reactor mode switch position specified in Table 1.1-1 for MODE 3 may be changed to include the refuel position, and operation considered not to be in MODE 2, to allow withdrawal of a single control rod, provided the following requirements are met:
- a. LCO 3.9.2, "Refuel Position One-Rod-Out Interlock";
- b. LCO 3.9.4, "Control Rod Position Indication";
- c. All other control rods are fully inserted; and
- d. 1. LCO 3.3.1.1, "Reactor Protection System (RPS)
Instrumentation," MODE 5 requirements for Functions 1.a, 1.b, 7.a, 7.b, 10, and 11 of Table 3.3.1.1-1, and LCO 3.9.5, "Control Rod OPERABILITY - Refueling,"
- 2. All other control rods in a five by five array centered on the control rod being withdrawn are disarmed, at which time LCO 3.1.1, "SHUTDOWN MARGIN (SDM)," MODE 3 requirements may be changed to allow the single control rod withdrawn to be assumed to be the highest worth control rod.
APPLICABILITY: MODE 3 with the reactor mode switch in the refuel position. Columbia Generating Station 3.10.3-1 Amendment -149,4-W 225
Single Control Rod Withdrawal - Hot Shutdown 3.10.3 ACTIONS
NOTE----------------------------------------------------------
Separate Condition entry is allowed for each requirement of the LCO. CONDITION REQUIRED ACTION COMPLETION TIME A. One or more of the A.1 --------------N OTE S------------ above requirements not 1. Required Actions to fully met. insert all insertable control rods include placing the reactor mode switch in the shutdown position.
- 2. Only applicable if the requirement not met is a required LCO.
Enter the applicable Immediately Condition of the affected LCO. A.2.1 Initiate action to fully insert Immediately all insertable control rods. A.2.2 Place the reactor mode 1 hour switch in the shutdown position. SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.10.3.1 Perform the applicable SRs for the required LCOs. According to the applicable SRs Columbia Generating Station 3.10.3-2 Amendment -149,4-69 225
Single Control Rod Withdrawal - Hot Shutdown 3.10.3 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.10.3.2 -------------------------------NO TE--------------------------- -- - Not required to be met if SR 3.10.3.1 is satisfied for LCO 3.10.3.d.1 requirements. Verify all control rods, other than the control rod In accordance being withdrawn, in a five by five array centered on with the the control rod being withdrawn, are disarmed. Surveillance Frequency Control Program SR 3.10.3.3 Verify all control rods, other than the control rod In accordance being withdrawn, are fully inserted. with the Surveillance Frequency Control Program Columbia Generating Station 3.10.3-3 Amendment +49,+w 22-a 238
Single Control Rod Withdrawal - Cold Shutdown 3.10.4 3.10 SPECIAL OPERATIONS 3.10.4 Single Control Rod Withdrawal - Cold Shutdown LCO 3.10.4 The reactor mode switch position specified in Table 1.1-1 for MODE 4 may be changed to include the refuel position, and operation considered not to be in MODE 2, to allow withdrawal of a single control rod, and subsequent removal of the associated control rod drive (CRD) if desired, provided the following requirements are met:
- a. All other control rods are fully inserted;
- b. 1. LCO 3.9.2, "Refuel Position One-Rod-Out Interlock," and LCO 3.9.4, "Control Rod Position Indication,"
OR
- 2. A control rod withdrawal block is inserted; and
- c. 1. LCO 3.3.1.1, "Reactor Protection System (RPS)
Instrumentation," MODE 5 requirements for Functions 1.a, 1.b, 7.a, 7.b, 10, and 11 of Table 3.3.1.1-1, LCO 3.3.8.2, "Reactor Protection System (RPS) Electric Power Monitoring," MODE 5 requirements, and LCO 3.9.5, "Control Rod OPERABILITY - Refueling,"
- 2. All other control rods in a five by five array centered on the control rod being withdrawn are disarmed, at which time LCO 3.1.1, "SHUTDOWN MARGIN (SDM)," MODE 5 requirements may be changed to allow the single control rod withdrawn to be assumed to be the highest worth control rod.
APPLICABI LlTY: MODE 4 with the reactor mode switch in the refuel position. Columbia Generating Station 3.10.4-1 Amendment +49,+99 225
Single Control Rod Withdrawal- Cold Shutdown 3.10.4 ACTIONS
NOTE------------------------------------------------------
Separate Condition entry is allowed for each requirement of the LCO. CONDITION REQUIRED ACTION COMPLETION TIME A. One or more of the A.1 --------------N OTE S------------ above requirements not 1. Required Actions to fully met with the affected insert all insertable control rod insertable. control rods include placing the reactor mode switch in the shutdown position.
- 2. Only applicable if the requirement not met is a required LCO.
Enter the applicable Immediately Condition of the affected LCO. OR A.2.1 Initiate action to fully insert Immediately all insertable control rods. AND A.2.2 Place the reactor mode 1 hour switch in the shutdown position. B. One or more of the B.1 Suspend withdrawal of the Immediately above requirements not control rod and removal of met with the affected associated CRD. control rod not insertable. AND B.2.1 Initiate action to fully insert Immediately all control rods. OR Columbia Generating Station 3.10.4-2 Amendment 44B ..tW 225
Single Control Rod Withdrawal - Cold Shutdown 3.10.4 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME B. (continued) B.2.2 Initiate action to satisfy the Immediately requirements of this LCO. SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.10.4.1 Perform the applicable SRs for the required LCOs. According to the applicable SRs SR 3.10.4.2 -------------------------------N 0 TE ------------ ------------------ Not required to be met if SR 3.10.4.1 is satisfied for LCO 3.10.4.c.1 requirements. Verify all control rods, other than the control rod In accordance being withdrawn, in a five by five array centered on with the the control rod being withdrawn, are disarmed. Surveillance Frequency Control Program SR 3.10.4.3 Verify all control rods, other than the control rod In accordance being withdrawn, are fully inserted. with the Surveillance Frequency Control Program SR 3.10.4.4 -------------------------------NO TE-------------------- --------- - Not required to be met if SR 3.10.4.1 is satisfied for LCO 3.10.4.b.1 requirements. Verify a control rod withdrawal block is inserted. In accordance with the Surveillance Frequency Control Program Columbia Generating Station 3.10.4-3 Amendment +49,-+S9 ~ 238
Single CRD Removal - Refueling 3.10.5 3.10 SPECIAL OPERATIONS 3.10.5 Single Control Rod Drive (CRD) Removal - Refueling LCO 3.10.5 The requirements of LCO 3.3.1.1, "Reactor Protection System (RPS) Instrumentation"; LCO 3.3.8.2, "Reactor Protection System (RPS) Electric Power Monitoring"; LCO 3.9.1, "Refueling Equipment Interlocks"; LCO 3.9.2, "Refuel Position One-Rod-Out Interlock"; LCO 3.9.4, "Control Rod Position Indication"; and LCO 3.9.5, "Control Rod OPERABILITY Refueling," may be suspended in MODE 5 to allow the removal of a single CRD associated with a control rod withdrawn from a core cell containing one or more fuel assemblies, provided the following requirements are met:
- a. All other control rods are fully inserted;
- b. All other control rods in a five by five array centered on the withdrawn control rod are disarmed;
- c. A control rod withdrawal block is inserted, and LCO 3.1.1, "SHUTDOWN MARGIN (SDM)," MODE 5 requirements may be changed to allow the single control rod withdrawn to be assumed to be the highest worth control rod; and
- d. No other CORE ALTERATIONS are in progress.
APPLICABILITY: MODE 5 with LCO 3.9.5 not met. ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One or more of the A.1 Suspend removal of the Immediately above requirements not CRD mechanism. met. A.2.1 Initiate action to fully insert Immediately all control rods. A.2.2 Initiate action to satisfy the Immediately requirements of this LCO. Columbia Generating Station 3.10.5-1 Amendment -MB,+6Q 225
Single CRD Removal - Refueling 3.10.5 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.10.5.1 Verify all control rods, other than the control rod In accordance withdrawn for the removal of the associated CRD, with the are fully inserted. Surveillance Frequency Control Program SR 3.10.5.2 Verify all control rods, other than the control rod In accordance withdrawn for the removal of the associated CRD, in with the a five by five array centered on the control rod Surveillance withdrawn for the removal of the associated CRD, Frequency are disarmed. Control Program SR 3.10.5.3 Verify a control rod withdrawal block is inserted. In accordance with the Surveillance Frequency Control Program SR 3.10.5.4 Perform SR 3.1 .1 .1. According to SR3.1.1.1 SR 3.10.5.5 Verify no other CORE ALTERATIONS are in In accordance progress. with the Surveillance Frequency Control Program Columbia Generating Station 3.10.5-2 Amendment ..:t-49,+69 ~ 238
Multiple Control Rod Withdrawal - Refueling 3.10.6 3.10 SPECIAL OPERATIONS 3.10.6 Multiple Control Rod Withdrawal - Refueling LCO 3.10.6 The requirements of LCO 3.9.3, "Control Rod Position"; LCO 3.9.4, "Control Rod Position Indication"; and LCO 3.9.5, "Control Rod OPERABILITY - Refueling," may be suspended, and the "full-in" position indicators may be bypassed for any number of control rods in MODE 5, to allow withdrawal of these control rods, removal of associated control rod drives (CRDs), or both, provided the following requirements are met:
- a. The four fuel assemblies are removed from the core cells associated with each control rod or CRD to be removed;
- b. All other control rods in core cells containing one or more fuel assemblies are fully inserted; and
- c. Fuel assemblies shall only be loaded in compliance with an approved spiral reload sequence.
APPLICABILITY: MODE 5 with LCO 3.9.3, LCO 3.9.4, or LCO 3.9.5 not met. ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One or more of the A.1 Suspend withdrawal of Immediately above requirements not control rods and removal of met. associated CRDs. AND A.2 Suspend loading fuel Immediately assemblies. Columbia Generating Station 3.10.6-1 Amendment .:+49,499 225
Multiple Control Rod Withdrawal - Refueling 3.10.6 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. (continued) A.3.1 Initiate action tc;> fully insert Immediately all control rods in core cells containing one or more fuel assemblies. A.3.2 Initiate action to satisfy the Immediately requirements of this LCO. SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.10.6.1 Verify the four fuel assemblies are removed from In accordance core cells associated with each control rod or CRD with the removed. Surveillance Frequency Control Program SR 3.10.6.2 Verify all other control rods in core cells containing In accordance one or more fuel assemblies are fully inserted. with the Surveillance Frequency Control Program SR 3.10.6.3 ------------- ------------------NOTE--------------- -------- ---- --- Only required to be met during fuel loading. Verify fuel assemblies being loaded are in In accordance compliance with an approved spiral reload with the sequence. Surveillance Frequency Control Program Columbia Generating Station 3.10.6-2 Amendment +49,+e9 22.a 238
Control Rod Testing - Operating 3.10.7 3.10 SPECIAL OPERATIONS 3.10.7 Control Rod Testing - Operating LCO 3.10.7 The requirements of LCO 3.1.6, "Rod Pattern Control," may be suspended to allow performance of SDM demonstrations, control rod scram time testing, and control rod friction testing provided:
- a. The banked position withdrawal sequence requirements of SR 3.3.2.1.8 are changed to require the control rod sequence to conform to the specified test sequence.
- b. The RWM is bypassed; the requirements of LCO 3.3.2.1, "Control Rod Block Instrumentation," Function 2 are suspended; and conformance to the approved control rod sequence for the specified test is verified by a second licensed operator or other qualified member of the technical staff.
APPLICABILITY: MODES 1 and 2 with LCO 3.1.6 not met. ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. Requirements of the A.1 Suspend performance of Immediately LCO not met. the test and exception to LCO 3.1.6. Columbia Generating Station 3.10.7-1 Amendment 449.400 225
Control Rod Testing - Operating 3.10.7 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.10.7.1 ---------------------------NOTE--------------------------- Not required to be met if SR 3.10.7.2 satisfied. Verify movement of control rods is in compliance During control rod with the approved control rod sequence for the movement specified test by a second licensed operator or other qualified member of the technical staff. SR 3.10.7.2 ------------------------------NOTE----------------------------- Not required to be met if SR 3.10.7.1 satisfied. Verify control rod sequence input to the RWM is in Prior to control conformance with the approved control rod rod movement sequence for the specified test. Columbia Generating Station 3.10.7-2 Amendment 449,4-69 225
SDM Test- Refueling (Prior to Implementation of PRNM Upgrade) 3.10.8 3.10 SPECIAL OPERATIONS 3.10.8 SHUTDOWN MARGIN (SDM) Test- Refueling LCO 3.10.8 The reactor mode switch position specified in Table 1.1-1 for MODE 5 may be changed to include the startup/hot standby position, and operation considered not to be in MODE 2, to allow SDM testing, provided the following requirements are met:
- a. LCO 3.3.1.1, "Reactor Protection System Instrumentation," MODE 2 requirements for Functions 2.a and 2.d of Table 3.3.1.1-1;
- b. 1. LCO 3.3.2.1, "Control Rod Block Instrumentation," MODE 2 requirements for Function 2 of Table 3.3.2.1-1, with banked position withdrawal sequence requirements of SR 3.3.2.1.8 changed to require the control rod sequence to conform to the SDM test sequence,
- 2. Conformance to the approved control rod sequence for the SDM test is verified by a second licensed operator or other qualified member of the technical staff;
- c. Each withdrawn control rod shall be coupled to the associated control rod drive (CRD);
- d. All control rod withdrawals during out of sequence control rod moves shall be made in notch out mode;
- e. No other CORE ALTERATIONS are in progress; and
- f. CRD charging water header pressure~ 940 psig.
APPLICABILITY: MODE 5 with the reactor mode switch in startup/hot standby position prior to implementation of Power Range Neutron Monitor (PRNM) upgrade. Columbia Generating Station 3.10.8-1 Amendment No. 4-69 ~ 226
SDM Test- Refueling (Prior to Implementation of PRNM Upgrade) 3.10.8 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. ------------NOTE------------ --------------------NOTE------------------- Separate Condition entry Rod worth minimizer may be is allowed for each bypassed as allowed by control rod. LCO 3.3.2.1, "Control Rod Block
--------------------------------- Instrumentation," if required, to allow insertion of inoperable control One or more control rod and continued operation.
rods not coupled to its ------------------------------------------------ associated CRD. A.1 Fully insert inoperable 3 hours control rod. AND A.2 Disarm the associated 4 hours CRD. B. One or more of the B.1 Place the reactor mode Immediately above requirements not switch in the shutdown or met for reasons other refuel position. than Condition A. SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.10.8.1 Perform the MODE 2 applicable SRs for According to the LCO 3.3.1.1, Functions 2.a and 2.d of applicable SRs Table 3.3.1.1-1. SR 3.10.8.2 -------------------------------NOTE------------------------------ Not required to be met if SR 3.1 0.8.3 satisfied. Perform the MODE 2 applicable SRs for According to the LCO 3.3.2.1, Function 2 of Table 3.3.2.1-1. applicable SRs Columbia Generating Station 3.10.8-2 Amendment No. 4e9 ~ 226
SDM Test- Refueling (Prior to Implementation of PRNM Upgrade) 3.10.8 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.10.8.3 -------------------------------N()TE------------------------------ Not required to be met if SR 3.1 0.8.2 satisfied. Verify movement of control rods is in compliance During control rod with the approved control rod sequence for the SDM movement test by a second licensed operator or other qualified member of the technical staff. SR 3.10.8.4 Verify no other C()RE AL TERATI()NS are in 12 hours progress. SR 3.10.8.5 Verify each withdrawn control rod does not go to the Each time the withdrawn overtravel position. control rod is withdrawn to "full out" position Prior to satisfying LC() 3.1 0.8.c requirement after work on control rod or CRD System that could affect coupling SR 3.10.8.6 Verify CRD charging water header pressure 7 days
~ 940 psig.
Columbia Generating Station 3.10.8-3 Amendment No. +69 ~ 226
SDM Test- Refueling (Prior to Implementation of PRNM Upgrade) 3.10.8 (This page intentionally blank) Columbia Generating Station 3.10.8-4 Amendment No. 226
SDM Test- Refueling (After Implementation of PRNM Upgrade) 3.10.8 3.10 SPECIAL OPERATIONS 3.10.8 SHUTDOWN MARGIN (SDM) Test- Refueling LCO 3.10.8 The reactor mode switch position specified in Table 1.1-1 for MODE 5 may be changed to include the startup/hot standby position, and operation considered not to be in MODE 2, to allow SDM testing, provided the following requirements are met:
- a. LCO 3.3.1.1, "Reactor Protection System (RPS) Instrumentation,"
MODE 2 requirements for Functions 2.a, 2.d, and 2.e of Table 3.3.1.1-1;
- b. 1. LCO 3.3.2.1, "Control Rod Block Instrumentation," MODE 2 requirements for Function 2 of Table 3.3.2.1-1, with banked position withdrawal sequence requirements of SR 3.3.2.1.8 changed to require the control rod sequence to conform to the SDM test sequence,
- 2. Conformance to the approved control rod sequence for the SDM test is verified by a second licensed operator or other qualified member of the technical staff;
- c. Each withdrawn control rod shall be coupled to the associated control rod drive (CRD);
- d. All control rod withdrawals during out of sequence control rod moves shall be made in notch out mode;
- e. No other CORE ALTERATIONS are in progress; and
- f. CRD charging water header pressure ~ 940 psig.
APPLICABILITY: MODE 5 with the reactor mode switch in startup/hot standby position after implementation of Power Range Neutron Monitor (PRNM) upgrade. Columbia Generating Station 3.10.8-5 Amendment No. 226
SDM Test- Refueling (After Implementation of PRNM Upgrade) 3.10.8 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. ------------NOTE------------ --------------------N0 TE ------------------- Separate Condition entry Rod worth minimizer may be is allowed for each bypassed as allowed by control rod. LCO 3.3.2.1, "Control Rod Block
--------------------------------- Instrumentation," if required, to allow insertion of inoperable control One or more control rod and continued operation.
rods not coupled to its ------------------------------------------------ associated CRD. A.1 Fully insert inoperable 3 hours control rod. AND A.2 Disarm the associated 4 hours CRD. B. One or more of the B.1 Place the reactor mode Immediately above requirements not switch in the shutdown or met for reasons other refuel position. than Condition A. SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.10.8.1 Perform the MODE 2 applicable SRs for According to the LCO 3.3.1.1, Functions 2.a, 2.d, and 2.e of applicable SRs Table 3.3.1.1-1. SR 3.10.8.2 -------------------------------N0 TE ------------------- ----------- Not required to be met if SR 3.1 0.8.3 satisfied. Perform the MODE 2 applicable SRs for According to the LCO 3.3.2.1, Function 2 of Table 3.3.2.1-1. applicable SRs Columbia Generating Station 3.10.8-6 Amendment No . .:tB9 22e 226
SDM Test - Refueling (After Implementation of PRNM Upgrade) 3.10.8 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.10.8.3 --------- ---- ---- ---- --- ---- ---N 0 TE------------------------------ Not required to be met if SR 3.10.8.2 satisfied. Verify movement of control rods is in compliance During control rod with the approved control rod sequence for the SDM movement test by a second licensed operator or other qualified member of the technical staff. SR 3.10.8.4 Verify no other CORE ALTERATIONS are in In accordance progress. with the Surveillance Frequency Control Program SR 3.10.8.5 Verify each withdrawn control rod does not go to the Each time the withdrawn overtravel position. control rod is withdrawn to "full out" position Prior to satisfying LCO 3.10.8.c requirement after work on control rod or CRD System that could affect coupling SR 3.10.8.6 Verify CRD charging water header pressure In accordance
~ 940 psig. with the Surveillance Frequency Control Program Columbia Generating Station 3.10.8-7 Amendment No. +e9 ~ 226 238
Design Features 4.0 4.0 DESIGN FEATURES 4.1 Site Location 4.1.1 Site and Exclusion Area Boundaries The site area shall include the area enclosed by the exclusion area plus the plant property lines that fall outside the exclusion area, as shown in Figure 4.1-1. The exclusion area boundary is a circle with its center at the reactor and a radius of 1950 meters. 4.1.2 Low Population Zone The low population zone is all the land within a circle with its center at the reactor and a radius of 4827 meters. 4.2 Reactor Core 4.2.1 Fuel Assemblies The reactor shall contain 764 fuel assemblies. Each assembly shall consist of a matrix of Zircaloy clad fuel rods with an initial composition of depleted, natural, or slightly enriched uranium dioxide (U0 2) as fuel material and water rods or channels. Limited substitutions of zirconium alloy or stainless steel filler rods for fuel rods, in accordance with approved applications of fuel rod configurations, may be used. Fuel assemblies shall be limited to those fuel designs that have been analyzed with applicable NRC staff approved codes and methods and shown by tests or analyses to comply with all safety design bases. A limited number of lead fuel assemblies that have not completed representative testing may be placed in nonlimiting core regions. 4.2.2 Control Rod Assemblies The reactor core shall contain 185 cruciform shaped control rod assemblies. The control material shall be boron carbide and hafnium metal as approved by the NRC. 4.3 Fuel Storage 4.3.1 Criticality 4.3.1 .1 The spent fuel storage racks are designed and shall be maintained with:
- a. keff ~ 0.95 if fully flooded with unborated water, which includes an allowance for uncertainties as described in Section 9.1.2 of the FSAR; and
- b. A nominal 6.5 inch center to center distance between fuel assemblies placed in the storage racks.
Columbia Generating Station 4.0-1 Amendment +W,48§. 225
Design Features 4.0 4.0 DESIGN FEATURES 4.3 Fuel Storage (continued) 4.3.1.2 The new fuel storage racks are designed and, with fuel assemblies inserted, shall be maintained with:
- a. kef! ::; 0.95 if fully flooded with unborated water, which includes an allowance for uncertainties as described in Section 9.1.1 of the FSAR; and
- b. A maximum of 60 new fuel assemblies stored in the new fuel storage racks, arranged in 6 spatially separated zones. Within a storage zone, the nominal center-to-center distance between cells for storing fuel assemblies is 14 inches. The nominal center-to center distance between cells for storing fuel assemblies in adjacent zones is 37 inches. Design features relied upon to spatially limit the placement of fuel bundles within the new fuel vault are required to be installed prior to placement of new fuel bundles in the vault.
4.3.2 Drainage The spent fuel storage pool is designed and shall be maintained to prevent inadvertent draining of the pool below elevation 583 ft 1.25 inches. 4.3.3 Capacity The spent fuel storage pool is designed and shall be maintained with a storage capacity limited to no more than 2658 fuel assemblies. Columbia Generating Station 4.0-2 Amendment 449,~ 225
Design Features 4.0 Riv~1' Pum p House!t
- NORTH Site Area Boundary WNP ....
\
I WYECJ~"AL GROUND l" EMERGENcy OPERATIONS FACtl..JTY MeT ToweR ACCESSftOAD TO ROUTE < Figure 4.1-1 (page 1 of 1) Site Area Boundary Columbia Generating Station 4.0-3 Amendment ~,~ 225
Responsibility 5.1 5.0 ADMINISTRATIVE CONTROLS 5.1 Responsibility 5.1.1 The Plant General Manager shall be responsible for overall unit operation and shall delegate in writing the succession to this responsibility during his absence. The Plant General Manager or his designee shall approve, prior to implementation, each proposed test, experiment, and modification to systems or equipment that affect nuclear safety. 5.1.2 The Shift Manager (SM) shall be responsible for the control room command function. During any absence of the SM from the control room while the unit is in MODE 1, 2, or 3, an individual with an active Senior Reactor Operator (SRO) license shall be designated to assume the control room command function. During any absence of the SM from the control room while the unit is in MODE 4 or 5, an individual with an active SRO license or Reactor Operator license shall be designated to assume the control room command function. Columbia Generating Station 5.1-1 Amendment 449,.:1-&9 225
Organization 5.2 5.0 ADMINISTRATIVE CONTROLS 5.2 Organization 5.2.1 Onsite and Offsite Organizations Onsite and offsite organizations shall be established for unit operation and corporate management, respectively. The onsite and offsite organizations shall include the positions for activities affecting safety of the nuclear power plant.
- a. Lines of authority, responsibility, and communication shall be defined and established throughout highest management levels, intermediate levels, and all operating organization positions. These relationships shall be documented and updated, as appropriate, in organization charts, functional descriptions of departmental responsibilities and relationships, and job descriptions for key personnel positions, or in equivalent forms of documentation. These requirements shall be documented in the FSAR.
- b. The Plant General Manager shall be responsible for overall safe operation of the plant and shall have control over those onsite activities necessary for safe operation and maintenance of the plant.
- c. The Chief Executive Officer shall have corporate responsibility for overall plant nuclear safety and shall take any measures needed to ensure acceptable performance of the staff in operating, maintaining, and providing technical support to the plant to ensure nuclear safety.
- d. The individuals who train the operating staff, carry out health physics, or perform quality assurance functions may report to the appropriate onsite manager; however, these individuals shall have sufficient organizational freedom to ensure their independence from operating pressures.
5.2.2 Unit Staff The unit staff organization shall include the following:
- a. At least two Equipment Operators shall be assigned when the unit is in MODES 1, 2, or 3; and at least one Equipment Operator shall be assigned when the unit is in MODE 4 or 5.
- b. Shift crew composition may be less than the minimum requirement of 10 CFR 50.54(m)(2)(i) and 5.2.2.a and 5.2.2.f for a period of time not to exceed 2 hours in order to accommodate unexpected absence of on-duty shift crew members provided immediate action is taken to restore the shift crew composition to within the minimum requirements.
Columbia Generating Station 5.2-1 Amendment 44Q,~ 225
Organization 5.2 5.2 Organization 5.2.2 Unit Staff (continued)
- c. An individual qualified to implement radiation protection procedures shall be on site when fuel is in the reactor. The position may be vacant for not more than 2 hours, in order to provide for unexpected absence, provided immediate action is taken to fill the required position.
- d. Deleted.
- e. The Operations Manager or Assistant Operations Manager shall hold an SRO license.
- f. An individual shall provide advisory technical support to the unit operations shift crew in the areas of thermal hydraulics, reactor engineering, and plant analysis with regard to the safe operation of the unit. This individual shall meet the qualifications specified by the Commission Policy Statement on Engineering Expertise on Shift.
Columbia Generation Station 5.2-2 Amendment ~,~ 225
Unit Staff Qualifications 5.3 5.0 ADMINISTRATIVE CONTROLS 5.3 Unit Staff Qualifications 5.3.1 Each member of the unit staff shall meet or exceed the minimum qualifications of ANSIIANS N18.1-1971, for comparable positions described in the FSAR, except for:
- a. The Operations Manager, who shall meet the requirements of ANSI/ANS N 18.1-1971 with the exception that in lieu of meeting the stated ANSIIANS requirement to hold a Senior Reactor Operator (SRO) license at the time of appointment to the position, the Operations Manager shall:
- 1. Hold an SRO license at the time of appointment; 2, Have held an SRO license; or
- 3. Have been certified for equivalent SRO knowledge; and
- b. The Radiation Protection Manager, who shall meet or exceed the qualifications of Regulatory Guide 1.8, Revision 1-R, May 1977, 5.3.2 For the purpose of 10 CFR 55.4, a licensed SRO and a licensed Reactor Operator (RO) are those individuals who, in addition to meeting the requirements of Specification 5.3.1, perform the functions described in 10 CFR 50,54(m),
Columbia Generation Station 5.3-1 Amendment 49Q.,~ 225
Procedures 5.4 5.0 ADMINISTRATIVE CONTROLS 5.4 Procedures 5.4.1 Written procedures shall be established, implemented, and maintained covering the following activities:
- a. The applicable procedures recommended in Regulatory Guide 1.33, Revision 2, Appendix A, February 1978;
- b. The emergency operating procedures required to implement the requirements of NUREG-0737 and NUREG-0737, Supplement 1, as stated in Generic Letter 82-33;
- c. Quality assurance program for radioactive effluent and radiological environmental monitoring;
- d. Fire Protection Program implementation; and
- e. All programs specified in Specification 5.5.
Columbia Generating Station 5.4-1 Amendment 449,4W 225
Programs and Manuals 5.5 5.0 ADMINISTRATIVE CONTROLS 5.5 Programs and Manuals The following programs shall be established, implemented, and maintained. 5.5.1 Offsite Dose Calculation Manual (ODCM)
- a. The ODCM shall contain the methodology and parameters used in the calculation of offsite doses resulting from radioactive gaseous and liquid effluents, in the calculation of gaseous and liquid effluent monitoring alarm and trip setpoints, and in the conduct of the radiological environmental monitoring program; and
- b. The ODCM shall also contain the radioactive effluent controls and radiological environmental monitoring activities, and descriptions of the information that should be included in the Annual Radiological Environmental Operating and Radioactive Effluent Release reports required by Specification 5.6.1 and Specification 5.6.2.
- c. Licensee initiated changes to the ODCM:
- 1. Shall be documented and records of reviews performed shall be retained. This documentation shall contain:
(a) Sufficient information to support the change(s) together with the appropriate analyses or evaluations justifying the change(s), and (b) A determination that the change(s) maintain the levels of radioactive effluent control required pursuant to 10 CFR 20.1302, 40 CFR 190,10 CFR 50.36a, and 10 CFR 50, Appendix I, and do not adversely impact the accuracy or reliability of effluent. dose, or setpoint calculations;
- 2. Shall become effective after review and acceptance by the Plant Operations Committee and the approval of the Plant General Manager; and
- 3. Shall be submitted to the NRC in the form of a complete, legible copy of the entire ODCM as a part of, or concurrent with, the Radioactive Effluent Release Report for the period of the report in which any change in the ODCM was made. Each change shall be identified by markings in the margin of the affected pages, clearly indicating the area of the page that was changed, and shall indicate the date (i.e., month and year) the change was implemented.
Columbia Generating Station 5.5-1 Amendment .ffi9,4-W 225
Programs and Manuals 5.5 5.5 Programs and Manuals 5.5.2 Primary Coolant Sources Outside Containment This program provides controls to minimize leakage from those portions of systems outside containment that could contain highly radioactive fluids during a serious transient or accident to levels as low as practicable. The systems include the Low Pressure Core Spray, High Pressure Core Spray, Residual Heat Removal, Reactor Core Isolation Cooling, process sampling, (the program requirements shall apply to the Post Accident Sampling System until such time as administrative controls provide for continuous isolation of the associated penetration(s) or a modification eliminates the potential leakage path{s)), containment monitoring, and Standby Gas Treatment. The program shall include the following:
- a. Preventive maintenance and periodic visual inspection requirements; and
- b. Integrated leak test requirements for each system at 24 month intervals or less.
The provisions of SR 3.0.2 are applicable to the 24 month Frequency for performing integrated system leak test activities. 5.5.3 Deleted 5.5.4 Radioactive Effluent Controls Program This program, conforming to 10 CFR 50.36a, provides for the control of radioactive effluents and for maintaining the doses to members of the public from radioactive effluents as low as reasonably achievable. The program shall be contained in the ODCM, shall be implemented by procedures, and shall include remedial actions to be taken whenever the program limits are exceeded. The program shall include the following elements:
- a. Limitations on the functional capability of radioactive liquid and gaseous monitoring instrumentation including surveillance tests and setpoint determination in accordance with the methodology in the ODCM;
- b. Limitations on the concentrations of radioactive material released in liquid effluents to unrestricted areas, conforming to 10 times the concentration values in Appendix B, Table 2, Column 2 to 10 CFR 20.1001 - 20.2402;
- c. Monitoring, sampling, and analysis of radioactive liquid and gaseous effluents pursuant to 10 CFR 20.1302 and with the methodology and parameters in the ODCM;
- d. Limitations on the annual and quarterly doses or dose commitment to a member of the public from radioactive materials in liquid effluents released from each unit to unrestricted areas, conforming to 10 CFR 50, Appendix I; Columbia Generating Station 5.5-2 Amendment ~,.:t.89 225
Programs and Manuals 5.5 5.5 Programs and Manuals 5.5.4 Radioactive Effluent Controls Program (continued)
- e. Determination of cumulative and projected dose contributions from radioactive effluents for the current calendar quarter and current calendar year in accordance with the methodology and parameters in the ODCM at least every 31 days;
- f. Limitations on the functional capability and use of the liquid and gaseous effluent treatment systems to ensure that appropriate portions of these systems are used to reduce releases of radioactivity when the projected doses in a period of 31 days would exceed 2% of the guidelines for the annual dose or dose commitment, conforming to 10 CFR 50, Appendix I;
- g. Limitations on the dose rate resulting from radioactive material released in gaseous effluents from the site to areas at or beyond the site boundary shall be limited to the following:
- 1. For noble gases: less than or equal to a dose rate of 500 mrems/yr to the whole body and less than or equal to a dose rate of 3000 mrems/yr to the skin, and
- 2. For iodine-131, iodine-133, tritium, and for all radionuclides in particulate form with half lives> 8 days: less than or equal to a dose rate of 1500 mrems/yr to any organ;
- h. Limitations on the annual and quarterly air doses resulting from noble gases released in gaseous effluents from each unit to areas beyond the site boundary, conforming to 10 CFR 50, Appendix I;
- i. Limitations on the annual and quarterly doses to a member of the public from iodine-131, iodine-133, tritium, and all radionuclides in particulate form with half lives> 8 days in gaseous effluents released from each unit to areas beyond the site boundary, conforming to 10 CFR 50, Appendix I;
- j. Limitations on the annual dose or dose commitment to any member of the public, beyond the site boundary, due to releases of radioactivity and to radiation from uranium fuel cycle sources, conforming to 40 CFR 190; and
- k. Limitations on venting and purging of the primary containment through the Standby Gas Treatment System to maintain releases as low as reasonably achievable.
I. The provisions of SR 3.0.2 and SR 3.0.3 are applicable to the Radioactive Effluent Controls Program surveillance frequency. Columbia Generating Station 5.5-3 Amendment ~,~ 225
Programs and Manuals 5.5 5.5 Programs and Manuals 5.5.5 Component Cyclic or Transient Limit This program provides controls to track the FSAR, Table 3.9-1, Note 1, cyclic and transient occurrences to ensure that components are maintained within the design limits. 5.5.6 Deleted Columbia Generating Station 5.5-4 Amendment~.~~' 243
Programs and Manuals 5.5 5.5 Programs and Manuals 5.5.7 Ventilation Filter Testing Program (yFTP) The VFTP shall establish the required testing of Engineered Safety Feature (ESF) filter ventilation systems. Tests described in Specification 5.5.7.a and 5.5.7.b shall be performed once per 24 months; after each complete or partial replacement of the HEPA filter train or charcoal adsorber filter; after any structural maintenance on the system housing; and, following significant painting, fire, or chemical release in any ventilation zone communicating with the system while it is in operation. Tests described in Specification 5.5.7.c shall be performed once per 24 months; after 720 hours of system operation; after any structural maintenance on the system housing; and, following significant painting, fire, or chemical release in any ventilation zone communicating with the system while it is in operation. Tests described in Specification 5.5.7.d and 5.5.7.e shall be performed once per 24 months. The provisions of SR 3.0.2 and SR 3.0.3 are applicable to the VFTP test Frequencies.
- a. Demonstrate for each of the ESF systems that an inplace test of the high efficiency particulate air (HEPA) filters shows a penetration and system bypass < 0.05% when tested in accordance with Regulatory Guide 1.52, Revision 2, and ASME N510-1989 at the system flowrate specified below:
ESF Ventilation System Flowrate (cfm) SGT System 4320 to 5280 CREF System 900 to 1100
- b. Demonstrate for each of the ESF systems that an inplace test of the charcoal absorber shows a penetration and system bypass < 0.05% when tested in accordance with Regulatory Guide 1.52, Revision 2, and ASME N510-1989 at the system flowrate specified below:
ESF Ventilation System Flowrate (cfm) SGT System 4320 to 5280 CREF System 900 to 1100 Columbia Generating Station 5.5-5 Amendment ~,+9Q 225
Programs and Manuals 5.5 5.5 Programs and Manuals 5.5.7 Ventilation Filter Testing Program (continued)
- c. Demonstrate for each of the ESF systems that a laboratory test of a sample of the charcoal absorber, when obtained as described in Regulatory Guide 1.52, Revision 2, shows the methyl iodide penetration less than the value specified below when tested in accordance with ASTM D3803-1989 at a temperature of 30°C (86°F) and the relative humidity specified below.
Testing of the SGT System will also be conducted at a face velocity of 75 feet per minute. ESF Ventilation System Penetration (%) RH (%) SGT System 0.5 70 CREF System 2.5 70 Allowed tolerances in the above testing parameters of temperature, relative humidity, and face velocity are as specified in ASTM D3803-1989.
- d. Demonstrate for each of the ESF systems that the pressure drop across the combined HEPA filters and the charcoal absorbers is less than the value specified below when tested at the system flowrate specified below:
ESF Ventilation System Delta P Flowrate (inches wg) (cfm) SGT System <8 4320 to 5280 CREF System <6 900 to 1100
- e. Demonstrate that the heaters for each of the ESF systems dissipate the nominal value specified below when tested in accordance with ASME N510-1989:
ESF Ventilation System Wattage (kW) SGT System 18.6 to 22.8 CREF System 4.5 to 5.5 5.5.8 Explosive Gas and Storage Tank Radioactivity Monitoring Program This program provides controls for potentially explosive gas mixtures contained in the Main Condenser Offgas Treatment System and the quantity of radioactivity contained in unprotected outdoor liquid storage tanks. Columbia Generating Station 5.5-6 Amendment +82,4W 225
Programs and Manuals 5.5 5.5 Programs and Manuals 5.5.8 Explosive Gas and Storage Tank Radioactivity Monitoring Program (continued) The program shall include:
- a. The limits for concentrations of hydrogen in the Main Condenser Offgas Treatment System and a surveillance program to ensure the limits are maintained. Such limits shall be appropriate to the system's design criteria (i.e., whether or not the system is designed to withstand a hydrogen explosion); and
- b. A surveillance program to ensure that the quantity of radioactivity contained in all outside temporary liquid radwaste tanks that are not surrounded by liners, dikes, or walls, capable of holding the tanks' contents and that do not have tank overHows and surrounding area drains connected to the Liquid Radwaste Treatment System is less than the amount that would result in concentrations greater than the limits of Appendix B, Table 2, Column 2 to 10 CFR 20.1001 - 20.2402, at the nearest potable water supply and the nearest surface water supply in an unrestricted area, in the event of an uncontrolled release of the tanks' contents.
The provisions of SR 3.0.2 and SR 3.0.3 are applicable to the Explosive Gas and Storage Tank Radioactivity Monitoring Program Surveillance Frequencies. 5.5.9 Diesel Fuel Oil Testing Program A diesel fuel oil testing program shall establish the required testing of both new fuel oil and stored fuel oil. The program shall include sampling and testing requirements, and acceptance criteria, all in accordance with applicable ASTM Standards. The purpose of the program is to establish the following:
- a. Acceptability of new fuel oil for use prior to addition to storage tanks by determining that the fuel oil has:
- 1. An API gravity, a specific gravity, or an absolute specific gravity within limits,
- 2. A kinematic viscosity, if gravity was not determined by comparison with the supplier's certificate, and a flash point within limits for ASTM 2-D fuel oil,
- 3. A water and sediment content within limits or a clear and bright appearance with proper color; Columbia Generating Station 5.5-7 Amendment 449AW 225
Programs and Manuals 5.5 5.5 Programs and Manuals 5.5.9 Diesel Fuel Oil Testing Program (continued)
- b. Other properties for ASTM 2-D fuel oil are within limits within 31 days following sampling and addition to storage tanks; and
- c. Total particulate concentration of the fuel oil in the storage tanks is
~ 10 mg/I when tested every 31 days.
The provisions of SR 3.0.2 and SR 3.0.3 are applicable to the Diesel Fuel Oil Testing Program test Frequencies. 5.5.10 Technical Specifications (TS) Bases Control Program This program provides a means for processing changes to the Bases of these Technical Specifications.
- a. Changes to the Bases of the TS shall be made under appropriate administrative controls and reviews.
- b. Licensees may make changes to Bases without prior NRC approval provided the changes do not require either of the following:
- 1. A change in the TS incorporated in the license; or
- 2. A change to the updated FSAR or Bases that requires NRC approval pursuant to 10 CFR 50.59.
- c. The Bases Control Program shall contain provisions to ensure that the Bases are maintained consistent with the FSAR.
- d. Proposed changes that meet the criteria of Specification 5.5.1 O.b above shall be reviewed and approved by the NRC prior to implementation.
Changes to the Bases implemented without prior NRC approval shall be provided to the NRC on a frequency consistent with 10 CFR 50.71(e). 5.5.11 Safety Function Determination Program (SFDP) This program ensures loss of safety function is detected and appropriate actions taken. Upon entry into LCO 3.0.6, an evaluation shall be made to determine if loss of safety function exists. Additionally, other appropriate limitations and remedial or compensatory actions may be identified to be taken as a result of the support system inoperability and corresponding exception to entering supported system Condition and Required Actions. This program implements the requirements of LCO 3.0.6. Columbia Generating Station 5.5-8 Amendment -i7+,~ 225
Programs and Manuals 5.5 5.5 Programs and Manuals 5.5.11 Safety Function Determination Program (SFDP) (continued)
- a. The SFDP shall contain the following:
- 1. Provisions for cross division checks to ensure a loss of the capability to perform the safety function assumed in the accident analysis does not go undetected;
- 2. Provisions for ensuring the plant is maintained in a safe condition if a loss of function condition exists;
- 3. Provisions to ensure that an inoperable supported system's Completion Time is not inappropriately extended as a result of multiple support system inoperabilities; and
- 4. Other appropriate limitations and remedial or compensatory actions.
- b. A loss of safety function exists when, assuming no concurrent single failure, a safety function assumed in the accident analysis cannot be performed.
For the purpose of this program, a loss of safety function may exist when a support system is inoperable, and:
- 1. A required system redundant to system(s) supported by the inoperable support system is also inoperable; or
- 2. A required system redundant to system(s) in turn supported by the inoperable supported system is also inoperable; or
- 3. A required system redundant to support system(s) for the supported systems described in b.1 and b.2 above is also inoperable.
- c. The SFDP identifies where a loss of safety function exists. If a loss of safety function is determined to exist by this program, the appropriate Conditions and Required Actions of the LCO in which the loss of safety function exists are required to be entered.
5.5.12 Primary Containment Leakage Rate Testing Program The Primary Containment Leakage Rate Testing Program shall establish the leakage rate testing of the containment as required by 10 CFR 50.54(0) and 10 CFR 50, Appendix J, Option B, as modified by approved exemptions. This program shall be in accordance with the guidelines contained in NEI 94-01, "Industry Guideline for Implementing Performance-Based option of 10 CFR Part 50, Appendix J," Revision 3-A, dated July 2012, and the conditions and limitations specified in NEI 94-01, Revision 2-A, dated October 2008. Columbia Generating Station 5.5-9 Amendment 4-7-7,494 225 247
Programs and Manuals 5.5 5.5 Programs and Manuals 5.5.12 Primary Containment Leakage Rate Testing Program (continued) The peak calculated primary containment internal pressure for the design basis loss of coolant accident, Pa, is 38 psig. The maximum allowable primary containment leakage rate, La, at Pa, shall be 0.5% of primary containment air weight per day. Leakage rate acceptance criteria are:
- a. Primary containment leakage rate acceptance criterion is s 1.0 La. During the first unit startup following testing in accordance with this program, the leakage rate acceptance criteria are < 0.60 La for the Type B and Type C tests (except for main steam isolation valves) and< 0.75 La for Type A tests;
- b. Primary containment air lock testing acceptance criteria are:
- 1. Overall primary containment air lock leakage rate is s 0.05 La when tested at.:: Pa; and
- 2. For each door, leakage rate is s 0.025 La when pressurized to
.:: 10 psig.
The provisions of SR 3.0.3 are applicable to the Primary Containment Leakage Rate Testing Program. 5.5.13 Battery Monitoring and Maintenance Program This Program provides for restoration and maintenance, which includes the following:
- a. Actions to restore battery cells with float voltage < 2.13 V; and
- b. Actions to equalize and test battery cells that had been discovered with electrolyte level below the top of the plates; and
- c. Actions to verify that the remaining cells are .:: 2.07 V when a cell or cells have been found to be< 2.13 V.
Columbia Generating Station 5.5-10 Amendment 494,2G4 ~ 247
Programs and Manuals 5.5 5.5 Programs and Manuals 5.5.14 Control Room Envelope Habitability Program A Control Room Envelope (CRE) Habitability Program shall be established and implemented to ensure that CRE habitability is maintained such that, with an OPERABLE Control Room Emergency Filtration (CREF) System, CRE occupants can control the reactor safely under normal conditions and maintain it in a safe condition following a radiological event, hazardous chemical release, or a smoke challenge. The program shall ensure that adequate radiation protection is provided to permit access and occupancy of the CRE under design basis accident (OBA) conditions without personnel receiving radiation exposures in excess of 5 rem total effective dose equivalent (TEDE) for the duration of the accident. The program shall include the following elements:
- a. The definition of the CRE and the CRE boundary.
- b. Requirements for maintaining the CRE boundary in its design condition including configuration control and preventive maintenance.
- c. Requirements for (i) determining the unfiltered air inleakage past the CRE boundary into the CRE in accordance with the testing methods and at the Frequencies specified in Sections C.1 and C.2 of Regulatory Guide 1 .197, "Demonstrating Control Room Envelope Integrity at Nuclear Power Reactors,"
Revision 0, May 2003, and (ii) assessing CRE habitability at Frequencies specified in Sections C.1 and C.2 of Regulatory Guide 1.197, Revision 0.
- d. Measurement, at designated locations, of the CRE pressure relative to all external areas adjacent to the CRE boundary during the pressurization mode of operation by one subsystem of the CREF System, operating at the flow rate required by the VFTP, at a Frequency of 24 months on a STAGGERED TEST BASIS. The results shall be trended and used as part of the 24 month assessment of the CRE boundary.
- e. The quantitative limits on unfiltered air inleakage into the CRE. These limits shall be stated in a manner to allow direct comparison to the unfiltered air inleakage measured by the testing described in paragraph c. The unfiltered air inleakage limit for radiological challenges is the inleakage flow rate assumed in the licensing basis analyses for OBA consequences. Unfiltered air inleakage limits for hazardous chemicals must ensure that exposure of CRE occupants to these hazards will be within the assumptions in the licensing basis.
- f. The provisions of SR 3.0.2 are applicable to the Frequencies for assessing CRE habitability, determining CRE unfiltered inleakage, and measuring CRE pressure and assessing the CRE boundary as required by paragraphs c and d, respectively.
Columbia Generating Station 5.5-11 Amendment 2G-7,a+e ~ 238 I
Programs and Manuals 5.5 5.5 Programs and Manuals 5.5.15 Surveillance Frequency Control Program This program provides controls for Surveillance Frequencies. The program shall ensure that Surveillance Requirements specified in the Technical Specifications are performed at intervals sufficient to assure the associated Limiting Conditions for Operation are met.
- a. The Surveillance Frequency Control Program shall contain a list of Frequencies of those Surveillance Requirements for which the Frequency is controlled by the program.
- b. Changes to the Frequencies listed in the Surveillance Frequency Control Program shall be made in accordance with NEI 04-10, "Risk-Informed Method for Control of Surveillance Frequencies," Revision 1.
- c. The provisions of Surveillance Requirements 3.0.2 and 3.0.3 are applicable to the Frequencies established in the Surveillance Frequency Control Program.
Columbia Generating Station 5.5-12 Amendment 238
Reporting Requirements 5.6 5.0 ADMINISTRATIVE CONTROLS 5.6 Reporting Requirements The following reports shall be submitted in accordance with 10 CFR 50.4. 5.6.1 Annual Radiological Environmental Operating Report The Annual Radiological Environmental Operating Report covering the operation of the unit during the previous calendar year shall be submitted by May 15 of each year. The report shall include summaries, interpretations, and analyses of trends of the results of the Radiological Environmental Monitoring Program for the reporting period. The material provided shall be consistent with the objectives outlined in the Offsite Dose Calculation Manual (ODCM), and in 10 CFR 50, Appendix I, Sections IV.B.2, IV.B.3, and IV.C. The Annual Radiological Environmental Operating Report shall include the results of analyses of all radiological environmental samples and of all environmental radiation measurements taken during the period pursuant to the locations specified in the table and figures in the ODCM, as well as summarized and tabulated results of these analyses and measurements in the format of the table in the Radiological Assessment Branch Technical Position, Revision 1, November 1979. In the event that some individual results are not available for inclusion with the report, the report shall be submitted noting and explaining the reasons for the missing results. The missing data shall be submitted in a supplementary report as soon as possible. 5.6.2 Radioactive Effluent Release Report The Radioactive Effluent Release Report covering the operation of the unit shall be submitted in accordance with 10 CFR 50.36a. The report shall include a summary of the quantities of radioactive liquid and gaseous effluents and solid waste released from the unit. The material provided shall be consistent with the objectives outlined in the ODCM and the Process Control Program and in conformance with 10 CFR 50.36a and 10 CFR 50, Appendix I, Section IV.B.1. Columbia Generating Station 5.6-1 Amendment No.~~ 226 I
Reporting Requirements 5.6 5.6 Reporting Requirements 5.6.3 CORE OPERATING LIMITS REPORT (COLR)
- a. Core operating limits shall be established prior to each reload cycle, or prior to any remaining portion of a reload cycle, and shall be documented in the COLR for the following:
- 1. The APLHGR for Specification 3.2.1;
- 2. The MCPR for Specification 3.2.2;
- 3. The LHGR for Specification 3.2.3;
- 4. LCO 3.3.1.3, "Oscillation Power Range Monitor (OPRM)
Instrumentation" prior to implementation of Power Range Neutron Monitor (PRNM) upgrade;
- 5. The Oscillation Power Range Monitor (OPRM) Instrumentation for Specification 3.3.1.1 after implementation of PRNM upgrade; and
- 6. The Rod Block Monitor Instrumentation for Specification 3.3.2.1 after implementation of PRNM upgrade.
- b. The analytical methods used to determine the core operating limits shall be those previously reviewed and approved by the NRC, specifically those described in the following documents:
- 1. XN-NF-81-58(P)(A), "RODEX2 Fuel Rod Thermal-Mechanical Response Evaluation Model," Exxon Nuclear Company
- 2. XN-NF-85-67(P)(A), "Generic Mechanical Design for Exxon Nuclear Jet Pump BWR Reload Fuel," Exxon Nuclear Company
- 3. EMF-85-74(P) Supplement 1(P)(A) and Supplement 2(P)(A),
"RODEX2A (BWR) Fuel Rod Thermal-Mechanical Evaluation Model,"
Siemens Power Corporation
- 4. ANF-89-98(P)(A), "Generic Mechanical Design Criteria for BWR Fuel Designs," Advanced Nuclear Fuels Corporation
- 5. XN-NF-80-19(P)(A) Volume 1, "Exxon Nuclear Methodology for Boiling Water Reactors - Neutronic Methods for Design and Analysis,"
Exxon Nuclear Company
- 6. XN-NF-80-19(P)(A) Volume 4, "Exxon Nuclear Methodology for Boiling Water Reactors: Application of the ENC Methodology to BWR Reloads," Exxon Nuclear Company Columbia Generating Station 5.6-2 Amendment No. +QG~ 226
Reporting Requirements 5.6 5.6 Reporting Requirements 5.6.3 CORE OPERATING LIMITS REPORT (COLR) (continued)
- 7. EMF-2158(P)(A), "Siemens Power Corporation Methodology for Boiling Water Reactors: Evaluation and Validation of CASM0-4/MICROBURN-B2," Siemens Power Corporation
- 8. XN-NF-80-19(P)(A) Volume 3, "Exxon Nuclear Methodology for Boiling Water Reactors, THERMEX: Thermal Limits Methodology Summary Description," Exxon Nuclear Company
- 9. XN-NF-84-1 05(P)(A) Volume 1, "XCOBRA-T: A Computer Code for BWR Transient Thermal-Hydraulic Core Analysis," Exxon Nuclear Company
- 10. ANF-524(P)(A), "ANF Critical Power Methodology for Boiling Water Reactors," Advanced Nuclear Fuels Corporation
- 11. ANF-913(P)(A) Volume 1, "COTRANSA2: A Computer Program for Boiling Water Reactor Transient Analysis," Advanced Nuclear Fuels Corporation
- 12. ANF-1358(P)(A) "The Loss of Feedwater Heating Transient in Boiling Water Reactors," Advanced Nuclear Fuels Corporation
- 13. EMF-2209(P)(A), "SPCB Critical Power Correlation," Siemens Power Corporation
- 14. EMF-2245(P)(A), "Application of Siemens Power Corporation's Critical Power Correlations to Co-Resident Fuel," Siemens Power Corporation
- 15. EMF-2361 (P)(A), "EXEM BWR-2000 ECCS Evaluation Model,"
Framatome ANP Richland
- 16. EMF-2292(P)(A), "ATRIUM' -1 0: Appendix K Spray Heat Transfer Coefficients," Siemens Power Corporation
- 17. EMF-CC-074(P)(A) Volume 4, "BWR Stability Analysis-Assessment of STAIF with Input from MICROBURN-B2," Siemens Power Corporation
- 18. CENPD-300-P-A, "Reference Safety Report for Boiling Water Reactor Reload Fuel," ABB Combustion Engineering Nuclear Operations
- 19. NED0-32465-A, "BWR Owners' Group Reactor Stability Detect and Suppress Solutions Licensing Basis Methodology and Reload Applications"
- 20. NEDC-33419P, "GEXL97 Correlation Applicable to ATRIUM-10 Fuel,"
Global Nuclear Fuel Columbia Generating Station 5.6-3 Amendment No. +9G- 22-e 226
Reporting Requirements 5.6 5.6 Reporting Requirements 5.6.3 CORE OPERATING LIMITS REPORT (COLR) (continued)
- 21. NEDE-24011-P-A and NEDE-24011-P-A-US, "General Electric Standard Application for Reactor Fuel (GESTAR II) and Supplement for United States," Global Nuclear Fuel
- c. The core operating limits shall be determined such that all applicable limits (e.g., fuel thermal mechanical limits, core thermal hydraulic limits, Emergency Core Cooling Systems (ECCS) limits, nuclear limits such as SDM, transient analysis limits, and accident analysis limits) of the safety analysis are met.
- d. The COLR, including any midcycle revisions or supplements, shall be provided upon issuance for each reload cycle to the NRC.
5.6.4 Post Accident Monitoring (PAM) Instrumentation Report When a report is required by Condition 8 or F of LCO 3.3.3.1, "Post Accident Monitoring (PAM) Instrumentation," a report shall be submitted within the following 14 days. The report shall outline the preplanned alternate method of monitoring, the cause of the inoperability, and the plans and schedule for restoring the instrumentation channels of the Function to OPERABLE status. Columbia Generating Station 5.6-4 Amendment No . .:t-90 ~ 226
High Radiation Area 5.7 5.0 ADMINISTRATIVE CONTROLS 5.7 High Radiation Area As provided in paragraph 20.1601 (c) of 10 CFR Part 20, the following controls shall be applied to high radiation areas in place of the controls required by paragraph 20.1601 (a) and (b) of 10 CFR Part 20. 5.7.1 High Radiation Areas with Dose Rates not Exceeding 1.0 rem/hour (at 30 centimeters from the radiation sources or from any surface penetrated by the radiation)
- a. Each entryway to such an area shall be barricaded and conspicuously posted as a high radiation area. Such barricades may be opened as necessary to permit entry or exit of personnel or equipment.
- b. Access to, and activities in, each such area shall be controlled by means of a Radiation Work Permit (RWP) or equivalent that includes specification of radiation dose rates in the immediate work area(s) and other appropriate radiation protection equipment and measures.
- c. Individuals qualified in radiation protection procedures and personnel continuously escorted by such individuals may be exempted from the requirement for an RWP or equivalent while performing their assigned duties provided that they are otherwise following plant radiation protection procedures for entry to, exit from, and work in such areas.
- d. Each individual or group entering such an area shall possess:
- 1. A radiation monitoring device that continuously displays radiation dose rates in the area; or
- 2. A radiation monitoring device that continuously integrates the radiation dose rates in the area and alarms when the device's dose alarm setpoint is reached, with an appropriate alarm setpoint; or
- 3. A radiation monitoring device that continuously transmits dose rate and cumulative dose to a remote receiver monitored by radiation protection personnel responsible for controlling personnel radiation exposure within the area; or
- 4. A self-reading dosimeter (e.g., pocket ionization chamber or electronic dosimeter) and, (i) Be under the surveillance, as specified in the RWP or equivalent, while in the area, of an individual qualified in radiation protection procedures, equipped with a radiation monitoring device that continuously displays radiation dose rates in the area; who is responsible for controlling personnel radiation exposure within the area, or Columbia Generating Station 5.7-1 Amendment 4-69,+82 225
High Radiation Area 5.7 5.7 High Radiation Area 5.7.1 High Radiation Areas with Dose Rates not Exceeding 1.0 rem/hour (at 30 centimetersfrom the radiation sources or from any surface penetrated by the radiation) (continued) (ii) Be under the surveillance, as specified in the RWP or equivalent, while in the area, by means of closed circuit television, of personnel qualified in radiation protection procedures, responsible for controlling personnel radiation exposure in the area, and with the means to communicate with individuals in the area who are covered by such surveillance.
- e. Except for individuals qualified in radiation protection procedures, or personnel continuously escorted by such individuals, entry into such areas shall be made only after dose rates in the area have been determined and entry personnel are knowledgeable of them. These continuously escorted personnel will receive a pre-job briefing prior to entry into such areas. This dose rate determination, knowledge, and pre-job briefing does not require documentation prior to initial entry.
5.7.2 High Radiation Areas with Dose Rates Greater than 1.0 rem/hour (at 30 centimeters from the radiation sources or from any surface penetrated by the radiation), but less than 500 rads/hour (at 1 meter from the radiation sources or from any surface penetrated by the radiation)
- a. Each entryway to such an area shall be conspicuously posted as a high radiation area and shall be provided with a locked or continuously guarded door or gate that prevents unauthorized entry, and in addition:
- 1. All such door and gate keys shall be maintained under the administrative control of the Shift Supervisor, Radiation Protection Manager, or his or her designee.
- 2. Doors and gates shall remain locked except during periods of personnel or equipment entry or exit.
- b. Access to, and activities in, each such area shall be controlled by means of an RWP or equivalent that includes specification of radiation dose rates in the immediate work area(s) and other appropriate radiation protection equipment and measures.
- c. IndividualS qualified in radiation protection procedures may be exempted from the requirement for an RWP or equivalent while performing radiation surveys in such areas provided that they are otherwise following plant radiation protection procedures for entry to, exit from, and work in such areas.
Columbia Generating Station 5.7-2 Amendment ~,~ 225
High Radiation Area 5.7 5.7 High Radiation Area 5.7.2 High Radiation Areas with Dose Rates Greater than 1.0 rem/hour (at 30 centimeters from the radiation sources or from any surface penetrated by the radiationl, but less than 500 rads/hour (at 1 meter from the radiation sources or from any surface penetrated by the radiationl (continued)
- d. Each individual or group entering such an area shall possess:
- 1. A radiation monitoring device that continuously integrates the radiation rates in the area and alarms when the device's dose alarm setpoint is reached, with an appropriate alarm setpoint. or
- 2. A radiation monitoring device that continuously transmits dose rate and cumulative dose to a remote receiver monitored by radiation protection personnel responsible for controlling personnel radiation exposure within the area with the means to communicate with and control every individual in the area, or
- 3. A self-reading dosimeter (e.g., pocket ionization chamber or electronic dosimeter) and, (i) Be under the surveillance, as specified in the RWP or equivalent, while in the area, of an individual qualified in radiation protection procedures, equipped with a radiation monitoring device that continuously displays radiation dose rates in the area; who is responsible for controlling personnel exposure within the area, or (ii) Be under the surveillance, as specified in the RWP or equivalent, while in the area, by means of closed circuit television, of personnel qualified in radiation protection procedures, responsible for controlling personnel radiation exposure in the area, and with the means to communicate with and control every individual in the area.
- 4. In those cases where options 2. and 3., above are impractical or determined to be inconsistent with the "As Low As is Reasonably Achievable" principle, a radiation monitoring device that continuously displays radiation dose rates in the area.
- e. Except for individuals qualified in radiation protection procedures, or personnel continuously escorted by such individuals, entry into such areas shall be made only after dose rates in the area have been determined and entry personnel are knowledgeable of them. These continuously escorted personnel will receive a pre-job briefing prior to entry into such areas. This dose rate determination, knowledge, and pre-job briefing does not require documentation prior to initial entry.
Columbia Generating Station 5.7-3 Amendment .:+69,~ 225
High Radiation Area 5.7 5.7 High Radiation Area 5.7.2 High Radiation Areas with Dose Rates Greater than 1.0 rem/hour (at 30 centimeters from the radiation sources or from any surface penetrated by the radiation), but less than 500 rads/hour (at 1 meter from the radiation sources or from any surface penetrated by the radiation) (continued)
- f. Such individual areas that are within a larger area where no enclosure exists for purpose of locking and where no enclosure can reasonably be constructed around the individual area need not be controlled by a locked door or gate, nor continuously guarded, but shall be barricaded, conspicuously posted, and a clearly visible flashing light shall be activated at the area as a warning device.
Columbia Generating Station 5.7-4 Amendment 4-69,+82 225
APPENDIX B TO FACILITY OPERATING LICENSE NO. NPF-21 ENERGY NORTHWEST COLUMBIA GENERATING STATION DOCKET NO. 50-397 ENVIRONMENTAL PROTECTION PLAN (NONRADIOLOGICAL) Amendment No. 157,169 225
ENERGY NORTHWEST COLUMBIA GENERATING STATION ENVIRONMENTAL PROTECTION PLAN (NON-RADIOLOGICAL) TABLE OF CONTENTS Section Page 1.0 Objectives of the Environmental Protection Plan .......................................................... 1-1 2.0 Environmental Protection Issues .................................................................................. 2-1 2.1 Aquatic Resources Issues ............................................................................................2-1 2.2 Terrestrial Resources Issues ........................................................................................2-1 3.0 Consistency Requirements ......................................................................................... 3-1 3.1 Plant Design and Operation .......................................................................................... 3-1 3.2 Reporting Related to the NPDES Permit and State Certification ................................... 3-2 3.3 Changes Required for Compliance with Other Environmental Regulations ................... 3-2 4.0 Environmental Conditions .............................................................................................4-1 4.1 Unusual or Important Environmental Events ................................................................. 4-1 4.2 Environmental Monitoring .............................................................................................4-1 5.0 Administrative Procedures ........................................................................................... 5-1 5.1 Review and Audit. .........................................................................................................5-1 5.2 Records Retention ........................................................................................................5-1 5.3 Changes in Environmental Protection Plan .................................................................. 5-1 5.4 Plant Reporting Requirements ......................................................................................5-2 Amendment No. 157,169 225
1.0 Objectives of the Environmental Protection Plan The Environmental Protection Plan (EPP) is to provide for protection of nonradiological environmental values during operation of the Columbia Generating Station facility. The principal objectives of the EPP are as follows: (1) Verity that the plant is operated in an environmentally acceptable manner, as established by the FES-OL and other NRC environmental impact assessments. (2) Coordinate NRC requirements and maintain consistency with other Federal, State and local requirements for environmental protection. (3) Keep NRC informed of the environmental effects of facility construction and operation and of actions taken to control those effects. Environmental concerns identified in the FES-OL which relate to water quality matters are regulated by way of the licensee's NPDES permit. 1-1 Amendment No . .:t-e9 225
2.0 Environmental Protection Issues In the FES-OL dated December 1981, the staff considered the environmental impacts associated with the operation of Columbia Generating Station. Certain environmental issues were identified which required study or license conditions to resolve environmental concerns and to assure adequate protection of the environment. 2.1 Aquatic Resources Issues The one aquatic issue raised by the staff in the FES-OL was that the disposal of chlorinated effluents in the river could have significant impacts on Hanford Reach biota if chlorine content were not carefully controlled (Section 5.5.2.2). This matter is addressed by the NPDES permit issued by the State of Washington Energy Facility Site Evaluation Council (EFSEC). Also, in the FES-OL (Section 5.5.3.2), the staff acknowledged that entrainment and impingement studies might be performed in accordance with special conditions of the water withdrawal permit, issued by the U.S. Army Corps of Engineers. The NRC will rely on these agencies for regulation of matters involving water quality and aquatic biota. 2.2 Terrestrial Resources Issues There is uncertainty in predicting the potential impact of cooling tower drift on vegetation surrounding the site (FES Section 5.5.1.1). To resolve the uncertainty, the staff recommended a monitoring program to detect any effects of cooling tower drift on vegetation (FES Section 5.5.3.1 ). NRC requirements with regard to the terrestrial issues are specified in Subsection 4.2 of this EPP. 2-1 Amendment No. .:tOO 225
3.0 Consistency Requirements 3.1 Plant Design and Operation The licensee may make changes in station design or operation or perform tests or experiments affecting the environment provided such activities do not involve an unreviewed environmental question and do not involve a change in the EPP. Changes in plant design or operation or performance of tests or experiments which do not affect the environment are not subject to the requirements of this EPP. Activities governed by Section 3.3 are not subject to the requirements of this Section. Before engaging in unauthorized construction or operation activities which may significantly affect the environment, the licensee shall prepare and record an environmental evaluation of such activity. Activities are excluded from this requirement if all measurable nonradiological effects are confined to the on-site areas previously disturbed during site preparation and plant construction. When the evaluation indicates that such activity involves an unreviewed environmental question, the licensee shall provide a written evaluation of such activity and obtain prior NRC approval. When such activity involves a change in the EPP, such activity and change to the EPP may be implemented only in accordance with an appropriate license amendment as set forth in Section 5.3 of this EPP. A proposed change, test or experiment shall be deemed to involve an unreviewed environmental question if it concerns: (1) a matter which may result in a significant increase in any adverse environmental impact previously evaluated in the FES-OL, environmental impact appraisals, or in any decisions of the Atomic Safety and Licensing Board; or (2) a significant change in effluents or power level or (3) a matter, not previously reviewed and evaluated in the documents specified in (1) of this Subsection, which may have a significant adverse environmental impact. The licensee shall maintain records of changes in facility design or operation and of tests and experiments carried out pursuant to this Subsection. These records shall include written evaluations which provide bases for the determination that the change, test, or experiment does not involve an unreviewed environmental question or constitute a decrease in the effectiveness of this EPP to meet the objectives specified in Section 1. O. The licensee shall include as part of its Annual Environmental Operating Report (per Subsection 5.4.1) brief descriptions, analyses, interpretations, and evaluations of such changes, tests and experiments. 3-1 Amendment No. ~ 225
3.2 Reporting Related to the NPDES Permit and State Certification Changes to, or renewals of, the NPDES Permit or the State certification shall be reported to the NRC within 30 days following the date the change or renewal is approved. If a permit or certification, in part or in its entirety, is appealed and stayed, the NRC shall be notified within 30 days following the date the stay is granted. The NRC shall be notified of changes to the effective NPDES Permit proposed by t.he licensee by providing NRC with a copy of the proposed change at the same time it is submitted to the permitting agency. The licensee shall provide the NRC a copy of the application for renewal of the NPDES Permit at the same time the application is submitted to the permitting agency. 3.3 Changes Required for Compliance with Other Environmental Regulations Changes in plant design or operation and performance of tests or experiments which are required to achieve compliance with other Federal, State, and local environmental regulations are not sUbject to the requirements of Section 3.1. 3-2 Amendment No. 225
4.0 Environmental Conditions 4.1 Unusual or Important Environmental Events Any occurrence of an unusual or important event that indicates or could result in significant environmental impact causally related to plant operation shall be recorded and reported to the NRC within 24 hours followed by a written report per Subsection 5.4.2. The following are examples: excessive bird impaction events, onsite plant or animal disease outbreaks, mortality or unusual occurrence of any species protected by the Endangered Species Act of 1973, fish kills, increase in nuisance organisms or conditions, and a significant, unanticipated or emergency discharge of waste water or chemical substances. No routine monitoring programs are required to implement this condition. 4.2 Environmental Monitoring 4.2.1 Cooling Tower Drift Study A terrestrial monitoring program shall be conducted to verify the level of effect from cooling tower drift. Soil and vegetation samples will be collected at locations subject to drift deposition and at control stations and analyzed for relevant chemical and physical parameters. Samples will be collected once per year during the seasonal peak of plant growth commencing no later than 18 months after issuance of a full power (100%) license. This program shall be terminated when data from three growing seasons after commencement of full power operation have been collected, provided the data support hypotheses of no adverse effects. Results and interpretation shall be included as part of the Annual Environmental Operating Report (Subsection 5.4.1). 4-1 Amendment No. 225
5.0 Administrative Procedures 5.1 Review and Audit The licensee shall provide for review and audit of compliance with the Environmental Protection Plan. The audits shall be conducted independently of the individual or groups responsible for performing the specific activity. A description of the organization structure utilized to achieve the independent review and audit function and results of the audit activities shall be maintained and made available for inspection. 5.2 Records Retention Records and logs relative to the environmental aspects of station operation shall be made and retained in a manner convenient for review and inspection. These records and logs shall be made available to NRC on request. Records of modifications to plant structures, systems and components determined to potentially affect the continued protection of the environment shall be retained for the life of the plant. All other records, data and logs relating to this EPP shall be retained for five years or, where applicable, in accordance with the requirements of other agencies. 5.3 Changes in Environmental Protection Plan Request for change in the Environmental Protection Plan shall include an assessment of the environmental impact of the proposed change and a supporting justification. Implementation of such changes in the EPP shall not commence prior to NRC approval of the proposed changes in the form of a license amendment incorporating the appropriate revision to the Environmental Protection Plan. 5-1 Amendment No. 225
5.4 Plant Reporting Requirements 5.4.1 Routine Reports An Annual Environmental Operating Report describing implementation of this EPP for the previous year shall be submitted to the NRC prior to May 1 of each year. The initial report shall be submitted prior to May 1 of the year following issuance of the operating license. The period of the first report shall begin with the date of issuance of the operating license. The report shall include summaries and analyses of the results of the environmental protection activities required by Subsection 4.2 of this Environmental Protection Plan for the report period, including a comparison with and related preoperational studies, operational controls (as appropriate), and previous non-radiological environmental monitoring reports, and an assessment of the observed impacts of the plant operation on the environment. If harmful effects or evidence of trends toward irreversible damage to the environment are observed, the licensee shall provide a detailed analysis of the data and a proposed course of mitigating action. The Annual Environmental Operating Report shall also include: (a) A list of EPP noncompliances and the corrective actions taken to remedy them. (b) A list of all changes in station design or operation, tests, and experiments made in accordance with Subsection 3.1 which involved a potentially significant unreviewed environmental question. (c) A list of nonroutine reports submitted in accordance with Subsection 5.4.2. (d) A summary of NPDES permit related water quality reports sent to EFSEC during the report period. In the event that some results are not available by the report due date, the report shall be submitted noting and explaining the missing results. The missing results shall be submitted as soon as possible in a supplementary report. 5-2 Amendment No. 225
5.4.2 Nonroutine Reports A written report shall be submitted to the NRC within 30 days of occurrence of a nonroutine event. The report shall (a) describe. analyze, and evaluate the event, including extent and magnitude of the impact and plant operating characteristics, (b) describe the probable cause of the event. (c) indicate the action taken to correct the reported event, (d) indicate the corrective action taken to preclude repetition of the event and to prevent similar occurrences involving similar components or systems, and (e) indicate the agencies notified and their preliminary responses. Events reportable under this subsection which also require reports to other Federal. State or local agencies shall be reported in accordance with those reporting requirements in lieu of the requirements of this subsection. The NRC shall be provided a copy of such report at the same time it is submitted to the other agency. This subsection does not apply to nonradiological water quality matters within the scope of the NPDES permit. 5-3 Amendment No. 225
APPENDIX C Deleted Amendment No. 157,223225 I}}