MONTHYEARGO2-24-110, Summary of Changes and Analysis for Revision 45 of Plant Procedures Manual 13.4.1, Emergency Notification2024-11-0404 November 2024 Summary of Changes and Analysis for Revision 45 of Plant Procedures Manual 13.4.1, Emergency Notification GO2-24-109, Summary of Changes and Analysis for Revision 42 of Plant Procedures Manual 13.8.1, Emergency Dose Projection System Operations2024-11-0404 November 2024 Summary of Changes and Analysis for Revision 42 of Plant Procedures Manual 13.8.1, Emergency Dose Projection System Operations ML24290A1142024-10-17017 October 2024 CGS FPTI 2024011 GO2-24-088, Supplement to Response to Request for Additional Information Regarding License Amendment Request to Revise Columbia Emergency Plan2024-09-24024 September 2024 Supplement to Response to Request for Additional Information Regarding License Amendment Request to Revise Columbia Emergency Plan GO2-24-051, Application to Revise Technical Specifications to Adopt TSTF-592, Revise Automatic Depressurization System (ADS) Instrumentation Requirements2024-09-23023 September 2024 Application to Revise Technical Specifications to Adopt TSTF-592, Revise Automatic Depressurization System (ADS) Instrumentation Requirements ML24247A1572024-09-12012 September 2024 Withholding Determination Letter for Presentation Materials for Energy Northwest Pre-application Meeting 8-9-2024 ML24255A1012024-09-12012 September 2024 Request for Withholding Information from Public Disclosure Energy Northwest Regulatory Engagement Plan, Revision 0 GO2-24-082, Response to Request for Additional Information Regarding License Amendment Request to Revise Columbia Emergency Plan2024-09-10010 September 2024 Response to Request for Additional Information Regarding License Amendment Request to Revise Columbia Emergency Plan IR 05000397/20240052024-08-22022 August 2024 Updated Inspection Plan for Columbia Generating Station (Report 05000397/2024005) IR 07200035/20244012024-08-19019 August 2024 Security Baseline Inspection Report 07200035/2024401 IR 05000397/20244022024-08-13013 August 2024 Security Baseline Inspection Report 05000397/2024402 IR 05000397/20240022024-08-0909 August 2024 Integrated Inspection Report 05000397/2024002 GO2-24-060, Reply to a Notice of Violation, EA-21-170 and EA-23-0542024-07-30030 July 2024 Reply to a Notice of Violation, EA-21-170 and EA-23-054 GO2-24-070, Response to Request for Additional Information Regarding Fifth Interval Inservice Testing Program2024-07-29029 July 2024 Response to Request for Additional Information Regarding Fifth Interval Inservice Testing Program GO2-24-063, Notification of Extension to Columbias Fourth 10-Year Interval Inservice Testing Program Plan2024-07-15015 July 2024 Notification of Extension to Columbias Fourth 10-Year Interval Inservice Testing Program Plan IR 05000397/20240122024-07-10010 July 2024 – Safety Conscious Work Environment Issue of Concern Follow-up Inspection 05000397/2024012 ML24180A1482024-06-28028 June 2024 Notification of an NRC Fire Protection Baseline Inspection (NRC Inspection Report 05000397/2024011) and Request for Information IR 05000397/20244202024-06-27027 June 2024 – Security Baseline Inspection Report 05000397 2024420 Cover Letter GO2-24-057, Notice of Readiness for Supplemental Inspection2024-06-19019 June 2024 Notice of Readiness for Supplemental Inspection ML24099A2232024-06-12012 June 2024 Issuance of Amendment No. 275 to Adopt TSTF-230, Revision 1, Add New Condition B to LCO 3.6.2.3, RHR Suppression Pool Cooling GO2-24-056, Relief Request for the Columbia Generating Station Fourth Ten-Year Interval Inservice Testing2024-06-11011 June 2024 Relief Request for the Columbia Generating Station Fourth Ten-Year Interval Inservice Testing ML24128A2242024-05-31031 May 2024 Issuance of Amendment No. 274 to Revise Technical Specifications to Adopt TSTF-584, Eliminate Automatic RWCU System Isolation on SLC Initiation GO2-24-049, 2023 Annual Radiological Environmental Operating Report2024-05-13013 May 2024 2023 Annual Radiological Environmental Operating Report GO2-24-050, Annual Environmental Operating Report2024-04-30030 April 2024 Annual Environmental Operating Report IR 05000397/20240012024-04-24024 April 2024 Integrated Inspection Report 05000397/2024001 GO2-24-042, 2023 Annual Radioactive Effluent Release Report2024-04-22022 April 2024 2023 Annual Radioactive Effluent Release Report ML24089A2282024-04-15015 April 2024 – Acceptance of Requested Licensing Action License Amendment Request to Revise Columbia Generating Station Emergency Plan GO2-24-044, Voluntary Response to Regulatory Issue Summary 2024-012024-04-11011 April 2024 Voluntary Response to Regulatory Issue Summary 2024-01 ML24074A4532024-04-11011 April 2024 Request for Withholding Information from Public Disclosure IR 05000397/20244012024-04-0202 April 2024 – Security Baseline Inspection Report 05000397/2024401 (Cover Letter Only) IR 05000397/20244032024-03-28028 March 2024 Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000397/2024403 GO2-24-034, Supplement to License Amendment Request to Revise Columbia Generating Station Emergency Plan2024-03-20020 March 2024 Supplement to License Amendment Request to Revise Columbia Generating Station Emergency Plan ML24058A0692024-03-14014 March 2024 Supplemental Information Needed for Acceptance of Requested Licensing Action Amendment Request for Emergency Plan ML24044A0492024-03-12012 March 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0064 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) GO2-24-041, Level of Financial Protection - Annual Reporting Requirement2024-03-12012 March 2024 Level of Financial Protection - Annual Reporting Requirement GO2-24-036, Presentation Information for Pre-Application Meeting Regarding Columbia’S Replacement Steam Dryer Evaluation Approach for Extended Power Uprate2024-03-11011 March 2024 Presentation Information for Pre-Application Meeting Regarding Columbia’S Replacement Steam Dryer Evaluation Approach for Extended Power Uprate GO2-24-039, Report of Changes or Errors in Emergency Core Cooling System Loss of Coolant Accident Analysis Models Pursuant to 10 CFR 50.462024-03-11011 March 2024 Report of Changes or Errors in Emergency Core Cooling System Loss of Coolant Accident Analysis Models Pursuant to 10 CFR 50.46 ML24047A0422024-03-0707 March 2024 Issuance of Amendment No. 273 Renewed Facility Operating License and Technical Specification Clean Up IR 05000397/20230062024-02-28028 February 2024 Annual Assessment Letter for Columbia Generating Station (Report 05000397/2023006) IR 05000397/20253012024-02-14014 February 2024 Notification of NRC Initial Operator Licensing Examination 05000397/2025301 GO2-24-004, License Amendment Request to Revise Emergency Plan2024-01-30030 January 2024 License Amendment Request to Revise Emergency Plan GO2-24-003, Relief Requests for the Columbia Generating Station Fifth Ten-Year Interval Inservice Testing2024-01-29029 January 2024 Relief Requests for the Columbia Generating Station Fifth Ten-Year Interval Inservice Testing IR 05000397/20230042024-01-29029 January 2024 Integrated Inspection and Independent Spent Fuel Storage Installation Report 05000397/2023004 and 07200035/2023001 05000397/LER-2024-001, Failure to Track Operability of Requirements of Transversing In-Core Probe Valves2024-01-22022 January 2024 Failure to Track Operability of Requirements of Transversing In-Core Probe Valves GO2-24-014, Independent Spent Fuel Storage Installation, Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2024-01-15015 January 2024 Independent Spent Fuel Storage Installation, Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML24011A1522024-01-10010 January 2024 March 2024 Emergency Preparedness Exercise Inspection-Request for Information GO2-24-005, Docket No. 50-397 Supplement to Reply to a Notice of Violation; EA-21-1702024-01-0808 January 2024 Docket No. 50-397 Supplement to Reply to a Notice of Violation; EA-21-170 GO2-23-136, Guarantee of Payment of Deferred Premium2023-12-20020 December 2023 Guarantee of Payment of Deferred Premium GO2-23-130, Reply to a Notice of Violation; EA-23-0542023-12-14014 December 2023 Reply to a Notice of Violation; EA-23-054 GO2-23-135, Notice of Readiness for Supplemental Inspection2023-12-14014 December 2023 Notice of Readiness for Supplemental Inspection 2024-09-24
[Table view] Category:Safety Evaluation
MONTHYEARML24128A2242024-05-31031 May 2024 Issuance of Amendment No. 274 to Revise Technical Specifications to Adopt TSTF-584, Eliminate Automatic RWCU System Isolation on SLC Initiation ML24047A0422024-03-0707 March 2024 Issuance of Amendment No. 273 Renewed Facility Operating License and Technical Specification Clean Up ML23288A0002023-12-0707 December 2023 Issuance of Amendment No. 272 to Adopt TSTF-541, Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position ML23143A1202023-06-27027 June 2023 Request Number 4ISI-11 to the American Society of Mechanical Engineers Boiler and Pressure Vessel Code Regarding Alternate Examination of Reactor Vessel Welds ML23083B4012023-04-27027 April 2023 Issuance of Amendment No. 271 to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling ML23013A0812023-03-15015 March 2023 Issuance of Amendment No. 270 Revision to Technical Specifications to Adopt TSTF 505, Revision 2, Provide Risk-Informed Extended Completion Times-RITSTF Initiative 4B ML22308A0962022-12-15015 December 2022 Issuance of Amendment No. 269 License Amendment to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors ML22263A4452022-11-23023 November 2022 Issuance of Amendment No. 268 to Revise Technical Specification 3.4.11 RCS Pressure and Temperature (P/T) Limits ML22109A0922022-05-18018 May 2022 Correction Letter - Approval for Alternate Disposal Procedures for the Continued Onsite Disposal of Cooling Tower and Spray Pond Sludge in the Existing Sediment Disposal Area ML22098A0642022-05-0909 May 2022 Issuance of Amendment No. 267 to Adopt Technical Specifications Task Force (TSTF) 546, Revision 0, Revise APRM Channel Adjustment Surveillance Requirement ML22004A1852022-03-11011 March 2022 Approval for Alternate Disposal Procedures for the Continued Onsite Disposal of Cooling Tower and Spray Pond Sludge in the Existing Sediment Disposal Area ML21293A1642022-01-13013 January 2022 Issuance of Amendment No. 266 License Amendment Request to Remove License Condition 2.C.(34) and Revise License Condition 2.C.(35) ML21273A1672021-11-22022 November 2021 Issuance of Amendment No. 265 Adoption of TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO ML21081A1502021-03-25025 March 2021 Approval for Request to Use a Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML21053A3162021-03-0303 March 2021 Issuance of Amendment No. 264 to Revise Technical Specification to Adopt Traveler TSTF-582, Revision 0, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements ML21005A1782021-01-25025 January 2021 Issuance of Amendment No. 263 to Revise Technical Specifications to Adopt TSTF-566, Revise Actions for Inoperable RHR Shutdown Cooling Subsystems Using the Consolidated Line Item Improvement Process ML20302A0262020-12-15015 December 2020 Issuance of Amendment No. 262 to Revise Technical Specifications to Adopt TSTF-564, Safety Limit MCPR ML20282A7322020-10-27027 October 2020 Proposed Alternative Request No. 4ISI-08 Applicable to the Fourth Inservice Inspection Interval ML20242A0022020-09-0404 September 2020 Issuance of Amendment No. 261 Revise Technical Specification 3.8.7, Distribution Systems - Operating (Exigent Circumstances) ML20203K8762020-07-22022 July 2020 Correction to Reduction in Commitment to the Operational Quality Assurance Program Description (EPID L-2020-LLQ-0003 (COVID-19)) ML20181A4452020-07-0707 July 2020 Reduction in Commitment to the Operational Quality Assurance Program Description (EPID L-2020-LLQ-0003)(Covid-19) ML20135H0842020-06-29029 June 2020 Issuance of Amendment No. 260 Revise Technical Specifications to Adopt TSTF-563, Revision 0, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program ML20136A3472020-06-22022 June 2020 Issuance of Amendment No. 259 Revise Technical Specifications Per TSTF-529, Revision 4, Clarify Use and Application Rules ML20125A0802020-05-12012 May 2020 Issuance of Amendment No. 258 Changes to Technical Specification Limiting Conditions for Operation 3.8.4 and 3.8.7 (Exigent Circumstances) ML20113E9842020-05-0404 May 2020 Issuance of Amendment No. 257 to Extend Implementation Date for Amendment No. 255 Control Room Air Conditioning System (Exigent Circumstances) ML19350B5792020-01-0202 January 2020 Generation Station - Safety Evaluation Regarding Implementation of Hardened Containment Vents Capable of Operation Under Severe Accident Conditions Related to Order EA-13-109 (CAC No. MF4383; EPID L-2014-JLD-0045) ML19063A5792019-06-20020 June 2019 Issuance of Amendment No. 253 Renewed Facility Operating License and Technical Specification Clean-Up ML18317A0052018-11-27027 November 2018 Correction to Safety Evaluation Pages 5 and 24 for Amendment No. 199 Dated November 27, 2006 Related to Alternative Source Term ML18283A1252018-11-0808 November 2018 Issuance of Amendment No. 252 Update Appendix B to Renewed Facility Operating License to Incorporate the 2017 Biological Opinion ML18255A3502018-10-30030 October 2018 Issuance of Amendment No. 251 Revision to the Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control ML18100A1992018-05-0202 May 2018 Issuance of Amendment No. 249 Change to Technical Specification 3.5.1 ECCS - Operating (CAC No. MG0015; EPID L-2017-LLA-0277) ML17333A8882018-02-22022 February 2018 Safety Evaluation Regarding Implementation of Mitigating Strategies and Reliable Spent Fuel Pool Instrumentation Related to Orders EA-12-049 and EA-12-051 ML17318A0422017-11-20020 November 2017 Relief Request No. 3ISI-17 from the Requirements of the ASME Code, Section XI for the Third 10-Year Inservice Inspection Interval (CAC No. MF8923; EPID L-2016 LLR-0005) ML17290A1272017-10-30030 October 2017 Columbia Generating Station - Issuance of Amendment No. 245 Re: Request for a One-Time Extension of the Residual Heat Removal Train A Completion Time (CAC No. MF8794; EPID L-2016-LLA-0016) ML17188A2302017-08-28028 August 2017 Issuance of Amendment No. 244 Emergency Action Level Scheme Change to Nuclear Energy Institute 99-01, Revision 6 ML17187A2572017-07-24024 July 2017 Columbia Generating Station - Issuance of Amendment No. 243 Re: Adoption of Technical Specifications Task Force Traveler TSTF 545, Revision 3 (CAC No. MF8148) ML17131A0712017-06-27027 June 2017 Columbia Generating Station - Issuance of Amendment No. 242 Re: Reduction of Reactor Steam Dome Pressure Specified in the Technical Specification 2.1.1, "Reactor Core SLs (Safety Limits)" (CAC No. MF8116) ML17095A1172017-05-11011 May 2017 Columbia Generating Station - Issuance Of Amendment No. 241 Re: Measurement Uncertainty Recapture (CAC No. MF8060) ML17046A5072017-02-16016 February 2017 Relief Request for Alternative 4ISI-07 Applicable to the Fourth 10-Year Inservice Inspection Program Interval ML16357A6462017-01-31031 January 2017 Issuance of Amendment No. 239, Adopt Technical Specification Task Force (TSTF)-522, Revision 0, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month ML17018A0822017-01-24024 January 2017 Relief Request for Alternative 4ISI-05 Applicable to the Fourth 10-Year Inservice Inspection Program Interval ML16292A8722016-11-0303 November 2016 Relief Request 4ISI-06, Use of Code Case N-666-1 on Socket Welded Connections Requiring Repair Due to Vibration Fatigue, Fourth 10-Year Inservice Inspection Interval ML16295A2122016-10-31031 October 2016 Relief Request 4ISI-02, Use of Code Case N-795 Following Repair/Replacement Activities, Fourth 10-Year Inservice Inspection Interval ML16263A2332016-10-0505 October 2016 Relief Request 4ISI-04, Reduced Percentage Requirements for Nozzle to Vessel Welds and Inner Radius Exams, for the Fourth 10-Year Inservice Inspection Interval ML16175A4602016-06-24024 June 2016 Relief Request 4ISI-03, Relief from ASME Code Requirements to Allow Use of Existing Procedures That Implement Repair/Replacement Activities, for the Fourth 10-Year ISI Interval ML16020A0312016-02-16016 February 2016 Issuance of Amendment No. 237, Adopt TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability, Using Consolidated Line Item Improvement Process ML15216A2662016-02-0303 February 2016 Issuance of Amendment No. 236, Adoption of Technical Specification Task Force Traveler TSTF-423, Revision 1, Technical Specifications End States, as Part of Consolidated Line Item Improvement Process ML15154A8002015-06-11011 June 2015 Issuance of Amendment No. 235, Extension of Implementation Period for Amendment 232 Changing Technical Specification Table 3.3.1.1-1, Function 7, Scram Discharge Volume Water Level - High (Exigent Circumstances) ML15098A2542015-05-11011 May 2015 Issuance of Amendment No. 234, Request to Revise Technical Specification 2.1.1.2 to Change Safety Limit Minimum Critical Power Ratio Values ML15076A1222015-04-15015 April 2015 Issuance of Amendment No. 233, Request to Revise Technical Specification Surveillance Requirement 3.7.1.1 Related to the Ultimate Heat Sink 2024-05-31
[Table view] |
Text
March 25, 2021 Mr. Bradley J. Sawatzke Chief Executive Officer Energy Northwest 76 North Power Plant Loop P.O. Box 968 (Mail Drop 1023)
Richland, WA 99352
SUBJECT:
COLUMBIA GENERATING STATION - REQUEST TO USE A PROVISION OF A LATER EDITION OF THE AMERICAN SOCIETY OF MECHANICAL ENGINEERS BOILER AND PRESSURE VESSEL CODE, SECTION XI (EPID L-2021-LLR-0015)
Dear Mr. Sawatzke:
The U.S. Nuclear Regulatory Commission (NRC) has approved your request to use a provision of a later edition of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel (BPV) Code,Section XI, for Columbia Generating Station (Columbia). This action is in response to your request dated March 1, 2021 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML21061A211).
Specifically, pursuant to Title 10 of the Code of Federal Regulations Section 50.55a(g)(4)(iv),
Energy Northwest (the licensee) proposed to use subparagraph IWA-4540(b) of the 2017 Edition of the ASME BPV Code,Section XI, in place of the corresponding subparagraph from the Code of Record.
The NRC staff approves the use of subparagraph IWA-4540(b) of the 2017 Edition of ASME BPV Code,Section XI, for Columbia, for the remainder of the fourth 10-year inservice inspection interval that started on December 13, 2015, and ends on December 12, 2025. All other ASME BPV Code,Section XI, requirements which are not modified by the NRC staffs approval of the licensees request remain applicable, including third-party review by the Authorized Nuclear Inservice Inspector.
Enclosed is the NRC staffs safety evaluation.
B. Sawatzke If you have any questions, please contact the Project Manager, Mahesh Chawla, at 301-415-8371 or by email at Mahesh.Chawla@nrc.gov.
Sincerely, Jennifer L. Digitally signed by Jennifer L. Dixon-Herrity Dixon-Herrity Date: 2021.03.25 08:47:03 -04'00' Jennifer L. Dixon-Herrity, Chief Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-397 cc: Listserv
SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION REQUEST 4ISI REQUEST TO USE A PROVISION OF A LATER EDITION OF THE AMERICAN SOCIETY OF MECHANICAL ENGINEERS BOILER AND PRESSURE VESSEL CODE ENERGY NORTHWEST COLUMBIA GENERATING STATION DOCKET NO 50-397
1.0 INTRODUCTION
By letter dated March 1, 2021 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML21061A211), Energy Northwest (the licensee) submitted proposal 4ISI-10 to use a portion of a later edition of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel (BPV) Code for Columbia Generating Station (Columbia).
Specifically, pursuant to Title 10 of the Code of Federal Regulations (10 CFR)
Section 50.55a(g)(4)(iv), Applicable ISI [Inservice Inspection] Code: Use of subsequent Code editions and addenda, the licensee proposed to use subparagraph IWA-4540(b) of the 2017 Edition of the ASME BPV Code,Section XI, instead of the corresponding subparagraph from the current Code of Record. The time period applicable for the use of the requested subsequent ASME BPV Code edition and addenda for Columbia is the fourth 10-year ISI interval. The licensee asserts that it meets all related requirements of the 2017 Edition of the ASME BPV Code,Section XI.
2.0 PROPOSED USE OF SUBSEQUENT CODE EDITION AND ADDENDA 2.1 Components for Which the Subsequent Code Edition Is Requested All Class 1, 2, and 3 items located in the ASME BPV Code,Section XI, boundaries.
2.2 Current Code Requirement Subparagraph IWA-4540(b) provides items that are exempt from pressure testing after repair/replacement activities.
Enclosure
2.3 Current Code Edition and Addenda of Record The ISI Code of Record for the current 10-year ISI interval at Columbia is the ASME BPV Code,Section XI, 2007 Edition through the 2008 Addenda.
2.4 Proposed Subsequent Code Edition and Addenda The proposed subsequent Code edition and addenda to be used is subparagraph IWA-4540(b) of the 2017 Edition of the ASME BPV Code,Section XI.
2.5 Duration of the Use of the Later Code Edition and Addenda The duration of this request is for the remainder of the fourth 10-year ISI interval that started on December 13, 2015, and ends on December 12, 2025.
3.0 REGULATORY EVALUATION
The licensee is proposing to use a section of a later edition and addenda of the ASME BPV Code,Section XI, in accordance with 10 CFR 50.55a(g)(4)(iv), which states:
Inservice examination of components and system pressure tests may meet the requirements set forth in subsequent editions and addenda that are incorporated by reference in paragraph (a) of this section, subject to the conditions listed in paragraph (b) of this section, and subject to Commission approval. Portions of editions or addenda may be used, provided that all related requirements of the respective editions or addenda are met.
Given that 10 CFR 50.55(g)(4)(iv) permits the U.S. Nuclear Regulatory Commission (NRC) staff to approve the use of subsequent ASME BPV Code edition and addenda, the staff finds that, subject to the following technical evaluation, the licensee may propose to use a section of a later edition and addenda of the ASME BPV Code,Section XI, and the staff has the regulatory authority to approve the later edition and addenda of the ASME BPV Code,Section XI.
4.0 NRC TECHNICAL EVALUATION As previously stated in Section 3.0 of this safety evaluation, prior to approving the use of a subsequent edition and addenda of the ASME BPV Code under 10 CFR 50.55a(g)(4)(iv), the NRC staff must find that (1) the proposed subsequent edition and addenda are incorporated by reference in 10 CFR 50.55a(a), Documents approved for incorporation by reference; (2) the licensee has identified any conditions listed in 10 CFR 50.55a(b), Use and conditions on the use of standards, appropriate to the request and will comply with those conditions; (3) the licensee has requested approval to use the subsequent edition and addenda; and (4) if only portions of edition or addenda are to be used, all related requirements of the respective edition or addenda are met. If these criteria are met, the NRC staff finds the use of the subsequent edition and addenda of the ASME BPV Code,Section XI, to be acceptable.
4.1 Incorporation by Reference In evaluating the first criterion, 10 CFR 50.55a(a) incorporates by reference the ASME BPV Code,Section XI, from the 1970 Edition through the 1976 Winter Addenda, and the 1977 Edition through the 2017 Edition. The licensee proposed to use the 2017 Edition, which is
included in the list of editions and addenda incorporated by reference in the current edition of 10 CFR 50.55a(a). Therefore, the NRC finds that the first criterion has been satisfied.
4.2 Subject to Conditions Listed in 10 CFR 50.55a(b)
In evaluating the second criterion, the NRC staff finds that 10 CFR 50.55a(b) contains no conditions relevant to this request. Therefore, the NRC staff finds that the second criterion has been satisfied.
4.3 Requesting Commission Approval In evaluating the third criterion, the licensee's request dated March 1, 2021, constitutes a request to the Commission for approval to use a subsequent edition/addendum of the ASME BPV Code. Therefore, the NRC staff finds that the third criterion has been satisfied.
4.4 All Related Requirements In evaluating the fourth criterion, the NRC staff finds that there are no related requirements relevant to this request. Therefore, the NRC staff finds that the fourth criterion has been satisfied.
4.5 Summary Based on the review above, the NRC staff finds that the licensee has adequately addressed all regulatory requirements set forth in 10 CFR 50.55a(g)(4)(iv).
5.0 CONCLUSION
As set forth above, NRC staff finds that the licensee has adequately addressed all of the regulatory requirements set forth in 10 CFR 50.55a(g)(4)(iv). Therefore, the NRC staff concludes that the use of subparagraph IWA-4540(b) of the 2017 Edition of the ASME BPV Code,Section XI, is acceptable. The NRC staff approves the use of subparagraph IWA-4540(b) of the 2017 Edition of the ASME BPV Code,Section XI, at Columbia for the remainder of the fourth 10-year ISI interval.
All other ASME BPV Code,Section XI, requirements which are not modified by the staffs approval of the licensees request remain applicable, including third-party review by the Authorized Nuclear Inservice Inspector.
Principal Contributor: M. Chawla, NRR Date: March 25, 2021
ML21081A150 *via e-mail OFFICE NRR/DORL/LPL4/PM* NRR/DORL/LPL4/LA* NRR/DNRL/NVIB/BC(A)*
NAME MChawla PBlechman DWidrevitz DATE 03/22/2021 03/22/2021 03/22/2021 OFFICE NRR/DNRL/NPHP* NRR/DORL/LPL4/BC*
NAME MMitchell JDixon-Herrity DATE 03/22/2021 03/25/2021