MONTHYEARML24291A1072024-10-16016 October 2024 NRR E-mail Capture - LIC-109 Acceptance Review - Columbia Generating Station - Application to Revise TS to Adopt TSTF-592, Revise Automatic Depressurization System (ADS) Instrumentation Requirements - EPID L-2024-LLA-0132 ML24215A3672024-08-0101 August 2024 NRR E-mail Capture - Final Request for Additional Information - Columbia Generating Station - License Amendment Request to Revise Emergency Plan - EPID L-2024-LLA-0011 ML24183A2392024-07-0101 July 2024 NRR E-mail Capture - LIC-109 Acceptance - Columbia Generating Station - Relief Request for the Fourth Ten-Year Interval Inservice Testing - EPID L-2024-LLR-0039 ML24169A0402024-06-14014 June 2024 NRR E-mail Capture - Final Request for Additional Information - Columbia Generating Station (Columbia) - Relief Requests for the Fifth Ten-Year Interval Inservice Testing - EPIDs (L-2024-LLR-007 Through 0013) ML24103A2022024-04-0909 April 2024 EN 57068 - Transco Products Inc Part 21 Initial Notification of Unverified Critical Characteristics of Darmatt KM-1 Flat Board ML24060A1022024-02-28028 February 2024 NRR E-mail Capture - (External_Sender) Energy Northwest Columbia Generating Station 2023 Biological Monitoring Report ML24053A0092024-02-21021 February 2024 NRR E-mail Capture - Columbia Generating Station - LIC-109 Acceptance of Relief Requests for the Fifth Ten-Year Interval Inservice Testing - EPIDs L-2024-LLR-0007 Through 00013 ML24008A0022024-01-0505 January 2024 NRR E-mail Capture - Columbia Generating Station - LIC-109 Acceptance of License Amendment Request for Application to Revise TS to Adopt TSTF-584, Eliminate Automatic RWCU System Isolation on SLC Initiation - EPID L-2023-LLA-0170 ML23278A0042023-10-0404 October 2023 NRR E-mail Capture - LIC-109 Acceptance Review of LAR for Columbia - Application to Revise Technical Specifications to Adopt TSTF-230, Revision 1, Add New Condition B to LCO 3.6.2.3, RHR Suppression Pool Cooling - EPID L-2023-LLA-0128 ML23275A0092023-09-29029 September 2023 NRR E-mail Capture - LIC-109 Acceptance Review of LAR for Columbia - Application to Revise Tech Specs to Adopt TSTF-230, Revision 1, Add New Condition B to LCO 3.6.2.3, RHR Suppression Pool Cooling - EPID: L-2023-LLA-0128 ML23150A2502023-05-26026 May 2023 NRR E-mail Capture - LIC-109 Acceptance Review of LAR for Columbia Generating Station - License Amendment Request to Clean-Up Operating License and Appendix a, Technical Specifications - EPID L-2023-LLA-0062 ML23124A2412023-05-0404 May 2023 NRR E-mail Capture - LIC-109 Acceptance Review of LAR for Columbia - Application to Revise TS to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position - EPID L-2023-LLA-0063 ML23124A0062023-05-0303 May 2023 NRR E-mail Capture - LIC-109 Acceptance Review of LAR for Columbia Generating Station - Application to Revise Tech Specs to Adopt TSTF-541, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling - EPID L-2023-LLA-0063 ML23065A0422023-02-23023 February 2023 NRR E-mail Capture - (External_Sender) Energy Northwest Columbia Generating Station 2022 Biological Monitoring Report ML22343A1802022-12-0808 December 2022 February 2023 Emergency Preparedness Program Inspection - Request for Information ML22349A2002022-12-0101 December 2022 NRR E-mail Capture - (External_Sender) Energy Northwest Columbia Generating Station 2022 Priority Pollutant Discharge Monitoring Report ML22312A0042022-11-0707 November 2022 NRR E-mail Capture - Columbia Generating Station - LIC-109 Acceptance of Fourth 10 Year ISI RR 4ISI-11 - EPID L-2022-LLR-0071 ML22301A1432022-10-28028 October 2022 NRR E-mail Capture - Final - Request for Additional Information - Columbia Generating Station - License Amendment Request to Adopt TSTF-505 - EPID L-2022-LLA-0023 ML22256A2002022-09-13013 September 2022 NRR E-mail Capture - Draft - Additional Audit Question - Columbia Generating Station - Regulatory Audit Question for LAR to Revise TS to Adopt TSTF-505, Revision 2 ML22241A0182022-08-26026 August 2022 NRR E-mail Capture - Draft - Additional Audit Question - Columbia Generating Station - Regulatory Audit Question for LAR to Revise TS to Adopt TSTF-505, Revision 2 ML22235A1052022-08-22022 August 2022 August 2022 Emergency Preparedness Exercise Inspection Request for Information ML22210A0072022-07-28028 July 2022 NRR E-mail Capture - Draft - Additional Audit Question - Columbia Generating Station - Regulatory Audit Question for LAR to Revise TS to Adopt TSTF-505, Revision 2 ML22173A0682022-06-17017 June 2022 Email Concurrence on SE Input for Columbia Pltr LAR ML22166A4122022-06-15015 June 2022 NRR E-mail Capture - LIC-109 Acceptance Review of LAR for Columbia Generating Station - Application to Revise TS to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling - EPID L-2022-LLA-0081 ML22144A0342022-05-18018 May 2022 NRR E-mail Capture - Draft - Request for Additional Information - Columbia Generating Station - LAR to Change TS 3.4.11 - Reactor Coolant System Pressure and Temperature Limits - EPID L-2021-LLA-0191 ML22075A3392022-03-15015 March 2022 NRR E-mail Capture - Columbia Generating Station - Audit Questions - Regulatory Audit of License Amendment Request to Adopt 50.69 - Categorization Process - EPID L-2021-LLA-0207 ML22067A0132022-03-0707 March 2022 NRR E-mail Capture - Columbia Generating Station - LIC-109 Acceptance of License Amendment Request to Adopt TSTF-505, Revision 2, Provide RISK-INFORMED Extended Completion Times - RITSTF Initiative 4b - EPID L-2022-LLA-0023 A002515, NRR E-mail Capture - (External Sender) Energy Northwest Columbia Generating Station 2021 Priority Pollutant Discharge Monitoring Report2022-01-12012 January 2022 NRR E-mail Capture - (External_Sender) Energy Northwest Columbia Generating Station 2021 Priority Pollutant Discharge Monitoring Report ML21348A1852021-12-14014 December 2021 NRR E-mail Capture - LIC-109 Acceptance Review - Columbia - License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors - EPID L-2021-LLA-0207 ML21335A0182021-11-30030 November 2021 NRR E-mail Capture - Columbia Generating Station - LIC-109 Acceptance of Requested Licensing Action - License Amendment Request to Change TS 3.4.11 Reactor Coolant System Pressure and Temperature Limits - EPID L-2021-LLA-0191 ML21216A0502021-08-0303 August 2021 NRR E-mail Capture - Final - Request for Additional Information - Columbia - License Amendment Request to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO EPID L-2021-LLA-0259 ML21209A9792021-07-28028 July 2021 NRR E-mail Capture - Final - Request for Additional Information - Columbia Generating Station - License Amendment Request to Remove License Condition 2.C.(34) and Revise License Condition 2.C.(35) - EPID L-2021-LLA-0074 ML21162A3062021-06-11011 June 2021 NRR E-mail Capture - LIC-109 Acceptance Review - Columbia Generating Station - License Amendment Request to Adopt TSTF-546, Revise APRM Channel Adjustment Surveillance Requirement - EPID L-2021-LLA-0084 ML21137A0012021-05-14014 May 2021 NRR E-mail Capture - LIC-109 Acceptance Review - Columbia Generating Station - License Amendment Request to Remove License Condition 2.C.(34) and Revise License Condition 2.C.(35) - EPID L-2021-LLA-0074 ML21120A1182021-04-30030 April 2021 NRR E-mail Capture - Final - Request for Additional Information - Columbia Generating Station - On-Site Cooling System Sediment Disposal Approval Request - EPID L-2020-LLL-0031 ML21109A2762021-04-0808 April 2021 Email Request for Information for Columbia Generating Station'S PIR Inspection_Redacted ML21068A2842021-03-0404 March 2021 2021002 Inservice Inspection (ISI) Request for Information (RFI) ML21036A2932021-02-0404 February 2021 NRR E-mail Capture - (External_Sender) Energy Northwest Columbia Generating Station 2020 Biological Monitoring Report ML20357B1502020-12-22022 December 2020 NRR E-mail Capture - LIC-109 Acceptance Review - Columbia - License Amendment Request - Adoption of TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO, Rev. 2 - EPID L-2020-LLA-0259 ML20336A1852020-11-30030 November 2020 NRR E-mail Capture - Final - RAI - Columbia - One -Time Exemption from 10 CFR 73, App B, Sect VI, Subsection C.3.(l)(1) Regarding Annual Force-On-Force Exercises Due to COVID-19 Pandemic - EPID L-2020-LLE-0172 ML20325A0402020-11-19019 November 2020 NRR E-mail Capture - Draft - RAI - Columbia - One -Time Exemption from 10 CFR 73, Appendix B, Section VI, Subsection C.3.(I)(1) Regarding Annual Force -On-Force Exercises Due to COVID-19 Pandemic - EPID L-2020-LLE-0172 ML20314A0452020-11-0606 November 2020 NMFS to Energy Northwest, Entrainment Study Results for Columbia Generating Station ML20297A3032020-10-22022 October 2020 NRR E-mail Capture - LIC-109 Acceptance Review of License Amendment Request for Columbia - Application to Revise Tech Specs to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements - EPID L-2020-LLA-0212 ML20267A5162020-09-23023 September 2020 NRR E-mail Capture - Columbia Generating Station - Final - Request for Additional Information - Fourth Ten-Year Interval Inservice Inspection (ISI) Program Relief Request 4ISI-09 - EPID L-2020-LLR-0068 ML20265A3242020-09-20020 September 2020 Email 9-20-2020 - Req_ Kick-Off Call Columbia Generating Station RFI Provided for Roll-Back EP Program Inspection (Week of Nov 2 2020) ML20245E2822020-08-31031 August 2020 NRR E-mail Capture - Columbia Additional Request for Additional Information: Exigent License Amendment Request to Extend Technical Specification 3.8.7, Distribution Systems - Operating, Completion Time ML20239A9702020-08-26026 August 2020 NRR E-mail Capture - Columbia Additional Request for Additional Information: Exigent License Amendment Request to Extend Technical Specification 3.8.7, Distribution Systems - Operating, Completion Time ML20149K4362020-05-26026 May 2020 NRR E-mail Capture - Formal RAIs for Columbia (COVID-19) QA Plan Change Surveillance, Request Response by Tuesday June 2, 2020 ML20136A0112020-05-14014 May 2020 NRR E-mail Capture - Acceptance Columbia Relief Request ISI Reactor Pressure Vessel Feedwater Nozzles, 4ISI-09 ML20112F4572020-04-21021 April 2020 NRR E-mail Capture - Official Release of NRC RAIs for Columbia Covid Exigent Due Friday April 24, 2020 2024-08-01
[Table view] Category:Technical Specifications
MONTHYEARML24128A2242024-05-31031 May 2024 Issuance of Amendment No. 274 to Revise Technical Specifications to Adopt TSTF-584, Eliminate Automatic RWCU System Isolation on SLC Initiation ML23288A0002023-12-0707 December 2023 Issuance of Amendment No. 272 to Adopt TSTF-541, Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position GO2-23-012, Application to Revise Technical Specifications to Adopt Tstf-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position2023-03-27027 March 2023 Application to Revise Technical Specifications to Adopt Tstf-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position ML22308A0962022-12-15015 December 2022 Issuance of Amendment No. 269 License Amendment to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors ML21053A3162021-03-0303 March 2021 Issuance of Amendment No. 264 to Revise Technical Specification to Adopt Traveler TSTF-582, Revision 0, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements ML21005A1782021-01-25025 January 2021 Issuance of Amendment No. 263 to Revise Technical Specifications to Adopt TSTF-566, Revise Actions for Inoperable RHR Shutdown Cooling Subsystems Using the Consolidated Line Item Improvement Process ML20242A0022020-09-0404 September 2020 Issuance of Amendment No. 261 Revise Technical Specification 3.8.7, Distribution Systems - Operating (Exigent Circumstances) ML20135H0842020-06-29029 June 2020 Issuance of Amendment No. 260 Revise Technical Specifications to Adopt TSTF-563, Revision 0, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program ML20125A0802020-05-12012 May 2020 Issuance of Amendment No. 258 Changes to Technical Specification Limiting Conditions for Operation 3.8.4 and 3.8.7 (Exigent Circumstances) ML18100A1992018-05-0202 May 2018 Issuance of Amendment No. 249 Change to Technical Specification 3.5.1 ECCS - Operating (CAC No. MG0015; EPID L-2017-LLA-0277) GO2-17-124, Final Technical Specification Markup and Clean Pages for Application to Revise Technical Specifications to Adopt TSTF-545, Revision 32017-07-0505 July 2017 Final Technical Specification Markup and Clean Pages for Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3 ML0531303192017-07-0505 July 2017 Current Facility Operating License NPF-21, Technical Specifications, Revised 11/01/2017 ML17095A1172017-05-11011 May 2017 Columbia Generating Station - Issuance Of Amendment No. 241 Re: Measurement Uncertainty Recapture (CAC No. MF8060) GO2-16-071, Final Technical Specification Markup and Clean Pages for License Amendment Request to Adopt Technical Specification Task Force (TSTF)-425, Revision 3 to Relocate Specific Surveillance Frequencies to a Licensee Controlled Program2016-05-11011 May 2016 Final Technical Specification Markup and Clean Pages for License Amendment Request to Adopt Technical Specification Task Force (TSTF)-425, Revision 3 to Relocate Specific Surveillance Frequencies to a Licensee Controlled Program ML15216A2662016-02-0303 February 2016 Issuance of Amendment No. 236, Adoption of Technical Specification Task Force Traveler TSTF-423, Revision 1, Technical Specifications End States, as Part of Consolidated Line Item Improvement Process GO2-15-173, Supplement to Response to Second Request for Additional Information on License Amendment Request for Adoption of Technical Specification Task Force (TSTF)-425, Revision 32015-12-28028 December 2015 Supplement to Response to Second Request for Additional Information on License Amendment Request for Adoption of Technical Specification Task Force (TSTF)-425, Revision 3 ML15154A8002015-06-11011 June 2015 Issuance of Amendment No. 235, Extension of Implementation Period for Amendment 232 Changing Technical Specification Table 3.3.1.1-1, Function 7, Scram Discharge Volume Water Level - High (Exigent Circumstances) ML15076A1222015-04-15015 April 2015 Issuance of Amendment No. 233, Request to Revise Technical Specification Surveillance Requirement 3.7.1.1 Related to the Ultimate Heat Sink ML15030A5012015-02-0101 February 2015 Issuance of Amendment No. 230, Revise Technical Specifications for One-Time Extension of Completion Time Required Actions Related to Residual Heat Removal System B Inoperability (Emergency Circumstances) ML15031A0022015-01-30030 January 2015 Emergency License Amendment Associated with Technical Specifications 3.5.1.A, 3.6.1.5.A, and 3.6.2.3.A, Request for CT Extension on RHR-B Inoperability ML14335A1892015-01-0707 January 2015 Redacted, Issuance of Amendment No. 229, Revise Emergency Core Cooling Systems Surveillance Requirements for Low Pressure Core Spray and Low Pressure Coolant Injection Pump Flows ML14290A3602014-11-12012 November 2014 Issuance of Amendment No. 228, Request to Adopt Technical Specification Task Force (TSTF)-535, Revision 0, Revise Shutdown Margin Definition to Address Advanced Fuel Designs ML14127A4002014-06-13013 June 2014 Request for Technical Specification Interpretation Regarding the Offsite Power Supplies to the Onsite Class 1E Alternating Current Power Distribution System GO2-14-043, License Amendment Request for Changing Technical Specification Table 3.3.1.1-1 Function 7, Scram Discharge Volume Water Level-High2014-03-24024 March 2014 License Amendment Request for Changing Technical Specification Table 3.3.1.1-1 Function 7, Scram Discharge Volume Water Level-High GO2-12-104, Response to Request for Additional Information for License Amendment Request to Make Administrative and Editorial Changes to Technical Specifications and the Operating License2012-07-30030 July 2012 Response to Request for Additional Information for License Amendment Request to Make Administrative and Editorial Changes to Technical Specifications and the Operating License GO2-12-003, License Amendment Request to Make Administrative and Editorial Changes to Technical Specifications and the Operating License2012-01-0909 January 2012 License Amendment Request to Make Administrative and Editorial Changes to Technical Specifications and the Operating License GO2-10-098, Request for Approval of the Cyber Security Plan2010-07-22022 July 2010 Request for Approval of the Cyber Security Plan ML1013903692010-05-11011 May 2010 Columbia Generating Station, License Amendment Request to Change Technical Specifications in Support of Prnm/Arts/Mella Implementation GO2-10-024, License Amendment Request to Change Technical Specifications Relating to Control Rod Operability and Control Rod Scram Accumulators2010-02-0808 February 2010 License Amendment Request to Change Technical Specifications Relating to Control Rod Operability and Control Rod Scram Accumulators GO2-09-043, Independent Spent Fuel Storage Installation - Offsite Dose Calculation Manual, Including Revision Made During 20082009-02-27027 February 2009 Independent Spent Fuel Storage Installation - Offsite Dose Calculation Manual, Including Revision Made During 2008 ML0823800182008-09-16016 September 2008 Tech Spec Pages for Amendment No. 209 TSTF-484, Use of TS 3.10.1 for Scram Time Testing Activities. ML0819005982008-09-15015 September 2008 Tech Spec Pages for Amendment No. 208 Adoption of Approved Generic Technical Specification Changes Associated with Containment Isolation Valves GO2-08-122, Supplement to Adoption of Approved Generic Technical Specification Changes Associated with Containment Isolation Valves2008-08-28028 August 2008 Supplement to Adoption of Approved Generic Technical Specification Changes Associated with Containment Isolation Valves ML0817702012008-06-30030 June 2008 Tech Spec Pages for Amendment No. 207 Control Room Habitability in Accordance with TSTF-448-A, Rev 3 ML0810602972008-04-15015 April 2008 License Page 3 and Technical Specification Page 10 for Amendment No. 206 Eliminate Condition 2.F GO2-07-156, Supplement to License Amendment Request for Proposed Changes to Technical Specifications: Miscellaneous Administrative Changes Including Adoption of Approved TSTF Travelers 284, 479, and 4852007-11-0606 November 2007 Supplement to License Amendment Request for Proposed Changes to Technical Specifications: Miscellaneous Administrative Changes Including Adoption of Approved TSTF Travelers 284, 479, and 485 ML0703802052007-02-27027 February 2007 License and Technical Spec Pages - Amendment No. 202 Under Exigent Circumstances TS 3.6.1.7, Suppression Chamber-to-Drywell Vacuum Breakers-Allow One-time Extension to Current Closure Verification SR ML0705203982007-02-13013 February 2007 Supplemental Information Regarding License Amendment Request to Technical Specifications Associated with AC and DC Electrical Power ML0703000212007-02-0909 February 2007 Technical Specifications, Issuance of Amendment No. 201 to Facility Operating License Suppression Chamber-to-Drywell Vacuum Breakers and Drywell-to-Suppression Chamber Bypass Leakage Test ML0632800532006-11-27027 November 2006 Tech Spec Pages for Amendment 199 Changes to Technical Specifications to Replace the Current Accident Source Term Used in Design Basis Radiological Analyses ML0624301412006-07-11011 July 2006 Issuance of Technical Specification Pages Re Inoperability of Snubbers GO2-06-060, Application for Technical Specification Change to Add LCO 3.0.8 on the Inoperability of Snubbers (TSTF-372) Using the Consolidated Line Item Improvement Process2006-04-17017 April 2006 Application for Technical Specification Change to Add LCO 3.0.8 on the Inoperability of Snubbers (TSTF-372) Using the Consolidated Line Item Improvement Process ML0610202712006-03-13013 March 2006 E-mail 3/13/2006 - Clean TS Pages for DG AOT ML0630400372005-12-0808 December 2005 Technical Specifications, One Time Extension of the 72- Hour Completion Time (CT) for the Required Action of Condition B Technical Specification (TS) 3.7.1 ML0534101872005-12-0808 December 2005 Issuance of Amendment One Time Extension of the 72- Hour Completion Time (CT) for the Required Action of Condition B Technical Specification (TS) 3.7.1 TAC No. MC8421 GO2-05-186, Supplement to the License Amendment Request for a One-Time Change to Technical Specifications2005-11-30030 November 2005 Supplement to the License Amendment Request for a One-Time Change to Technical Specifications ML0527300232005-09-29029 September 2005 Tech Spec Pages for Amendment 194 Regarding Technical Specification Improvement to Revise Control Rod Scram Time Testing Frequency Using the Consolidated Line Item Improvement Process GO2-05-099, License Amendment Request to Technical Specifications Associated with AC and DC Electrical Power2005-05-31031 May 2005 License Amendment Request to Technical Specifications Associated with AC and DC Electrical Power ML0513602142005-05-12012 May 2005 Technical Specification Pages Reactor Coolant System (RCS) Pressure and Temperature Limits (Tac. MC3591) ML0510301872005-04-12012 April 2005 Technical Specifications, One-Time Extension of Appendix J Type a Integrated Leakage Rate Test Interval 2024-05-31
[Table view] |
Text
I Brian Benney - Technical Specification Pages Bn B y . T a So PPage 1 From: "WALLI, LORI A." <LWALLI@energy-northwest.com>
To: "Brian Benney" <BJB~nrc.gov>
Date: 3/13/06 6:25PM Subjec:t: Technical Specification Pages Brian, Attached are the clean TS pages for 3.8.1. Do you need a hard copy sent to you? Let me know and I'll put one in FedEx.
Thanks, Lori This e-mail message and all attachments transmitted with it are for the sole use of the intended recipient(s) and may contain confidential and/or legally privileged information. Please DO NOT forward this e-mail outside of the recipient's company unless expressly authorized to do so herein. Any unauthorized review; use, disclosure or distribution is prohibited. If you are not the intended recipient, please contact the sender by reply e-mail and destroy all copies of the original message.
Warning: Although Energy Northwest has taken reasonable precautions to ensure no viruses are present in this e-mail, the agency cannot accept responsibility for any loss or damage arising from the use of Ihis e-mail or its attachments.
- .****. ****************************************************************************a*************
CC: "RHOADS, JERRAL E." <JERHOADS@energy-northwest.com>
Page 1 c:\temp\GW)OOOO1 .TMP I cAtemp\GW)00001.TMP Page 1 Mail Envelope Properties (4415FF4C.062: 21: 20578)
Subject:
Technical Specification Pages Creation Date: 3/13/06 6:24PM From: "WALLI, LORI A." <LWALLI@energy-northwest.com>
Created By: LWALLI@energy-northwest.com Recipients nrc.gov owf4.po.OWFNDO BJB (Brian Benney) energy-northwest.com JERHOADS CC (JERRAL E. RHOADS)
Post Office Route owf4.po.OWFNDO nrc.gov energy-northwest.corn Files Size Date & Time MESSAGE 1081 03/13/06 06:24PM TEXT.htm 2014 TS Pages.pdf 116688 Mime.822 165486 Options Expiration Date: None Priority: Standard Reply Requested: No Return Notification: None Concealed
Subject:
No Security: Standard
I Bian Benney - TEXT.htrn Page Brian Benney TEXT.htm Paqe 11 Brian, Attached are the clean TS pages for 3.8.1. Do you need a hard copy sent to you? Let me know and I'll put one in FedEx. Thanks, Lori
- This e-mail message and all attachments transmitted with it are for the sole use of the intended recipient(s) and may contain confidential and/or legally privileged information. Please DO NOT forward this e-mail outside of the recipient's company unless expressly authorized to do so herein. Any unauthorized review; use, disclosure or distribution is prohibited. If you are not the intended recipient, please contact the sender by reply e-mail and destroy all copies of the original message. Warning: Although Energy Northwest has taken reasonable precautions to ensure no viruses are present in this e-mail, the agency cannot accept responsibility for any loss or damage arising from the use of this e-mail or its attachments.
lBrian Benney - TSPages.pdf Page1 AC Sources- Operating 3.8.1 3.8 ELECTRICAL POWER SYSTEMS 3.8.1 AC Sources -Operating LCO 3.8.1 The following AC electrical power sources shall be OPERABLE:
- a. Two qualified circuits between the offsite transmission network and the onsite Class 1E AC Electric Power Distribution System: and
- b. Three diesel generators COGs).
APPLICABILITY: MODES 1. 2. and 3.
NOTE----------------------------
Division 3 AC electrical power sources are not required to be OPERABLE when High Pressure Core Spray System is inoperable.
ACTIONS
-.............-- --------------- - NOTE------------------ - - - -
LCO 3.0.4.b is not applicable to DGs.
I CONDITION REOUIRED ACTION COMPLETION TIME A. One offsite circuit A.1 Perform SR 3.8.1.1 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> inoperable. for OPERABLE offsite circuit. AND Once per 8 nours thereafter AND (continued)
Columbia Generating Station 3.8.1-1 Amendment No. 149,169 187
IBrian Benney -TSFages.pdf I Page 2 AC Sources- Operating 3.8.1 ACTIONS CONDITION REOUIRED ACTION COMPLETION TIME A. (continued) A.2 Dcclare required 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> from feature(s) with no discovery of no offsite power offsite power available inoperable to one division when the redundant concurrent with required feature(s) inoperability are inoperable. of redundant required feature(s)
AND A.3 Restore offsite 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> circuit to OPERABLE status. AND 6 days from discovery of failure to meet LCO when not associated with Required Action B.4.2.2 AND 17 days from discovery of failure to meet LCO B. One required DG B.1 Perform SR 3.8.1.1 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> inoperable. for OPERABLE offsite circuit(s). AND Once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter AND (continued)
Columbia Generating Station 3.8.1-2 Amendment No. 149.169
I Brian Rennpv - T.; Paaes.ndf P~age 3 I Rri- R--nn---ienfrae, v- T AC Sources -Operating 3.8.1 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME B. (continued) B.2 Declare required 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> from feature(s), supported discovery of by the inoperable DG. Condition B inoperable when the concurrent with redundant required inoperability feature(s) are of redundant inoperable. required feature(s)
AND B.3.1 Determine OPERABLE 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> DG(s) are not inoperable due to common cause failure.
OR B.3.2 Perform SR 3.8.1.2 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> if not for OPERABLE DG(s). performed within the past 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> AND B.4.1 Restore required DG 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />s* from to OPERABLE status. discovery of an iroperable DG AND 6 days from discovery of failure to meet LCO OR (continued)
- On a one-time basis. during the refurbishment/replacement of the 18 Service Water Pump during Cycle 18. the Completion Time for the Division 2 DG is extended to 144 hours0.00167 days <br />0.04 hours <br />2.380952e-4 weeks <br />5.4792e-5 months <br />.
Columbia Generating Station 3.8.1-3 Amendment No. 149,169,195
I Brian Bennev - TS-Paqes.pdf Page 4 IB -*TSPc Id g 4 AC Sources- Operating 3.8.1 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME B. (continued) B.4.2.1 Establish risk 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> management actions for the alternate AC sources.
AND B.4.2.2 Restore required DG 14 days to OPERABLE status.
AND 17 days from discovery of failure to meet LCO C. Two offsite circuits C.1 Declare required 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> from inoperable. feature(s) inoperable discovery of when the redundant Condition C required feature(s) concurrent with are inoperable. inoperability of redundant required feature(s)
AND C.2 Restore one offsite 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> circuit to OPERABLE status.
(continued)
Columbia Generating Station 3.8.1-4 Amendment No. 149,169
II RianBen ev S PaeDdf Page 5
- - _ - I--
AC Sources- Operating 3.8.1 ACTIONS CONDITION REOUIRED ACTION COMPLETION TIME D. One offsite circuit ------------ NOTE-------------
inoperable. Enter applicable Conditions and Required Actions of AND LCO 3.8.7. Distribution Systems- Operating.' when One required DG Condition 0 is entered with inoperable. no AC power Source to any division.
D.1 Restore offsite 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> circuit to OPERABLE status.
OR 0.2 Restore required DG 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> to OPERABLE status.
E. Two required DOGs E.i Restore one required 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> inoperable. DG to OPERABLE status. OR 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> if Division 3 DG is inoperable F. Required Action and f.1 Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> Associated Completion Time of Condition A, AND B. C. D. or E not met.
F.2 Be in MODE 4. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> G. Three or more required G.1 Enter LCO 3.0.3. Immediately AC sources inoperable.
Columbia Generating Station 3.8.1-5 Amendment No. 149.169
I Brian Benne -TS-Pages.pdf Page 6 I Brian Bennev TS9'aQes.pdf Page 6 AC Sources -Operating 3.8.1 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREOUENCY SR 3.8.1.1 Verify correct breaker alignment and 7 days indicated power availability for each offsite circuit.
SR 3.8.1.2 - ---------- NOTES-------------------
- 1. All DG starts may be preceded by an engine prelube period and followed by a warmup period prior to loading.
- 2. A modified DG start involving idling and gradual acceleration to synchronous speed may be used for this SR as recommended by the manufacturer.
When modified start procedures are not used, the time, voltage, and frequency tolerances of SR 3.8.1.7 must be met.
Verify each required DC starts from standby 31 days conditions and achieves steady state:
- a. Voltage > 3910 V and < 4400 V and frequency > 58.8 Hz and < 61.2 Hz for DG-1 and DG-2: and
- b. Voltage > 3910 V and < 4400 V and frequency > 58.8 Hz and < 61.2 Hz for DG-3.
(continued)
Columbia Generating Station 3.8.1-6 Amendment No. 149.169 181