Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML23288A000 | 7 December 2023 | Issuance of Amendment No. 272 to Adopt TSTF-541, Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position | Ultimate heat sink Water Inventory Control Surveillance Frequency Control Program |
ML23083B401 | 27 April 2023 | Issuance of Amendment No. 271 to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling | Surveillance Frequency Control Program |
ML23013A081 | 15 March 2023 | Issuance of Amendment No. 270 Revision to Technical Specifications to Adopt TSTF 505, Revision 2, Provide Risk-Informed Extended Completion Times-RITSTF Initiative 4B | Safe Shutdown Reactor Vessel Water Level High Radiation Area Ultimate heat sink Water Inventory Control Internal Flooding Probabilistic Risk Assessment FLEX Fukushima Dai-Ichi Surveillance Frequency Control Program Scram Discharge Volume Large early release frequency Maintenance Rule Program Offsite Circuit |
ML22340A689 | 20 December 2022 | Regulatory Audit Summary in Support of Review for LAR to Revise Technical Specifications to Adopt TSTF-505, Rev. 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4B | Probabilistic Risk Assessment |
ML22308A096 | 15 December 2022 | Issuance of Amendment No. 269 License Amendment to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors | Safe Shutdown High winds Internal Flooding Probabilistic Risk Assessment FLEX Large early release frequency |
ML22263A445 | 23 November 2022 | Issuance of Amendment No. 268 to Revise Technical Specification 3.4.11 RCS Pressure and Temperature (P/T) Limits | Anticipated operational occurrence Hydrostatic Finite Element Analysis Pressure and Temperature Limits Report |
ML22098A064 | 9 May 2022 | Issuance of Amendment No. 267 to Adopt Technical Specifications Task Force (TSTF) 546, Revision 0, Revise APRM Channel Adjustment Surveillance Requirement | Surveillance Frequency Control Program Fuel cladding Power change |
ML21293A164 | 13 January 2022 | Issuance of Amendment No. 266 License Amendment Request to Remove License Condition 2.C.(34) and Revise License Condition 2.C.(35) | Aging Management License Renewal |
ML21273A167 | 22 November 2021 | Issuance of Amendment No. 265 Adoption of TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO | Safe Shutdown Time of Discovery Anticipated operational occurrence Surveillance Frequency Control Program Maintenance Rule Program Offsite Circuit |
ML21053A316 | 3 March 2021 | Issuance of Amendment No. 264 to Revise Technical Specification to Adopt Traveler TSTF-582, Revision 0, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements | Water Inventory Control Surveillance Frequency Control Program Fuel cladding Offsite Circuit |
ML21005A178 | 25 January 2021 | Issuance of Amendment No. 263 to Revise Technical Specifications to Adopt TSTF-566, Revise Actions for Inoperable RHR Shutdown Cooling Subsystems Using the Consolidated Line Item Improvement Process | Surveillance Frequency Control Program |
ML20302A026 | 15 December 2020 | Issuance of Amendment No. 262 to Revise Technical Specifications to Adopt TSTF-564, Safety Limit MCPR | Reactor Vessel Water Level Anticipated operational occurrence Fuel cladding |
ML20242A002 | 4 September 2020 | Issuance of Amendment No. 261 Revise Technical Specification 3.8.7, Distribution Systems - Operating (Exigent Circumstances) | Safe Shutdown Anticipated operational occurrence Probabilistic Risk Assessment Surveillance Frequency Control Program |
ML20135H084 | 29 June 2020 | Issuance of Amendment No. 260 Revise Technical Specifications to Adopt TSTF-563, Revision 0, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program | Shutdown Margin Probabilistic Risk Assessment Surveillance Frequency Control Program Large early release frequency Pressure Boundary Leakage |
ML20136A347 | 22 June 2020 | Issuance of Amendment No. 259 Revise Technical Specifications Per TSTF-529, Revision 4, Clarify Use and Application Rules | Time of Discovery |
ML20125A080 | 12 May 2020 | Issuance of Amendment No. 258 Changes to Technical Specification Limiting Conditions for Operation 3.8.4 and 3.8.7 (Exigent Circumstances) | Safe Shutdown Anticipated operational occurrence Probabilistic Risk Assessment Emergency Lighting Surveillance Frequency Control Program Pandemic COVID-19 |
ML20113E984 | 4 May 2020 | Issuance of Amendment No. 257 to Extend Implementation Date for Amendment No. 255 Control Room Air Conditioning System (Exigent Circumstances) | Operator Manual Action Pandemic Coronavirus COVID-19 |
ML19234A016 | 26 August 2019 | Issuance of Amendment No. 254 Change to Technical Specification 3.8.7, Distribution Systems - Operating (Exigent Circumstances) | Safe Shutdown Anticipated operational occurrence Probabilistic Risk Assessment FLEX |
ML19063A579 | 20 June 2019 | Issuance of Amendment No. 253 Renewed Facility Operating License and Technical Specification Clean-Up | Shutdown Margin Water Inventory Control Surveillance Frequency Control Program Scram Discharge Volume Overtravel |
ML18317A005 | 27 November 2018 | Correction to Safety Evaluation Pages 5 and 24 for Amendment No. 199 Dated November 27, 2006 Related to Alternative Source Term | Water Inventory Control Squib Severe Accident Management Guideline |
ML18283A125 | 8 November 2018 | Issuance of Amendment No. 252 Update Appendix B to Renewed Facility Operating License to Incorporate the 2017 Biological Opinion | |
ML18255A350 | 30 October 2018 | Issuance of Amendment No. 251 Revision to the Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control | Shutdown Margin Reactor Vessel Water Level High Radiation Area Stroke time Anticipated operational occurrence Water Inventory Control Post Accident Monitoring Hydrostatic Probabilistic Risk Assessment Surveillance Frequency Control Program Scram Discharge Volume Fuel cladding Pressure Boundary Leakage |
ML18100A199 | 2 May 2018 | Issuance of Amendment No. 249 Change to Technical Specification 3.5.1 ECCS - Operating (CAC No. MG0015; EPID L-2017-LLA-0277) | Surveillance Frequency Control Program |
ML17290A127 | 30 October 2017 | Columbia Generating Station - Issuance of Amendment No. 245 Re: Request for a One-Time Extension of the Residual Heat Removal Train A Completion Time (CAC No. MF8794; EPID L-2016-LLA-0016) | |
ML17188A230 | 28 August 2017 | Issuance of Amendment No. 244 Emergency Action Level Scheme Change to Nuclear Energy Institute 99-01, Revision 6 | High winds Ultimate heat sink Water Inventory Control Operating Basis Earthquake Spent Fuel Pool Instrumentation Earthquake Fuel cladding |
ML17187A257 | 24 July 2017 | Columbia Generating Station - Issuance of Amendment No. 243 Re: Adoption of Technical Specifications Task Force Traveler TSTF 545, Revision 3 (CAC No. MF8148) | |
ML053130319 | 5 July 2017 | Current Facility Operating License NPF-21, Technical Specifications, Revised 11/01/2017 | |
ML17131A071 | 27 June 2017 | Columbia Generating Station - Issuance of Amendment No. 242 Re: Reduction of Reactor Steam Dome Pressure Specified in the Technical Specification 2.1.1, "Reactor Core SLs (Safety Limits)" (CAC No. MF8116) | |
ML17095A117 | 11 May 2017 | Columbia Generating Station - Issuance Of Amendment No. 241 Re: Measurement Uncertainty Recapture (CAC No. MF8060) | |
ML17052A125 | 9 March 2017 | Issuance of Amendment No. 240 Request to Modify Technical Specification Surveillance Requirement 3.4.3.1 and 3.4.4.1 Safety/Relief Valve Setpoint Lower Tolerance | Anticipated operational occurrence Probabilistic Risk Assessment Surveillance Frequency Control Program |
ML16357A646 | 31 January 2017 | Issuance of Amendment No. 239, Adopt Technical Specification Task Force (TSTF)-522, Revision 0, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month | Surveillance Frequency Control Program |
ML16253A025 | 3 November 2016 | Issuance of Amendment No. 238, Adopt Technical Specification Task Force Traveler TSTF-425, Revision 3, Relocate Surveillance Frequencies to Licensee Control - RITSTF Initiative 5b | Reactor Vessel Water Level High Radiation Area Post Accident Monitoring Internal Flooding Hydrostatic Probabilistic Risk Assessment Squib Surveillance Frequency Control Program Large early release frequency Spiral reload Overtravel Pressure Boundary Leakage Offsite Circuit Backfit |
ML16020A031 | 16 February 2016 | Issuance of Amendment No. 237, Adopt TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability, Using Consolidated Line Item Improvement Process | High winds Fire Barrier Internal Flooding Probabilistic Risk Assessment Large early release frequency Turbine Missile |
ML15216A266 | 3 February 2016 | Issuance of Amendment No. 236, Adoption of Technical Specification Task Force Traveler TSTF-423, Revision 1, Technical Specifications End States, as Part of Consolidated Line Item Improvement Process | Safe Shutdown Ultimate heat sink Probabilistic Risk Assessment Large early release frequency Offsite Circuit Backfit |
ML15154A800 | 11 June 2015 | Issuance of Amendment No. 235, Extension of Implementation Period for Amendment 232 Changing Technical Specification Table 3.3.1.1-1, Function 7, Scram Discharge Volume Water Level - High (Exigent Circumstances) | Commercial Grade Dedication Scram Discharge Volume |
ML15098A254 | 11 May 2015 | Issuance of Amendment No. 234, Request to Revise Technical Specification 2.1.1.2 to Change Safety Limit Minimum Critical Power Ratio Values | Reactor Vessel Water Level Anticipated operational occurrence Minimum Critical Power Ratio MELLLA |
ML15076A122 | 15 April 2015 | Issuance of Amendment No. 233, Request to Revise Technical Specification Surveillance Requirement 3.7.1.1 Related to the Ultimate Heat Sink | Safe Shutdown Ultimate heat sink Mission time Tornado Generated Missile Earthquake |
ML15042A464 | 27 March 2015 | Issuance of Amendment No. 231, Request to Revise License Condition Related to Approval of Revised Cyber Security Plan Implementation Schedule | Cyber Security Significance Determination Process |
ML15063A010 | 27 March 2015 | Issuance of Amendment No. 232, Request to Revise Technical Specification Table 3.3.1.1-1 Function 7, Scram Discharge Volume Water Level - High | Reactor Vessel Water Level Anticipated operational occurrence Incorporated by reference Scram Discharge Volume |
ML15030A501 | 1 February 2015 | Issuance of Amendment No. 230, Revise Technical Specifications for One-Time Extension of Completion Time Required Actions Related to Residual Heat Removal System B Inoperability (Emergency Circumstances) | Probabilistic Risk Assessment Large early release frequency |
ML14335A189 | 7 January 2015 | Redacted, Issuance of Amendment No. 229, Revise Emergency Core Cooling Systems Surveillance Requirements for Low Pressure Core Spray and Low Pressure Coolant Injection Pump Flows | |
ML14290A360 | 12 November 2014 | Issuance of Amendment No. 228, Request to Adopt Technical Specification Task Force (TSTF)-535, Revision 0, Revise Shutdown Margin Definition to Address Advanced Fuel Designs | Shutdown Margin Anticipated operational occurrence Power change |
ML14010A030 | 11 February 2014 | Issuance of Amendment No. 227, Request to Adopt Technical Specification Task Force (TSTF)-477, Revision 3, Adding an Action Statement for Two Inoperable Control Room Air Conditioning Subsystem | |
ML13317B623 | 31 January 2014 | Redacted - Issuance of Amendment No. 226, Technical Specification Changes to Support Installation of GE Hitachi Power Range Neutron Monitoring System; Implementation of Arts/Mellla | Safe Shutdown Shutdown Margin Reactor Vessel Water Level Safety Limit Minimum Critical Power Ratio Half scram Offsite Dose Calculation Manual Anticipated operational occurrence Safe Shutdown Earthquake Post Accident Monitoring Operating Basis Earthquake Operator Manual Action Cyber Security Incorporated by reference Scram Discharge Volume Annual Radiological Environmental Operating Report Process Control Program Feedwater Controller Failure MELLLA Operability Determination Overtravel Fuel cladding |
ML13030A457 | 1 March 2013 | Correction to Amendment Letter and Safety Evaluation Pages for Amendment No. 225, Administrative and Editorial Changes to Technical Specifications Related to Change in Software and to Adopt TSTF-GG-05-01 Revision 2 Writer'S Guide | Cyber Security |
ML12269A254 | 29 January 2013 | Issuance of Amendment No. 225, Administrative and Editorial Changes to Technical Specifications Related to Change in Software and to Adopt TSTF-GG-05-01 Revision 2 Writer'S Guide | |
ML12089A043 | 22 May 2012 | Issuance of Renewed Facility Operating License No. NPF-21 for Columbia Generating Station. Columbia Lr Ltr to Applicant | Safe Shutdown Time of Discovery Shutdown Margin Reactor Vessel Water Level High Radiation Area Ultimate heat sink Grab sample Offsite Dose Calculation Manual Post Accident Monitoring Hydrostatic Squib Cyber Security Scram Discharge Volume Annual Radiological Environmental Operating Report Process Control Program Safeguards Contingency Plan Spiral reload Overtravel License Renewal Pressure Boundary Leakage Offsite Circuit Fire Protection Program Unidentified leakage Overspeed trip |
ML12089A090 | 22 May 2012 | Issuance of Renewed Facility Operating License No. NPF-21 for Columbia Generating Station Renewed License | Safe Shutdown Cyber Security Safeguards Contingency Plan License Renewal Fire Protection Program |
ML120810235 | 23 April 2012 | Issuance of Amendment No. 224, Adoption of Technical Specification Task Force (TSTF)-514, Revision 3, Revise BWR Operability Requirements and Actions for RCS Leakage Instrumentation | Grab sample Pressure Boundary Leakage |
ML120800078 | 30 March 2012 | Issuance of Amendment No. 223, Administrative Changes to Facility Operating License to Modify Existing License Conditions or Delete Obsolete License Conditions | Safe Shutdown Reactor Vessel Water Level Ultimate heat sink License Renewal Turbine Missile Fire Protection Program |