Letter Sequence Other |
---|
|
|
MONTHYEARML0422304932004-08-10010 August 2004 Withholding from Public Disclosure, NEDC-33144P, Pressure-Temperature Curves for Energy Northwest Columbia Project stage: Other ML0511602772005-05-12012 May 2005 Issuance of AMD.193 Reactor Coolant System Pressure Temeprature Limits (Tac. MC3591) Project stage: Approval ML0513602142005-05-12012 May 2005 Technical Specification Pages Reactor Coolant System (RCS) Pressure and Temperature Limits (Tac. MC3591) Project stage: Other 2004-08-10
[Table View] |
|
---|
Category:Technical Specifications
MONTHYEARML24128A2242024-05-31031 May 2024 Issuance of Amendment No. 274 to Revise Technical Specifications to Adopt TSTF-584, Eliminate Automatic RWCU System Isolation on SLC Initiation ML23288A0002023-12-0707 December 2023 Issuance of Amendment No. 272 to Adopt TSTF-541, Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position GO2-23-012, Application to Revise Technical Specifications to Adopt Tstf-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position2023-03-27027 March 2023 Application to Revise Technical Specifications to Adopt Tstf-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position ML22308A0962022-12-15015 December 2022 Issuance of Amendment No. 269 License Amendment to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors ML21053A3162021-03-0303 March 2021 Issuance of Amendment No. 264 to Revise Technical Specification to Adopt Traveler TSTF-582, Revision 0, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements ML21005A1782021-01-25025 January 2021 Issuance of Amendment No. 263 to Revise Technical Specifications to Adopt TSTF-566, Revise Actions for Inoperable RHR Shutdown Cooling Subsystems Using the Consolidated Line Item Improvement Process ML20242A0022020-09-0404 September 2020 Issuance of Amendment No. 261 Revise Technical Specification 3.8.7, Distribution Systems - Operating (Exigent Circumstances) ML20135H0842020-06-29029 June 2020 Issuance of Amendment No. 260 Revise Technical Specifications to Adopt TSTF-563, Revision 0, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program ML20125A0802020-05-12012 May 2020 Issuance of Amendment No. 258 Changes to Technical Specification Limiting Conditions for Operation 3.8.4 and 3.8.7 (Exigent Circumstances) ML18221A1072018-09-0606 September 2018 Issuance of Amendment No. 250 Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-551, Revision 3, Revise Secondary Containment Surveillance Requirements ML18100A1992018-05-0202 May 2018 Issuance of Amendment No. 249 Change to Technical Specification 3.5.1 ECCS - Operating (CAC No. MG0015; EPID L-2017-LLA-0277) GO2-17-124, Final Technical Specification Markup and Clean Pages for Application to Revise Technical Specifications to Adopt TSTF-545, Revision 32017-07-0505 July 2017 Final Technical Specification Markup and Clean Pages for Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3 ML0531303192017-07-0505 July 2017 Current Facility Operating License NPF-21, Technical Specifications, Revised 06/20/2024 ML17095A1172017-05-11011 May 2017 Issuance of Amendment No. 241 Measurement Uncertainty Recapture GO2-16-071, Final Technical Specification Markup and Clean Pages for License Amendment Request to Adopt Technical Specification Task Force (TSTF)-425, Revision 3 to Relocate Specific Surveillance Frequencies to a Licensee Controlled Program2016-05-11011 May 2016 Final Technical Specification Markup and Clean Pages for License Amendment Request to Adopt Technical Specification Task Force (TSTF)-425, Revision 3 to Relocate Specific Surveillance Frequencies to a Licensee Controlled Program ML15216A2662016-02-0303 February 2016 Issuance of Amendment No. 236, Adoption of Technical Specification Task Force Traveler TSTF-423, Revision 1, Technical Specifications End States, as Part of Consolidated Line Item Improvement Process GO2-15-173, Supplement to Response to Second Request for Additional Information on License Amendment Request for Adoption of Technical Specification Task Force (TSTF)-425, Revision 32015-12-28028 December 2015 Supplement to Response to Second Request for Additional Information on License Amendment Request for Adoption of Technical Specification Task Force (TSTF)-425, Revision 3 ML15154A8002015-06-11011 June 2015 Issuance of Amendment No. 235, Extension of Implementation Period for Amendment 232 Changing Technical Specification Table 3.3.1.1-1, Function 7, Scram Discharge Volume Water Level - High (Exigent Circumstances) ML15076A1222015-04-15015 April 2015 Issuance of Amendment No. 233, Request to Revise Technical Specification Surveillance Requirement 3.7.1.1 Related to the Ultimate Heat Sink ML15030A5012015-02-0101 February 2015 Issuance of Amendment No. 230, Revise Technical Specifications for One-Time Extension of Completion Time Required Actions Related to Residual Heat Removal System B Inoperability (Emergency Circumstances) GO2-15-019, Emergency License Amendment Associated with Technical Specifications 3.5.1.A, 3.6.1.5.A, and 3.6.2.3.A, Request for CT Extension on RHR-B Inoperability2015-01-30030 January 2015 Emergency License Amendment Associated with Technical Specifications 3.5.1.A, 3.6.1.5.A, and 3.6.2.3.A, Request for CT Extension on RHR-B Inoperability ML14335A1892015-01-0707 January 2015 Redacted, Issuance of Amendment No. 229, Revise Emergency Core Cooling Systems Surveillance Requirements for Low Pressure Core Spray and Low Pressure Coolant Injection Pump Flows ML14290A3602014-11-12012 November 2014 Issuance of Amendment No. 228, Request to Adopt Technical Specification Task Force (TSTF)-535, Revision 0, Revise Shutdown Margin Definition to Address Advanced Fuel Designs ML14127A4002014-06-13013 June 2014 Request for Technical Specification Interpretation Regarding the Offsite Power Supplies to the Onsite Class 1E Alternating Current Power Distribution System GO2-14-043, License Amendment Request for Changing Technical Specification Table 3.3.1.1-1 Function 7, Scram Discharge Volume Water Level-High2014-03-24024 March 2014 License Amendment Request for Changing Technical Specification Table 3.3.1.1-1 Function 7, Scram Discharge Volume Water Level-High GO2-12-104, Response to Request for Additional Information for License Amendment Request to Make Administrative and Editorial Changes to Technical Specifications and the Operating License2012-07-30030 July 2012 Response to Request for Additional Information for License Amendment Request to Make Administrative and Editorial Changes to Technical Specifications and the Operating License GO2-12-003, License Amendment Request to Make Administrative and Editorial Changes to Technical Specifications and the Operating License2012-01-0909 January 2012 License Amendment Request to Make Administrative and Editorial Changes to Technical Specifications and the Operating License GO2-10-098, Request for Approval of the Cyber Security Plan2010-07-22022 July 2010 Request for Approval of the Cyber Security Plan ML1013903692010-05-11011 May 2010 License Amendment Request to Change Technical Specifications in Support of Prnm/Arts/Mella Implementation GO2-10-024, License Amendment Request to Change Technical Specifications Relating to Control Rod Operability and Control Rod Scram Accumulators2010-02-0808 February 2010 License Amendment Request to Change Technical Specifications Relating to Control Rod Operability and Control Rod Scram Accumulators GO2-09-043, Independent Spent Fuel Storage Installation - Offsite Dose Calculation Manual, Including Revision Made During 20082009-02-27027 February 2009 Independent Spent Fuel Storage Installation - Offsite Dose Calculation Manual, Including Revision Made During 2008 ML0823800182008-09-16016 September 2008 Tech Spec Pages for Amendment No. 209 TSTF-484, Use of TS 3.10.1 for Scram Time Testing Activities ML0819005982008-09-15015 September 2008 Tech Spec Pages for Amendment No. 208 Adoption of Approved Generic Technical Specification Changes Associated with Containment Isolation Valves GO2-08-122, Supplement to Adoption of Approved Generic Technical Specification Changes Associated with Containment Isolation Valves2008-08-28028 August 2008 Supplement to Adoption of Approved Generic Technical Specification Changes Associated with Containment Isolation Valves ML0817702012008-06-30030 June 2008 Tech Spec Pages for Amendment No. 207 Control Room Habitability in Accordance with TSTF-448-A, Rev 3 ML0810602972008-04-15015 April 2008 License Page 3 and Technical Specification Page 10 for Amendment No. 206 Eliminate Condition 2.F GO2-07-156, Supplement to License Amendment Request for Proposed Changes to Technical Specifications: Miscellaneous Administrative Changes Including Adoption of Approved TSTF Travelers 284, 479, and 4852007-11-0606 November 2007 Supplement to License Amendment Request for Proposed Changes to Technical Specifications: Miscellaneous Administrative Changes Including Adoption of Approved TSTF Travelers 284, 479, and 485 ML0703802052007-02-27027 February 2007 License and Technical Spec Pages - Amendment No. 202 Under Exigent Circumstances TS 3.6.1.7, Suppression Chamber-to-Drywell Vacuum Breakers-Allow One-time Extension to Current Closure Verification SR ML0705203982007-02-13013 February 2007 Supplemental Information Regarding License Amendment Request to Technical Specifications Associated with AC and DC Electrical Power ML0703000212007-02-0909 February 2007 Technical Specifications, Issuance of Amendment No. 201 to Facility Operating License Suppression Chamber-to-Drywell Vacuum Breakers and Drywell-to-Suppression Chamber Bypass Leakage Test ML0632800532006-11-27027 November 2006 Tech Spec Pages for Amendment 199 Changes to Technical Specifications to Replace the Current Accident Source Term Used in Design Basis Radiological Analyses ML0624301412006-07-11011 July 2006 Issuance of Technical Specification Pages Re Inoperability of Snubbers GO2-06-060, Application for Technical Specification Change to Add LCO 3.0.8 on the Inoperability of Snubbers (TSTF-372) Using the Consolidated Line Item Improvement Process2006-04-17017 April 2006 Application for Technical Specification Change to Add LCO 3.0.8 on the Inoperability of Snubbers (TSTF-372) Using the Consolidated Line Item Improvement Process ML0610202712006-03-13013 March 2006 E-mail 3/13/2006 - Clean TS Pages for DG AOT ML0534101872005-12-0808 December 2005 Issuance of Amendment One Time Extension of the 72- Hour Completion Time (CT) for the Required Action of Condition B Technical Specification (TS) 3.7.1 TAC No. MC8421 ML0630400372005-12-0808 December 2005 Technical Specifications, One Time Extension of the 72- Hour Completion Time (CT) for the Required Action of Condition B Technical Specification (TS) 3.7.1 GO2-05-186, Supplement to the License Amendment Request for a One-Time Change to Technical Specifications2005-11-30030 November 2005 Supplement to the License Amendment Request for a One-Time Change to Technical Specifications ML0527300232005-09-29029 September 2005 Tech Spec Pages for Amendment 194 Regarding Technical Specification Improvement to Revise Control Rod Scram Time Testing Frequency Using the Consolidated Line Item Improvement Process ML0523703242005-08-17017 August 2005 License Amendment Request for One-Time Extension of the Completion Time for Condition B of Technical Specification 3.7.1 and Exemption from Note 1 of Required Action B.1 GO2-05-099, License Amendment Request to Technical Specifications Associated with AC and DC Electrical Power2005-05-31031 May 2005 License Amendment Request to Technical Specifications Associated with AC and DC Electrical Power 2024-05-31
[Table view] |
Text
RCS P/T Limits 3.4. 11 1400
-1300 1200 1100 CA.
2 1000 w
IL 900 n 800 en o 700 600 2
J 500 a.,)400 300 200 100 INITIAL RTndt VALUES ARE 28'F FOR BELTLINE, 34'F FOR UPPER VESSEL, I
AND 34'F FOR BOTTOM HEAD BELTLINE CURVES ADJUSTED AS SHOWN:
EFPY SHIFT (-F) 33.1 35 I
HEATUP/COOLDOWN RATE OF COOLANT
.c 20F/HR
-UPPER VESSEL AND BELTLINE LIMITS BOTTOM HEAD CURVE 0
0 25 50 75 100 125 150 175 200 MINIMUM REACTOR VESSEL METAL TEMPERATURE
('F)
Figure 3.4.11-1 (Page 1 of 1)
Inservice Le;k and Hydrostatic Testing Curve Columbia Generdliryg Stait ion 3.4. 11 -7 Amendment Nlo.
14-9, 1r.'9--a6 &,
193
RCS P/T Limits 3.4.11 1400 1300 1200 41 4nt' INITIAL RTndl VALUES ARE 28'F FOR EELTLINE.
34'F FOR UPPER VESSEL, AND 34'F FOR BOTTOM HEAD BELTLINE CURVES ADJUSTED AS SHOWN:
EFPY SHIFT (OF) 33.1 35 I luu c.
la-1000 rL 900 eo o 700
-W.,
w cc 600 z
M 500 W
90 400
-w 300 HEATUP/COOLDOWN RATE OF COOLANT
< 100OFIR 1 200 100
-UUPPER VESSEL AND BELTLINE LIMITS
-BOTTOM HEAD CURVE I0 0
25 50 75 100 -125 150 175. 200 225 250 MINIMUM REACTOR VESSEL METAL TEMPERATURE (F)
Figure 3.4.11-2 (Page 1 of 1) flon-fluclear Heating and Cooldown Curve Cohimbia Generating Station 3.4
.1 1-8 Amendment Nio. {49 -T'- 9+,.193
RCS P/T Limits 3.4.11 1400 1300 1200 1100 I.
04 CL 81000 SwB0 o
700 x
t:
600 F-J 500 w
U) 400 300 INITIAL RTndt VALUES ARE 28F FOR BELTLINE.
34'F FOR UPPER
- VESSEL, AND 34OF FOR BOTTOM HEAD BELTLINE CURVE ADJUSTED AS SHOWN:
EFPY SHIFT ('F) 33.1 35 HEATUP/COOLDOWN RATE OF COOLANT c 1004FIHR ACCEPTABLE AREA OF OPERATION TO THE RIGHT OF THIS CURVE 200 100
-BELTLINE AND NON-BELTLINE LIMITS 1
0 0
25 50 75 100 125 150 175 200 225 250 275 300 MINIMUM REACTOR VESSEL METAL TEMPERATURE (F)
Figure 3.4.11-3 (Page I of 1) fluclear Heating and Cooldown Curve ColIumbi a Genera ti ng Sta ti on 3.4.1 l-9 Amendment lo. 149-G-19,169, 193