Category:Code Relief or Alternative
MONTHYEARML20282A7322020-10-27027 October 2020 Proposed Alternative Request No. 4ISI-08 Applicable to the Fourth Inservice Inspection Interval ML17318A0422017-11-20020 November 2017 Relief Request No. 3ISI-17 from the Requirements of the ASME Code, Section XI for the Third 10-Year Inservice Inspection Interval (CAC No. MF8923; EPID L-2016 LLR-0005) ML17046A5072017-02-16016 February 2017 Relief Request for Alternative 4ISI-07 Applicable to the Fourth 10-Year Inservice Inspection Program Interval ML17018A0822017-01-24024 January 2017 Relief Request for Alternative 4ISI-05 Applicable to the Fourth 10-Year Inservice Inspection Program Interval ML16292A8722016-11-0303 November 2016 Relief Request 4ISI-06, Use of Code Case N-666-1 on Socket Welded Connections Requiring Repair Due to Vibration Fatigue, Fourth 10-Year Inservice Inspection Interval ML16295A2122016-10-31031 October 2016 Relief Request 4ISI-02, Use of Code Case N-795 Following Repair/Replacement Activities, Fourth 10-Year Inservice Inspection Interval ML16175A4602016-06-24024 June 2016 Relief Request 4ISI-03, Relief from ASME Code Requirements to Allow Use of Existing Procedures That Implement Repair/Replacement Activities, for the Fourth 10-Year ISI Interval ML15357A3502015-12-23023 December 2015 Email, Verbal Authorization of Relief Request 4ISI-03, Relief from ASME Code Requirements to Allow Use of Existing Procedures That Implement Repair/Replacement Activities, for the Fourth 10-Year ISI Interval ML15036A2202015-02-13013 February 2015 Relief Request 3ISI-14 - Use of Code Case N-702 for Nozzle-Vessel Weld and Inner Radius Exams for the Third 10-Year Inservice Inspection Interval ML15030A2322015-02-0909 February 2015 Correction to 10 CFR 50.55a Citation and Administrative Changes - Relief Request Nos. RV-03, RV-02, RV-01, RP-06, RP-05, RP-04, RP-03, PV-04, RP-02, RP-01, RG-01, for the 4th 10-Year Inservice Testing Interval ML14337A4492014-12-0909 December 2014 Relief Request Nos. RV-03, RV-02, RV-01, RP-06, RP-05, RP-04, RP-03, PV-04, RP-02, RP-01, RG-01, for the Fourth 10-Year Inservice Testing Interval (TAC MF3847-MF3849, MF3851-MF3858) ML13191A0542013-08-0909 August 2013 Relief Request 3ISI-12, Use of Code Case N-795, Alternative Requirements for BWR Class 1 System Leakage Test Pressure Following Repair/Replacement Activities ML13098A0642013-04-10010 April 2013 Memorandum to File, Verbal Authorization on 4/6/2013 of Relief Request ISI3-13, Temporary Non-Code Repair of Reactor Water Cleanup System Piping to Prevent Reactor Shutdown Until Start of Refueling Outage 21 JAFP-11-0112, Relief Request (RR-8), Alternative Examination Requirements for Nozzle-to-Vessel Shell Welds and Nozzle Inner Radius Sections Using American Society of Mechanical Engineers Code Case N-702 and BWRVIP-108NP2011-10-0303 October 2011 Relief Request (RR-8), Alternative Examination Requirements for Nozzle-to-Vessel Shell Welds and Nozzle Inner Radius Sections Using American Society of Mechanical Engineers Code Case N-702 and BWRVIP-108NP ML1101101722011-02-0303 February 2011 Relief Request Nos. 3ISI-10, Use of Updated Method for RPV Weld Inspection, and 3ISI-11, Use of Requirements of BWRVIP-75-A, for the Third 10-Year Inservice Inspection Program ML1017400752010-06-0909 June 2010 Request for Relief from ASME OM Code Test Interval for a Class 2 Pressure Relief Valve ML0829504822008-10-0909 October 2008 Inservice Inspection Program Request 3ISI-09 ML0733300012007-12-18018 December 2007 Request for Relief No. 2ISI-32-1 Through 2ISI-32-20 for the Second 10-Year Inservice Inspection Program Interval and Withdrawal of 2ISI-32-21 ML0710103442007-05-15015 May 2007 Request for Relief Nos. RP01, RP03, RP06, RV01 and RV02 for the Third 10-year Inservice Testing Program Interval ML0706001112007-03-23023 March 2007 Relief, Request for Relief Nos. RP04, RP05, RP07, RV03, RV04, and RV05 for the Third 10-year Interval Inservice Testing Program ML0707305992007-03-22022 March 2007 Relief Request No. 3ISI-06 for the Third 10-Year Inservice Inspection Interval Synchronization of Interval for Class Mc Components and Their Supports ML0706506612007-03-19019 March 2007 Relief Request No. 3ISI-05 for the Third 10-Year Inservice Inspection Interval Hold Time Prior to VT-2 Examination of Standby Liquid Control System ML0705901752007-03-16016 March 2007 Request for Relief No. 3ISI-07 for the Third 10-year Inservice Inspection Interval Program ML0705105212007-03-0808 March 2007 Relief Request Nos. 3ISI-03 and 3ISI-04 for Third 10-Year Inservice Inspection Interval ML0513100912005-06-0101 June 2005 Columbia Generating Station (CGS) - Safety Evaluation for CGS on Relief Request for Alternative to Volumetric Examination of Reactor Pressure Vessel Circumferential Shell Welds in Accordance with BWRVIP-05 ML0508703482005-05-17017 May 2005 5/17/05 -J. Parrish, Ltr Columbia Gs - American Society of Mechanical Engineers Inservice Inspection Program Relief Requests 21SI-29 and 21SI-30, Subsequent ASME Section XI Edition and Addenda for Pressure Testing ML0508901152005-04-15015 April 2005 Relief, American Society of Mechanical Engineers Inservice Inspection Program Relief Requests 2ISI-31, Subsequent ASME Section XI Edition and Addenda for Pressure Testing (Tac No. MC5851) ML0510405562005-04-14014 April 2005 Columbia Generating Station - American Society of Mechanical Engineers Inservice Inspection Program Second 10-Year Interval Request for Relief 2ISI-028 ML0412701902004-05-0606 May 2004 5/6/04, Columbia Generating Station - American Society of Mechanical Engineers Boiler and Pressure Vessel Code - Relief for Qualification Requirements for Dissimilar Metal Piping Welds 2020-10-27
[Table view] Category:Letter
MONTHYEARGO2-24-110, Summary of Changes and Analysis for Revision 45 of Plant Procedures Manual 13.4.1, Emergency Notification2024-11-0404 November 2024 Summary of Changes and Analysis for Revision 45 of Plant Procedures Manual 13.4.1, Emergency Notification GO2-24-109, Summary of Changes and Analysis for Revision 42 of Plant Procedures Manual 13.8.1, Emergency Dose Projection System Operations2024-11-0404 November 2024 Summary of Changes and Analysis for Revision 42 of Plant Procedures Manual 13.8.1, Emergency Dose Projection System Operations ML24290A1142024-10-17017 October 2024 CGS FPTI 2024011 GO2-24-088, Supplement to Response to Request for Additional Information Regarding License Amendment Request to Revise Columbia Emergency Plan2024-09-24024 September 2024 Supplement to Response to Request for Additional Information Regarding License Amendment Request to Revise Columbia Emergency Plan GO2-24-051, Application to Revise Technical Specifications to Adopt TSTF-592, Revise Automatic Depressurization System (ADS) Instrumentation Requirements2024-09-23023 September 2024 Application to Revise Technical Specifications to Adopt TSTF-592, Revise Automatic Depressurization System (ADS) Instrumentation Requirements ML24247A1572024-09-12012 September 2024 Withholding Determination Letter for Presentation Materials for Energy Northwest Pre-application Meeting 8-9-2024 ML24255A1012024-09-12012 September 2024 Request for Withholding Information from Public Disclosure Energy Northwest Regulatory Engagement Plan, Revision 0 GO2-24-082, Response to Request for Additional Information Regarding License Amendment Request to Revise Columbia Emergency Plan2024-09-10010 September 2024 Response to Request for Additional Information Regarding License Amendment Request to Revise Columbia Emergency Plan IR 05000397/20240052024-08-22022 August 2024 Updated Inspection Plan for Columbia Generating Station (Report 05000397/2024005) IR 07200035/20244012024-08-19019 August 2024 Security Baseline Inspection Report 07200035/2024401 IR 05000397/20244022024-08-13013 August 2024 Security Baseline Inspection Report 05000397/2024402 IR 05000397/20240022024-08-0909 August 2024 Integrated Inspection Report 05000397/2024002 GO2-24-060, Reply to a Notice of Violation, EA-21-170 and EA-23-0542024-07-30030 July 2024 Reply to a Notice of Violation, EA-21-170 and EA-23-054 GO2-24-070, Response to Request for Additional Information Regarding Fifth Interval Inservice Testing Program2024-07-29029 July 2024 Response to Request for Additional Information Regarding Fifth Interval Inservice Testing Program GO2-24-063, Notification of Extension to Columbias Fourth 10-Year Interval Inservice Testing Program Plan2024-07-15015 July 2024 Notification of Extension to Columbias Fourth 10-Year Interval Inservice Testing Program Plan IR 05000397/20240122024-07-10010 July 2024 – Safety Conscious Work Environment Issue of Concern Follow-up Inspection 05000397/2024012 ML24180A1482024-06-28028 June 2024 Notification of an NRC Fire Protection Baseline Inspection (NRC Inspection Report 05000397/2024011) and Request for Information IR 05000397/20244202024-06-27027 June 2024 – Security Baseline Inspection Report 05000397 2024420 Cover Letter GO2-24-057, Notice of Readiness for Supplemental Inspection2024-06-19019 June 2024 Notice of Readiness for Supplemental Inspection ML24099A2232024-06-12012 June 2024 Issuance of Amendment No. 275 to Adopt TSTF-230, Revision 1, Add New Condition B to LCO 3.6.2.3, RHR Suppression Pool Cooling GO2-24-056, Relief Request for the Columbia Generating Station Fourth Ten-Year Interval Inservice Testing2024-06-11011 June 2024 Relief Request for the Columbia Generating Station Fourth Ten-Year Interval Inservice Testing ML24128A2242024-05-31031 May 2024 Issuance of Amendment No. 274 to Revise Technical Specifications to Adopt TSTF-584, Eliminate Automatic RWCU System Isolation on SLC Initiation GO2-24-049, 2023 Annual Radiological Environmental Operating Report2024-05-13013 May 2024 2023 Annual Radiological Environmental Operating Report GO2-24-050, Annual Environmental Operating Report2024-04-30030 April 2024 Annual Environmental Operating Report IR 05000397/20240012024-04-24024 April 2024 Integrated Inspection Report 05000397/2024001 GO2-24-042, 2023 Annual Radioactive Effluent Release Report2024-04-22022 April 2024 2023 Annual Radioactive Effluent Release Report ML24089A2282024-04-15015 April 2024 – Acceptance of Requested Licensing Action License Amendment Request to Revise Columbia Generating Station Emergency Plan GO2-24-044, Voluntary Response to Regulatory Issue Summary 2024-012024-04-11011 April 2024 Voluntary Response to Regulatory Issue Summary 2024-01 ML24074A4532024-04-11011 April 2024 Request for Withholding Information from Public Disclosure IR 05000397/20244012024-04-0202 April 2024 – Security Baseline Inspection Report 05000397/2024401 (Cover Letter Only) IR 05000397/20244032024-03-28028 March 2024 Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000397/2024403 GO2-24-034, Supplement to License Amendment Request to Revise Columbia Generating Station Emergency Plan2024-03-20020 March 2024 Supplement to License Amendment Request to Revise Columbia Generating Station Emergency Plan ML24058A0692024-03-14014 March 2024 Supplemental Information Needed for Acceptance of Requested Licensing Action Amendment Request for Emergency Plan ML24044A0492024-03-12012 March 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0064 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) GO2-24-041, Level of Financial Protection - Annual Reporting Requirement2024-03-12012 March 2024 Level of Financial Protection - Annual Reporting Requirement GO2-24-036, Presentation Information for Pre-Application Meeting Regarding Columbia’S Replacement Steam Dryer Evaluation Approach for Extended Power Uprate2024-03-11011 March 2024 Presentation Information for Pre-Application Meeting Regarding Columbia’S Replacement Steam Dryer Evaluation Approach for Extended Power Uprate GO2-24-039, Report of Changes or Errors in Emergency Core Cooling System Loss of Coolant Accident Analysis Models Pursuant to 10 CFR 50.462024-03-11011 March 2024 Report of Changes or Errors in Emergency Core Cooling System Loss of Coolant Accident Analysis Models Pursuant to 10 CFR 50.46 ML24047A0422024-03-0707 March 2024 Issuance of Amendment No. 273 Renewed Facility Operating License and Technical Specification Clean Up IR 05000397/20230062024-02-28028 February 2024 Annual Assessment Letter for Columbia Generating Station (Report 05000397/2023006) IR 05000397/20253012024-02-14014 February 2024 Notification of NRC Initial Operator Licensing Examination 05000397/2025301 GO2-24-004, License Amendment Request to Revise Emergency Plan2024-01-30030 January 2024 License Amendment Request to Revise Emergency Plan GO2-24-003, Relief Requests for the Columbia Generating Station Fifth Ten-Year Interval Inservice Testing2024-01-29029 January 2024 Relief Requests for the Columbia Generating Station Fifth Ten-Year Interval Inservice Testing IR 05000397/20230042024-01-29029 January 2024 Integrated Inspection and Independent Spent Fuel Storage Installation Report 05000397/2023004 and 07200035/2023001 05000397/LER-2024-001, Failure to Track Operability of Requirements of Transversing In-Core Probe Valves2024-01-22022 January 2024 Failure to Track Operability of Requirements of Transversing In-Core Probe Valves GO2-24-014, Independent Spent Fuel Storage Installation, Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2024-01-15015 January 2024 Independent Spent Fuel Storage Installation, Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML24011A1522024-01-10010 January 2024 March 2024 Emergency Preparedness Exercise Inspection-Request for Information GO2-24-005, Docket No. 50-397 Supplement to Reply to a Notice of Violation; EA-21-1702024-01-0808 January 2024 Docket No. 50-397 Supplement to Reply to a Notice of Violation; EA-21-170 GO2-23-136, Guarantee of Payment of Deferred Premium2023-12-20020 December 2023 Guarantee of Payment of Deferred Premium GO2-23-130, Reply to a Notice of Violation; EA-23-0542023-12-14014 December 2023 Reply to a Notice of Violation; EA-23-054 GO2-23-135, Notice of Readiness for Supplemental Inspection2023-12-14014 December 2023 Notice of Readiness for Supplemental Inspection 2024-09-24
[Table view] Category:Safety Evaluation
MONTHYEARML24128A2242024-05-31031 May 2024 Issuance of Amendment No. 274 to Revise Technical Specifications to Adopt TSTF-584, Eliminate Automatic RWCU System Isolation on SLC Initiation ML24047A0422024-03-0707 March 2024 Issuance of Amendment No. 273 Renewed Facility Operating License and Technical Specification Clean Up ML23288A0002023-12-0707 December 2023 Issuance of Amendment No. 272 to Adopt TSTF-541, Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position ML23143A1202023-06-27027 June 2023 Request Number 4ISI-11 to the American Society of Mechanical Engineers Boiler and Pressure Vessel Code Regarding Alternate Examination of Reactor Vessel Welds ML23083B4012023-04-27027 April 2023 Issuance of Amendment No. 271 to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling ML23013A0812023-03-15015 March 2023 Issuance of Amendment No. 270 Revision to Technical Specifications to Adopt TSTF 505, Revision 2, Provide Risk-Informed Extended Completion Times-RITSTF Initiative 4B ML22308A0962022-12-15015 December 2022 Issuance of Amendment No. 269 License Amendment to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors ML22263A4452022-11-23023 November 2022 Issuance of Amendment No. 268 to Revise Technical Specification 3.4.11 RCS Pressure and Temperature (P/T) Limits ML22109A0922022-05-18018 May 2022 Correction Letter - Approval for Alternate Disposal Procedures for the Continued Onsite Disposal of Cooling Tower and Spray Pond Sludge in the Existing Sediment Disposal Area ML22098A0642022-05-0909 May 2022 Issuance of Amendment No. 267 to Adopt Technical Specifications Task Force (TSTF) 546, Revision 0, Revise APRM Channel Adjustment Surveillance Requirement ML22004A1852022-03-11011 March 2022 Approval for Alternate Disposal Procedures for the Continued Onsite Disposal of Cooling Tower and Spray Pond Sludge in the Existing Sediment Disposal Area ML21293A1642022-01-13013 January 2022 Issuance of Amendment No. 266 License Amendment Request to Remove License Condition 2.C.(34) and Revise License Condition 2.C.(35) ML21273A1672021-11-22022 November 2021 Issuance of Amendment No. 265 Adoption of TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO ML21081A1502021-03-25025 March 2021 Approval for Request to Use a Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML21053A3162021-03-0303 March 2021 Issuance of Amendment No. 264 to Revise Technical Specification to Adopt Traveler TSTF-582, Revision 0, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements ML21005A1782021-01-25025 January 2021 Issuance of Amendment No. 263 to Revise Technical Specifications to Adopt TSTF-566, Revise Actions for Inoperable RHR Shutdown Cooling Subsystems Using the Consolidated Line Item Improvement Process ML20302A0262020-12-15015 December 2020 Issuance of Amendment No. 262 to Revise Technical Specifications to Adopt TSTF-564, Safety Limit MCPR ML20282A7322020-10-27027 October 2020 Proposed Alternative Request No. 4ISI-08 Applicable to the Fourth Inservice Inspection Interval ML20242A0022020-09-0404 September 2020 Issuance of Amendment No. 261 Revise Technical Specification 3.8.7, Distribution Systems - Operating (Exigent Circumstances) ML20203K8762020-07-22022 July 2020 Correction to Reduction in Commitment to the Operational Quality Assurance Program Description (EPID L-2020-LLQ-0003 (COVID-19)) ML20181A4452020-07-0707 July 2020 Reduction in Commitment to the Operational Quality Assurance Program Description (EPID L-2020-LLQ-0003)(Covid-19) ML20135H0842020-06-29029 June 2020 Issuance of Amendment No. 260 Revise Technical Specifications to Adopt TSTF-563, Revision 0, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program ML20136A3472020-06-22022 June 2020 Issuance of Amendment No. 259 Revise Technical Specifications Per TSTF-529, Revision 4, Clarify Use and Application Rules ML20125A0802020-05-12012 May 2020 Issuance of Amendment No. 258 Changes to Technical Specification Limiting Conditions for Operation 3.8.4 and 3.8.7 (Exigent Circumstances) ML20113E9842020-05-0404 May 2020 Issuance of Amendment No. 257 to Extend Implementation Date for Amendment No. 255 Control Room Air Conditioning System (Exigent Circumstances) ML19350B5792020-01-0202 January 2020 Generation Station - Safety Evaluation Regarding Implementation of Hardened Containment Vents Capable of Operation Under Severe Accident Conditions Related to Order EA-13-109 (CAC No. MF4383; EPID L-2014-JLD-0045) ML19063A5792019-06-20020 June 2019 Issuance of Amendment No. 253 Renewed Facility Operating License and Technical Specification Clean-Up ML18317A0052018-11-27027 November 2018 Correction to Safety Evaluation Pages 5 and 24 for Amendment No. 199 Dated November 27, 2006 Related to Alternative Source Term ML18283A1252018-11-0808 November 2018 Issuance of Amendment No. 252 Update Appendix B to Renewed Facility Operating License to Incorporate the 2017 Biological Opinion ML18255A3502018-10-30030 October 2018 Issuance of Amendment No. 251 Revision to the Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control ML18100A1992018-05-0202 May 2018 Issuance of Amendment No. 249 Change to Technical Specification 3.5.1 ECCS - Operating (CAC No. MG0015; EPID L-2017-LLA-0277) ML17333A8882018-02-22022 February 2018 Safety Evaluation Regarding Implementation of Mitigating Strategies and Reliable Spent Fuel Pool Instrumentation Related to Orders EA-12-049 and EA-12-051 ML17318A0422017-11-20020 November 2017 Relief Request No. 3ISI-17 from the Requirements of the ASME Code, Section XI for the Third 10-Year Inservice Inspection Interval (CAC No. MF8923; EPID L-2016 LLR-0005) ML17290A1272017-10-30030 October 2017 Columbia Generating Station - Issuance of Amendment No. 245 Re: Request for a One-Time Extension of the Residual Heat Removal Train A Completion Time (CAC No. MF8794; EPID L-2016-LLA-0016) ML17188A2302017-08-28028 August 2017 Issuance of Amendment No. 244 Emergency Action Level Scheme Change to Nuclear Energy Institute 99-01, Revision 6 ML17187A2572017-07-24024 July 2017 Columbia Generating Station - Issuance of Amendment No. 243 Re: Adoption of Technical Specifications Task Force Traveler TSTF 545, Revision 3 (CAC No. MF8148) ML17131A0712017-06-27027 June 2017 Columbia Generating Station - Issuance of Amendment No. 242 Re: Reduction of Reactor Steam Dome Pressure Specified in the Technical Specification 2.1.1, "Reactor Core SLs (Safety Limits)" (CAC No. MF8116) ML17095A1172017-05-11011 May 2017 Columbia Generating Station - Issuance Of Amendment No. 241 Re: Measurement Uncertainty Recapture (CAC No. MF8060) ML17046A5072017-02-16016 February 2017 Relief Request for Alternative 4ISI-07 Applicable to the Fourth 10-Year Inservice Inspection Program Interval ML16357A6462017-01-31031 January 2017 Issuance of Amendment No. 239, Adopt Technical Specification Task Force (TSTF)-522, Revision 0, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month ML17018A0822017-01-24024 January 2017 Relief Request for Alternative 4ISI-05 Applicable to the Fourth 10-Year Inservice Inspection Program Interval ML16292A8722016-11-0303 November 2016 Relief Request 4ISI-06, Use of Code Case N-666-1 on Socket Welded Connections Requiring Repair Due to Vibration Fatigue, Fourth 10-Year Inservice Inspection Interval ML16295A2122016-10-31031 October 2016 Relief Request 4ISI-02, Use of Code Case N-795 Following Repair/Replacement Activities, Fourth 10-Year Inservice Inspection Interval ML16263A2332016-10-0505 October 2016 Relief Request 4ISI-04, Reduced Percentage Requirements for Nozzle to Vessel Welds and Inner Radius Exams, for the Fourth 10-Year Inservice Inspection Interval ML16175A4602016-06-24024 June 2016 Relief Request 4ISI-03, Relief from ASME Code Requirements to Allow Use of Existing Procedures That Implement Repair/Replacement Activities, for the Fourth 10-Year ISI Interval ML16020A0312016-02-16016 February 2016 Issuance of Amendment No. 237, Adopt TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability, Using Consolidated Line Item Improvement Process ML15216A2662016-02-0303 February 2016 Issuance of Amendment No. 236, Adoption of Technical Specification Task Force Traveler TSTF-423, Revision 1, Technical Specifications End States, as Part of Consolidated Line Item Improvement Process ML15154A8002015-06-11011 June 2015 Issuance of Amendment No. 235, Extension of Implementation Period for Amendment 232 Changing Technical Specification Table 3.3.1.1-1, Function 7, Scram Discharge Volume Water Level - High (Exigent Circumstances) ML15098A2542015-05-11011 May 2015 Issuance of Amendment No. 234, Request to Revise Technical Specification 2.1.1.2 to Change Safety Limit Minimum Critical Power Ratio Values ML15076A1222015-04-15015 April 2015 Issuance of Amendment No. 233, Request to Revise Technical Specification Surveillance Requirement 3.7.1.1 Related to the Ultimate Heat Sink 2024-05-31
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 January 24, 2017 Mr. Mark E. Reddemann Chief Executive Officer Energy Northwest P.O. Box 968 (Mail Drop 1023)
Richland, WA 99352-0968
SUBJECT:
COLUMBIA GENERATING STATION - RELIEF REQUEST FOR ALTERNATIVE 41Sl-05 APPLICABLE TO THE FOURTH 10-YEAR INSERVICE INSPECTION PROGRAM INTERVAL (CAC NO. MF7358)
Dear Mr. Reddemann:
By letter dated February 17, 2016, as supplemented by letter dated August 3, 2016, Energy Northwest (the licensee) submitted a request to the U.S. Nuclear Regulatory Commission (NRC) for the use of an alternative to certain American Society of Mechanical Engineers Boiler and Pressure Vessel Code (ASME Code),Section XI, requirements for system leakage testing of the reactor pressure vessel (RPV) flange leak-off lines at Columbia Generating Station (CGS).
The proposed alternative in Relief Request 41Sl-05 is to perform the system leakage test of the RPV flange leak-off lines at CGS, using the pressure developed when the refueling cavity is filled to the normal refueling water level in lieu of the pressure required by ASME Code,Section XI, paragraphs IWB-5221 and IWC-5221. Specifically, pursuant to Title 10 of the Code of Federal Regulations (10 CFR), Part 50, Section 50.55a(z)(2), the licensee requested to use the proposed alternative on the basis that complying with the specified requirement would result in hardship or unusual difficulty without a compensating increase in the level of quality and safety.
The NRC staff has reviewed the subject request and concludes, as set forth in the enclosed safety evaluation, that the licensee has adequately addressed all of the regulatory requirements set forth in 10 CFR 50.55a(z)(2). Therefore, the NRC authorizes the licensee's proposed alternative for system leakage testing of the RPV for the duration of the fourth 10-year inservice inspection interval at CGS ending on December 12, 2025.
All other ASME Code requirements for which relief was not specifically requested and approved in the subject request for relief remain applicable, including third-party review by the Authorized Nuclear lnservice Inspector.
M. Reddemann If you have any questions regarding this matter, please contact the NRC project manager, John Klos, at (301) 415-5136 or via e-mail at John.Klos@nrc.gov.
Sincerely, Robert J. Pascarelli, Chief Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-397
Enclosure:
Safety Evaluation cc w/encl: Distribution via Listserv
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION REQUEST FOR ALTERNATIVE 41Sl-05 REGARDING PRESSURE TESTING OF REACTOR PRESSURE VESSEL FLANGE LEAK-OFF LINES ENERGY NORTHWEST COLUMBIA GENERATING STATION DOCKET NO. 50-397
1.0 INTRODUCTION
By letter dated February 17, 2016, as supplemented by letter dated August 3, 2016 (Agencywide Documents Access and Management System Accession Nos. ML16054A797 and ML16216A697, respectively), Energy Northwest (the licensee) submitted a request to the U.S.
Nuclear Regulatory Commission (NRC) for the use of an alternative to certain American Society of Mechanical Engineers Boiler and Pressure Vessel Code (ASME Code),Section XI, "Rules for lnservice Inspection of Nuclear Power Plant Components," requirements for system leakage testing of the reactor pressure vessel (RPV) flange leak-off lines at Columbia Generating Station (CGS).
The proposed alternative in Relief Request 41Sl-05 is to perform the system leakage test of the RPV flange leak-off lines at CGS, using the pressure developed when the refueling cavity is filled to the normal refueling water level in lieu of the pressure required by ASME Code,Section XI, paragraphs IWB-5221 and IWC-5221. Specifically, pursuant to Title 10 of the Code of Federal Regulations (10 CFR), Part 50, Section 50.55a(z)(2), the licensee requested to use the proposed alternative on the basis that complying with the specified requirement would result in hardship or unusual difficulty without a compensating increase in the level of quality and safety.
2.0 REGULATORY REQUIREMENTS The regulations in 10 CFR 50.55a(g)(4), "lnservice inspection standards requirement for operating plants," require that ASME Code Class 1, 2, and 3 components (including supports) shall meet the requirements, except the design and access provisions and the preservice examination requirements, set forth in the ASME Code,Section XI, to the extent practical within the limitations of design, geometry, and materials of construction of the components. The regulations require that inservice examination of components and system pressure tests, conducted during the first 10-year interval and subsequent intervals, comply with the requirements in the latest edition and addenda of Section XI of the ASME Code, incorporated by reference in 10 CFR 50.55a(a), 12 months prior to the start of the 120-month interval, subject to the conditions listed therein.
Enclosure
The regulation in 10 CFR 50.55a(z), "Alternatives to codes and standards requirements," states, in part, that the Director of the Office of Nuclear Reactor Regulation may authorize an alternative to the requirements of 10 CFR 50.55a(b) through (h) given that the licensee demonstrates one of the two justifications. First, per 10 CFR 50.55a(z)(1 ), the licensee must demonstrate that the proposed alternative would provide an acceptable level of quality and safety. For the second possible justification for an alternative to be authorized, described in 10 CFR 50.55a(z)(2), the licensee must show that following the ASME Code requirements would result in hardship or unusual difficulty without a compensating increase in the level of quality and safety.
Based on the above, and subject to the following technical evaluation, the NRG staff concludes that regulatory authority to authorize an alternative to the ASME Code requirement, as requested by the licensee exists. Accordingly, the NRG staff has reviewed and evaluated the licensee's request pursuant to 10 CFR 50.55a(z)(2).
3.0 TECHNICAL EVALUATION
3.1 ASME Code Components Affected
- Code Class 1 RPV Flange Leak-off Piping nominal pipe size (NPS) % inch and 1 inch
- Code Class 2 RPV Flange Leak-off Piping NPS % inch 3.2 Applicable Code Requirement:
The Code of Record for the CGS fourth 10-year inservice inspection (ISi) interval, which began December 13, 2015 and is scheduled to end on December 12, 2025, is the ASME Code,Section XI, 2007 Edition through 2008 Addenda.
ASME Code,Section XI, IWB-2500, "Examination and Pressure Test Requirements,"
Table IWB-2500-1, Code Category B-P, Item No. 815.20 requires that all Class 1 pressure retaining components be subject to a system leakage test with a Visual Examination, VT-2 once per inspection interval. Subparagraph IWB-5221 (a) requires that the system leakage test be conducted at a pressure not less than the pressure corresponding to 100 percent rated reactor power.
ASME Code,Section XI, IWC-2500, Table IWC-2500-1, Code Category C-H, Item No. C7.10 requires that all Class 2 pressure retaining components be subject to a system leakage test with a Visual Examination, VT-2 each inspection period. Paragraph IWC-5221, "Pressure," requires that the system leakage test be conducted at the system pressure obtained while the system, or portion of the system, is in service performing its normal operating function or at a system pressure developed during a test conducted to verify system operability.
3.3 Reason for Request:
As summarized in the licensee's application dated February 17, 2016, the RPV flange leak-off piping is separated from the reactor pressure boundary by one passive membrane, which is an 0-ring (inner), located on the vessel flange. A second 0-ring (outer) is located on the opposite side of the tap in the vessel flange. Failure of the inner 0-ring is the only condition under which the leak-off line is pressurized. Therefore, the line would not be pressurized during the Class 1 system pressure test following a refueling outage.
The configuration of this system precludes system pressure testing while the vessel head is removed because the configuration and size of the vessel tap and the high test pressure requirement prevents the tap in the flange from being temporarily plugged or connected to other piping. The opening in the flange is smooth walled, making the effectiveness of a temporary seal very limited.
Failure of a high pressure temporary seal could possibly cause the device used for plugging to be ejected into the reactor vessel.
The licensee stated, in part, in its letter dated February 17, 2016, that:
The configuration also precludes pressure testing with the vessel head installed because the seal prevents complete filling of the piping, which has no vent available. The top head of the vessel contains two grooves that hold the 0-rings. The 0-rings are held in place by a series of retainer clips that are housed in recessed cavities in the flange face. If a pressure test was performed with the head on, the inner 0-ring would be pressurized in a direction opposite to what it would see in normal operation. This test pressure would result in a net inward force on the inner 0-ring that would tend to push it into the recessed cavities that house the retainer clips. The thin 0-ring material would very likely be damaged by this inward force.
Purposely failing or not installing the inner 0-ring in order to perform a pressure test would require replacing the new outer and possibly the new inner 0-ring each time the test is conducted. This would result in additional time needed during the outage and additional radiation exposure to personnel associated with the removal and reinstallation of the RPV head.
It is possible to pressurize the Class 2 portion only by closing a valve (MS-V-753) and pressurizing with an external source at the test connection point. This portion of the RPV flange leak-off line consist of less than two feet of% inch piping. Performing this task each inspection period would require an additional dose of 64 millirem each period versus performing a combined Class 1 and Class 2 examination once per interval in accordance with this request.
3.4 Proposed Alternative and Basis for Use In its letter dated February 17, 2016, the licensee proposes to perform a Visual Examination, VT-2 of the Class 1 and Class 2 portions of the RPV flange leak-off line with the components subject to static pressure head with the RPV head removed and the refueling cavity filled to its normal refueling water level for at least 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />. The minimum head pressure in the leak-off line would be 24.5 feet of water.
Further, the licensee stated, in part in its letter dated February 17, 2016, that, This proposed [alternative] is identical to that presented in ASME Code Case N-805. This Code Case has not yet been approved by the NRC and is not yet identified in the current revision of Regulatory Guide 1.147, "In-service Inspection Code Case Acceptability, ASME Section XI, Division 1" ....
The licensee proposes to perform this test once at or near the end of the inspection interval for both the Class 1 and Class 2 portions of the line. Once per interval testing is consistent with IWB-5222(b) requirements and reduces the dose received during testing of the Class 2 portion.
3.5 NRC Staff Evaluation The NRC staff has evaluated the proposed alternative 41Sl-05 pursuant to 10 CFR 50.55a(z)(2).
The NRC staff focused on whether compliance with the specified requirements of 10 CFR 50.55a(g), or portions thereof, would result in hardship or unusual difficulty, and if there is a compensating increase in the level of quality and safety despite the hardship.
The NRC staff determined that it would result in hardship if the IWB-5221 (a) requirement for leak testing of the RPV head flange seal leak-off line piping is imposed upon the licensee. This hardship is due to the existing design and configurations of reactor vessel flange and flange leak-off line, which makes system leakage testing of the leak-off line piping at a pressure corresponding to 100 percent rated reactor power either before or after the RPV head is removed unusually difficult. This is because the testing would require either temporary modifications or permanent design changes as described above. These modifications could introduce foreign materials into the reactor, either through ejection of a temporary seal or welding and grinding activities in close proximity to the RPV, which would introduce a plant Foreign Material Exclusion program concern. Personnel carrying out these tasks would incur additional radiation dose, which would be an as-low-as-reasonably-achievable (ALARA) program concern. To conduct the required system testing with the RPV head in place, the licensee would have to install new test connections and valves to existing piping to be able to externally pressurize the leak-off piping and provide a vent path. Personnel performing these tasks and conducting testing would be exposed to additional dose, which would be an ALARA program concern. Furthermore, when the head is on if the subject piping was externally pressurized for the purpose of conducting the ASME Code required leak testing of the leak-off piping, the inner 0-ring seal may fail due being pressurized in the opposite direction than its designed purpose. Requiring the RPV head to be removed and reinstalled to perform the pressure test by purposely failing or not installing the 0-ring would also result in additional radiation exposure to personnel involved with the removal and reinstallation of the RPV head, which would be an ALARA program concern. Therefore, the NRC staff determines that the above items constitute a hardship in this case.
The NRC staff determines that the licensee's proposed system leakage test of the RPV leak-off piping will subject the system to the highest pressure that can be obtained without design modifications to existing configurations of both the vessel flange face and the flange leak-off piping. Specifically, the leak-off line piping will be pressurized by the proposed static pressure head (24.5 feet) developed from the refueling water level above the reactor vessel flange during the vessel cavity floodup, and will be examined by the IWA-5240 required VT-2 visual examinations after attaining the proposed test pressure for at least four hours. Any evidence of leakage, from an existing flaw in the piping and its associated connections, would be detected by the VT-2.
With respect to the Class 2 portion of the RPV flange leak-off piping, the NRC staff determines that performing the pressure testing once per interval in accordance with the proposed alternative is consistent with the requirements of IWB-5222(b). IWB-5222(b) applies to the Class 1 pressure retaining boundary, which is not pressurized when the system valves are in the position required for normal reactor startup and requires pressure testing of these portions of Class 1 systems pressurized and examined at or near the end of the inspection interval.
The NRC staff determined that the licensee has sufficient leakage detection capabilities (i.e.,
detection of increase in drywell temperature and pressure, detection of an increase in drywell floor drain leakage, containment radiation monitors as well as monitoring of drywell fission products) that provides warning to the control room operator in the unlikely event of a through wall leak in the RPV flange seal leak-off line piping concurrent with leak or failure of the RPV flange inner seal. If the proposed alternative was not effective in identifying a through-wall leak, originating from an existing flaw in the subject piping, the plant's existing leakage detection capability will be able to identify the leakage during normal operation and the licensee will be required to implement appropriate corrective actions. Furthermore, the licensee stated that CGS has no history of 0-ring leakage or degradation in vessel flange leak-off piping.
Should the inner 0-ring and leak off piping no longer be capable of withstanding the pressure, and the leakage rates do not meet technical specification requirements, shutdown of the reactor would be required. There is reasonable assurance that any problems in the subject piping would be detected through these measures. NRC staff concludes that requiring compliance with the IWB-5221 system pressure test requirements results in a hardship or unnecessary difficulty without a compensating increase in the level of quality and safety. Therefore, the NRC staff concludes that the proposed system leakage testing using the static head pressure from normal refueling water levels is adequate to provide reasonable assurance of structural integrity and leak tightness of the RPV flange seal leak-off line piping.
On the basis of the above evaluation, the NRC staff concludes that the licensee's proposed alternative 41Sl-05 is acceptable for the fourth 10-year ISi interval of CGS.
4.0 CONCLUSION
As set forth above, the NRC staff concludes that the licensee's proposed alternative 41Sl-05 provides reasonable assurance of the structural integrity and leak tightness of the RPV head flange leak-off piping, and that complying with the specified ASME Code requirement would result in hardship or unusual difficulty without a compensating increase in the level of quality and safety. Accordingly, the staff concludes that the licensee has adequately addressed all of the regulatory requirements set forth in 10 CFR 50.55a(a)(z)(2) and, therefore, authorizes the use of proposed alternative 41Sl-05 at CGS for the fourth 10-year ISi interval, which commenced on December 13, 2015, and will end on December 12, 2025.
All other ASME Code,Section XI requirements for which relief was not specifically requested and approved remain applicable, including third-party review by the Authorized Nuclear lnservice Inspector.
Principal Contributor: Keith M. Hoffman Date: January 24, 2017
M. Reddemann COLUMBIA GENERATING STATION - RELIEF REQUEST FOR ALTERNATIVE 41Sl-05 APPLICABLE TO THE FOURTH 10-YEAR INSERVICE INSPECTION PROGRAM INTERVAL (CAC NO. MF7358) Dated January 24, 2017 DISTRIBUTION:
PUBLIC LPL4 R/F RidsACRS_MailCTR Resource RidsNrrDeEpnb Resource RidsNrrDorlLpl4 Resource RidsNrrPMColumbia Resource RidsNrrLAPBlechman Resource RidsRgn4Mai1Center Resource KHoffman, NRR MWatford, NRR ADAMS Accession Number.: ML17018A082 *email dated OFFICE NRR/DORULPL4/PM NRR/DORULPL4/LA NRR/DE/EPNB/BC* NRR/DORULPL4/BC NAME JKlos (MWatford for) PBlechman DAiiey RPascarelli DATE 1/18/17 1/18/17 10/28/16 1/24/17 OFFICIAL RECORD COPY