ML23206A124
| ML23206A124 | |
| Person / Time | |
|---|---|
| Site: | Technical Specifications Task Force |
| Issue date: | 07/31/2023 |
| From: | Victor Cusumano, Michelle Honcharik NRC/NRR/DSS/STSB |
| To: | Technical Specifications Task Force |
| Shared Package | |
| ML23209A038 | List: |
| References | |
| EPID L-2022-PMP-0002 | |
| Download: ML23206A124 (1) | |
Text
July 31, 2023 Technical Specifications Task Force 11921 Rockville Pike, Suite 100 Rockville, MD 20852
SUBJECT:
FINAL SAFETY EVALUATIONS OF TECHNICAL SPECIFICATIONS TASK FORCE TRAVELER TSTF-584, REVISION 0, ELIMINATE AUTOMATIC RWCU SYSTEM ISOLATION ON SLC SYSTEM INITIATION (EPID L 2022 PMP 0002)
Dear Members of the Technical Specifications Task Force:
By letter dated February 23, 2022 (ADAMS Accession No. ML22054A292), the Technical Specifications Task Force (TSTF) submitted Traveler TSTF-584, Revision 0, Eliminate Automatic RWCU [reactor water cleanup] System Isolation on SLC [standby liquid control]
System Initiation, to the U.S. Nuclear Regulatory Commission (NRC) for review and approval.
The traveler was submitted as part of the consolidated line-item improvement process (CLIIP).
Traveler TSTF-584, Revision 0, is approved as a CLIIP traveler. The NRC staffs final traveler and model safety evaluations are enclosed.
If you have any questions, please contact Michelle Honcharik at 301-415-1774 or via e-mail at Michelle.Honcharik@nrc.gov.
Sincerely, Victor G. Cusumano, Chief Technical Specifications Branch Division of Safety Systems Office of Nuclear Reactor Regulation Project No. 753
Enclosures:
- 1. Final Traveler SE
- 2. Final Model SE cc: See next page Victor G.
Cusumano Digitally signed by Victor G. Cusumano Date: 2023.07.31 11:01:57 -04'00'
Technical Specifications Task Force Project No. 753 cc:
Technical Specifications Task Force c/o EXCEL Services Corporation 11921 Rockville Pike, Suite 100 Rockville, MD 20852 Attention: Brian D. Mann E-mail: brian.mann@excelservices.com James P. Miksa Entergy Nuclear Operations, Inc.
Palisades Nuclear Power Plant 27780 Blue Star Memorial Highway Covert, MI 49043 E-mail: jmiksa@entergy.com Jordan L. Vaughan Duke Energy EC07C / P.O. Box 1006 Charlotte, NC 28202 E-mail: jordan.vaughan@duke-energy.com Ryan M. Joyce Southern Nuclear Operating Company 3535 Colonnade Parkway / Bin N-274-EC Birmingham, AL 35243 E-mail: rmjoyce@southernco.com David M. Gullott Exelon Generation 4300 Winfield Road Warrenville IL 60555 E-mail: David.Gullott@exeloncorp.com Wesley Sparkman Southern Nuclear Operating Company 3535 Colonnade Parkway / Bin N-226-EC Birmingham, AL 35242 E-mail: wasparkm@southernco.com
ML23209A038, Package ML23206A124, Cover letter ML23206A076, Final traveler SE ML23206A075, Final Model SE
- Previous concurrence (ML23012A281)
NRR-106 OFFICE NRR/DORL/LPL3/LA*
DSS/SNSB/ABC*
NRR/DORL/LPL2-2/BC*
NAME KEntz DWoodyatt DWrona DATE 2/14/2023 9/27/2022 3/7/2023 OFFICE OGC/NLO*
NRR/DSS/STSB/PM**
NRR/DSS/STSB/BC**
NAME ANaber MHoncharik VCusumano DATE 3/13/2023 7/25/2023 7/31/2023