Category:Inservice/Preservice Inspection and Test Report
MONTHYEARML24193A3442024-07-11011 July 2024 Fourth 10-Year Interval, Second Period Owner’S Activity Report Number 3R24 ML23188A1872023-07-0707 July 2023 Fourth 10-Year Interval, Second Period Owners Activity Report Number 2R24 ML23013A0912023-01-13013 January 2023 Fourth 10-Year Interval, Second Period Owners Activity Report Number 3R23 ML22189A1432022-07-0808 July 2022 Fourth 10-Year Interval, First Period Owner'S Activity Report Number 1R23 ML22018A2022022-01-18018 January 2022 Fourth 10-Year Interval, First Period Owner'S Activity Report Number 2R23 ML21341A5522021-12-0303 December 2021 Snubber Program for the Fourth 10-Year Testing Interval ML21292A1842021-10-19019 October 2021 Nd Refueling Outage Steam Generator Tube Inspection Report ML21197A2052021-07-16016 July 2021 Fourth 10-Year Interval, First Period Owner'S Activity Report Number 3R22 ML21047A4972021-02-16016 February 2021 Twenty-Second Refueling Outage Owner'S Activity, Report 1R22 ML20288A2982020-10-13013 October 2020 Refueling Outage 22 Steam Generator Inspection Report ML20203M2042020-07-17017 July 2020 Fourth 10-Year Interval, First Period Owner'S Activity Report Number 2R22 ML20054A2692020-02-19019 February 2020 Response to Request for Additional Information - Relief Request 64 - Unit 1 Impractical Examinations for the Third 10-Year Inservice Inspection Interval ML20028D5402020-01-24024 January 2020 Owner'S Activity Report Number U3R21 ML19291F5762019-10-18018 October 2019 Generator (Pvggs), Unit 1 - Steam Generataor Tube Inspection Ruport ML19205A2642019-07-24024 July 2019 Third 10-Year Interval, Third Period: Owner'S Activity Report Number U1R21 ML19198A3402019-07-17017 July 2019 Relief Request 64 - Unit 1 Impractical Examinations for the Third 10-Year Inservice Inspection Interval ML19179A3312019-06-28028 June 2019 Response to Request for Additional Information - Relief Request 63 - Unit 3 Impractical Examinations for the Third 10-Year Inservice Inspection Interval ML19017A3452019-01-17017 January 2019 Fourth 10-Year Interval Pump and Valve Inservice Testing Program ML19010A3072019-01-10010 January 2019 Relief Request 63 -Unit 3 Impractical Examinations for the Third 10-Year Inservice Inspection Interval ML18306A9992018-11-0202 November 2018 Steam Generator Tube Inspection Report ML18277A2972018-09-21021 September 2018 Third 10-Year Interval Inservice Inspection Program Update, Part 1 of 7 ML18277A3122018-09-21021 September 2018 Third 10-Year Interval Inservice Inspection Program Update, Part 4 of 7 ML18277A3032018-09-21021 September 2018 Third 10-Year Interval Inservice Inspection Program Update, Part 2 of 7 ML18277A3102018-09-21021 September 2018 Third 10-Year Interval Inservice Inspection Program Update. (Part 3 of 7) ML18277A3232018-09-21021 September 2018 Third 10-Year Interval Inservice Inspection Program Update, Part 7 of 7 ML18277A3212018-09-21021 September 2018 Third 10-Year Interval Inservice Inspection Program Update, Part 6 of 7 ML18277A3192018-09-21021 September 2018 Third 10-Year Interval Inservice Inspection Program Update, Part 5 of 7 ML18102B6842018-04-12012 April 2018 Third 10-Year Interval, Third Period: Owner'S Activity Report Number 1R20 Correction ML18093A3352018-03-30030 March 2018 Palo Verde, Units 1, 2 and 3 - Fourth 10-Year Interval Pump and Valve Inservice Testing Program ML18030B1382018-01-26026 January 2018 Third 10-Year Interval, Third Period: Owner'S Activity Report Number 1R20 ML17270A4242017-09-26026 September 2017 Transmittal of 20th Refueling Outage Steam Generator Tube Inspection Report ML17181A5202017-06-30030 June 2017 Third 10-Year Interval, Third Period: Owner'S Activity Report Number U2R20 ML17248A5232017-05-30030 May 2017 3INT-ISI-1, Revision 5, Third Inspection Interval Inservice Inspection Program Summary Manual, Unit 1, Enclosure 1 to 102-07551-MDD/MSC ML17248A5252017-05-26026 May 2017 3INT-ISI-2, Revision 6, Third Inspection Interval Inservice Inspection Program Summary Manual, Unit 2, Enclosure 2 to 102-07551-MDD/MSC ML17054D6872017-02-23023 February 2017 Fourth 10-Year Interval Pump and Valve Inservice Testing Program Relief Requests GRR-01, GRR-02, PRR-01, PRR-02, PRR-03, PRR-04, PRR-05, and PRR-06 ML16308A2322016-10-26026 October 2016 Steam Generator Tube Inspection Report - Refueling Outage 19 ML16180A4462016-06-24024 June 2016 Third 10-Year Interval, Third Period: Owner'S Activity Report Number U1R19 ML16015A4542016-01-15015 January 2016 Submittal of Owner'S Activity Report (Form OAR-1) Refueling Outage 19 (U2R19) ML15267A2692015-09-23023 September 2015 Steam Generator Tube Inspection Report ML14035A4042013-08-29029 August 2013 3INT-ISI-3, Rev. 3, Palo Verde, Unit 3, 3rd Interval: Inservice Inspection Program Summary Manual ML14035A4022013-08-28028 August 2013 3INT-ISI-2, Rev. 4, Palo Verde, Unit 2, 3rd Interval: Inservice Inspection Program Summary Manual ML14035A4002013-08-22022 August 2013 INT-ISI-1, Rev. 3, 3rd Interval, Inservice Inspection Program Summary Manual ML13182A0152013-06-26026 June 2013 Third 10-Year Interval, Second Period: Owner'S Activity Report Number U1R17 ML14035A3992013-05-31031 May 2013 INT-ISI-1, Rev. 2, 3rd Inspection Interval, Inservice Inspection Program Summary Manual ML14035A4012013-05-31031 May 2013 INT-ISI-2, Rev. 3, 3rd Inspection Interval, Inservice Inspection Program Summary Manual ML14035A4032013-05-31031 May 2013 3INT-ISI-3, Rev. 2, Palo Verde, Unit 3, 3rd Interval: Inservice Inspection Program Summary Manual ML12242A2492012-08-0707 August 2012 Steam Generator Tube Inspection Report ML11287A0142011-10-0404 October 2011 Revised Third 10 Year Interval Inservice Inspection Plans ML11136A1062011-05-0505 May 2011 Submittal of Steam Generator Tube Inspection Report ML0916300622009-06-0404 June 2009 Submission of Relief Request 36 Revision 1 to the American Society of Mechanical Engineers Section Xl, Inservice Inspection Program Third Interval 2024-07-11
[Table view] Category:Letter
MONTHYEARML24285A2562024-10-11011 October 2024 License Renewal - Alloy 600 Management Program Plan Response to Request for Additional Information IR 07200044/20244012024-10-0808 October 2024 Independent Spent Fuel Storage Installation Security Inspection Report 07200044/2024401 ML24269A1542024-09-27027 September 2024 Summary of Presubmittal Meeting with Arizona Public Service Company to Discuss Proposed Life-of-Plant Alternatives for a Pressurizer Thermowell Nozzle Repair at Palo Verde Nuclear Generating Station, Unit 1 ML24262A0972024-09-23023 September 2024 Notification of Post-Approval Site Inspection for License Renewal and Request for Information Inspection (05000529/2024011) ML24241A2782024-08-28028 August 2024 License Amendment Request to Revise the Technical Specifications 3.5.1 and 3.5.2 Safety Injection Tank Pressure Bands, and to Use GOTHIC Code ML24241A2542024-08-28028 August 2024 Inservice Inspection Request for Information ML24240A2682024-08-27027 August 2024 Transmittal of Technical Specification Bases Revision 79 IR 05000528/20240052024-08-22022 August 2024 Updated Inspection Plan for Palo Verde Nuclear Generating Station - Units 1, 2, and 3 (Report 05000528/2024005, 05000529/2024005, 05000530/2024005) 05000530/LER-2024-001-01, Inoperable Boron Dilution Alarm System(Bdas) with Technical Specification Violation2024-08-21021 August 2024 Inoperable Boron Dilution Alarm System(Bdas) with Technical Specification Violation ML24208A0612024-08-20020 August 2024 Issuance of Amendment Nos. 224, 224, and 224 Regarding Revision to Technical Specifications 3.5.1, 3.5.2 and 3.6.5 IR 05000528/20244042024-08-0808 August 2024 Cybersecurity Inspection Report 05000528/2024404, 05000529/2024404 and 05000530/2024404 ML24213A3232024-07-31031 July 2024 Transmittal of Relief Request (RR) No. 71: Re-Submittal of RR-30 ML24213A3292024-07-31031 July 2024 Transmittal of Relief Request (RR) No. 72: Re-Submittal of RR-39 IR 05000528/20240022024-07-29029 July 2024 Integrated Inspection Report 05000528/2024002 and 05000529/2024002 and 05000530/2024002 ML24173A3302024-07-24024 July 2024 Pressurizer Surge Line Inspection Program ML24159A4702024-07-17017 July 2024 Issuance of Amendment Nos. 223, 223, and 223 Revision to Technical Specifications 3.5.1 and 3.5.2 Using Risk Informed Process for Evaluations ML24198A0662024-07-16016 July 2024 Program Review - Simulator Testing Methodology ML24193A3442024-07-11011 July 2024 Fourth 10-Year Interval, Second Period Owner’S Activity Report Number 3R24 ML24129A0522024-07-0303 July 2024 Review of the Spring 2023 Steam Generator Tube Inspection Report IR 05000528/20240042024-06-25025 June 2024 Notification of Inspection (NRC Inspection Report 05000528/2024004, 05000529/2024004, 05000530/2024004) ML24177A3212024-06-25025 June 2024 Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Transportable Storage Canisters Identification Numbers AMZDFX180, AMZDFX181, AMZDFX182 Vertical Concrete Cask Identification Nu ML24177A3222024-06-25025 June 2024 Invalid Specified System Actuation of Train B Emergency Diesel Generator ML24170A9962024-06-18018 June 2024 Response to Second Request for Additional Information to Revise Technical Specifications (TS) 3.5.1, Safety Injection Tanks (Sits) – Operating, TS 3.5.2, Safety Injection Tanks (Sits) – Shutdown a IR 05000528/20243012024-06-17017 June 2024 NRC Examination Report 05000528/2024301; 05000529/2024301; 05000530/2024301 ML24129A2062024-06-14014 June 2024 Issuance of Amendment Nos. 222, 222, and 222 Revision to Technical Specifications to Adopt TSTF-266-A ML24157A3392024-06-0505 June 2024 Inoperable Boron Dilution Alarm System(Bdas) with Technical Specification Violation ML24159A0262024-06-0303 June 2024 Annual Report of Guarantee of Payment of Deferred Premium ML24144A2772024-05-23023 May 2024 Valid Specified System Actuations of Unit 2 Train B Emergency Diesel Generator and Train B Auxiliary Feedwater ML24135A2482024-05-14014 May 2024 Response to Second Request for Additional Information to Proposed Method to Manage Environmentally Assisted Fatigue for the Pressurizer Surge Line ML24164A2582024-05-0909 May 2024 10-PV-2024-04 Post-Exam Comments ML24129A1482024-05-0707 May 2024 and Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Casks with Applied Changes ML24128A2702024-05-0707 May 2024 Docket Nos. Stn 50-528/529/530 - Response to NRC Regulatory Issue Summary (RIS) 2024-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000528/20240012024-05-0202 May 2024 Independent Spent Fuel Storage Installation, Integrated Inspection Report 05000528/2024001, 05000529/2024001, 05000530/2024001, 07200044/2024001, and Exercise of Enforcement Discretion ML24119A0022024-04-26026 April 2024 2023 Annual Environmental Operating Report ML24116A2082024-04-24024 April 2024 Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report 2023 IR 05000528/20244012024-04-22022 April 2024 Security Baseline Inspection Report 05000528/2024401 and 05000529/2024401 and 05000530/2024401 (Cover Letter) ML24109A0712024-04-22022 April 2024 NRC Initial Operator Licensing Examination Approval 05000528/2024301, 05000529/2024301, and 05000530/2024301 ML24112A0012024-04-19019 April 2024 Core Operating Limits Report, Revision 32 ML24108A1982024-04-16016 April 2024 Independent Spent Fuel Storage Installation - Registration of Dry Spent Fuel Storage Casks with Applied Changes Authorized by an Amended Certificate of Compliance ML24103A2482024-04-12012 April 2024 Emergency Core Cooling System Performance Evaluation Models, 10 CFR 50.46(a)(3)(ii) Annual Report for 2023 ML24131A0972024-04-10010 April 2024 Annual Radiological Environmental Operating Report 2023 ML24096A2202024-04-0505 April 2024 Transmittal of Technical Specification Bases Revision 78 ML24032A1542024-04-0303 April 2024 Exemption from Select Requirements of 10 CFR Part 73 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting) ML24089A1892024-03-28028 March 2024 Present Levels of Financial Protection ML24068A2522024-03-0808 March 2024 License Amendment Request to Revise Technical Specifications 3.5.1 and 3.5.2 Using Risk-Informed Process for Evaluations ML24066A0472024-03-0606 March 2024 Response to Request for Additional Information to Revise Technical Specifications (TS) 3.5.1, Safety Injection Tanks (Sits) – Operating, TS 3.5.2, Safety Injection Tanks (Sits) – Shutdown and TS IR 05000528/20240122024-03-0404 March 2024 Age-Related Degradation Inspection Report 05000528/2024012, 05000529/2024012 and 05000530/2024012 IR 05000528/20230062024-02-28028 February 2024 Annual Assessment Letter for Palo Verde Nuclear Generating Station, Units 1, 2 and 3 Report 05000528/2023006 and 05000529/2023006 and 05000530/2023006 ML24053A3972024-02-22022 February 2024 License Renewal - Alloy 600 Management Program Plan ML24047A3632024-02-16016 February 2024 Independent Spent Fuel Storage Installation - Registration of Dry Spent Fuel Transportable Storage Canisters Identification Numbers AMZDFX177, AMZDFX178, AMZDFX179 Vertical Concrete Cask Identification No. AMZDNE179, AMZDNE178 2024-09-27
[Table view] |
Text
10 CFR 50.55a
Palo Verde Nuclear Generating Station P.O. Box 52034 Phoenix, AZ 85072 102-08832-MDD/CJS Mail Station 7636 July 11, 2024 Tel: (623) 393-3495
ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
Subject:
Palo Verde Nuclear Generating Station Unit 3 Docket No. STN 50-530 Fourth 10-Year Interval, Second Period Owners Activity Report Number 3R24
Pursuant to Title 10 of the Code of Federal Regulations 50.55a and in accordance with the American Society of Mechanical Engineers Boiler and Pressure Vessel Code Case N-532-5, Repair/Replacement Activity Documentation Requirements and Inservice Inspection Summary Report Preparation and Submission Section XI, Division 1, Arizona Public Service Company hereby submits the Owners Activity Report (Form OAR-1) for Unit 3 refueling outage 24 (3R24). The outage ended on May 12, 2024.
No commitments are being made to the NRC by this letter. Should you need further information regarding this submittal, please contact me at (623) 393-3495.
Sincerely, Dilorenzo, Michael Digitally signed by Dilorenzo, Michael D(Z99838)
D(Z99838) Date: 2024.07.11 09:48:14
-07'00'
Michael D. DiLorenzo Department Leader Nuclear Regulatory Affairs - Licensing
MDD/CJS/cr
Enclosure:
Unit 3 Twenty-Fourth Refueling Outage Owners Activity Report, Report 3R24
cc: J. D. Monninger NRC Region IV Regional Administrator W. T. Orders NRC NRR Project Manager for PVNGS N. Cuevas NRC Acting Senior Resident Inspector for PVNGS
A member of the STARS Alliance LLC Callaway Diablo Canyon Palo Verde Wolf Creek ENCLOSURE
Unit 3
Twenty-Fourth Refueling Outage Owners Activity Report
Report 3R24 FORM OAR-1 OWNERS ACTIVITY REPORT
Report Number: ________________________________________________________________________________________________3R24
Plant: ___________________________________________________________________________________________________________Palo Verde Generating Station, 5801 S. Wintersburg Road, Tonopah, Arizona 85354-7529
Unit No.: ___________ Commercial service date: ___________________ Refueling Outage No.: ___________________3 Jan 8, 1988 24 (if applicable)
Current inspection interval ______________________________________________________________________________________IWB,IWC,IWD,IWF = 4th ; IWE = 3rd ; IWL = 3rd ; SPT = 4th (1st, 2nd, 3rd, 4th, other)
Current inspection period _______________________________________________________________________________________IWB,IWC,IWD,IWF = 2nd ; IWE = 2nd ; IWL = 1st ; SPT = 2nd (1st, 2nd, 3rd)
Edition and Addenda of Section XI applicable to the inspection plans ____________________________________________2013 Edition (IWE = 2007 Ed.,'08 Ad.)
Date and revision of inspection plans ___________________________________________________________________________ISI = 3/6/24 R2; IWE = 10/3/18 R0; IWL = 6/17/22 R0; SPT = 6/21/18 R0
Edition and Addenda of Section XI applicable to repair/replacement activities, if different than the inspection plans ____________________________________________________________________________2013 Edition
Code Cases used for inspection and evaluation:
_____________________________________________________________________________________________N-532-5, N-716-1, N-722-1, N-729-6, N-770-5, N-845, N-885 (if applicable)
CERTIFICATE OF CONFORMANCE
I certify that (a) the statements made in this report are correct; (b) the examinations and tests meet the Inspection Plan as required by the ASME Code,Section XI; and (c) the repair/replacement activities and evaluations supporting the completion of
_______________ conform to the requirements of Section XI. U3R24 (refueling outage number)
Folley, Roy Digitally signed by Folley, Roy C(Z07131)
Signed _________________________________________________________ Date: _____________________________________ C(Z07131)Date: 2024.07.03 11:18:37 -07'00'Jul 3, 2024
CERTIFICATE OF INSERVICE INSPECTION
I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and employed by _____________________________ of _______________________________ have inspected the items described in
- Hartford, Connecticut this Owners Activity Report, and state that, to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair/replacement activities and evaluation described in this report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
Digitally signed by
7KH+DUWIRUG6WHDP%RLOHU,QVSHFWLRQDQG,QVXUDQFH&RPSDQ\\
Hogstrom, Hogstrom, Robert (YH2450)
Robert (YH2450) Date: 2024.07.03 11:32:40
__________________________________________ Commissions ____________________________________________________-07'00'N.B. 9685 "A, N, I, C" AZ 264
(Inspectors Signature) National Board, State, Province, and Endorsements Date: _____________________________________Jul 3, 2024
PV-E0796 Ver. 2 Table 1 3R24 Items with Flaws or Relevant Conditions That Required Evaluation for Continued Service
Examination Category and Item Description Evaluation Description Item Number None None None
Table 2 Abstract of 3R24 Repair/Replacement Activities Required for Continued Service
Code Component ID Description of Work Date Repair/Replacement Class Complete Plan Number SEAL INJECTION TO RCP 2B MANUAL ISOLATION VALVE 1 3PCHNV813 Replace valve due to degraded stem. New 4/30/2024 5333988-0 valve will be installed with half couplings welded to the valve body SEAL INJECTION TO RCP 2B MANUAL 1 3PCHNV813 ISOLATION VALVE 4/16/2024 5333988-3 Socket weld half couplings to valve to be installed by task 0 per DEC 18-07684-002
REPLACEMENT STEAM GENERATOR 1 3MRCEE01A Install Westinghouse mechanical plugs in SG 4/26/2024 5340281-0
3MRCEE01A "HOT" leg
REPLACEMENT STEAM GENERATOR 1 3MRCEE01A Install Westinghouse mechanical plugs in SG 4/26/2024 5340282-0
3MRCEE01A "COLD" leg
REPLACEMENT STEAM GENERATOR 1 3MRCEE01B Install Westinghouse mechanical plugs in SG 4/26/2024 5340283-0
3MRCEE01B "HOT" leg
REPLACEMENT STEAM GENERATOR 1 3MRCEE01B Install Westinghouse mechanical plugs in SG 4/26/2024 5340284-0
3MRCEE01B "COLD" leg
PRESSURIZER SAFETY RELIEF VALVE 1 3JRCEPSV0200 Replace the pressurizer relief valve with a 5/09/2024 5502249-0
reconditioned spare.
PRESSURIZER SAFETY RELIEF VALVE 1 3JRCEPSV0201 Replace the pressurizer relief valve with a 5/09/2024 5502250-0 reconditioned spare.
PRESSURIZER SAFETY RELIEF VALVE 1 3JRCEPSV0202 Replace the pressurizer relief valve with a 5/09/2024 5502251-0
reconditioned spare.
PRESSURIZER SAFETY RELIEF VALVE 1 3JRCEPSV0203 Replace the pressurizer relief valve with a 5/09/2024 5502252-0
reconditioned spare.
RC LOOP "1B" DRAIN VALVE TO RDT 1 3PRCEV235 RCE-L058 Spool N-00B will be removed from 5/10/2024 5618251-0 RCE-V235 and weld replaced with Vendor supplied materials.
RC LOOP "1B" DRAIN VALVE TO RDT 1 3PRCEV335 RCE-V335 will be removed and weld replaced 5/10/2024 5618251-0
with vendor supplied material.
1 Table 2 Abstract of 3R24 Repair/Replacement Activities Required for Continued Service
Code Component ID Description of Work Date Repair/Replacement Class Complete Plan Number STEAM GEN 1 RCEE01A DISCHDR TO REACT 1 3PRCEL058 DRAIN TK 5/10/2024 5618251-0 Replace RCE-L058 Spool N-00B with vendor supplied material.
S/G #2 LINE 2 SAFETY RELIEF VALVE
2 3JSGEPSV0558 Replacement of main steam safety valve with 5/10/2024 5502165-0 reconditioned and tested spare.
SNUBBER SUPPORT AT TOP OF AIR CYLINDER ON 3JSGAUV0175.
2 3SG203H014 PM for replacement of air cylinder. Existing 5/10/2024 5502596-1 snubber support bracket to be transferred to the replacement air cylinder.
SNUBBER SUPPORT AT TOP OF AIR CYLINDER ON 3JSGAUV0135.
2 3SG203H013 PM for replacement of air cylinder. Existing 5/10/2024 5502597-1 snubber support bracket to be transferred to the replacement air cylinder.
S/G #1 LINE 2 SAFETY RELIEF VALVE 2 3JSGEPSV0579 Replacement of main steam safety valve with 5/10/2024 5502165-0 reconditioned and tested spare.
SIT "1A" PRESSURE RELIEF VALVE 2 3JSIEPSV0231 5/08/2024 5502802-0 Remove and test PSV, rework if required.
SIT 1B To Safety Valve 3JSIEPSV0241 2 3PSIEL230 Modify SIE-L230 Spool N-00B per DEC 22-5/08/2024 5598241-0 07965-018 and EDC 2024-00129 using vendor supplied materials.
STEAM GEN 2 MAIN STEAM LN1 CONSTANT 2 3SG042H011 SPRING HANGER 5/10/2024 5615569-0 Replace failed constant spring support.
SNUBBER HPSI PMP DISCHGTRAIN B AND RWT 2 3SI107H012 Replace snubber for cause. Torque carrier and 2/20/2024 5510445-0 shaft assembly are bent. Snubber passed ST requirements.
AIR AFTERCORS HT EXCH TOSPRAY POND 3 3PSPAL101 TRAIN A S-001 3/05/2023 5392007-3 Base metal repair of pipe spool.
3 3MDGAE01A EDG INTERCOOLER A 3/05/2023 5392011-0 Weld repair of corroded areas
3 3MDGAE01B EDG INTERCOOLER B 3/05/2023 5392011-0 Weld repair of corroded areas EDG INTERCOOLER CROSS CONNECT SPOOLS 3 3MDGAE01A (5, 6, 7, and 8) 3/05/2023 5392011-0 Weld repair of corroded areas
2 Table 2 Abstract of 3R24 Repair/Replacement Activities Required for Continued Service
Code Component ID Description of Work Date Repair/Replacement Class Complete Plan Number
3 3MDGAE05 EDG JACKET WATER COOLER 3/05/2023 5392011-0 Weld repair of corroded areas
3 3MDGAE04 EDG LUBE OIL COOLER 3/05/2023 5392011-0
Weld repair of corroded areas ESS SPRAY POND SPBP01 TOJACKET WATER 3 3PSPBL032A COOLER (Spools 14 and 15) 6/16/2023 5398442-4 Base Metal Repair of piping DG CLG WTR HT EXCH DGBE01 FROM SPRAY 3 3PSPBL049A POND TRAIN B (Spool 1) 6/16/2023 5398442-4 Base Metal Repair of Piping LUBE OIL CLR DGBE04 TOSPRAY POND TRAIN 3 3PSPBL106 B (Spools 1 and 4) 6/16/2023 5398442-4 Base Metal Repair of Piping 3 3MDGBE01A EDG INTERCOOLER A 6/16/2023 5398449-0 Weld repair of corroded areas 3 3MDGBE04 EDG LUBE OIL COOLER 6/16/2023 5398449-0 Weld repair of corroded areas
3 3MDGBE01B EDG INTERCOOLER B 6/16/2023 5398449-0 Weld repair of corroded areas 3 3MDGBE05 EDG JACKET WATER COOLER 6/16/2023 5398449-0 Weld repair of corroded areas
ECWS HTEXCH A 3 3MEWAE01 Perform base material repairs to the heat 4/24/2024 5502134-1 exchanger as directed by engineering weld inspection maps.
"B" D/G FUEL OIL STORAGE TANK 3 3MDFBT01 Fab and Install splice plate on cracked 6/16/2023 5542379-0 stiffener ring in Diesel Fuel Oil Tank
3