Letter Sequence RAI |
---|
|
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance, Acceptance
- Supplement, Supplement
|
MONTHYEARML22101A2002022-03-31031 March 2022, 5 April 2022 TRISO-X, LLC Fuel Fabrication Facility License Application Submittal Project stage: Request ML22101A2052022-04-0505 April 2022 TRISO-X, LLC Fuel Fabrication Facility License Application Submittal Project stage: Other ML22166A0422022-08-0909 August 2022 Cover Letter - NRC Requests for Supplemental Information (Rsis) for TRISO-X License Application Project stage: Other ML22166A0412022-08-0909 August 2022 NRC Request for Supplemental Information for the TRISO-X License Application Project stage: Request ML22166A0432022-08-0909 August 2022 Enclosure 1 - Requests for Supplement Information for the TRISO-X License Application Review Project stage: Other ML22266A2692022-09-23023 September 2022 TRISO-X Fuel Fabrication Facility Environmental Report Submittal Project stage: Request ML22286A1442022-10-13013 October 2022 Response to Requests for Supplemental Information for the Acceptance Review of the TRISO-X Fuel Fabrication Facility License Application Submittal Project stage: Request ML22286A1472022-10-13013 October 2022 Responses to Requests for Supplemental Information to Support the TRISO-X License Application Project stage: Supplement ML22308A2512022-11-0404 November 2022 Triso-X, LLC, License Application and ISA Summary Changes Associated with Responses to Requests for Supplemental Information for the Acceptance Review of the TRISO-X Fuel Fabrication Facility License Application Submittal Project stage: Request ML22320A5632022-11-16016 November 2022 Triso-X, LLC - Additional Information Supporting the Response to Rsi Question 8.1 Concerning the Acceptance Review of the TRISO-X Fuel Fabrication Facility License Application Project stage: Other ML22320A1102022-11-18018 November 2022 NRC Acceptance of the TRISO-X, LLC - Application for a Fuel Fabrication Facility Project stage: Acceptance Review ML22348A0162022-12-16016 December 2022 Enclosure 1 - Observations Developed During the Acceptance Review to Support the TRISO-X Application for a Fuel Fabrication Facility (Public) Project stage: Acceptance Review ML22348A0132022-12-16016 December 2022 NRC Observations Developed During the Acceptance Review of the TRISO-X License Application Project stage: Request ML22348A0142022-12-16016 December 2022 Cover Letter - Nuclear Regulatory Commission Observations to Support the TRISO-X License Application for a Fuel Fabrication Facility Project stage: Other ML23104A4192023-04-14014 April 2023 TRISO-X, LLC, Response to Requests for Additional Information on the Environmental Report for the Proposed Fuel Fabrication Facility Project stage: Request ML23127A0132023-05-31031 May 2023 Enclosurai for the TRISO-X Application Project stage: RAI ML23127A0122023-05-31031 May 2023 Request for Additional Information (Set 1) for the Triso-X, LLC License Application for a Fuel Fabrication Facility (Enterprise Project Identification Number L-2022-NEW-0005) Project stage: RAI ML23127A0112023-05-31031 May 2023 Triso-X RAIs for License Application Project stage: Request ML23198A2592023-07-27027 July 2023 Request for Additional Information for the Triso-X, LLC License Application for a Fuel Fabrication Facility (Enterprise Project Identification Number L-2022-NEW-0005) Project stage: RAI ML23198A2572023-07-27027 July 2023 NRC Letter Request for Additional Information on Chp 1, 2, EP for the TRISO-X, LLC License Application Project stage: Request ML23209A8212023-07-28028 July 2023 Response to Request for Additional Information (Set 1) for the TRISO-X, LLC License Application for a Fuel Fabrication Facility Project stage: Response to RAI ML23230B2002023-08-18018 August 2023 Triso-X, LLC, Supplemental Response to Request for Additional Information Question 3-2 (Set 1) for the TRISO-X License Application Project stage: Supplement ML23237B4842023-08-25025 August 2023 Response to Request for Additional Information (Set 2) for the TRISO-X License Application Project stage: Response to RAI ML23230B1912023-08-28028 August 2023 Cover Letter - RAI Set 3 for the ISA Summary (Programmatic) and Security Regarding TRISO-X License Application Project stage: RAI ML23254A3812023-09-29029 September 2023 Letter to Triso-X for the Fourth Set of RAIs That Includes an Enclosure for Geotechnical and an Enclosure for Hydrology Project stage: Request ML23285A3442023-10-12012 October 2023 Response to Request for Additional Information Set 3 (ISA and Security) for the TRISO-X License Application Project stage: Response to RAI ML23265A2622023-10-25025 October 2023 Request for Additional Information Set 5 for the Radiological and Chemical Review Regarding the TRISO-X, LLC License Application for a New Fuel Fabrication Facility (Enterprise Project Identification Number L-2022-NEW-0005 Project stage: RAI ML23312A2482023-11-0808 November 2023 7-5-23 Email Summary of Meeting to Discuss Draft ISA RAIs for Alignment Project stage: Request ML23312A3382023-11-0808 November 2023 Response to Request for Additional Information (Set 4) for the TRISO-X License Application Project stage: Response to RAI ML23313A1142023-11-17017 November 2023 Cover Letter - Triso-X License Application Sixth Set of RAIs for Material Control and Accounting, Fire, and Structural Project stage: RAI ML23313A1102023-11-17017 November 2023 Triso-X for the Sixth Set of RAIs Including Material Control & Accounting and Fire Safety Project stage: Request ML23320A2052023-11-17017 November 2023 Enclosure 1 - Request for Additional Information for (Programmatic) Structural Review Regarding the TRISO-X License Application Project stage: RAI ML23235A2262023-11-20020 November 2023, 27 November 2023 TRISO-X Fff Environmental RAI Part 2 Project stage: Request ML23343A0022023-12-0909 December 2023 Response to Request for Additional Information Set 5 (Chemical Safety and Radiation Protection) for the TRISO-X License Application Project stage: Response to RAI ML23354A2882023-12-20020 December 2023 TRISO-X, LLC, Response to Request for Additional Information Part 2-1 for the TRISO-X Environmental Report and License Application Project stage: Response to RAI ML23353A1832023-12-27027 December 2023 Summary of Meeting on December 4, 2023, with TRISO-X LLC, to Align on TRISO-X Draft Responses to the Requests for Additional Information for the Chemical Safety Analysis Project stage: Draft RAI ML23353A1822023-12-27027 December 2023 Summary of Meeting Held on December 4, 2023, to Discuss the TRISO-X Draft Responses to the Requests for Additional Information Project stage: Request ML23353A1842023-12-27027 December 2023 Enclosure 1 - Participants List for Summary of Meeting Held December 4, 2023, with TRISO-X, LLC to Align on Draft Responses to Requests for Additional Information for Chemical Safety Analysis Project stage: Draft RAI ML23362A0632024-01-16016 January 2024 12-19-23 Summary of Meeting with Triso-X, LLC, to Align on Triso-X Draft Environmental Safety Request for Additional Information Project stage: Request ML23321A0422024-02-26026 February 2024 Cover Letter - RAIs Set Seven for the Environmental Safety Review Regarding the TRISO-X License Application Project stage: RAI ML23321A0512024-02-26026 February 2024 Enclosure - RAIs Set Seven for the Environmental Safety Review Regarding TRISO-X License Application Project stage: RAI ML24065A3132024-03-0404 March 2024 Response to Request for Additional Information Part 2-2 for the TRISO-X Environmental Report and License Application Project stage: Response to RAI ML24057A3632024-03-11011 March 2024 Memorandum - Summary of Meeting 2-12-24 with TRISO-X to Discuss Draft RAIs on Environmental Protection Project stage: Draft RAI ML24057A3622024-03-11011 March 2024 Enclosure - Participants in Meeting Held 2-12-24 with TRISO-X to Discuss the Draft RAIs on Environmental Protection Project stage: Draft RAI ML24057A3612024-03-11011 March 2024 Summary of Meeting on 2-12-24 with TRISO-X to Discuss Draft Requests for Additional Information on Environmental Protection Project stage: Request ML23354A1652024-03-25025 March 2024 Cover Letter - Set Eight Containing a Programmatic Request for Additional Information for the Integrated Safety Analysis Review Regarding the TRISO-X License Application Project stage: RAI ML24087A2352024-03-27027 March 2024 Triso-X, LLC, Response to Request for Additional Information Set 7 (Environmental Safety) for the TRISO-X License Application Project stage: Response to RAI ML24085A2702024-04-0202 April 2024 Request TRISO-X, LLC to Provide Supplemental Information to Resolve Programmatic Requests for Additional Information Regarding the Management Measures and Quality Assurance Portion of the License Application Project stage: RAI ML24095A3412024-04-0404 April 2024 Response to Request for Additional Information Part 3 for the TRISO-X Environmental Report Project stage: Request ML24101A0172024-04-23023 April 2024 Request TRISO-X, Llc. to Provide Structural Supplemental Information to Resolve Programmatic Requests for Additional Information for the TRISO-X License Application Project stage: RAI 2023-12-09
[Table View] |
|
---|
Category:Request for Additional Information (RAI)
MONTHYEARML24162A3262024-06-0606 June 2024 Email - the U.S. Nuclear Regulatory Commission Extension of Due Dates for TRISO-X Request for Additional Information Supplements for Integrated Safety Analysis Summary and Structural Design ML24115A2452024-05-0808 May 2024 Enclosure 1 - RAI Status Update for the Safety and Safeguards Requests for Additional Information for the TRISO-X License Application ML24101A0172024-04-23023 April 2024 Request TRISO-X, Llc. to Provide Structural Supplemental Information to Resolve Programmatic Requests for Additional Information for the TRISO-X License Application ML24059A4432024-03-0606 March 2024 TRISO-X Fff EIS RAIs Part 3 Final ML24059A4442024-03-0606 March 2024 Letter to J Wheeler Re TRISO-X Fff Environmental Review Request for Additional Information Part 3 ML23321A0512024-02-26026 February 2024 Enclosure - RAIs Set Seven for the Environmental Safety Review Regarding TRISO-X License Application ML23321A0422024-02-26026 February 2024 Cover Letter - RAIs Set Seven for the Environmental Safety Review Regarding the TRISO-X License Application ML23342A2142023-12-15015 December 2023 TRISO-X Fff Environmental Review Request for Additional Information Part 2 -2 ML23235A2252023-11-27027 November 2023 EnclosuTRISO-X Fff EIS RAIs Part 2 - 1 ML23235A2232023-11-20020 November 2023 Letter to J Wheeler Re TRISO-X Fff EIS RAIs Part 2 -1 ML23320A2052023-11-17017 November 2023 Enclosure 1 - Request for Additional Information for (Programmatic) Structural Review Regarding the TRISO-X License Application ML23265A2622023-10-25025 October 2023 Request for Additional Information Set 5 for the Radiological and Chemical Review Regarding the TRISO-X, LLC License Application for a New Fuel Fabrication Facility (Enterprise Project Identification Number L-2022-NEW-0005 ML23254A3832023-09-29029 September 2023 Enclosure 2 - Request for Additional Information on the Hydrological Review for the TRISO-X Application ML23254A3842023-09-29029 September 2023 Enclosure 1 - Request for Additional Information on the Geotechnical Review for the TRISO-X Application ML23230B1912023-08-28028 August 2023 Cover Letter - RAI Set 3 for the ISA Summary (Programmatic) and Security Regarding TRISO-X License Application ML23198A2582023-07-27027 July 2023 Enclosure 1 - RAIs Regarding Chapter 1 - General Information for the TRISO-X License Application ML23198A2602023-07-27027 July 2023 Enclosure 3 - RAIs Regarding the Emergency Plan for the TRISO-X License Application ML23199A0362023-07-27027 July 2023 Enclosure 2 - RAIs Regarding Chapter 2 - Organization and Administration for the TRISO-X License Application ML23127A0132023-05-31031 May 2023 Enclosurai for the TRISO-X Application ML23072A4562023-03-22022 March 2023 TRISO-X Fuel Fabrication Facility EIS RAI Part 1 Letter and Enclosure ML22166A0432022-08-0909 August 2022 Enclosure 1 - Requests for Supplement Information for the TRISO-X License Application Review 2024-06-06
[Table view] |
Text
JLopez - Chapter 1 (Structural) - Programmatic RAIs, Part 2 Structural Review (Programmatic) Request for Additional Information for the TRISO-X License Application Review - Part 2 RAI-1 Follow-up Flooding Regulatory Basis:
This information is necessary to demonstrate compliance with the regulations in Title 10 of the Code of Federal Regulations (10 CFR) Section 70.64(a)(2), which states, in part, that the design must provide for adequate protection against natural phenomena with consideration of the most severe documented historical events for the site, as well as 10 CFR 70.61(b) and 10 CFR 70.61(c) which state, in part, that the risk of credible high- and intermediate-consequence events must be limited. Per 10 CFR 70.61(e) also requires the identification and implementation of items relied on for safety (IROFS).
Guidance:
The guidance in NUREG-1520, Revision 2, Appendix D, Natural Phenomena Hazards, states in part, In addition to the facility's location relative to the 100-year or 500-year flood plains, the effects of local intense precipitation and snow load should be considered. Local intense precipitation, especially in the form of snow, can result in roof collapse and localized site flooding.
Describe Issue:
In response to the request for additional information (RAI) 3-2 (Agencywide Documents Access and Management System Accession Number ML23230B200), TRISO-X (the applicant) submitted calculation no. XE-C-CE-008, Revision 0, Local Intense Precipitation (LIP) Analysis, via the TRISO-X portal for staff review. This analysis concludes that the maximum water level due to local intense precipitation (LIP) at the TRISOX Fuel Fabrication Facility will be above the 811 ft floor elevation credited for flooding in the license application and integrated safety analysis (ISA) summary. The analysis further states that openings in the building (e.g., door opening) will allow for flood water to enter the building, but found the higher flooding water levels acceptable after considering a new permissible water level threshold of 813 ft. However, the license application and ISA summary do not address the external event described in this analysis and the new permissible water level threshold of 813 ft.
The staff notes that Section 1.4.1, Flood, and Section 4.2.5.5, Design Basis Flood, of the ISA summary and Section 1.1.1.3, Hydrology, and other related sections in the license application only describe the flood hazard for the TRISO-X site in terms of its location relative to flood plains from nearby water bodies (e.g., rivers, streams), see NUREG-1520, Appendix D, Natural Phenomena Hazards.
When flooding is considered a credible event, an evaluation of the effectiveness of proposed protection and/or action(s) will need to be provided and should consider the effects of inundation, hydrostatic loading, erosion, and sedimentation. However, the application does not address flooding hazards from other applicable flood related events as part of the safety analysis of the site (e.g., a description of the LIP analysis), its methodology, and how the effects of inundation will be managed or prevented to ensure safe operation of the fuel facility and the safety of its workers). The ISA summary also does not describe how the consequences of this external event are being prevented or mitigated to demonstrate compliance with the performance requirements in the regulation.
1 Enclosure 1
JLopez - Chapter 1 (Structural) - Programmatic RAIs, Part 2 Information Needed:
Update the application to include the sites evaluation of other flood-related hazards (e.g., local intense precipitation) and a description of the design basis flood level credited for the facility.
The information should include, in part, a general description of the analyses performed, the methodology followed, and an evaluation of the effectiveness of proposed protection and/or action(s) that will be implemented to address the effects of inundation, hydrostatic loading, erosion, and sedimentation. The ISA summary should also be updated to include analyses and/or IROFS relied upon to demonstrate compliance with 10 CFR 70.61.
RAI-2 Risk Category Regulatory Basis:
This information is necessary to demonstrate compliance with the regulations in 10 CFR 70.64(a)(2), which states, (2) Natural phenomena hazards. The design must provide for adequate protection against natural phenomena with consideration of the most severe documented historical events for the site.
Describe Issue:
As stated in the license application, the design of the structures and facilities complies with the 2018 Edition of the International Building Code and American Society of Civil Engineers (ASCE) 7-16, Minimum Design Loads and Associated Criteria for Buildings and Other Structures, as appropriate for the geographic location of the site. To apply its provisions, ASCE 7-16 states that buildings and other structures shall be classified based on the risk to human life, health, and welfare associated with their damage or failure. ASCE 7-16 table 1.5-1 provides for this classification in terms of Risk Category based on the nature of use or occupancy of the buildings and other structures.
ISA summary section 4.2.5.3 states that a Risk Category III was selected for the TRISO-X fuel fabrication facility (FFF), based on considering that the building could pose a substantial risk to human life with potential to cause a substantial economic impact and/or disruption to daytoday civilian life in the event of a failure. However, ASCE 7-16, table 1.5-1, categorizes facilities that manufacture, process, handle and/or store highly toxic substances (e.g., hazardous fuels and/or hazardous chemicals) as essential facilities with a Risk Category IV level. Similarly, per U.S.
Department of Energy DOE-STD-1020-2016, a Risk Category IV is assigned to facilities that results in lower radiological or chemical consequences to the worker and the public (i.e., a SDC-2 facility) than those specified in 10 CFR 70.61. Therefore, the selected Risk Category III for the determination of the design-basis criteria for the TRISO-X FFF is inconsistent with the criteria specified in ASCE 7-16 due to the nature of the hazardous materials that are manufactured, processed, handled, and stored at the proposed facility.
Information Needed:
Update the information in the license application and ISA summary (including the design-basis values) to be consistent with the corresponding risk category for a hazardous FFF as identified in ASCE 7-16 (i.e., Risk Category IV structure as discuss above) or justify the use of Risk Category III.
2