MONTHYEARML24162A3262024-06-0606 June 2024 Email - the U.S. Nuclear Regulatory Commission Extension of Due Dates for TRISO-X Request for Additional Information Supplements for Integrated Safety Analysis Summary and Structural Design ML24115A2452024-05-0808 May 2024 Enclosure 1 - RAI Status Update for the Safety and Safeguards Requests for Additional Information for the TRISO-X License Application ML24101A0172024-04-23023 April 2024 Request TRISO-X, Llc. to Provide Structural Supplemental Information to Resolve Programmatic Requests for Additional Information for the TRISO-X License Application ML24059A4432024-03-0606 March 2024 TRISO-X Fff EIS RAIs Part 3 Final ML24059A4442024-03-0606 March 2024 Letter to J Wheeler Re TRISO-X Fff Environmental Review Request for Additional Information Part 3 ML23321A0512024-02-26026 February 2024 Enclosure - RAIs Set Seven for the Environmental Safety Review Regarding TRISO-X License Application ML23321A0422024-02-26026 February 2024 Cover Letter - RAIs Set Seven for the Environmental Safety Review Regarding the TRISO-X License Application ML23342A2142023-12-15015 December 2023 TRISO-X Fff Environmental Review Request for Additional Information Part 2 -2 ML23235A2252023-11-27027 November 2023 EnclosuTRISO-X Fff EIS RAIs Part 2 - 1 ML23235A2232023-11-20020 November 2023 Letter to J Wheeler Re TRISO-X Fff EIS RAIs Part 2 -1 ML23320A2052023-11-17017 November 2023 Enclosure 1 - Request for Additional Information for (Programmatic) Structural Review Regarding the TRISO-X License Application ML23265A2622023-10-25025 October 2023 Request for Additional Information Set 5 for the Radiological and Chemical Review Regarding the TRISO-X, LLC License Application for a New Fuel Fabrication Facility (Enterprise Project Identification Number L-2022-NEW-0005 ML23254A3832023-09-29029 September 2023 Enclosure 2 - Request for Additional Information on the Hydrological Review for the TRISO-X Application ML23254A3842023-09-29029 September 2023 Enclosure 1 - Request for Additional Information on the Geotechnical Review for the TRISO-X Application ML23230B1912023-08-28028 August 2023 Cover Letter - RAI Set 3 for the ISA Summary (Programmatic) and Security Regarding TRISO-X License Application ML23198A2582023-07-27027 July 2023 Enclosure 1 - RAIs Regarding Chapter 1 - General Information for the TRISO-X License Application ML23198A2602023-07-27027 July 2023 Enclosure 3 - RAIs Regarding the Emergency Plan for the TRISO-X License Application ML23199A0362023-07-27027 July 2023 Enclosure 2 - RAIs Regarding Chapter 2 - Organization and Administration for the TRISO-X License Application ML23127A0132023-05-31031 May 2023 Enclosurai for the TRISO-X Application ML23072A4562023-03-22022 March 2023 TRISO-X Fuel Fabrication Facility EIS RAI Part 1 Letter and Enclosure ML22166A0432022-08-0909 August 2022 Enclosure 1 - Requests for Supplement Information for the TRISO-X License Application Review 2024-06-06
[Table view] |
Text
Enclosure REQUESTS FOR ADDITIONAL INFORMATION ON THE TRISO-X, LLC, ENVIRONMENTAL REPORT AND APPLICATION FOR A PROPOSED FUEL FABRICATION FACILITY PART 3 The purpose of these Part 3 requests for additional information (RAIs) presented below is to obtain additional data and information from TRISO-X, LLC (TRISO-X), for the U.S. Nuclear Regulatory Commission (NRC) staff to complete the environmental review and Environmental Impact Statement (EIS) in support of the NRCs evaluation of the TRISO-X license application to construct, operate, and decommission a Fuel Fabrication Facility (FFF) in Oak Ridge, Tennessee, to manufacture high-assay low-enriched uranium fuel up to 19.75 percent weight Uranium-235. The FFF would produce TRistructural ISOtropic uranium fuel for use in both existing and advanced commercial nuclear reactors. The fuel is designed to seal uranium particles in a protective coating that resists meltdowns and prevents release of fission products.
The TRISO-X license application included an Environmental Report (ER), and these RAIs were developed by the NRC staff based on its ongoing review of the ER and other documentation independently obtained by the staff. The NRCs EIS is being prepared to fulfill the requirements of the National Environmental Policy Act of 1969, as amended (NEPA), and the NRC's NEPA implementing regulations in Title 10 of the Code of Federal Regulations Part 51. The staff used the guidance in NUREG-1748, Environmental Review Guidance for Licensing Actions Associated with NMSS Programs, for its review of the application.
Waste Management RAI3-ER-WM-1 Provide a description of the types and estimated amounts of waste that will be generated during construction, operation, and decommissioning.
In Section 4.13, provide additional information on the estimated amount and types of municipal and debris waste that will be generated during construction, operation, and decommissioning.
Also provide information on the estimated amount and types of radioactive, mixed, hazardous, industrial, debris, and municipal waste that will be generated during decommissioning. Provide assurance that local capacity exists for the debris and municipal wastes (include specific locations). Provide an estimate of the number of annual shipments of the waste streams identified in table 2.1-2 of the TRISO-X Environmental Report and table ER-WM-2-1of the TRISO-X response to RAI dated April 14, 2023. This information is needed by staff to make an environmental impact determination.