ML21076A456
ML21076A456 | |
Person / Time | |
---|---|
Site: | 07000925 |
Issue date: | 02/26/2021 |
From: | Lux J Environmental Properties Management |
To: | Davis P, Robert Evans, James Smith Office of Nuclear Material Safety and Safeguards, NRC Region 4, State of OK, Dept of Environmental Quality (DEQ) |
Shared Package | |
ML21076A479 | List:
|
References | |
Download: ML21076A456 (2) | |
Similar Documents at 07000925 | |
---|---|
Category:Decommissioning Plan DKTs 30
MONTHYEARML23108A0372023-04-17017 April 2023
[Table view]Cimarron Environmental Response Trust NRC Schedule for Review of License Amendment Request ML22284A1502022-10-12012 October 2022 Cimarron Environmental Response Trust Facility Decommissioning Plan, Rev 3 ML22285A1002022-09-14014 September 2022 Burns & Mcdonnell/Environmental Properties Management, LLC, Figures, Decommission Plan, Revision 3 ML21076A4812021-02-26026 February 2021 Cimarron Environmental Response Trust Facility Decommissioning Plan, Revision 2, Appendix E, Historical & Cultural Resource Document, Part 4 ML21076A4832021-02-26026 February 2021 Cimarron Environmental Response Trust Facility Decommissioning Plan, Revision 2, Appendix B, SWP3 and General Permit, Part 4 ML21076A4802021-02-26026 February 2021 Cimarron Environmental Response Trust Facility Decommissioning Plan, Revision 2, Appendix G, Floodplan Development Documents ML21076A4782021-02-26026 February 2021 Cimarron Environmental Response Trust Facility Decommissioning Plan, Revision 2, Appendix E, Historical & Cultural Resource Document, Part 5 ML21076A4772021-02-26026 February 2021 Cimarron Environmental Response Trust Facility Decommissioning Plan, Revision 2, Appendix K - Compiled, Part 3 ML21076A4762021-02-26026 February 2021 Cimarron Environmental Response Trust Facility Decommissioning Plan, Revision 2, Appendix B, SWP3 and General Permit, Part 1 ML21076A4742021-02-26026 February 2021 Cimarron Environmental Response Trust Facility Decommissioning Plan, Revision 2, Tables, Domestic Water Wells Near the Cimarron Site, Part 1 ML21076A4732021-02-26026 February 2021 Cimarron Environmental Response Trust Facility Decommissioning Plan, Revision 2, Appendix L, 2020 Groundwater Flow Model Part 6 ML21076A4722021-02-26026 February 2021 Cimarron Environmental Response Trust Facility Decommissioning Plan, Revision 2, Appendix L, 2020 Groundwater Flow Model Part 4 ML21076A4712021-02-26026 February 2021 Cimarron Environmental Response Trust Facility Decommissioning Plan, Revision 2, Appendix M, RPP Div. 4, Part 2 ML21076A4702021-02-26026 February 2021 Cimarron Environmental Response Trust Facility Decommissioning Plan, Revision 2, Figures, Part 3 ML21076A4692021-02-26026 February 2021 Cimarron Environmental Response Trust Facility Decommissioning Plan, Revision 2, Appendix L, 2020 Groundwater Flow Model, Part 2 ML21076A4672021-02-26026 February 2021 Cimarron Environmental Response Trust Facility Decommissioning Plan, Revision 2, Figures, Part 4 ML21076A4662021-02-26026 February 2021 Cimarron Environmental Response Trust Facility Decommissioning Plan, Revision 2, Tables, Historical Earthquakes in Oklahoma Greater than 3.0 Magnitude (as of February 9, 2021), Part 2 ML21076A4652021-02-26026 February 2021 Cimarron Environmental Response Trust Facility Decommissioning Plan, Revision 2, Appendix I, 2020 Groundwater Flow Model Part 3 ML21076A4642021-02-26026 February 2021 Cimarron Environmental Response Trust Facility Decommissioning Plan, Revision 2, Appendix L, 2020 Groundwater Flow Model Part 5 ML21076A4632021-02-26026 February 2021 Cimarron Environmental Response Trust Facility Decommissioning Plan, Revision 2, Figures, Part 5 ML21076A4612021-02-26026 February 2021 Cimarron Environmental Response Trust Facility Decommissioning Plan, Revision 2, Appendix M, RPP Div. 4, Part 1 ML21076A4602021-02-26026 February 2021 Cimarron Environmental Response Trust Facility Decommissioning Plan, Revision 2, Appendix K - Compiled, Part 4 ML21076A4592021-02-26026 February 2021 Cimarron Environmental Response Trust Facility Decommissioning Plan, Revision 2, Appendix M, RPP Div. 4, Part 3 ML21076A4582021-02-26026 February 2021 Cimarron Environmental Response Trust Facility Decommissioning Plan, Revision 1 ML21076A4572021-02-26026 February 2021 Cimarron Environmental Response Trust Facility Decommissioning Plan, Revision 2, Appendix L, 2020 Groundwater Flow Model, Part 1 ML21076A4552021-02-26026 February 2021 Cimarron Environmental Response Trust Facility Decommissioning Plan, Revision 2, Figures, Part 2 ML21076A4542021-02-26026 February 2021 Cimarron Environmental Response Trust Facility Decommissioning Plan, Revision 2, Appendix K - Compiled, Part 5 ML21076A4532021-02-26026 February 2021 Cimarron Environmental Response Trust Facility Decommissioning Plan, Revision 2, Figures, Part 1 ML21076A4842021-02-26026 February 2021 Cimarron Environmental Response Trust Facility Decommissioning Plan, Revision 2, Appendix a - Geotech Invest, Part 1 ML21076A5082021-02-26026 February 2021 Cimarron Environmental Response Trust Facility Decommissioning Plan, Revision 2, Appendix D, Noise Level Report ML21076A5072021-02-26026 February 2021 Cimarron Environmental Response Trust Facility Decommissioning Plan, Revision 2, Appendix D, Noise Level Report ML21076A5062021-02-26026 February 2021 Cimarron Environmental Response Trust Facility Decommissioning Plan, Revision 2, Appendix J, Compiled, Part 1 ML21076A5052021-02-26026 February 2021 Cimarron Environmental Response Trust Facility Decommissioning Plan, Revision 2, Appendix E, Historical & Cultural Resource Document, Part 1 ML21076A5042021-02-26026 February 2021 Cimarron Environmental Response Trust Facility Decommissioning Plan, Revision 2, Appendix K - Compiled, Part 1 ML21076A5032021-02-26026 February 2021 Cimarron Environmental Response Trust Facility Decommissioning Plan, Revision 2, Appendix E, Historical & Cultural Resource Document, Part 3 ML21076A5012021-02-26026 February 2021 Cimarron Environmental Response Trust Facility Decommissioning Plan, Revision 2, Appendix I, Basic of Design, Part 1 ML21076A5002021-02-26026 February 2021 Cimarron Environmental Response Trust Facility Decommissioning Plan, Revision 2, Appendix K - Compiled, Part 2 ML21076A4992021-02-26026 February 2021 Cimarron Environmental Response Trust Facility Decommissioning Plan, Revision 2, Appendix a, Geotech Invest, Part 2 ML21076A4982021-02-26026 February 2021 Cimarron Environmental Response Trust Facility Decommissioning Plan, Revision 2, Appendix J, Compiled, Part 2 ML21076A4972021-02-26026 February 2021 Cimarron Environmental Response Trust Facility Decommissioning Plan, Revision 2, Appendix E, Historical & Cultural Resource Document, Part 2 ML21076A4962021-02-26026 February 2021 Cimarron Environmental Response Trust Facility Decommissioning Plan, Revision 2, Appendix I, Basic of Design, Part 2 ML21076A4952021-02-26026 February 2021 Cimarron Environmental Response Trust Facility Decommissioning Plan, Revision 2, Appendix O, QAAP-001, Rev. 4 ML21076A4942021-02-26026 February 2021 Cimarron Environmental Response Trust Facility Decommissioning Plan, Revision 2, Appendix J, Compiled, Part 4 ML21076A4922021-02-26026 February 2021 Cimarron Environmental Response Trust Facility Decommissioning Plan, Revision 2, Appendix H, Exemption from U-235 Limit ML21076A4912021-02-26026 February 2021 Cimarron Environmental Response Trust Facility Decommissioning Plan, Revision 2, Appendix B, SWP3 and General Permit Part 2 ML21076A4902021-02-26026 February 2021 Cimarron Environmental Response Trust Facility Decommissioning Plan, Revision 2, Appendix B, SWP3 and General Permit Part 3 ML21076A4882021-02-26026 February 2021 Cimarron Environmental Response Trust Facility Decommissioning Plan, Revision 2, Appendix F, Visual and Scenic Resources ML21076A4872021-02-26026 February 2021 Cimarron Environmental Response Trust Facility Decommissioning Plan, Revision 2, Appendix C, Ecological Resources Documentation ML21076A4862021-02-26026 February 2021 Cimarron Environmental Response Trust Facility Decommissioning Plan, Revision 2, Appendix J, Compiled, Part 3 ML21076A4852021-02-26026 February 2021 Cimarron Environmental Response Trust Facility Decommissioning Plan, Revision 2, Appendix P, Certification of Financial Assurance 2023-04-17 Category:40 MONTHYEARML24116A1712024-04-24024 April 2024
[Table view]Cimarron Environmental Response Trust Updated Decommissioning Cost Estimate ML23108A0372023-04-17017 April 2023 Cimarron Environmental Response Trust NRC Schedule for Review of License Amendment Request ML22284A1502022-10-12012 October 2022 Cimarron Environmental Response Trust Facility Decommissioning Plan, Rev 3 ML22285A1002022-09-14014 September 2022 Burns & Mcdonnell/Environmental Properties Management, LLC, Figures, Decommission Plan, Revision 3 ML21123A2902021-05-0303 May 2021 Environmental Property Management, LLC - Cimarron License Amendment Request to Redefine the Licensed Area ML21230A2492021-05-0303 May 2021 2021-05-03 EPM - LAR - to Redefine the Licensed Area ML21076A4652021-02-26026 February 2021 Cimarron Environmental Response Trust Facility Decommissioning Plan, Revision 2, Appendix I, 2020 Groundwater Flow Model Part 3 ML21076A4812021-02-26026 February 2021 Cimarron Environmental Response Trust Facility Decommissioning Plan, Revision 2, Appendix E, Historical & Cultural Resource Document, Part 4 ML21076A4782021-02-26026 February 2021 Cimarron Environmental Response Trust Facility Decommissioning Plan, Revision 2, Appendix E, Historical & Cultural Resource Document, Part 5 ML21076A4772021-02-26026 February 2021 Cimarron Environmental Response Trust Facility Decommissioning Plan, Revision 2, Appendix K - Compiled, Part 3 ML21076A4762021-02-26026 February 2021 Cimarron Environmental Response Trust Facility Decommissioning Plan, Revision 2, Appendix B, SWP3 and General Permit, Part 1 ML21076A4742021-02-26026 February 2021 Cimarron Environmental Response Trust Facility Decommissioning Plan, Revision 2, Tables, Domestic Water Wells Near the Cimarron Site, Part 1 ML21076A4732021-02-26026 February 2021 Cimarron Environmental Response Trust Facility Decommissioning Plan, Revision 2, Appendix L, 2020 Groundwater Flow Model Part 6 ML21076A4722021-02-26026 February 2021 Cimarron Environmental Response Trust Facility Decommissioning Plan, Revision 2, Appendix L, 2020 Groundwater Flow Model Part 4 ML21076A4712021-02-26026 February 2021 Cimarron Environmental Response Trust Facility Decommissioning Plan, Revision 2, Appendix M, RPP Div. 4, Part 2 ML21076A4702021-02-26026 February 2021 Cimarron Environmental Response Trust Facility Decommissioning Plan, Revision 2, Figures, Part 3 ML21076A4692021-02-26026 February 2021 Cimarron Environmental Response Trust Facility Decommissioning Plan, Revision 2, Appendix L, 2020 Groundwater Flow Model, Part 2 ML21076A4672021-02-26026 February 2021 Cimarron Environmental Response Trust Facility Decommissioning Plan, Revision 2, Figures, Part 4 ML21076A4662021-02-26026 February 2021 Cimarron Environmental Response Trust Facility Decommissioning Plan, Revision 2, Tables, Historical Earthquakes in Oklahoma Greater than 3.0 Magnitude (as of February 9, 2021), Part 2 ML21076A4802021-02-26026 February 2021 Cimarron Environmental Response Trust Facility Decommissioning Plan, Revision 2, Appendix G, Floodplan Development Documents ML21076A4642021-02-26026 February 2021 Cimarron Environmental Response Trust Facility Decommissioning Plan, Revision 2, Appendix L, 2020 Groundwater Flow Model Part 5 ML21076A4632021-02-26026 February 2021 Cimarron Environmental Response Trust Facility Decommissioning Plan, Revision 2, Figures, Part 5 ML21076A4612021-02-26026 February 2021 Cimarron Environmental Response Trust Facility Decommissioning Plan, Revision 2, Appendix M, RPP Div. 4, Part 1 ML21076A4602021-02-26026 February 2021 Cimarron Environmental Response Trust Facility Decommissioning Plan, Revision 2, Appendix K - Compiled, Part 4 ML21076A4592021-02-26026 February 2021 Cimarron Environmental Response Trust Facility Decommissioning Plan, Revision 2, Appendix M, RPP Div. 4, Part 3 ML21076A4582021-02-26026 February 2021 Cimarron Environmental Response Trust Facility Decommissioning Plan, Revision 1 ML21076A4572021-02-26026 February 2021 Cimarron Environmental Response Trust Facility Decommissioning Plan, Revision 2, Appendix L, 2020 Groundwater Flow Model, Part 1 ML21076A4552021-02-26026 February 2021 Cimarron Environmental Response Trust Facility Decommissioning Plan, Revision 2, Figures, Part 2 ML21076A4542021-02-26026 February 2021 Cimarron Environmental Response Trust Facility Decommissioning Plan, Revision 2, Appendix K - Compiled, Part 5 ML21076A4532021-02-26026 February 2021 Cimarron Environmental Response Trust Facility Decommissioning Plan, Revision 2, Figures, Part 1 ML21076A4562021-02-26026 February 2021 Cimarron Environmental Response Trust Facility Decommissioning Plan, Revision 2 ML21076A4832021-02-26026 February 2021 Cimarron Environmental Response Trust Facility Decommissioning Plan, Revision 2, Appendix B, SWP3 and General Permit, Part 4 ML21076A5082021-02-26026 February 2021 Cimarron Environmental Response Trust Facility Decommissioning Plan, Revision 2, Appendix D, Noise Level Report ML21076A5072021-02-26026 February 2021 Cimarron Environmental Response Trust Facility Decommissioning Plan, Revision 2, Appendix D, Noise Level Report ML21076A5062021-02-26026 February 2021 Cimarron Environmental Response Trust Facility Decommissioning Plan, Revision 2, Appendix J, Compiled, Part 1 ML21076A5052021-02-26026 February 2021 Cimarron Environmental Response Trust Facility Decommissioning Plan, Revision 2, Appendix E, Historical & Cultural Resource Document, Part 1 ML21076A5042021-02-26026 February 2021 Cimarron Environmental Response Trust Facility Decommissioning Plan, Revision 2, Appendix K - Compiled, Part 1 ML21076A5032021-02-26026 February 2021 Cimarron Environmental Response Trust Facility Decommissioning Plan, Revision 2, Appendix E, Historical & Cultural Resource Document, Part 3 ML21076A5012021-02-26026 February 2021 Cimarron Environmental Response Trust Facility Decommissioning Plan, Revision 2, Appendix I, Basic of Design, Part 1 ML21076A5002021-02-26026 February 2021 Cimarron Environmental Response Trust Facility Decommissioning Plan, Revision 2, Appendix K - Compiled, Part 2 ML21076A4992021-02-26026 February 2021 Cimarron Environmental Response Trust Facility Decommissioning Plan, Revision 2, Appendix a, Geotech Invest, Part 2 ML21076A4982021-02-26026 February 2021 Cimarron Environmental Response Trust Facility Decommissioning Plan, Revision 2, Appendix J, Compiled, Part 2 ML21076A4972021-02-26026 February 2021 Cimarron Environmental Response Trust Facility Decommissioning Plan, Revision 2, Appendix E, Historical & Cultural Resource Document, Part 2 ML21076A4962021-02-26026 February 2021 Cimarron Environmental Response Trust Facility Decommissioning Plan, Revision 2, Appendix I, Basic of Design, Part 2 ML21076A4952021-02-26026 February 2021 Cimarron Environmental Response Trust Facility Decommissioning Plan, Revision 2, Appendix O, QAAP-001, Rev. 4 ML21076A4942021-02-26026 February 2021 Cimarron Environmental Response Trust Facility Decommissioning Plan, Revision 2, Appendix J, Compiled, Part 4 ML21076A4922021-02-26026 February 2021 Cimarron Environmental Response Trust Facility Decommissioning Plan, Revision 2, Appendix H, Exemption from U-235 Limit ML21076A4912021-02-26026 February 2021 Cimarron Environmental Response Trust Facility Decommissioning Plan, Revision 2, Appendix B, SWP3 and General Permit Part 2 ML21076A4902021-02-26026 February 2021 Cimarron Environmental Response Trust Facility Decommissioning Plan, Revision 2, Appendix B, SWP3 and General Permit Part 3 ML21076A4882021-02-26026 February 2021 Cimarron Environmental Response Trust Facility Decommissioning Plan, Revision 2, Appendix F, Visual and Scenic Resources 2024-04-24 Category:50 MONTHYEARML24116A1712024-04-24024 April 2024
[Table view]Cimarron Environmental Response Trust Updated Decommissioning Cost Estimate ML23108A0372023-04-17017 April 2023 Cimarron Environmental Response Trust NRC Schedule for Review of License Amendment Request ML22284A1502022-10-12012 October 2022 Cimarron Environmental Response Trust Facility Decommissioning Plan, Rev 3 ML22285A1002022-09-14014 September 2022 Burns & Mcdonnell/Environmental Properties Management, LLC, Figures, Decommission Plan, Revision 3 ML21076A4802021-02-26026 February 2021 Cimarron Environmental Response Trust Facility Decommissioning Plan, Revision 2, Appendix G, Floodplan Development Documents ML21076A4562021-02-26026 February 2021 Cimarron Environmental Response Trust Facility Decommissioning Plan, Revision 2 ML21076A4782021-02-26026 February 2021 Cimarron Environmental Response Trust Facility Decommissioning Plan, Revision 2, Appendix E, Historical & Cultural Resource Document, Part 5 ML21076A4772021-02-26026 February 2021 Cimarron Environmental Response Trust Facility Decommissioning Plan, Revision 2, Appendix K - Compiled, Part 3 ML21076A4762021-02-26026 February 2021 Cimarron Environmental Response Trust Facility Decommissioning Plan, Revision 2, Appendix B, SWP3 and General Permit, Part 1 ML21076A4742021-02-26026 February 2021 Cimarron Environmental Response Trust Facility Decommissioning Plan, Revision 2, Tables, Domestic Water Wells Near the Cimarron Site, Part 1 ML21076A4732021-02-26026 February 2021 Cimarron Environmental Response Trust Facility Decommissioning Plan, Revision 2, Appendix L, 2020 Groundwater Flow Model Part 6 ML21076A4722021-02-26026 February 2021 Cimarron Environmental Response Trust Facility Decommissioning Plan, Revision 2, Appendix L, 2020 Groundwater Flow Model Part 4 ML21076A4712021-02-26026 February 2021 Cimarron Environmental Response Trust Facility Decommissioning Plan, Revision 2, Appendix M, RPP Div. 4, Part 2 ML21076A4702021-02-26026 February 2021 Cimarron Environmental Response Trust Facility Decommissioning Plan, Revision 2, Figures, Part 3 ML21076A4692021-02-26026 February 2021 Cimarron Environmental Response Trust Facility Decommissioning Plan, Revision 2, Appendix L, 2020 Groundwater Flow Model, Part 2 ML21076A4672021-02-26026 February 2021 Cimarron Environmental Response Trust Facility Decommissioning Plan, Revision 2, Figures, Part 4 ML21076A4662021-02-26026 February 2021 Cimarron Environmental Response Trust Facility Decommissioning Plan, Revision 2, Tables, Historical Earthquakes in Oklahoma Greater than 3.0 Magnitude (as of February 9, 2021), Part 2 ML21076A4652021-02-26026 February 2021 Cimarron Environmental Response Trust Facility Decommissioning Plan, Revision 2, Appendix I, 2020 Groundwater Flow Model Part 3 ML21076A4642021-02-26026 February 2021 Cimarron Environmental Response Trust Facility Decommissioning Plan, Revision 2, Appendix L, 2020 Groundwater Flow Model Part 5 ML21076A4632021-02-26026 February 2021 Cimarron Environmental Response Trust Facility Decommissioning Plan, Revision 2, Figures, Part 5 ML21076A4612021-02-26026 February 2021 Cimarron Environmental Response Trust Facility Decommissioning Plan, Revision 2, Appendix M, RPP Div. 4, Part 1 ML21076A4602021-02-26026 February 2021 Cimarron Environmental Response Trust Facility Decommissioning Plan, Revision 2, Appendix K - Compiled, Part 4 ML21076A4592021-02-26026 February 2021 Cimarron Environmental Response Trust Facility Decommissioning Plan, Revision 2, Appendix M, RPP Div. 4, Part 3 ML21076A4582021-02-26026 February 2021 Cimarron Environmental Response Trust Facility Decommissioning Plan, Revision 1 ML21076A4572021-02-26026 February 2021 Cimarron Environmental Response Trust Facility Decommissioning Plan, Revision 2, Appendix L, 2020 Groundwater Flow Model, Part 1 ML21076A4552021-02-26026 February 2021 Cimarron Environmental Response Trust Facility Decommissioning Plan, Revision 2, Figures, Part 2 ML21076A4542021-02-26026 February 2021 Cimarron Environmental Response Trust Facility Decommissioning Plan, Revision 2, Appendix K - Compiled, Part 5 ML21076A4532021-02-26026 February 2021 Cimarron Environmental Response Trust Facility Decommissioning Plan, Revision 2, Figures, Part 1 ML21076A4832021-02-26026 February 2021 Cimarron Environmental Response Trust Facility Decommissioning Plan, Revision 2, Appendix B, SWP3 and General Permit, Part 4 ML21076A5082021-02-26026 February 2021 Cimarron Environmental Response Trust Facility Decommissioning Plan, Revision 2, Appendix D, Noise Level Report ML21076A5072021-02-26026 February 2021 Cimarron Environmental Response Trust Facility Decommissioning Plan, Revision 2, Appendix D, Noise Level Report ML21076A5062021-02-26026 February 2021 Cimarron Environmental Response Trust Facility Decommissioning Plan, Revision 2, Appendix J, Compiled, Part 1 ML21076A5052021-02-26026 February 2021 Cimarron Environmental Response Trust Facility Decommissioning Plan, Revision 2, Appendix E, Historical & Cultural Resource Document, Part 1 ML21076A5042021-02-26026 February 2021 Cimarron Environmental Response Trust Facility Decommissioning Plan, Revision 2, Appendix K - Compiled, Part 1 ML21076A5032021-02-26026 February 2021 Cimarron Environmental Response Trust Facility Decommissioning Plan, Revision 2, Appendix E, Historical & Cultural Resource Document, Part 3 ML21076A5012021-02-26026 February 2021 Cimarron Environmental Response Trust Facility Decommissioning Plan, Revision 2, Appendix I, Basic of Design, Part 1 ML21076A5002021-02-26026 February 2021 Cimarron Environmental Response Trust Facility Decommissioning Plan, Revision 2, Appendix K - Compiled, Part 2 ML21076A4992021-02-26026 February 2021 Cimarron Environmental Response Trust Facility Decommissioning Plan, Revision 2, Appendix a, Geotech Invest, Part 2 ML21076A4982021-02-26026 February 2021 Cimarron Environmental Response Trust Facility Decommissioning Plan, Revision 2, Appendix J, Compiled, Part 2 ML21076A4972021-02-26026 February 2021 Cimarron Environmental Response Trust Facility Decommissioning Plan, Revision 2, Appendix E, Historical & Cultural Resource Document, Part 2 ML21076A4962021-02-26026 February 2021 Cimarron Environmental Response Trust Facility Decommissioning Plan, Revision 2, Appendix I, Basic of Design, Part 2 ML21076A4952021-02-26026 February 2021 Cimarron Environmental Response Trust Facility Decommissioning Plan, Revision 2, Appendix O, QAAP-001, Rev. 4 ML21076A4942021-02-26026 February 2021 Cimarron Environmental Response Trust Facility Decommissioning Plan, Revision 2, Appendix J, Compiled, Part 4 ML21076A4922021-02-26026 February 2021 Cimarron Environmental Response Trust Facility Decommissioning Plan, Revision 2, Appendix H, Exemption from U-235 Limit ML21076A4912021-02-26026 February 2021 Cimarron Environmental Response Trust Facility Decommissioning Plan, Revision 2, Appendix B, SWP3 and General Permit Part 2 ML21076A4902021-02-26026 February 2021 Cimarron Environmental Response Trust Facility Decommissioning Plan, Revision 2, Appendix B, SWP3 and General Permit Part 3 ML21076A4882021-02-26026 February 2021 Cimarron Environmental Response Trust Facility Decommissioning Plan, Revision 2, Appendix F, Visual and Scenic Resources ML21076A4872021-02-26026 February 2021 Cimarron Environmental Response Trust Facility Decommissioning Plan, Revision 2, Appendix C, Ecological Resources Documentation ML21076A4862021-02-26026 February 2021 Cimarron Environmental Response Trust Facility Decommissioning Plan, Revision 2, Appendix J, Compiled, Part 3 ML21076A4852021-02-26026 February 2021 Cimarron Environmental Response Trust Facility Decommissioning Plan, Revision 2, Appendix P, Certification of Financial Assurance 2024-04-24 Category:70 MONTHYEARML24116A1712024-04-24024 April 2024
[Table view]Cimarron Environmental Response Trust Updated Decommissioning Cost Estimate ML23108A0372023-04-17017 April 2023 Cimarron Environmental Response Trust NRC Schedule for Review of License Amendment Request ML22284A1502022-10-12012 October 2022 Cimarron Environmental Response Trust Facility Decommissioning Plan, Rev 3 ML22285A1002022-09-14014 September 2022 Burns & Mcdonnell/Environmental Properties Management, LLC, Figures, Decommission Plan, Revision 3 ML21123A2902021-05-0303 May 2021 Environmental Property Management, LLC - Cimarron License Amendment Request to Redefine the Licensed Area ML21230A2492021-05-0303 May 2021 2021-05-03 EPM - LAR - to Redefine the Licensed Area ML21076A4652021-02-26026 February 2021 Cimarron Environmental Response Trust Facility Decommissioning Plan, Revision 2, Appendix I, 2020 Groundwater Flow Model Part 3 ML21076A4812021-02-26026 February 2021 Cimarron Environmental Response Trust Facility Decommissioning Plan, Revision 2, Appendix E, Historical & Cultural Resource Document, Part 4 ML21076A4782021-02-26026 February 2021 Cimarron Environmental Response Trust Facility Decommissioning Plan, Revision 2, Appendix E, Historical & Cultural Resource Document, Part 5 ML21076A4772021-02-26026 February 2021 Cimarron Environmental Response Trust Facility Decommissioning Plan, Revision 2, Appendix K - Compiled, Part 3 ML21076A4762021-02-26026 February 2021 Cimarron Environmental Response Trust Facility Decommissioning Plan, Revision 2, Appendix B, SWP3 and General Permit, Part 1 ML21076A4742021-02-26026 February 2021 Cimarron Environmental Response Trust Facility Decommissioning Plan, Revision 2, Tables, Domestic Water Wells Near the Cimarron Site, Part 1 ML21076A4732021-02-26026 February 2021 Cimarron Environmental Response Trust Facility Decommissioning Plan, Revision 2, Appendix L, 2020 Groundwater Flow Model Part 6 ML21076A4722021-02-26026 February 2021 Cimarron Environmental Response Trust Facility Decommissioning Plan, Revision 2, Appendix L, 2020 Groundwater Flow Model Part 4 ML21076A4712021-02-26026 February 2021 Cimarron Environmental Response Trust Facility Decommissioning Plan, Revision 2, Appendix M, RPP Div. 4, Part 2 ML21076A4702021-02-26026 February 2021 Cimarron Environmental Response Trust Facility Decommissioning Plan, Revision 2, Figures, Part 3 ML21076A4692021-02-26026 February 2021 Cimarron Environmental Response Trust Facility Decommissioning Plan, Revision 2, Appendix L, 2020 Groundwater Flow Model, Part 2 ML21076A4672021-02-26026 February 2021 Cimarron Environmental Response Trust Facility Decommissioning Plan, Revision 2, Figures, Part 4 ML21076A4662021-02-26026 February 2021 Cimarron Environmental Response Trust Facility Decommissioning Plan, Revision 2, Tables, Historical Earthquakes in Oklahoma Greater than 3.0 Magnitude (as of February 9, 2021), Part 2 ML21076A4802021-02-26026 February 2021 Cimarron Environmental Response Trust Facility Decommissioning Plan, Revision 2, Appendix G, Floodplan Development Documents ML21076A4642021-02-26026 February 2021 Cimarron Environmental Response Trust Facility Decommissioning Plan, Revision 2, Appendix L, 2020 Groundwater Flow Model Part 5 ML21076A4632021-02-26026 February 2021 Cimarron Environmental Response Trust Facility Decommissioning Plan, Revision 2, Figures, Part 5 ML21076A4612021-02-26026 February 2021 Cimarron Environmental Response Trust Facility Decommissioning Plan, Revision 2, Appendix M, RPP Div. 4, Part 1 ML21076A4602021-02-26026 February 2021 Cimarron Environmental Response Trust Facility Decommissioning Plan, Revision 2, Appendix K - Compiled, Part 4 ML21076A4592021-02-26026 February 2021 Cimarron Environmental Response Trust Facility Decommissioning Plan, Revision 2, Appendix M, RPP Div. 4, Part 3 ML21076A4582021-02-26026 February 2021 Cimarron Environmental Response Trust Facility Decommissioning Plan, Revision 1 ML21076A4572021-02-26026 February 2021 Cimarron Environmental Response Trust Facility Decommissioning Plan, Revision 2, Appendix L, 2020 Groundwater Flow Model, Part 1 ML21076A4552021-02-26026 February 2021 Cimarron Environmental Response Trust Facility Decommissioning Plan, Revision 2, Figures, Part 2 ML21076A4542021-02-26026 February 2021 Cimarron Environmental Response Trust Facility Decommissioning Plan, Revision 2, Appendix K - Compiled, Part 5 ML21076A4532021-02-26026 February 2021 Cimarron Environmental Response Trust Facility Decommissioning Plan, Revision 2, Figures, Part 1 ML21076A4562021-02-26026 February 2021 Cimarron Environmental Response Trust Facility Decommissioning Plan, Revision 2 ML21076A4832021-02-26026 February 2021 Cimarron Environmental Response Trust Facility Decommissioning Plan, Revision 2, Appendix B, SWP3 and General Permit, Part 4 ML21076A5082021-02-26026 February 2021 Cimarron Environmental Response Trust Facility Decommissioning Plan, Revision 2, Appendix D, Noise Level Report ML21076A5072021-02-26026 February 2021 Cimarron Environmental Response Trust Facility Decommissioning Plan, Revision 2, Appendix D, Noise Level Report ML21076A5062021-02-26026 February 2021 Cimarron Environmental Response Trust Facility Decommissioning Plan, Revision 2, Appendix J, Compiled, Part 1 ML21076A5052021-02-26026 February 2021 Cimarron Environmental Response Trust Facility Decommissioning Plan, Revision 2, Appendix E, Historical & Cultural Resource Document, Part 1 ML21076A5042021-02-26026 February 2021 Cimarron Environmental Response Trust Facility Decommissioning Plan, Revision 2, Appendix K - Compiled, Part 1 ML21076A5032021-02-26026 February 2021 Cimarron Environmental Response Trust Facility Decommissioning Plan, Revision 2, Appendix E, Historical & Cultural Resource Document, Part 3 ML21076A5012021-02-26026 February 2021 Cimarron Environmental Response Trust Facility Decommissioning Plan, Revision 2, Appendix I, Basic of Design, Part 1 ML21076A5002021-02-26026 February 2021 Cimarron Environmental Response Trust Facility Decommissioning Plan, Revision 2, Appendix K - Compiled, Part 2 ML21076A4992021-02-26026 February 2021 Cimarron Environmental Response Trust Facility Decommissioning Plan, Revision 2, Appendix a, Geotech Invest, Part 2 ML21076A4982021-02-26026 February 2021 Cimarron Environmental Response Trust Facility Decommissioning Plan, Revision 2, Appendix J, Compiled, Part 2 ML21076A4972021-02-26026 February 2021 Cimarron Environmental Response Trust Facility Decommissioning Plan, Revision 2, Appendix E, Historical & Cultural Resource Document, Part 2 ML21076A4962021-02-26026 February 2021 Cimarron Environmental Response Trust Facility Decommissioning Plan, Revision 2, Appendix I, Basic of Design, Part 2 ML21076A4952021-02-26026 February 2021 Cimarron Environmental Response Trust Facility Decommissioning Plan, Revision 2, Appendix O, QAAP-001, Rev. 4 ML21076A4942021-02-26026 February 2021 Cimarron Environmental Response Trust Facility Decommissioning Plan, Revision 2, Appendix J, Compiled, Part 4 ML21076A4922021-02-26026 February 2021 Cimarron Environmental Response Trust Facility Decommissioning Plan, Revision 2, Appendix H, Exemption from U-235 Limit ML21076A4912021-02-26026 February 2021 Cimarron Environmental Response Trust Facility Decommissioning Plan, Revision 2, Appendix B, SWP3 and General Permit Part 2 ML21076A4902021-02-26026 February 2021 Cimarron Environmental Response Trust Facility Decommissioning Plan, Revision 2, Appendix B, SWP3 and General Permit Part 3 ML21076A4882021-02-26026 February 2021 Cimarron Environmental Response Trust Facility Decommissioning Plan, Revision 2, Appendix F, Visual and Scenic Resources 2024-04-24 Category:Letter MONTHYEARML24260A0522024-09-12012 September 2024
[Table view]Cimarron Environmental Response Trust - Uranium in Groundwater in the Southern Portion of BA1 ML24235A5192024-08-21021 August 2024 Cimarron Environmental Response Trust, Semi-Annual Report of Projected Administrative Expenses ML24226A0902024-07-25025 July 2024 Cert Wetland Delineation Report ML24191A4512024-07-0909 July 2024 Cimarron Environmental Response Trust, Updated Information Regarding Potential for Seepage in Burial Area 1 ML24185A0932024-07-0303 July 2024 Environmental Properties Management LLC, Cimarron Environmental Response Trust Annual Environmental Monitoring Program Data ML24173A2662024-06-19019 June 2024 Letter Dated 06/19/2024 from J.P.Davis and Rmiller, Odeq, to Jhesemann, Cimarron Environmental Response Trust, (Cert) Regarding Letter Dated June 13, 2024 to Engage Legal Counsel for Construction Contracting Support ML24173A2582024-06-19019 June 2024 Letter Dated 06/19/2024 from J.P.Davis and Rmiller, Odeq, to Jhesseman, Cimarron Environmental Response Trust, (Cert) Regarding Letter Dated May 31, 2024, Regarding Intent Investigate Insurance for Water Treatment Facility ML24165A2722024-06-13013 June 2024 Environmental Properties Management, LLC, Cimarron Environmental Response Trust Intent to Engage Legal Counsel for Construction Contracting Support ML24156A0672024-05-31031 May 2024 Environmental Properties Management, LLC, Cimarron Environmental Response Trust Corrected Decommissioning Cost Estimate ML24173A2722024-05-31031 May 2024 Letter Dated 05/31/2024, John R. Hesemann, Cimarron Environmental Trust, to Jsmith, NRC, Rmiller, Odeq Regarding Request for Approval to Investigate Insurance for Water Treatment Facility ML24151A3812024-05-29029 May 2024 Letter from R.Yalen Chief, Environmental Protection Unit, Department of Justice to J.Lux, Cimarron Environmental Response Trust Regarding Request for One-Time Waiver of Section 3.2.5 of Trust Agreement Addressed in Letter, Dated April 1, 2 ML24149A3662024-05-28028 May 2024 Cimarron Environmental Response Trust U-235 Enrichment in Environmental Media at the Cimarron Site ML24179A2862024-05-0707 May 2024 Letter Dated 05072024 from J.P.Davis and Rmiller, Odeq, to Jlux, Cimarron Environmental Response Trust, (Cert) Regarding Response to NRC Concerns Regarding Seepage at Burial Area 1 (February 21, 2024) ML24115A2422024-04-25025 April 2024 Cimarron Environmental Response Trust - NRC Inspection Report 07000925/2024001 ML24116A1712024-04-24024 April 2024 Cimarron Environmental Response Trust Updated Decommissioning Cost Estimate ML24109A1712024-04-17017 April 2024 Cimarron Environmental Response Trust License Condition 27(e) Annual Report for 2023 ML24089A0672024-04-0606 April 2024 Letter to Oklahoma SHPO Closing Out Section 106 Consultation Related to Cimarron Site ML24093A2182024-04-0101 April 2024 Cimarron Environmental Response Trust Request for Waiver of Competitive Bidding Requirement Pursuant to Section 3.2.5 of the Environmental Response Trust Agreement (Cimarron) ML24089A2602024-03-29029 March 2024 Cimarron Environmental Response Trust Bat Habitat and Aquatic Habitat Assessment Reports ML24068A0892024-03-0707 March 2024 EPM - Report of 27(e) Changes in 2023 ML24061A2102024-03-0101 March 2024 Cimarron Environmental Response Trust - Notes from February 21, 2024, Project Status Teleconference ML24061A2392024-03-0101 March 2024 Cimarron Environmental Response Trust, Proposed Revision to Annual Environmental Monitoring Program ML24052A3602024-02-21021 February 2024 Cimarron Environmental Response Trust - Response to NRC Concerns Regarding Potential Seepage in Burial Area 1 ML24040A1852024-02-0909 February 2024 Cimarron Environmental Response Trust to NRC Concerns Regarding Responses to RAIs Related to Health Physics ML24043A1462024-02-0202 February 2024 Letter from Rachel Miller, Oklahoma DEQ to Jlux, Dated 2-2-2024 Cimarron Regarding 2024 Proposed Budget and Scope of Work ML24017A0552024-01-17017 January 2024 Cimarron Environmental Response Trust Burial Area 1 Redox Evaluation Report ML23346A2622023-12-0808 December 2023 Cimarron Environmental Response Trust, Response to October 2, 2023, Request for Additional Information ML23319A2032023-11-15015 November 2023 Cimarron Environmental Response Trust - Response to November 1, 2023, Request for Additional Information Related to Nuclear Criticality Safety ML23317A1112023-11-13013 November 2023 Cimarron Environmental Response Trust - October 18, 2023, Project Status Teleconference Notes ML23335A1482023-11-0606 November 2023 Letter from Oklahoma State Historic Preservation Office Historic Properties at the Cimarron Site ML23319A2522023-11-0303 November 2023 Cimarron Environmental Response Trust - Response to September 6, 2023, Request for Additional Information ML23335A1492023-11-0303 November 2023 Letter from Oklahoma Archeological Survey Historic Properties at the Cimarron Site ML20336A2062023-10-10010 October 2023 Letter to Ok Shpo Re Recommendations of Eligibility for Historic Properties at the Former Cimarron Fuel Fabrication Facility ML23279A1282023-10-10010 October 2023 Letter to Ok Archeological Survey Re Recommendations of Eligibility for Historic Properties at the Former Cimarron Fuel Fabrication Facility ML23251A2122023-10-0202 October 2023 Cimarron - Cover Letter with Request for Additional Information for the Safety Review of the Decommissioning Plan ML23268A4422023-09-15015 September 2023 Cimarron Environmental Response Trust - Clarification of On-Site Disposal Vs. Soil Laydown Area ML23270B9152023-09-13013 September 2023 Letter from Rachel Miller, Oklahoma Department of Environmental Quality, Cimarron Environmental Response Trust Bounding Conditions for Fissile Exempt Material, Dated 9/13/2023 ML23230B2172023-09-0606 September 2023 Request for Additional Information for the Environmental Assessment of the Decommissioning Plan for the Cimarron Site Near Crescent, Oklahoma ML23248A4542023-09-0505 September 2023 NRC Copy of Rachel Miller, Odeq Letter to Jeff Lux Regarding the Cimmarron Environmental Response Trust Dated September 5, 2023 ML23248A4642023-08-24024 August 2023 Letter from J.Paul Davis, Odeq, and Rachel Miller, Odeq to Jeff Lux the Cimarron Environmental Response Trust to NRC Dated August 24/2023 ML23222A1342023-08-0808 August 2023 Environmental Properties Management, LLC, Cimarron Environmental Response Trust, Determination of Distribution Coefficients for Use in the Cimarron Decommissioning Plan ML23205A1792023-07-21021 July 2023 Cimarron Environmental Response Trust, Bounding Conditions for Fissile Exempt Material ML23193A8432023-07-12012 July 2023 Cimarron Environmental Response Trust Revision of License Amendment Requests in Section 6 of Decommissioning Plan - Rev 3 ML23171A9212023-06-13013 June 2023 Letter from J. Paul Davis, Odeq, Dated 6/13/2023 Regarding Letter from the Cimarron Environmental Response Trust to NRC- Dated April 17 2023 ML23152A0222023-06-0101 June 2023 Response to Letter Dated April 17 with Respect to Schedule for Processing License Amendment Request for Special Nuclear Material License SNM-928 Cimarron 5 24 2023 ML23139A0782023-05-17017 May 2023 Letter from J.Paul Davis, Odeq to Jlux, Cimarron Environmental Properties, Dated 5 17 2023 Regarding Addendum to License Application Addressing Cimarron Environmental Response Trust - Addressing 10 CFR Part 74 in the Cert Decommissioning Pl ML23142A1142023-05-0101 May 2023 Incoming Fee Exemption Request from State of Oklahoma on Behalf of Cimarron ML23109A1432023-04-18018 April 2023 Environmental Properties Management, LLC - Application for Exemption of Fees Pursuant to 10 CFR 170.12 Docket No. 07000925; License No. SNM-928 ML23108A0372023-04-17017 April 2023 Cimarron Environmental Response Trust NRC Schedule for Review of License Amendment Request ML23066A0382023-03-0707 March 2023 Cimarron Environmental Response Trust - License Condition 27(e) Annual Report for 2022 2024-09-12 |
Text
~
environmental properties management. LLC February 26, 2021 Mr. James Smith U.S. Nuclear Regulatory Commission 11555 Rockville Pike Washington, DC 20555-0001 Mr. Paul Davis Oklahoma Department of Environmental Quality 707 North Robinson Oklahoma City, OK 73101 Mr. Robert Evans U.S. Nuclear Regulatory Commission 1600 East Lamar Blvd.
Arlington, TX 76011-4511 Re: Cimarron Environmental Response Trust Facility Decommissioning Plan - Revision 2 Docket No. 070-00925; License No. SNM-928
Dear Sirs:
Solely as Trustee for the Cimarron Environmental Response Trust (CERT), Environmental Properties Management LLC (EPM) submits herein to the U. S. Nuclear Regulatory Commission (NRC) and the Oklahoma Department of Environmental Quality (DEQ) Facility Decommissioning Plan - Rev 2 (the DP).
The 2015 Facility Decommissioning Plan was submitted to NRC on December 31, 2015. The NRC completed both the acceptance review and the detailed technical review of that document, and EPM responded to the RAIs that resulted from the detailed technical review. Responding to RAIs resulted in the need to perform additional field work to complete responses to RAIs and to prepare the 2018 submittal of Facility Decommissioning Plan - Rev 1.
Following NRCs acceptance review of the 2018 Facility Decommissioning Plan - Rev 1, the NRC issued a February 28, 2019 request for supplemental information. Responding to that request for supplemental information resulted in the need to perform additional field work and to evaluate the revise the estimated cost to operate remediation systems and dispose of wastes generated by water treatment systems. Available funding was determined to be insufficient to provide for full implementation of the decommissioning plan, and the NRC and the DEQ agreed that a phased approach to decommissioning must be developed and implemented.
9400 Ward Parkway
- Kansas City, MO 64114 Tel: 405-642-5152
- jlux@envpm.com
~
environmental properties management. LLC Mr. James Smith, et. al.
February 26, 2021 Page 2 Both agencies agreed that the highest priority is the removal of sufficient uranium from groundwater to achieve termination of the NRC license. The decommissioning plan was therefore revised to provide for a phased approach to groundwater remediation, in which the first phase targets only those areas in which the concentration of uranium in groundwater exceeds the NRC criterion for unrestricted release. The cost and schedule to achieve license termination, based upon the implementation of only Phase I, would be estimated to determine if available funding is sufficient to achieve license termination.
Should funding be available when the NRC criterion is met, groundwater treatment could continue to further reduce the concentration of uranium in groundwater, or groundwater remediation could be expanded to other areas to address non-radiological contaminants. Because the extent of additional groundwater remediation that could be implemented after reaching the NRC criterion cannot be defined, the decision was made to retain all the groundwater extraction and treatment infrastructure in this Facility Decommissioning Plan - Rev 2 (this Plan) that was provided for in the groundwater extraction and treatment systems for all areas that had been addressed in the 2018 Facility Decommissioning Plan - Rev 1.
To eliminate the need for agency personnel to review the numerous documents submitted between the November 2018 submittal of Facility Decommissioning Plan - Rev 1 and the submittal of this Plan (Rev 2), we have incorporated all responses to the NRCs request for supplemental information. EPM believes this Plan may be treated as a comprehensive document resulting from the February 2019 request for supplemental information, and the NRC may proceed directly to the detailed technical review this Plan.
Please call me at (405) 642-5152 or e-mail me at jlux@envpm.com if you desire clarification or if additional information is needed.
Sincerely, Jeff Lux, P.E.
Trustee Project Manager Enclosure