ML21076A467
| ML21076A467 | |
| Person / Time | |
|---|---|
| Site: | 07000925 |
| Issue date: | 02/26/2021 |
| From: | Environmental Properties Management, Enercon Services, Burns & McDonnell Engineering Co, Veolia Nuclear Solutions Federal Services |
| To: | Office of Nuclear Material Safety and Safeguards, Cimarron Environmental Response Trust, NRC Region 4 |
| Shared Package | |
| ML21076A479 | List:
|
| References | |
| Download: ML21076A467 (14) | |
Text
ci
~
>--z cE
~
0 0
(9 z ii::
w w
z (5 z w
_J
_J w
z z 0
0 tJ
~
olS Cl) z 0:::
- i m
N 0
N Z:\\Clients\\ENS\\CERT\\_Clientlnfo\\Sites\\Database\\Geospatial\\Maps & Dwgs\\ArcGIS\\BMCD_Files\\Arcdocs\\2020\\2022 - Decommissioning Plan\\Figure 5-2_Property Owned by CERT FIGURE 5-2 PROPERTY OWNED BY THE TRUST FACILITY DECOMMISSIONING PLAN REVISION 2
~
environmental
~ BURNS
'-.."-MSDONNELL properties management, LLC LEGEND CJ 1 ACRE SOLD IN Cl 117 ACRES SOLD IN 4/3/2015 (APPROXIMATE) 24 ACRES SOLD IN 1/28/2015 (APPROXIMATE) 140ACRES SOLD IN 11/30/2017 (APPROXIMATE)
CJ CERT PROPERTY LINE - MARCH 2018 N
700 1,400 SCALE IN FEET Rev No: 2 Preparer: BELOCKWOOD Date: 2/16/2021 Reviewer: EDULLE Date: 2/16/2021 Coordinate System NAO 1983 StatePlane Oklahoma North FIPS 3501 Feet
u
~
>--z
~
~
0 Cl (j
~
0:::
UJ UJ z (9
z UJ
....J
....J UJ z z 0
0 u
~
~
V) z 0:::
a::i N
0 N
Z:\\Clients\\ENS\\CERT\\_Clientlnfo\\Sites\\Database\\Geospatial\\Maps & Dwgs\\ArcGIS\\BMCD_Files\\Arcdocs\\2020\\2022 - Decommissioning Plan\\Figure 5-3_Land Use During Operating Years FIGURE 5-3 LAND USE DURING OPERATING YEARS FACILITY DECOMMISSIONING PLAN REVISION 2
~ BURNS
"-MS:DONNELL LEGEND
~
environmental properties management. LLC HISTORICALLY USED FOR GRAZING AND HARVESTING GRASS FOR CATTLE (APPROXIMATE)
E3 CERT PROPERTY LINE - MARCH OLD SANITARY LAGOON D
BURIAL BUILDINGS D
EMERGENCY POND D
OLD WASTE POND D
LINED SANITARY LAGOON NOTES
- 1) SHADED AREAS SHOW THE LOCATIONS OF OPERATING FACILITIES. SEE FIGURE 1-3 FOR SPECIFIC DETAILS.
750 1,500 SCALE IN FEET Rev No: 2 Preparer: BELOCKWOOD Date: 2/16/2021 Reviewer: EDULLE Date: 2/16/2021 Coordinate System NAO 1983 StatePlane Oklahoma North FIPS 3501 Feet
CJ
~
z ct
~
0
(.)
CJ
~
er::
LLJ LLJ z (9 z LLJ
...J
...J LLJ z z 0
0
(.)
~
~
(/) z er::
co N
0 N._ _______
Z:\\Clients\\ENS\\CERT\\_Clientlnfo\\Sites\\Database\\Geospatial\\Maps & Dwgs\\ArcGIS\\BMCD_Files\\Arcdocs\\2020\\2022 - Decommissioning Plan\\Figure 5-4_Western Area Infrastructure and Stormwater Controls FIGURE 5-4 WESTERN AREA INFRASTRUCTURE AND STORMWATER CONTROLS FACILITY DECOMMISSIONING PLAN REVISION 2
~ BURNS
'-'-MSDONNELL LEGEND
~
envi ronmenta I properties management LLC MONITOR WELL IN ALLUVIUM
+
MONITOR WELL IN SANDSTONE
+
MONITOR WELL IN SANDSTONE B
+
MONITOR WELL IN SANDSTONE C
+
MONITOR WELL IN TRANSITION ZONE EXTRACTION WELL/SUMP (INSTALLED)
EXTRACTION WELL/SUMP (PLANNED) e INJECTION WELL (PLANNED)
WA OUTFALL PIPING SILT FENCE GROUNDWATER EXTRACTION PIPING
-- TREATED WATER INJECTION PIPING GROUNDWATER EXTRACTION TRENCH TREATED WATER INJECTION TRENCH
-- TREATMENT FACILITY BUILDING TREATMENT FACILITY TRUEGRID x-x-
TREATMENT FACILITY FENCE
- -tc::::c::::> 1206 DRAINAGE PERFORATED PIPE SOILS MIXING CERT PROPERTY LINE - MARCH 2018 NOTES
- 1) BMPS WILL ALSO BE INSTALLED AROUND EQUIPMENT AND MATERIAL STAGING AREAS AS REQUIRED.
- 2) BMP LOCATIONS ARE APPROXIMATE AND SHOW AREAS TO BE ADDRESSED.
- 3) BASEMAP: GOOGLE EARTH 2017 400 800 SCALE IN FEET Rev No: 2 Preparer: BELOCKWOOD Date: 2/23/2021 Reviewer: EDULLE Date: 2/23/2021 Coordinate System NAD 1983 StatePlane Oklahoma North FIPS 3501 Feet
(/)
°E i::
0 u t ro E
0 in "O
C:
ro
~
t5 2
in i C:
ro
~
<(
cii
'§
~I U1
~
,Ql
~
C:
rn a:
Cl C:
0
'iii
(/)
.E E
0
(.J (1) 0 N
N 0
~
0 N 0
~
(/)
(.J 0
"O e
- 5
(/)
~
u::
01 u
~
co U)
~
(.J
- 5
(/)
Cl 0
~ ILEGEND C.
rn MONITOR WELL IN ALLUVIUM
~u i ~I +
MONITOR WELL IN SANDSTONE 8
~ ~
MONITOR WELL IN SANDSTONE C
~ ~ +
MONITOR WELL IN TRANSITION ZONE
--- 0
~ u PROPOSED MONITOR WELL ro (.9
{i!z ro ii:
0 UJ ui UJ
-~~.
CJ) (.9 EXTRACTION WELL/SUMP (INSTALLED)
EXTRACTION WELL/SUMP (PLANNED)
INJECTION WELL(INSTALLED)
- § dJ e
INJECTION WELL (PLANNED)
C:
~ :::1 -- GROUNDWATER EXTRACTION PIPING (1) UJ u1~ -- TREATED WATER INJECTION PIPING
~ ~ -
GROUNDWATER EXTRACTION TRENCH
~ ~ -
TREATED WATER INJECTION TRENCH
--- c6
~ cn - - -
- OUTFALL 002 PIPE UJ z ui o:: -
SILT FENCE fii co NOTES
- 1) BMPS WILL ALSO BE INSTALLED AROUND EQUIPMENT AND MATERIAL STAGING AREAS AS REQUIRED.
- 2) BMP LOCATIONS ARE APPROXIMATE AND SHOW AREAS TO BE ADDRESSED.
- 3) BASEMAP: GOOGLE EARTH 2017 0
150 300 SCALE IN FEET FIGURE 5-5 BURIAL AREA #1 INFRASTRUCTURE AND STORMWATER CONTROLS FACILITY DECOMMISSIONI NG PLAN REVISION 2
~ BURNS
~
M5DONNELL.
~
environmental prnperties management. LLC Rev No: 2 Preparer: BELOCKWOOD Date: 2/23/2021 Reviewer: EDULLE Date: 2/23/2021 0 N Coordinate S stem
~ ~
NAO 1983 StatePlane Oklahoma North FIPS 3501 Feet
N 0
N Z:\\Clients\\ENS\\CERT\\_Clientlnfo\\Sites\\Database\\Geospatial\\Maps & Dwgs\\ArcGIS\\BMCD_Files\\Arcdocs\\2020\\2022 - Decommissioning Plan\\Figure 5-6_Maximum Potential Land Disturbance FIGURE 5-6 MAXIMUM POTENTIAL LAND DISTURBANCE FACILITY DECOMMISSIONING PLAN REVISION 2
~ BURNS
~
M£DONNELL_ ~
environmental properties management. LI£ EXTRACTION WELL/SUMP (INSTALLED)
EXTRACTION WELL/SUMP (PROPOSED)
INJECTION WELL (INSTALLED) e INJECTION WELL (PROPOSED)
DIESEL PUMP EXISTING FENCE
--- OG & E EASEMENT (50 FEET)
- - -
- OUTFALL Pl PING TRENCHING ASSOCIATED WITH UTILITY ROUTING GROUNDWATER EXTRACTION TRENCH TREATED WATER INJECTION TRENCH
~
SOILS MIXING r--i 1206 NORTH DRAINAGE REMEDATION L___J AR EA r777Zm GENERAL TREATMENT FACILITY rLLLLLL1 LOCATIONS
,:::J HISTORIC CORRAL D
EXISTING BUILDING AREA OF POTENTIAL LAND DISTURBANCE r--, CERT PROPERTY BOUNDARY-MARCH L--1 2018 NOTES R LABELS R-01 THROUGH R-07 IDENTIFY THE HISTORIC STRUCTURE OR ITEM REFERENCED IN THE CULTURAL RESOURCES SURVEY.
500 1,000 SCALE IN FEET Rev No: O Preparer: BELOCKWOOD Date: 2/23/2021 Reviewer: EDULLE Date: 2/23/2021 Coordinate System NAD 1983 StatePlane Oklahoma North Fl PS 3501 Feet
(_)
~
z
~
~
0
(.)
C)
~
0::
w w
z a z
w
...J
...J w z z 0
0 0
~
~
Cl) z er:
Ill N
0 N..,_ _____
Z:\\Clients\\ENS\\CERT\\_Clientlnfo\\Sites\\Database\\Geospatial\\Maps & Dwgs\\ArcGIS\\BMCD_Files\\Arcdocs\\2020\\2022 - Decommissioning Plan\\Figure 8-1 (a)_Western Area GW Remediation Areas - Phase I FIGURE 8-1 (a)
WESTERN AREA GROUNDWATER REMEDIATION AREAS - PHASE I FACILITY DECOMMISSIONING PLAN REVISION 2
~ BURNS
--MSDONNELL_
LEGEND
~
environmental properties management. LLC MONITOR WELL IN ALLUVIUM
+
MONITOR WELL IN SANDSTONE A MONITOR WELL IN SANDSTONE B MONITOR WELL IN SANDSTONE C
+
MONITOR WELL IN TRANSITION ZONE
+
PROPOSED MONITOR WELL EXTRACTION WELL/SUMP (INSTALLED)
EXTRACTION WELL/SUMP (PLANNED) e INJECTION WELL (PLANNED)
.A.
OUTFALL
-- GROUNDWATER EXTRACTION PIPING
-- TREATED WATER INJECTION PIPING GROUNDWATER EXTRACTION TRENCH TREATED WATER INJECTION TRENCH
-- WESTERN AREA TREATMENT FACILITY EXTRACTION, INJECTION, AND
-- UTILITY CORRIDOR WA DISCHARGE PIPING 100 µg/L URANIUM CONCENTRATION WU-BA3 REMEDIATION AREA WAA U>DCGL REMEDIATION AREA 1206-NORTH REMEDIATION AREA NOTES
- 1) 180 PICOCURIES PER LITER (PCI/L) IN THE WAA U > DCGL, 1206-NORTH, AND BA3 AREAS WAS CALCULATED AT 119 MICROGRAMS PER LITER (UG/L). THE 100 MG/L ISOPLETH IS SHOWN FOR CONSERVATISM.
- 2) BASEMAP: GOOGLE EARTH 2017 400 800 SCALE IN FEET Rev No: o Preparer: BELOCKWOOD Date: 2/24/2021 Reviewer: EDULLE Date: 2/24/2021 Coordinate System NAO 1983 StatePlane Oklahoma North FIPS 3501 Feet
Z:\\Clients\\ENS\\CERT\\_Clientlnfo\\Sites\\Database\\Geospatial\\Maps & Dwgs\\ArcGIS\\BMCD_Files\\Arcdocs\\2020\\2022 - Decommissioning Plan\\Figure 8-1 (b)_Western Area GW Remediation Areas - Phase II FIGURE 8-1 (b)
WESTERN AREA GROUNDWATER REMEDIATION AREAS - PHASE II FACILITY DECOMMISSIONING PLAN REVISION 2
~ BURNS
-M£DONNELL LEGEND
~
environmental properties management. LLC MONITOR WELL IN ALLUVIUM
+
MONITOR WELL IN SANDSTONE A
+
MONITOR WELL IN SANDSTONE B
+
MONITOR WELL IN SANDSTONE C
+
MONITOR WELL IN TRANSITION ZONE
+
PROPOSED MONITOR WELL EXTRACTION WELL/SUMP (INSTALLED)
EXTRACTION WELL/SUMP (PLANNED) e INJECTION WELL(INSTALLED) e INJECTION WELL (PLANNED)
OUTFALL WA DISCHARGE PIPING EXTRACTION, INJECTION, AND UTILITY CORRIDOR
-- GROUNDWATER EXTRACTION PIPING
-- TREATED WATER INJECTION PIPING Y.
GROUNDWATER EXTRACTION TRENCH TREATED WATER INJECTION TRENCH
-- WESTERN AREA TREATMENT Ill WU-BA3 REMEDIATION AREA WM-BLUFF REMEDIATION AREA WM-EAST REMEDIATION AREA WM-WEST REMEDIATION AREA WM U>DCGL REMEDIATION AREA 1206-NORTH REMEDIATION AREA WU-UP2-SSB REMEDIATION AREA WU-PBA REMEDIATION AREA WU-UP1 REMEDIATION AREA WU-UP2-SSA REMEDIATION AREA WU-1348 REMEDIATION AREA NOTES
- 1) INJECTION TRENCHES GWI-UP1-01, GWI-UP1-02 AND A PORTION OF GWI-UP2-01 WERE INSTALLED IN 2017.
- 2) BASEMAP: GOOGLE EARTH 2017 400 800 SCALE IN FEET Rev No: 1 Preparer: BELOCKWOOD Date: 2/23/2021 Reviewer: EDULLE Date: 2/23/2021 Coordinate System NAO 1983 StatePlane Oklahoma North FIPS 3501 Feet
Q) rn
.c
- a.
rn
~
<(
C 0
~
u QJ E Q)
Cl:'.
~
~
cc
,.-l rn
~
CX)
~
Ol
~
C rn 0:::
Ol C
- 1:
0
"' E E
0 u (I) 0 N
N 0
S:!
0 N
0 S:!
u 0
-0 u
~
.J!1 u:
01
(.)
~
cc u5 c3
~
~
Ol
~
0 oil 0..
rn
~~
cij-i~-
~~
9~
~(.)
~~
iii il:
ow cijW QJ z 55a
-z
.Ew
~_J C...J Q) w u~
i:::IO LEGEND MONITOR WELL IN ALLUVIUM MONITOR WELL IN SANDSTONE B
+
MONITOR WELL IN SANDSTONE C
+
MONITOR WELL IN TRANSITION ZONE
+
PROPOSED MONITOR WELL EXTRACTION WELL/SUMP (INSTALLED)
EXTRACTION WELL/SUMP (PLANNED) e INJECTION WELL(INSTALLED) e INJECTION WELL (PLANNED)
-- 201 ug/L URANIUM ISOPLETH GROUNDWATER EXTRACTION PIPING NOTES
- 1) INJECTION TRENCH GWI-BA1-01 AND EXTRACTION TRENCH GETR-BA1-01 WERE INSTALLED IN 2017.
- 2) INJECTION WELL GWI-BA1-01AAND EXTRACTION WELLS GETR-BA1-01AAND GETR-BA1-01B WERE INSTALLED IN 2017.
- 3) ISOPLETHS ARE DRAWN BASED ON "REPRESENTATIVE" URANIUM CONCENTRATIONS, EXPRESSED IN MICROGRAMS PER LITER (UG/L ). WITH A CONSERVATIVELY ESTIMATED VALUE OF 1.3% FOR U -235 ENRICHMENT, THE 201 MG/L ISOPLETH, AS SHOWN, REPRESENTS THE 180 PCI/L (PICOCURIES PER LITER) ISOPLETH.
-- TREATED WATER INJECTION PIPING GROUNDWATER EXTRACTION TRENCH
- 4) BASEMAP: GOOGLE EARTH 2017 ffi ca
~ ! -- BA #1 TREATMENT FACILITY N
TREATED WATER INJECTION TRENCH FIGURE 8-2(a)
BURIAL AREA #1 GROUNDWATER REMEDIATION AREAS - PHASE I FACILITY DECOMMISSIONING PLAN REVISION 2
~ BURNS
'-'.M5DONNELL~
Preparer: BELOCKWOOD
~
environmental properties management, LLC Rev No: O Date: 2/24/2021
~!..
BA1-AREMEDIATIONAREA 0
100 200 $
~ ~..
BA1-B3 REMEDIATION AREA
~~~§iiiiijiiiijijl~~~~~~
Coordinate System
~~L==~B=A~~1-~C~3~R~E:M=E~D~IA~T~l~O~N~A~R~E=A~----------~S~C:A:L~E:.:,:IN.:.,:_F~E~E~T;_ __________
...J~N~A~D~1~98~3~S~t~at~e~P~la~ne;..;.O~kl~ah~o~m~a~N~o~rt-h_F_IP_s __
35_o_1_F_e_et __
Reviewer: EDULLE Date: 2/24/2021 NN
Q)
[fl Cll
.r:.
- a.
[fl Cll Q)
~
C
.Q iii u Q)
E Q) a::
s C)
~
I
~
CX) f!!
- l Cl u:::: c m
a:
Cl C *c 0
iii
[fl
.E E
0 0
Q) 0 N
N 0
S:,!
0 N
0 S:,!
[fl 0
0 "C
0
~
[fl
~
u::::
o' 0
2 CD en
~
~
[fl
~
0 cl)
(J)
Cl.
m.
2U
- z m-i~-
MONITOR WELL IN ALLUVIUM g ~
MONITOR WELL IN SANDSTONE B
~ 8 +
MONITOR WELL IN SANDSTONE C (J)
~ ~
+
MONITOR WELL IN TRANSITION ZONE
~ ffi
+
PROPOSED MONITOR WELL
~ ~
EXTRACTION WELL/SUMP (INSTALLED)
~ ~
8 EXTRACTION WELL/SUMP (PLANNED)
UJ
~ j e
INJECTION WELL(INSTALLED)
~ ~
e INJECTION WELL (PLANNED) f==
1g -- GROUNDWATER EXTRACTION PIPING BA1-A REMEDIATION AREA BA 1-B REMEDIATION AREA 1111 BA1-C REMEDIATION AREA NOTES
- 1) INJECTION TRENCH GWI-BA1-01 AND EXTRACTION TRENCH GETR-BA1-01 WERE INSTALLED IN 2017.
- 2) INJECTION WELL GWI-BA1-01AAND EXTRACTION WELLS GETR-BA1-01AAND GETR-BA1-01B WERE INSTALLED IN 2017.
a:: 0
~ 2 -- TREATED WATER INJECTION PIPING
- 3) BASEMAP: GOOGLE EARTH 2017
-~
N UJZ
- § ~ -
GROUNDWATER EXTRACTION TRENCH FIGURE 8-2(b)
BURIALAREA#1 GROUNDWATER REMEDIATION AREAS - PHASE II FACILITY DECOMMISSIONING PLAN REVISION 2
~ BURNS
"-.M~DONNELL.
Preparer: BELOCKWOOD Reviewer: EDULLE
~
environmental properties management, LLC Rev No: 1 Date: 2/16/2021 Date: 2/16/2021
~ UJ -- BA #1 TREATMENT FACILITY O
100 200 $
C C1J
~..-
TREATED WATER INJECTION TRENCH SCALE IN FEET Coordinates stem ON
~ ~
NAO 1983 StatePlane Oklahoma North FIPS 3501 Feet
GE-WAA-04 (20 GPM) f-GE-WAA-01 (25 GPM) f-GE-WAA-02 (30 GPM) f---
WESTERN AREA INJECTION 8GPM J
GWI-WU-01 (8 GPM) f--
I I
WESTERN AREA rl GETR-WU-02A (8 GPM)
J H GE-WAA-03 (24 GPM)
J TK-101 15,000 GALLON 107 GPM Ci U -158-:&8 ug/L N. 38.15 mg/L F - 2.62 mg/L Tc 0.00 ng/L Cmax U
- 158.68 ug/L N
- 38.15 mg/L F
I TK-102 15,000 GALLON 181 GPM OUTFALL 001 181 GPM I
I TK-105 12,000 GALLON FILTER BA1 URANIUM IX TRAIN 2 100 -125 GPM I
I Z ICLIENTSIENSICERn120832_CERT-DECOM2020\\STUDIESIREMEDIATION\\2021 D-PLAN REV 2\\FIGURES\\NATIVE FILES\\8-3A\\FIGURE 8-3A_WELL FIELD & WATER TREATMENT LINE DIAGRAM.DWG 2/22/2021 7.29 PM ALANSTAETT TK-106 9,000 GALLON BURIAL AREA 1
j GE-BA1-06 (10 GPM) f--------1 GE-BA1-05 (10 GPM)
j GE-BA1-04 (24 GPM) f--------1 GE-BA1-03 (18 GPM) 1---------j GE-BA1-02 (24 GPM)
IGETR-BA1-01B (7 GPM)f---
jGETR-BA1-02A (7 GPM)f---
TK-201 12,000 GALLON 100 GPM Ci U -1018 ug/L Cmax U -1018 ug/L TK-202 12,000 GALLON BURIAL AREA 1 INJECTION 18 GPM I GWI-BA1-01 (10 GPM) J J
GWI-BA1-02 (4 GPM)
J GWI-BA1-03 (4 GPM) 11----~
NOTES:
- 1.
EXTRACTION AND INJECTION FLOW RATES ARE NOMINAL DESIGN RATES FOR EACH COMPONENT EXTRACTION AND INJECTION RATES WILL VARY THROUGHOUT OPERATION.
- 2.
THIS SCHEMATIC IS CONCEPTUAL IN NATURE AND IS NOT INTENDED TO CONVEY ALL PIPING OR PROCESS COMPONENTS THAT WILL BE REQUIRED FOR PROPER SYSTEM DESIGN, CONSTRUCTION, OR OPERATION.
- 3.
THE FLOW RATES PRESENTED ON THIS SCHEMATIC REFLECT INITIAL OPERATING CONDITIONS. FLOW RATES FOR INDIVIDUAL REMEDIATION COMPONENTS WILL VARY OVER THE COURSE OF OPERATIONS.
- 4.
THE COMBINED TREATMENT SYSTEM INFLUENT CONCENTRATIONS PRESENTED ON THIS SCHEMATIC REFLECT INITIAL OPERATING CONDITIONS.
CONCENTRATIONS WILL VARY OVER THE COURSE OF OPERATIONS.
LEGEND:
U-URANIUM N-NITRATE F-FLUORIDE Tc TECHNETIUM-99 GPM - GALLONS PER MINUTE mg/L - MILLIGRAMS PER LITER u~L-M~ROGRAMSPERLITER ng/L - NANOGRAMS PER LITER Ci - INITIAL CONCENTRATION Cmax - MAXIMUM CONCENTRATION IX - ION EXCHANGE FIGURE 8-3(a)
WELL FIELD & WATER TREATMENT LINE DIAGRAM - PHASE I FACILITY DECOMMISSIONING PLAN REVISION 2 Preparer: A. Anstaett Date: 1/05/21 Rev. No. 0 Reviewer: E. Dulle Date: 2/2/21
WESTERN AREA I GE-WAA-05 (10 GPM) f-ri GE-WAA-15 (10 GPM) I
~,
H GE-WAA-14 (10 GPM) I I GE-WAA-04 (20 GPM) f-
-jGETR-WU-02A (8 GPM) rl GE-WAA-13 (12 GPM) I I GE-WAA-01 (25 GPM) f-
-j GE-WAA-03 (24 GPM) rl GE-WAA-12 (13 GPM) I I GE-WAA-02 (30 GPM) f-
-j GE-WAA-06 (13 GPM)
~r
~,
rl GE-WAA-11 (14GPM) I
~
-j GE-WAA-07 (13 GPM) I H GE-WAA-10 (13 GPM) j 1J H GE-WAA-09 (13 GPM) I H GE-WAA-08 (13 GPM) I I GE-WU-01 (5 GPM) f-1J I GETR-WU-01A (4 GPM)f-TK-101 15,000 GALLON 250 GPM I
I URANIUM URANIUM IX TRAIN 1 IX TRAIN 2 100 -125 GPM 100 -125 GPM I
~
I
~
NITRATE TREATMENT SYSTEM 250 GPM TK-102 15,000 GALLON I
OUTFALL 001 WESTERN AREA INJECTION 132 GPM 118 GPM I GWI-WU-01 (8 GPM) J,,
t GWI-UP2-01 (35 GPM)
~,
I GWI-UP1-04 (7 GPM) f--
~..,,
l___j GWI-UP2-02 (5 GPM)
~,
I GWI-UP1-01 (15 GPM) l______j GWI-UP2-03 (5 GPM)
I GWI-UP1-03 (7 GPM) f---
'---j GWI-UP2-04 (21 GPM)
I GWI-UP1-02 (15 GPM)
Z:ICLIENTSIENSICERn12os32_cERT-DECOM2020\\STUDIESIREMEDIATION\\2021 D-PLAN REV 2\\FIGURES\\NATIVE FILES\\8-38\\WELL FIELD & WATER TREATMENT LINE DIAGRAM_REV.8 (04-14-20).DWG 2/22/2021 7:51 PM ALANSTAETT BURIAL AREA 1 GE-BA1-09 (10 GPM)
GE-BA 1-08 (10 GPM)
GE-BA1-07 (0 GPM)
GETR-BA1-01B (7 GPM),1-----1 GETR-BA1-02A (7 GPM)
GETR-BA1-01A (0 GPM)
OUTFALL002 82GPM TK-201 12,000 GALLON 100 GPM URANIUM IX TRAIN 3 70 -100 GPM TK-202 12,000 GALLON GWI-BA1-01 (10 GPM)
GWI-BA1-02 (4 GPM)
GWI-BA1-03 (4 GPM)
GE-BA1-06 (0 GPM)
GE-BA1-05 (0 GPM)
GE-BA1-04 (24 GPM)
GE-BA1-03 (18 GPM)
GE-BA1-02 (24 GPM)
BURIAL AREA 1 INJECTION 18GPM NOTES:
- 1.
EXTRACTION AND INJECTION FLOW RATES ARE NOMINAL DESIGN RATES FOR EACH COMPONENT.
EXTRACTION AND INJECTION RATES WILL VARY THROUGHOUT OPERATION.
- 2.
THIS SCHEMATIC IS CONCEPTUAL IN NATURE AND IS NOT INTENDED TO CONVEY ALL PIPING OR PROCESS COMPONENTS THAT WILL BE REQUIRED FOR PROPER SYSTEM DESIGN, CONSTRUCTION, OR OPERATION.
- 3.
THE FLOW RATES PRESENTED ON THIS SCHEMATIC REFLECT INITIAL OPERATING CONDITIONS. FLOW RATES FOR INDIVIDUAL REMEDIATION COMPONENTS WILL VARY OVER THE COURSE OF OPERATIONS.
- 4.
THE COMBINED TREATMENT SYSTEM INFLUENT CONCENTRATIONS PRESENTED ON THIS SCHEMATIC REFLECT INITIAL OPERA TING CONDITIONS.
CONCENTRATIONS WILL VARY OVER THE COURSE OF OPERATIONS.
- 5.
THIS FIGURE ASSUMES ALL PROPOSED INFRASTRUCTURE AND TREATMENT SYSTEMS ARE INSTALLED UPON COMPLETION OF PHASE I.
LEGEND:
U-URANIUM N - NITRATE F-FLUORIDE Tc TECHNETIUM-99 GPM - GALLONS PER MINUTE mg/L - MILLIGRAMS PER LITER ug/L - MICROGRAMS PER LITER ng/L - NANOGRAMS PER LITER Ci - INITIAL CONCENTRATION Cmax - MAXIMUM CONCENTRATION IX - ION EXCHANGE FIGURE 8-3(b)
WELL FIELD & WATER TREATMENT LINE DIAGRAM Rev. No. 1 FACILITY DECOMMISSIONING PLAN REVISION 2 Preparer: A. Anstaett Date: 1/05/21 Reviewer: E. Dulle Date: 2/2/21
(.) z
>-="
z a:
~
0
(.)
(9 z
0::
w w z (9 z w
....J
....J w z z 0
0 u
~
~
en z 0::
- )
CD N
0 Nominal Pumping Scenario Operating Scenario 1 Operating Scenario 2 N..._.....,.....,;.._..._oiiiiiiiii,,,i~.,,;;,a Z:\\Clients\\ENS\\CERT\\_Clientlnfo\\Sites\\Database\\Geospatial\\Maps & Dwgs\\ArcGIS\\BMCD_Files\\Arcdocs\\2020\\2022 - Decommissioning Plan\\Figure 8-4_BA 1 GW Remed. Forward Particle Tracking - Stag. Zone Analysis,(2020)
FIGURE 8-4 BURIAL AREA #1 PARTICLE TRACKING 2020 STAGNATION ZONE ANALYSIS FACILITY DECOMMISSIONING PLAN REVISION 2
~ BURNS
"-M£DONNELL
~
environmental properties management LLC LEGEND MONITOR WELL IN ALLUVIUM
+
MONITOR WELL IN SANDSTONE C MONITOR WELL IN TRANSITION ZONE EXTRACTION WELL PARTICLE ADDED FOR STAGNATION ZONE ANALYSIS STAGNATION ZONE PARTICLE TRAVEL PATH NOTES
- 1) THE DISTANCE BETWEEN ARROWS REPRESENTS THE DISTANCE THE PARTICLE TRAVELS IN 60 DAYS.
- 2) GPM - GALLONS PER MINUTE.
- 3) BASEMAP: GOOGLE EARTH 2017 0
90 180 SCALE IN FEET Rev No: 2 Preparer: BELOCKWOOD Date: 2/23/2021 Reviewer: EDU LLE Date: 2/23/2021 Coordinate System NAD 1983 StatePlane Oklahoma North FIPS 3501 Feet
(_) z
>-="
z ct
- !?
0
(.)
(9 z
~
LU LU z CJ z LU LU z z 0
0
(.)
- !?
o,5 Cl) z 0::
- )
co N
0 N
Nominal Pumping Scenario Operating Scenario 1 Operating Scenario 2 Z:\\Clients\\ENS\\CERT\\_Clientlnfo\\Sites\\Database\\Geospatial\\Maps & Dwgs\\ArcGIS\\BMCD_Files\\Arcdocs\\2020\\2022 - Decommissioning Plan\\Figure 8-S_WA GW Remed. Forward Particle Tracking - Stag. Zone Analysis (2020)
FIGURE 8-5 WESTERN AREA PARTICLE TRACKING 2020 STAGNATION ZONE ANALYSIS FACILITY DECOMMISSIONING PLAN REVISION 2
~ *BURNS
~
M£DONNELL~ ~
environmental properties management, LLC LEGEND
-+
+
MONITOR WELL IN ALLUVIUM MONITOR WELL IN TRANSITION ZONE PROPOSED MONITOR WELL EXTRACTION WELL PARTICLE ADDED FOR STAGNATION ZONE ANALYSIS STAGNATION ZONE PARTICLE TRAVEL PATH GROUNDWATER EXTRACTION TRENCH NOTES
- 1) THE DISTANCE BETWEEN ARROWS REPRESENTS THE DISTANCE THE PARTICLE TRAVELS IN 60 DAYS.
- 2) GPM - GALLONS PER MINUTE.
- 3) BASEMAP: GOOGLE EARTH 2017 0
125 250 SCALE IN FEET Rev No: 2 Preparer: BELOCKWOOD Date: 2/23/2021 Reviewer: EDULLE Date: 2/23/2021 Coordinate System NAD 1983 StatePlane Oklahoma North Fl PS 3501 Feet
900 800
§ 700
>-0 600 C
~ 500 C
- g 400.
N
- , 300 ro o 200 f-100 0
0.0 30.0 60.0 90.0 Total U-235 Inventory On-Site During the First Year 120.0 150.0 180.0 210.0 240.0 270.0 300.0 330.0 360.0 Operation Time (Days)
-- WA -- BA Total Total U-235 Inventory On-Site During Operation of U Treatment System 900 800 M
';:: 700
.8 600 C
(lJ E 500
- g 400 N
- , 300
~ 200 0
1-100 0
NOTE:
0.0 20.0 40.0 60.0 80.0 Operation Time (Months)
-- WA -- BA Total GRAPHS PREPARED BY VEOLIA NUCLEAR SOLUTIONS - FEDERAL SERVICES Z:\\Clients\\ENS\\CERT\\120832 CERT-DECOM2020\\Studies\\Remediation\\2021 D-Plan Rev 2\\Figures\\Native Files 100.0 Rev. No.2 120.0 140.0 BURNS MCDONNELL Preparer:
Reviewer:
390.0 FIGURE 8-6 PROJECTED RESIN VESSEL LOADING DIAGRAM FACILITY DECOMMISSIONING PLAN REVISION 2 A. Anstaett 2/1/2021 E. Dulle 2/1/2021