Cimarron Environmental Response Trust Facility Decommissioning Plan, Revision 2, Appendix B, SWP3 and General Permit Part 3
ML21076A490
Person / Time
Site: 07000925
Issue date: 02/26/2021
From:
Environmental Properties Management, Enercon Services, Burns & McDonnell Engineering Co, Veolia Nuclear Solutions Federal Services
To:
Office of Nuclear Material Safety and Safeguards, Cimarron Environmental Response Trust, NRC Region 4
Shared Package
ML21076A479 List:
References
Download: ML21076A490 (33)


Text

ADDENDUM G -ANNUAL COMPREHENSIVE SITE COMPLIANCE EVALUATION REPORT DEQForm 606-005B Oct. 18, 2017 0

~

Oklahoma Department of Environmental Quality Annual Comprehensive Site Compliance Evaluation Report (ACSCER) for Stormwater Discharges Associated with Construction Supporting Activity under the OPDES General Permit OKRlO Submission of this ACSCER form is required in ADDENDUM G of this permit for Concrete and Asphalt Plants.

All requested information must be provided on this form. See instructions on Page 5 of this form DEQ Authorization Number: OKRlO _____________ _

Part A: Operator Information and Certification Section I. Operator Information Operator Name:-----------------------------------

Mailing Address: _ _ ______________________ City: ________ _

County: ___________ State: ____ Zip Code: _______ _

Operator's Point of

Contact:

Title:

Phone:

Email:

Section II. Facility Information Facility Name: _______________________ Phone: _ __________ _

Address:----------------------------------------

City: _ _ _______ County: ____________ State: ___ Zip Code: _____ _

Latitude: __________ Longitude: ___________ _

Facility's Point of

Contact:

Title:

Phone: ____ _______

E-mail: ________________ _

Section III. Certification I certify under penalty of law that I have read and understand the requirements for filing this Annual Comprehensive Site Compliance Evaluation Report, which is to be filed by March 1st of each year beginning in 2018.

This report is also to be retained as part of the Stormwater Pollution Prevention Plan (SWP3) for at least three (3) years from the date permit coverage expires or is terminated and will be made available to any State or Federal Inspector visiting this facility. All records of actions taken in accordance with Addendum F of this Permit as part of the SWP3 will be retained for at least three (3) years from the date permit coverage expires or is terminated. I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted. Based upon my inquiry of the person or persons who manage the system, or those persons directly involved in gathering the information, the information submitted is to the best of my knowledge and belief true, accurate, and complete. I am aware there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations.

Print Name:

Title:

Signature: ___ _ ________________

Date: ______ _____ _

Part B:

Annual Comprehensive Site Compliance Evaluation Reporting period:

1.

Number of routine facility inspections you performed during the reporting period:

2.

Dates of the Inspection performed:

3.

Did any of your routine facility inspections find that one or more of your BMPs was not effective in controlling the pollutant source for which it was designed?

D Yes No D All BMPs were effective Were all BMPs you indicated you would be using in your SWP3, including good housekeeping practices, actually being implemented at the time

4.

of the Annual Comprehensive Site Compliance Evaluation?

D Yes No

5.

If you found one or more ineffective BMPs, have they all been replaced with an alternative or modified BMP?

D Yes No D All BMPs were being effective

6.

Were there additional BMPs needed to address any conditions requiring corrective action?

D Yes No

7.

If one or more BMPs were not being implemented, were corrective actions taken after the first inspection to eliminate the problem?

D Yes No All BMPs were being implemented

8.

Was/were the same failure(s) to implement a BMP deficiency(ies) noted in more than one inspection?

Yes No No deficiencies noted in any inspection

9.

Document any deficiencies identified and any corrective actions implemented to remove the original violation below. Use additional sheets if necessary.

Date I

Deficiencies Corrected Date of Correction Yes No Yes No Yes No Yes No

10.

What must you do to correct the deficiencies that remain uncorrected?

11.

Did any conditions require SWP3 review and revision to eliminate design, selection, installation, and/or implementation problem during the past year? If yes, describe the conditions in brief:

0 No D Yes

12.
13.

At any time during the reporting period, did you discover any previously unidentified unauthorized non-stormwater discharges from your facility or previously unidentified pollutants in the existing discharges?

D Yes No Have all unauthorized non-stormwater discharges (including any discovered in previous years) been eliminated or permitted?

D Yes No D Permit applied for D No unauthorized discharges

14.

Have any significant spills or leaks occurred at your facility during the reporting period?

D Yes No If any significant spills or leaks occurred, did they result in either a dry weather discharge or an actual discharge of the

15.

spilled or leaked material commingled with stormwater ( as opposed to the spilled material being washed away by storm water?)

D Yes No If any significant spills or leaks occurred, did they result in more than the minimum amounts of material being discharged in storm water? Base your answer on your knowledge of the material you spilled or that leaked. The

16.

minimum amounts could vary with the nature (toxicity, oxygen demand, pH, etc.) of the spilled or leaked material from amounts left after normal "sweeping" type cleanup to the point at which even trace amounts left after cleanup could cause an environmental problem.

17.
18.
19.

D Yes No D No spills or leaks occurred Have all known spills or leaks been cleaned up or otherwise prevented from contaminating stormwater that would be discharged under the authority of this permit?

D Yes No D No spills or leaks occurred How many times did you visually monitor all of your storm water discharges at all the outfalls during the reporting year?

Would the results of your visual monitoring indicate that there are pollutants in your stormwater discharges that are not adequately controlled by your current BMPs?

D Yes No

20.

If the results of your visual monitoring indicated a potential problem, was it due to one or more of the following?

D New pollutant source (including exposure of previously unexposed material)

D Failure to implement or maintain an existing BMP D Less than expected performance from a BMP D No BMP was selected to deal with that problem D N/A (No problems identified)

21.

If your visual monitoring indicated a potential problem, what have you done to resolve the problem?

D Eliminated exposure or pollutant source D Modified existing BMPs

Added a new BMP Plan to address problem by end of current reporting year Nothing planned NI A (No problems identified)

22.

Did any monitoring results exceed a numeric effluent limitation contained in Parts 3.4.1 and F. 7.B during the past discharge monitoring period?

D Yes No

23. If your answer to the previous question was Yes, list the dates, name of the pollutants and the test results that exceeded numeric effluent limitations. Use additional sheets if necessary.

Date I

Pollutants I

Test Results I

Date I

Pollutants I

Test Results

24.

Were there any incidents of noncompliance in the past year or any noncompliance that is currently ongoing?

D Yes No D Compliant with the Permit

25.

Were there any required revisions to the SWP3 resulting from the inspection and/or monitoring?

D Yes No

26. If your answer to the previous question was Yes, list the dates, reason for revision and brief description of the revision. Use additional sheets if necessary.

Date I

Reason for Revision I

Description of Revision

Instructions for Completing the Annual Comprehensive Site Compliance Evaluation Report (ACSCER)

Form 606-00SB for Stormwater Discharges Associated with Construction supporting Activity for Concrete or Asphalt Batch Plants When to File an ACSCER Form Permittees who are presently covered under OPDES construction general permit OKRI0 for stormwater discharges associated with construction supporting activity for concrete or asphalt batch plants must submit an Annual Comprehensive Site Compliance Evaluation Report (ACSCER) form to DEQ by March 1 of each year beginning in 2018. If your authorization becomes effective less than I month from the end of the yearly monitoring period, your first monitoring period starts with the next annual monitoring period.

Completing the Form To complete this form, type or print in the appropriate areas only.

Permit Information Enter the existing DEQ Authorization assigned to the facility identified in Section I for stormwater discharges from industrial activity.

Part A: Operator Information and Certification Section I. Operator Information Provide the legal name of the person, firm, public organization or any other commercial entity that owns or operates the facility described in this application. The name of the operator may or may not be the same name as the facility. An operator is the legal entity that controls the facility's operation, rather than the plant or site manager. Provide complete mailing address including city, county, state, and ZIP code. Include operator's point of contact name, title, telephone number and a valid email address.

Section II. Facility Information:

Enter the facility's official or legal name and complete physical address including city, county, state, and ZIP code. Include facility's point of contact name, telephone number and email address. Indicate the latitude and longitude of the facility to the nearest 15 seconds..

Include facility's point of contact name, title, telephone number and a valid email address.

Section III. Certification The ACSCER form must be signed by a responsible party - for corporation: by a responsible corporate official, such as: president, vice president, secretary, and treasurer either for a corporation or company; for a partnership or sole proprietorship: by a general partner or the proprietor, respectively. (Note: for limited liability company (LLC):

by one of its owners, called managing members/partners of the company); for a municipality, state, Federal, or other public facility: by either a principal executive or ranking elected official.

Part B: Annual Comprehensive Site Compliance Evaluation Report I.

A summary of your past year's routine facility inspection documentation such as control measures' maintenance, repair and/or replacement, any additional control measures needed to comply with the permits;

2.

The location(s) of discharges of pollutants from the site, evidence of pollutants discharging to receiving waters at all facility outfall(s),

and the condition of and around the outfall(s);

3.

A summary of your past year's corrective action documentation;

4.

A summary of your past year's quarterly visual monitoring documentation;

5.

A summary of your past year's effluent limitation violations if applicable; and

6.

Describe any incidents of noncompliance in the past year or currently ongoing, or if none, provide a statement th!;\\t you are in compliance with the Permit.

Note: Please see Part F.5 ofCGP OKRJ0 for detailed scope of Annual Comprehensive Site Compliance Evaluation Completed ACSCER form must be submitted to DEQ by March I of each year beginning in 2018.

If you need any assistance or have any question, contact the Stormwater Unit of Environmental Complaints and Local Services (ECLS) of DEQ at

( 405) 702-6100 or email to:

ecls-stormwaterpermitting@deq. ok. gov Where to file an ACSCER Form Completed ACSCER form must be submitted to the following address:

Stormwater Unit ofECLS Oklahoma DEQ P.O. Box 1677 Oklahoma City, OK 73101-1677 or fax it to: ( 405)702-6226 or email it to: ecls-stormwaterpermitting@deg.ok.gov Commencing December 21, 2020, NECs must be electronically submitted to DEQ. Instructions on how to access and use the appropriate electronic reporting tool will be made available on DEQ 's website prior to the December 21, 2020 compliance deadline.

ADDENDUM H - BUFFER REQUIRMENTS The purpose of this Addendum is to assist you in complying with the requirements in Parts 3.3. l.B and 3.5.2.A of this permit regarding the establishment of natural buffers or equivalent sediment controls.

H.1 Sites that are required to provide and maintain natural buffers and/or equivalent erosion and sediment controls If the land disturbing activities will occur within the Aquatic Resources of Concern (ARC) which are identified by USFWS and ODWC, a vegetated buffer of at least 100 feet is required between the area disturbed and all perennial or intermittent streams on or adjacent to the construction site, or a vegetated buffer of at least 50 feet is required between the area disturbed and all ephemeral streams. If your disturbing activities will be adjacent to the waters of the State, a vegetated buffer of at least 50 feet is required. Figure H - 1 illustrates when a site would be required to comply with the requirements in Part 3.3. l.D due to their proximity to surface waters. If the surface water is not located within 50 feet of the earth-disturbing activities, Part 3.3.1 does not apply. If you determine that the buffer requirements apply to your site and those buffer requirements cannot be met, you may continue on to Part H. 2 of this Addendum.

Figure H - 1. Example of Earth-Disturbing Activities within 50 feet of surface water.

Area of Earth Disturbance Buffer H.2 Compliance Alternatives to the Buffer Requirements Surface Water The following are 3 compliance alternatives from which permittees can choose, unless you qualify for any of the exceptions in Part H.3 of the Addendum:

1. Provide and maintain a 100-foot or 50-foot undisturbed natural buffer; or
2. Provide and maintain an undisturbed natural buffer that is less than 100-feet or 50-feet and is supplemented by additional erosion and sediment controls that achieve the sediment load reduction equivalent to a 100-foot or 50-foot undisturbed natural buffer; or
3. If infeasible to provide and maintain an undisturbed natural buffer of any size, implement erosion and sediment controls to achieve the sediment load reduction equivalent to a 100-foot or 50-foot undisturbed natural buffer.

The compliance alternative selected must be maintained throughout the duration of permit coverage.

H.3 Exceptions to the Compliance Alternatives The following exceptions apply to the requirement of Parts 3.3.1.B and 3.5.2.A

Construction approved under a CWA Section 404 permit; or Construction of a water-dependent structure or water access areas ( e.g., pier, boat ramp, trail); or If there is no discharge of storm water to waters of the State through the area between the disturbed portions of the site and any waters of the State located within 100-feet or 50-feet of the site; or Where no natural buffer exists due to preexisting development disturbances ( e.g., structures, impervious surfaces) that occurred prior to the initiation of planning for the current development of the.

site.

You must document in your SWP3 if any disturbances related to any of the above exceptions occurs within the buffer area on your site.

H.4 Requirements for Providing and Maintaining Natural Buffers This part of the Addendum applies to you if you choose either Compliance Alternative 1 (100-foot or 50-foot buffer) or Compliance Alternative 2 (a buffer of< 100 feet or< 50 feet supplemented by additional erosion and sediment controls that achieve the equivalent sediment load reduction as the 100-foot or 50-foot buffer).

A. Buffer Width Measurement Where you are retaining a buffer of any size, the buffer should be measured perpendicularly from any of the following points, whichever is further landward from the water:

1. The ordinary high water mark of the water body, defined as the line on the shore established by fluctuations of water and indicated by physical characteristics such as a clear, natural line impressed on the bank, shelving, changes in the character of soil, destruction of terrestrial vegetation, and/or the presence of litter and debris; or
2. The edge of the stream or river bank, bluff, or cliff, whichever is applicable.

Refer to Figure H-2 and Figure H-3. You may find that specifically measuring these points is challenging if the flow path of the surface water changes frequently, thereby causing the measurement line for the buffer to fluctuate continuously along the path of the waterbody. Where this is the case, DEQ suggests that rather than measuring each change or deviation along the water's edge, it may be easier to select regular intervals from which to conduct your measurement. For instance, you may elect to conduct your buffer measurement every 5 to IO feet along the length of the water.

Figure H - 2 Buffer measurements from the ordinary high water mark of the water body, as indicated by a clear natural line impressed on the bank, shelving, changes in the character of the soil, destruction of terrestrial vegetation, and/or the presence of litter/debris.

Ordinary high water...,.

Surface Water Ordinary high water 111arlt

Figure H - 3 Buffer measurements from the edge of the bank, bluff, or cliff, whichever is applicable.

7nk/bluff /dlff Surface Water l

B. Limits to Disturbance within the Buffer You are considered to be in compliance with this requirement to provide and maintain a natural buffer if you retain and protect from construction activities the natural buffer that existed prior to the commencement of construction. If the buffer area contains no vegetation prior to the commencement of construction ( e.g., sand or rocky surface), you are not required to plant vegetation. As noted above, any preexisting structures or impervious surfaces are allowed in the buffer provided you retain and protect from disturbance the vegetation in the buffer outside the preexisting disturbance.

To ensure that the water quality protection benefits of the buffer are retained during construction, you are prohibited from conducting any earth-disturbing activities within the buffer during permit coverage.

C. Discharges to the Buff er You must ensure that all discharges from the area of earth disturbance to the natural buffer are first treated by the site's erosion and sediment controls (for example, you must comply with the Part 3.3.1.C requirement to establish sediment controls along any perimeter areas of the site that will receive pollutant discharges),

and if necessary to prevent erosion caused by stormwater flows within the buffer, you must use velocity dissipation devices.

D. S WP3 Documentation You are required to document in your SWP3 the natural buffer width that is retained. For example, if you are complying with Compliance Alternative 1, you must specify in your SWP3 that you are providing a 100-foot or 50-foot buffer. Or, if you will complying with Compliance Alternative 2, you must document the reduced width of the buffer you will retaining (and you must also describe the erosion and sediment controls you will use to achieve an equivalent sediment reduction, as required in Part H.5 below. Note that you must also show any buffers on your site map in your SWP3. Additionally, if any disturbances related to the exceptions in Part H occur within the buffer area, you must document this in the SWP3.

H.5 Guidance for Providing the Equivalent Sediment Reduction as the 100-foot or SO-foot Buffer If you are selecting Compliance Alternative 2 (provide and maintain a buffer that is less than 100 feet or 50 feet that is supplemented by erosion and sediment controls that achieve the sediment load reduction equivalent to a 100-foot or 50-foot buffer) or Compliance Alternative 3 (implement erosion and sediment controls to achieve the sediment load reduction equivalent to a 100-foot or 50-foot buffer)

A. Determine whether it is Feasible to Provide a Reduced Buffer

DEQ recognizes that there will be a number of situations in which it will be infeasible to provide and maintain a buffer of any width. While some of these situations may exempt you from the buffer requirement entirely (See H.3), if you do not qualify for one of these exemptions, there still may be conditions or circumstances at your site that make it infeasible to provide a natural buffer. For example, there may be sites where a significant portion of the property on which the earth-disturbing activities will occur is located within the buffer area, thereby precluding the retention of natural buffer areas.

Therefore, you should choose Compliance Alternative 2 if it is feasible for you to retain some natural buffer on your site. (Note: For any buffer width retained, you are required to comply with the requirements in Part H.4, above, concerning the retention of vegetation and restricting earth disturbances.) Similarly, if you determine that it is infeasible to provide a natural buffer of any size during construction, you should choose Compliance Alternative 3.

B. Design Controls That Provide Equivalent Sediment Reduction as 100-foot or 50-foot Buffer You must next determine what additional controls must be implemented on your site that alone, or in combination with any retained natural buffer, achieve a reduction in sediment equivalent to that achieved by a 100-foot or 50-foot buffer.

Note that if only a portion of the natural buffer is less than 50 feet, you are only required to implement erosion and sediment controls that achieve the sediment load reduction equivalent to the 50-foot buffer for discharges through that area. You would not be required to provide additional treatment of stormwater discharges that flow through 50 feet or more of natural buffer. See Figure H - 4.

Figure H - 4 Example of how to comply with the requirement to provide the equivalent sediment reduction when only a portion of your earth-disturbances discharge to a buffer of less than 50 feet.

Discharges through this area are required to be treated to provide the equivalent sediment reduction as the SO-foot buffer.

Discharges through this area are not required to be treated to provide the equivalent sediment reduction as the SO-foot buffer since the SO-foot buffer is provided. *-... ~

Area of Earth Disturbance Surface Water Steps to help you meet Compliance Alternative 2 and 3 requirements are provided below:

Step 1 - Estimate the Sediment Reduction from the 100-foot or 50-foot Buffer In order to design controls that match the sediment removal efficiency of a 100-foot or 50- foot buffer, you first need to know what this efficiency is for your site. The sediment removal efficiencies of natural buffers vary according to a number of site-specific factors, including precipitation, soil type, land cover, slope length, width, steepness, and the types of sediment controls used to reduce the

discharge of sediment prior to the buffer. DEQ has simplified this calculation by developing buffer performance tables covering a range of vegetation and soil types for the areas covered by the permit.

See Attachment 1, Tables H - 1 through H - 4.

Note: buffer performance values in Tables H - 1 through H - 4 represent the percent of sediment captured through the use of perimeter controls (e.g., silt fences) and 100-foot or 50-foot buffers at disturbed sites of fixed proportions and slopes. Using Tables H - 1 through H - 4 (see Attachment 1),

you can determine the sediment removal efficiency of a 100-foot or 50-foot buffer for your geographic area by matching the vegetative cover type and the type of soils that predominate at your site. For example, if your site is located in Oklahoma City (see Table H - 1), and your buffer vegetation corresponds most closely with that of fescue grass, and the soil type at your site is best typified as sand, your site's sediment removal efficiency would be 90 percent.

In this step, you should choose the vegetation type in the tables that most closely matches the vegetation that would exist naturally in the buffer area on your site regardless of the condition of the buffer. However, because you are not required to plant any additional vegetation in the buffer area, in determining what controls are necessary to meet this sediment removal equivalency in Step 2 below, you will be able to take credit for this area as a fully vegetated "natural buffer."

Similarly, if a portion of the buffer area adjacent to the surface water is owned by another party and is not under your control, you can treat the area of land not under control as having the equivalent vegetative cover and soil type that predominates on the portion of the property on which your construction activities are occurring. For example, if your earth-disturbances occur within 50 feet of a surface water, but the 10 feet of land immediately adjacent to the surface water is owned by a different party than the land on which your construction activities are taking place and you do not have control over that land, you can treat the 10 foot area adjacent to the stream as having the equivalent soil and vegetation type that predominates in the 40 foot area under your control. You would then make the same assumption in Step 2 for purposes of determining the equivalent sediment removal.

Alternatively, you may do your own calculation of the effectiveness of the 50-foot buffer based upon your site-specific conditions, and may use this number as your sediment removal equivalency standard to meet instead of using Tables H - 1 through H - 4. This calculation must be documented in your SWP3.

Step 2 - Design Controls That Match the Sediment Removal Efficiency of the 100-foot or 50-foot Buffer Once you have determined the estimated sediment removal efficiency of a 100-foot or 50-foot buffer for your site in Step 1, you must next select stormwater controls that will provide an equivalent sediment load reductions.

To make the determination that your controls and/or buffer area achieve an equivalent sediment load reduction as the 100-foot or 50-foot buffer, you may use stormwater controls listed in Tables H-1 through H-4 toselect a single designed control, such as 12" or 6" wattle, roll material, silt fence or straw mulch or gravel bag berm (see Attachment 1), or you will use a model or other type of calculator.

There are a variety of models available that can be used to support your calculation, including USDA's RUSLE-series programs and the WEPP erosion model, SEDCAD, SEDIMOT, or other models.

Alternatively, you may elect to install a combination of stormwater controls and to retain some amount of a buffer. Whichever control(s) you select, you must demonstrate in your SWP3 that the controls will provide at a minimum the same sediment removal capabilities as the 100-foot or 50-foot buffer (Step 1 ). You are allowed to take credit for the removal efficiencies of your required perimeter controls in your calculation of equivalency, because these were included in calculating the buffer removal efficiencies in Tables H - 1 through H - 4. (Note: You are reminded that the controls must be kept in effective operating condition until you have completed final stabilization on the disturbed portions of the site discharging to the surface water.)

If you are retaining a buffer of less than 100 feet or 50 feet, you may take credit for the removal that will occur from the reduced buffer and only need to provide additional controls to make up the difference between the removal efficiency of a 100-foot or 50-foot buffer and the removal efficiency of the narrower buffer. For example, if you are retaining a 30-foot buffer, you can account for the

sediment removal provided by the 30-foot buffer retained, and you will only need to design controls to make up for the additional removal provided by the 20-foot of buffer that is not being provided. To do this, you would plug the width of the buffer that is retained into RUSLE or another model, along with other stormwater controls that will together achieve a sediment reduction equivalent to a natural 50-foot buffer.

As described in Step 1 above, you can take credit for the area you have retained as a "natural buffer" as being fully vegetated, regardless of the condition of the buffer area.

For example, if your earth-disturbances occur within 30 feet of a surface water, but the 10 feet of land immediately adjacent to the surface water is owned by a different party than the land on which your construction activities are taking place and you do not have control over that land, you can treat the 10-foot area adjacent to the stream as having the equivalent soil and vegetation type a natural buffer, regardless of the activities that are taking place in the area. Therefore, you can assume (for purposes of your equivalency calculation) that your site is providing the sediment removal equivalent of a 30-foot buffer, and you will only need to design controls to make up for the additional removal provided by the 20- foot of buffer that is not being provided.

Step 3 - Document How Site-Specific Controls Will Achieve the Sediment Removal Efficiency of the 100-foot or 50-foot Buffer In Steps 1 and 2, you determined both the expected sediment removal efficiency of a 100-foot or 50-foot buffer at your site, and you used this number as a performance standard to design controls to be installed at your site, which alone or in combination with any retained natural buffer, achieves the expected sediment removal efficiency of a 100-foot or 50-foot buffer at your site. The final step is to document in your SWP3 the information you relied on to calculate the equivalent sediment reduction as an undisturbed natural buffer. DEQ will consider your documentation to be sufficient if it generally meets the following:

For Step 1: refer to the Table in Attachment 1 that you used to derive your estimated 100-foot or 50-foot buffer sediment removal efficiency performance. Include information about the buffer vegetation and soil type that predominate at your site, which you used to select the sediment load reduction value in Tables H - 1 through H - 4. Or, if you conducted a site-specific calculation for sediment removal efficiency, provide the specific removal efficiency, and the information you relied on to make your site-specific calculation.

For Step 2: (1) Specify a single designed stormwater control (see Table H H-4) or other stormwater controls that you used to estimate sediment load reductions from your site. Specify a model or other type of calculator that you used to support your calculation if any; and (2) the results of calculations showing how your controls will meet or exceed the sediment removal efficiency from Step 1. If you choose Compliance Alternative 3, you must also include in your SWP3 a description of why it is infeasible for you to provide and maintain an undisturbed natural buffer of any size.

ATTACHMENT 1 Sediment Removal Efficiency Tables: Percent of sediment removal was calculated for a 200-foot runoff area with a 100-foot buffer, and a 100-foot runoff area with a 50-foot buffer. DEQ recognizes that very high removal efficiencies, even where theoretically achievable by a 50-foot or 100-foot buffer, may be very difficult to achieve in practice using alternative controls. Therefore in the tables below, DEQ has limited the removal efficiencies to a maximum of 90%. Efficiencies that were calculated at greater than 90% are shown as 90%, and this is the minimum percent removal that must be achieved by alternative controls.

When more than one alternative BMP must be used to compensate for the loss of the buffer strip, this amount should be calculated using the following formula:

Removal Rate10101 = Removal Rate1 + (1 -

Removal Rate1)(Removal Rate2 )

For example, if we are installing two BMPs that both have a 70% removal rate, the total removal rate 1s:

0.70 + (1 - 0.70)(0.70) = 0.91 = 91 %

Best Management Practices Defined:

Fescue: Buffer strip (100 feet or 50 feet) at the end of the overland flow path ofFescue grass, the area has not been grazed Grama Grass: Buffer strip (100 feet or 50 feet) at the end of the overland flow path of Grama grass, at least the third year after seeding Range Grass: Buffer zone (100 feet or 50 feet) at the end of the overland flow path of a generic low production range grass Weeds: Buffer zone (100 feet or 50 feet) at the end of the overland flow path of at least 5 years of growth of generic weeds started from volunteer germination 12" Wattle: 12 inch straw sock or wattle installed at the base of the runoff area 6" Wattle: 6 inch straw sock or wattle installed at the end of the overland flow path Roll Material: Erosion control blanket placed over the disturbed area Silt Fence: Full retardance fabric silt fence installed at the end of the overland flow path Straw Mulch: Straw mulch applied over the disturbed area, 4000 lbs/acre Gravel Berm: Gravel bag berm installed on a level contour to intercept sheet flows.

Soils Defined:

Cl y (perc 10 20 30 re t) 0 90 rce )

100

Table H-1 Estimated Buffer Performance of Blade Fill in Oklahoma County, Oklahoma*

Best Management Practices**

Fescue (100' Buffer)

Fescue (SO' Buffer)

Grama Grass (100' Buffer)

Grama Grass (SO' Buffer)

Range Grass (100' Buffer)

Range Grass (SO' Buffer)

Weeds (100' Buffer)

Weeds (SO' Buffer) 12" Wattle 6" Wattle Roll Material Silt Fence Straw Mulch Gravel Bag Berm ro u 90 90 80 79 89 88 68 67 71 61 90 61 76 80 ro u

+/-:

vi 90 90 83 79 87 86 67 65 61 52 90 52 75 68 ro u

> E

+/-: ro 0

V)

.....J 90 90 81 82 90 90 70 69 56 48 90 48 77 64

  • Applicable for sites less than nine percent slope
    • Characterization focuses on the under-story vegetation E

ro 0

.....J ro u 90 90 82 80 90 90 71 68 67 59 90 59 73 75 Estimated % Sediment Removal E

ro 0

.....J vi 90 90 81 81 90 90 71 70 45 41 90 41 78 so E

ro 0

.....J 90 90 81 80 90 90 72 71 57 52 90 52 75 62

~E c:

ro ro o V)

.....J 90 90 80 80 90 90 73 71 70 68 90 68 77 74

+/-:

vi 90 90 79 79 90 90 72 70 20 20 90 20 81 27 ro u

~E c:

ro ro o V)

.....J 90 90 82 80 90 90 73 72 76 73 90 73 76 80 Table H-2 Estimated Buffer Performance of Blade Cut in Oklahoma County, Oklahoma

  • Best Management Practices**

Fescue (100' Buffer)

Fescue (SO' Buffer)

Grama Grass (100' Buffer)

Grama Grass (SO' Buffer)

Range Grass (100' Buffer)

Range Grass (SO' Buffer)

Weeds (100' Buffer)

Weeds (50' Buffer) 12" Wattle 6" Wattle Roll Material Silt Fence Straw Mulch Gravel Bag Berm ro u 90 90 60 59 87 85 57 53 63 28 83 28 44 76 ro u

+-'

5i 90 90 58 53 85 84 52 51 53 26 84 26 42 65 90 90 74 67 89 88 62 58 55 45 85 45 45 61

  • Applicable for sites less than nine percent slope E

ro 0

.....J ro u 90 90 69 62 90 89 63 58 65 46 83 46 42 72

    • Characterization focuses on the under-story vegetation Estimated % Sediment Removal E

ro 0

.....J

+-'

~

90 90 78 74 90 90 64 62 46 42 86 42 46 48 E

~ E ro c:

ro

_g

~ _g 90 90 90 90 90 90 77 73 74 30 69 74 90 90 89 90 90 89 64 66 62 64 66 62 62 75 20 58 63 17 85 85 90 58 63 17 44 46 55 62 73 22 ro u

~E c:

ro ro o U"I

.....J 90 90 72 70 89 87 26 58 77 38 85 38 43 77 E -c ro c:

o ro

.....J V) 90 90 85 83 90 98 73 67 82 66 90 66 77 84 E -c ro c:

o ro

.....J U"I 90 90 57 38 86 84 52 46 54 7

86 7

48 82

"'C C:

ro V) 90 90 87 76 89 87 63 53 73 29 90 66 88 86

"'C C:

~

90 90 16 11 86 84 43 39 11 1

86 1

47 82

Table H-3 Estimated Buffer Performance of Blade Fill Tulsa County, Oklahoma

  • Estimated % Sediment Removal E

E ctl ctl ro ctl u

u u E 0

ro 0

E

~E

>- E "O

ctl z-ctl ctl ctl C

rtl C

rtl Best Management Practices**

u vi

= 0 u

vi 0

n::s 0

vi n::s 0

V')

V')

V')

Fescue (100' Buffer) 90 90 90 90 90 90 90 90 90 Fescue (SO' Buffer) 90 90 90 90 90 90 90 90 90 Grama Grass (100' Buffer) 81 82 82 82 81 81 80 79 82 Grama Grass (SO' Buffer) 79 80 82 82 81 81 80 78 80 Range Grass (100' Buffer) 90 87 90 90 90 90 90 89 90 Range Grass (SO' Buffer) 88 86 89 90 90 90 90 90 90 Weeds (100' Buffer) so so 48 51 so so 49 47 51 Weeds (SO' Buffer) 43 48 47 49 48 47 49 45 49 12" Wattle 68 60 53 658 44 57 69 18 73 6" Wattle 57 so 47 58 40 53 66 18 71 Roll Material 90 90 90 90 90 90 90 90 90 Silt Fence 57 so 47 58 40 53 66 18 71 Straw Mulch 72 75 75 73 76 74 74 79 92 Gravel Bag Berm 77 66 60 71 49 62 72 24 77

  • Applicable for sites less than nine percent slope
    • Characterization focuses on the under-story vegetation Table H-4 Estimated Buffer Performance of Blade Cut in Tulsa County, Oklahoma
  • Best Management Practices**

Fescue (100' Buffer)

Fescue (SO' Buffer)

Grama Grass (100' Buffer)

Grama Grass (SO' Buffer)

Range Grass (100' Buffer)

Range Grass (SO' Buffer)

Weeds (100' Buffer)

Weeds (SO' Buffer) 12" Wattle 6" Wattle Roll Material Silt Fence Straw Mulch Gravel Bag Berm ctl u 90 90 60 58 87 85 52 49 62 25 82 40 35 73 ro u

vi 90 89 59 55 85 84 so 45 55 27 83 27 41 63 ro u >- E ro 0

V')

90 90 73 68 89 88 58 45 55 45 84 45 42 58

  • Applicable for sites less than nine percent slope E

ctl 0 _.

ctl u 90 90 68 63 90 89 59 56 63 so 80 so 27 69

  • Characterization focuses on the under-story vegetation Estimated% Sediment Removal E

ctl 0 _.

.:t:

vi 90 90 78 76 90 90 63 59 45 41 86 74 43 47 E

ctl 0 _.

90 90 77 75 90 90 64 61 61 57 90 57 39 61

~E C

ro

+-'

~ _g 5i 90 90 90 90 73 88 70 73 90 87 90 88 66 63 59 56 75 20 63 198 85 90 63 18 40 51 70 20 90 90 72 69 90 87 56 49 77 38 84 38 42 74

>-E -o rtl C

o ro V')

90 90 85 84 90 88 51 44 80 62 90 62 75 82 E -o rtl C

_g ~

90 90 56 39 86 84 42 41 55 6

86 6

43 79 "O

C ctl V')

90 90 87 76 89 86 48 40 71 30 90 30 76 84 90 90 13 11 85 84 40 36 8

1 86 1

44 82

ADDENDUM I - STORMW ATER RUNOFF COEFFICIENTS Typical Runoff Coefficients for 5 to 10 year Frequency Design*

Description of Area Runoff Coefficients Business 1

Downtown areas 0.70-0.95 2

Neighborhood areas 0.50-0.70 Residential 3

Single-family areas 0.30-0.50 4

Multi-units, detached 0.40-0.60 5

Multi-units, attached 0.60-0.75 6

Residential (suburban) 0.25-0.40 7

Apartment dwelling areas 0.50-0.70 Industrial 8

Light areas 0.50-0.80 9

Heavy areas 0.60-0.90 10 Parks, cemeteries 0.10-0.23 11 Playgrounds 0.20-0.35 12 Railroad yard areas 0.20-0.40 13 Un improved areas 0.10-0.30 Streets 14 Asphalt 0.70-0.95 15 Concrete 0.80-0.95 16 Brick 0.70-0.85 17 Drives and walks 0.75-0.85 18 Roofs 0.75-0.95 Lawns, Sandy soil 19 Flat, 2%

0.05-0.10 20 Average, 2-7%

0.10-0.15 21 Steep, 7%

0.15-0.20 Lawns, Heavy soil 22 Flat, 2%

0.13-0.17 23 Average, 2-7%

0.18-0.22 24 Steep, 7%

0.25-0.35

  • Viessman, W., Jr., G. L. Lewis, J. W. Knapp, 1989, Introduction to Hydrology, 3rd ed., Harper and Row, New York.

ADDENDUM J - NOTIFICATIO OF CHANGE OF OWNERSHIP (Project Name and permit authorization number#)

I, _______________, operator of a larger common plan of development or sale, (Name of Permittee) located at _________________ and authorized under DEQ's Construction (Subdivision Name)

General Permit (CGP) OKR 10, have notified the new owner/operator, __________ _

(Name of New Owner/Operator) who can be reached at ________ and __________________ _

(Phone Number)

(Email Address) of an individual lot# ________, Block# _______ of ________ _

(Lot Number)

(Block Number)

(Subdivision Name) of the stormwater permitting requirements for his/her construction site(s).

DEQ CGP OKRI O requires this new owner/operator to submit a NOi and prepare a SWP3 prior to commencement of any construction activity for this lot(s). I understand that with the sale of this lot to the new owner(s)/operator(s); I must notify the new owner(s)/operator(s) of their obligation to obtain their own permit coverage with DEQ prior to commencement of construction activity.

Signature: ___________________

Title:

Print Name:

Date:

APPENDIX B - NOTICE OF INTENT AND AUTHORIZATION

DEQ Form 606-002A Oct 18, 2017 Oldahoma Department of Environmental Quality Notice of Intent (NOi)

OKlAHOMA OUA~TMENf Of ENVl~ONl>.EtllAl OUAlTIY for Stormwater Discharges Associated with Construction Activity under the OPDES Construction General Permit OKRlO Submission of this NOI constitutes notice that the party identified in Section lof this form intends to be authorized by DEQ for stoIDlwater discharges associated with construction activity on land disturbance of equal to or greater than 1 or more acres, or less than 1 acre of total land area that is part of a larger common plan of development or sale in the State of Oklahoma. Becoming a permittee obligates such discharger to comply with the terms and conditions of the OKRl O permit.

To obtain an authorization from DEQ, this form must be complete with all the pertinent information.

All associated fees must be submitted with this NOI..See instructions for com letin the NOl on a es 3 and 4 of this form.

NEW APPLICATION, 0 MODIFICATION or (81 RENEW AL of current permit, enter the authorization number: 0 KR.1 0 2 7 644 Operator Name: _

B_u_r_ns_ &_M_cD_on_n_e_l_l E_n_g_i_n_ee_r_in_g_ C_o_m_p_a_n_y_, _ln_c _ ___

Phone: _

_ (_3_14_)_6_8_2_-_15_6_0 __

Mailing Address: ______

9_4_oo_ w_a_r_d_P_a_r_kw_a_y _______ ___ ___ _

City: ___ K_a_n_s_a_s _C_it_Y ___ State: ___

M_o _ _ _ Zip Code: _

_ 6_4_1_1_4 _ _ _

Operator's Point of Contact : _______

J_o_h_n_H_e_se_m_a_n_n _ _ _____

Title:

___ R_eg_i_o_n_a_l _M_a_n_a_g_e_r _ _ _

jhesemann@burnsmcd.com Site/Project Name: ______ G_ro_u_n_d_w_a_t_e_r_R_e_m_e_d_ia_t_io_n_P_ro_j_e_c_t _ _ ____ Phone: ___________ _

Site/ProjectAddress: _ ___ ________

_ 1_oo_ N_o_rt_h_H_ig_h_w_a_y_7_4 ____ _________ _

City: ___ G_ ut_h_ri_e _ __ County: _ ___ L_o_g_a_n _ _ _ _

State: __

o_K __ Zip Code: ___ 7_3_04_4 __ _

Site/Project's Point of Contact : -

~ ------J_e_ff_L_u_x _ _ _ _____

Title:

____ P_ro_je_c_t_M_ a_n_a_g_e_r __ _

Phone: ___

( 4_0_5_)_6_4_2-_5_1_5_2 __ E-mail: _

_ ___._ilu_x_@_e_n_v_p_m_._co_m ___ _ _

Site/Project's purpose:

Road/Bridge Wind Fann Residential Subdivision D Commercial Building lEIOthers 35°53'00.84"N 97°34'34.03"W Latitude: _ _ _ ____ _ _ _

Longitude: ____ _____ _

Latitude: _ _______ _ _

Longitude: ___ ______ _

at the center of the Site/Project or starting and ending points for Linear Project Estimated construction start date:

0911812017 Estimated construction end date:

12/12/2017 Total area of the construction site: _ ___ 6_65_.o_o ___ (acres)

Estimated area to be disturbed: ___ _ 1_.o_o _ __ (acres)

  • CmTent total impervious area: ___ 6_6_2_.o_o ___ (acres)

Post-construction total impervious area: ___ 6_6_2_-_o_o _ __ (acres)

Post -construction runoff coefficient of the site: _ _ o_.2_2 _ _ Soil and fill material description: sandY clay loam-silty clay loa Is this site part of the common plan of development or sales?

D Yes 181 No Endangered Species Eligibility a.D My site/project is not located within any of the corridors of Federal and State identified Aquatic Resources of Concern (ARC);

b. lEI My site/project is located within a con-idor of Federal and State identified ARC and I agree to implement the control measures specified in Step 2 of Part 10.2 of the OKRl0 permit;
c. D If one of eligibility criteria cannot be met, I may use Addendum H for equivalent sediment controls or contact DEQ at ( 405)702-8100 for further assistance;
d. D I am required to have an Endangered Species Act Section 7 consultation process and
e. D I am relying on another permittee's certification of eligibility and agree to comply with the conditions of that certification.

Does the facility discharge stmmwater into a MS4?

D Yes 181 No, If yes, name of the MS4 Operator: ______ _

Receiving Water Information (note: use additional sheet of paper if necessary)

Name of the Receiving Waterbody Is this waterbody impaired?

Is there a TMDL for that impairment?

If so, what are its im airmen ts?

Yes 181 No Cimarron River (OK62091001001 O_

Yes No Yes No Yes No D Yes No Yes No Yes No Yes No Has the SWP3 been prepared and available on site?

ffi Yes tll No Is the operator registered for constrnction activities with the Secretary of State of Oklahoma?

~ Yes D No Proposed Best Management Practices to control pollution in the stormwater discharges, check all that apply:

D Construction phased D Sediment basin/trap 121 Mulching/seeding/sodding 121 Vegetated buffer D Vehicle/concrete wash-out D Construction entrances IZ1 Spill prevention/cleanup D Construction sequencing IZI Site inspection IZ1 Silt fence IZI Employee training D Riprap D Diversion dikes D Waste management D Compost blanket/geotextiles D Gradient ten-aces D Inlet protection D Stream crossings D Check dams D Silt dikes Other BMPs: ---------------------------------'------

Post-construction Best Management Practices for construction activities, Check all that apply:

D Nan-ow street/turnaround D Wet/dry pond D Protected natural features D Vegetated filter trips D Eliminated curbs & gutters D Wetland D Infiltration basin/trench D Porous pavement D Bio-retention/rain gardens D Riparian D Redevelopment/retrofit D Grassed swales D Low impact development D Gre.en designs D Conservation easements D Retrofit

    • ,\\i~j:*

I certify under penalty of lmv that this document and all attachments were prepared under my direction or supervis;on in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted Based on my inquilJJ of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I h(Jl)e no personal knowledge that the information submitted is other than true, accurate, and complete. I am mvare that there are significant penalties for submittingfalse information_. including the possibility of fine and imprisonment for knowing violations.

Print Name:

John Hesemann

Title:

Regional Manager For DEQ*_µse_ only:.Assigned Authorization-'Number: oKR.10-'-*.. _______ ~--

Instructions for Completing NOi Form 606-002A 0

K l A H O M.A DfrARll,lftH Of EtlYIWW,IHHAt OUA\\ilY for Stormwater Discharges Associated with Construction Activity on Sites of One or more acres under the OPDES Construction General Permit OKRlO Who Must File an NOi Form Under Section 402(p) of the Clean Water Act and regulation at 40 CFR § 122.26, adopted and incorporated by reference in Oklahoma Administrative Code (OAC) 252:606-l-3(b)(3)(L), stormwater discharges associated with construction activities are prohibited to waters of Oklahoma State unless authorized under an Oklahoma Pollutant Discharge Elimination System (OPDES) permit from Oklahoma Department of Environmental Quality (DEQ). Operators of construction sites where one or more acres are disturbed, smaller sites that are pa1i of a larger common plan of development or sale where. there is a cumulative disturbance of at least one acre must obtain coverage under the OPDES Construction General Permit (CGP) OKRl0 by submitting a completed NOI to DEQ. If you have questions regarding permit coverage under the Stormwater Program, you may call the Stonnwater Unit of Environmental Complaints and Local Services (ECLS) of DEQ at ( 405) 702-6100 or email to ecls-stormwaterpermitting@deg.ok.gov.

Completing the NOI Form To complete an NOI form, type or print in all the appropriate places of the form. Check the appropriate box whether you are filing for a new application or modification or renewal of your current permit. Enter your current authorization number, if you are applying for pe1mit modification or renewal.

Section I. Operator Information Provide the legal name, mailing address and telephone number of the company/firm, public organization, or any other entity that either individually or together meets the following two criteria: (1) have operational control over construction plans and specifications, including that the ability to make modifications to those plans and specifications (e.g., in most cases this is the owner of the site); and/or (2) have the day-to-day operational control of those activities at the site necessary to ensure compliance with Stormwater Pollution Prevention Plan (SWP3) and/or other permit conditions (e.g., they are authorized to direct worker at a site to carry out activities required by the permit; in most cases this the general contractor of the project).

Also enter the name, title, phone number, and email address for the operator's point of contact.

Section II. Site/Project Information Provide the site/project's official or legal name, phone number and street address or general location information (e.g., Intersection of State Highways 61 and 34). Also provide the name, title, phone number, and email address for the site/project's point of contact.

Indicate the purpose of the project (i.e., residential subdivision, commercial building, road and/or bridges, wind faim, etc.).

Provide Latitude and Longitude of the construction project or site (at the center of the site). Latitude and Longitude can be obtained online at DEQ and USGS's websites or other mapping tools.

Provide the estimated staiting and ending dates of the construction or site or project. The date must be provided in DD-MM-YYYY where YY is the year, MM is the month and DD is the date.

Provide total area of construction site, and estimated area to be disturbed in acres.

Provide total impervious ai*ea (pre-construction) and total imperious ai*ea construction completed (post-construction) in acres.

Provide post-construction runoff coefficient of the site after the construction addressed in the NOI is completed. Operator may use recommended runoff coefficients in Addendum I of this permit. Average coefficients for composite ai*ea may be calculated on an area weighted basis from C=I:CiAifIAi Where Ci is the coefficient applicable to the ai-ea Ai.

Descript the nature of fill material and existing soil data describing soils (i.e., coai*se-grained soils: gravels, sands, or fine-grained soils: silts and clays, silts and clays, and highly organic soils etc.). Operator may use soil classification chart in of Addendum H to determine the types of the soils on the sites.

Indicate whether this is the site bf the common plan of development or sale.

Complete the section on Endangered Species Eligibility by checking the appropriate box: (a) the site/project is not located within any of the corridors of the Federal or State identified Aquatic Resources of Concern (ARC) and further investigation is not required; or (b) the site/project is located within a corridor of a Federal or State identified ARC. Operator agrees to implement the control measures specified in Step 2 of Pait 10.2 of this permit; or ( c) If one of those eligibility criteria under Part 1.2.2.E.2.b, d, ore cannot be met, operator may use Addendum H Buffer Requirements to evaluate alternatives of buffer requirements and select equivalent sediment controls or contact DEQ for fmiher consultation; or (d) operator's federally approved constructi?n activities are authorized by the appropriate Federal or State agency and that authorization addresses the Endangered Species Act Section 7 consultation for the operator's stormwater discharge or stmmwater-related activities.

Operator selecting option d

must include documentation from US Fish and Wildlife Service (USFWS) or a qualified biologist that demonstrates Section 7 consultation has been completed. The SWP3 must include any conditions resulting from that consultation; or (e) operator's stormwater dischai*ges and stormwater-related activities were already addressed in another operator's certification of eligibility under Pmi l.3.2E.2.d that included the proposed site/project area.

Operator agrees to comply with any conditions attached to that certification.

Section III. Site/Project Discharge Information Indicate whether the site/project dischai*ges stormwater to a Municipal Separate Storm Sewer Syste*m (MS4), if yes; enter the name of the MS4 operator. A MS4 is defined as a conveyance or system of conveyances, including roads with drainage systems, municipal streets, catch basins, curbs, gutters, ditches, man-made channels, or st01m drains that are owned or operated by a state, city, town, borough, parish, district, association, or other public body which is designed or used for collecting or conveying stmmwater.

Identify all the receiving waterbodies from the sites that discharge st01mwater, including names of those waterbodies.

Check appropriate box if the receiving waterbody is listed in DEQ 303(d) impaired waterbodies or drained to the watershed with approved Total Maximum Daily Loads (TMDL) report.

Identified the pollutant(s) for which the waterbody is impaired.

Instructions for Completing NOi Form 606-002A OKLAHOMA Df?AR1MEIIJ Of flNIWNMHHAL OUAllTY for Stormwater Discharges Associated with Construction Activity on Sites of One or more acres under the OPDES Construction General Permit OKRlO Section IV. Stormwater Pollution Prevention Plan (SWP3)

Information All site/projects eligible for coverage under the CGP OKRIO pe1mit must prepare a SWP3 prior to submitting the NOI to DEQ. The SWP3 is intended to document the selection, design, and installation of different control measures to meet the pe1mit's non-numeric technology based effluent limitations, if applicable, numeric effluent limitations, and water quality based effluent limitations contained in Pait 3 of the Permit as well as to document compliance with other permit requirements. The SWP3 must be prepared in accordance with good engineering practices and to indust1y standai*ds.

Check appropriate box whether the SWP3 has been prepai*ed and is available on site.

Check appropriate box if the operator has registered for construction activities with the Secretaiy of State of Oklahoma.

List all the proposed Best Management Practices (BMPs) for construction activities. Operator must describe the proposed measures, including BMPs to control pollutants in stormwater discharges during construction. Specify any BMPs to be used if additional erosion and sediment controls are required by local government or due to specific site conditions.

List all the post-construction proposed Best Management. Practices (B1'1Ps) for construction activities. Operator must describe the proposed measures to be used to control pollutants in stormwater discharges that will occur after construction operations have been complete, including any BMPs to be used if additional erosion and sediment controls are required by local government or due to specific site conditions.

Section V. Certification Federal regulations require all permit applications and rep01t shall be signed as follows:

For a corporation: by a responsible corporate officer, which means: (i) a president, secretary, treasurer, or vice-president of the corporation in charge of a principal business function, or any other person who performs similai* policy or decision making functions for the corporation, or (ii) the manager of one or more manufacturing, production, or operating facilities, provided, the manager is authorized to make management decisions which govern the operation of the regulated facility including having the explicit or implicit duty of making major capital investment recommendations, and initiating and directing other comprehensive measures to assure long term environmental compliance with environmental law and regulations; the manager can ensure that the necessaiy systems ai*e established or actions taken to gather complete and accurate information for permit application requirements; and where authority to sign1 documents had been assigned or. delegated to the manager in accordance with corporate procedures; For a paitnership or sole proprietorship: by a general partner or the proprietors, respectively (Note: for li!nited liability company (LLC) - by one of its owners, called managing members/partners of the company); or For a municipality, state, Federal, or other public facility: by either a principal executive or ranking elected official.

  • Modifying Existing Notice Of Intent (NOI)

After issQance of an authorization, an amended NOI may be submitted by a permittee if circumstances change ( e.g., the area to be disturbed has been changed from 20 acres to 40 acres).

However, the modification of an NOI cannot be used if the area to be disturbed has been changed from 40 acres to 20 acres. The amended NOI shall include the operator's assigned authorization number and request a change.

The original authorization number will be retained. DEQ will provide an acknowledgement by either mail or email that the amended NOI has been received and processed. Perrnittees must update their SWP3 to reflect the modification.

Submitting Your NOi Form Completed NOI form must be submitted to the following address:

Stormwater Unit of ECLS Oklahoma DEQ P.O. Box 1677, Oklahoma City, OK 73101-1677 or fax it to: ( 405)702-6226 or email it to: ecls-st01mwaterpermitting@deq.ok.gov All applicable fees must be submitted with this NOI, including:

Renewal NOI - $100 application fee New NOI - $447.71 ($100 application fee and $347.71 annual permit fee)

Note:

Commencing December 21, 2020, NO! must be electronically submitted to DEQ. Instructions on how to access and use the appropriate electronic reporting tool will be made available on DEQ's website prior to the December 21, 2020 compliance deadline.

Do not submit an SWP3 with the NO! unless the site/project is located (1) within Outstanding Resource Waters (ORFV), or (2) within a Federal and State ARC, or (3) within a Watershed that is subject to an approved T.MDL, and/or watershed plan and/or local compliance plan and such site to be disturbed is about 5 acres or more, or (4) *within a larger site which is disturbing land of 40 or more acres.

OKLAHOMA DEPARTMENT OF ENVIRONMENTAl QUA LITY SCOTT A. THOMPSON Executive Director OKLAHOMA DEPARTMENT OF ENVIRONMENTAL QUALITY March 9, 2017 John R Hesemann Bums & McDonnell Engineering Co., Inc.

9400 Ward Pkwy Kansas City, MO 64114 Re:

Authorization for Stormwater Discharge from Construction or Land Disturbing Activity DEQ Authorization Number: OKR l 027644

Dear Mr. Hesemann:

MARY FALUN Governor The new Notice of Intent for the facility listed below was received on February 97 2017 and processed by the Oklahoma Depai1ment of Environmental Quality (DEQ). Enclosed is an authorization allowing you to discharge stormwater associated with construction or land disturbing activities under the terms and conditions ofiOPDES General Permit OKRIO for stormwater discharges from constmction activities from the following site located in Logan County.

Facility:

Groundwater Remediation Project 100NHwy74 Guthrie, OK 73044 All applicable fees associated with this authorization have been paid. Site that remains active one year from the effective date of the authorization will be invoiced for the next full permit year. Once this project is completed and stabilized, you must submit a Notice of Termination form to DEQ to terminate this authorization. Please note that your authorization will expire on September 12, 2017.

If you have any question regarding this Authorization or the Stormwater Program, please call me at

( 405)702-8193.

Ismat Esrar, P.E.

Municipal Discharge & Stormwater Permitting Water Quality Division 707 NORTH ROBINSON, P.O. BOX 1677, OKLAHOMA CITY, OKLAHOMA 73101-1677 printed on recycled paper with soy ink

Oklahoma Department of Environmental Quality Authorization to Discharge under the OPDES Stormwater Construction General Permit OKR10 AUTHORIZATION NO. OKR1027644 In compliance with the Oklahoma Pollution Discharge Elimination System (OP DES) Act, 27 A O.S. §2-6-201, the Rules of the Department of Environmental Quality (DEQ), and in reliance on the certified statements and representations heretofore made in its application, Burns & (VlcDonnell Engineering Co., Inc.

9400 Ward Pkwy Kansas City, MO 64114 is authorized to discharge stormwater from a construction site located in Logan County at Groundwater Remediation Project 100 N Hwy 74 Guthrie, OK 73044 The receiving body of water is Cimarron River.

This facility discharges into an aquatic resource of concern.

The OPDES permit requires permittee to have a Stormwater Pollution Prevention Plan (SWP3) which includes a description of appropriate sediment control measures. These are applicable to your construction site, which is subject to inspection. Proof of this authorization must be available at the construction site.

The authorization shall become effective March 10, 2017 and will expire at midnight September 12, 2017.

All terms and conditions of the OPDES Stormwater Construction General Permit OKR10, as published on September 13, 2012, shall apply to the recipient of this authorization.

Micheal Jordan, P.E., Engineering Manager Municipal Discharge & Stormwater Permitting Water Quality Division

APPENDIX C - CONSTRUCTION SITE NOTICE

Groundwater Remediation Project CONSTRUCTION SITE NOTICE For Storm Water Discharges Associated with Construction Activity Authorized by the Oklahoma Department of Environmental Quality under the National Pollutant Discharge Elimination System Permittee:

Environmental Properties Management, LLC Project Name:

Groundwater Remediation Project General Permit No.:

OKR1027644 Facility and SWP3 Jeff Lux, Project Manager Contact Name:

( 405) 642-5152 Project

Description:

The Project will construct four injection trenches and one extraction trench in Logan County, Oklahoma (35°53'00.84"N, 97°34'34.03"W) to test the groundwater injection and extraction efficiency as part of final design for a groundwater remediation project. The goal of the groundwater remediation project is to reduce the concentration of contaminates (e.g., uranium, nitrates, and fluorides) in the groundwater to levels that will allow unrestricted release of the site and license termination from foe U.S. Nuclear Regulatory Commission and the Oklahoma DEQ. Major soil-disturbing activities associated with the Project include trenching, excavation, backfilling, and rvehicular traffic.

The Project site is approximately 665 acres, of which an estimated 1 acre will be disturbed. Construction is scheduled to begin on September 18, 201 7, with an estimated completion date of January 15, 2018.

The construction plan is located and available onsite in the site manager's truck.

The Notice of Intent is attached to this document.

APPENDIX D - NOTICE OF TERMINATION

Instructions for Completing NOT Form 606-003 OKlAHO/.IA C!fAll"O,T Qf fl;'MO!i'A!l<TAI Ol*~t*W for Stormwater Discharges Associated with Industrial or Construction Activity Who May File a Notice of Termination Form The Permittee currently covered by the OKR05 (Industrial) or OKRlO (Construction) General Permit for stormwater discharges associated with industrial or construction activity must submit a Notice of Termination (NOT) within 30 days after one or more of the following conditions have been met:

A new owner or operator has taken over responsibility for the facility or site or project, and has submitted an NOi for permit coverage.

Stormwater discharge from industrial activity is being terminated under the OKR05 permit.

All construction activities have completed and met all other requirements under the OKRlO permit, including final stabilization, on all portions of the site. (See Part'3.3.2.B of the OKR10 permit for specific requirement on final stabilization}.

You obtained coverage under an individual or alternative general permit for all discharges.

You must meet all of the termination requirements of the general permit prior to submitting the NOT.

Section I. Permit Information Provide the current OPDES General Permit number assigned to the facility or the site identified in Section II. Indicate your Reason for submitting this NOT by checking the appropriate box.

Section II. Operator Information Provide the legal name of the company, firm, public organization or any other entity that operates the facility or site described in this NOT. Provide the operator's phone number, mailing address, and email address.

Section Ill. Facility Information Provide the legal name of the facility or site or project and complete street address, including city, county, state, and ZIP code of the facility or site. If the facility or site lacks a street address, indicate the general location of the facility (e.g., Intersection of State Highways 74 and 34).

Provide the latitude and longitude at the entrance of the facility or site or the center of the construction project or site. Latitude and Longitude can be obtained online at DEO, USGS, or by using other mapping tools.

You must also include an updated facility map or site map that shows all disturbed areas over the course of your construction/project (i.e.,

aerial images or general site maps with project extents marked, including stabilized areas of concrete or asphalt batch plants, equipment staging yards, stockpile, borrow areas, wash-out area, etc.)

with this form.

Section IV. New Operator Information If applicable, provide the legal name of the company, firm, public organization or any other entity that has assumed ownership for the facility or site described in this NOT.

Provide phone number, complete physical address including city, state, ZIP code, and email address. If there is more than one new operator, use additional sheet(s) to include all the new operators' information.

Permittee is required to prepare and submit a Notification of Change of Ownership (NCO) form for each new owner and submit the NCO form to DEQ (see Part 2.3.3 of OKRlO for change of ownership requirement).

NCO forms may be submitted at the change of ownership or with the NOT.

Section V. Certification The NOT form must be signed as follows:

For a corporation: by a responsible corporate officer. For the purpose of this Section, a responsible corporate officer means: (i) a president, secretary, treasurer, or vice-president of the corporation in charge of a principal business function, or any other person who performs similar policy-or decision-making functions for the corporation, or (ii) the manager of one or more manufacturing, production, or operating facilities, provided, the manager is authorized to make management decisions which govern the operation of the regulated facility including having the explicit or implicit duty of making major capital investment recommendations, and initiating and directing other comprehensive measures to assure long-term environmental compliance with environmental laws and regulations; the manager can ensure that the necessary systems are established or actions taken to gather complete and accurate information for permit application requirements; and where authority to sign documents has been assigned or delegated to the manager in accordance with corporate procedures; For a partnership or sole proprietorship: by a general partner or the proprietor, respectively (Note: for limited liability company (LLC) - by one of its owners, ca/led managing members/partners of the company);

For a municipality, state, Federal, or other public facility: by either a principal executive officer or ranking elected official.

Include the name and title of the person signing the form and the date of signing.

An unsigned or undated NOT form will not be processed for termination of permit coverage.

If you have questions, contact Stormwater Unit of Environmental Complaints and Local Services (ECLS} of DEQ at (405) 702-6100 or email to ecls-sto rmwate rpe rmitting@deg.ok.gov Where to File an NOT form:

Completed NOT must be submitted to the following address:

Stormwater Unit of ECLS Oklahoma DEQ P.O. Box 1677 Oklahoma City, Oklahoma 73101-1677 or fax it to: (405)702-6226 or email it to: ecls-stormwaterpermitting@deg.ok.gov Commencing December 21, 2020, NOT must be electronically submitted to DEQ. Instructions on how to access and use the appropriate electronic reporting tool will be made available on DEQ's website prior to the December 21, 2020 compliance deadline.

DEQForm 606-003 July 5, 2017 OKLAHOMA DEPARTMENT Of ENVIWN11.EIITA! OU.All!Y Oklahoma Department of Environmental Quality Notice of Termination (NOT) for Stormwater Discharges Associated with Industrial Activity or Construction Activity under an OPDES General Permit Submission of this NOT form constitutes notice that the operator identified in Section II of this form no longer intends to be authorized to discharge stormwater associated with industrial or construction activity under an OPDES Stormwater General Permit. Authorization is not terminated until you are notified that all termination requirements have been met and your complete NOT has been processed by DEQ.

All necessary information must be provided on this form. See completing instructions on the back of this form.

I. Permit Information DEQ Authorization Number: OKR ________ _

Reason for Termination (check one only):

Cl A new owner or operator has taken over responsibility for the facility/site/project and has submitted an NOi for permit coverage.

D Stormwater discharge from industrial activity is being terminated under OKR0S permit.

. D All construction activities have been completed and met all other requirements under OKR10 permit including final stabilization on all portion of the site.

Cl You obtained coverage under an individual or alternative general permit for all stormwater discharges.

II. Operator Information Operator Name: ________________________ _ Phone: _________ _

Mailing Address: _______________________ _ City: ________ _

County: _________ State: __ Zip Code: _____ E-mail: ___________ _

Ill. Facility/Site/Project Information Facility or Site Name:------------------ -----*-------------

Address: ____________________________________ _

City: ___________ County: _________ State:~ Zip Code: _____ _

Latitude: ________ Longitude: _________ at the entrance of the facility or center of the site (Note: You must include an updated facility map or site map that shows all the completed activities.)

IV. New Operator Information New Operator Name: ______________________ Phone: __________ _

Address: ______________________________ City: ________ _

County: ________ State:~ Zip Code: _____ E-mail: ____________ _

{Note: Use additional sheets of paper if necessary. Permittee is required to prepare a Notification of Change of Ownership for each new operator)

V. Certification I certify under penalty of law that all stormwater discharges associated with industrial or construction activity from the identified facility that were authorized by a general permit have been eliminated or that I am no longer the operator of the facility or construction site. I understand that by submitting this NOT form and upon receiving the termination letter from DEQ that the all termination requirements have been met and the complete NOT has been processed, I am no longer authorized to discharge stormwater associated with industrial or construction activity under the General Permit OKR0S or OKR10 to waters of the State. It is unlawful under the Clean Water Act and OAC 252:606-1-3(b)(3)(L) where the discharge is not authorized by an OPDES permit. f also understand that the submittal of this NOT form does not release me as operator from liability for any violations of this Permit or the Clean Water Act.

Print Name:

Title:

Signature: ______________________ Date:

APPENDIX E - FIGURES AND RUNOFF COEFFICIENT CALCULATION

co KS MO NM OK AR TX

  • 1: ~-------------------------

C 0

  • s;
J 0

~

~

Q)

C Q)

('.)

f-oc w

(.)

en u 0

Cl u

~

en

~

u::

El ro Cl in c3

~

0 tf Q) 0 a:

C 0

~

i5 Q)

E Q) oc ai 1ii

-0 C

J 0

c'.5 f-oc w

(.)

E 0

(.)

~

=>

en c3 Q)

£

-0 C ro cn-

.9

J

.0

'"E 0 u

a.

ro

~

ai

~

u5 C

Q) a.

0 6

(.)

('.) z ro-ii C >,

E

a.

ro

~

~

C ffi

.c t:.,

  • c en w

rn C

0 :.::

Cl C

0

~

ro C

.c

(.)

c-ro

(.)

oc le z

a, a.-

~

~

c w

Q)

~

~ cj~

g ~(.)

Cl >-~

-~ :i~

~ a. E

~ ~2

~ (.)£ 9 0zcn-

a. _('.)
a. occn
a. UJ:::>

~ ~Q)-

Ol c3 §

§ z..3 0

LJ.Ja,

""...JCl

§...J

~ UJUJ a' ~ffi

.=: QI

+

I..O'v r*,

(fli,34:r.

I :

l.

  • 1 p..

r--

t-:->,

3 I

CJ)

)
  • .,.II,I'-*
  • ~ I z

~ 'a*5i-

~ ~w..,_ _________________._ ______________...,_.,. ______... __..,. ___....., ____________...,.,...,.. ____

l ~~

i z~

a. oc :::J

~ ii5~

~ r---ui

~ ~~ CJ Project Boundary -- Highway

~ @U

~ 1--Q)

NHD Stream l:-**: City Limit 52 ~j' ~

ARC Corridor N g:_~

~M

[~~J County Line 0 1.5 3

Miles BURNS M5DONNELI:

General Vicinity Map Groundwater Remediation Project Cimarron Environmental Response Trust Logan County, Oklahoma

a. ucn.,_ __________________________________ "'!"'li"-!!I---------_.--------------------.--~

Source: ESRI : USGS NHD: OK DEQ: Cimarron Environmental Response Trust: Burns & McDonnell Enqineerinq Companv, Inc.

ssue : 1/23 2017

cl X E ri.

(IJ

i:
  • a en I--

er::

LU u

~

0 Cl

~

<I:

~

i.i:

(IJ Cl en a

~

0 C

0 -~

'a (l)

E (l) er::

ai iii

=

cl C

J 0

~

C

J E rs,..-~-.~

u 3i

i en a (l)

£ cl C

(IJ c'.5 uf I-Cl er::

en LU

J u

-e

~ ~

Ol LU

~

~

~

~-

§ c..i-§_

8 ~~

Cl >-" 8' OJ z (l)

_f; <x:C!J

~ a..L.

~ ~~

~ u,

~ (!Jl11 a:

~LU-a.. er:: (l)

~ ttli en z (l)

Cl (5C!J

.§ z(l)-

o UJ.o

.§ ~~

i: z.!!!,...,~......,_

a' z:gi..,. _____... __ _

-~ ~~- See Section 2.4 in SWP3 narrative for soil types and descriptions

~ :i:u'J1---------------------------------------..

ai j j~ c:J Project Boundary

~ ~en

~ t---2

~ ~]

~ @U (l) I-ai al I>-

S2

(!) l1J N ~~

.i:: it~

iii O (l)

Soil Series 1,000 500 0

Feet 1,000 BURNS M5DONNELI:

Soils Map Groundwater Remediation Project Cimarron Environmental Response Trust Logan County, Oklahoma a.. uen IIJ!S!""o-u-rce-: '!!!'E'!!'S!!!!!'R'!"'I :"!"N!'!!R!"!!C!'!S!!"'!!!'S'!!!!'S'!"!U"!!R""!!G!"!!O!!"':'"'!C!!"!'im-a-rr-on~E-nv"'!'i_ro_n_m_e_n-ta"!"I !!!!!'R_e_sp_o_n_s_e"!!T!""ru_s_t:"'!B!!"'u-r-ns"""'!!"&"!"M"!"c"!!O!""o.,.n-ne"'!l'!"'I E!!"n-q""'in_e_e"'!ri-nq-_ ""!!C!""o_m_p_a_nv-.~ln_c ______________

,.s_su-e""""': ""!'1 "1'!'1'!!!!'9"1'!!2!"!!!0"""17!!!1

C 0 >

0

~

ci.

111

~

m

~

tr UJ u "iii 0

0 u

~

~

u::

111 iii 0

in

~

u QJ a it C

0

~

i:i QJ E

QJ Q:'.

.; 1

§ 0

c'.5 I-Q:'.

UJ

(..)

Detailed Water Resources Map Groundwater Remediation Project Cimarron Environmental Response Trust Logan County, Oklahoma

Total Site Area 665.00 100.0%

Existing (Pre-Construction) a b

C d !

e f

Post-Construction g.

h j

k Pre-and Post-Construction Runoff Coefficient Calculation Groundwater Remediation Project Pre-Construction Post-Construction Pervious lmoervious Pervious lmoervious Units 661.68 3.33

  • -661;68 '

3.33 acres 99.5%

0.5%

99.5%

0.5%

percent 665.00 Area of the Site Pavement 3.33 Impervious Site Area Asphalt and Concrete 0.95 Impervious C Value Brick 661.68_j Pervious Site Area Roofs 0.22 Pervious C Value Lawns, Sandy Soil 0.22 Existing Site Runoff Coeff.

Flat (2 percent)

Average (2 to 7 percent) 3.~

Impervious Site Area Steep (> 7 percent) 0.95 Impervious C Value Lawn, Heavy Soil 661.68 I Pervious Site Area Flat (2 percent) 0.22 Pervious C Value Average (2 to 7 percent) 0.22 Post-Construction Runoff Coeff.

Steep (> 7 percent) 0.95 0.85 0.95 0.1 0.15 0.2 0.17 0.22 0.35