MONTHYEARIR 05000315/20244022024-09-10010 September 2024 Security Baseline Inspection Report 05000315/2024402 and 05000316/2024402, Independent Spent Fuel Storage Installation Security Inspection Report 07200072/2024401 IR 05000315/20243012024-09-0505 September 2024 NRC Initial License Examination Report 05000315/2024301 and 05000316/2024301 IR 05000315/20240112024-08-30030 August 2024 NRC Inspection Report 05000315/2024011 and 05000316/2024011 and Notice of Violation IR 05000315/20240052024-08-21021 August 2024 Updated Inspection Plan for Donald C. Cook Nuclear Plant, Units 1 and 2 (Report 05000315/2024005 and 05000316/2024005) IR 05000315/20240022024-07-24024 July 2024 Integrated Inspection Report 05000315/2024002 and 05000316/2024002 IR 05000315/20244012024-05-14014 May 2024 – Security Baseline Inspection Report 05000315/2024401 and 05000316/2024401 IR 05000315/20240012024-05-14014 May 2024 Integrated Inspection Report 05000315/2024001 and 05000316/2024001 IR 05000315/20230062024-02-28028 February 2024 Annual Assessment Letter for Donald C. Cook Nuclear Plant, Units 1 and 2 (Report 05000315/2023006 and 05000316/2023006) IR 05000315/20230042024-01-31031 January 2024 Integrated Inspection Report 05000315/2023004 and 05000316/2023004 IR 05000315/20234042023-11-0606 November 2023 Cyber Security Inspection Report 05000315/2023404 and 05000316/2023404 IR 05000315/20234032023-09-19019 September 2023 Security Baseline Inspection Report 05000315/2023403 and 05000316/2023403 IR 05000315/20230112023-08-31031 August 2023 Functional Engineering Inspection - Commercial Grade Dedication Report 05000315/2023011 and 05000316/2023011 IR 05000315/20234022023-08-11011 August 2023 Security Baseline Inspection Report 05000315/2023402 and 05000316/2023402 IR 05000315/20230022023-07-24024 July 2023 Integrated Inspection Report 05000315/2023002 and 05000316/2023002 IR 05000315/20230122023-06-22022 June 2023 Biennial Problem Identification and Resolution Inspection Report 05000315/2023012 and 05000316/2023012 IR 05000315/20235012023-06-21021 June 2023 Emergency Preparedness Biennial Exercise Inspection Report 05000315/2023501 and 05000316/2023501 IR 05000315/20230012023-05-0303 May 2023 Integrated Inspection Report 05000315/2023001 and 05000316/2023001 IR 05000315/20234012023-03-16016 March 2023 Security Baseline Inspection Report 05000315/2023401 and 05000316/2023401 IR 05000315/20220062023-03-0101 March 2023 Annual Assessment Letter for Donald C. Cook Nuclear Plant, Units 1 and 2 (Report 05000315/2022006 and 05000316/2022006) IR 05000315/20220042023-02-0101 February 2023 Integrated Inspection Report 05000315/2022004 and 05000316/2022004 and Exercise of Enforcement Discretion IR 05000315/20230102023-01-31031 January 2023 Phase 4 Post-Approval License Renewal Inspection Report 05000315/2023010 and 05000316/2023010 IR 05000315/20220112022-11-0404 November 2022 Design Basis Assurance Inspection (Teams) Inspection Report 05000315/2022011 and 05000316/2022011 IR 05000315/20220032022-10-28028 October 2022 Integrated Inspection Report 05000315/2022003 and 05000316/2022003 IR 05000315/20224202022-10-19019 October 2022 Cover Letter - Donald C. Cook Nuclear Plant Units 1 and 2 - Security Baseline Inspection Report 05000315/2022420 and 05000316/2022420 IR 05000315/20224012022-09-21021 September 2022 Security Baseline Inspection Report 05000315 2022401 05000316 2022401 Independent Spent Fuel Storage Security Inspection Report 07200072 2022401 IR 05000315/20223012022-08-31031 August 2022 NRC Initial License Examination Report 05000315/2022301; 05000316/2022301 IR 05000315/20220052022-08-24024 August 2022 Updated Inspection Plan for Donald C. Cook Nuclear Plant, Units 1 and 2 (Report 05000315/2022005 and 05000316/2022005) IR 05000315/20220022022-08-0808 August 2022 Integrated Inspection Report 05000315/2022002 and 05000316/2022002 IR 05000315/20224022022-07-0505 July 2022 Material Control and Accounting Program Inspection Report 05000315/2022402 and 05000316/2022402 ML22165A2012022-06-14014 June 2022 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000315/2022001 and 05000316/2022001 ML22129A2052022-05-10010 May 2022 Integrated Inspection Report 05000315/2022001 and 05000316/2022001 IR 05000315/20220012022-05-10010 May 2022 Integrated Inspection Report 05000315/2022001 and 05000316/2022001 IR 05000315/20220102022-04-0505 April 2022 Triennial Fire Protection Inspection Report 05000315/2022010 and 05000316/2022010 ML22084A5812022-03-25025 March 2022 Request for Information for an NRC Triennial Baseline Design Bases Assurance Inspection (Team): Inspection Report 05000315/2022011 05000316/2022011 IR 05000315/20210062022-03-0202 March 2022 Annual Assessment Letter for Donald C. Cook Nuclear Plant, Units 1 and 2 (Report 05000315/2021006 and 05000316/2021006) IR 05000315/20210042022-02-0707 February 2022 Integrated Inspection Report 05000315/2021004 and 05000316/2021004 and Exercise of Enforcement Discretion IR 05000315/20210132021-12-0606 December 2021 Inspection Report 05000315/2021013 and 05000316/2021013 IR 05000315/20214032021-11-17017 November 2021 Security Baseline Inspection Report 05000315/2021403 and 05000316/2021403 IR 05000315/20210112021-11-15015 November 2021 Design Basis Assurance Inspection (Programs) Inspection Report 05000315/2021011 and 05000316/2021011 IR 05000315/20210032021-10-26026 October 2021 Integrated Inspection Report 05000315/2021003; 05000316/2021003; and 07200072/2021001 IR 05000315/20214012021-10-21021 October 2021 Cyber Security Inspection Report 05000315/2021401 and 05000316/2021401 IR 05000315/20215012021-10-0606 October 2021 Emergency Preparedness Biennial Exercise Inspection Report 05000315/2021501 and 05000316/2021501 IR 05000315/20210102021-09-0707 September 2021 Biennial Problem Identification and Resolution Inspection Report 05000315/2021010 and 05000316/2021010 IR 05000315/20210052021-09-0101 September 2021 Updated Inspection Plan for Donald C. Cook Nuclear Plant, Units 1 and 2 (Report 05000315/2021005 and 05000316/2021005) IR 05000315/20210122021-08-0202 August 2021 Donald Cook Nuclear Plant - NRC Inspection Report 05000315/2021012 and 05000316/2021012 IR 05000315/20210022021-07-22022 July 2021 Integrated Inspection Report 05000315/2021002 and 05000316/2021002 IR 05000315/20214022021-06-0909 June 2021 Donald D. C. Cook Nuclear Plant - Security Baseline Inspection Report 05000315/2021402 and 05000316/2021402 ML21158A1732021-06-0909 June 2021 Review of the Fall 2017 Steam Generator Tube Inspections Report IR 05000315/20210012021-04-28028 April 2021 Integrated Inspection Report 05000315/2021001 and 05000316/2021001 IR 05000315/20200062021-03-0404 March 2021 Annual Assessment Letter for Donald C. Cook Nuclear Plant, Units 1 and 2 (Report 05000315/2020006 and 05000316/2020006) 2024-09-05
[Table view] Category:Letter
MONTHYEARAEP-NRC-2024-77, U2C28 Steam Generator Tube Inspection Report2024-10-21021 October 2024 U2C28 Steam Generator Tube Inspection Report AEP-NRC-2024-80, Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Cask2024-10-15015 October 2024 Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Cask AEP-NRC-2024-79, Unit 2, Independent Spent Fuel Storage Installation - Registration of Dry Spent Storage Cask2024-09-26026 September 2024 Unit 2, Independent Spent Fuel Storage Installation - Registration of Dry Spent Storage Cask AEP-NRC-2024-78, Reply to a Notice of Violation: EA-24-0472024-09-23023 September 2024 Reply to a Notice of Violation: EA-24-047 05000316/LER-2024-002-01, Manual Reactor Trip Following Rapid Downpower for Steam Leak2024-09-12012 September 2024 Manual Reactor Trip Following Rapid Downpower for Steam Leak IR 05000315/20244022024-09-10010 September 2024 Security Baseline Inspection Report 05000315/2024402 and 05000316/2024402, Independent Spent Fuel Storage Installation Security Inspection Report 07200072/2024401 AEP-NRC-2024-69, Core Operating Limits Report2024-09-0909 September 2024 Core Operating Limits Report IR 05000315/20243012024-09-0505 September 2024 NRC Initial License Examination Report 05000315/2024301 and 05000316/2024301 ML24225A0022024-09-0303 September 2024 Issuance of Amendment Nos. 363 and 344 Revising Technical Specifications Section 3.8.1, AC Sources-Operating, for a One-Time Extension of a Completion Time IR 05000315/20240112024-08-30030 August 2024 NRC Inspection Report 05000315/2024011 and 05000316/2024011 and Notice of Violation AEP-NRC-2024-51, Annual Report of Loss-Of-Coolant Accident Evaluation Model Changes2024-08-28028 August 2024 Annual Report of Loss-Of-Coolant Accident Evaluation Model Changes AEP-NRC-2024-76, Unit 2 - Supplement to License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating2024-08-28028 August 2024 Unit 2 - Supplement to License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating 05000316/LER-2024-003, Plant Shutdown Required by Technical Specifications Due to Reactor Coolant System Identified Leakage2024-08-22022 August 2024 Plant Shutdown Required by Technical Specifications Due to Reactor Coolant System Identified Leakage IR 05000315/20240052024-08-21021 August 2024 Updated Inspection Plan for Donald C. Cook Nuclear Plant, Units 1 and 2 (Report 05000315/2024005 and 05000316/2024005) AEP-NRC-2024-61, Unit 2 - Response to Request for Additional Information for Neutron Flux Instrumentation License Amendment Request2024-08-15015 August 2024 Unit 2 - Response to Request for Additional Information for Neutron Flux Instrumentation License Amendment Request ML24221A2702024-08-0808 August 2024 Unit 2 Independent Spent Fuel Storage Installation - Registration of Dry Spent Fuel Storage Cask AEP-NRC-2024-62, Unit 2, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Cask2024-08-0707 August 2024 Unit 2, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Cask ML24256A1482024-08-0202 August 2024 2024 Post Examination Submittal Letter AEP-NRC-2024-47, Form OAR-1, Owners Activity Report2024-07-30030 July 2024 Form OAR-1, Owners Activity Report ML24183A0162024-07-25025 July 2024 Review of Reactor Vessel Material Surveillance Program Capsule W Technical Report ML24169A2142024-07-25025 July 2024 Issuance of Amendment No. 362 Regarding Change to Technical Specification 3.4.12, Low Temperature Overpressure Protection System IR 05000315/20240022024-07-24024 July 2024 Integrated Inspection Report 05000315/2024002 and 05000316/2024002 05000316/LER-2024-002, Manual Reactor Trip Following Rapid Downpower for Steam Leak2024-07-15015 July 2024 Manual Reactor Trip Following Rapid Downpower for Steam Leak ML24197A1262024-07-15015 July 2024 Unit 2 - Request for Additional Information (RAI) for License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating ML24191A0692024-07-0909 July 2024 Operator Licensing Examination Approval - Donald C. Cook Nuclear Power Plant, July 2024 AEP-NRC-2024-56, Unit 2, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Cask2024-07-0808 July 2024 Unit 2, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Cask AEP-NRC-2024-48, Response to Request for Additional Information (RAI) for License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating2024-07-0202 July 2024 Response to Request for Additional Information (RAI) for License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating ML24176A1012024-06-21021 June 2024 57143-EN 57143 - Paragon Energy Solutions - Update 1 (Final) - 10CFR Part 21 Final Notification: P21-05242024-FN, Rev. 0 AEP-NRC-2024-45, Report Per Technical Specification 5.6.6 for Inoperability of Post Accident Monitoring Neutron Flux Monitoring2024-06-13013 June 2024 Report Per Technical Specification 5.6.6 for Inoperability of Post Accident Monitoring Neutron Flux Monitoring ML24163A0132024-06-12012 June 2024 Request for Information for the NRC Age-Related Degradation Inspection: Inspection Report 05000315/2024012 and 05000316/2024012 ML24159A2522024-05-30030 May 2024 10 CFR 50.71(e) Update and Related Site Change Reports AEP-NRC-2024-23, Core Operating Limits Report2024-05-23023 May 2024 Core Operating Limits Report 05000316/LER-2024-001, Reactor Trip Due to Main Turbine Trip from a High-High Thrust Bearing Position Trip2024-05-20020 May 2024 Reactor Trip Due to Main Turbine Trip from a High-High Thrust Bearing Position Trip ML24141A2162024-05-20020 May 2024 —Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection AEP-NRC-2024-40, Unit 2 - Supplement to License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating2024-05-16016 May 2024 Unit 2 - Supplement to License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating AEP-NRC-2024-41, Annual Radiological Environmental Operating Report2024-05-15015 May 2024 Annual Radiological Environmental Operating Report IR 05000315/20240012024-05-14014 May 2024 Integrated Inspection Report 05000315/2024001 and 05000316/2024001 AEP-NRC-2024-07, Unit 2 - Transmittal of Report of Changes to the Emergency Plan2024-05-14014 May 2024 Unit 2 - Transmittal of Report of Changes to the Emergency Plan AEP-NRC-2024-26, Transmittal of Donald C. Cook Nuclear Plant, Emergency Plan Revision 492024-05-14014 May 2024 Transmittal of Donald C. Cook Nuclear Plant, Emergency Plan Revision 49 IR 05000315/20244012024-05-14014 May 2024 – Security Baseline Inspection Report 05000315/2024401 and 05000316/2024401 AEP-NRC-2024-24, Form OAR-1, Owners Activity Report2024-05-0707 May 2024 Form OAR-1, Owners Activity Report ML24115A2152024-05-0707 May 2024 LTR: CNP Non-Acceptance with Opportunity TS 3-8-1 ML24256A1472024-05-0606 May 2024 DC Cook 2024 NRC Examination Submittal Letter: Submittal ML24116A0002024-05-0202 May 2024 – Regulatory Audit in Support of Review of the Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors AEP-NRC-2024-35, Response to NRC Regulatory Issue Summary 2024-01 Preparation and Scheduling of Operator Licensing Examinations2024-04-30030 April 2024 Response to NRC Regulatory Issue Summary 2024-01 Preparation and Scheduling of Operator Licensing Examinations AEP-NRC-2024-28, 2023 Annual Radioactive Effluent Release Report2024-04-29029 April 2024 2023 Annual Radioactive Effluent Release Report AEP-NRC-2024-31, Annual Report of Individual Monitoring2024-04-24024 April 2024 Annual Report of Individual Monitoring AEP-NRC-2024-02, Unit 2 License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating2024-04-0303 April 2024 Unit 2 License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating AEP-NRC-2024-29, (CNP) Unit 2 - Request for Relief Related to American Society of Mechanical Engineers (ASME) Code Case N-729-6 Supplemental Examination Requirements, ISIR-5-072024-04-0303 April 2024 (CNP) Unit 2 - Request for Relief Related to American Society of Mechanical Engineers (ASME) Code Case N-729-6 Supplemental Examination Requirements, ISIR-5-07 AEP-NRC-2024-19, Annual Report of Property Insurance2024-04-0101 April 2024 Annual Report of Property Insurance 2024-09-09
[Table view] |
Inspection Report - Cook - 2023010 |
---|
|
|
Text
January 31, 2023
SUBJECT:
DONALD C. COOK NUCLEAR PLANT - PHASE 4 POST-APPROVAL LICENSE RENEWAL INSPECTION REPORT 05000315/2023010 AND 05000316/2023010
Dear Q. Shane Lies:
On January 13, 2023, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Donald C. Cook Nuclear Plant. On January 17, 2023, the NRC inspectors discussed the results of this inspection with you and other members of your staff. The results of this inspection are documented in the enclosed report.
No findings or violations of more than minor significance were identified during this inspection.
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely, Signed by Feliz-Adorno, Nestor on 01/31/23 Néstor J. Féliz Adorno, Chief Engineering & Reactor Projects Branch Division of Operating Reactor Safety Docket Nos. 05000315 and 05000316 License Nos. DPR-58 and DPR-74
Enclosure:
As stated
Inspection Report
Docket Numbers: 05000315 and 05000316 License Numbers: DPR-58 and DPR-74 Report Numbers: 05000315/2023010 and 05000316/2023010 Enterprise Identifier: I-2023-010-0021 Licensee: Indiana Michigan Power Company Nuclear Generation Group Facility: Donald C. Cook Nuclear Plant Location: Bridgman, MI Inspection Dates: January 09, 2023 to January 13, 2023 Inspectors: A. Dahbur, Senior Reactor Inspector M. Domke, Reactor Inspector E. Magnuson, Reactor Inspector Approved By: Néstor J. Féliz Adorno, Chief Engineering & Reactor Projects Branch Division of Operating Reactor Safety Enclosure
SUMMARY
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a Phase 4 Post-Approval License Renewal Inspection at Donald C.
Cook Nuclear Plant, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
List of Findings and Violations
No findings or violations of more than minor significance were identified.
Additional Tracking Items
None.
INSPECTION SCOPES
Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.
OTHER ACTIVITIES
- TEMPORARY INSTRUCTIONS, INFREQUENT AND ABNORMAL
===71003 - Post-Approval Site Inspection for License Renewal The NRC conducted this Phase 4 Post -Approval Site Inspection for License Renewal in accordance with the License Renewal Inspection Program (LRIP). Per Inspection Manual Chapter 2516, the LRIP is the process used by NRC staff to verify the adequacy of Aging Management Programs (AMPs), Time Limited Aging Analyses (TLAAs), and other activities associated with an applicants request to renew an operating license of a commercial nuclear power plant beyond the initial licensing period under Title 10 of the Code of Federal Regulations (CFR), Part 54, Requirements for the Renewal of Operating Licenses for Nuclear Power Plants. This inspection evaluated the licensee implementation of aging management activities by reviewing the AMPs listed below.
Post-Approval Site Inspection for License Renewal ===
- (1) 15.1.6, Buried Piping Inspection Program
- (2) 15.1.11, Environmental Qualification of Electric Components Program
- (3) 15.1.14, Fire Water System Program
- (4) 15.1.22, Instrument Air Quality Program
- (5) 15.1.23, Non-EQ Inaccessible Medium-Voltage Cable Program
- (6) 15.1.24, Non-EQ Instrumentation Circuits Test Review Program
- (7) 15.1.42, Wall Thinning Monitoring Program
INSPECTION RESULTS
No findings were identified.
EXIT MEETINGS AND DEBRIEFS
The inspectors verified no proprietary information was retained or documented in this report.
On January 17, 2023, the inspectors presented the Phase 4 Post-Approval License Renewal Inspection results to Q. Shane Lies, Senior VP and Chief Nuclear Officer and other members of the licensee staff.
DOCUMENTS REVIEWED
Inspection Type Designation Description or Title Revision or
Procedure Date
71003 Calculations DIT-B-03569-O1 The Minimum Required Pipe Wall Thickness Value Based on 10/07/2014
Axial Loading for Select Unit-1 NESW Piping Segments
Shown in Table-1
DIT-B-03570-O1 Minimum Required Pipe Wall Thickness Value Based on 01/26/2015
Axial Loading for Select Unit 2 NESW Piping Segments
Shown in Table-1
Corrective Action AR 2011-10619 2-TK-39-DN Dew Point Greater than 34 Degrees F 09/19/2011
Documents AR 2011-8350 2-TK-39-DN Dew Point Not Meeting Acceptance Criteria 07/20/2011
AR 2013-13007 U1 North Control Air Receiver Dewpoint Is High out of Spec 09/04/2013
AR 2013-5789 1-NRI-32 Shorted Outer Shield near Detector Well 04/20/2013
AR 2014-3138 U2 North Dry Air Receiver High Dewpoint 03/05/2014
AR 2015-12751 PHB Tank and Tank Vent Line Coating Damaged/Disbonded 09/30/2015
AR 2015-13346 Degraded Coating on AFW Discharge Piping Detailed 10/14/2015
Description
AR 2015-13632 12-DR-265 Excavation Backfilled with Open Inspection Preds 10/20/2015
AR 2015-5381 2-XRV-11 Not Open to Regenerate Control Air Drying Tower 04/15/2015
AR 2015-8078 U2 North Dry Air Receiver Dew Point High 06/16/2015
AR 2016-1134 Buried Lake Township Water Line Coating/Pipe Degradation 01/28/2016
AR 2016-2730 1-OME-122W, CAD Timer Not Advancing- Dewpoint 41 Deg 03/30/2016
F
AR 2016-2907 Plant Air Quality to Digital Positioners 03/14/2016
AR 2016-8766 Coating Degradation on Buried Transformer Drain Piping 07/29/2016
AR 2017-2160 U2 North Control Air Dewpoint High out-of-Spec 02/22/2017
AR 2017-2511 2-TK-39-DN Dew Point Not Meeting Acceptance Criteria 07/05/2017
AR 2017-6969 High Dew Point on 2-TK-39-DS (CA South Dry Air Receiver) 07/20/2017
AR 2017-9689 Minor Surface Corrosion/Paint Degraded on 8 Condensate 09/29/2017
Pipe
AR 2018-10056 Control Air Dewpoint of 2-TK-39-DN above Acceptance 10/31/2018
Criteria
AR 2018-10698 Unit 2 Control Air Dryer Failure, 2-OME-122W 11/28/2018
AR 2018-11453 3 inch Well Water Break 12/22/2018
Inspection Type Designation Description or Title Revision or
Procedure Date
AR 2018-2296 2-NRI-31 CHAR Test Indicates a Short at The Detector 03/03/2018
AR 2018-8658 High out of Spec. Control Air dewpoint in 2-TK-39-DN 09/05/2018
AR 2019-11684 CD Fuel Oil Storage Tank Recommended Future Repairs 10/21/2019
AR 2020-6941 U2 Manual Reactor Trip and Auto Safety Injection 09/09/2020
AR 2020-8047 Filters Do Not Literally Meet Implied LRA Requirements 10/09/2020
AR 2020-8661 Update The SPV List and FMEA's for Charging & Spray 10/15/2020
Valves
AR 2020-8677 Sample U2 Containment Control Air Quality 10/15/2020
AR 2021-10328 U2 PAC Oil Sample Port Misting Oil 12/21/2021
AR 2021-1470 Water Leak at Access Road Just North of East Sewage Bldg 02/15/2021
AR 2021-1660 Received Ann. 204, Drop 33 CNTMT Control Air Header 02/24/2021
Press Lo
AR 2021-6956 Control Air Dew Point > Acceptance Criteria at 2-TK-39-DN 08/11/2021
AR 2021-8469 Evaluate Degraded Lead Paint Coating on Pipe 10/12/2021
AR 2022-0089 Unit 2 PAC Oil Mist Eliminator Not Working 01/04/2022
AR 2022-1386 U2 PAC Oil Misting Following Compressor Replacement 02/17/2022
AR 2022-3335 Surface Rust on Piping 04/19/2022
GT 2015-1005 Air Operated Valve Program Self Assessment 03/14/2016
GT 2020-10439 NRC Information Notice 2020-04 12/23/2020
Corrective Action AR 2022-9895 Condition Adverse to Regulatory Compliance 12/06/2022
Documents AR 2023-0242 Oxidation on Air Dryer Piping 01/10/2023
Resulting from AR 2023-0243 Gasket Misaligned on 2-SI-14 01/10/2023
Inspection AR 2023-0245 Conduit Contact above Control Air Dryer 01/10/2023
AR 2023-0247 Corrosion on 2-HE-24 Inlet Line 01/10/2023
AR 2023-0273 Correct Documentation and Edison DB for Non-Existent 01/11/2023
Manhole
AR 2023-0299 Incorrect Use of Westinghouse Document to Justify 01/11/2023
Condition
Engineering 57371 Removal of Bellows, Protective Cover, and Weld Build Up for 0
Changes Containment Penetration 1-CPN-26
Engineering 11.68 Closed Head Sprinkler Sampling/Testing/Replacement 06/30/2022
Evaluations Program Plan Basis Document and Proposed Closed Spray
Head Sampling Plan
Inspection Type Designation Description or Title Revision or
Procedure Date
11.72 Fire Water System Piping Internal Inspection Program 4
11.77 D. C. Cook Nuclear Plant (CNP) Replacement Plan for The 1
Unit 1 and Unit 2 Fire Protection Ring Header and MIC
Mitigation Program
COO-96475 Special Test of Selective Leaching Evaluation 06/08/2017
(4 components)
D.C-66895 Selective Leaching Analysis of Underground Fire Protection 06/14/2022
Valve
EQER 2011-005 EQ Evaluation of Class 1E Equipment for License Renewal 12/27/2011
installed at DC Cook Nuclear Plant, Units 1 and 2
Procedures 12-EHP-5022- FAC Inspection and Mitigation Program 21
001-001
2-EHP-5030- Characterization Testing Program 14
CAR-001
2-EHP-5070- Underground Piping and Tank Integrity Program 13
UPTI-001
EHI-5054 Wall Thinning Monitoring Program 2
EHI-5070-UPTI Underground Piping and Tank Integrity Program 15
FPE-5070-FP Fire Protection Aging Management Program 7
IHP-6040-064- Control Air Performance Monitoring 4
001
PMI-2270 Fire Protection Program 43
Work Orders 55433968 Non-EQ Instrumentation Circuits Test 01/20/2014
5551213501 NNPF, Replace I-CPN-26 Assembly Piping 04/28/2022
C10005974001 Inspect Manholes without Special Requirements 06/22/2022
WO-55459734 2016 EDG Carbon and Copper Excavation 09/16/2016
WO-55515707 Tank 47 (AB) Underground Diesel Tank Internal Inspection 12/16/2019
and UTT Examination October 2019
WO-55516301 Tank 47 (CD) Underground Diesel Tank Internal Inspection 12/16/2019
and UTT Examination October 2019
6