Fr Notice of Receipt of 920827 Application for Design Certification from GE for Simplified BWR Std Plant Design
ML20071M294
Person / Time
Site: 05200004
Issue date: 05/27/1993
From: Crutchfield D
Office of Nuclear Reactor Regulation
To:
Shared Package
ML20024G666 List: ... further results
References
NUDOCS 9408040137
Download: ML20071M294 (3)


Text

. . . . _ _ _ _ _ __ _ _ _

h United States Nuclear Reaulatory Comission GE Nuclear Enerav i Receiot of Aeolication for Desian Certification Notice is hereby given that the Nuclear Regulatory Commission (the Commission) has received an application from GE Nuclear Energy (GE) dated August 27, 1992, filed pursuant to Section 103 of the Atomic Energy Act and ,

~

10 CFR Part 32, for design certification of the Simplified Boiling Water Reactor (S'3WR) Standard Plant Design. On February 25 and 28 and May 7, 1993, GE provided additional information in response to the NRC staff's identifica-tion of missing or incomplete information during the staff's acceptance review of the submittal sent August 27, 1993. With the receipt of the additional information, the staff considers that the application sufficiently complete to be accepted formally as a docketed petition for design certification. A notice relating to the rulemaking pursuant to 10 CFR 52.51 for design certifi-cation, including provisions for participation of the public and other parties, will be published in the future. j The SBWR is a 670 MWe boiling water reactor in which passive safety systems are used for the ultimate safety protection of the plant. All of the safety systems are designed to be passive, where natural forces, such as gravity, natural convection, and stored energy (in the form of compressed gas 9408040137 940629 PDR COfftS NRCC CORRESPONDENCE PDR

l or batteries), are used as the motive forces of these systems. The SBWR has a number of unique features that distinguish it from the current generation of light-water reactors and the evolutionary light-water reactors. The SBWR application includes the entire power generation complex, except those elements and features considered to be site specific, and is not a modular design in which major components are shared.

A copy of the application and transmittals of additional information are available for public inspection at the Commission's Public Document Room, the Gelman Building, 2120 L Street, N.W., Washingtori, D.C. Previous correspon-dence on this application is filed under Project Number 681. The docket number established for this application is52-004.

Dated at Rockville, Maryland this 27th day of May 1993.

FOR THE NUCLEAR REGULATORY COMMISSION g 9Mh Dennis M. Crutchfield, As ciate Director for Advanced Reactors and License Renewal Office of Nuclear Reactor Regulation

1 p\N i

{

F h

w"'

l  :

I i

i l

l

u n -) * // g age

. . WW

/ 'o UNITED STATES 4M i g % ,, y',g NUCLEAR REGULATORY COMMISSION gg,

/g W ASI HN GTON. D.C. 20555 '/

a,, 8 h)-

  • sse*

/ June 23, 1993 Ow ~) .

OFFICE OF THE b. II SECRETARY O to te) q

'L b

MEMORANDUM TO: James M. Taylor ~~ ' JJ Executive Dire to for Operations c3'

/ 6:__ -

FROM: q"vSamuel v J. Chi. cretary l

SUBJECT:

SECY-92-287/ 7A - FORM AND CONTENT FOR A  !

DESIGN CERTIFICATION RULE 7 The Commission (with all Commissioners agreeing) has approved-the  ;

e! u f proposals to:

(1) defer a decision on whether or not selected requirements from the first rule certifying a standard design would apply to all subsequent certification

  • rules, and (2) e': tend the use of the 50.59-like change process for Tier 2 information to applicants that reference a certified design.

The Commission (with all Commissioners agreeing) has deferred a decision on an exemption to the Tier 2 change process. The staff should solicit public comments on this issue.

The Commission (with all Commissioners agreeing) has disapproved the staff proposal to use the backfit standard in Section 50.109 (a) ( 3 ) for NRC-imposed changes to Tier 2 information.

Instead, the backfitting standards of 10 CFR 52.63 should be

applied for such changes to Tier 2.

l The staff should seek public comment on the proposed general approach to the form and content for a design certification rule, including the use of public workshops, as needed. After receipt and evaluation of public comments, the staff should revise SECY-92-287 and forward a proposed rule format for Commirgslua SECY NOTE: SECY-92-287 WAS RELEASED TO THE PUBLIC ON AUGUST 25, 1992. SECY-92-287A WAS RELEASED TO THE PUBLIC ON APRIL 20, 1993. THIS SRM AND THE VOTE SHEETS OF ALL COMMISSIONERS WILL BE MADE PUBLICLY AVAILABLE 10 WORKING DAYS FROM THE DATE OF THIS SRM I DNbl0~ ]

l

review and approval prior to issuance of an actual proposed design certification rule for public comments.

(EDO) (SECY Suspense: 6/6/94)

Additionally, the Commission recommended that the staff consider eventually entering and maintaining the Design Control Document and other related documents in a retrievable computer system and provide its thoughts on the benefits of such a system (e.g.,

ready access by the project managers and technical reviewers of a future plant's current licensing basis).

(EDO) (SECY Suspense: 12/30/93) cc: The Chairman Commissioner Rogers Commissioner Curtiss Commissioner Remick Commissioner de Planque OGC OIG Office Directors, Regions, ACRS, ACNW (via E-Mail)

ASLBP (via FAX) i f

i 1

\

1 l N

l f"""%

Wi!

s, er<

.....f March 26, 1993 POLICY ISSUE sECv-92-28vA (Notation Vote)

FOR: The Commissioners i 1

FROM: James M. Taylor Executive Director for Operations

SUBJECT:

FORM AND CONTENT FOR A DESIGN CERTIFICATION RULE Purcose:

To provide the Commission with the staff's response to the staff requirements memorandum (SRM) 920908 and the subject memorandum from Commissioner Curtiss dated September 9, 1992. l Backaround:

On September 8, 1992, the staff briefed the Commission on SECY-92-287, " Form  ;

and Content for a Design Certification Rule, dated August 18, 1992." In response to that briefing, the Commission issued an SRM, on September 30, )

1992. In that SRM, the Commission asked the staff to make recommendations on l

specified issues related to the form and content of a design certification rule under 10 CFR Part 52. In addition, Commissioner Curtiss asked the staff, in a memorandum of September 9,1992, to respond to a list of questions j related to matters that were addressed at the September 8,1992, Commission I briefing. This memorandum responds to both requests.

Discussion:

SRM 920908 directed the staff to recommend a resolution to the apparent inconsistencies between the staff's proposed change process for Tier 2 NOTE: TO BE MADE PUBLICLY AVAILABLE WHEN THE FINAL SRM IS MAL'E CONTACT: AVAILABLE J. N. Wilson, NRR 504-3145

$2/hY- 'O

, u

l l

The Commissioners l l

information in SECY-92-287, and the Commission's SRM on SECY-90-377, " Require- i~

! ments for Design Certification under 10 CFR Part 52," dated February 15, 1991.

The staff discussed in detail its proposed change process for the so-called ,'

two-tier certification rule in Enclosures 5, 6, and 7 of SECY-92-287. The staff proposed a new change process for a rule certifying a standard design in .

i order to accommodate the two-tiered concept that was not envisioned when the '

Commission issued Part 52. In preparing the proposed' change process in SECY-92-287, the staff inadvertently neglected to request Commission '

reconsideration of certain proposals on the Tier 2 change process that l conflicted with Commission guidance in its SRM on SECY-90-377, " Requirements j for Design Certification Under 10 CFR Part 52." The discussion in Enclosure 1 to this memorandum summarizes the evolution of the staff's views regarding the two-tier change process and the bases for its proposals in SECY-92-287. The l

pros and cons of providing a separate appendix to Part 52 for generic require-ments applicable to all design certification applicants is also discussed in Enclosure 1. The staff's responses to the questions from Commissioner Curtiss appear in Enclosure 2 to this memorandum.

After it receives the Commission's final comments or preliminary conclusions on the requested recommendations and responses, the staff will revise SECY-92-287 and publish the proposed certification rule in the Federal l

Reaister for public comment. The staff will use the comments generated by the l

Federal Reaister notice in its preparation of the proposed rule for the first '

standard design that receives a final design approval for certification.

s Recommendation:

i On the basis of the discussions in Enclosures 1 and 2 and the evolution of the >

I development of Tier 2 information, the staff requests that the Commission reconsider its previous guidance on the change process for Tier 2 information.

l The staff recommends that the Commission (1) ADorove the use of the backfit standard in Section 50.109(a)(3) for rulemaking changes to Tier 2 information.

(2) Extend the use of the change process set forth in Section A.15(e) of Enclosure 1 to SECY-92-287 to applicants that reference a certified design.

(3) Defer the decision on whether or not selected requirements from the first rule certifying a standard design would apply to all subsequent certifi-cation rules.

i I

i I

{

i I

l The Commissioners -

i i

(4) Add an' exemption to the Tier 2 change process. If approved, the staff l will develop the Tier 2 exemption process during the public comment period. j Coordination:

The Office of the General Counsel concurs in this paper.

l __

s J mes .T Mor [m '

xecutive irector for Operations

Enclosures:

1. Responses to SRM dated 9/30/92
2. Questions on SECY-92-287 Commissioners' comments or consent should be provided directly to the Office of the Secretary by COB Friday,-April 9, 1993.

Commission Staff Office comments, if any, should be submitted  ;

to the Commissioners NLT Friday, April 2, 1993, with an'infor-mation copy to the Office of the Secretary. If the paper is of such a nature that it requires additional review and comment, the Commissioners and the Secretariat should be apprised of when comments may be expected.

DISTRIBUTION:

Commissioners OGC OCAA OIG OPP EDO ACRS SECY l

t n ,, m _n-- 7 m---e- - - - -v g

RESPONSES TO STAFF REQUIREMENTS MEMORANDUM (SRM)

DATED SEPTEMBER 30, 1992 The following discussion summarizes the background and bases for the staff's proposals in SECY-92-287, " Form and Content for a Design Certification Rule,"

that differed from the Commission's guidance on the standard and timing for Tier 2 changes. It also discusses the pros and cons of providing a separate appendix for generic requirements applicable to all design certification applicants as opposed to incorporating all the requirements for each applicant in a single appendix.

The nuclear industry proposed a two-tiered structure.for design certification rules in a letter from the Nuclear Management and Resources Council (NUMARC),

dated August 31, 1990. This letter was submitted in response to the Commis-sion's request for comments on SECY-90-241, " Level of Detail Required for Design Certification Under Part 52," dated July 11, 1990. NUMARC proposed the two-tiered structure to achieve greater flexibility in a rule certifying a standard design, while retaining the concept that design issues would not be relitigated on a license specific basis. Therefore, with the Commission's approval of a two-tiered structure for a design certification rule in its SRM of February 15, 1991, on SECY-90-377, " Requirements for Design Certification Under 10 CFR Part 52," the staff sought to achieve a two-tiered certification rule that has more flexibility than Part 52 originally provided.

One area where the staff proposed additional flexibility was the standard for generic changes to information in the standard safety analysis report (SSAR) that is approved by the rule (Tier 2 information). In its SRM on SECY-90-377, the Commission stated that "the staff should be held to the l backfitting standards of 10 CFR 52.63 for all matters resolved in the design certification rulemaking (in both Tiers 1 and 2)." (The staff presently views Tier 2 as more detailed descriptions of Tier 1 desiin information, including enveloping analyses to justify a particular acceptance criteria in Tier 1, and

.information that should have an easier change standard than Tier T. While the concept of a Tier 2 is not inconsistent with Part 52, it must be implemented in a manner consistent with it. Tier 2 is not subject to tre change process in 10 CFR 52.63 since it is not a " design certification" within the meaning of Part 52. However, Tier 2 is a rule and it would bc oinding on the Nuclear Regulatory Commission (NRC) staff and Commissicn aosent "special circum-stances" under 10 CFR 2.758 (rule challenge). Since Section 2.758 only applies to adjudicatory proceedings, the effect is that Tier 2 would be binding unless or until it is suspended or amended. This suggests that Tier 2 l

' should not only include a 50.59-like change process for applicants and i licensees but also a backfit standard and an exemption process for the NRC and for licensees when the 50.59-like process cannot be used.

In developing its proposed two-tiered rule in SECY-92-287, the staff also tried to achieve industry's objectives of issue preclusion and conformance with both tiers of the rule, while maintaining the Commission's goal of a more stable and predictable licensing process. This led to a proposed rule that certifies Tier 1 information and approves Tier 2 information, as explained in i SECY-92-287. By referencing both tiers of information in the rule that certi-fies a design, an applicant referencing the certified design would have to conform with both tiers of information subject to the change process and would ENCLOSURE 1

. m __ _ __. . _- _ _ . _ . _ . - _- . . _ . . _ _

I l

I l achieve issue preclusion for every matter covered in either tier, including l

the determination of what information should be placed in each tier. However, approval of Tier 2 information by rule would mean that generic changes to Tier 2 information would require rulemaking .a_rd plant-specific changes to Tier 2 information that did not meet the "50.59-like" standards would also require rulemaking. Since the rulemaking standard for a Tier 1 change is adequate protection, as set forth in Section 52.63(a), the staff chose the  :

backfit standard from Section 50.109 for rulemaking changes to Tier 2 to achieve the additional flexibility. Section 50.109 allows backfitting only  :

when it is determined that there is a substantial increase in the overall protection of the public health and safety or the common defense and security ,

to be derived from the backfit and that the direct and indirect costs of '

implementation are justified in view of the increased protection. Although

(

the backfit standard of Section 50.109 provides more flexibility than the adequate protection standard, it is still a very difficult standard to meet. '

1 The- rationale 4orsthesestcjc,tive: change standard of Section 52.63 for Tier 1, which was to provide-imoremstable,and predictable licensing process and to ' k I

achieve.the benef-itsuokstandardization,. does not apply to Tier 2. The reason ,(

is,.that- there'arectic-Ttandardi2ation constraints on licensee changes to Tier 2 /

under the 50.59s1 % e7 rotess. Axrationale for using Section 52.63 would need { y to be"de'veloped., Also h'e%Yc"kfit*9ule would probably need to be amended to j avoid iriconsistEnhEs- GeEnNR'C 3a'nges before the combined license (COL)

! issuance (52.63'alpli sQndschanges after COL issuance (50.109 applies).

l The staff's proposal in SECY-92-287 for rulemaking changes to Tier 2 is consistent with the proposal in NUMARC's letter of August 31, 1990, and '

NUMARC's revised letter of September 10, 1990. Specifically, NUMARC stated that "NRC backfits involving matters described in the first tier would be  !

governed by the provisions of Section 52.63, whereas Section 50.109 would govern backfitting as respects the second tier." However, in its letter of i October 5, 1992, on SECY-92-287, NUMARC now states that "To achieve the Part 52 goals of standardization and licensing predictability and stability, we urge the NRC staff to adhere to the earlier SRM guidance...." The ACRS recommended, in its letter of October 16, 1992, that "the staff adhere to the Commission guidance in this regard, and apply the ' adequate protection' standard to such changes." The staff believes that rulemaking with the i backfit standard of Section 50.109 provides the appropriate balance between stability and flexibility. Also, as discussed in the response to Question 2 >

of Enclosure 2, Section 52.63 cannot be applied to non-certified information, ,

such as Tier 2. ,

Since the issuance of SECY-92-287, the staff has recognized that an appii-cant or licensee seeking a plant-specific Tier 2 change that did not meet the '

"50.59-like" change standard would have to petition for rulemaking in accor-dance with Section 2.802 and meet the backfit standard of Section 50.109. The staff is concerned about the effects of this additional restriction on the ,

flexibility of Tier 2 information. A solution to this concern would be to add an exemption process, similar to 10 CFR 50.12, to the Tier 2 change process.

The staff recommends that a Tier 2 exemption process be aJded to the proposed rule that is issued for public comment.

s

Another area in which the stiff proposed more flexibility for the Tier 2 change process is in the timing for a plant-specific change. Specifically, the staff proposed in SECY-92-287 that the "50.59-like" change process be applicable to both applicants and licensees that reference a certified design.

In its SRM on SECY-90-377, the Commission stated that it had "no objection to a process similar to 10 CFR 50.59 for making changes to Tier 2 information between COL [ combined license] issuance and authorization for operation, recognizing of course, that such changes open the possibility for challenge in a hearing." The Commission's guidance appears to restrict the use of the "50.59-like" change process to licensees. The staff believes that the identi-fication of the need for changes to Tier 2 information will begin during the preparation of an application for a COL. That is when an applicant will identify the need to change analytical methodologies for design acceptance criteria, editions of codes and standards, etc. If these changes do not meet the standards of Section A.15(e) of Enclosure 1 to SECY-92-287 for a "50.59-like" process, then the staff can review these changes as part of its review of the COL application. If we follow the Commission's guidance, then the changes and review requests will be deferred until-after the COL is issued, thereby degrading the predictability and stability of the COL.

NUMARC stated in its letter of August 31, 1990, and its subsequent revision of September 10, 1990, that "We understand the staff is investigating the potential use of 50.59 for COL applicants. We think this makes functional sense and encourage the staff to pursue this latitude for COL applicants within the confines to Part 52." NUMARC's letter of October 5, 1992, stated that "NUMARC is in general agreement with... extending the availability of the 10 CFR 50.59 process for Tier 2 changes to COL applicants." The ACRS recom-mended in its letter of December 10, 1990, that a process similar to 10 CFR 50.59 for making changes to Tier 2 information be permitted for the period beginning after design certification. The staff believes that extending the use of the "50.59-like" change process to an applicant that references a certified design will provide necessary flexibility at the appropriate time in

- the licensing process and will result in a COL with more predictability and greater stability.

The Commission also asked the staff to review the pros and cons of providing a separate appendix for generic requirements applicable to all design certifi-cation applicants as opposed to incorporating all the requirements for each applicant in a single appendix. In SECY-92-287, the staff proposed that the rule that certified a particular design be an appendix to Part 52, and provided an example certification rule in Enclosure 1 in SECY-92-287. Some requirements in that certification rule may be applicable to multiple standard designs. A possible benefit to grouping these requirements into a separate appendix would be to eliminate the need to restate the same requirements in each certification rule. However, the creation of such an appendix would constitute, for all practical purposes, a revision to Subpart B of Part 52.

The staff believes that it is premature to consider revisions to Part 52 because of the limited experience in implementing Subpart B of Part 52. It is also premature to decide which portions of a certification rule would apply to multiple standard designs.

_4-In preparing the example rule in Enclosure 1 to SECY-92-287, the staff restated some of the regulations from Subpart B to Part 52 for illustrative purposes. In the actual certification rule, the staff proposes to reference these sections of Subpart B rather than restate the requirement. Other parts of the example certification rule that appear to be generic are related to the use of Tier 2 information. The change process for Tier 2 information is still in a developmental stage. When sufficient experience has been obtained in identifying and using Tier 2 information, the staff could propose necessary changes to Subpart B of Part 52 to incorporate the two-tiered concept. The remainder of the rule will be specific to a particular design, such as the list of technical positions that will become " applicable regulations" for that particular design and the list of selected staff positions from the final safety evaluation report that will be treated as "unreviewed safety questions" for purposes of the "50.59-like" change process. Therefore, the staff believes that it would not be appropriate to have a separate appendix for apparent generic requirements. A better approach would be to propose amend-ments to Part 52 after sufficient experience has been gained in implementing it. The staff believes that it is premature to decide which requirements from the proposed certification rule are truly generic.

I i

QUESTIONS ON SECY-92-287 In a memorandum dated September 9, 1992, Commissioner Curtiss asked the staff and the Office of the General Counsel (0GC) to respond to the follow-ing questions related to the September 8, 1992, Commission briefing on SECY-92-2S7, " Form and Coatent for a Design Certification Rule." The answers to the questions are identified with an "A" preceding the question number.

Q1 In Enclosure 1 to SECY-92-287, Section A.9(d) of the proposed design certification rule provides that ...

Q1(a) Please explain in detail the purpose of this provision. Why is this l provision necessary?

A1(a) In the staff requirements memorandum (SRM) pertaining to SECY-91-262,

" Resolution of Selected Technical and Severe Accident Issues for Evolutionary Light Water Reactor Designs," the Commission approved the i staff's recommendation to proceed with design-specific rulemakings through individual design certifications to resolve selected technical and severe-accident issues for the GE ABWR and ABB/CE System 80+

designs. The purpose of Section A.9(d) of the proposed design certifi- J cation rule is to identify th s.aff positions that deviate from or are  ;

not embodied in current regulations, but were approved by the Commis- i sion, such as SECY-90-016, " Evolutionary Light Water Reactor (LWR) 1 Certification Issues and their Re'ationship to Current Regulatory l Requirements." These staff positions will then become " applicable I regulations" via the certification rulemaking that will be added to the list of regulations in Sections 52.48 and 52.54 that were used to approve the design to be certified. Rather than reference these

.staff proposed regulations, as proposed was doneregulations in Enclosure 1 to SECY-92-287, .the Dh now plans to list these in the design certification rule. These proposed regulations would be stated broadly, similar to the general design criteria, and would become part of the Commission's baseline of regulations that were " applicable and in effect at the time the certificati'on was issued."
Without this baseline of applicable regulations, the staff could not perform reviews

,/inaccordancewithSections52.59and52.63.

i l

The reference to Section 52.48 is also necessary for two other reasons.

l First, it serves as a basis for obtaining public comment on the pro-posed adoption of the staff positions as " applicable requirements."

Second, it provides confirmation that the staff positions are being adopted by the Commission as " applicable requirements" under Sec-tion 52.54 for the design certification being approved. Absent a provision such as Section A.9, a design certification applica-t could argue that the Commission cannot lawfully condition approval of the design certification on compliance with the staff positions used during the review. This is because the staff positions, without further Commission action, are not " applicable standards and requirements of the... Commission's regulations" under Sections 52.48 and 52.54.

After further consideration of Section A.9, OGC recognized that it should be modified to also reference Section 52.59, to make it clear ENCLOSURE 2 1

I that for the purposes of renewal of a design certification under Section 52.59, the staff positions are part of the applicable regula-

}ionsineffectatthetimethatthedesigncertificationwasfirst

) i s sued .'i l The reference to Section 52.63 is necessary to make it clear that the Commission has a right under Sections 53.63(a)(1) and (3) to require a

! modification to Tier 1 of the design certification or issue a plant-specific order, respectively, to ensure that the design certification or plant complies with the staff's positions that the Commission adopted as binding requirements in Section A.9 of the design certifica-tion rule. Otherwise, the Commission could not, without re-reviewing the merits of each position, require a change to Tier 1 of the design certification, nor could it issue a plant-specific order requiring a l

change to Tier 1 merely because the modification was necessary for l compliance with a matter involving these staff positions.

Q1(b) Does this provision mean that the staff's technical positions at the referenced FSER pages wo ald be given the force and effect of regula-tions?

Al(b) ' yes', but the technical positions that are deemed " applicable regula-tions" in Section A.9 of the certification rule would have the force O and effect of regulations prtly for those applications or licenses that reference that certified desigrf. In addition, the staff's technical positions would be considered " applicable regulations" for purposes of the design certification rule in which they are included, and for applying the backfitting requirements of 52.63. However, the staff positions would not be

  • regulations" in the sense of " generally appli-cable" requirements that all design certification applicants must F comply with, ea ., Section 50.48. Each design certification for which the- Commission wishes to make the staff positions applicable must specify the staff positions as " applicable regulations."

Q1(c) Would a COL applicant have to get an exemption or file a petition for rulemaking in order to deviate from the staff technical position at the referenced FSER pages? If so, shouldn't the referenced FSER pages be part of Tier 1 of the design certification rule?

A1(c) ' Yes. An applicant or licensee would have to request an exemption or petition for rulemaking in order to deviate from a staff position that was deemed an " applicable regulation" in the certification rule.

No. The " applicable regulations" should not be in Tier 1 of the design certification rule. The staff does not consider the technical posi-tions themselves to be either " Tier 1" or " Tier 2," since from a legal standpoint they are requirements that a design must meet, rather than the actual design information. The staff will incorporate into Tier 1 the key features of the design resulting from these regulations. A deviation from a staff technical position (applicable regulation) could affect Tier 1 or Tier 2 information; and any changes to Tier 1 or W

J Tier 2 must involve either exemption, rulemaking, or a determination

' under the "50.59-like" process. Therefore, an exemption or a rule-making amendment may be required in order to deviate from the staff technical position. As stated earlier, the staff has decided to list these "applicabla regulations" in the rule that certifies the design ,

l rather than reference the FSER pages.

Q2 In the SRM on SECY-90-377, " Requirements for Design Certification Under 10 CFR Part 52," the Commission indicated that it ...

Q2(a)

How would the change process in Section A.15 be modified in order to conform it to the Commission's direction in the SRM on SECY-90-377?

A2(a) Sections 52.63(a) and (b)(1) apply only to certified information (Tier 1). However, one possibility would be to revise Sections A.15(d) and (e) to read as follows:

A.15(d)(1) The Commission may not modify, rescind, or impose new requirements on Tier 2 information, whether on its own motion, or in response to a petition from any person, unless the Commission deter-mines in a rulemaking that a modification is necessary either to bring the Tier 2 informatiqn or the referencing plants into compliance with i the Commission's regulations applicable and in effect at the time this certification was issued, or to ensure adequate protection of the public health and safety or the common defense and security. The rulemaking procedures must provioe for notice and comment and an opportunity for the party which applied for this certification to request an informal hearing which uses the procedures described in Section 52.51.

(2) Any modification the NRC imposes under paragraph (d)(1) of this section will be applied to all plants referencing this certified design, except those to which the modification has been rendered technically irrelevant by action taken under paragraphs (d)(3) or (e) of this section.

(3) Unless (i) a modification is necessary to secure compliance with the Commission's regulations applicable and in effect at the time the certification was issued, or to ensure adequate protection of the public health and safety or the common defense and security, and (ii) special circumstances as defined in 10 CFR 50.12(a) are present,

$o j on thetheCommission may Tier 2 information of anot impose specific plant new requirements referencing this design by plant-s gf certification. In addition to the factors listed in Section 50.12(a),

the Commission shall consider whether the special circumstances which 4 Section 50.12(a)(2) requires to be present outweigh any decrease in v safety that may result from the reduction in standardization caused by

(,0 the plant-specific order.

fN e(e)

[ licensee that references this standard design certification may make changes to the Tier 2 information, without prior NRC approval,

l l ,

1 1 l

( '

I unless the change involves a change to the certified standard design  ;

l (Tier 1), the technical specifications, or an "unreviewed safety j i

question" as defined in 10 CFR 50.59 or soecified in the FSER. The '

Tier 2 changes will no longer be considered " matters resolved in connection with the issuance or renewal of a design certification" within the meaning of 10 CFR 52.63 (a)(4). J j

The above modification to the change process in Section A.15 would conform with the intent of the Commission's direction in the SRM on '

SECY-90-377, but it would restrict the flexibility of the Tier 2 {)U information that the staff believes is necessary, as described in /

Enclosure 1 to. this memorandum. The staff's proposal was intended to provide the necessary balance between flexibility and stability. i Q2(b)

Should the "50.59-type" change process for Tier 2 also apply for COL l

apolicants af ter the filing of the COL application but before issuance of the COL (as proposed by the staff in Section A.15(e))?

! A2(b) Yes. The staff did not investigate whether a COL applicant should

! be allowed to make "50.59-like" changes in advance of COL issuance l in SECY-90-377. Therefore, the staff raised that policy issue in SECY-92-287 but neglected to request that the Commission reconsider its apparent guidance in the SRM for SECY-90-377. There does not appear to be any reason to preveti the use of the "50.59-like" change process during both the preparation snd review of a COL application. Rather, l

)

l the staff recommends that the Commission extend the use of the "50.59-l like" change process to an applicant that references a certified design as explained in SECY-92-287. This would facilitate the preparation and review of a COL application and would result in a more robust combined license.

Q2(c) How can the Commission legally limit staff, design certification l' holder, or public-requested Tier 2 changes to changes made pursuant to the processes in 10 CFR 52.63 (or 10 CFR 2.758)? Must these limita-tions be imposed by provisions in the design certification rule itself or by modifications to Part 52, or can they be made legally binding by a simple Commission declaration? i A2(c) The Commission's direction in the SRM on SECY-90-377 goes beyond Part 52, in that Section 52.63(a) only applies to certified design information (Tier 1). In both SECY-90-377 and SECY-92-287, the staff proposed that Tier 2 information not be certified. The Commission could impose such restrictions on individual design certifications by including provisions in the rule itself (see A2(a) above). However, j such a constraint on staff initiated changes to Tier 2 would not be a part of the body of general principles of Part 52, but specific to each design certification and subject to comment and hearing in each certif-ication rulemaking hearing. It would seem that in proposing any change to Tier 2, a change could be proposed to the change standard as well.

Thus, it is not clear that a Section 52.63 constraint on staff initiat-ed changes would be fully effective. While the same would be true with

regard to applying the backfit rule to NRC initiated changes to Tier 2 before COL issuance, this limited use of backfit rule concept would seem to have more permanence because it has a logical effect of harmo-nizing constraints on staff initiated changes before and after COL issuance. As noted before, a rationale would need to be developed to apply Section 52.63 to Tier 2.

Q3 10 CFR 52.97(b) provides that ...

Q3(a) Apart from ITAAC, to what extent will the certified design be incorpo-rated into the COL? Will Tier 2 of the certified design be " identified in the license?"

A3(a) All of the Tier 1 information, including ITAAC, will be incorporated into the COL. The Tier 2 information and the remainder of the COL application will not be incorporated into the COL, but it will be identified. This is similar to the Part 50 licensing process, where the construction permit or operating license does not actually incorpo-rate the PSAR or FSAR, respectively.

Q3(b) If Tier 2 of the certified design is incorporated in the COL:

Q3(b)(1)

Will licensee-initiated changes to Tier 2 require license amend-ments that must be processed in accordance with Section 52.97(b)?

A3(b)(i) If Tier 2 information is " incorporated" (not simply " identified")

into the COL, so that it becomes part of the COL, as technical specifications are incorporated into an operating license, then licensee-initiated changes woult' require license amendments under Section 52.97.

Q3(b)(ii) How would the proposed "50.59-type" process be used to change Tier 2 aspects of the design that are contained in the COL? Would the licensee be able to use the proposed "50.59-type" process to modify Tier 2 without prior NRC approval or the amendments required by Section 52.97(b)?

A3(b)(ii) Yes. A licensee would be able to make changes to Tier 2 informa-tion without prior NRC approval or COL amendments otherwise re-quired by Section 52.97(b) if all of the prerequisites of Sec-The tion A.15(e) of Enclosure I to SECY-92-287 are satisfied.

staff plans to add selected technical positions from the FSER to Section A.15(e) to be treated as additional "unreviewed safety questions," as described in Enclosure 6 to SECY-92-287.

l

~

,e " % ,

c s

2

\, ...../

March 26, 1993 POLICY ISSUE secv-92-282A (Notation Vote)

FOR: The Commissioners FROM: James M. Taylor Executive Director for Operations

SUBJECT:

FORM AND CONTENT FOR A DESIGN CERTIFICATION RULE

Purpose:

To provide the Commission with the staff's response to the staff requirements memorandum (SRM) 920908 and the subject memorandum from Commissioner Curtiss dated September 9, 1992.

Backaround:

On September 8, 1992, the staff briefed the Commission on SECY-92-287, " Form and Content for a Design Certification Rule, dated August 18, 1992." In response to that briefing, the Commission issued an SRM, on September 30, 1992. In that SRM, the Commission asked the staff to make recommendations on specified issues related to the form and content of a design certification rule under 10 CFR Part 52. In addition, Commissioner Curtiss asked the staff, in a memorandum of September 9, 1992, to respond to a list of questions related to matters that were addressed at the September 8, 1992, Commission  !

briefing. This memorandum responds to both requests. l Discussion:

SRM 920908 directed the staff to recommend a resolution to the apparent l inconsistencies between the staff's proposed change process for Tier 2 NOTE: TO PE MADE PUBLICLY AVAILABLE WHEN THE FINAL SRM IS MADE CONTACT: AVAILABLE Sb431 I

f&Bpd, OR

The Commissioners information in SECY-92-287, and the Commission's SRM on SECY-90-377, " Require-ments for Design Certification under 10 CFR Part 52," dated February 15, 1991.

The staff discussed in detail its proposed change process for the so-called two-tier certification rule in Enclosures 5, 6, and 7 of SECY-92-287. The staff proposed a new change process for a rule certifying a standard design in order to accommodate the two-tiered concept that was not envisioned when the Commission issued Part 52. In preparing the proposed change process in SECY-92-287, the staff inadvertently neglected to request Commission reconsideration of certain proposals on the Tier 2 change process that conflicted with Commission guidance in its SRM on SECY-90-377, " Requirements for Design Certification Under 10 CFR Part 52." The discussion in Enclosure 1 to this memorandum summarizes the evolution of the staff's views regarding the two-tier change process and the bases for its proposals in SECY-92-287. The pros and cons of providing a separate appendix to Part 52 for generic require-l ments applicable to all design certification applicants is also discussed in l Enclosure 1. The staff's responses to the questions from Commissioner Curtiss appear in Enclosure 2 to this memorandum.

After it receives the Commission's final comments or preliminary conclusions on the requested recommendations and responses, the staff will revise SECY-92-287 and publish the proposed certification rule in the Lederal Reaister for public comment. The staff will use the comments generated by the Federal Reaister notice in its preparation of the proposed rule for the first standard design that receives a final design approval for certification.

Recommendation:

On the basis of the discussions in Enclosures 1 and 2 and the evolution of the development of Tier 2 information, the staff requests that the Commission reconsider its previous guidance on the change process for Tier 2 information.

The staff recommends that the Commission (1) Approve the use of the backfit standard in Section 50.109(a)(3) for /

rulemaking changes to Tier 2 information.

(2) Extend the use of the change process set forth in Section A.15(e) of Enclosure 1 to SECY-92-287 to applicants that reference a certified l

design.

1 (3) Defer the decision on whether or not selected requirements from the first rule certifying a standard design would apply to all subsequent certifi-cation rules.

l l

I I

i l

l The Commissioners (4) Add an exemption to the Tier 2 change process. If approved, the staff will develop the Tier 2 exemption process during the public comment period. j Coordination:

The Office of the General Counsel concurs in this paper.

1

---, /

66 or J mes M. T l

i xecutive irector i l

for Operations l

Enclosures:

1. Responses to SRM l dated 9/30/92
2. Questions on SECY-92-287 1

Commissioners' comments or consent should be provided directly j to the Office of the Secretary by COB Friday, April 9, 1993.

Commission Staff Office comments, if any, should be submitted to the Commissioners NLT Friday, April 2, 1993, with an infor-  !

I mation copy to the Office of the Secretary. If the paper is of such a nature that it requires additional review and comment, the Commissioners and the Secretariat should be apprised of when comments may be expected. .

(

DISTRIBUTION:

Commissioners OGC OCAA OIG OPP EDO ACRS SECY i

t l

l

RESPONSES TO STAFF REQUIREMENTS MEMORANDUM (SRM)

DATED SEPTEMBER 30, 1992 The following discussion summarizes the background and bases for the staff's ,

proposals in SECY-92-287, " Form and Content for a Design Certification Rule,"

that differed from the Commis:, ion's guidance on the standard and timing for Tier 2 changes. It also discusses the pros and cons of providing a separate appendix for generic requirements applicable to all design certification applicants as opposed to incorporating all the requirements for each applicant l

in a single appendix.

~

The nuclear industry proposed a two-tiered structure for design certification rules in a letter from the Nuclear Management and Resources Council (NUMARC),

dated August 31, 1990. This letter was submitted in response to the Commis-

! sion's request for comments on SECY-90-241, " Level of Detail Required for Design Certification Under Part 52," dated July 11, 1990. NUMARC proposed the two-tiered structure to achieve greater flexibility in a rule certifying a l

standard design, while retaining the concept that design issues would not be l relitigated on a license specific basis. Therefore, with the Commission's approval of a two-tiered structure for a design certification rule in its SRM of February 15, 1991, on SECY-90-377, " Requirements for Design Certification Under 10 CFR Part 52," the staff sought to achieve a two-tiered certification rule that has more flexibility than Part 52 originally provided.

One area where the staff proposed additional flexibility was the standard l for generic changes to information in the standard safety analysis report (SSAR) that is approved by the rule (Tier 2 information). In its SRM on '

SECY-90-377, the Commission stated that "the staff should be held to the backfitting standards of 10 CFR 52.63 for all matters resolved in the design certification rulemaking (in both Tiers 1 and 2)." The staff presently views Tier 2 as more detailed descriptions of Tier 1 design information, including enveloping analyses to justify a particular acceptance criteria in Tier 1, and

! information that should have an easier change standard than Tier 1. While the concept of a Tier 2 is not inconsistent with Part 52, it must be implemented i in a manner consistent with it. Tier 2 is not subject to the change process in 10 CFR 52.63 since it is not a " design certification" within the meaning of Part 52. However, Tier 2 is a rule and it would be bindir.g on the Nuclear Regulatory Commission (NRC) staff and Commission absent "special circum-stances" under 10 CFR 2.758 (rule challenge). Since Section 2.758 only applies to adjudicatory proceedings, the effect is that Tier 2 would be binding unless or until it is suspended or amended. This suggests that Tier 2 should not only include a 50.59-like change process for applicants and licensees but also a backfit standard and an exemption process for the NRC and for licensees when the 50.59-like process cannot be used.

In developing its proposed two-tiered rule in SECY-92-287, the staff also tried to achieve industry's objectives of issue preclusion and conformance with both tiers of the rule, while maintaining the Commission's goal of a more stable and predictable licensing process. This led to a proposed rule that certifies Tier 1 information and approves Tier 2 information, as explained in

! SECY-92-287. By referencing both tiers of information in the rule that certi-fies a design, an applicant referencing the certified design would have to conform with both tiers of information subject to the change process and would ENCLOSURE 1 j

i achieve issue preclusion for every matter covered in either tier, including '

the determination of what information should be placed in each tier. However, approval of Tier 2 information by rule would mean that generic changes to Tier 2 information would require rulemaking and plant-specific changes to Tier 2 information that did not meet the "50.59-like" standards would also require rulemaking. Since the rulemaking standard for a Tier I change is adequate protection, as set forth in Section 52.63(a), the staff chose the backfit standard from Section 50.109 for rulemaking changes to Tier 2 to i

achieve the additional flexibility. Section 50.109 allows backfitting only when it is determined that there is a substantial increase in the overall protection of the public health and safety or the common defense and security to be derived from the backfit a_n_d that the direct and indirect costs of implementation are justified in view of the increased protection. Although the backfit standard of Section 50.109 provides more flexibility than the adequate protection standard, it is still a very difficult standard to meet.

The rationale for the restrictive change standard of Section 52.63 for Tier 1, which was to provide a more stable and predictable licensing process and to achieve the benefits of standardization, does not apply to Tier 2. The reason is that there are no standardization constraints on licensee changes to Tier 2 j under the 50.59-like process. A rationale for using Section 52.63 would need  !

to be developed. Also, the backfit rule would probably need to be amended to  !

avoid inconsistencies between NRC changes before the combined license (COL) ]

issuance (52.63 applies) and changes after COL issuance (50.109 applies).

The staff's proposal in SECY-92-287 for rulemaking changes to Tier 2 is l consistent with the proposal in NUMARC's letter of August 31, 1990, and NUMARC's revised letter of September 10, 1990. Specifically, NUMARC stated that "NRC backfits involving matters described in the first tier would be governed by the provisions of Section 52.63, whereas Section 50.109 would ,

govern backfitting as respects the second tier." However, in its letter of i October 5, 1992, on SECY-92-287, NUMARC now states that "To achieve the j Part 52 goals of standardization and licensing predictability and stability, i we urge the NRC staff to adhere to the earlier SRM guidance...." The ACRS recommended, in its letter of October 16, 1992, that "the staff adhere to the Commission guidance in this regard, and apply the ' adequate protection' standard to such changes." The staff believes that rulemaking with the backfit standard of Section 50.109 provides the appropriate balance between stability and flexibility. Also, as discussed in the response to Question 2 of Enclosure 2, Section 52.63 cannot be applied to non-certified information, such as Tier 2.

Since the issuance of SECY-92-287, the staff has recognized that an appli-cant or licensee seeking a plant-specific Tier 2 change that did not meet the "50.59-like" change standard would have to petition for rulemaking in accor-dance with Section 2.802 and meet the backfit standard of Section 50.109. The staff is concerned about the effects of this additional restriction on the flexibility of Tier 2 information. A solution to this concern would be to add an exemption process, similar to 10 CFR 50.12, to the Tier 2 change process.

The staff recommends that a Tier 2 exemption process be added to the proposed rule that is issued for public comment.

4 Another area in which the staff proposed more flexibility for the Tier 2 change process is in the timing for a plant-specific change. Specifically, the staff proposed in SECY-92-287 that the "50.59-like" change process be applicable to both applicants and licensees that reference a certified design.

In its SRM on SECY-90-377, the Commission stated that it had "no objection to a process similar to 10 CFR 50.59 for making changes to Tier 2 information between COL [ combined license) issuance and authorization for operation, reccgnizing of course, that such changes open the possibility for challenge in a hearing." The Commission's guidance appears to restrict the use of the "50.59-like" change process to licensees. The staff believes that the identi-fication of the need for changes to Tier 2 information will begin during the preparation of an application for a COL. That is when an applicant will identify the need to change analytical methodologies for design acceptance criteria, editions of codes and standards, etc. If these changes do not meet the standards of Section A.15(e) of Enclosure 1 to SECY-92-287 for a "50.59-like" process, then the staff can review these changes as part of its review of the COL application. If we follow the Commission's guidance, then the changes and review requests will be deferred until after the COL is issued, thereby degrading the predictability and stability of the COL.

NUMARC stated in its letter of August 31, 1990, and its subsequent revision of September 10, 1990, that "We urederstand the staff is investigating the potential use of 50.59 for COL applicants. We think this makes functional sense and encourage the staff to pursue this latitude for COL applicants within the confines to Part 52." NUMARC's letter of October 5, 1992, stated that '"NUMARC is in general agreement with. . . extending the availability of the 10 CFR 50.59 process for Tier 2 changes to COL applicants." The ACRS recom-mended in its letter of December 10, 1990, that a process similar to 10 CFR 50.59 for making changes to Tier 2 information be permitted for the period beginning after design cert Mication. The staff believes that extending the use of the "50.59-like" change process to an applicant that references a certified design will provide necessary flexibility at the appropriate time in the licensing process and will result in a COL with more predictability and greater stability.

The Commission also asked the staff to review the pros and cons of providing h separate appendix for generic requirements applicable to all design certifi-cation applicants as opposed to incorporating all the requirements for each applicant in a single appendix. In SECV-92-287, the staff proposed that the rule that certified a particular design be an appendix to Part 52, and provided an example certification rule in Enclosure 1 in SECY-92-287. Some requirements in that certification rule may be applicable to multiple standard designs. A possible benefit to grouping these requirements into a separate appendix would be to eliminate the need to restate the same requirements in each certification rule. However, the creation of such an appendix would constitute, for all practical purposes, a revision to Subpart B of Part 52.

The staff believes that it is premature to consider revisions to Part 52 because of the limited experience in implementing Subpart B of Part 52. It is also premature to decide which portions of a certification rule would apply to multiple standard designs.

In preparing the example rule in Enclosure 1 to SECY-92-287, the staff ,

restated some of the regulations from Subpart B to Part 52 for illustrative l purposes. In the actual certification rule, the staff proposes to reference  !

these sections of Subpart B rather than restate the requirement. Other parts of the example certification rule that appear to be generic are related to the use of Tier 2 information. The change process for Tier 2 information is still in a developmental stage. When sufficient experience has been obtained in ,

l identifying and using Tier 2 information, the staff could propose necessary l changes to Subpart B of Part 52 to incorporate the two-tiered concept. The remainder of the rule will be specific to a particular design, such as the list of technical positions that will become " applicable regulations" for that l particular design and the list of selected staff positions from the final l

<afety evaluation report that will be treated as "unreviewed safety questions" j for purposes of the "50.59-like" change process. Therefore, the staff  !

l believes that it would not be appropriate to have a separate appendix for apparent generic requirements. A better approach would be to propose amend-ments to Part 52 after sufficient experience has been gained in implementing j it. The staff believes that it is premature to decide which requirements from l the proposed certification rule are truly generic. i 1

i i

l l

i i l

i 4

5 i

1

QUESTIONS ON SECY-92-287 In a memorandum dated September 9, 1992, Commissioner Curtiss asked the staff and the Office of the General Counsel (OGC) to respond to the follow-ing questions related to the September 8, 1992, Commission briefing on SECY-92-287, " Form and Content for a Design Certification Rule." The answers to the questions are identified with an "A" preceding the question number.

Q1 In Enclosure 1 to SECY-92-287, Section A.9(d) of the proposed design certification rule provides that ...

Q1(a) Please explain in detail the purpose of this provision. Why is this provision necessary?

In the staff requirements memorandum (SRM) pertaining to SECY-91-262, j Al(a)

" Resolution of Selected Technical and Severe Accident Issues for i Evolutionary Light Water Reactor Designs," the Commission approved the staff's recommendation to proceed with design-specific rulemakings through individual design certifications to resolve selected technical and severe-accident issues for the GE ABWR and ABB/CE System 80+

designs. The purpose of Section A.9(d) of the proposed design certifi-l ' cation rule is to identify the staff positions that deviate from or are ,

not embodied in current regulations, but were approved by the Commis- l sion, such as SECY-90-016, " Evolutionary Light Water Reactor (LWR)

Certification Issues and their Relationship to Current Regulatory Requirements." These staff positions will then become " applicable  ;

regulations" via the certification rulemaking that will be added to the

list of regulations in Sections 52.48 and 52.54 that were used to
approve the design to be certified. Rather than reference these proposed regulations, as was done in Enclosure 1 to SECY-92-287, the staff now plans to list these proposed regulations in the design certification rule. These proposed regulations would be stated broadly, similar to the general design criteria, and would become part of the Commission's baseline of regulations that were " applicable and in effect at the time the certification was issued." Without this baseline of applicable regulations, the staff could not perform reviews in accordance with Sections 52.59 and 52.63.

l The reference to Section 52.48 is also necessary for two other reasons.

! First, it serves as a basis for obtaining public comment on the pro-

! posed adoption of the staff positions as " applicable requirements."

! Second, it provides confirmation that the staff positions are being adopted by the Commission as " applicable requirements" under Sec-tion 52.54 for the design certification being approved. Absent a provision such as Section A.9, a design certification applicant could argue that the Commission cannot lawfully condition approval of the design certification on compliance with the staff positions used during the review. This is because the staff positions, without further Commission action, are not " applicable standards and requirements of the... Commission's regulations" under Sections 52.48 and 52.54.

After further consideration of Section A.9, OGC recognized that it should be modified to also reference Section 52.59, to make it clear ENCLOSURE 2

I l

I that for the purposes of renewal of a design certification under Section 52.59, the staff positions are part of the applicable regula-tions in effect at the time that the design certification was first ,

j issued. i The reference to Section 52.63 is necessary to make it clear that the i Commission has a right under Sections 53.63(a)(1) and (3) to require a J modification to Tier 1 of the design certification or issue a plant-specific order, respectively, to ensure that the design certification or plant complies with the staff's positions that the Commission i adopted as binding requirements in Section A.9 of the design certifica-tion rule. Otherwise, the Commission could not, without re-reviewing the merits of each position, require a change to Tier 1 of the design ,

certification, nor could it issue a plant-specific order requiring a l change to Tier 1 merely because the modification was necessary for l

l compliance with a matter involving these staff positions.

Q1(b) Does this provision mean that the staff's technical positions at the referenced FSER pages would be given the force and effect of regula-l tions?

Al(b) Yes, but the technical positions that are deemed " applicable regula-tions" in Section A.9 of the certification rule would have the force and effect of regulations only for those applications or licenses that reference that certified design. In addition, the staff's technical l positions would be considered " applicable regulations" for purposes of the design certification rule in which they are included, and for applying the backfitting requirements of 52.63. However, the staff positions would not be " regulations" in the sense of " generally appli-cable" requirements that all design certification applicants must comply with,.e_J1., Section 50.48. Each design certification for which the Commission wishes to make the staff positions applicable must specify the staff positions as " applicable regulations."

Q1(c) Would a COL applicant have to get an exemption or file a petition for I rulemaking in order to deviate from the staff technical position at the referenced FSER pages? If so, shouldn't the referenced FSER pages be part of Tier 1 of the design certification rule?  ;

\

Al(c) Yes. An applicant or licensee would have to request an exemption or petition for rulemaking in order to deviate from a staff position that l was deemed an " applicable regulation" in the certification rule. l

! No. The " applicable regulations" should not be in Tier 1 of the design certification rule. The staff does not consider the technical posi-tions themselves to be either " Tier 1" or " Tier 2," since from a legal standpoint they are requirements that a design must meet, rather than i the actual design information. The staff will incorporate into Tier 1 l the key features of the design resulting from these regulations. A deviation from a staff technical position (applicable regulation) could affect Tier 1 or Tier 2 information; and any changes to Tier 1 or  ;

I l

Tier 2 must involve either exemption, rulemaking, or a determination under the "50.59-like" process. Therefore, an exemption or a rule-making amendment may be required in order to deviate from the staff technical position. As stated earlier, the staff has decided to list these " applicable regulations" in the rule that certifies the design rather than reference the FSER pages.

Q2 In the SRM on SECY-90-377, " Requirements for Design Certification Under 10 CFR Part 52," the Commission indicated that it ...

Q2(a) How would the change process in Section A.15 be modified in order to conform it to the Commission's direction in the SRM on SECY-90-3777 A2(a) Sections 52.63(a) and (b)(1) apply only to certified information (Tier 1). However, one possibility would be to revise Sections A.15(d) and (e) to read as follows: l A.15(d)(1) The Commission may not modify, rescind, or impose new requirements on Tier 2 information, whether on its own motion, or in ,

response to a petition from any person, unless the Commission deter- l mines in a rulemaking that a modification is necessary either to bring l the Tier 2 information or the referencing plants into compliance with the Commission's regulations applicable and in effect at the time this certification was issued, or to ensure adequate protection of the public health and safety or the common defense and security. The rulemaking procedures must provide for notice and comment and an opportunity for the party which applied for this certification to request an informal hearing which uses the procedures described in Section 52.51.

(2) Any modification the NRC imposes under paragraph (d)(1) of this section will be applied to all plants referencing this certified ^

design, except those to which the modification has been rendered technically irrelevant by action taken under paragraphs (d)(3) or (e) of this section.

(3) Unless (i) a modification is necessary to secure compliance with the Commission's regulations applicable and in effect at the time the certification was issued, or to ensure adequate protection of the public health and safety or the common defense and security, and (ii) special circumstances as defined in 10 CFR 50.12(a) are present, the Commission may not impose new requirements by plant-specific order on the Tier 2 information of a specific plant referencing this design certification. In addition to the factors listed in Section 50.12(a),

the Commission shall consider whether the special circumstances which Section 50.12(a)(2) requires to be present outweigh any decrease in safety that may result from the reduction in standardization caused by the plant-specific order.

(e) A licensee that references this standard design certification may make changes to the Tier 2 information, without prior NRC approval,

j unless the change involves a change to the certified standard design l

(Tier 1), the technical specifications, or an "unreviewed safety question" as defined in 10 CFR 50.59 or specified in the FSER. The Tier 2 changes will no longer be considered " matters resolved in connection with the issuance or renewal of a design certification" within the meaning of 10 CFR 52.63 (a)(4).

The above modification to the change process in Section A.15 would conform with the intent of the Commission's direction in the SRM on SECY-90-377, but it would restrict the flexibility of the Tier 2 information that the staff believes is necessary, as described in Enclosure 1 to this memorandum. The staff's proposal was intended to provide the necessary balance between flexibility and stability.

~

l Q2(b) Should the "50.59-type" change process for Tier 2 also apply for COL aoolicants after the filing of the COL application but before issuance of the COL (as proposed by the staff in Section A.15(e))7 A2(b) Yes. The staff did not investigate whether a COL applicant should be allowed to make "50.59-like" changes in advance of COL issuance in SECY-90-377. Therefore, the staff raised that policy issue in  ;

SECY-92-287 but neglected to request that the Commission reconsider its  !

apparent guidance in the SRM for SECY-90-377. There does not appear to be any reason to prevent the use of the "50.59-like" change process during both the preparation and review of a COL application. Rather, ,

the staff recommends that the Commission extend the use of the "50.59-l like" change process to an applicant that references a certified design as explained in SECY-92-287. This would facilitate the preparation and review of a COL application and would result in a more robust combined license.

02(c) How can the Commission legally limit staff, design certification holder, or public-requested Tier 2 changes to changes made pursuant to l the processes in 10 CFR 52.63 (or 10 CFR 2.758)7 Must these limita-tions be imposed by provisions in the design certification rule itself or by modifications to Part 52, or can they be made legally binding by a simple Commission declaration 7 A2(c) The Commission's direction in the SRM on SECY-90-377 goes beyond Part 52, in that Section 52.63(a) only applies to certified design information (Tier 1). In both SECY-90-377 and SECY-92-287, the staff proposed that Tier 2 information not be certified. The Commission could impose such restrictions on individual design certifications by including provisions in the rule itself (see A2(a) above). However, such a constraint on staff initiated changes to Tier 2 would not be a part of the body of general principles of Part 52, but specific to each l design certification and subject to comment and hearing in each certif-ication rulemaking hearing. It would seem that in proposing any change to Tier 2, a change could be proposed to the change standard as well.

Thus, it is not clear that a Section 52.63 constraint on staff initiat-ed changes would be fully effective. While the same would be true with 1

i l

l l 1

regard to applying the backfit rule to NRC initiated changes to Tier 2 before COL issuance, this limited use of backfit rule concept would

! seem to have more permanence because it has a logical effect of harmo-nizing constraints on staff initiated changes before and after COL ,

issuance. As noted before, a rationale would need to be developed to apply Section 52.63 to Tier 2.

l Q3 10 CFR 52.97(b) provides that ...

i Q3(a) Apart from ITAAC, to what extent will the certified design be incorpo- j rated into the COL? Will Tier 2 of the certified design be " identified l in the license?"

A3(a) All of the Tier 1 information, including ITAAC, will be incorporated into the COL. The Tier 2 information and the remainder of the COL i application will not be incorporated into the COL, but it will be I identified. This is similar to the Part 50 licensing process, where l the construction permit or operating license does not actually incorpo- )

rate the PSAR or FSAR, respectively.  !

Q3(b) If Tier 2 of the certified design is incorporated in the COL:

Q3(b)(1) Will licensee-initiated changes to Tier 2 require license amend-ments that must be processed in accordance with Section 52.97(b)? j A3(b)(i) If Tier 2 information is " incorporated" (not simply " identified") l l

into the COL, so that it becomes part of the COL, as technical i specifications are incorporated into an operating license, then licensee-initiated changes would require license amendments under Section 52.97.

l Q3(b)(ii) How would the proposed "50.59-type" process be used to change Tier 2 aspects of the design that are contained in the COL? Would the licensee be able to use the proposed "50.59-type" process to modify Tier 2 without prior NRC approval or the amendments required by Section 52.97(b)?

A3(b)(ii) Yes. A licensee would be able to make changes to Tier 2 informa-tion without prior NRC approval or COL amendments otherwise re-quired by Section 52.97(b) if all of the prerequisites of Sec-tion A.15(e) of Enclosure 1 to SECY-92-287 are satisfied. The staff plans to add selected technical positions from the FSER to Section A.15(e) to be treated as additional "unreviewed safety questions," as described in Enclosure 6 to SECY-92-287.

N0TATION V0TE RESPONSE SHEET 'I T0: SAMUEL J. CHILK, SECRETARY OF THE COMMISSION FROM: C0W4ISSIONER CURTISS l l

SUBJECT:

SECY-92-287A - FORM AND CONTENT FOR A DESIGN l CERTIFICATION RULE j l

APPROVED X/in part DISAPPROVED X/in part ABSTAIN  !

NOT PARTICIPATING REQUEST DISCUSSION C0H4ENTS:

See attached coments.

l l

l

. M Q SIGNATURE RELEASE VOTE /X/ June 4, 1993 DATE WITHHOLD VOTE / /

ENTERED ON "AS" YES x No

-93h8$Wr$6-- '3pQ-

Commissioner Curtiss' comments on SECY-92-287A:

l I agree with the staff's recommendation to issue for public comment a proposed form and content for future design certification rules and, with one exception, am comfortable soliciting comment on the substantive approach that the staff proposes to take in SECY-92-287A.

l The one exception concerns the " change standard" that the staff proposes be applied to NRC-initiated modifications to matters Consistent with the addressed in the design certification.

Commission's Staff Requirements Memorandum concerning SECY 377, and for the reasons set forth below, I continue to believe that NRC-proposed backfits affecting any matter resolved in connection with a design certification rulemaking (i.e., any matter addressed in either Tier 1 or Tier 2) should be subject to the backfitting standards of 10 CFR 52.63, rather than the less stringent provisions of 10 CFR 50.109. In my view, adoption of a lower threshhold for NRC-initiated changes to Tier 2 would be a significant departure from a key concept that the Commission embraced when it issued Part 52 -- a concept that is the very cornerstone of the Part 52 framework for achieving regulatory stability with respect to future plant design requirements.

Succinctly stated, Part 52 contemplates that all safety issues  ;

associated with nuclear power plant designs certified under Part 52 are to be settled with a high degree of finality at the time 4 of design certification. The strictures of 10 CFR 52.63, which limit the imposition of new requirements on certified designs to  :

those necessary for adequate protection of the public health and safety or common defense and security, or compliance with the ,

Commission's regulations, were adopted at the time Part 52 was i promulgated to ensure that all matters settled in connection with the design certification were indeed settled with finality.'

For the foregoing reasons, I would modify the staff's proposal

' along the lines set forth in Enclosure 2 to SECY-92-287A (ggg p.

3, A2(a)), thereby incorporating the 52.63-type change standard for controlling NRC-initiated changes to Tier 2 information.

This approach should be reflected in the proposed design certification rule format prior to solicitation of public comment.

'At the time Part 52 was issued, the Commission did not l contemplate the two-tiered design certification rule structure

! subsequently advanced by the staff to provide the flexibility for changing design details necessitated by practical considerations, such as as-procured equipment design information, and as-built information unavailable prior to construction. The Commission, however, made clear in its SRM on SECY-90-377 that in adopting the two-tiered approach, NRC-initiated changes to Tier 2 should be governed by the standards of 10 CFR 52.63(b).

l i

-2 -

In addition, I would recommend that, as a procedural matter, we i

direct the staff to proceed with publication of the proposed design certification rule format,2 modified as indicated above, for a comment period of 75 days . Following public comment, I would recommend that the staff finalize its proposals and submit them to the commission for approval, so that the approach can be formalized in a manner that would be generically applicable to all subsequent design certifications (e.o., via a Policy statement), prior to the time when we actually begin processing design certificatiot.s.

l l

i l

l j

l 2 Since this proposal could potentially affect Canadian interests involving certification of the CANDU-3 design, the usual 60 day comment period should be extended 15 days pursuant to the approach for implementing the U.S.-Canadian Free Trade Agreement.

f f

i I

4

(@

a 1

v d. \ +r'4 k

a 4

d 1

4 4

j

{

4 i.Wm#.

3

]

,y L

i 1

1 I

I 1

l t

}

4 e

J J

4 i

T 1

i e

i

}

4 i

i

(

i i

l' 1

t T

U. 8

  • 4

[

y 'i i o UNITED STATES NUCLEAR REGULATORY COMMISSION g i 5 * ;g) . g WASHIN GTON, D.C. 20555 )

o, .f Cl:, $

%, ' %d ,o# July 11, 1989 l OFFICE OF THE COMMISSIONER I

i MEMORANDUM FOR: Kenneth M. Carr j Chairman p i FROM: James R. Curtiss M '

Commissioner

SUBJECT:

COMMISSION MEETING -- EPRI DESIGN REQUIREMENTS DOCUMENT In view of a number of recent developments, I think it would be beneficial for the Commission to schedule a meeting on the subject of the EPRI Design Requirements Document.  ;

The Commission was last briefed on the subject of the EPRI Design Requirements Document in June of 1988. As the Commission indicated at that time, the EPRI initiative to develop a Design Requirements Document for future reactors is a significant undertaking, with the potential for having a positive impact on i the design of the next generation of nuclear power plants. For  !

this reason, the EPRI initiative warrants continued-and periodic i Commission oversight. Additionally, it is my understanding that  ;

the Commission has endeavored to meet with EPRI roughly on an annual basis.

Accordingly, I would recommend that a Commission meeting be scheduled for the staff and EPRI to report on the current status i of the EPRI Design Requirements Document initiative, with an '

agenda along the following lines:

1. Update on the status of the Design Requirements Document for the evolutionary ALWRs--

e Brief summary of the process for review and approval of the document, including a discussion of the general approach being taken to the identification and resolution of safety issues; e Status report on progress to date, including chapters submitted / reviewed, specific approach being taken on major safety issues, and optimization b ~

(. . .

3 I

q i

! subjects identified to date; 4

i

e Schedule for submission / review of

! remaining chapters, including a

! detailed report on status of j Chapter 5, dealing with Safety j systems -- major issues identified ,

j to date in Chapter 5 and the l 1 options for addressing those

issues, including a status report on current approach to addressing i d

(i) hydrogen control; (ii) source j term; and (iii) containment

venting / performance; and i
e . Discussion of the relationship of

! the Design Requirements Document to l ongoing reviews of the GE ABWR, the j CE System 80+, and the Westinghouse 3

SP/90.

i

! 2. Update on the status of the Design

} Requirements Document for the passive ALWRs--

i i e Summary of the process for

] submission / review and approval of 4 the document, including a 4 discussion of the general approach j to be taken to the identification j and resolution of safety issues, i the schedule for the review, and j the major issues anticipated in a such review.

1 cc: Commissioner Roberts Commissioner Rogers SECY

E WI BW + l h

gh l

l I

l 1

l l

4 l

1 l

l i l

i j

,