ML20071M384
ML20071M384 | |
Person / Time | |
---|---|
Site: | 05200002, 05200004 |
Issue date: | 08/21/1991 |
From: | Taylor J NRC OFFICE OF THE EXECUTIVE DIRECTOR FOR OPERATIONS (EDO) |
To: | Selin I, The Chairman NRC COMMISSION (OCM) |
Shared Package | |
ML20024G666 | List:
|
References | |
NUDOCS 9408040177 | |
Download: ML20071M384 (1) | |
Category:INTERNAL OR EXTERNAL MEMORANDUM
MONTHYEARML20203F5261999-02-12012 February 1999
[Table view]Notification of 990224 Meeting with ABB-Combustion Engineering in Rockville,Md to Discuss Proposed Improvements to Design of ABB-CE PWR Fuel.Draft Agenda Attached ML20203F7221999-02-12012 February 1999 Notification of 990224 Meeting with ABB-Combustion Engineering in Rockville,Md to Discuss Ongoing & Future Licensing Plans & Interactions Between ABB-CE & NRC ML20203F5311999-02-11011 February 1999 Notification of 990225 Meeting with ABB-Combustion Engineering in Rockville,Md to Discuss ABB-CE Crossflow Ultrasonic Flow Measurement Device ML20236Q6001998-06-25025 June 1998 Forwards ABB-CE Sys 80+ Std Design Fda Pursuant to 10CFR52, App O & Notice of Issuance of Fda Pursuant to 10CFR52,App O, Sys 80+ Std Design ABB-CE,Inc ML20137J9491997-04-0101 April 1997 Notification of 970402 Meeting W/Abb Combustion Engineering in Rockville,Md to Discuss Seismic Design Site Parameters for Sys 80+ Std Design ML20134D7641997-01-28028 January 1997 Notification of Cancellation of 970206 Meeting w/ABB-CE in Rockville,Md to Discuss ABB-CE Response to NRC 961001 RAI on Small Break LOCA Evaluation Model Topical Rept (CENPD-137) ML20135F5891996-12-0404 December 1996 Forwards Summary of 961114 Meeting W/Ceog in Rockville,Md to Discuss Topics of Mutual Interest ML20129F6551996-10-24024 October 1996 Notification of 961030 Meeting w/ABB-Combustion Engineering in Rockville,Md to Discuss ABB-CE Response to 961001 Request for Addl Info on Small LOCA Evaluation Model Topical Rept. Proposed Agenda Encl ML20129C3241996-10-21021 October 1996 Forwards Response to NEI Proposals Re Three Design Certification Issues NUREG-1299, Forwards Continuation of Curtiss Papers to Be Filed Under Commission Correspondence in Pdr.Advanced Copy Sent to Pdr. List of Documents Included in Four Boxes Encl1994-06-29029 June 1994 Forwards Continuation of Curtiss Papers to Be Filed Under Commission Correspondence in Pdr.Advanced Copy Sent to Pdr. List of Documents Included in Four Boxes Encl ML20149E5131994-05-31031 May 1994 Informs That NRC in Process of Completing FSERs for Both GE Advanced BWR & ABB-CE Sys 80+ Designs.Safety Conclusions Will Need to Be Reassessed by Both NRC & Design Certification Applicants on Listed Issues ML20059K8051994-01-28028 January 1994 Notification of 940131 & 940201 Meetings w/ABB-CE in Rockville,Md to Review & Resolve Remaining Structural/ Geotechnical Design Issues of Nonnuclear Island Analysis & Design Calculations.Agenda Encl ML20059K8821994-01-28028 January 1994 Notification of 940131 Meeting w/ABB-CE in Rockville,Md to Discuss Boron Dilution During small-break loss-of-coolant Accidents ML20059L3181994-01-27027 January 1994 Notification of 940131 Meeting w/ABB-CE in Rockville,Md to Discuss Key PRA Insights & Assumptions for Sys 80+ Standard Plant Design ML20059K1771994-01-26026 January 1994 Notification of 940201 Meeting W/Senior Mgt in Rockville,Md to Discuss Status of Certification Review of ABB-CE Sys 80+ Design ML20059J1291994-01-25025 January 1994 Notification of 940126 Meeting W/Util in Rockville,Md to Discuss Remaining Technical Issues Re Sys 80+ Std Design ML20059J7861994-01-25025 January 1994 Notification of 940126 Meeting w/ABB-CE in Rockville,Md to Discuss Source Term & Ph Control for in-containment Refueling Water Storage ML20059E9161994-01-0707 January 1994 Notification of 940121 Meeting W/Italian Officials & NRC Applicants in Piacenza,Italy,Re Test Facilities & Activities for GE Sbwr & Westinghouse AP600 Designs ML20059F3131994-01-0707 January 1994 Notification of 940124 Meeting W/Util & Swiss Officials in Wurenlingen,Switzerland to Discuss Simplified BWR Testing Activities ML20058P4371993-12-20020 December 1993 Notification of 931221 Meeting w/ABB-CE in Rockville,Md to Discuss New Source Term & Application for Environ Qualification of Plant Equipment ML20058K5771993-12-13013 December 1993 Notification of 931214-16 Meeting w/ABB-CE in Windsor,Ct to Discuss Bases for TS Section 3.3, Instrumentation for Sys 80+ ML20058H2171993-12-0707 December 1993 Notification of 931209 Meeting w/ABB-CE in Rockville,Md to Discuss Remaining Severe Accident Issues for System 80+ ML20058G9931993-12-0101 December 1993 Notification of 931214 Meeting W/Us Dept of Energy in Rockville,Md to Discuss Status of Advanced Reactor Reviews. Agenda Encl ML20058G5621993-11-30030 November 1993 Notification of 931201 Meeting w/ABB-CE in Rockville,Md to Discuss Sys 80+ Final Rept on Potential for Containment Bypass During SG Tube Rupture Event ML20058A2741993-11-18018 November 1993 Forwards Request for Addl Info Re Chapters 2,6 & 15,Sections 2.3,6.4 & 15.4,respectively to Ssar ML20058A6451993-11-18018 November 1993 Notifies of 931122 Meeting W/Abb C-E in Rockville,Md Re Status of Certification Review of Sys 80+ ML20062J8461993-11-15015 November 1993 Notification of 911117 Meeting w/ABB-CE in Rockville,Md to Discuss NRC & Contractor Comments on TS for Instrumentation Proposed for Sys 80+ in Section 16.6 of CESSAR-DC ML20058A2181993-11-0909 November 1993 Notification of 931129 Meeting W/Licensee in Rockville,Md to Discuss Credit for Boron in SFP ML20059K2781993-11-0909 November 1993 Notification of 931110 Meeting w/ABB-CE in Rockville,Md to Review Status of Structural/Geotechnical Design Issues for Sys 80+.Tentative Agenda Encl ML20059J0761993-11-0404 November 1993 Notification of 931116 Meeting W/Ge in Rockville,Md to Discuss Testing Program for Simplified Sbwr ML20059K3201993-10-26026 October 1993 Advises That Commission Has Agreed W/Staff Recommendation That GE Be Required to Prepare ABWR Design Control Document in SI & Provide Conversion Table from SI to English Units in Lieu of Providing Dual Units ML20059B4851993-10-26026 October 1993 Notification of 931027 Meeting w/ABB-CE in Rockville,Md to Discuss Sys 80+ Fuel Design Under Tier 1,Tier 2 & Tier 2* Provisions ML20059B5001993-10-25025 October 1993 Notification of 931028 Meeting w/ABB-CE in Rockville,Md to Discuss Status of Certification Review of Sys 80+ ML20057F2611993-10-12012 October 1993 Notification of 931028 & 29 Meetings w/ABB-CE in Charlotte, Nc to Discuss Sys 80+ Nuclear Island Design Audit ML20058N1441993-10-0505 October 1993 Notification of 931012 & 13 Meetings w/C-E in Boston,Ma to Audit Sys 80+ Non-nuclear Island Category I Structures Analysis & Design ML20057E1441993-10-0505 October 1993 Notification of 931022 Meeting w/C-E in Windsor,Ct to Discuss NRC & Contractors Comments on TS for Instrumentation Proposed for Sys 80+ in Section 16.6 of CESSAR-DC ML20057E1501993-10-0505 October 1993 Notification of 931021 Meeting w/C-E in Windsor,Ct to Discuss Comments of NRC Staff & Contractor on Software Program Manual for Sys 80+ ML20057E0191993-09-30030 September 1993 Discusses CE Request for Exemption from Compliance W/Nrc Metrication Policy Re ABWR Design Certification, Specifically Exemption from Performing Conversion to SI or Providing Dual Units in Design Certification Rule Documents ML20057D7301993-09-28028 September 1993 Notification of 931006-07 Meeting w/ABB-CE in Windsor,Ct to Review Status of Steel Containment Vessel Buckling Analysis for ABB-CE Sys 80+ ML20057D0801993-09-27027 September 1993 Notification of 931004 Meeting W/Ge in Rockville,Md to Discuss Testing Program for Simplified Boiling Water Reactor (Sbwr) Design ML20057D0831993-09-24024 September 1993 Notification of 930924 Meeting w/ABB-CE in Windsor,Ct to Discuss Staff Comments on Tier 1 Design Certification Material for CE Sys 80+ Design ML20057C5401993-09-23023 September 1993 Notification of 931004 Meeting w/ABB-CE in Windsor,Ct to Discuss Closure of Issues of Final SER on CE Sys 80+ PRA ML20057B7381993-09-21021 September 1993 Notification of 931025-26 Meeting W/Ge in San Jose,Ca to Discuss GE Proposed Responses to NRC Requests for Addl Info on Giraffe Testing Program for Simplified Boiling Water Reactor (Sbwr).Proposed Agenda Encl ML20057B6101993-09-17017 September 1993 Notification of 931001 Meeting W/Util in West Lafayette,In to Discuss GE Testing Program for Sbwr Design & NRC Confirmatory Test Program Activities ML20057B1121993-09-14014 September 1993 Notification of 930916 Meeting w/ABB-CE in Rockville,Md to Discuss ABB-CE Evaluation of Potential Design Alternatives to Cope W/Containment Bypass Event During SG Tube Rupture ML20056G0501993-08-25025 August 1993 Notification of 930902 Meeting W/Abb C-E in Windsor,Ct to Discuss Progress on Issue Closure for Pra.Proposed Agenda Encl ML20056G6341993-08-18018 August 1993 Forwards Info Transmitted & Received for ABB-CE System 80+ Std Plant Design Certification ML20056E0961993-08-17017 August 1993 Notification of 930818 Meeting w/C-E in Rockville,Md to Review Status of Safeguards Review for Sys 80+.Proposed Meeting Agenda Encl ML20057D1151993-08-16016 August 1993 Notification of 931005 Meeting w/DOE,ABB-CE & GE in Rockville,Md to Discuss Design Certification Reviews. Meeting Cancelled ML20056E0921993-08-16016 August 1993 Notification of 931005 Mgt Meeting W/Doe in Rockville,Md to Discuss Status of Design Certification Reviews 1999-02-12 Category:MEMORANDUMS-CORRESPONDENCE MONTHYEARML20203F7221999-02-12012 February 1999
[Table view]Notification of 990224 Meeting with ABB-Combustion Engineering in Rockville,Md to Discuss Ongoing & Future Licensing Plans & Interactions Between ABB-CE & NRC ML20203F5261999-02-12012 February 1999 Notification of 990224 Meeting with ABB-Combustion Engineering in Rockville,Md to Discuss Proposed Improvements to Design of ABB-CE PWR Fuel.Draft Agenda Attached ML20203F5311999-02-11011 February 1999 Notification of 990225 Meeting with ABB-Combustion Engineering in Rockville,Md to Discuss ABB-CE Crossflow Ultrasonic Flow Measurement Device ML20236Q6001998-06-25025 June 1998 Forwards ABB-CE Sys 80+ Std Design Fda Pursuant to 10CFR52, App O & Notice of Issuance of Fda Pursuant to 10CFR52,App O, Sys 80+ Std Design ABB-CE,Inc ML20137J9491997-04-0101 April 1997 Notification of 970402 Meeting W/Abb Combustion Engineering in Rockville,Md to Discuss Seismic Design Site Parameters for Sys 80+ Std Design ML20134D7641997-01-28028 January 1997 Notification of Cancellation of 970206 Meeting w/ABB-CE in Rockville,Md to Discuss ABB-CE Response to NRC 961001 RAI on Small Break LOCA Evaluation Model Topical Rept (CENPD-137) ML20135F5891996-12-0404 December 1996 Forwards Summary of 961114 Meeting W/Ceog in Rockville,Md to Discuss Topics of Mutual Interest ML20129F6551996-10-24024 October 1996 Notification of 961030 Meeting w/ABB-Combustion Engineering in Rockville,Md to Discuss ABB-CE Response to 961001 Request for Addl Info on Small LOCA Evaluation Model Topical Rept. Proposed Agenda Encl ML20129C3241996-10-21021 October 1996 Forwards Response to NEI Proposals Re Three Design Certification Issues NUREG-1299, Forwards Continuation of Curtiss Papers to Be Filed Under Commission Correspondence in Pdr.Advanced Copy Sent to Pdr. List of Documents Included in Four Boxes Encl1994-06-29029 June 1994 Forwards Continuation of Curtiss Papers to Be Filed Under Commission Correspondence in Pdr.Advanced Copy Sent to Pdr. List of Documents Included in Four Boxes Encl ML20149E5131994-05-31031 May 1994 Informs That NRC in Process of Completing FSERs for Both GE Advanced BWR & ABB-CE Sys 80+ Designs.Safety Conclusions Will Need to Be Reassessed by Both NRC & Design Certification Applicants on Listed Issues ML20059K8051994-01-28028 January 1994 Notification of 940131 & 940201 Meetings w/ABB-CE in Rockville,Md to Review & Resolve Remaining Structural/ Geotechnical Design Issues of Nonnuclear Island Analysis & Design Calculations.Agenda Encl ML20059K8821994-01-28028 January 1994 Notification of 940131 Meeting w/ABB-CE in Rockville,Md to Discuss Boron Dilution During small-break loss-of-coolant Accidents ML20059L3181994-01-27027 January 1994 Notification of 940131 Meeting w/ABB-CE in Rockville,Md to Discuss Key PRA Insights & Assumptions for Sys 80+ Standard Plant Design ML20059K1771994-01-26026 January 1994 Notification of 940201 Meeting W/Senior Mgt in Rockville,Md to Discuss Status of Certification Review of ABB-CE Sys 80+ Design ML20059J1291994-01-25025 January 1994 Notification of 940126 Meeting W/Util in Rockville,Md to Discuss Remaining Technical Issues Re Sys 80+ Std Design ML20059J7861994-01-25025 January 1994 Notification of 940126 Meeting w/ABB-CE in Rockville,Md to Discuss Source Term & Ph Control for in-containment Refueling Water Storage ML20059F3131994-01-0707 January 1994 Notification of 940124 Meeting W/Util & Swiss Officials in Wurenlingen,Switzerland to Discuss Simplified BWR Testing Activities ML20059E9161994-01-0707 January 1994 Notification of 940121 Meeting W/Italian Officials & NRC Applicants in Piacenza,Italy,Re Test Facilities & Activities for GE Sbwr & Westinghouse AP600 Designs ML20058P4371993-12-20020 December 1993 Notification of 931221 Meeting w/ABB-CE in Rockville,Md to Discuss New Source Term & Application for Environ Qualification of Plant Equipment ML20058K5771993-12-13013 December 1993 Notification of 931214-16 Meeting w/ABB-CE in Windsor,Ct to Discuss Bases for TS Section 3.3, Instrumentation for Sys 80+ ML20058H2171993-12-0707 December 1993 Notification of 931209 Meeting w/ABB-CE in Rockville,Md to Discuss Remaining Severe Accident Issues for System 80+ ML20058G9931993-12-0101 December 1993 Notification of 931214 Meeting W/Us Dept of Energy in Rockville,Md to Discuss Status of Advanced Reactor Reviews. Agenda Encl ML20058G5621993-11-30030 November 1993 Notification of 931201 Meeting w/ABB-CE in Rockville,Md to Discuss Sys 80+ Final Rept on Potential for Containment Bypass During SG Tube Rupture Event ML20058A2741993-11-18018 November 1993 Forwards Request for Addl Info Re Chapters 2,6 & 15,Sections 2.3,6.4 & 15.4,respectively to Ssar ML20058A6451993-11-18018 November 1993 Notifies of 931122 Meeting W/Abb C-E in Rockville,Md Re Status of Certification Review of Sys 80+ ML20062J8461993-11-15015 November 1993 Notification of 911117 Meeting w/ABB-CE in Rockville,Md to Discuss NRC & Contractor Comments on TS for Instrumentation Proposed for Sys 80+ in Section 16.6 of CESSAR-DC ML20059K2781993-11-0909 November 1993 Notification of 931110 Meeting w/ABB-CE in Rockville,Md to Review Status of Structural/Geotechnical Design Issues for Sys 80+.Tentative Agenda Encl ML20058A2181993-11-0909 November 1993 Notification of 931129 Meeting W/Licensee in Rockville,Md to Discuss Credit for Boron in SFP ML20059J0761993-11-0404 November 1993 Notification of 931116 Meeting W/Ge in Rockville,Md to Discuss Testing Program for Simplified Sbwr ML20059B4851993-10-26026 October 1993 Notification of 931027 Meeting w/ABB-CE in Rockville,Md to Discuss Sys 80+ Fuel Design Under Tier 1,Tier 2 & Tier 2* Provisions ML20059K3201993-10-26026 October 1993 Advises That Commission Has Agreed W/Staff Recommendation That GE Be Required to Prepare ABWR Design Control Document in SI & Provide Conversion Table from SI to English Units in Lieu of Providing Dual Units ML20059B5001993-10-25025 October 1993 Notification of 931028 Meeting w/ABB-CE in Rockville,Md to Discuss Status of Certification Review of Sys 80+ ML20057F2611993-10-12012 October 1993 Notification of 931028 & 29 Meetings w/ABB-CE in Charlotte, Nc to Discuss Sys 80+ Nuclear Island Design Audit ML20057E1441993-10-0505 October 1993 Notification of 931022 Meeting w/C-E in Windsor,Ct to Discuss NRC & Contractors Comments on TS for Instrumentation Proposed for Sys 80+ in Section 16.6 of CESSAR-DC ML20057E1501993-10-0505 October 1993 Notification of 931021 Meeting w/C-E in Windsor,Ct to Discuss Comments of NRC Staff & Contractor on Software Program Manual for Sys 80+ ML20058N1441993-10-0505 October 1993 Notification of 931012 & 13 Meetings w/C-E in Boston,Ma to Audit Sys 80+ Non-nuclear Island Category I Structures Analysis & Design ML20057E0191993-09-30030 September 1993 Discusses CE Request for Exemption from Compliance W/Nrc Metrication Policy Re ABWR Design Certification, Specifically Exemption from Performing Conversion to SI or Providing Dual Units in Design Certification Rule Documents ML20057D7301993-09-28028 September 1993 Notification of 931006-07 Meeting w/ABB-CE in Windsor,Ct to Review Status of Steel Containment Vessel Buckling Analysis for ABB-CE Sys 80+ ML20057D0801993-09-27027 September 1993 Notification of 931004 Meeting W/Ge in Rockville,Md to Discuss Testing Program for Simplified Boiling Water Reactor (Sbwr) Design ML20057D0831993-09-24024 September 1993 Notification of 930924 Meeting w/ABB-CE in Windsor,Ct to Discuss Staff Comments on Tier 1 Design Certification Material for CE Sys 80+ Design ML20057C5401993-09-23023 September 1993 Notification of 931004 Meeting w/ABB-CE in Windsor,Ct to Discuss Closure of Issues of Final SER on CE Sys 80+ PRA ML20057B7381993-09-21021 September 1993 Notification of 931025-26 Meeting W/Ge in San Jose,Ca to Discuss GE Proposed Responses to NRC Requests for Addl Info on Giraffe Testing Program for Simplified Boiling Water Reactor (Sbwr).Proposed Agenda Encl ML20057B6101993-09-17017 September 1993 Notification of 931001 Meeting W/Util in West Lafayette,In to Discuss GE Testing Program for Sbwr Design & NRC Confirmatory Test Program Activities ML20057D1801993-09-14014 September 1993 Staff Requirements Memo Suggesting NRC Continue Discussions W/Acrs on Generic RM & Monitor Progress of Reviews of Passive Designs ML20057B1121993-09-14014 September 1993 Notification of 930916 Meeting w/ABB-CE in Rockville,Md to Discuss ABB-CE Evaluation of Potential Design Alternatives to Cope W/Containment Bypass Event During SG Tube Rupture ML20056G0501993-08-25025 August 1993 Notification of 930902 Meeting W/Abb C-E in Windsor,Ct to Discuss Progress on Issue Closure for Pra.Proposed Agenda Encl ML20056G6341993-08-18018 August 1993 Forwards Info Transmitted & Received for ABB-CE System 80+ Std Plant Design Certification ML20056E0961993-08-17017 August 1993 Notification of 930818 Meeting w/C-E in Rockville,Md to Review Status of Safeguards Review for Sys 80+.Proposed Meeting Agenda Encl ML20056E0921993-08-16016 August 1993 Notification of 931005 Mgt Meeting W/Doe in Rockville,Md to Discuss Status of Design Certification Reviews 1999-02-12 |
Text
. _ _ _ _ _ _ .
' ~~ U. t *lf Tec
~IR6 p ey7-uy
,(p3 no jo,, UNITED STATES g4 e g NUCLEAR REGULATORY COMMISSION
- E WASHINGTON, D. C. 20555 N D,,
> ~%...../ AUG 211991 MEMORANDUM FOR: The Chairman .
FROM: James M. Taylor Executive Director for Operations
SUBJECT:
ECONOMIC ASSESSMENT OF NEW GE DESIGNS You asked that we look at the economics of the GE advanced designs (ABWR and SBWR) using the methodology employed in Appendix H of the GEIS for Part
- 51. The analysis, using GE's assumptions is enclosed.
3ym w a s M. Taylor x cutive Director for Operations
Enclosure:
l As stated i cc: Commissioner Rogers Commissioner Curtiss V
/
Commissioner Remick SECY OGC l
e-A c.