ML20071M384

From kanterella
Jump to navigation Jump to search
Forwards Analysis Using GE Assumptions Re GE Advanced Designs.W/O Encl
ML20071M384
Person / Time
Site: 05200002, 05200004
Issue date: 08/21/1991
From: Taylor J
NRC OFFICE OF THE EXECUTIVE DIRECTOR FOR OPERATIONS (EDO)
To: Selin I, The Chairman
NRC COMMISSION (OCM)
Shared Package
ML20024G666 List: ... further results
References
NUDOCS 9408040177
Download: ML20071M384 (1)


Text

. _ _ _ _ _ _.

U. t *lf Tec

~~

~IR6 p ey7-

,(p3 no jo,,

UNITED STATES g4 uy NUCLEAR REGULATORY COMMISSION e

g N D,,

E WASHINGTON, D. C. 20555

~%...../

AUG 211991 MEMORANDUM FOR: The Chairman FROM:

James M. Taylor Executive Director for Operations

SUBJECT:

ECONOMIC ASSESSMENT OF NEW GE DESIGNS You asked that we look at the economics of the GE advanced designs (ABWR and SBWR) using the methodology employed in Appendix H of the GEIS for Part

51. The analysis, using GE's assumptions is enclosed.

3ym w

a s M. Taylor x cutive Director for Operations

Enclosure:

As stated i

cc: Commissioner Rogers

/

Commissioner Curtiss V Commissioner Remick SECY OGC l

e-A c.

9400040177 940629 PDR COMMS NRCC CORRESPONDENCE PDR