ML20062L180

From kanterella
Revision as of 04:24, 1 June 2023 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Public Version of Rev 6 to State of Me Ingestion Pathway Plan for Seabrook Station. W/931222 Release Memo
ML20062L180
Person / Time
Site: Seabrook  NextEra Energy icon.png
Issue date: 10/18/1993
From: Feigenhaum T
NORTH ATLANTIC ENERGY SERVICE CORP. (NAESCO)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20062L183 List:
References
NYN-93141, NUDOCS 9312290223
Download: ML20062L180 (7)


Text

.

@ n eabrook, NH 03874 Telephone (603)474-9521

(

J[h Facsimile (603)474-2987 Energy Service Corporation Ted C. Feigenbaum i Senior Vice President and 1 Chief Nuclear Officer NYN- 93141 October 18,1993 United States Nuclear Regulatory Commission Washington, D.C. 20555 Attention: Document Control Desk

References:

(a) Facility Operating License NPF-67 (b) Maine Emergency Management Agency Letter, dated October 1,1993. D. D.

Brown to D. W. Warren, Ill, FEMA, Region I

Subject:

Transmittal of the State of Maine Ingestion Pathway Plan for Seabrook Station, Revlsion 6 Gentlemen:

By letter dated October 1,1993, (Reference b), the Maine Emergency Management Agency transmitted Revision 6 to the Maine Ingestion Pathway Plan for Seabrook Station (MIPP) to the Federal Emergency Management Agency. Revision 6 to the MIPP is hereby submitted as Enclosure 1.

The Revision 6 changes to the MlPP are submitted in the form of change pages. The change pages are accompanied by Change Instructions which identify the pages to be removed from the MIPP and the Revision 6 changes to be inserted. The changes contained in Revision 6 are denoted by a vertical side bar in the left hand margin of each changed page. The changes are the result of the annual review conducted by the State of Maine, and consist of changes to the Division of Health Engineering procedures located in Appendix D of the MIPP.

If you should have questions or require further information, please contact Anthony M.

Callendrello, Licensing Manager, at (603) 474-9521, extension 2751.

Very truly yours, f&

Ted C. Feigenba .

TCF:JBH/sm Enclosure

/

1.P ,

25:093 '* * ' *** '

e

    • "Y" "'"

9312290223 931018 PDR ADOCK 05000443 F PDR I

-- .- . . . ... . . . . = -

t United States Nuclear Regulatory Commission October 18,1993 Attention: Document Control Desk Page two l t

cc without enclosure:

Mr. Thomas T. Martin Regional Administrator U.S. Nuclear Regulatory Commission ,

Region I .!

475 Allendale Road  ?

King of Prussia, PA 19406 f Mr. Albert W. De Agazio, Sr. Project Manager -

Project Directorate 1-4.

l Division of Reactor Projects j

- U.S. Nuclear Regulatory Commission l Washington, DC 20555 -!

Mr. Noel Dudley NRC Senior Resident Inspector P.O. Box 1149 i Seabrook, NFI 03874 i

't i

i h

t s

l l

WUCL m 8' , .c . , 'i E W A$tiltdblON O C 205%

% ,' * ,o }

.s

) (p /L - \,)[') )&p)L]LpJ

,bO j

[

.L(Lj( {CD .

MEMORANDUM FOR:

Chief, Document Control Branch, IRM FROM: Director. Division of Freedom of Infomation and Publications Services, ADM

SUBJECT:

REVIEW Of UTILITY EMERGENCY PLAN DOCUMENTATION The Division of freedom of Information and Publications Services has reviewed the attached document and has detennined that it may now be made publicly available.

lJ'm" W hd y) [

Donnie H. Grimsley, Director , ' kk s Division of Freedom of Infonnation and Publications Services Office of Administration 2300?1 EM:33

i I

I North Atlantic October 18,1993  !

i a

L 4

ENCI.OSURE 1 TO NYN-93141 I

h

(

l P

l 5

i l

i 1

j l

I

[

DAVE: 10/08/93 CONTROLLED DOCUMENT TRANSHITVAL NO: L010-T-000143 PAGE: I ATTN: DCC DESK NRC OFFSITE THE ATTACHED DOCUMENTS (IDENTIFIED BELOW)

REPRESENT A CHANGE TO YOUR CONTROLLED DOCUMENT FILES. PLEASE ENSURE-THAT ALL DOCUMENTS REFERENCED ARE ATTACHED. ACKNOWLEDGE RECEIPT OF THIS TRANSMITTAL BY COMPLETING THE ENDORSEMENT BELOW AND RETURNING THIS TRANSMITTAL TO THE RMD BY [

10/22/93. THIS WILL INDICATE THAT YOU HAVE RECEIVED THE ATTACHED CONTROLLED DOCU-  !

MENTS AND PROCESSED THEM IN ACCORDANCE WITH HARM CHAPTER 3, SECTION 10. UNLESS DIRECTED OTHERWISE BELOW OR BY DEPARTMENTAL GUIDANCE, DESTROY SUPERCEDED COPIES.

l SUPERCEDED COPIES RETAINED FOR RECORD PURPOSES MUST BE STAMPED INFORMATION ONLY.

SUP PURCH/ ORDER PKG/ DOCUMENT IDENT. SHEET ID ISS/REV QUANTITY ,

ISSUE PRV RETURN MIPP 006/C00 1 1- -

SEE CHANGE INSTRUCTIONS  !

l

?

F 4

I I

RECEPT ACKNDEED3EMENT l HDI RE(llHRED  !

w w FOR PLANNING A SCHEDULING USE ONLY M N l'

WORK COMPLETED (STATUS CODE 16 OR GREATER) REMOVE PACKAGE FROM DDS OTHER (EXPLAIN)

M M M RECEIPT ACKNOWLEDGEMENT RECEIVED BY: DATE:

SIGN AND RETURN THIS TRANSMITTAL-TO: RECORDS MANAGEMENT DEPARTMENT 02-85 SEABROOK STATION P. O. BOX 300 SEABROOK, NH 03874 NARM TRANSMITTAL 3-10B/DDS WORK ORDER NO: 096751 J

L H

MAINE EMERGENCY MANAGEMENT AGENCY October 1,1993 Ltr. #50-93-1 Daniel W. Warren, III Acting Regional Director Federal Emergency Management Agency 442 John W. McConr.ack POCH Boston, Massachusetts 02109

Dear Mr. Wantn:

Transmittal of the Maine Ingestion Pathway Plan for Seabrook Station, Revision 6-The Maine Emergency Management Agency has completed Revision 6 to the Maine Ingestion Pathway Plan for Seabrook Station. Revision 6 is hereby formally transmitted to FEMA.

The Revision 6 changes are submitted in the form of change pages. The change pages are accompanied by Change Instructions which identify the pages to be removed from the plan and the Revision 6 pages to be inserted.

The changes contained in the revision are denoted by a vertical side bar in the left hand i margin of each changed page. The changes are the result of the annual review conducted by the State of Maine, and consist of changes to Division of Health Engineering procedmes located in appendix D of the plan.

If you have questions or require further information, please do not hesitate to contact this i office.

Sincerely, David D. Brown State Director Encl: as cited State House Station 72, Augusta, Maine o4333 - Office in basement State Office Building ;

(207) 287-4080 / 1-800-452-8735 c

. l s

_CHetNGE INSTRUCTIONS STATE OF MAINE INGESTION PATHWAY PLAN (MIPP) POR SEABROOK STATION REVISION 6 1 i

REMOVE INSERT I

Cover, Rev. 5 Cover, Rev. 6 LOEP-1, Rev. 5 LOEP-1 to LOEP-2, Rev. 6 Page 3-3, Rev. 3 Page 3-3, Rev. 6 Pane 4-6, Rev. 3 Page 4-6, Rev. 6  ?

Pages 6-1 to 6-2, Rev. 3 Pages 6-1 to 6-2, Rev. 6 Page B-2, Rev. 3 Page 8-2, Rev. 6 ,

Pages 8-11 to 8-12, Rev. 3 Pages 8-11 to 8-12, Rev. 6 Page A-2, Rev. 3 Page A-2, Rev. 6 Page A-5, Rev. 3 Page A-5, Rev. 6 Pages D-1 to D-2, Rev. 4 Pages D-1 to D-2, Rev. 6 Pages D-3 to D-9, Rev. 5 Pages D-3 to D-9, Rev. 6 Pages D-11 to D-14, Rev. 3 Pages D-11 to D-14, Rev. 6 Page D-17, Rev. 3 Page D-17, Rev. 6 2

Pages D-20 to D-24, Rev. 3 Pages D-20 to D-24, Rev. 6 Pages D-30 to D-32, Rev. 3 Pages D-30 to D-32, Rev. 6 Pages D-34 to D-35, Rev. 3 Pages D-34 to D-35, Rev. 6 [

Pages D-67 to D-72, Rev. 3 Pages D-67 to D-79, Rev.-6 Page F-1 to F-2, Rev. 3 Page F-1 to F-2, Rev. 6 Page F-52, Rev. 3 Page F-52, Rev. 6  ;

l

)

I i

l l

\

-. -, -- .