B10546, Final Significant Deficiency Rept SD-23 Re Emergency Diesel Generator Shaft Spider Assembly.Initially Reported on 820628.Deficiency Resulted from Loose Stud & Nuts.S&W Will Retorque All Studs & Nuts

From kanterella
Revision as of 02:51, 1 June 2023 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Final Significant Deficiency Rept SD-23 Re Emergency Diesel Generator Shaft Spider Assembly.Initially Reported on 820628.Deficiency Resulted from Loose Stud & Nuts.S&W Will Retorque All Studs & Nuts
ML20063K368
Person / Time
Site: Millstone Dominion icon.png
Issue date: 08/19/1982
From: Council W, Counsil W
NORTHEAST NUCLEAR ENERGY CO.
To: Haynes R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
10CFR-050.55E, 10CFR-50.55E, AEC-MP3-2815E, B10546, SD-23, NUDOCS 8209030371
Download: ML20063K368 (2)


Text

--

. - - . o

  • a- ' ""
  • S* '*" 5""' 8""a ca"a c c='

NORTHEAST tmLMES EjO2'ML'"*IC~ "*

5 fOaTronEcoNNECTICUT 06101 2":::::"%2:"~'~ (2n men L L  ; =:::0;;::=l=l August 19, 1982 Docket No. 50-423 AEC-MP3-281 B10546 Mr. Ronald C. Haynes Region 1 Office of Inspection and Enforcement 631 Park Avenue King of Prussia, PA 10406 Gentlemen:

Millstone Nuclear Power Station, Unit No.3 Final Report for a Reported Potential Significant Deficiency in Construction; SD-23 Emergency Diesel Generator Shaft Spider Assembly As required by Title 10, Code of Federal Regulations Part 50, Paragraph 55(e), Northeast Nuclear Energy Company (NNECO) reported a potential significant deficiency, in construction, in a telephone conversation between your T. Elsasser and our S. Orefice on June 28, 1982.

The significant deficiency resulted from the possibility of loose studs and nuts to exist on the shaft spider assembly. Colt-Beloit Power Division reported that this was due to possible misapplication of torquing equipment during assembly. Because of this condition, the Diesel Generator's ability to provide emergency power may have been compromised.

l To correct this significant deficiency Colt-Beloit Power Division has notified Stone and Webster and indicated the following actions are required:

o Remove the generator coil guards to gain access to the studs and nuts on the shaft spider assembly.

o Retorque all stud / nut combinations per manufacturer's recommended sequences.

o Note all movement in nuts during retorquing and reassemble coil guards.

hh D 0 s gf>q

. i

w., . .

Stone and Webster indicates that this bolt torquing will occur in the presence of the Colt representative during final Diesel Generator inspection on-site prior to generator startup.

Per the August 11, 1982 telephone conversation betweeen your Mr. T.

Elsasser and our Mr.-J. M. Powers this final report is being forwarded after the required 30 day period. We trust the above report satisfies any concerns you may have.

Very truly yours, NORTHEAST NUCLEAR ENERGY COMPANY W. G' Counsil