MONTHYEARNOC-AE-000676, Monthly Operating Repts for Sept 1999 for South Texas Project,Units 1 & 2.With1999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for South Texas Project,Units 1 & 2.With NOC-AE-000643, Monthly Operating Repts for Aug 1999 for South Texas Project,Units 1 & 2.With1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for South Texas Project,Units 1 & 2.With ML20210R3631999-07-31031 July 1999 Monthly Operating Repts for July 1999 for South Tx Project, Units 1 & 2.With NOC-AE-000593, Monthly Operating Repts for June 1999 for Stp,Units 1 & 2. with1999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Stp,Units 1 & 2. with NOC-AE-000563, Monthly Operating Repts for May 1999 for Stp,Units 1 & 2. with1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Stp,Units 1 & 2. with NOC-AE-000543, Monthly Operating Repts for Apr 1999 for Stp,Units 1 & 2. with1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Stp,Units 1 & 2. with NOC-AE-000507, Monthly Operating Repts for Mar 1999 for Stp,Units 1 & 2. with1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Stp,Units 1 & 2. with NOC-AE-000468, Monthly Operating Repts for Feb 1999 for South Texas Project Electric Generating Station.With1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for South Texas Project Electric Generating Station.With NOC-AE-000403, Monthly Operating Repts for Dec 1998 for South Texas Project Unit 1 & 2.With1998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for South Texas Project Unit 1 & 2.With NOC-AE-000385, Monthly Operating Repts for Nov 1998 for Stp,Units 1 & 2. with1998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Stp,Units 1 & 2. with NOC-AE-000357, Monthly Operating Repts for Oct 1998 for STP Electric Generating Station,Units 1 & 2.With1998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for STP Electric Generating Station,Units 1 & 2.With NOC-AE-000329, Monthly Operating Repts for Sept 1998 for Stp,Units 1 & 2. with1998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Stp,Units 1 & 2. with NOC-AE-000296, Monthly Operating Repts for Aug 1998 for South Texas Project,Units 1 & 2.With1998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for South Texas Project,Units 1 & 2.With NOC-AE-000256, Monthly Operating Repts for July 1998 for STP Electric Generating Station,Units 1 & 21998-07-31031 July 1998 Monthly Operating Repts for July 1998 for STP Electric Generating Station,Units 1 & 2 NOC-AE-000233, Monthly Operating Repts for June 1998 for Stp,Units 1 & 21998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Stp,Units 1 & 2 NOC-AE-000202, Monthly Operating Repts for May 1998 for South Tx Project Electric Generating Station,Units 1 & 21998-05-31031 May 1998 Monthly Operating Repts for May 1998 for South Tx Project Electric Generating Station,Units 1 & 2 NOC-AE-000172, Monthly Operating Repts for Apr 1998 for South Texas Project Units 1 & 21998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for South Texas Project Units 1 & 2 ML20216G4911998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for South Texas Project,Units 1 & 2 NOC-AE-000108, Monthly Operating Repts for Feb 1998 for South Texas Project Electric Generating Station,Units 1 & 21998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for South Texas Project Electric Generating Station,Units 1 & 2 NOC-AE-000090, Monthly Operating Repts for Jan 1998 for South Tx Project, Units 1 & 21998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for South Tx Project, Units 1 & 2 NOC-AE-000061, Monthly Operating Repts for Dec 1997 for South Texas Project Electric Generating Station1997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for South Texas Project Electric Generating Station NOC-AE-000039, Monthly Operating Repts for Nov 1997 for South Texas Project Units 1 & 21997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for South Texas Project Units 1 & 2 ML20199K0571997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for South Texas Project Unit 1 & 2 ML20198J9221997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for South Texas Project,Units 1 & 2 ML20216H9651997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for South Texas Project Electric Generating Station,Units 1 & 2 ML20210K5201997-07-31031 July 1997 Monthly Operating Repts for July 1997 for STP ML20141H3041997-06-30030 June 1997 Monthly Operating Repts for June 1997 for South Tx Project, Units 1 & 2 ML20148K5871997-05-31031 May 1997 Monthly Operating Repts for May 1997 for South Texas Project Electric Generating Station Units 1 & 2 ML20141G2841997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for South Texas Project Electric Generating Station Units 1 & 2 ML20137X5811997-03-31031 March 1997 Monthly Operating Repts for Mar 1997 for South Tx Project Units 1 & 2 ML20137X6011997-02-28028 February 1997 Revised Monthly Operating Rept for Feb 1997 for South Tx Project Unit 2 ML20137B3981997-02-28028 February 1997 Monthly Operating Repts for Feb 1997 for STP ML20134M7421997-01-31031 January 1997 Monthly Operating Repts for Jan 1997 for South Texas Project Electric Generating Station,Units 1 & 2 ML20133P3191996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for South Texas Project Electric Generating Station,Units 1 & 2 ML20132C1301996-11-30030 November 1996 Monthly Operating Repts for Nov 1996 for South Texas Project Electric Generating Station Units 1 & 2 ML20134M7431996-10-31031 October 1996 Monthly Operating Repts for Oct 1996 for South Texas Project Electric Generating Station,Units 1 & 2 ML20129A5961996-09-30030 September 1996 Monthly Operating Repts for Sept 1996 for South Texas Project Units 1 & 2 ML20129A6361996-08-31031 August 1996 Monthly Operating Repts for Aug 1996 for South Texas Project Electric Generating Station ML20129A6541996-07-31031 July 1996 Revised Monthly Operating Rept for July 1996 for South Texas Project Electric Generating Station Unit 1 ML20116M6721996-07-31031 July 1996 Monthly Operating Repts for Jul 1996 for South Texas Project Electric Generating Station ML20115H0321996-06-30030 June 1996 Monthly Operating Repts for June 1996 for South Tx Project, Units 1 & 2 ML20112H9921996-05-31031 May 1996 Monthly Operating Repts for May 1996 for South Texas Project Electric Generating Station Units 1 & 2 ML20117G0101996-04-30030 April 1996 Monthly Operating Repts for April 1996 for STP ML20100R2861996-02-29029 February 1996 Monthly Operating Repts for South Texas Project Electric Generating Station Units 1 & 2 ST-HL-AE-0053, Monthly Operating Repts for Jan 1996 for STP1996-01-31031 January 1996 Monthly Operating Repts for Jan 1996 for STP ST-HL-AE-5277, Monthly Operating Repts for Dec 1995 for South Texas Project1995-12-31031 December 1995 Monthly Operating Repts for Dec 1995 for South Texas Project ST-HL-AE-5256, Monthly Operating Repts for Nov 1995 for STP Units 1 & 21995-11-30030 November 1995 Monthly Operating Repts for Nov 1995 for STP Units 1 & 2 ST-HL-AE-5239, Monthly Operating Repts for Oct 1995 for South Texas Project Units 1 & 21995-10-31031 October 1995 Monthly Operating Repts for Oct 1995 for South Texas Project Units 1 & 2 ST-HL-AE-5215, Monthly Operating Repts for Sept 1995 for South Tx Project1995-09-30030 September 1995 Monthly Operating Repts for Sept 1995 for South Tx Project ST-HL-AE-5178, Monthly Operating Repts for Aug 1995 for STP Electric Generating Station1995-08-31031 August 1995 Monthly Operating Repts for Aug 1995 for STP Electric Generating Station 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217K9441999-10-15015 October 1999 SER Accepting Util Alternative Proposed Relief Request RR-ENG-2-4 for Second 10-year ISI Interval at Stp,Units 1 & 2 Pursuant to 10CFR50.55a(a)(3)(i) ML20217K9151999-10-15015 October 1999 SER Authorizing Util Relief Request RR-ENG-2-3 for Second 10-year ISI Interval of Stp,Units 1 & 2 Pursuant to 10CFR50.55a(a)(3)(i) NOC-AE-000676, Monthly Operating Repts for Sept 1999 for South Texas Project,Units 1 & 2.With1999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for South Texas Project,Units 1 & 2.With ML20217D0531999-09-30030 September 1999 Rev 1 to STP Electric Generating Station Unit 2 Cycle 7 Colr ML20217D0481999-09-30030 September 1999 Rev 1 to STP Electric Generating Station Unit 1 Cycle 9 Colr ML20211P8411999-09-0909 September 1999 Safety Evaluation Supporting Alternative Proposed by Licensee to Surface Exam to Perform Boroscopic VT-1 Visual Exam of Pump Casing Welds within Pump Pits for Welds Covered by Relief Request RR-ENG-24 ML20211P7811999-09-0909 September 1999 SER Approving Second 10-year Interval Inservice Insp Program Plan Relief Request RR-ENG-2-8 (to Use Code Case N-491-2) for South Texas Project,Units 1 & 2 ML20211Q6731999-09-0909 September 1999 Safety Evaluation Accepting First 10-yr Interval ISI Program Plan Request for Relief from ASME Code Case N-498 NOC-AE-000643, Monthly Operating Repts for Aug 1999 for South Texas Project,Units 1 & 2.With1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for South Texas Project,Units 1 & 2.With ML20212E5191999-08-31031 August 1999 Rev 3 to SG-99-04-005, STP 1RE08 Outage Condition Monitoring Rept & Final Operational Assessment ML20211F4531999-08-24024 August 1999 Safety Evaluation Supporting Licensee Proposed Alternative to Defer Partial First Period Exams of flange-to-shell Weld to Third Period & Perform Required Ultrasonic Exams,Both Manual & Automated,During Third Period ML20211F5111999-08-23023 August 1999 Safety Evaluation Supporting Licensee Proposed Alternative Contained in Request for Relief RR-ENG-30 ML20210C9411999-07-31031 July 1999 Rev 1 to SG-99-07-002, South Tx,Unit 1 Cycle 9 Voltage- Based Repair Criteria 90-Day Rept, Jul 1999 ML20210R3631999-07-31031 July 1999 Monthly Operating Repts for July 1999 for South Tx Project, Units 1 & 2.With ML20210D9161999-07-23023 July 1999 Safety Evaluation Accepting Inservice Testing Relief Request RR-56 Re Component Cooling Water & Safety Injection Sys Containment Isolation Check Valve Closure Test Frequency ML20210D4821999-07-21021 July 1999 1RE08 ISI Summary Rept for Steam Generator Tubing of South Texas Project Electric Generating Station Unit 1 ML20210D4491999-07-21021 July 1999 Revised Chapters to Operations QA Plan, Including Rev 9 to Chapter 1.0, Organization & Rev 6 to Chapter 16.0, Independent Technical Review NOC-AE-000583, LER 99-S03-00:on 990619,failure to Revitalize Sdg Number 11 Was Noted.Caused by Failure to Communicate Status of Sdg. Subject Sdg Revitalized on 990619 & Licensee Will Develop Security Force Instruction Re Sdgs.With1999-07-15015 July 1999 LER 99-S03-00:on 990619,failure to Revitalize Sdg Number 11 Was Noted.Caused by Failure to Communicate Status of Sdg. Subject Sdg Revitalized on 990619 & Licensee Will Develop Security Force Instruction Re Sdgs.With ML20207H6361999-07-0808 July 1999 Safety Evaluation Approving 2nd 10 Yr Interval ISI Program Plan Request to Use ASME Section XI Code Case N-546 for Licenses NPF-76 & NPF-80,respectively ML20216D7481999-07-0707 July 1999 1RE08 ISI Summary Rept for Welds & Component Supports of STP Electric Generating Station,Unit 1 NOC-AE-000593, Monthly Operating Repts for June 1999 for Stp,Units 1 & 2. with1999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Stp,Units 1 & 2. with NOC-AE-000570, LER 99-S01-00:on 990527,discovered That Unescorted Access Had Been Inappropriately Granted.Caused by Failure to Follow Procedure.Util Verified That Individual Did Not Have Current Unescorted Access at STP or Any Other Util.With1999-06-28028 June 1999 LER 99-S01-00:on 990527,discovered That Unescorted Access Had Been Inappropriately Granted.Caused by Failure to Follow Procedure.Util Verified That Individual Did Not Have Current Unescorted Access at STP or Any Other Util.With ML20196G5821999-06-23023 June 1999 LER 99-S02-00:on 990601,failure to Maintain Positive Control of Vital Area Security Key Was Noted.Caused by Lack of Attention to Detail.Discussed Event with Operator Involved IAW Constructive Discipline Program ML20195J6871999-06-17017 June 1999 Safety Evaluation Supporting Proposed Alternative Contained in RR-ENG-2-5.Proposed Alternative Authorized Per 10CFR50.55a(a)(3)(i) for 2nd ISI Interval ML20196A2391999-06-15015 June 1999 Change QA-042 to Rev 13 of Operations QAP, Reflecting Current Organizational Alignment for South Texas Project & Culminating Organizational Realigment That Has Been Taking Place During Past Several Months NOC-AE-000563, Monthly Operating Repts for May 1999 for Stp,Units 1 & 2. with1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Stp,Units 1 & 2. with ML20206U5411999-05-18018 May 1999 Non-proprietary Errata Pages for Rev 2,Addendum 1 to WCAP-13699, Laser Welded Sleeves for 3/4 Inch Diamete Tube Feedring Type & W Preheater SGs Generic Sleeving Rept ML20206A7721999-04-30030 April 1999 STP Electric Generating Station Unit 1 Cycle 9 Colr NOC-AE-000543, Monthly Operating Repts for Apr 1999 for Stp,Units 1 & 2. with1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Stp,Units 1 & 2. with ML20205H0321999-03-31031 March 1999 Change QA-040 to Rev 13 of Operations QA Plan NOC-AE-000507, Monthly Operating Repts for Mar 1999 for Stp,Units 1 & 2. with1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Stp,Units 1 & 2. with ML20205A3781999-03-22022 March 1999 STP Electric Generating Station Simulator Certification Four Yr Rept for Units 1 & 2 ML20204B2711999-03-15015 March 1999 Safety Evaluation Authorizing 990201 Request to Authorize Alternative to Regulations Per 10CFR50.55a(a)(3)(i) That Would Revise Start of Second 120-month IST Interval to No Later than 011201 ML20207M9231999-03-12012 March 1999 Amended Part 21 Rept Re Cooper-Bessemer Ksv EDG Power Piston Failure.Total of 198 or More Pistons Have Been Measured at Seven Different Sites.All Potentially Defective Pistons Have Been Removed from Svc Based on Encl Results NOC-AE-000468, Monthly Operating Repts for Feb 1999 for South Texas Project Electric Generating Station.With1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for South Texas Project Electric Generating Station.With ML20207D1101999-02-24024 February 1999 Change QA-039 to Rev 13 of Operations QA Plan, for STP ML20203H8361999-02-17017 February 1999 Safety Evaluation Supporting Request for Relief from ASME Code Requirements for Class 3 Piping for Plant ML20202H9621999-02-0303 February 1999 SER Accepting Change to EALs Used in Classification of Emergency Conditions ML20202E8471999-01-31031 January 1999 2RE06 ISI Summary Rept for SG Tubing of STP Electric Generating Station,Unit 2 ML20216G2011999-01-31031 January 1999 City Public Svc of San Antonio Annual Rept 1998-1999 ML20199G5961999-01-31031 January 1999 Cycle 7 Voltage-Based Repair Criteria Rept for Jan 1999 ML20199K7711999-01-21021 January 1999 Safety Evaluation Accepting ISI Program Request for Relief for ASME Cose Repair Requirements for Code Class 3 Piping ML20199G8161999-01-19019 January 1999 SER Accepting Util 970707 Response to NRC 970509 RAI Re GL 92-08, Thermo-Lag 330-1 Fire Barriers. NRC Finds No Significant Safety Hazards Based on Application of Util Ampacity Derating Methodology ML20199H4981999-01-11011 January 1999 2RE06 ISI Summary Rept for Welds & Component Supports of Stp,Unit 2 ML20206Q3751999-01-0404 January 1999 2RE06 ISI Summary Rept for Sys Pressure Tests (Class 1 & 2) ML20206Q3721999-01-0404 January 1999 2RE06 ISI Summary Rept for Repairs & Replacements ML20216G2171998-12-31031 December 1998 Houston Industries 1998 Annual Rept. App a 1998 Financial Statements & Us Securities & Exchange Commission Form 10-K Encl NOC-AE-000403, Monthly Operating Repts for Dec 1998 for South Texas Project Unit 1 & 2.With1998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for South Texas Project Unit 1 & 2.With ML20216G1521998-12-31031 December 1998 Central & South West Corp 1998 Summary Annual Rept & Securities & Exchange Commission Form 10-K ML20198M3431998-12-28028 December 1998 SER Accepting Util Request for Relief from ASME Code Repair Requirements for ASME Code Class 3 Piping for South Texas Project,Unit 2 1999-09-09
[Table view] |
Text
.
The Light.
company llouston Lighting & Power _ outpesas rject et c encradng Statjoy P. O. km ]_ }_{_aportMesas 77g j
1 May 11, 1992 ;
ST-HL-AE-4091 File No.: G02 10CFR50.71 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555 South Texas Project Units 1 & 2 Docket Nos. STN 50-498 & 50-499 Monthly Ooeratina Repsrts for Anri). 1992 Pursuant to 10CFR50.71(a) and South Texas Project Electric Generat!'- ."tation (STPFGS) Technical Specification 6.9.1.5, attachea ,c the Monthly Operating Reports for April,-1992.
Please no', that the cumulative total has been adjusted for the Operating Data for Unit 1 (Number of hours reactor was critical) due to an error for October 23, 1991. The correction has increased the cumulative total _by 11.0 hours0 days <br />0 hours <br />0 weeks <br />0 months <br />, if-you should have any questions on this matter, please contact Mr. C. A. Ayala at (512)-972-8628.
4$1m . o William J. Jump Manager Nuclear Licensing
._MKJ/lf'
- - Attachments
- 1) STPEGS Unit 1 Monthly Operating Report -
April, 1992
- 2) STPEGS Unit 2 Monthly Operating Report -
April, 1992
-9205340173 PDR 920430 I R ADOCK 05000498 '} p PDR RREP)92128001,1&2 A Subsidiary of Houston Industries Incorporated -[/
9 { 'l g
/
1400N
Houstpr. Lighti g & Power Company . ST-HL-AE-4091
.-- . South Texas Project Electric Generating Station F le No.: G02 Page 2 cc:
Regional Administrator, Region IV Rufus S. Scott Nuclear Regulatory Commission Associate General Counsel 611 Ryan Plaza Drive, Suite 400 Houston Lighting & Power Companf Arlington, TX 76011- P. O. Bcx 61867 Houston, TX 77208 George Dick, Project Manager U.S. Nuclear Regulatory Commission INPO Washington, DC 20555 Records Center 1100 Circle 75 Parkway J. I. Tapia- Atlanta, GA 30339-3064 Senior Resident Inspector c/o U. S. Nuclear Regulatory Dr. Joseph M. Hendrie Commission 50 Bellport Lane P. O. Box 910 Bellport, NY 11713 Bay City, TX 77414 D. K. Lacker J. R. Newman, Esquire Bureau of Radiation Control Newman & Holtzinger, P.C. Texas Department of Health 1615 L Street,-N.W. 1100 West 49th Street Washington, DC 20036 Austin, TX 78756-3189 D. E. Ward /T. M. Puckett Contral_ Power and Light Company P. O. Box'2121 Corpus Christi, TX 78403 J. C. Lanierf'M . B. Lee City of '..ustin Electric Utility Department
- P.O. Boy 1088 Austin, TX 78767 K. J. Fiedler/M. T. Ha';dt City Public Service Board P. O.'Dox 1771 San Antonio, TX 78296 L
l Revised 10/11/91 L4/NRC/
l
i I
ATTACHMENT l ST-HL-AE-409 I e
PAGE - I 0F b
)
o SOUTH TEXAS PROJECT
{ ELECTRIC GENERATING STATION UNIT 1 MONTHLY OPEPATING REPORT APRIL 1992 HOUSTON LIGHTING AND POWER CO. '
NRC DOCKET NO. 50-498 LICENSE NO. hPF-76 Reviewe 1 : ,
~
._ . s - T - 9 7-
~
Supervis Date Reviewed By: b. lA S'-841 Plant En [n.ering Manager Date Approved - -
-- 4 6!A/4L-ode Plantannage\
an
~
ATTACHMENT /
Bi-HL-AE- j Monthly Summagy PAGE_2_._4oql
._ OF ._(p__
j STPEG9 Unit 1 began the operating per';
d at 1001 reactor power.
to perform scheduled maintenance.On 4/5/92 at 1654 the unit was removed from serv outage at 1236 and achieved 100% reactor power on 4/15/92 at 0036.The unit was returned to The reporting period was concluded with the unit operating at full power .
i l
t
, ~
ATTACHMENT I ST-HL-AE- H a9 /
OPERATING DATA REPORT PAGE l ._ 0F~.fe DOCKET NO. 50 498 UNIT 1 DATE May 6. 1991.
COMPLETED-BY A.P. Kent TELEPHONE }12/972-7786 OPERATING STATUS
- 1. REPORTING PERIOD: 04/01-04/30 CROSS HOURS IN REPORTING PERIOD: _.2.L9
- 2. CURRENTLY AUTHORIZED POWER LEVEL (MWt). 3800 MAX. DEPEND.CAPAC17f (MWe-Net): 1250.6 DESIGN ELECTRICAL RATING (MWe-Net): 1250.6
- 3. POWER LEVEL TO WHICH RESTRICTED (IF ANY)(MWe Net): None 4 REASONS FOR RESTRICTION (IF ANY): N/A THIS MONTH YR TO DATE CUMUIATIVE
- 5. NUMBER OF HOURS REACTOR WAS CRITICAL..... 539.4 2648_d 21678,9
- 6. REACTOR RESERVE SHUTDOWN HOURS......... 0 0 0 I
- 7. HOURS GENERATOR ON LINE....,............. 532.3 2631.5 21843.7
- 8. UNIT RESERVE SHUTDOWN HOURS.. . ..... . 0 Q 0
- 9. GROSS THERMAL ENE"GY GENERATED (MWt).... 1965083 9 9 2)_4._}.2 80079774
- 10. -GROSS. ELECTRICAL ENEF.GY GENERATED (MWH).. 666570 3384690 27092690
- 11. NET ELECTRICAL ENERGY GENERATED (MWH).. . 636350 374.2}_Q6. ,_JM7087li
- 12. REACTOR. SERVICE FACTOR............. ..... 75.0% 91.2% _70.5% s
- 13. REACTOR AVAIIABILITY FACTOR. , . ..., .... 75.0% 91.2% 70.3%
- 14. LUNI1 3RVICE FACT 0R...................... 74.0% _. " 0 . 6 %. 67.7% .
- 15. UNIT HAILABILITY FACTOR. . . . . . . . . . . . .... 74 0% 90.6% 67.7%
~
L16. . UNIT CAPACITY FACTOR (Using MDC)...... ,, 70.81 89.3% 63.31
- 17. UNIT CAPACITY FACTOR (Using Design MWe).. 70.8% 89.S_1 G3.3%.
- 18. UNIT. FORCED OUTAGE RATE...... .... ...... 0.01 3.1% 1L11
- 19. SHUTDOC3 SCHEDUIED OVER NEXT 6 MONTHS (TIPE, DATE, AND-DURATION OF EACH):
Scheduled 62 day refueling outage to begin September 19, 1992.
- 20. IF S13)T DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: N/A l
l 1
P m , _ .. _
. ., ~_
ATTACHMENT l I
ST-HL-AE- Voi /
PAGE ..LL _ gp & '"
AVERAGE DAILY UNIT POWER LEVEL - -
]
l l
l DOCKET NO. 50-498 UNIT 1 DATE May. 6. 1992 .
COMPLETED BY A.P. Kent TEI EP5*0NE 512/972-7786 MONTH APRik
' DAY AVERAGE DAILY POWER LEVEL DAY AVERACE DAILY POWER LEVEL
.(MWe-Net) (hWe-Net) 1 ,_, 1217 17 1254 2 1217 18 1752 3 1216 19 1254 4 M14 20 ,
1255 ,
5 355 21 1255 1246
~
6 0 22 7 0 23 1247 8 0 24 1251 9 -0 25. 1250 J10_ 1, 26 1252 11 0- 27 1254 12- '0 28 ,
-1254 -
13 197 29 1255 14- .. 10F _ 30 1253
+ .- 15 .. -1241- 31 N/A 16 1250 4 * + c- v 97-y
e s
UNIT SHUTDOWES AND POWLR REDUCTIONS DOCKET NO. 50-498 UNIT 1 DATE May, 6. 19??
. COMPLETED BY A.P. Kent >
TELEPHONE 512/972-7786 REPORT. MONTH APRIL' I
1 2 . 3 4 5 .
No. Date Type Duration Reason , Method of Licensee System Component Cause & Correct"ve Action'to .!
(Hours) IShutting- Event Code Code Prevent Recurrence Down Report **
Reactor 92-02 920405 S 186.7 B ! N/A !!/A N/A ucheduled maintenance outage.
4 I
t I
AN mien 1 2 3 4 5 b F: Forced Reason: Method: IEEE 805-1983 IEEF CJ3A-1983 h*,
S: Scheduled A-Equipment Failure.(Explain) 1-Manual y -~~ b B-Haintenance or Test 2-Manual Scram n-C-Re fue ling 3-Automatic Scram ,
D-Regul. n- striction 4-Cont. of Existing I E-Operatot . aining 6. License Exam Outage F-Administrative 5-Reduction C-Operational Error (Explain) 9-Other
_ _ _ _ _ _ - _ _ _ _ - - _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ - _ _ - - - _ _ _ _ _ - - - - -- ._ - . __ a
A h^-
, I_
FTITACHMENT -
ST-HL- AE- 40 l ls- --
PAGE 4 - 0F __
10RVs and Safety Valves Summars There were no PORV or Safety Valves challenged during the reporting period.
1; a
-l i
~\
ATTACHMENT 2 ST HL AE-40 9 /
PAGE 1 0F b SOUTH TEXAS PROJECT ELECTRIC CENERATING STATION l UNIT 2 1 MONTHLY OPERATING REPORT APRIL 1992 HOUSTON LICHTINC AND POWER CO.
NRC D3CKET NO, 50-499 LICENSE NO. NPF-80 I
)
l l
Rev'lewe .:
a . S 57'2 Superviso Date I Reviewed'By: b- w I- 84 L Plant 'g[eeringManager i -Date- )
Approved By: we 5!8f*1>
Plant Man ger Date-l 4
.m 1
ATT ACHMENT 2-Monthly Sur: mary ST.HL-AE H 9 I g
, ) $ __ h - = -- ~~
STPEGS Unit 2 began the reporting period at 65% reactor power during a pover escalation af ter recovering from a tripped main feedwater pump. The unit achieved 100% reactor power on 4/1/92 at 0600, On 4/14/92 reactor power was reduced to 28% to allow corrective maintenance on the steam generator feedwater pumps, During power ascension, reactor power was held at 48% to allow corrective maintenance on a feedwater booster pump, The unit was returned to 100% reactor power en 4/21/92 at 1000.
The unit concluded the reporting period ct full power, 1
~-
ATTACHME?IT 'l ""1 ST-HL AE- Voi /
PAGE 3 0F 3 OPERATING DATA REPORT DOCKET No. 50-499 UNIT 2 DATE May 6. 1992 COMPLETED BY A.P. Rent TELEPHONE }_12/972-7786 OPERATING STATUS 1.
- 2. REPORTING PERIOD: 04/01-04/30 GROSS HOURS IN REPORTING P5RIOD: 719 CURRENTLY AUTHORIZED POWER LEVEL (MWt): 3800 MAX. DEPEND. CAPACITY (MWe-Net): 1250.6 DESIGN ELECTRICAL RATING (MWe Net): 1250.6 3.
4 POWER LEVEL TO WHICH RESTRICTED (IF ANY)(MWe-Net): _f.io ne REASONS FOR RESTRICTION (IF ANY): N/A THIS MONTH YR TO DATE CUMULATIVE
- 5. NUMBER OF HOURS REACTOR VAS CRITICAL. .. '*19.0 2754.6 18177.2
- 6. REACTOR RESERVE SHUTDOWN HOURS. , . 0 0 0
- 7. HOURS GENERATOR ON LINE.. . . . .. 719.0 2717.3 17199.5
- 8. UNIT RESERVE SHUTDOWN HOURS. .. . .. 0 0 0 9,
GROSS THERMAL ENERGY GENERATED (MWt). .2374113 9740404 62133675, 10.
GROSS ELECTRICAL ENERGY GENERATED (MWH).._~'2'QO 3313410 209807L0 11.
NET ELECTRICAL ENERGY GENERATED (MWH). 762359 3170214 19874217
- 12. REACTOR SERVICE FACTOR. ~
. . 100.0% 94.9% 72.3%
- 13. REACTOR AVAI1 ABILITY FACTOR. , . . .. 100.0% 94.9% 72.3%
- 14. UNIT SERVICE FACTOR. . ., . . . 100.0% 93.6% 68.4%
- 15. UN'T AVA11 ABILITY FACTOR. . . .. .
100.01 93.6% 68.4%
- 16. UNIT CAPACITY FACTOR (Using MDC)... . . . 84.8% 87.3% 63.2%
- 17. UNIT CAPACITY FACTOR (Using Design MWe).. 84.8% _ 87.31 63 21
- 18. UNIT FORCED OUTAGE RATE. . . 0.0% 6.4% . 15.0%
19.
SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE AND DURATION OF EACH):
N/A 20.
IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: N/A
=
ATTACHMENT % o ST-HL AEs407 i PAGE 4 0F _ 6
"~~~
AVERAGE DAILY UNIT F0VER LEVEL /
DOCKET NO. 50-499 UNIT 2 DATE May 6. 1992 COMPLETED BY A.P. Kent TELEPHONE 512/972-7786 MONTH APRIL DAY AVERAGE DAILY F0WER LEVEL DAY AVERAGE DAILY F0VER LEVEL (MWe-Net) (MVa-Net) 1 1207 17 524 i 2 1251 18 532 3 1228 19 538 4 _ _ _
1214 2.0 595 5 1255 21 1168 6 1251 22 1220 7 1248 23 1231 8 3247 24 1252 -
9 1246 25 1251 10 1228 26 1252 11 1233 27 1251 12 1230 28 1207 13 1236 29 1242 14 736 30 1250 15 243 31 N/A 16 253
UNIT SHUTDOWNS AND POWER'REEUCTIONS '
DOCKET WO. 50-499 UNIT 2 DATE May 6. 1992 -
' COMPLETED BY A.P. Kent TELEPHONE 512/972-7786 REPORT MONTH APRIL 1 '2 -
3 4 5 No. Date Type Duration Reason Method of Licensee System Component Cause & Corrective Action to (Hours) Shutting Event Code Code Prevent Recurrence Down Report #
Reactor 92-05 920414 F 0.0 A 5 .N/A SJ CLN Reactor power was. reduced to 28% to determine the cause of the steam generator
( feedwater pumps erratic speed control responses. A loose terminal was discover-ed on a power supply common to al~.the feedwater pumps. The terminal was tightened.
l 1
i a v> >
1 2 3 4 5
?>2 W F: Forced Reasen: Method: IEEE 805-1983 IEEE 803/-1983 n1 }C 2 S: Scheduled A-Equipment Failure (Explain) 1-Manual bT n, S: ,
B-Maintenance or Test 2-Manual Scram at"2 C-Refueling 3-Automatic Scree c) $}j ;
D-Regulatory Restriction 4-Cont. of Existing 71 ,s E-Operator Training & License Exam Outage ,
F-Administrative 5-Reduction "
G-Operational Error (Explain) 9-Other H-Other (Explain) i
'- 77 :1c.; _ -'
AiTACHMENT 1
- . ST-HL AE- 4o3 /
-e PAGE G 0F 6 IpRVs ami Saft r Vatves - Sumary There vore no PORV or Ss fety Valves challenged during the reporting period.
)
i s.
!I j ..
a '--- e- t W