MONTHYEARML20217K1051999-10-19019 October 1999 Ack Receipt of Ltr Dtd 990707,which Transmitted Rev 29 to Callaway Plant Physical Security Plan,Under Provisions of 10CFR50.54(p).Based on Determination That Changes Do Not Decrease Effectiveness of Plan,No NRC Approval Required ML20217G2071999-10-14014 October 1999 Forwards Insp Rept 50-483/99-10 on 990913-16.No Violations Noted.Insp Was to Review Emergency Plan & Procedures During Biennial Emergency Preparedness Exercise ML20217B5901999-10-0505 October 1999 Informs That Staff Concludes That Licensee Responses to GL 97-06 Provides Reasonable Assurance That Condition of Util SG Internals in Compliance with Current Licensing Bases for Callaway Plant,Unit 1 ML20217B5711999-10-0505 October 1999 Discusses GL 98-01 Issued by NRC on 980511 & Uec Responses for Callaway NPP Unit 1 ,990224 & 990628.Informs That Staff Reviewed Responses & Concluded That All Requested Info for GL 98-01 Provided ML20212G0221999-09-22022 September 1999 Forwards Insp Rept 50-483/99-11 on 990812-20.No Violations Noted.Team Found,Weakness in flow-accelerated Corrosion Monitoring Program Resulted in No Previous Insp of Pipe Segment Which Failed ML20212D9341999-09-16016 September 1999 Informs That on 990818,NRC Completed Midcycle PPR of Callaway Plant.In Area of Ep,C/As Taken in Response to Problems Identified During Previous Exercises Warrant More in-dept Review.Details of Insp Plan Through March 2000 Encl ML20217D5791999-09-15015 September 1999 Provides Formal Documentation of Reviews & Discussions Re Technical Ltr Rept for Proprietary Info.Review of Ltr Was Discussed in Telcon & Via e-mail Messages. Summary of Telcons as Documented on 990708,included ML20212A4921999-09-13013 September 1999 Forwards Insp Rept 50-483/99-08 on 990725-0904.Two Severity Level IV Violations of NRC Requirements Identified & Being Treated as Noncited Violations Consistent with App C of Enforcement Policy ML20212A4701999-09-10010 September 1999 Rssponds to NRC 990709 RAI Re Util Relief Request to Allow Use of 1998 Edition of ASME Section Xi,Subsection Iwe. Acceptance Criteria for Liner Plate Pressure Boundary Thickness Will Be Limited to 10% Nominal Thinning ML20212B1521999-09-10010 September 1999 Forwards Insp Rept 50-483/99-07 on 990809-13.No Violations Noted.Inspectors Used Annual Licensed Operator Requalification Exams to Assess Licensed Operator Performance ML20211N0321999-09-0202 September 1999 Forwards SE Concluding That Util Adequately Addressed Actions Requested in GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves ML20211B0241999-08-18018 August 1999 Ack Receipt of Ltr Dtd 990714,transmitting Scenario for Licensee Upcoming Biennial Exercise.Based on Review,Nrc Determined That Exercise Scenario Sufficient to Meet Emergency Plan Requirements & Exercise Objectives ML20210T9121999-08-13013 August 1999 Forwards Insp Rept 50-483/99-06 on 990613-0724.One Severity Level 4 Violation Occurred & Being Treated as Ncv,Consistent with App C of Enforcement Policy ML20210R7241999-08-12012 August 1999 Forwards semi-annual Fitness for Duty Program Performance Data Rept for Callaway Nuclear Plant for 990101-990630,IAW 10CFR26.71(d) ML20211A9501999-08-12012 August 1999 Discusses 990720-21 Workshop Conducted in Region IV Ofc,Re Exchange of Info in Area of Use of Risk Insights in Regulatory Activities.List of Attendees,Summary of Topic & Issues,Agenda & Copies of Handouts Encl ULNRC-04085, Forwards Rev 4 to Callaway Plant Cycle 10 COLR, Per TS 6.9.1.9.COLR Has Been Revised to Update Rod Bank Insertion (Ril) Limits,As Function of Rated Thermal Power1999-08-11011 August 1999 Forwards Rev 4 to Callaway Plant Cycle 10 COLR, Per TS 6.9.1.9.COLR Has Been Revised to Update Rod Bank Insertion (Ril) Limits,As Function of Rated Thermal Power ML20210P0371999-08-10010 August 1999 Forwards SE Granting Licensee 980710 Requests for Relief (ISI-13 - ISI-18) from Requirements of Section XI of 1989 Edition of ASME B&PV Code for Second 10-year Interval ISI at Plant,Unit 1 ML20210L1461999-08-0303 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Requests Submittal of Ltr Identifying Individuals Taking Exam,Personnel Allowed Access to Exams & Mailing Address for Exams ULNRC-04079, Forwards 180-day Response to NRC GL 99-02, Lab Testing of Nuclear-Grade Activated Charcoal1999-08-0202 August 1999 Forwards 180-day Response to NRC GL 99-02, Lab Testing of Nuclear-Grade Activated Charcoal ML20210H6381999-07-30030 July 1999 Forwards SE Accepting Relief Request for Approval for Use of Alternate Exam Requirement for Plant Inservice Insp Program A93443, Forwards Addl Info as Committed to in Telcon Between Amerenue & NRC Personnel on 990616,re GL 95-07, Pressure Locking & Thermal Binding of MOV Gate Valves1999-07-28028 July 1999 Forwards Addl Info as Committed to in Telcon Between Amerenue & NRC Personnel on 990616,re GL 95-07, Pressure Locking & Thermal Binding of MOV Gate Valves ULNRC-04075, Forwards Response to NRC 990618 RAI Re GL 96-05, Periodic Verification of Design-Basis Capability of SR Motor-Operated Valves1999-07-28028 July 1999 Forwards Response to NRC 990618 RAI Re GL 96-05, Periodic Verification of Design-Basis Capability of SR Motor-Operated Valves ULNRC-04076, Informs of Implementation of Amend 131 to License NPF-30, Revising OL to Reflect Requirement in TS 3/4.7.1.7 for Four Operable ASD Lines & Associated Revs,Rather than Three Operable ASDs1999-07-28028 July 1999 Informs of Implementation of Amend 131 to License NPF-30, Revising OL to Reflect Requirement in TS 3/4.7.1.7 for Four Operable ASD Lines & Associated Revs,Rather than Three Operable ASDs ULNRC-04070, Forwards Rev 3 to Callaway Plant Cycle 10 COLR, IAW TS 6.9.1.9.COLR Has Been Revised to Update RAOC Axial Flux Difference (Afd) Limits,As Function of Rated Thermal Power1999-07-27027 July 1999 Forwards Rev 3 to Callaway Plant Cycle 10 COLR, IAW TS 6.9.1.9.COLR Has Been Revised to Update RAOC Axial Flux Difference (Afd) Limits,As Function of Rated Thermal Power 05000483/LER-1998-008, Forwards Amended Response to GL 81-07, Control of Heavy Loads, to Address Corrective Action Described in LER 98-008-00.Discrepancy Between Earlier Submittals of Snupps Rept on Control of Heavy Loads & TS Re RHR Sys,Resolved1999-07-27027 July 1999 Forwards Amended Response to GL 81-07, Control of Heavy Loads, to Address Corrective Action Described in LER 98-008-00.Discrepancy Between Earlier Submittals of Snupps Rept on Control of Heavy Loads & TS Re RHR Sys,Resolved ULNRC-04071, Informs That Util Anticipates Approx Ten Licensing Actions That Could Occur During Fys 2000 & 2001,in Response to Administrative Ltr 99-021999-07-27027 July 1999 Informs That Util Anticipates Approx Ten Licensing Actions That Could Occur During Fys 2000 & 2001,in Response to Administrative Ltr 99-02 ML20210B5611999-07-20020 July 1999 Forwards Review of Ltr & Encl Objectives for Plant,Unit 1,1999 Emergency Plan Exercise Scheduled for 990914 ML20210B4021999-07-19019 July 1999 Ack Receipt of Facility Emergency Plan Implementing Procedure EIP-ZZ-00101, Classification of Emergencies, Rev 23,issued on 990513,under Provisions of 10CFR50,App E, Section V ML20210B4401999-07-19019 July 1999 Ack Receipt of Revs to Facility Radiological Emergency Response Plan,Chapters 8.0 & 4.0,issued Respectively on 990512-14,under Provisions of 10CFR50,App E,Section V ML20212A3291999-07-15015 July 1999 Forwards Scenario Manual Containing Description of Callaway Plant 1999 Biennial Emergency Response Plan Exercise to Be Conducted 990914.Correspondence to Satisfy 60-day Submittal Requirement ML20209F3471999-07-0909 July 1999 Forwards Response to NRC 990624 RAI to Complete NRC Review of Relief Request to Allow Use of 1998 Edition of ASME Section Xi,Subsection IWE ML20209E5591999-07-0808 July 1999 Informs That as Result of NRC Review of Util Responses to GL 92-01,rev 1,suppl 1 & Suppl 1 Rai,Staff Revised Info in Reactor Vessel Integrity Database & Releasing Database as Rvid Version 2.TAC MA0531 Closed ML20209H2471999-07-0707 July 1999 Forwards Rev 29 to Physical Security Plan,Per 10CFR50.54(p). Rev Withheld,Per 10CFR73.21 ML20196J9501999-07-0202 July 1999 Ack Receipt of Plant Ep,Rev 22,received on 981207 & Submitted Under Provision of 10CFR50,App E,Section V.Changes Does Not Decrease Effectiveness of EP & Continues to Meet Stds of 10CFR50.47(b).NRC Approval Not Required ML20209B6851999-06-28028 June 1999 Responds to GL 98-01,Suppl 1, Y2K Readiness of Computer Systems at Nuclear Power Plants. Disclosure Rept Encl ML20209C0171999-06-28028 June 1999 Forwards Special Rept 99-01 Re Fifteenth Year Inservice Containment Bldg Tendon Surveillance Failure.Observed Voids in Sheathing Filler Grease Do Not Indicate Degradation of post-tensioning Sys,Based on Encl Evaluation ML20196F8101999-06-25025 June 1999 Informs That J Donohew Will Assume Project Manager Responsibilities,Effective 990621 ML20196H2521999-06-25025 June 1999 Forwards Insp Rept 50-483/99-05 on 990502-0612.Two Violations Occurred & Being Treated as Noncited Violations, Consistent with App C of Enforcement Policy ML20196F8181999-06-24024 June 1999 Forwards RAI Re 990111 Request for Relief from Certain ASME Code ISI Requirements for Containment Liners.Response Requested within 30 Days from Date of Agreement ML20196G5621999-06-21021 June 1999 Informs NRC of Implementation of Amend 132 to Callaway License NPF-30 to Allows Installation of Electrosleeves for Steam Generator Tube Repair for Two Cycles Following Installation of First Electrosleeve IR 05000483/19990041999-06-18018 June 1999 Refers to GL 96-05 Issued by NRC on 960918,UE Responses & 970313 & NRC Insp Rept 50-483/99-04,dtd 990427. Forwards Request for Addl Info Re GL 96-05 Program at Callaway Plant,Unit 1 ML20212J2441999-06-18018 June 1999 Submits Request for Alternate Exam Requirements for Plant Re ISI Program Plan.Plant Does Not Torque Bolted Connections to Stress Values Greater than 100 Ksi ML20195H0971999-06-14014 June 1999 Discusses Une 990407 Request That Proprietary Document Entitled, Thermal Stability Assessment - Electrosleeved Tubes, Be Withheld from Public Disclosure.Determined Info to Be Proprietary & Will Be Withheld from Public Disclosure ML20207H3751999-06-14014 June 1999 Discusses 990407 Une Request That Proprietary Version of Document Entitled, Evaluation of Severe Accident Simulation, Dtd April 1999,be Withheld from Public Disclosure.Determined Info Proprietary & Will Be Withheld ML20195H9731999-06-11011 June 1999 Forwards Requested Addl Info Related to Relief Request ISI-16,encountered During Refuel 9 ML20195J9301999-06-0808 June 1999 Informs That Refuel 9 OAR-1 Owners Data Rept for ISI & Summary Rept for Interval 2 Was Submitted with Typographical Error,In That Commercial Service Date Should Be 841219,vice 941219.Please Substitute Encl Corrected Document ML20207G3201999-06-0707 June 1999 Ack Receipt of Change Notice 98-008 Dtd 980918,which Transmitted Changes to Callaway Plant Ep,Rev 21,under Provisions of 10CFR50,App E,Section V.No NRC Approval Required.No Violations Identified ML20207G3151999-06-0707 June 1999 Ack Receipt of Callaway Plant EP Implementing Procedure EIP-ZZ-001001M,Classification of Emergencies,Rev 22,issued on 981222 Under 10CFR50,App E,Section V Provisions.No Violations Identified ML20195C5131999-05-28028 May 1999 Forwards Revs to Sections 3.9 & 5.6 of Its,Based on Resolution Telcons Held Between NRC Staff & Util on 990526 & 27 A98803, Forwards Certified ITS & ITS Bases for Callaway Plant,In Response to NRC 990402 Draft SE for License Amend to Convert TSs to Format & Expanded Bases of ITS1999-05-27027 May 1999 Forwards Certified ITS & ITS Bases for Callaway Plant,In Response to NRC 990402 Draft SE for License Amend to Convert TSs to Format & Expanded Bases of ITS 1999-09-22
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML20217D5791999-09-15015 September 1999 Provides Formal Documentation of Reviews & Discussions Re Technical Ltr Rept for Proprietary Info.Review of Ltr Was Discussed in Telcon & Via e-mail Messages. Summary of Telcons as Documented on 990708,included ML20212A4701999-09-10010 September 1999 Rssponds to NRC 990709 RAI Re Util Relief Request to Allow Use of 1998 Edition of ASME Section Xi,Subsection Iwe. Acceptance Criteria for Liner Plate Pressure Boundary Thickness Will Be Limited to 10% Nominal Thinning ML20210R7241999-08-12012 August 1999 Forwards semi-annual Fitness for Duty Program Performance Data Rept for Callaway Nuclear Plant for 990101-990630,IAW 10CFR26.71(d) ULNRC-04085, Forwards Rev 4 to Callaway Plant Cycle 10 COLR, Per TS 6.9.1.9.COLR Has Been Revised to Update Rod Bank Insertion (Ril) Limits,As Function of Rated Thermal Power1999-08-11011 August 1999 Forwards Rev 4 to Callaway Plant Cycle 10 COLR, Per TS 6.9.1.9.COLR Has Been Revised to Update Rod Bank Insertion (Ril) Limits,As Function of Rated Thermal Power ULNRC-04079, Forwards 180-day Response to NRC GL 99-02, Lab Testing of Nuclear-Grade Activated Charcoal1999-08-0202 August 1999 Forwards 180-day Response to NRC GL 99-02, Lab Testing of Nuclear-Grade Activated Charcoal ULNRC-04075, Forwards Response to NRC 990618 RAI Re GL 96-05, Periodic Verification of Design-Basis Capability of SR Motor-Operated Valves1999-07-28028 July 1999 Forwards Response to NRC 990618 RAI Re GL 96-05, Periodic Verification of Design-Basis Capability of SR Motor-Operated Valves A93443, Forwards Addl Info as Committed to in Telcon Between Amerenue & NRC Personnel on 990616,re GL 95-07, Pressure Locking & Thermal Binding of MOV Gate Valves1999-07-28028 July 1999 Forwards Addl Info as Committed to in Telcon Between Amerenue & NRC Personnel on 990616,re GL 95-07, Pressure Locking & Thermal Binding of MOV Gate Valves ULNRC-04076, Informs of Implementation of Amend 131 to License NPF-30, Revising OL to Reflect Requirement in TS 3/4.7.1.7 for Four Operable ASD Lines & Associated Revs,Rather than Three Operable ASDs1999-07-28028 July 1999 Informs of Implementation of Amend 131 to License NPF-30, Revising OL to Reflect Requirement in TS 3/4.7.1.7 for Four Operable ASD Lines & Associated Revs,Rather than Three Operable ASDs 05000483/LER-1998-008, Forwards Amended Response to GL 81-07, Control of Heavy Loads, to Address Corrective Action Described in LER 98-008-00.Discrepancy Between Earlier Submittals of Snupps Rept on Control of Heavy Loads & TS Re RHR Sys,Resolved1999-07-27027 July 1999 Forwards Amended Response to GL 81-07, Control of Heavy Loads, to Address Corrective Action Described in LER 98-008-00.Discrepancy Between Earlier Submittals of Snupps Rept on Control of Heavy Loads & TS Re RHR Sys,Resolved ULNRC-04070, Forwards Rev 3 to Callaway Plant Cycle 10 COLR, IAW TS 6.9.1.9.COLR Has Been Revised to Update RAOC Axial Flux Difference (Afd) Limits,As Function of Rated Thermal Power1999-07-27027 July 1999 Forwards Rev 3 to Callaway Plant Cycle 10 COLR, IAW TS 6.9.1.9.COLR Has Been Revised to Update RAOC Axial Flux Difference (Afd) Limits,As Function of Rated Thermal Power ULNRC-04071, Informs That Util Anticipates Approx Ten Licensing Actions That Could Occur During Fys 2000 & 2001,in Response to Administrative Ltr 99-021999-07-27027 July 1999 Informs That Util Anticipates Approx Ten Licensing Actions That Could Occur During Fys 2000 & 2001,in Response to Administrative Ltr 99-02 ML20212A3291999-07-15015 July 1999 Forwards Scenario Manual Containing Description of Callaway Plant 1999 Biennial Emergency Response Plan Exercise to Be Conducted 990914.Correspondence to Satisfy 60-day Submittal Requirement ML20209F3471999-07-0909 July 1999 Forwards Response to NRC 990624 RAI to Complete NRC Review of Relief Request to Allow Use of 1998 Edition of ASME Section Xi,Subsection IWE ML20209H2471999-07-0707 July 1999 Forwards Rev 29 to Physical Security Plan,Per 10CFR50.54(p). Rev Withheld,Per 10CFR73.21 ML20209C0171999-06-28028 June 1999 Forwards Special Rept 99-01 Re Fifteenth Year Inservice Containment Bldg Tendon Surveillance Failure.Observed Voids in Sheathing Filler Grease Do Not Indicate Degradation of post-tensioning Sys,Based on Encl Evaluation ML20209B6851999-06-28028 June 1999 Responds to GL 98-01,Suppl 1, Y2K Readiness of Computer Systems at Nuclear Power Plants. Disclosure Rept Encl ML20196G5621999-06-21021 June 1999 Informs NRC of Implementation of Amend 132 to Callaway License NPF-30 to Allows Installation of Electrosleeves for Steam Generator Tube Repair for Two Cycles Following Installation of First Electrosleeve ML20212J2441999-06-18018 June 1999 Submits Request for Alternate Exam Requirements for Plant Re ISI Program Plan.Plant Does Not Torque Bolted Connections to Stress Values Greater than 100 Ksi ML20195H9731999-06-11011 June 1999 Forwards Requested Addl Info Related to Relief Request ISI-16,encountered During Refuel 9 ML20195J9301999-06-0808 June 1999 Informs That Refuel 9 OAR-1 Owners Data Rept for ISI & Summary Rept for Interval 2 Was Submitted with Typographical Error,In That Commercial Service Date Should Be 841219,vice 941219.Please Substitute Encl Corrected Document ML20195C5131999-05-28028 May 1999 Forwards Revs to Sections 3.9 & 5.6 of Its,Based on Resolution Telcons Held Between NRC Staff & Util on 990526 & 27 A98803, Forwards Certified ITS & ITS Bases for Callaway Plant,In Response to NRC 990402 Draft SE for License Amend to Convert TSs to Format & Expanded Bases of ITS1999-05-27027 May 1999 Forwards Certified ITS & ITS Bases for Callaway Plant,In Response to NRC 990402 Draft SE for License Amend to Convert TSs to Format & Expanded Bases of ITS ML20196L2911999-05-19019 May 1999 Forwards Responses to NRC 990315 RAI Concerning GL 95-07, Pressure Locking & Thermal Binding of MOV Gate Valves A36791, Forwards Response to NRC 990510 RAI Re GL 96-06 with Respect to Analysis of Water Hammer & two-phase Flow Issues. Supporting Calculation Also Encl1999-05-17017 May 1999 Forwards Response to NRC 990510 RAI Re GL 96-06 with Respect to Analysis of Water Hammer & two-phase Flow Issues. Supporting Calculation Also Encl ULNRC-04034, Forwards Amerenues Risk Evaluation Summary & Provides Listing of Other Documents Which Have Been Previously Provided to Support Evaluation of Electrosleeves at High Temp Severe Accident Conditions1999-05-17017 May 1999 Forwards Amerenues Risk Evaluation Summary & Provides Listing of Other Documents Which Have Been Previously Provided to Support Evaluation of Electrosleeves at High Temp Severe Accident Conditions 05000483/LER-1998-003, Forwards LER 98-003-01 Re Inadvertent Actuation of ESFAS Due to 'A' SG High Level During Refuel 9.Rept Is Submitted to Report Change in C/A from That Reported in Original Rept1999-05-12012 May 1999 Forwards LER 98-003-01 Re Inadvertent Actuation of ESFAS Due to 'A' SG High Level During Refuel 9.Rept Is Submitted to Report Change in C/A from That Reported in Original Rept ML20206Q9551999-05-12012 May 1999 Responds to NRC Re Violations Noted in Insp Rept 50-483/99-04.Corrective Actions:Une Commits to Make Available for NRC Review,Action Plan Outlining Scope & Completion Dates of Project ULNRC-04027, Forwards Comments on Draft SE Re Proposed Conversion to Improved Tss.Copy of ITS & ITS Bases Will Be Provided by 990524,to Support Issuance of License Amend on or About 9905281999-05-0404 May 1999 Forwards Comments on Draft SE Re Proposed Conversion to Improved Tss.Copy of ITS & ITS Bases Will Be Provided by 990524,to Support Issuance of License Amend on or About 990528 ML20206E3211999-04-28028 April 1999 Forwards Special Rept 98-03 Re Inservice Insp of CP Sgs,Per Plant TS 4.4.5.5.b.Insp Was Performed in Apr 1998 During Plant Ninth Refueling Outage.Rept Is Being Resubmitted Due to Typos in Original Rept ML20206E5781999-04-23023 April 1999 Informs That R Schukai Is No Longer Employed with Amerenue & Info Sent Is No Longer Required.Name Should Be Removed from Mailing Lists.Mailing Label Used by Company Which May Assist in Matter,Submitted ULNRC-04018, Submits follow-up Items Re Proposed Conversion to ITS Sections 1.0,3.3,3.4,3.6,3.7 & 3.9.Suppl to Ltr Will Be Submitted at Later Date1999-04-21021 April 1999 Submits follow-up Items Re Proposed Conversion to ITS Sections 1.0,3.3,3.4,3.6,3.7 & 3.9.Suppl to Ltr Will Be Submitted at Later Date ML20205Q7751999-04-16016 April 1999 Forwards Special Rept 98-03 Concerning ISI of Callaway SGs Performed in Apr 1998 During Callaway Plants Ninth Ro. Rept Documents Final SG Insp Results ULNRC-04015, Forwards Cash Flow Projection & Certification to Satisfy Guarantee of Payment of Retrospective Premiums,Per 10CFR140.211999-04-15015 April 1999 Forwards Cash Flow Projection & Certification to Satisfy Guarantee of Payment of Retrospective Premiums,Per 10CFR140.21 ULNRC-04005, Forwards Proprietary & non-proprietary White Paper Entitled, Evaluation of Severe Accident Simulation, as Addl Info to Facilitate Approval of Requested Amend to Revise TS to Use Repair SG Tubes.Proprietary Info Withheld,Per 10CFR2.7901999-04-0707 April 1999 Forwards Proprietary & non-proprietary White Paper Entitled, Evaluation of Severe Accident Simulation, as Addl Info to Facilitate Approval of Requested Amend to Revise TS to Use Repair SG Tubes.Proprietary Info Withheld,Per 10CFR2.790 ULNRC-04004, Forwards Proprietary Thermal Stability Background Data Along with Time/Temp Graph Requested in 990402 Telcon with NRC & Contractor,Argonne Natl Lab.Proprietary Info Withheld1999-04-0707 April 1999 Forwards Proprietary Thermal Stability Background Data Along with Time/Temp Graph Requested in 990402 Telcon with NRC & Contractor,Argonne Natl Lab.Proprietary Info Withheld ULNRC-04007, Submits follow-up Items Related to Proposed Conversion to ITSs Sections 3.3,3.4,3.6 & 3.7.Encl Includes mark-ups of ITS Sections 3.5,3.6 & 3.8.Suppl to Ltr Will Be Provided at Later Date1999-04-0707 April 1999 Submits follow-up Items Related to Proposed Conversion to ITSs Sections 3.3,3.4,3.6 & 3.7.Encl Includes mark-ups of ITS Sections 3.5,3.6 & 3.8.Suppl to Ltr Will Be Provided at Later Date ULNRC-04000, Forwards Rept Re Present Level of Insurance & Sources of Insurance Applicable to Callaway Plant,Per 10CFR50.54(w)1999-04-0101 April 1999 Forwards Rept Re Present Level of Insurance & Sources of Insurance Applicable to Callaway Plant,Per 10CFR50.54(w) ULNRC-03998, Forwards Required Financial Info Re Decommissioning Callaway Nuclear Plant,Per 10CFR50.751999-03-30030 March 1999 Forwards Required Financial Info Re Decommissioning Callaway Nuclear Plant,Per 10CFR50.75 ML20205G2211999-03-25025 March 1999 Submits Rev 28A to Callaway Plant Physical Security Plan, Incorporating Addendum Re Security Sys Replacement Transition Plan,Per 10CFR50.54(p).Encl Withheld,Per 10CFR73.21 ML20205R5251999-03-25025 March 1999 Forwards Special Rept 98-03 Re Results of Tenth SG Tube Inservice Insp,Per Requirements of Plant TS 4.4.5.5.b.Insp Was Performed in Apr 1998 During Plant Ninth Refueling Outage ULNRC-03988, Requests Approval of Alternative Exam ISI-12A Per 10CFR50.55a(a)(3)(i) & (II) for 1989 Edition of ASME Section IX,IWA-5242(a) for Class I Bolted Connections Inside Bioshield for RFO 101999-03-19019 March 1999 Requests Approval of Alternative Exam ISI-12A Per 10CFR50.55a(a)(3)(i) & (II) for 1989 Edition of ASME Section IX,IWA-5242(a) for Class I Bolted Connections Inside Bioshield for RFO 10 ULNRC-03991, Forwards 1998 Annual Rept of Individual Monitoring Results, Per 10CFR20.2206.Rept Provided in Electronic Format on Diskette IAW Gudiance of Reg Guide 8.7.Without Diskette1999-03-19019 March 1999 Forwards 1998 Annual Rept of Individual Monitoring Results, Per 10CFR20.2206.Rept Provided in Electronic Format on Diskette IAW Gudiance of Reg Guide 8.7.Without Diskette ML20204F7211999-03-17017 March 1999 Forwards Amended Fitness for Duty Program Performance Data for Six Month Period Beginning Jul-Dec 1998 ML20204E1331999-03-17017 March 1999 Responds to NRC Re Violations Noted in Insp Rept 50-483/99-02 on 990208-12.Corrective Actions:Will Revise Security Plan to Increase Min Staffing by Three Armed Security Force Response Personnel Per Shift ML20207C3631999-03-12012 March 1999 Forwards Exam Matl & Associated QA Checklist for Written Exam to Support Plant RO Retake Exam Scheduled for 990423. Exam Matls Requested to Be Withheld from Public Disclosure Until After Exam Completion 05000483/LER-1998-001, Forwards LER 98-001-01,being Submitted to Clarify Scope of Original Reviews Performed for Corrective Action Number 3 in LER 98-001-00.Reviews Have Identified Case of Failure to Properly Establish Equipment Operability1999-03-10010 March 1999 Forwards LER 98-001-01,being Submitted to Clarify Scope of Original Reviews Performed for Corrective Action Number 3 in LER 98-001-00.Reviews Have Identified Case of Failure to Properly Establish Equipment Operability ULNRC-03979, Submits follow-up Items Related to Proposed Conversion to ITSs Sections 3.3,3.4,3.6,3.7,3.8,3.9 & 5.0.Suppl to Ltr Dtd 970515,will Be Provided at Later Date1999-03-0909 March 1999 Submits follow-up Items Related to Proposed Conversion to ITSs Sections 3.3,3.4,3.6,3.7,3.8,3.9 & 5.0.Suppl to Ltr Dtd 970515,will Be Provided at Later Date ULNRC-03975, Informs of No Reportable ECCS Evaluation Model Revs for Callaway During Time Period from Mar 1998 to Mar 1999,IAW 10CFR50.46.ECCS Evaluation Model Margin Assessment Encl1999-03-0505 March 1999 Informs of No Reportable ECCS Evaluation Model Revs for Callaway During Time Period from Mar 1998 to Mar 1999,IAW 10CFR50.46.ECCS Evaluation Model Margin Assessment Encl ULNRC-03971, Forwards Annual Personnel Exposure & Monitoring Rept for 1998, Per TS Sections 6.9.1.4 & 6.9.1.5.Rept Includes One Incident of Specific Activity Analysis of RCS in Which Limits of TS 3.4.8 Were Exceeded1999-02-26026 February 1999 Forwards Annual Personnel Exposure & Monitoring Rept for 1998, Per TS Sections 6.9.1.4 & 6.9.1.5.Rept Includes One Incident of Specific Activity Analysis of RCS in Which Limits of TS 3.4.8 Were Exceeded ML20207A4311999-02-17017 February 1999 Forwards semi-annual Fitness for Duty Program Performance Data Rept for Callaway Nuclear Plant for Period of 980701-981231 1999-09-15
[Table view] |
Text
--
1901 Chouteau Avenue Post Othce Box 149 St. Louis. Missouri 63166
., 314 554-2650 Union uar 15, 996 o 's> >cs u EtEcrmc :',,~ ?-~'
s U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Station F1-137 Washington, DC 20555-0001 Gentlemen:
ULNRC- 03378 TAC No. M90859 Callaway Plant Docket Number 50-483
- Inservice Inspection Plan Relief Requests
References:
- 1) ULNRC-3086 dated October 12, 1994
- 2) ULNRC-3255 dated August 18, 1995
- 3) NRC letter dated December 20, 1995 l
i Union Electric submitted Revisions 0 and 1 l of the second 10-year interval Inservice Inspection Program Plan via References 1 and 2, respectively.
The NRC staff approved the relief requests associated ,
l with the second 10-year plan in Reference 3. l l However, two of the relief requests as approved by l l the NRC require clarification.
Relief Request ISI-09, Basis for Relief, states in paragraph 3 that "The Type A leakage test is performed three times in a ten year interval and the Type B and C !
tests are performed at intervals not greater than 24 months." The NRC has subsequently approved Option B of 10CFR50, Appendix J, which allows Local Leak Rate Tests for Type C penetrations to extend to a maximum interval of
! five years and Integrated Leak Rate Tests to extend to a
- maximum interval of ten years. Therefore, Relief Request
- ISI-09 is amended to state that primary reactor
- containment integrity is periodically verified by
. performing leakage tests in accordance with 10CFR50, Appendix J.
Relief Request ISI-07 was approved conditionally in Reference 3. The conditions that, "the licensee shall remove all existing removable insulation each 2000;7 M 9605200469 960515 1/
PDR ADOCK 05000483-G PDR 3
ULNRC-03378 Page 2 4
- I refueling outage at bolted connections in systems borated for the purpose of controlling reactivity and perform a VT-2 visual examination for evidence of leakage" are more stringent than the frequencies specified for Class 2 category C-H piping. These, conditions negate the relief altogether. By specifying all " removable insulation" no relief is granted from IWA-5242. The majority of piping I systems covered by ISI-07 use removable insulation to 1 meet 10CFR50, Appendix A requirements for ,
1 accessibility.
In addition, the visual inspections imposed by IWA-5242 would be performed on bolted connections that are not susceptible to boric acid corrosion.
Relief Request ISI-07 defines the current programs that ensure bolting degradation is minimized.
We understand that the conditions imposed on Relief Request ISI-07 include criteria from ASME Code Case N-533. However, based on the design of the subject piping systems, the hardships incurred, and the negligible gain in nuclear safety, Union Electric requests reconsideration of Relief Request ISI-07 with the additional justification provided as described in the basis for relief, and without consideration of Code Case N-533. If you have any questions concerning this letter, please co.ntact us.
Very truly yours, O
l Donald F. Schnell CDN/WEK/MMR Attachments i
i i
cc: T. A. Baxter, Esq. ,
Shaw, Pittman, Potts & Trowbridge l 2300 N. Street, N.W. I Washington, D.C. 20037 M. H. Fletcher Professional Nuclear Consulting, Inc. l 19041 Raines Drive l Derwood, MD 20855-2432 j L. Joe Callan Regional Administrator U.S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive Suite 400 1 Arlington, TX 76011-8064 Senior Resident Inspector Callaway Resident Office U.S. Nuclear Regulatory Commission 8201 NRC Road Steedman, MO 65077 Kristine M. Thomas (2)
Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission l
1 White Flint, North, Mail Stop 13E16 11555 Rockville Pike Rockville, MD 20852-2738 .
Manager, Electric Department Missouri Public Service Commission P.O. Box 360 Jefferson City, MO 65102 ;
1 l
t i
1 l
4
= l 1 l 1
RELIEF REOUEST NUMBER: ISI-09A !
(Page 1 of 3)
COMPONENTIDENTIFICATION Code Class: 2
Reference:
Tab!c IWC-2500-1 Examination Category: C-H Item Numbers: C7.30, C7.40, C7.70, and C7.80
Description:
Alternate Provisions for Pressure Testing Code Class 2 Piping and Valves at l Containment Penetrations Where the Balance of the System is Outside the l
Scope of Section XI.
l Component Numbers: Line Number Penetration Description l
l BB-103-HCB-1" P-62 Pressurizer relief tank gas line BL-028-HCB-3" P-25 Reactor water storage tank to RCP i standpipes l' BM-053-HBB-3" P-78 Steam Generator drain EC-067-HCB-6" P-53 Fuel pool cooling return
- EC-072-HCB-6" P-54 Refueling pool to fuel pool cooling pump suction l ,
l EC-081-HCB-3" P-55 Refueling pool to fuel pool skimmer
! Pump EM-071-BCB-3/4" P-92 SIS pump test line return to Reactor water storage tank
! GP-003-HBB-1" P-51 ILRT test connection lines j l
GP-005-HBB-1" P-51 ILRT test connectionlines j GS-025-HBB-6" P-65 Hydrogen purge subsystem to ESF l filters
! GT-007-HBB-36" V-160 Containment shutdown purge GT-004-HBB-36" V-161 Containment shutdown purge GT-029-HBB-18" V-161 Containment shutdown purge GT-034 HBB-18" V-160 Containment shutdown purge GT 033-HBB-18" V-160 Containment shutdown purge GT-030-HBB-18" V-161 Containment shutdown purge HB-015-HCB-3" P-26 From reactor coolant drain tank heat exchanger j HB-025-HBB-3/4" P.-44 Reactor coolant drain tank to waste gas j compressor HD-015-HBB-2" P-43 Auxiliary steam for reactor vessel head
, decontamination t
}
3 RELIEF REOUEST NUMBER: ISI-09A (Page 2 of 3)
Component Numbers (Cont.): Line Number Penetration Description KA-244-HCB-1 1/2" P-30 Compressed air KA-259-HCB-1 1/2" P-30 Compressed air KA-051-HBB-5" P-63 Service air KA-261 HBB-1" P-63 Reactor building service air i
KA-732-HBB-1" N/A Personnel hatch penetration test lines ]
KA-733-HBB-1" N/A Personnel hatch penetration test lines l KB-001-HCB-2" P-98 Breathing air .
KC-560-HBB-4" P-67 Fire protection LF-842-HCB-6" P-32 Containment building floor drain header SJ-002-BCB-1" P 69 Nuclear sampling from pressurizer vapor space SJ-003-ECB-1" P-95 Nuclear sampling from accumulator tanks SJ-001-BCB-1" P-93 Loop I hot legliquid sample to PASS SJ-029-BCB-1" P-93 Loop I hotleg liquid sample to PASS SJ-021-BCB-1" P-64 Loop 3 hot leg & pressurizerliquid sample to PASS SJ-024-BCB-1" P-57 PASS to reactor coolant drain tank SJ-025-BCB-1" P-58 PASS to reactor coolant drain tank CODE REOUIREMENT ASME Section XI, Table IWC-2500-1, Examination Category C-H, requires the performance of a visual VT-2 examination during a system pressure test on Code Class 2 pressure retaining components. Note 7 of this table states, "The pressure boundary includes only those portions of the system required to operate or support the safety system function up to and including the first normally closed valve (including a safety or relief valve) or valve capable of automatic closure when the safety function is required."
1 RELIEF REOUEST NUMBER: ISI-09A i (Page 3 of 3)
BASIS FOR RELIEF j l
Union Electnc Company requests relief from the requirement to perform a pressure test in accordance with ASME I Section XI, Table IWC-2500-1, Examination Category C-H on the Code Class 2 lines listed above. Based on the discussion below, these pressure tests are considered redandant and without a compensating increase in the level of quality or safety.
The lines listed above are non-safety related portions of piping systems that penetrate the primary reactor containment. At each containment penetration, the process pipe is classified Code Class 2 and prosided with ,
isolation valves that are either locked closed during normal operation, capable of automatic closure, or capable of i remote closure to support the containment integrity function. The piping and valves are considered part of the primary reactor containment and upgraded to Code Class 2 at the penetration only to support the primary reactor containment integrity function. Except for this, the lines listed above prmide no safety function.
The primary reactor containment integrity, including all containment penetrations, is periodically verified by 1 performing leakage tests in accordance with a 10 CFR 50, Appendix J. Each of the Code Class 2 lines listed above l and its namaciated isolatbs W3ves are tested during an Appendix J Type A, B or C leakage test at a pressure not less than 48.1 psig, peak alculated containment pressure Performance of these Appendix J leak tests will verify the integrity of the subject Code Class 2 lines at each respective penetration. Appendix J Option B test intenals I will not exceed five years for an LLRT on Type C penetrations and ten years for an ILRT. The performance of l ASME Section XI, Examination Category C-H pressure tests on these same lines will provide little, if any, )
additional verification of primary reactor containment integrity. Based on this, the performance of Examination j Category C-H pressure tests on these lines is considered by Union Electric to be unnecessary and prmides a j negligible increase in the level of quality or safety.
This Relief Request mirrors the requirerr.cnts of ASME Code Case N-522 which has not yet been approved in Regulatory Guide 1.147 PROPOSED ALTERNATE PROVISIONS l
Union Electric shall perform 10 CFR 50, Appendix J leakage tests on the primary reactor containment penetration lines listed above, and on their associated valves, in accordance with Callaway Technical Specification 3/4.6.
I 4
A 4
e 1
e RELIEF REOUEST ISI-07A (Page 1 of 3)
COMPONENT FUNCTION Code Class: I and 2
Reference:
IWA-5242(a)
Examination Category: B-P and C-H ltem Numbers: All Item Numbers Listed Under Examination Categories B-P and C-H
Description:
Alternate Rules for Insulation Remova: During IWA-5000 Pressure Tests at Bolted Connections in Systems Borated for the Purpose of Controlling Reactivity Component Numbers: Bolted Connections in Systems Borated for the Purpose of Controlling Reactivity CODE REOUIREMENTS ASME Section XI,1989 Edition, Paragraph IWA-5242(a) states, "For systems borated for the purpose of controlling reactivity, insulation shall be removed from pressure retaining bolted connections for visual examination VT-2."
BASIS FOR RELIEF Reliefis requested from the requirement to remove insulation for visual VT-2 examination of bolted connections during a system pressure test on systems borated for the purpose of controlling reactivity.
Union Electric believes that removal ofinsulation at bolted con'metions for the sole purpose of visual examination is impractical and will result in hardship and unusual difficulty for the reasons listed below:
- 1) The visual VT-2 examination of the Reactor Coolant System (RCS) is performed following the majority of all outage maintenance activities and just prior to reactor criticality. The RCS is at a normal operating temperature and pressure (557'F and 2235 psig) during tim pressure test as required by IWA-5000. Performance of a visual VT-2 examination, re-installation ofinsulation, and disassembly of scaffolding under these conditions is a personnel safety hazard.
- 2) The anticipated dose based on a best case analysis from past experience (best RCS cleanup) and plant history from check valve flow testing is 11 Person Rem exposure during Refuel 8 for the sole purpose of supporting these visual exams. This is approximately 9% of the total budgeted dose for Refuel 8.
- 3) Differential thermal expansion occurs when insulation is removed from a bolted connection that creates a greater chance for leakage. When insulation is removed, the flanges expand at a rate greater than the bolts causing stress on the connection. Once the bolts expand, the stress has caused the equivalent of untorquing the connection. The less tightened connection then has a high:r probability ofIraking.
4 4
- +- RELIEF REOUESTISI-07A (Page 2 of 3)
- 4) Code Class 1 and 2 systems borated for the purpose of controlling reactivity are extensive and large systems covering many areas inside and outside of containment on multiple elevations. Scaffolding will be required to access many of the bolted connections. In addition, many of the bolted connections are located in difficult to access areas and in medium to high radiation areas. Insulation removal l combined with scaffolding requirements will increase outage costs. Approximately 590 insulator i
! manhaars and 428 scaffolder manhours will be required to be added to Refuel 8 to support the performance of these VT-2 exams Based on craR hourly labor rates as of June,1995 for outage work, this equates to $18,495, The VT-2 is performed between modes 3 and 2 ascending, which normally has a duraten of six to eight hours. Under the new requirements, critical path time will be extended several hours to accommodate the insulation installation and scaffold removal inside the bio-shield wall and throughout containment aRet the examination is complete. Critical path cost is currently estimated at $207,000 per day.
Union Electric believes that the established Callaway programs described below in addition to the alternative examination proposed below, provide an acceptable level of safety and quality for bolted !
l I
nannartmna in systems borated for the purpose of controlling reactivity. ]
- 1) In response to NRC Generic letter 88 05, Union Electric established a program for Engineering to inspect all boric acid leaks dis: overed in the contain.nent building and to evaluate the impact of those leaks on carbon steel or low alley steel components. All evidence ofleaks, incleding boric acid crystals or residue, is law and evaluated regardless of whether the leak was discovered at power or during an outage. Issues such as the following are considered in the inspection and evaluation: 1) evidence of corrosion or metal degradation, 2) effect the leak may have on the pressure boundary, 3) possibility of boric acid traveling along the inside ofinsulation on piping, and 4) possibility of dripping or spraying on other components. Based on this evaluation, Engineering initiates ,
appropriate corrective actions to prevent reoccurrence of the leak and to repair, if necessary, any degraded materials or components. ,
1
!. 2) In addition to the nondestructive examinations required by ASME Section XI, Union Electric has l committed to the botting examination reqmrements of NRC Bulletin 82 02. In accordance with this Bulletin, at least two nondestructive examination techniques (e.g., ultrasonic, liquid penetrant, magnetic particle, or visual VT-1) are performed on bolted connections of the following components:
Steam Generator primary manways, Pressurizer primary manway, Pressurizer safety valves, and a l total of 22 Reactor Coolant System isolation valves that are greater than 6" NPS. As a minimum, two l
nomb,wiive examination techniques are used whenever the bolted connection of one of the subject co nponents is disassembled for maintenance or other inspection. These additional examinations ensure that degradation mechanisms such as Stress Corrosion Cracking or corrosion do not go undetected in bolted connections critical to reactor safety.
- 3) All bolted connections on Callaway's Class I and 2 borated systems are either stainless materials SA-564 Grade 630 and SA 194 Grade 6 or superalloy SA-453 Grade 660. The stainless steels were designed to be resistant in corrosive applications. This is substantiated by documents such as EPRI +
NP 5679 which attests to the resistance of stainless steels to boric acid corrosion. The superalloy was designed for resistivity to acid corrosion environments due to its high nickel and chrome content and l
the inclusion of molybdenum specifically to inhibit inorganic acids such as boric acid. To ensure that i
degradation mechanisms in these metals are mitigated, Union Electric maintains a program at the ;
! Callaway Plant that controls materials (insulation, thread lubricant, boron, etc.) that may come in
{ contact with safety related components, including bolting. This program ensures that impurities are j not present in concentrations that would promote development of Stress Corrosion Cracking in
- stainless steel bolted connections. The only carbon steel bolted connections at the Callaway Plant on ;
j systems borated for the purpose of controlling reactivity are Steam Generators Manways, Reactor ;
- Coolant Pump Bolting and Pressurizer Manways. These areas will be inspected for leakage by plant i programs with the insulation removed i
=
RELIFJ_REQUESTlSI47A (Page 3 of 3)
PROPOSED ALTERNATE EXAMINATION Bolted connections fabricated of materials resistant to boric acid corrosion in systems borated for the purpose of controlling reactivity shall receive a visual VT-2 examination during the system pressure tests ofIWB-5000 and IWC-5000 with the insulation installed. If evidence ofleakage is detected, either by discovery of active leakage or evidence of boric acid crystals, the insulation shall be removed and the bolted connection shall be re-examined and, if necessary, evaluated in accordance with the corrective measures of Subarticle IWA-5250.
Carbon steel bolted connections within the Insenice Inspection boundaries will receive an inspection for boric acid residue with the insulation removed. In addition, a Vf-2 inspection will be performed in accordance with ASME Section XI requirements with the insulation installed at normal operating pressure and temperature.
l Ifinsulation is removed for planned maintenance, repair, or other inspection at a bolted connection in a system borated for the purpose of controlling reactivity, a visual VT-2 examination shall be performed on j the bolted connection prior to disassembly and, if evidence ofleakage is discovered, evaluated in accordance with the corrective measures of Subarticle IWA-5250.
l l
g e
l j l
2 1
- l i
l 1
l