ML21217A334
From kanterella
ML21217A334 | |
Person / Time | |
---|---|
Site: | Wolf Creek |
Issue date: | 08/05/2021 |
From: | Benham R Wolf Creek |
To: | Document Control Desk, Office of Nuclear Reactor Regulation |
References | |
RA 21-0063 WCRE-30, I4-P2-RF24 | |
Download: ML21217A334 (5) | |
Similar Documents at Wolf Creek | |
---|---|
Category:Inservice/Preservice Inspection and Test Report
MONTHYEARML23277A2772023-10-11011 October 2023
[Table view]Regulatory Audit Summary Concerning Review of Request Number CI3R-01 for Proposed Alternative Inspection Frequency for Containment Unbonded Post Tensioning System Components ML23075A0742023-03-16016 March 2023 Containment Inservice Inspection Program Third Interval, Second Period, Refueling Outage 25 Owners Activity Report ML23075A1632023-03-16016 March 2023 Inservice Inspection Program Fourth Interval, Third Period, Refueling Outage 25 Owners Activity Report ML22124A0062022-05-0505 May 2022 Review of the Spring 2021 Refueling Outage 24 Steam Generator Tube Inservice Inspection Report ET 21-0009, Results of the Steam Generator Tube Inservice Inspection During the 24th Refueling Outage2021-11-0101 November 2021 Results of the Steam Generator Tube Inservice Inspection During the 24th Refueling Outage ML21217A3342021-08-0505 August 2021 Inservice Inspection Program Fourth Interval, Second Period, Refueling Outage 24 Owner'S Activity Report ML21217A3352021-08-0505 August 2021 Containment Inservice Inspection Program Third Interval, First Period, Refueling Outage 24 Owner'S Activity Report ML20042C8922020-02-0404 February 2020 Containment Inservice Inspection Program Third Interval, First Period, Refueling Outage 23 Owner'S Activity Report ML20042C8962020-02-0404 February 2020 Lnservice Inspection Program Fourth Interval, Second Period, Refueling Outage 23 Owner'S Activity Report ET 18-0029, (WCGS) - Results of the Twenty First Steam Generator Tube Inservice Inspection2018-10-31031 October 2018 (WCGS) - Results of the Twenty First Steam Generator Tube Inservice Inspection ML18234A1322018-08-14014 August 2018 Submittal of Containment Inservice Inspection Program Second Interval, Third Period, Refueling Outage 22 Owner'S Activity Report ML18234A1312018-08-14014 August 2018 Lnservice Inspection Program Fourth Interval, First Period, Refueling Outage 22 Owner'S Activity Report ET 17-0008, Results of the Twentieth Steam Generator Tube Lnservice Inspection2017-05-0202 May 2017 Results of the Twentieth Steam Generator Tube Lnservice Inspection ET 17-0007, CFR 50.55a Request 14R-05 for the Fourth Inservice Inspection Program Interval2017-04-13013 April 2017 CFR 50.55a Request 14R-05 for the Fourth Inservice Inspection Program Interval ET 16-0005, Inservice Inspection Plan and 10 CFR 50.55a Requests 14R-01 and 14R-02 for the Fourth Inservice Inspection Program Interval2016-02-23023 February 2016 Inservice Inspection Plan and 10 CFR 50.55a Requests 14R-01 and 14R-02 for the Fourth Inservice Inspection Program Interval ET 15-0024, Results of the Nineteenth Steam Generator Tube Inservice Inspection2015-10-20020 October 2015 Results of the Nineteenth Steam Generator Tube Inservice Inspection ET 15-0022, Fourth Ten-Year Interval Submittal Snubber Program Plan and Inservice Testing Program Plan, WCOP-29, Revision 02015-09-0202 September 2015 Fourth Ten-Year Interval Submittal Snubber Program Plan and Inservice Testing Program Plan, WCOP-29, Revision 0 ML15217A0222015-07-28028 July 2015 Containment Inservice Inspection Program Second Interval, Second Period, Refueling Outage 20 Owner'S Activity Report ML15222A2512015-07-28028 July 2015 Inservice Inspection Program Third Interval, Third Period, Refueling Outage 20 Owner'S Activity Report ET 14-0018, 10CFR50.55a Request I3R-10 for Third Inservice Inspection Program Interval2014-06-26026 June 2014 10CFR50.55a Request I3R-10 for Third Inservice Inspection Program Interval ML14174B1232014-06-25025 June 2014 Review of 18th Steam Generator Tube Inspection Report ET 13-0030, Results of the Eighteenth Steam Generator Tube Inservice Inspection2013-09-30030 September 2013 Results of the Eighteenth Steam Generator Tube Inservice Inspection ML13199A2362013-07-11011 July 2013 Submittal of Containment Inservice Inspection Program Second Interval, Second Period, Refueling Outage 19 Owner'S Activity Report ET 11-0008, (WCGS) - Results of the Seventeenth Steam Generator Tube Inservice Inspection2011-10-19019 October 2011 (WCGS) - Results of the Seventeenth Steam Generator Tube Inservice Inspection ML11263A1492011-09-13013 September 2011 Containment Inservice Inspection Program Second Interval, First Period, Refueling Outage 18 Owner'S Activity Report ML11263A1482011-09-13013 September 2011 Inservice Inspection Program Third Interval, Second Period, Refueling Outage 18 Owner'S Activity Report ET 10-0012, Results of the Sixteenth Steam Generator Tube Inservice Inspection2010-04-0808 April 2010 Results of the Sixteenth Steam Generator Tube Inservice Inspection ML1004907522010-02-0909 February 2010 Submittal of Inservice Inspection Program Third Interval, Second Period, Refueling Outage 17 Owner'S Activity Report ML0822603672008-08-0606 August 2008 Containment Inservice Inspection Program First Interval, Third Period, Owner'S Activity Reports ML0822603412008-08-0606 August 2008 Inservice Inspection Program Third Interval, First Period, Refueling Outage 16 Owner'S Activity Report ML0704304622007-01-31031 January 2007 Containment Inservice Inspection Program First Interval, Third Period, Refueling Outage 15 Owner'S Activity Report RA-07-0012, Inservice Inspection Program Third Interval, First Period, Refueling Outage 15 Owner'S Activity Report2007-01-31031 January 2007 Inservice Inspection Program Third Interval, First Period, Refueling Outage 15 Owner'S Activity Report ML0614503192006-05-19019 May 2006 10 CFR 50.55a Request I3R-05, Installation and Examination of Full Structural Weld Overlays for Repairing/Mitigating Pressurizer Nozzle-to-Safe End Dissimilar Metal Welds and Adjacent Safe End-to Piping Stainless Steel Welds ET 06-0011, CFR 50.55a Requests I2R-34, I2R-35, I2R-36, I2R-37, and I2R-38 for the Second Inservice Inspection Program Interval2006-03-0202 March 2006 CFR 50.55a Requests I2R-34, I2R-35, I2R-36, I2R-37, and I2R-38 for the Second Inservice Inspection Program Interval ET 06-0010, Inservice Inspection Program Plan for the Third Ten-Year Interval and 10 CFR 50.55a Requests I3R-01, I3R-02, and I3R-042006-03-0202 March 2006 Inservice Inspection Program Plan for the Third Ten-Year Interval and 10 CFR 50.55a Requests I3R-01, I3R-02, and I3R-04 ET 06-0001, Revision to Technical Specification 5.5.8, Inservice Testing Program to Adopt Technical Specification Task Force Standard Technical Specification Change Traveler, TSTF-479, Revision 02006-02-0101 February 2006 Revision to Technical Specification 5.5.8, Inservice Testing Program to Adopt Technical Specification Task Force Standard Technical Specification Change Traveler, TSTF-479, Revision 0 ET 05-0004, Steam Generator Tube Plugging Report2005-05-0404 May 2005 Steam Generator Tube Plugging Report WM 04-0046, Results of the Twelfth Steam Generator Tube Inservice Inspection2004-10-27027 October 2004 Results of the Twelfth Steam Generator Tube Inservice Inspection WM 04-0008, Request to Extend the Second 10-year Inservice Inspection (ISI) Interval for Reactor Pressure Vessel Examinations, 10 CFR 50.55a Request 12R-282004-04-15015 April 2004 Request to Extend the Second 10-year Inservice Inspection (ISI) Interval for Reactor Pressure Vessel Examinations, 10 CFR 50.55a Request 12R-28 ET 03-0006, Implementation of the ASME Code for Operation and Maintenance of Nuclear Power Plants, Regarding the Check Valve Monitoring Program2003-08-26026 August 2003 Implementation of the ASME Code for Operation and Maintenance of Nuclear Power Plants, Regarding the Check Valve Monitoring Program ML0319704482003-07-0808 July 2003 Inservice Inspection Program Second Interval, Second Period Owner'S Activity Reports ET 02-0046, Results of Eleventh Steam Generator Tube Inservice Inspection2002-12-11011 December 2002 Results of Eleventh Steam Generator Tube Inservice Inspection ET 02-0049, Containment Inservice Inspection Program First Interval, First Period Owner'S Activity Reports2002-11-0404 November 2002 Containment Inservice Inspection Program First Interval, First Period Owner'S Activity Reports 2023-03-16 Category:Letter MONTHYEARML24025A0992024-01-25025 January 2024
[Table view]Withdrawal of Request for Exemption from Specific 10 CFR Part 73 Requirements ML24018A0792024-01-22022 January 2024 Individual Notice of Consideration of Issuance of Amendment to Renewed Facility Operating License, Proposed Nshcd and Opportunity for a Hearing (EPID L-2024-LLA-0007) (Letter) ML24018A1382024-01-18018 January 2024 Inservice Inspection Request for Information ML24018A2482024-01-18018 January 2024 License Amendment Request to Modify the Implementation Date of License Amendment No. 238 IR 05000482/20230042024-01-11011 January 2024 Integrated Inspection Report 05000482/2023004 ML23356A0722024-01-0404 January 2024 Supplemental Information Needed for Acceptance of Requested Licensing Actions Exemption from Specific 10 CFR Part 73N Requirements (EPID L-2023-LLE-0048) (Redacted Version) WO 23-0002, Operating Corp., Summary of Actions Implemented for EA-18-165, Confirmatory Order, NRC Inspection Report 05000482/2019010 and NRC Investigation Report 4-2018-0082023-12-26026 December 2023 Operating Corp., Summary of Actions Implemented for EA-18-165, Confirmatory Order, NRC Inspection Report 05000482/2019010 and NRC Investigation Report 4-2018-008 ML23348A3662023-12-18018 December 2023 Notification of an NRC Fire Protection Baseline Inspection (NRC Inspection Report 05000482 2024012) and Request for Information ML23334A2502023-11-30030 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23299A2662023-11-29029 November 2023 Issuance of Amendment No. 238 Modified Implementation Date of License Amendment No. 237 ML23331A4972023-11-27027 November 2023 Supplement to License Amendment Request to Modify the 90-Day Implementation of License Amendment No. 237 ML23325A2112023-11-20020 November 2023 Submittal of Request for Exemption from Specific Provisions in 10 CFR 73.55 ML23320A2772023-11-16016 November 2023 License Amendment Request to Revise Ventilation Filter Testing Program Criteria in Technical Specification 5.5.11.b and Administrative Correction of Absorber in Technical Specification 5.5.11 ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV ML23305A3472023-11-0101 November 2023 Revision of One Form That Implements the Radiological Emergency Response Plan (RERP) ML23292A3592023-10-19019 October 2023 License Amendment Request to Modify the 90-Day Implementation of License Amendment No. 237 ML23292A3572023-10-19019 October 2023 Operating Corporation, Request for Correction in Response to Issuance of Amendment No. 237 and Corresponding Safety Evaluation ML23277A2772023-10-11011 October 2023 Regulatory Audit Summary Concerning Review of Request Number CI3R-01 for Proposed Alternative Inspection Frequency for Containment Unbonded Post Tensioning System Components ML23284A2392023-10-11011 October 2023 NRC Initial Operator Licensing Examination Approval 05000482/2023301 ML23276B4552023-10-0303 October 2023 Technical Specification 5.6.8 Post Accident Monitoring (PAM) Report ML23264A8682023-09-21021 September 2023 Independent Spent Fuel Storage Installation Registration of Dry Storage Canister WC-EOS-37PTH-008-B4L, WC-EOS-37PTH-007-B4L, and WC-EOS-37PTH-002-B4L ML23256A2062023-09-14014 September 2023 Withdrawal of Requested Licensing Action Exemption from Specific 10 CFR Part 73 Requirements ML23165A2502023-08-31031 August 2023 Issuance of Amendment No. 237 Request for Deviation from Fire Protection Requirements ML23243A0002023-08-31031 August 2023 Wolf Generating Station - Withdrawal of Request for Exemption from Specific 10 CFR Part 73 Requirements IR 05000482/20230052023-08-23023 August 2023 Updated Inspection Plan for Wolf Creek Nuclear Operating Corporation, Unit 1 (Report 05000482/2023005) - Mid-Cycle Letter 2023 ML23232A0012023-08-19019 August 2023 Revision of One Procedure That Implements the Radiological Emergency Response Plan (Rerp). Includes EPP 06-009, Rev. 13 ML23221A3932023-08-0909 August 2023 Submittal of Request for Exemption from Specific 10 CFR Part 73 Requirements ML23220A4222023-08-0808 August 2023 Supplement to License Amendment Request (LAR) for Deviation from Fire Protection Program Requirements ML23201A1212023-08-0707 August 2023 Issuance of Amendment No. 236 Revision to Technical Specifications to Adopt TSTF-554, Revise Reactor Coolant Leakage Requirements ML23130A2902023-07-26026 July 2023 Issuance of Amendment No. 235 Revision to Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections IR 05000482/20230022023-07-11011 July 2023 Integrated Inspection Report 05000482/2023002 ML23167A0042023-06-26026 June 2023 Audit Plan to Support Review of Request for Alternative Containment Inservice Inspection Frequency IR 05000482/20234012023-06-21021 June 2023 Security Baseline Inspection Report 05000482/2023401 ML23171B1312023-06-20020 June 2023 Additional Supplement to License Amendment Request to Adopt TSTF-577-A, Revision 1, Revised Frequencies for Steam Generator Tube Inspections ML23151A4162023-05-31031 May 2023 Revision of One Form That Implements the Radiological Emergency Response Plan (RERP) for Wolf Creek Generating Station (WCGS) ET 23-0006, CFR 50.55a Request Number CI3R-01 for the Third Containment Inservice Inspection Program Interval for Proposed Alternative Frequency to Containment Unbonded Post-Tensioning System Components2023-05-17017 May 2023 CFR 50.55a Request Number CI3R-01 for the Third Containment Inservice Inspection Program Interval for Proposed Alternative Frequency to Containment Unbonded Post-Tensioning System Components WO 23-0014, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-05-17017 May 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23132A1532023-05-12012 May 2023 Transmittal of 2022 Annual Financial Reports WM 23-0009, Financial Assurance Requirements for Decommissioning Nuclear Power Reactors 10 CFR 50.75(f)(1)2023-05-10010 May 2023 Financial Assurance Requirements for Decommissioning Nuclear Power Reactors 10 CFR 50.75(f)(1) ML23135A1172023-05-0808 May 2023 Redacted Version of Revision 36 to Updated Safety Analysis Report ML23117A2112023-04-27027 April 2023 Annual Exposure Report (2022) ML23117A1342023-04-27027 April 2023 2022 Annual Radioactive Effluent Release Report Report 46 2024-01-04 |
Text
Retrieved from "https://kanterella.com/w/index.php?title=ML21217A334&oldid=3392811"