ML20140G370

From kanterella
Revision as of 16:44, 12 December 2021 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Amend 2 to License Application for SEFOR
ML20140G370
Person / Time
Site: 05000231
Issue date: 05/05/1997
From: Cohen K
GENERAL ELECTRIC CO.
To:
Shared Package
ML20140G249 List: ... further results
References
FOIA-97-34 NUDOCS 9705090066
Download: ML20140G370 (4)


Text

k * -

i:

.. .- 1

!4

)

^

t' AMENDMENT NO, 2 e

TO LICENSE APPLICATION .

FOR SOUTHWEST EXPERIMENTAL FAST OXIDE REACTOR (SEFOR)

$10 o R

% 1 2 s, V(g %

0$ I Af.

n!

s gy ).v,a , ~

4 A

i Re: Docket 50 231 I J ile. Cope ,

b

,h e. .

s

/ t' %

81, S gh h

, :s h 4 s e ~

P (o do l

l General Electric Company Advanced Products Operation 1

%' c- 175 Curtner Avenue .

l v San Jose, California

[""0//ffg 4O,, a SI.OfM I

]

t

,.,_JJ

~

9705090066 970505 f il PDR FOIA VARADY97-34 PDR a 1380

. . . _ . . . - - . -- = .. . -

fX -

i AMENDMENT NO. 2 TO ~

, LICENSE APPLICATION FOR SOUTHWE*ST EXPERIMENTAL FAST OXIDE REACTOR (SEFOR) f l

General Electric Company filed an Application for Construction Permit

, and Operating License for the Southwest Experimental Fast Oxide Reactor (SEFOR).

l l

l ^

General Electric hereby amends its application to include additional i ,

information concerning financial qualifications of Southwest Atomic

( Energy Associates and Gesellschaft by the submission of revised pages 4 and 5 and information referenced therein, dated April 19,1965 which i

thereby supersede the same numbered pages of the application dated October 16, 1964.

l GENERAL ELECTRIC COMPANY ,

ADVANCED PRODUCTS OPERATION By Karl Cohen, General Manager i

Attest:

b lh i At ;esting Secretary -

Subscribed and sworn to before me this // day of /// _ ,1965.

./

^ '

NotarT y Pd61ic/n and for the County of Santa Clara, State of California.

~ F E/ LORD My Commission Empires Sept. 5.1968 50-231-a

I g . .

health and safety. The Hazards Summary Report will be amended in the future to provide any additional technical information which may be necessary to enable the Commission to exercisc its licensing j6dgment.

4. Class of License Applied for and Term of License Applicants request the issuance of a Section 104 (b) construction j

l permit and operatit g license. Applicants request that the operating license be issued for an initial term of ten years.

l l 5. Other Licenses Applicants further request such source, special nuclear, and by-product material licenses as may be necessary to the construction and operation of SEFOR.  !

l l 1 l 6. Estimated Construction Cost and Financial Qualifications I Applicants estimate the cost of constructing SEFOR at $12,400,000.

l l Of the estimated sum, SAEA will provide a maximum of $5,900,000, l

Gesellschaft, acting for itself and Euratom, will contribute a maxi-l mum of $5,000,000, and General Electric will provide all additional l

l funds required for completion of construction.

General Electric's financial qualifications and the Commission's findings thereon are of record in Commission Docket No. 50-183. A copy of General Electric's latest Annual Report was submitted to the Commission on

  • April 12, 1965*.
  • The financial qualifications of SAEA are evidenced by the agree-l l
ment among the member utilities of SAEA dated July 22,'1963 and the financial statements of the member utilities, copies of which are

^

~

attached hereto as Exhibit "C". h License W. Decliet W. 50-231 Sect (b. 4f/ Pese 1

l Amend b. 2* Deee April 19, 1965 Amends sect.(s) 6. 4

I g . .

The financial qualifications of Gesellschaft are evidenced by the attached Declaration of the Federal Republic of Germany.*

m

7. Technical Qualifications  !

1 (ab A general description of technical qualifications of General Electric, which will construct and operate SEFOR, is set forth in the license application in Docket 50-183. General Electric further submits that it has engaged in a number of projects commencing in 1947 which are related to the design, construction, and operation of sodium-cooled reactors.

o There are approximately 250 engineers and scientists in 1

the employ of General Electric's Atomic Power Equipment Department who have direct experience in sodium-cooled I

reactors and related equipment. The qualifications of three U

such employees who will have primary responsibilities con-cerning the design or construction of SEFOR are as follows:

Dr. Karl Paley Cohen,* General Manager, Advanced Products Ope ration

  • Dr. Cohen received his B. A. degree in 1933, his M. A. degree in 1934, and his PhD in Physical Chemistry in 1936. All degrees were received from Columbia University. Dr. Cohen, who was born in New York City, New York, is now residing in Palo Alto, California.

l, Dr. Cohen is a 25-year veteran in the atomic field. He was assistant to Professor H.C. Urey of Columbia University i

from 1938 to 1940, and was one of the pioneers in the early

~

License b. Decket W. 50-231 sect, b . 7.(a) Pege Amend h. 2* m April 19, 1965 A .ds sect.(s) 6., 7.(a) 5 l