Application for Amend to License DR-15,addendum to Proposed Change 3 to SEFOR
ML20140H482
Person / Time
Site: 05000231
Issue date: 09/08/1970
From:
GENERAL ELECTRIC CO.
To:
Shared Package
ML20140G249 List: ... further results
References
FOIA-97-34 NUDOCS 9705130157
Download: ML20140H482 (3)


Text

.. . . . - , ~ .. . . . _ _ - . . ~ . . . . . . . . _ - . . - - . . . - - - . . . . . - ...- ..

i -.

j. 3 ,

l e

t goodn r:

. .s l

ADDENDUM TO PROPOSED CHANGE No. 3 I

l FOR THE l

SOUTHWEST EXPERIMENTAL FAST OXIDE REACTOR l

l J

I 4

Re: LICENSE DR-15 DOCKET 50-231 1

l

.. --.- y- l. ..~.

,rss /, ,

f. , .
  1. L' 4 b(f)9 '.,
b. .a ~2'1gy,i h?! . v ,

+ . . . .

, c.c. ., t

.. r x, g,;-

- i l GENERAL ELECTRIC COMPANY t

310 DeGuigne Drive

+

l Sunnyvale, California 94086

"~

9705130157 970505 PDR FOIA j of 4 ;

r .--VARAD.Y97-34

+-

PDR v// i

. ~ . _ . . ,-

ADDENDUM TO PROPOSED CHANGE No. 3 FOR THE

., SOUTHWEST EXPERIMENTAL FAST OXIDE REACTOR I. Introduction Proposed Change No. 3 to the SEFOR Technical Specifications was previously submitted on July 8, 1970. This addendum proposes

! additional changes and presents additional discussion justifying l

the proposed changes.

I II. Additional Proposed Changes Pursuant to the provisions of 10 CFR 50.59, General Electric requests that the Technical Specifications be changed by substitu-ting pages 3.3-2, 3.3-7, and 3.3-8 in , Attachment A of this document for corresponding pages of the current Technical Specifications.

l The proposed changes to the current Technical Specifications are l

indicated by brackets in the margin on the enclosed pages.

i I

III. Discussion General Electric feels that the information presented in Proposed Change No. 3, dated July 8,1970, provides valid and sufficient reasons for permitting the guinea pig rods to remain under the innermost refueling ports while the reactor is operated at the design power level. We also feel that such operation will provide important information for both the SEFOR program and the LMFBR program.

l The safety evaluation of Proposed Change No. 3 was based on the l

l possibility of operating at 22 MWt. However, the maximum planned I

power level is_only 20 MWt. If the proposed change is approved,

< the high flux trip level for the safety system will be reduced to l

-- --. - . ~ . .- . - ..-. - . . . - - ~ - -. ~

. j. . . -.

1 the'value of Pg 7, calculated as explained in the bases for proposed specifica,t' ion 3.3.N whenever the reactor is operated above 17.5 FMt and one nor more guinea pig rods are located under the innermost

f j ,

ports. This wi11' provide assurance that the guinea pig rods are not i operated at linear power densities greater than that for which the  !

-i safety of standard rods has been assessed.(1)

. Operation at power levela achieved thus far'(17.5 MWt) has shown that t

the reactor is very stable'and that the power level can be controlled with good precision. Consequently, operation with the trip' level set

~

within 1 or 2% of the powr.r level appears to be feasible for special tests. However, should this approach prove to be unfeasible, General Electric will re-submit the request for operation with guinea pig )

rods as originally proposed in the July 8,1970 submittal.  !

l

References:

H

1. SEFOR Technical Spe'cifications, page 2.1-3. l