Amended Contention of Atty General Jm Shannon on Notification Sys for Commonwealth of Ma.* Atty General Submits Listed Amended Contention W/Bases on Applicant Vehicular Alert & Notification Sys.Certificate of Svc EnclML20151N955 |
Person / Time |
---|
Site: |
Seabrook |
---|
Issue date: |
04/15/1988 |
---|
From: |
Jonas S, Shannon J MASSACHUSETTS, COMMONWEALTH OF |
---|
To: |
|
---|
References |
---|
CON-#288-6102 OL-1-R, NUDOCS 8804260052 |
Download: ML20151N955 (11) |
|
|
---|
Category:INTERVENTION PETITIONS
MONTHYEARML20209H9101999-07-20020 July 1999 Motion of Connecticut Light & Power Co & North Atlantic Energy Corp for Leave to Intervene & Petition for Hearing.* with Certificate of Svc & Notice of Appearance ML20199F7641999-01-21021 January 1999 Answer of Montaup Electric Co to Motion of Ui for Leave to Intervene & Petition to Allow Intervention out-of-time.* Requests Motion Be Denied on Basis of Late Filing.With Certificate of Svc ML20206Q0151999-01-12012 January 1999 North Atlantic Energy Svc Corp Answer to Petition to Intervene of New England Power Co.* If Commission Deems It Appropriate to Explore Issues Further in Subpart M Hearing Context,Naesco Will Participate.With Certificate of Svc ML20199A4331999-01-11011 January 1999 Motion of United Illuminating Co for Leave to Intervene & Petition to Allow Intervention out-of-time.* Company Requests That Petition to Allow Intervention out-of-time Be Granted.With Certificate of Svc ML20198P7181998-12-31031 December 1998 Motion of Nepco for Leave to Intervene & Petition for Summary Relief Or,In Alternative,For Hearing.* Moves to Intervene in Transfer of Montaup Seabrook Ownership Interest & Petitions for Summary Relief or for Hearing ML20237C6981998-08-18018 August 1998 Sapl/Necnp Reply to Naesco Response to Proposed Contentions.* Board Should Admit Sapl/Necnp Contentions 1-4 & North Atlantic Energy Svcs Corp Arguments to Contrary. W/Certificate of Svc ML20237C6791998-08-18018 August 1998 Sapl/New England Coalition on Nuclear Pollution Reply to Staff Answer to Contentions.* Petitioners Believe Board Can & Should Give Cases Consideration W/O Filing of Addl,But Not Substantively Different Contention.W/Certificate of Svc ML20237A0501998-08-10010 August 1998 North Atlantic Energy Svc Corp Response to Proposed Contentions.* Petitioners Failed to Propose Admissible Contention.Request for Hearing & Petition to Intervene,As Applied to Both Petitioners Should Be Denied ML20236X9281998-08-10010 August 1998 NRC Staff Answer to Contentions.* for Reasons Stated,All of Contentions Proposed Should Be Rejected & Proceeding Should Be Terminated.W/Certificate of Svc ML20066H2581991-02-14014 February 1991 Response of Ma Atty General & Necnp to ASLB Order of 910124.* Intervenors Believe ASLB Should Reopen Record, Permit Discovery & Hold Hearing on Beach Sheltering Issues. W/Certificate of Svc ML19332D7241989-11-21021 November 1989 Intervenors Motion for Clarification Or,In Alternative,For Reconsideration.* Clarification or Reconsideration of Scheduling Requirements Set by Commission 891121 Order Requested.Certificate of Svc Encl ML19332D5191989-11-15015 November 1989 Applicant Answer to Intervenors Motion to Admit late-filed Contention & Reopen Record Based Upon Withdrawal of Commonwealth of Ma Emergency Broadcast Sys Network & Wcgy.* Motion Should Be Denied Since Results Unlikely to Change ML19325E0171989-10-20020 October 1989 Applicant Answer to Intervenors Second Motion to Admit Contentions on 890927 Emergency Plan Exercise.* Motion to Assert Addl Bases for Original Onsite Exercise Contention JI-Onsite Ex-1 Should Be Denied.W/Certificate of Svc ML19325E0011989-10-20020 October 1989 Applicant Response to Intervenors Motion to Amend Intervenors Motions of 890929 & 1013 to Admit Contentions on 890927 Onsite Emergency Plan Exercise.* Issue Re Admittance Committed to Board Discretion.Certificate of Svc Encl ML20248J3511989-10-13013 October 1989 Intervenors Second Motion to Admit Contentions on 890927 Emergency Plan Exercise.* Advises That Applicant Contentions Filed on 890929 to Admit Addl Bases Re Scope of Onsite Exercsise Should Be Admitted.W/Certificate of Svc ML20248J0601989-09-28028 September 1989 Intervenors Motion to Admit Contentions on 890927 Emergency Plan Exercise.* Requests Hearing & to Engage in Discovery for Hearing on Contention.Supporting Documentation & Certificate of Svc Encl ML20247Q6761989-09-22022 September 1989 Intervenors Second Informational Suppl to Low Power Contentions Filed on 890721 & 0828.* Incorporates Encl Plant Startup Test Procedure 1-ST-22,Rev 2 Into Low Power Testing Contentions.W/Supporting Info & Certificate of Svc ML20246N1001989-09-0101 September 1989 Intervenors Reply to Responses of Applicant & Staff Re Intervenors Motion to Admit Contention,Or,In Alternative,To Reopen Record & Request for Hearing.* Contention Raises New Issues & Should Be Admitted.W/Certificate of Svc ML20247E0321989-07-21021 July 1989 Intervenors Motion to Admit Contention,Or in Alternative,To Reopen Record & Request for Hearing.* Requests Contentions Re Deficiencies in Training,Mgt Control,Supervision, Communication & Procedure Compliance Be Admitted ML20246P2041989-07-0505 July 1989 Joint Intervenor (Ji) Contentions on Spmc & June 1988 Graded Exercise.* ML20248F4691989-04-0303 April 1989 Seacoast Anti-Pollution League (Sapl) Trial Brief on Contention Ji 56 & Sapl Contentions EX-2,4,6,7,8,12,13 & 14.* Svc List Encl ML20206M9761988-11-23023 November 1988 NRC Staff Response to 881114 Board Order Requesting Comments on Significance of ALAB-903 for Seabrook Proposed General Exercise Contentions.* Contentions & Bases Should Be Denied. Certificate of Svc Encl ML20206M9431988-11-22022 November 1988 New England Coalition on Nuclear Pollution Comments on Significance of ALAB-903 to Seabrook Offsite Exercise Contentions.* Svc List Encl ML20206M9031988-11-22022 November 1988 Seacoast Anti-Pollution League Comments on Significance of ALAB-903 to Exercise Contentions.* Svc List Encl ML20205R7201988-11-0202 November 1988 Town of Hampton Contention on Applicant Plan to Fund Decommissioning Costs of Seabrook Station.* Supporting Documentation & Certificate of Svc Encl ML20205R5661988-11-0202 November 1988 Seacoast Anti-Pollution League Contentions on Applicant Plan in Response to NRC Order CLI-88-07.* Supporting Documentation Encl ML20205R5441988-11-0202 November 1988 Commonwealth of Ma Atty General Jm Shannon late-filed Contentions Concerning Joint Applicant Financial Qualifications to Operate Seabrook Nuclear Power Station.* Supporting Documentation & Certificate of Svc Encl ML20205R4971988-11-0202 November 1988 New England Coalition on Nuclear Pollution Contentions on Applicant Decommissioning Plan,Motion for Stay of Low Power Operation & Motion to Reopen Record.* Supporting Info & Svc List Encl ML20205R4821988-11-0202 November 1988 Commonwealth of Ma Atty General Jm Shannon late-filed Contentions Concerning Joint Applicant Decommissioning Plan for Seabrook Nuclear Power Station.* ML20205E0011988-10-24024 October 1988 Reply of Commonwealth of Ma Atty General to Responses of NRC Staff & Applicant to Commonwealth of Ma Atty General Exercise Contentions.* Certificate of Svc Encl ML20205E0271988-10-21021 October 1988 New England Coalition on Nuclear Pollution (Necnp) & Town of Hampton (Toh) Reply to Applicant & NRC Staff Responses to Contentions Toh/Necnp EX-2 & Toh/Necnp EX-3.* Svc List Encl ML20205D8051988-10-21021 October 1988 Town of Hampton & New England Coalition on Nuclear Pollution Reply to Responses of Staff & Applicant to Intervenor Contentions on Graded Exercise.* Certificate of Svc Encl ML20206C1951988-10-18018 October 1988 Seacoast Anti-Pollution League (Sapl) Reply to Applicant & Staff Responses to Sapl Contentions on June 1988 Graded Exercise.* Svc List Encl ML20204G9731988-10-13013 October 1988 NRC Staff Response to Intervenors Contentions on Graded Exercise.* Proposed General Exercise Contentions Should Be Admitted for Litigation & Proferred Contentions Should Be Denied Admission.Certificate of Svc Encl ML20154S4571988-09-28028 September 1988 Applicant Response to Intervenor Contentions on June 1988 Seabrook Exercise.* Intervenor Contentions Should Be Disposed Of.Certificate of Svc Encl ML20154P3461988-09-21021 September 1988 New England Coalition on Nuclear Pollution & Town of Hampton Contentions Re 1988 Exercise of Offsite Plans & Preparedness for Plant Emergency Planning Zone.* Svc List Encl ML20154K8741988-09-21021 September 1988 Commonwealth of Ma Atty General Exercise Contentions Submitted in Response to June 1988 Plant Initial full- Participation Exercise.* Supporting Documentation & Certificate of Svc Encl ML20154K9331988-09-21021 September 1988 Town of Hampton & New England Coalition on Nuclear Pollution Emergency Planning Contentions on 880628-29 Exercise.* Supporting Documentation & Certificate of Svc Encl ML20154N9061988-09-20020 September 1988 Seacoast Anti-Pollution League Contentions on Graded Exercise.* Svc List Encl ML20154D7431988-09-12012 September 1988 New England Coalition on Nuclear Pollution Petition for Review of ALAB-899.* Petition Should Be Granted on Basis That Integrity of RCS Significantly Paramount to Safe Operation of Plant.W/Certificate of Svc ML20151A6461988-07-0707 July 1988 NRC Staff Response to Town of Salisbury Amended Contentions Re Applicant Plan for Commonwealth of Ma Communities.* Applicant Untimely Amends to Contentions Should Be Rejected. Certificate of Svc Encl ML20151A6301988-07-0606 July 1988 NRC Staff Response to City of Haverhill Detailed Contentions.* City of Haverhill late-filed Contentions Should Be Rejected.Certificate of Svc Encl ML20196G7031988-06-27027 June 1988 Applicant Response to City of Haverhill Detailed Contentions.* Contentions Should Be Rejected & City Should Be Denied Admission as Party,Per 10CFR2.714.Supporting Documentation & Certificate of Svc Encl ML20196A3761988-06-22022 June 1988 New England Coalition on Nuclear Pollution (Necnp) Reply to Applicant & NRC Staff Response to Necnp Contentions on Spmc.* Certificate of Svc Encl ML20196A3991988-06-22022 June 1988 Reply of Massachussetts Atty General to Responses of NRC Staff and Applicant to Contentions 7 Through 83 Filed by Massachussetts Atty General.* Certificate of Svc Encl ML20196A5261988-06-22022 June 1988 Town of Amesbury Reply to NRC Staff & Applicant Responses to Town of Amesbury Contentions on Seabrook Plan for Massachussetts Communities.* Certificate of Svc Encl ML20196A8701988-06-20020 June 1988 Reply of Commonwealth of Ma Atty General to Responses of NRC Staff & Applicant to First Six Contentions Filed by Commonwealth of Ma Atty General.* ML20151N6271988-06-17017 June 1988 Town of Salisbury Reply to Applicant Response to Intervenor Contentions on Seabrook Plan for State of Ma Communities ML20151A8361988-06-17017 June 1988 Reply of Town of West Newbury to Responses of Applicant & NRC Staff to Intervenors Contentions Re Seabrook Plan for Commonwealth of Ma Communities.* Certificate of Svc Encl ML20151N6461988-06-17017 June 1988 Town of Salisbury Amended Contentions Re Applicant Plan for State of Ma Communities.Certificate of Svc Encl 1999-07-20
[Table view] Category:RESPONSES & CONTENTIONS
MONTHYEARML20209H9101999-07-20020 July 1999 Motion of Connecticut Light & Power Co & North Atlantic Energy Corp for Leave to Intervene & Petition for Hearing.* with Certificate of Svc & Notice of Appearance ML20199F7641999-01-21021 January 1999 Answer of Montaup Electric Co to Motion of Ui for Leave to Intervene & Petition to Allow Intervention out-of-time.* Requests Motion Be Denied on Basis of Late Filing.With Certificate of Svc ML20206Q0151999-01-12012 January 1999 North Atlantic Energy Svc Corp Answer to Petition to Intervene of New England Power Co.* If Commission Deems It Appropriate to Explore Issues Further in Subpart M Hearing Context,Naesco Will Participate.With Certificate of Svc ML20199A4331999-01-11011 January 1999 Motion of United Illuminating Co for Leave to Intervene & Petition to Allow Intervention out-of-time.* Company Requests That Petition to Allow Intervention out-of-time Be Granted.With Certificate of Svc ML20198P7181998-12-31031 December 1998 Motion of Nepco for Leave to Intervene & Petition for Summary Relief Or,In Alternative,For Hearing.* Moves to Intervene in Transfer of Montaup Seabrook Ownership Interest & Petitions for Summary Relief or for Hearing ML20237C6981998-08-18018 August 1998 Sapl/Necnp Reply to Naesco Response to Proposed Contentions.* Board Should Admit Sapl/Necnp Contentions 1-4 & North Atlantic Energy Svcs Corp Arguments to Contrary. W/Certificate of Svc ML20237C6791998-08-18018 August 1998 Sapl/New England Coalition on Nuclear Pollution Reply to Staff Answer to Contentions.* Petitioners Believe Board Can & Should Give Cases Consideration W/O Filing of Addl,But Not Substantively Different Contention.W/Certificate of Svc ML20237A0501998-08-10010 August 1998 North Atlantic Energy Svc Corp Response to Proposed Contentions.* Petitioners Failed to Propose Admissible Contention.Request for Hearing & Petition to Intervene,As Applied to Both Petitioners Should Be Denied ML20236X9281998-08-10010 August 1998 NRC Staff Answer to Contentions.* for Reasons Stated,All of Contentions Proposed Should Be Rejected & Proceeding Should Be Terminated.W/Certificate of Svc ML20066H2581991-02-14014 February 1991 Response of Ma Atty General & Necnp to ASLB Order of 910124.* Intervenors Believe ASLB Should Reopen Record, Permit Discovery & Hold Hearing on Beach Sheltering Issues. W/Certificate of Svc ML19332D7241989-11-21021 November 1989 Intervenors Motion for Clarification Or,In Alternative,For Reconsideration.* Clarification or Reconsideration of Scheduling Requirements Set by Commission 891121 Order Requested.Certificate of Svc Encl ML19332D5191989-11-15015 November 1989 Applicant Answer to Intervenors Motion to Admit late-filed Contention & Reopen Record Based Upon Withdrawal of Commonwealth of Ma Emergency Broadcast Sys Network & Wcgy.* Motion Should Be Denied Since Results Unlikely to Change ML19325E0171989-10-20020 October 1989 Applicant Answer to Intervenors Second Motion to Admit Contentions on 890927 Emergency Plan Exercise.* Motion to Assert Addl Bases for Original Onsite Exercise Contention JI-Onsite Ex-1 Should Be Denied.W/Certificate of Svc ML19325E0011989-10-20020 October 1989 Applicant Response to Intervenors Motion to Amend Intervenors Motions of 890929 & 1013 to Admit Contentions on 890927 Onsite Emergency Plan Exercise.* Issue Re Admittance Committed to Board Discretion.Certificate of Svc Encl ML20248J3511989-10-13013 October 1989 Intervenors Second Motion to Admit Contentions on 890927 Emergency Plan Exercise.* Advises That Applicant Contentions Filed on 890929 to Admit Addl Bases Re Scope of Onsite Exercsise Should Be Admitted.W/Certificate of Svc ML20248J0601989-09-28028 September 1989 Intervenors Motion to Admit Contentions on 890927 Emergency Plan Exercise.* Requests Hearing & to Engage in Discovery for Hearing on Contention.Supporting Documentation & Certificate of Svc Encl ML20247Q6761989-09-22022 September 1989 Intervenors Second Informational Suppl to Low Power Contentions Filed on 890721 & 0828.* Incorporates Encl Plant Startup Test Procedure 1-ST-22,Rev 2 Into Low Power Testing Contentions.W/Supporting Info & Certificate of Svc ML20246N1001989-09-0101 September 1989 Intervenors Reply to Responses of Applicant & Staff Re Intervenors Motion to Admit Contention,Or,In Alternative,To Reopen Record & Request for Hearing.* Contention Raises New Issues & Should Be Admitted.W/Certificate of Svc ML20247E0321989-07-21021 July 1989 Intervenors Motion to Admit Contention,Or in Alternative,To Reopen Record & Request for Hearing.* Requests Contentions Re Deficiencies in Training,Mgt Control,Supervision, Communication & Procedure Compliance Be Admitted ML20246P2041989-07-0505 July 1989 Joint Intervenor (Ji) Contentions on Spmc & June 1988 Graded Exercise.* ML20248F4691989-04-0303 April 1989 Seacoast Anti-Pollution League (Sapl) Trial Brief on Contention Ji 56 & Sapl Contentions EX-2,4,6,7,8,12,13 & 14.* Svc List Encl ML20206M9761988-11-23023 November 1988 NRC Staff Response to 881114 Board Order Requesting Comments on Significance of ALAB-903 for Seabrook Proposed General Exercise Contentions.* Contentions & Bases Should Be Denied. Certificate of Svc Encl ML20206M9431988-11-22022 November 1988 New England Coalition on Nuclear Pollution Comments on Significance of ALAB-903 to Seabrook Offsite Exercise Contentions.* Svc List Encl ML20206M9031988-11-22022 November 1988 Seacoast Anti-Pollution League Comments on Significance of ALAB-903 to Exercise Contentions.* Svc List Encl ML20205R7201988-11-0202 November 1988 Town of Hampton Contention on Applicant Plan to Fund Decommissioning Costs of Seabrook Station.* Supporting Documentation & Certificate of Svc Encl ML20205R5661988-11-0202 November 1988 Seacoast Anti-Pollution League Contentions on Applicant Plan in Response to NRC Order CLI-88-07.* Supporting Documentation Encl ML20205R5441988-11-0202 November 1988 Commonwealth of Ma Atty General Jm Shannon late-filed Contentions Concerning Joint Applicant Financial Qualifications to Operate Seabrook Nuclear Power Station.* Supporting Documentation & Certificate of Svc Encl ML20205R4971988-11-0202 November 1988 New England Coalition on Nuclear Pollution Contentions on Applicant Decommissioning Plan,Motion for Stay of Low Power Operation & Motion to Reopen Record.* Supporting Info & Svc List Encl ML20205R4821988-11-0202 November 1988 Commonwealth of Ma Atty General Jm Shannon late-filed Contentions Concerning Joint Applicant Decommissioning Plan for Seabrook Nuclear Power Station.* ML20205E0011988-10-24024 October 1988 Reply of Commonwealth of Ma Atty General to Responses of NRC Staff & Applicant to Commonwealth of Ma Atty General Exercise Contentions.* Certificate of Svc Encl ML20205E0271988-10-21021 October 1988 New England Coalition on Nuclear Pollution (Necnp) & Town of Hampton (Toh) Reply to Applicant & NRC Staff Responses to Contentions Toh/Necnp EX-2 & Toh/Necnp EX-3.* Svc List Encl ML20205D8051988-10-21021 October 1988 Town of Hampton & New England Coalition on Nuclear Pollution Reply to Responses of Staff & Applicant to Intervenor Contentions on Graded Exercise.* Certificate of Svc Encl ML20206C1951988-10-18018 October 1988 Seacoast Anti-Pollution League (Sapl) Reply to Applicant & Staff Responses to Sapl Contentions on June 1988 Graded Exercise.* Svc List Encl ML20204G9731988-10-13013 October 1988 NRC Staff Response to Intervenors Contentions on Graded Exercise.* Proposed General Exercise Contentions Should Be Admitted for Litigation & Proferred Contentions Should Be Denied Admission.Certificate of Svc Encl ML20154S4571988-09-28028 September 1988 Applicant Response to Intervenor Contentions on June 1988 Seabrook Exercise.* Intervenor Contentions Should Be Disposed Of.Certificate of Svc Encl ML20154P3461988-09-21021 September 1988 New England Coalition on Nuclear Pollution & Town of Hampton Contentions Re 1988 Exercise of Offsite Plans & Preparedness for Plant Emergency Planning Zone.* Svc List Encl ML20154K8741988-09-21021 September 1988 Commonwealth of Ma Atty General Exercise Contentions Submitted in Response to June 1988 Plant Initial full- Participation Exercise.* Supporting Documentation & Certificate of Svc Encl ML20154K9331988-09-21021 September 1988 Town of Hampton & New England Coalition on Nuclear Pollution Emergency Planning Contentions on 880628-29 Exercise.* Supporting Documentation & Certificate of Svc Encl ML20154N9061988-09-20020 September 1988 Seacoast Anti-Pollution League Contentions on Graded Exercise.* Svc List Encl ML20154D7431988-09-12012 September 1988 New England Coalition on Nuclear Pollution Petition for Review of ALAB-899.* Petition Should Be Granted on Basis That Integrity of RCS Significantly Paramount to Safe Operation of Plant.W/Certificate of Svc ML20151A6461988-07-0707 July 1988 NRC Staff Response to Town of Salisbury Amended Contentions Re Applicant Plan for Commonwealth of Ma Communities.* Applicant Untimely Amends to Contentions Should Be Rejected. Certificate of Svc Encl ML20151A6301988-07-0606 July 1988 NRC Staff Response to City of Haverhill Detailed Contentions.* City of Haverhill late-filed Contentions Should Be Rejected.Certificate of Svc Encl ML20196G7031988-06-27027 June 1988 Applicant Response to City of Haverhill Detailed Contentions.* Contentions Should Be Rejected & City Should Be Denied Admission as Party,Per 10CFR2.714.Supporting Documentation & Certificate of Svc Encl ML20196A3761988-06-22022 June 1988 New England Coalition on Nuclear Pollution (Necnp) Reply to Applicant & NRC Staff Response to Necnp Contentions on Spmc.* Certificate of Svc Encl ML20196A3991988-06-22022 June 1988 Reply of Massachussetts Atty General to Responses of NRC Staff and Applicant to Contentions 7 Through 83 Filed by Massachussetts Atty General.* Certificate of Svc Encl ML20196A5261988-06-22022 June 1988 Town of Amesbury Reply to NRC Staff & Applicant Responses to Town of Amesbury Contentions on Seabrook Plan for Massachussetts Communities.* Certificate of Svc Encl ML20196A8701988-06-20020 June 1988 Reply of Commonwealth of Ma Atty General to Responses of NRC Staff & Applicant to First Six Contentions Filed by Commonwealth of Ma Atty General.* ML20151N6271988-06-17017 June 1988 Town of Salisbury Reply to Applicant Response to Intervenor Contentions on Seabrook Plan for State of Ma Communities ML20151A8361988-06-17017 June 1988 Reply of Town of West Newbury to Responses of Applicant & NRC Staff to Intervenors Contentions Re Seabrook Plan for Commonwealth of Ma Communities.* Certificate of Svc Encl ML20151N6461988-06-17017 June 1988 Town of Salisbury Amended Contentions Re Applicant Plan for State of Ma Communities.Certificate of Svc Encl 1999-07-20
[Table view] Category:LEGAL TRANSCRIPTS & ORDERS & PLEADINGS
MONTHYEARML20217H9511999-10-21021 October 1999 Memorandum & Order.* Proceeding Re Nepco 990315 Application Seeking Commission Approval of Indirect License Transfers Consolidated,Petitioners Granted Standing & Two Issues Admitted.With Certificate of Svc.Served on 991021 ML20217N2561999-10-21021 October 1999 Transcript of Affirmation Session on 990121 in Rockville, Maryland Re Memorandum & Order Responding to Petitions to Intervene Filed by co-owners of Seabrook Station Unit 1 & Millstone Station Unit Three.Pp 1-3 ML20211L5141999-09-0202 September 1999 Comment on Draft Reg Guide DG-4006, Demonstrating Compliance with Radiological Criteria for License Termination. Author Requests Info as to When Seabrook Station Will Be Shut Down ML20211J1451999-08-24024 August 1999 Comment Opposing NRC Consideration of Waiving Enforcement Action Against Plants That Operate Outside Terms of Licenses Due to Y2K Problems ML20210S5641999-08-13013 August 1999 Motion of Connecticut Light & Power Co,Western Massachusetts Electric Co & North Atlantic Energy Corp to Strike Unauthorized Response of Nepco.* Unauthorized Response Fails to Comply with Commission Policy.With Certificate of Svc ML20210Q7531999-08-11011 August 1999 Order Approving Application Re Corporate Merger (Canal Electric Co). Canal Shall Provide Director of NRR Copy of Any Application,At Time Filed to Transfer Grants of Security Interests or Liens from Canal to Proposed Parent ML20210P6271999-08-10010 August 1999 Response of New England Power Company.* Nu Allegations Unsupported by Any Facts & No Genuine Issues of Matl Facts in Dispute.Commission Should Approve Application Without Hearing ML20210H8311999-08-0303 August 1999 Reply of Connecticut Light & Power Co,Western Massachusetts Electric Co & North Atlantic Energy Corp to Response of New England Power Co to Requests for Hearing.* Petitioners Request Hearing on Stated Issues.With Certificate of Svc ML20210J8501999-08-0303 August 1999 Order Approving Transfer of License & Conforming Amend.North Atlantic Energy Service Corp Authorized to Act as Agent for Joint Owners of Seabrook Unit 1 ML20211J1551999-07-30030 July 1999 Comment Opposing That NRC Allow Seabrook NPP to Operate Outside of Technical Specifications Due to Possible Y2K Problems ML20210E3011999-07-27027 July 1999 Response of New England Power Co to Requests for Hearing. Intervenors Have Presented No Justification for Oral Hearing in This Proceeding.Commission Should Reject Intervenors Request for Oral Hearing & Approve Application ML20209H9101999-07-20020 July 1999 Motion of Connecticut Light & Power Co & North Atlantic Energy Corp for Leave to Intervene & Petition for Hearing.* with Certificate of Svc & Notice of Appearance ML20195H1911999-06-15015 June 1999 Application of Montaup Electric Co & New England Power Co for Transfer of Licenses & Ownership Interests.Requests That Commission Consent to Two Indirect Transfers of Control & Direct Transfer ML20206A1611999-04-26026 April 1999 Memorandum & Order.* Informs That Montaup,Little Bay Power Corp & Nepco Settled Differences Re Transfer of Ownership of Seabrook Unit 1.Intervention Petition Withdrawn & Proceeding Terminated.With Certificate of Svc.Served on 990426 ML20205M7621999-04-15015 April 1999 Notice of Withdrawal of Intervention of New England Power Co.* New England Power Co Requests That Intervention in Proceeding Be Withdrawn & Hearing & Related Procedures Be Terminated.With Certificate of Svc CLI-99-06, Order.* Joint Request for ten-day Extension of Schedule Set Forth in CLI-99-06 in Order to Facilitate Parties Settlement Efforts Granted,With Exception of Date of Hearing. with Certificate of Svc.Served on 9904071999-04-0707 April 1999 Order.* Joint Request for ten-day Extension of Schedule Set Forth in CLI-99-06 in Order to Facilitate Parties Settlement Efforts Granted,With Exception of Date of Hearing. with Certificate of Svc.Served on 990407 ML20205G0921999-04-0505 April 1999 Joint Motion of All Active Participants for 10 Day Extension to Permit Continuation of Settlement Discussion.* Participants Request That Procedural Schedule Be Extended by 10 Days.With Certificate of Svc ML20205G3091999-03-31031 March 1999 Petition That Individuals Responsible for Discrimination Against Contract Electrician at Plant as Noted in OI Rept 1-98-005 Be Banned by NRC from Participation in Licensed Activities for at Least 5 Yrs ML20204E6401999-03-24024 March 1999 Protective Order.* Issues Protective Order to Govern Use of All Proprietary Data Contained in License Transfer Application or in Participants Written Submission & Oral Testimony.With Certificate of Svc.Served on 990324 ML20204G7671999-03-23023 March 1999 Comment Supporting Proposed Rule 10CFR50.54(a) Re Direct Final Rule,Changes to QA Programs ML20207K1941999-03-12012 March 1999 North Atlantic Energy Svc Corp Participation in Proceeding.* Naesco Wished to Remain on Svc List for All Filings.Option to Submit post-hearing Amicus Curiae Brief Will Be Retained by Naesco.With Certificate of Svc ML20207H4921999-02-12012 February 1999 Comment on Draft Contingency Plan for Year 2000 Issue in Nuclear Industry.Util Agrees to Approach Proposed by NEI ML20203F9471999-02-0909 February 1999 License Transfer Application Requesting NRC Consent to Indirect Transfer of Control of Interest in Operating License NPF-86 ML20199F7641999-01-21021 January 1999 Answer of Montaup Electric Co to Motion of Ui for Leave to Intervene & Petition to Allow Intervention out-of-time.* Requests Motion Be Denied on Basis of Late Filing.With Certificate of Svc ML20199H0451999-01-21021 January 1999 Answer of Little Bay Power Corp to Motion of Ui for Leave to Intervene & Petition to Allow Intervention out-of-time.* Requests That Ui Petition to Intervene & for Hearing Be Denied for Reasons Stated.With Certificate of Svc ML20199D2461999-01-19019 January 1999 Supplemental Affidavit of Js Robinson.* Affidavit of Js Robinson Providing Info Re Financial Results of Baycorp Holding Ltd & Baycorp Subsidiary,Great Bay Power Corp. with Certificate of Svc ML20199D2311999-01-19019 January 1999 Response of New England Power Co to Answers of Montaup Electric Co & Little Bay Power Corp.* Nep Requests That Nep Be Afforded Opportunity to File Appropriate Rule Challenge with Commission Pursuant to 10CFR2.1329 ML20206R1041999-01-13013 January 1999 Answer of Little Bay Power Corp to Motion of New England Power Co for Leave to Intervene & Petition for Summary Relief Or,In Alternative,For Hearing.* with Certificate of Svc ML20206Q8451999-01-12012 January 1999 Written Comments of Massachusetts Municipal Wholesale Electric Co.* Requests That Commission Consider Potential Financial Risk to Other Joint Owners Associated with License Transfer.With Certificate of Svc.Served on 990114 ML20199A4741999-01-12012 January 1999 Answer of Montaup Electric Co to Motion of Nepco for Leave to Intervene & Petition for Summary Relief Or,In Alternative,For Hearing.* Nepco 990104 Motion Should Be Denied for Reasons Stated.With Certificate of Svc ML20206Q0151999-01-12012 January 1999 North Atlantic Energy Svc Corp Answer to Petition to Intervene of New England Power Co.* If Commission Deems It Appropriate to Explore Issues Further in Subpart M Hearing Context,Naesco Will Participate.With Certificate of Svc ML20199A4331999-01-11011 January 1999 Motion of United Illuminating Co for Leave to Intervene & Petition to Allow Intervention out-of-time.* Company Requests That Petition to Allow Intervention out-of-time Be Granted.With Certificate of Svc ML20198P7181998-12-31031 December 1998 Motion of Nepco for Leave to Intervene & Petition for Summary Relief Or,In Alternative,For Hearing.* Moves to Intervene in Transfer of Montaup Seabrook Ownership Interest & Petitions for Summary Relief or for Hearing ML20198P7551998-12-30030 December 1998 Affidavit of J Robinson.* Affidavit of J Robinson Describing Events to Date in New England Re Premature Retirement of Npps,Current Plans to Construct New Generation in Region & Impact on Seabrook Unit 1 Operation.With Certificate of Svc ML20195K4061998-11-24024 November 1998 Memorandum & Order.* North Atlantic Energy Services Corp Granted Motion to Withdraw Proposed Amends & Dismiss Related Adjudicatory Proceedings as Moot.Board Decision LBP-98-23 Vacated.With Certificate of Svc.Served on 981124 ML20155J1071998-11-0909 November 1998 NRC Staff Answer to North Atlantic Energy Svc Corp Motion for Leave to File Reply.* Staff Does Not Object to North Atlantic Energy Svc Corp Motion.With Certificate of Svc ML20155D0041998-10-30030 October 1998 Motion for Leave to File Reply.* Licensee Requests Leave to Reply to Petitioner 981026 Response to Licensee 981015 Motion to Terminate Proceedings.Reply Necessary to Assure That Commission Is Fully Aware of Licensee Position ML20155D0121998-10-30030 October 1998 Reply to Petitioner Response to Motion to Terminate Proceedings.* Licensee Views Segmentation Issue as Moot & Requests Termination of Subj Proceedings.With Certificate of Svc ML20155B1641998-10-26026 October 1998 Response to Motion by Naesco to Withdraw Applications & to Terminate Proceedings.* If Commission Undertakes to Promptly Proceed on Issue on Generic Basis,Sapl & Necnp Will Have No Objection to Naesco Motion.With Certificate of Svc ML20154K8751998-10-15015 October 1998 Motion to Withdraw Applications & to Terminate Proceedings.* NRC Does Not Intend to Oppose Motion.With Certificate of Svc ML17265A8071998-10-0606 October 1998 Comment on Integrated Review of Assessment Process for Commercial Npps.Util Endorses Comments Being Provided by NEI on Behalf of Nuclear Industry ML20154C8171998-10-0606 October 1998 Notice of Appointment of Adjudicatory Employee.* Notice Given That W Reckley Appointed as Commission Adjudicatory Employee to Advise Commission on Issues Related to Review of LBP-98-23.With Certificate of Svc.Served on 981006 CLI-98-18, Order.* Grants Joint Motion Filed by Naesco,Sapl & Necnp for Two Week Deferral of Briefing Schedule Set by Commission in CLI-98-18.With Certificate of Svc.Served on 9810061998-10-0505 October 1998 Order.* Grants Joint Motion Filed by Naesco,Sapl & Necnp for Two Week Deferral of Briefing Schedule Set by Commission in CLI-98-18.With Certificate of Svc.Served on 981006 ML20153H4471998-10-0101 October 1998 Joint Motion of Schedule Deferral.* Naesco,Sapl & Necnp Jointly Request Temporary Deferral of Briefing Schedule as Established by Commission Order of 980917 (CLI-98-18). with Certificate of Svc ML20154F9891998-09-29029 September 1998 License Transfer Application Requesting Consent for Transfer of Montaup Electric Co Interest in Operating License NPF-86 for Seabrook Station,Unit 1,to Little Bay Power Corp ML20154D7381998-09-21021 September 1998 Affidavit of FW Getman Requesting Exhibit 1 to License Transfer Application Be Withheld from Public Disclosure,Per 10CFR2.790 ML20153C7791998-09-18018 September 1998 Comment Supporting Proposed Rule 10CFR50 Re Reporting Requirements for Nuclear Power Reactors.Util Endorses NRC Staff Focus on Operability & Funtionality of Equipment & NEI Comments ML20151Z5611998-09-18018 September 1998 Order.* Pursuant to Commission Order CLI-98-18 Re Seabrook Unit 1 Proceeding,Schedule Described in Board 980904 Memorandum & Order Hereby Revoked Pending Further Action. with Certificate of Svc.Served on 980918 ML20151Y0331998-09-17017 September 1998 Order.* All Parties,Including Util,May File Brief No Later than 981007.Brief Shall Not Exceed 30 Pages.Commission May Schedule Oral Argument to Discuss Issues,After Receiving Responses.With Certificate of Svc.Served on 980917 ML20153E8771998-09-16016 September 1998 Comment Opposing Draft NUREG-1633, Assessment of Use of Potassium Iodide (Ki) as Protective Action During Severe Reactor Accidents. Recommends That NRC Reverse Decision to Revise Emergency Planning Regulation as Listed 1999-09-02
[Table view] |
Text
- _ _ _ _ - _ _ __
WOA oncMET NUMBER enoo.a urit rAc pqp m e ... ,..
y/ g - /
00CKETE0 USHRC UNITED STATES OF AMERICA 38 MW 19 P5 ;21 NUCLEAR REGULATORY COMMISSION ATOMIC SAFETY AND LICENSING BOARD . .-
00CXEi,v . .. cce" Before Administrative Judges:
Sheldon J. Wolfe, Chairman crr!Cr.EH?!C 'a 57l E Emmeth A. Luebke Jerry Harbour
) Docket Nos. 50-443-OL-1-R IN THE MATTER OF ) 50-444-OL-1-R
)
! PUBLIC SERVICE COMPANY OF ) (On-Site Emergency NEW;9AMPSHIRE ) Planning and Safety
) Issues)
(SEABROOK STATION, UNITS 1 and 2) )
) April 15, 1988 AMENDED CONTENTION OF ATTORNEY GENERAL JAMES M. SHANNON ON NOTIFICATION SYSTEM FOR MASSACHUSETTS Pursuant to this Board's order of March 25, 1988, ASLBP No.
88-558-01-OLR, and an allowed extension of time, the Mass AG submits the following amended contention with bases on the Applicants' Vehicular Alert and Notification System (VANS) and the backup airborne system for the Massachusetts portion of the Seabrook EPZ.
The sole sources of information on the VANS system available to the Mass AG are a February 26, 1988 letter from George S. Thomas of New Hampshire Yankee to the NRC, NYN-88025, and an April 1, 1988 Response to Request for Additional Information on the Public Alert and Notification System, 8804260052 880415 PDR ADOCK 05000443 G PDR.
3
])50
O*
NYN-88042. The letters provide a general and, in many respects, incomplete description of the VANS system. For example, the staging areas and acoustic locations have not been identified. Moreover, testing of the system apparently will not be accomplished until April 30, 1988. The Mass AG submits the following amended contention based on the limited information provided by the Applicants to date on the VANS system. Should the Applicants provide additional information, the Mass AG will file appropriate revisions or additional contentions.
CONTENTION AND BASES CONTENTION: Applicants have failed to comply with the provisions of 10 C.F.R. S50.47(b)(5) and Part 50, Appendix E, IV, D(3). The means they claim to have established to provide -
early notification and clear instruction to the populace of the Towns of Amesbury, Merrimac, Newbury, Newburyport, Salisbury and West Newbury, Massachusetts and SGlisbury State Beach Reservation in Salisbury, Massachusetts a*e inadequate.
BASES:
A. VANS System And Overlapping Siren Coverage The Applicants have indicated in a February 26, 1988 submission to the NRC (NYN-88025) as amended by the April 1, 1988 submission (NYN-88042) that their alert and notification syr, tem for the six Massachusetts communities within the Seabrook EPZ consists of the VANS vehicles and equipment l
, - . . . , -.,e v n.-- . . - - - .-n. . , - - - , _ _ - - - . - -
-functioning as fixed sirens; fixed siren coverage from sirens located in New Hampshire; and a helicopter mounted siren system as a backup system. This system has numerous deficiencies rendering it inadequate and unable to meet the provisions 'f 10 C.F.R. S50.47(b)(5) and Part 50, Appendix E, IV, D(3).
- 1. The VANS and the New Hampshire fixed sirens because of their locations, height, acoustic range and number, do not provide tone or message coverage for essentially 100 percent of the population in the Massachusetts plume exposure pathway EPZ at the sound pressure levels required in NUREG-0654 and FEMA-REP-10.
- 2. The Applicants are legally prohibited under local ordinances from operating their six staging areas and their VANS vehicles at the pre-selected acoustic locations. The specific laws and ordinances can be identified when the Applicants disclose the acoustic locations and staging areas.
- 3. The fourteen VANS locations are physically inaccessible to the VANS equipment.
- 4. The VANS vehicles are inadequate for their intended ,
t use. The vehicles cannot withstand and will not operate '
i l properly with the weights, amount and nature of equipment intended to be carried by the vehicles. The weight distribution with the siren fully extended will cause the l
equipment to fall and/or the lifting mechanism to bend or break under heavy wind or precipitation conditions. Moreover, the
__ ~ ..
telescopic crane will not reliably 115t the siren to its fully extended position because of the weight of the siren and the capacity of the crane.
- 5. The time needed for driver alert, dispatch, route transit, setup and activation in accordance with NRC regulations will exceed 15 minutes for many of the VANS vehicles in optimum weather conditions. The reasons for this include the time required to get vehicles on the road (which itself includes the time required to notify the driver, have the driver proceed to the vehicle, check out the vehicle and equipment, atart the vehicle and leave the staging area, along with other vehicles at the staging area), the distance to be traveled, the traffic that will be encountered, the setup time and the need for both alert signal and message capability within the 15 minute period. In poor weather, heavy traffic, and nighttime conditions the times needed to accomplish these tasks will increase.
- 6. Snow, icy and extreme cold weather conditions will impede extension of the sirens to their operational position, rotation and oscillation of the sirens during the tone and message modes and operation of the sirens themselves.
- 7. At a sound level of 134 dBC anyone within 100 feet of l
the siren during its operation will suffer severe hearing damage.
- 8. Because of the large size of the intended dispersion angle (60 degree 5), sound irregularities will occur within the coverage angles including gaps in sound coverage for certain areas. Moreover, the oscillation of the speaker assembly will cause gaps in coverage when the siren is used in its tone alert mode.
- 9. Listeners in areas where there is an overlap in sound coverage from 2 or more sirens, whether both sirens are in Massachusetts or one is in Massachusetts and one is in New Hampshire, will experience severe echo conditions, rendering any voice message unintelligible.
- 10. The Applicants have not indicated when and under what circumstances the tone alert mode or tne message mode will be used.
- 11. Sufficient drivers and backup drivers will not be otationed at the six staging areas to ensure 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> availability of the system. Moreover, the system will work reliably, if at all, only when each vehicle is manned by at least two people.
- 12. The system will encounter a substantial failure rate because many drivers will be unwilling to accomplish the
! assigned tasks during a real radiological emergency. The
- effect of this will be magnified in terms of system failure if l
only one person is assigned to each vehicle, l
t i .
l
[
0 *
- 13. The VANS system with its backup airborne system is extremely expensive. Funding of the system is not in the ordinary course of PSNH's business. Therefore, the bankruptcy court presiding over PSNH's bankruptcy must approve all expenditures by PSNH of its shace of these funds. It has not done so. Because the major issue in the bankruptcy is the future of the Seabrook plant, no decision will be made by the court on the expeaditure of funds for low-power testing until all parties are heard and the issues are fully analyzed and briefed. A decision on the issue, presently not scheduled for litigation, is at least many months off. No other joint owners have indicated that they will pay for PSNH's share of these funds. Therefore, the funds to pay for a full VANS and airborne backup system are not and will not in the near future be available.
- 14. The Applicants have not identified the equipment to be used for remote activation of the VANS sirens and, therefore, no conclusion can be reached concerning the reliability of the equipment. Moreover, the Applicants have not indicated whether the siren signals will be pre-recorded or broadcast to the remote locations and have not provided sufficient information to conclude
- hat in either event the equipment has adequate fidelity to ensure intelligibility.
I i
o .
B. Airborne Alerting System The Applicants have not identified the circumstances under which the backup airborne alerting system would be called into operation, the flight path it would take, whether tone or message mode would be used, the time necessary to complete a single operational run, or the areas the helicopter is intended to cover. This lack of information prevents this Board from making a finding that the airborne system meets NRC regulations and standards.
Based on the limited information provided, the system also has the following deficiencies:
- 1. One of the circumstances which might give rise to the need for a backup system, poor weather (and in particular high wind, heavy rain, snow, icy or. extreme cold conditions), is equally or more debilitating for the use of a helicopter.
- 2. The airborne system would not meet regulatory i
requirements for any sizable area in that it would not provide coverage within 15 minutes (because of the time needed for pilot alert, start-up, warmup, lift-off, travel to the predetermined route, and conducting an operational run), would not both sound a siren and issue a .nessage and would not sound the siren for the required 3 to 5 minutes.
- 3. A steady 3 to 5 0.inute tone alert capable of repetition cannot be accomplished with the airborne system for significant numbers of people even within the covered area because the l
4-speed necessary to provide that duration of a tone is too slow for extended operation of the aircraft.
- 4. Any attempted informational messages for the airborne siren will be garbled and unintelligible because of the strength and size of the speaker array and amplifier system, the height of the aircraft and the effect of the heJicopter's rotary blades.
- 5. The backup system will be subject to a substantial risk of failure because available pilots will be unwilling to accomplish their assigned tasks during a real radiological emergency.
JAMES M. SHANNON ATTORNEY GENERAL COMMONWEALTH OF MASSACHUSETTS
/ h Stephen A./Conas Assistant Attorney General l Office of the Attorney G*ner&1 i
Public ?rotection Bureau i
One Ashburton Place l Boston, Massachusetts 02108 (617) 727-4378 l
l
i 00tKETC0 UNITED STATES OF AMERICA USNhc NUCLEAR REGULATORY COMMISSION ATOMIC SAFETY AND LICENSING BOA $ AR? 1 Before Administrative Judges:
Sheldon J. Wolfe, Chairman OFFICE N SE 2r IAf r Emmeth A. Luebke 00CKEimu a 3Eimci, Jerry Hrrbour BRANCH IN THE MATTER OF
) Docket Nos. 50-443-OL-1-R
)
50-444-OL-1-R
)
PUBLIC SERVICS COMPANY OF ) (On-Site Emergency NEW HAMPSHIRE ) Planning and Safety
) Issues)
(SEABROOK STATION, UNITS 1 and 2) )
) April 15, 1988 CERTIFTCATE OF SERVICE I, Stephen A. Jonas, hereby certify that on April 15, 1988, I made service of the within document, by mailing copies thereof, postage prepaid, by first class mail, to:
Alan S. Rosenthal, Chairman Judge Emmeth A. Luebke A5.omic Safety and Licensing Atomic Safety and Licensing Board Appeal Panel Panel U.S. Nuclear Regulatory 5500 Friendship Boulevard Commission Apartment 1923N East West Towers Building Chevy Chase, MD 20815 4350 East West Highway Bethesda, MD 20814 Dr. Jerry Harbour Atomic Safety and Licensing Board Thomas S. Moore Panel Atomic Safety and Licensing U.S. Nuclear Pegulatory Commission Appeal Panel East West Towers U.S. Nuclear Regulatory 4350 East West Highway Commission Bethesda, MD 20814 1
East West Towers Building
(
4350 East West Highway Howard A. Wilber Bethesda, MD 20814 Atomic Safety and Licensing Appeal Panel Administrative Judge Sheldon J. U.S. Nuclear Regulatory Commission i Wolfe, Esquire, Chairman East West Towers Building l Atomic Safety and Licensing 4350 East West Highway i
Board Panel Bethesda, MD 20814 U.S. Nuclear Regulatory Commission Mr. Ed Thomas i
East West Towers Building FEMA, Region I 4350 East West Highway 442 John W. McCormack Post Office
- Bethesda, MD 20814 Courthouse Post Office Square Boston, MA 02109 V .
i' Robert Carrigg, Chairman Senator Gordon J. Humphrey l Board of Selectmen U.S. Senate l Town Office Washington, DC 20510 l Atlantic Avenue Attention: Tom Burack l North Hampton, NH 03862 l Senator Gordon J. Humphrey Diane Curran, Esquire One Eagle Square, Suite 507 Andrea C. Ferster, Esquire Concord, NH 03301 Harmon & Weiss Attention: Herb Boynton
- suite 430 2001 S Street, N.W. Mr. Thomas F. Powers, III Washington, DC 20009 Town Manager Town of Exeter Stephen E. Merrill, Esquire 10 Front Street Attorney General Exeter, NH 03833 George Dana Bisbee, Esquire Assistant Attorney General Sherwin E. Turk, Esq.
Office of the Attorney General Office of General Counsel 25 Capitol Street U.S. Nuclear Regulatory Commission Concord, NH 03301-6397 One White Flint North, 15th Floor 11555 Rockville Pike Atomic Safety & Licensing Rockville, MD 20852 Board Panel U.S. Nuclear Regulatory Robert A. Backus, Esquire Commission Backus, Meyer & Solomon East West Towers Building 116 Lowell Street 4350 East West Highway P.O. Box 516 Bethesda, MD 20814 Manchester, NH 03105 Atomic Safety & Licensing Mr. J.P. Nadeau Appeal Board Panel Selectmen's Office U.S. Nuclear Regulatory 10 Central Road Commission Rye, NH 03870 Washington, DC 20555 Thomas G. Dignan, Esquire Philip Ahrens, Esquire George H. Lewald Asssistant Attorney General Roper & Gray Department of the Attorney 225 Franklin Street General Boston, MA 02110 Augusta, ME 04333 Mr. Calvin A. Canney Paul McEachern, Esquire City Manager Matthew T. Brock, Esquire City Hall Shaines & McEachern 126 Daniel Street 25 Maplewood Avenue Portsmouth, NH 03801 P.O. Box 360 Portsmouth, NH 03801 Mr. Angie Machiros Chairman of the Board of Mrs. Sandra Gavutis Selectmen Chairman, Board of Selectmen Town of Newbury RFD 1 - Box 1154 Newbury, MA 01950 Route 107 Kensington, NH 03827
i 4
Mr. Peter S. Matthews Judith Mizner, Esquire Mayor Silverglate, Gertner, Baker, Fine, City Hall Good & Mizner Newburyport, MA 01950 88 Broad Street Boston, MA 02110 Mr. William S. Lord Board of-Selectmen Brentwood. Board of Selectmen Town Hall - Friend Street RFD Dalton Road Amesbury, MA 01913 Brentwood, NH 03833 H. Joseph Flynn, Esquire Richard A. Hampe, Esquire Office of General Counsel- Hampe and McNicholas Federal Emergency Management 35 Pleasant Street Agency Concord, NH 03301 500 C. Street, S.W.
Washington, DC 20472 Charles P. Graham, Esquire McKay, Murphy and Graham Gary W. Holmes, Esquire 100 Main Street Holmes & Ells Amesbury, MA 01913 47 Winnacunnet Road Hampton, NH 03841 Docketing & Service U.S. Nuclear Regulatory Commission Washington, DC 205 5 5
/G s
/ (2 f St'eph(n A. Jo6as Assistant Attorney General Deputy Chief Public Protecti^7 Bureau i DATED: April 15, 1988
.