ML20206B792

From kanterella
Revision as of 15:19, 6 December 2021 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Revises Composition of 870708 Restart Assessment Panel
ML20206B792
Person / Time
Site: Pilgrim
Issue date: 10/08/1987
From: Kane W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Russell W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML20206B722 List:
References
FOIA-88-198 NUDOCS 8811160021
Download: ML20206B792 (2)


Text

..- . . .. ,_ ., .. . . .

00T 081987 MEMORANDUM FOR: William T. Russell Regional Administretor l-FROM: William F. Kane, Director I Division of Reactor Projects i

^

.dWECT: P!LGRIM RESTART ASSES $ MENT PANEL COMPOSITION I This memorandum revises the composition of Pilgrim Restart Assessment Panel as  ;

f. described in my memorandum of July 8,1987. At that time, the Deputy Director l of the Divis'en of Reactor Projects (ORP) was acting also as the cornizant *}

Projects Branch Chief.  !

Now that a permanent Projects Branch Chief has been named, the Deputy Director, i DRP will remain on the panel (as Chairman) and the Projects Branch Chief will  !

also be on that panel, j i

There are no other changes to penel composition or functions. }

I j de), / - <

W111 tam 4.Kane, Director Division of Reactor Projects  !

=

Approved: ,

William T. Russell  !

Regional Administrator t Date: _

/s/([r/ l

[

i l

l i

I I

t I

l t

I i

I J

B811160021 081025 5 POR FOIA JOHNSONSS-198 PDR I h  !

t

t

.i n r.n4 e., Winia, T. Russ.n  :

00T 081987 i t

4 bec: )

J. Allan. R! l

5. Collins, RI i

' R. Bellamy, RI

< J. Durr, RI J. Wiggins, R!
' R. Bleugh, RI i L. Doorflein, R! l R. Fwhrootster, R!

B. Boger, NRR R. Westman NRR  !

l

  • i I

1 r t 4

(

l.

. r

' I i I 9

s j 2

i s

i 1

1 L

1 I [

i i 1

l 1

I f

i j

4 i

.f

t i  !

! l l

L e

I

_